STRUKTUR KOMPOSIT – VC

LAPORAN EVALUASI AKHIR STRUKTUR KOMPOSIT

Perhitungan Shear Connector Jembatan Penyebrangan

Disusun Oleh :

Zahra Nandi Aquila

NRP. 2035211067

Dosen Pengampu :

Ir. Ibnu Pudji Rahardjo ,M. S

PROGRAM STUDI TEKNOLOGI REKAYASA PENGELOLAAN DAN


PEMELIHARAAN BANGUNAN SIPIL
DEPARTEMEN TEKNIK INFRASTRUKTUR SIPIL

FAKULTAS VOKASI
INSTITUT TEKNOLOGI SEPULUH NOPEMBER SURABAYA
DAFTAR ISI

COVER ................................................................................................................................ 1

DAFTAR ISI ......................................................................................................................... 2

I. SOAL ............................................................................................................................ 3

II. PERHITUNGAN ........................................................................................................... 4

1. Metode Unshoring ...................................................................................................... 5

2. Metode ASD AISC ..................................................................................................... 8

3. Metode LRFD AISC ................................................................................................. 11

III. GAMBAR DETAIL ..................................................................................................... 13


I. SOAL

Sebuah jembatan penyeberangan dari struktur komposit WF baja dan plat beton
dengan sistem perletakan sederhana ( sendi-rol).

Panjang bentang L = 24 m
L = 25 m
Lebar plat jembatan B = 4 m
Jarak antar girder s = 2 m
Mutu beton fc' = 30 Mpa
Mutu baja WF = BJ 37 (fy 240 Mpa)
Dipakai WF 900.300.16.28 = As = 309.8 cm2
Ix = 411.000 cm4
q bs = 243 kg/m'

Proses pelaksanaannya tidak menggunakan penyokong (unpropped)

1. Rencanakan shear connector (STUD CONNECTOR) berdasarkan kapasitas


bahan beton atau baja (cara ASD AISC), perhatikan syarat/batasan jarak shear
connector (SNI/AISC).
2. Rencanakan shear connector (STUD CONNECTOR) berdasarkan kapasitas
bahan beton atau baja (cara LRFD AISC), perhatikan syarat/batasan jarak
shear connector (SNI/AISC).
3. Gambarkan dengan CAD (format pdf) hasil perencanaan saudara.

II. PERHITUNGAN
 Diketahui :
fc’ : 30 MPa
fy : 240 MPa
Lebar Plat : 2000 mm
Tebal Plat : 300 mm
Bentang : 25 m
WF 900.300.16.18
H : 900 mm A : 309,8 cm2
B : 300 mm lx : 411.000 cm4
tf : 28 mm ly : 12.600 cm4
tw : 16 mm q : 243 kg/m

 q LL  p LL
𝐿𝑒𝑏𝑎𝑟 𝑃𝑙𝑎𝑡 1,4 ×4,4 × 𝐿𝑒𝑏𝑎𝑟 𝑃𝑙𝑎𝑡
: × 0,9 :
1000 1000
2000 1,4 ×4,4 × 2000
: 1000 × 0,9 : 1000

: 1,8 t/m : 12,82 t


 q DL
𝑞 𝑏𝑠 𝑇𝑒𝑏𝑎𝑙 𝑃𝑙𝑎𝑡 𝐿𝑒𝑏𝑎𝑟 𝑃𝑙𝑎𝑡 243 300 2000
:1000 + ( × ) × 2,5 : 1000 + (1000 × 1000 ) × 2,5
1000 1000

: 1,743 t/m
 Tegangan Ijin Tekan Beton  Tegangan Ijin Baja
fcc : 0,45 × 𝑓𝑐 ′ fa
2
: 3 × 𝑓𝑦′
: 0,45 × 30 2
: 3 × 240
: 14 MPa
: 160 MPa
 Ec’ Beton : 4700 × (𝑓𝑐′)0,5
: 4700 × (30)0,5
: 25,743 MPa
 Es Baja : 200.000 MPa
𝐸𝑠 200.000
 n : 𝐸𝑐′ : 25,743
: 7,769 : 257,429 mm
𝑩𝒆 2.000
 : 7,769
𝒏

