Anda di halaman 1dari 45

Daftar Pembesian Beton

PEKERJAAN : PEMBANGUNAN RUMAH GURU MAN IC ( MADRASAH ALIYAH NEGERI INSAN CENDEKIA )
LOKASI : KEC. SAKRA - KAB. LOMBOK TIMUR
TAHUN ANGGARAN : 2017
JMH BEGEL PJG SENGKANG
Lebar Volume Jumlah / Dia'' Tul. Pokok Tul. Pokok Begel Total Total
NO JENIS PEKERJAAN Begisting Beton dalam Pembesiannya Besi Ulir Besi polos Besi polos Besi Ulir Besi Polos Jmh beugel Pjg sengkang
M2 Per - M³ Kg Kg Bh M
1 2 3 4 5 6 7 8 9 10 11 12

### SLOOF 15/20 6.67 33.33 4Ø12mm 118.37 170.98


Bg, Ø8 -15 52.61 222.22 0.60

### SLOOF 20/30 5.00 16.67 6D16mm 157.82 157.82 61.65


Bg, Ø10 -15 61.65 111.11 0.90

### KOLOM 25/50 12.00 8.00 12D19mm 213.65 238.91 69.05


2D16mm 25.25
Bg, Ø10 -10 69.05 80.00 1.40

### KOLOM 25/40 13.00 10.00 10D19mm 222.56 254.12 73.98


2D16mm 31.56
Bg, Ø10 -10 73.98 100.00 1.20

### KOLOM 25/25 16.00 16.00 8D16mm 202.01 202.01 88.78


Bg, Ø10 -10 88.78 160.00 0.90

### KOLOM SIRIP 10/60 23.33 16.67 8D12mm 118.37 118.37 92.06
Bg, Ø8 -10 92.06 166.67 1.40

Balok beton
1 BALOK 20/30 9.33 16.67 6D16mm 157.82 157.82 61.65
Bg, Ø10 -12,5 61.65 111.11 0.90

2 BALOK 20/35 11.14 14.29 8D16mm 180.37 180.37 70.46


Bg, Ø10 -12,5 70.46 114.29 1.00

3 BALOK 25/75 8.69 5.33 11D19mm 130.57 147.40 57.18


2D16mm 16.83
Bg, Ø10 -12,5 57.18 46.38 2.00

4 BALOK 25/60 8.87 6.67 10D19mm 148.37 169.41 52.61


2D16mm 21.04
Bg, Ø10 -12,5 52.61 53.33 1.60

5 BALOK KONSOL 20/25 14.00 20.00 6D16mm 189.39 189.39


Bg, Ø8 -12,5 50.50 160.00 0.80

6 BALOK GANTUNG 10/20 25.00 50.00 4D12mm 177.55 177.55 94.69


Selasar Bg, Ø8 -12,5 94.69 400.00 0.60

7 BALOK ANAK 15/20 13.67 33.33 4D13mm 138.92 138.92 63.13


Selasar Bg, Ø8 -12,5 63.13 266.67 0.60

8 BALOK RING 15/20 18.33 33.33 4D12mm 118.37 118.37 63.13


Bg, Ø8 -12,5 63.13 266.67 0.60

Plat beton
1 PLAT MEJA T.6CM 16.67 Bg, Ø8 -15 46.03 92.06
Besi tunggal Bg, Ø8 -15 46.03

2 PLAT SUNSCREN T.8CM 12.50 Bg, Ø10 -15 53.94 88.47


Besi tunggal Bg, Ø8 -15 34.52

3 PLAT DAK T.10CM 10.00 Bg, Ø10 -12,5 52.40 85.