1. Metode Unshoring
Mencari Garis Netral Komposit
𝑇𝑝 𝑇𝑝 𝐻 𝑇𝑝
 𝑦𝑏 = (Be × × ( 2 + 𝐻) + 𝐴 × 100 × 2 ) : (𝐵𝑒 × + 𝐴 × 100)
𝑛 𝑛

300 300 900


(2000 × 7,769 × ( 2 + 900) + 309,8 × 100 × 2 )
𝑦𝑏 =
300
(2000 × 7,769 + 309,8 × 100)

𝑦𝑏 = 878,222 𝑚𝑚
 𝑦𝑡 = 𝑡𝑝 + 𝐻 − 𝑦𝑏
𝑦𝑡 = 300 + 900 − 878,22
𝑦𝑡 = 321,778 𝑚𝑚
 𝑰𝒌𝒐𝒎𝒑𝒐𝒔𝒊𝒕

2
1 𝑡𝑝3 𝑡𝑝 𝑡𝑝 2
𝐻
= × 𝐵𝑒 × + 𝐼𝑥 × 10.000 + 𝐵𝑒 × × ( − 𝑦𝑡) + 𝐴 × 100 × ( − 𝑦𝑏)
12 𝑛 𝑛 2 2
2
1 3003 300 300
= × 2000 × + 411.000 × 10.000 + 2000 × ×( − 321,778)
12 7,769 7,769 2

2
900
+309,8 × 100 × ( − 878,222)
2

= 12.648.990.838 𝑚𝑚 4

 M max akibat DL :
1 𝑡𝑝 𝑞
= × 𝐵𝑒 × × 2,5 + × (𝐿)2
8 100000 1000
1 300 243
= × 2000 × × 2,5 + × (25)2
8 100000 1000
= 131,172 𝑡 − 𝑚 ~1.361.718.730 𝑁 − 𝑚𝑚
 M max akibat LL :

1 1
= × (𝑞 𝐿𝐿 × 𝐿)2 + × 𝑝 𝐿𝐿 × 𝐿
8 4

1 1
= × (1,8 × 25)2 + × 12,82 × 25
8 4

= 217,625 𝑡 − 𝑚 ~2.176.250.000 𝑁 − 𝑚𝑚
Kontrol Tegangan Saat Pelaksanaan
𝐻
𝑀 𝐷𝐿×
 fwf top 1 : 𝐼𝑥 ×10.000
2

900
1.361.717.750×
2
: 410.000 ×10.000

: 149,09 𝑁/𝑚𝑚2
𝐻
𝑀 𝐷𝐿×
 fwf bottom 1 : 𝐼𝑥 ×10.000
2

900
1.361.717.750×
2
: 410.000 ×10.000

: 149,09 𝑁/𝑚𝑚2

Kontrol Tegangan Akibat Beban Hidup


𝑦𝑡
 fc top : 𝑀 𝐿𝐿 × ÷ 𝐸𝑠
𝐼 𝑘𝑜𝑚𝑝𝑜𝑠𝑖𝑡
321,778
: 2.167.250.000 × 12.648.990.838 ÷ 200.000
: 7,13 𝑁/𝑚𝑚 2
𝑦𝑡−𝑡𝑝
 fwf top 2 : 𝑀 𝐿𝐿 × 𝐼 𝑘𝑜𝑚𝑝𝑜𝑠𝑖𝑡
321,778−300
: 2.167.250.000 × 12.648.990.838

: 3,75 𝑁/𝑚𝑚 2
𝑦𝑏
 fwf bottom 2 : 𝑀 𝐿𝐿 × 𝐼 𝑘𝑜𝑚𝑝𝑜𝑠𝑖𝑡
878,222
: 2.167.250.000 × 12.648.990.838

: 151,10 𝑁/𝑚𝑚2

Kontrol Tegangan Saat Service


𝐻
𝑀 𝐷𝐿×
 fc top : 𝐼𝑥 2
10.000
(7,13 < 14 )

: 7,13 𝑁/𝑚𝑚 2 (OK < TEG. IJIN)


 fwf top : fwf top 1 + fwf top 2
: 149,09 + 3,75 (152,84 < 160 )
: 152,84 𝑁/𝑚𝑚 2 (OK < TEG. IJIN)
 fwf bottom : fwf bottom 1 + fwf bottom 2
: 149,09 + 151,10 (300,19 > 160 )
: 300,19 𝑁/𝑚𝑚 2 (NOT OK > TEG. IJIN)

Perhitungan Tambahan Plat baja 1 Lapis

Posisi pengehentian penebalan plat flange a =7m

t plat tambahan (tt1) = 16 mm

b plat tambahan (bt1) = 275 mm

Ra DL = 21,7875 t

MDL = 109,809 t-m

Ra LL = 31,3704 t

MLL = 175,493 t-m

Yb = 859,59 mm

Yt = 356,41 mm

I Komposit = 12766597351mm4

- Kontrol Tegangan Saat Pelaksanaan


f wf top 1 = 149,09 N/mm2
f wf bottom 1 = 149,09 N/mm2
- Kontrol Tegangan Akibat Beban Hidup
fc top = 6,55 N/mm2
f wf top 2 = 12,02 N/mm2
f wf bottom 2 = 143,42 N/mm2
- Kontrol Tegangan Saat Service
fc top = 6,55 N/mm2 (OK< dari teg ijin)
f wf top = 161,11 N/mm2 (OK< dari teg ijin)
f wf bottom = 292,51 N/mm2 (Not OK< dari teg ijin)
Sudah dilakukan penambahan plat, tetapi f wf bottom tetap tidak memenuhi tegangan ijin.

Maksimum M yang dihasilkan oleh beban mati adalah 136,178 t-m dan M maksimum
yang dihasilkan oleh beban hidup adalah 217,625 t-m. Karena menggunakan metode
unshoring, gelagar menanggung seluruh beban mati sebelum menjadi komposit, dan
nilai kontrol tegangan saat pelayanan pad fwf bottom melebihi tegangan izin. Hal ini
disebabkan oleh bentang yang terlalu panjang dan keterbatasan kemampuan baja
untuk menopangnya.

2. Metode ASD AISC


Perencanaan shear connector di bagi menjadi 5 segmen dan dipasang 3
shear connector tiap jarak dengan variasi SC
Perhitungan :

1
 V DL = 2 × 𝐿 × 𝑞 𝐷𝐿
1
= 2 × 25 × 1,743

= ±21, 788 𝑡𝑜𝑛


1
 V LL = 2 × 𝐿 × 𝑞 𝐷𝐿 + 𝑝 𝐿𝐿
1
= 2 × 25 × 1,8 + 12,32

= ±34, 82 𝑡𝑜𝑛
 V DL + LL = 𝑽 𝑫𝑳 + 𝑽 𝑳𝑳
= 21,788 + 32,82
= 56, 608 𝑡𝑜𝑛
2,5+2,5+2,5+2,5
 V per 2,5 m = 𝐿 × 𝑉 𝐷𝐿
2

= 45,286 𝑡𝑜𝑛
Hasil perhitungan daya dukung shear connector
D Asc Qn (1) Qn(2)
mm mm2 kN kN
13 132.732 58.32 47.78
16 201.062 88.35 72.38
19 283.529 124.58 102.07

𝜋
 Asc = 4 × 𝐷2
𝜋
= 4 × 132

= 132,73 mm2
 Vu = Qn (1)
= 𝐴𝑠𝑐 × √𝑓𝑐′ × 𝐸𝑐′ ÷ 1000 ÷ 2

= 132,73 × √30 × 25,743 ÷ 1000 ÷ 2


= 58,32 kN
1,5
 Qn (2) = 𝐴𝑠𝑐 × 𝑓𝑦 × 1000
1,5
= 132,73 × 240 × 1000
= 47,78 kN
𝐻 𝑡𝑓 𝐻−2×𝑡𝑓 𝐻−2×𝑡𝑓
 Swf =2 × (𝐵 × 𝑡𝑓 × ( 2 − 2 ) + ( ) × 𝑡𝑤 × ( ))
2 4

Vh
Vu (ton) t (Mpa)
(kN)
Bagian Dsc (mm) L'(m) Qn (N)
D.S/
gaya Vu t.b.L'
(b.I)
1 3 D13 2.5m 56.61 4.67 47.78
3.503
2 3 D13 2.5m 45.29 3.74 47.78
2.803
3 3 D13 2.5m 33.96 2.80 47.78
2.102
4 2 D13 2.5m 22.64 1.87 47.78
1.401
5 1 D13 2.5m 11.32 0.93 47.78
701

n= Jarak L Syarat JarakB Syarat


Jumlah
Vh/(3xQn) (mm) jarak L (mm) jarak B
75 100 TRUE 124 TRUE 75 D13
60 125 TRUE 124 TRUE 60 D13
45 150 TRUE 124 TRUE 45 D13
30 150 TRUE 248 TRUE 30 D13
15 150 TRUE 248 TRUE 15 D13
225 D13

𝑉𝑢 × 10000 × 𝑆𝑤𝑓
 t : 𝑏×𝐼𝑥×10000
56,61 × 10000 × 10,17
: 300 × 410.000 × 10000

: 4,67 MPa
𝐵
 Vh : 𝑡 × 𝐿 × 1000 ×
1000
300
: 4,67 × 25 × 1000 × 1000
: 3,503 MPa
𝑉ℎ
 n : 3×𝑄𝑛
3,503
: 3×47,78

: 75
𝐿′ 1000 𝐵−4×13
 L : 𝑛 ×  B :
25 2
3
300−4×13
2,5 1000 :
: 75 × 2
25
3
: 124 mm
: 100 mm
 Syarat Jarak Shear Connrctor
Tranversal : 4D < s < bf
: 4 × 13 < 300
: 52 < 𝑠 < 300
Longitudinal : 6D < s < 8tp
: 6 × 13 < 8 × 300
: 78 < 𝑠 < 2400
∴ Jumlah shear connector dengan cara ASD di pakai 225 D13. Di pasang ½
bentang dengan variasi :
 2,5 meter pertama 3 D13 dengan jarak 100 mm
 2,5 kedua 3 D13 dengan jarak 125 mm
 2,5 ketiga 3 D13 dengan jarak 150 mm
 2,5 ke empat 3 D13 dengan jarak 150 mm
 2,5 ke lima 3 D13 dengan jarak 150 mm

3. Metode LRFD AISC


Shear Connector didesain berdasarkan nilai terkecil dari 2 persamaan ini

 𝐶𝑐 ′ = 0,85 × 𝑓𝑐 ′ × 𝐵𝑒 × 𝑡𝑝
𝐶𝑐 ′ = 0,85 × 30 × 2000 × 300
𝐶𝑐 ′ = 15.300.00 𝑁
 𝑇 = 𝐴 × 𝑓𝑦
𝑇 = 309,8 × 100 × 240
𝑇 = 7.435.200 𝑁

Sehingga nilai Vh = 7.435.200 N


Hasil perhitungan daya dukung Shear Connector

D Asc Qn (1) Qn(2)


mm mm2 kN kN

13 132.732 58.32 47.78

16 201.062 88.35 72.38

19 283.529 124.58 102.07

Jumlah shear connector dipasang dari Mmax sd M=0 (per sisi balok) :

D Qn n Jarak L Syarat L
mm kN Vh/Qn mm
13 47.78 156 225 TRUE
16 72.38 105 350 TRUE
19 102.07 75 500 TRUE

Perhitungan

𝑉ℎ
 L : 𝑄𝑛
7.435.200
: 47,78

: 225 𝑚𝑚
 Syarat Jarak Shear Connrctor
Tranversal : 4D < s < bf
: 4 × 13 < 300
: 52 < 𝑠 < 300
Longitudinal : 6D < s < 8tp
: 6 × 13 < 8 × 300
: 78 < 𝑠 < 2400
∴ Jumlah shear connector dengan cara LRFD di pakai 156 D13. Di
pasang ½ bentang dengan jarak 225 meter.
III. GAMBAR DETAIL
Lampiran Selanjutnya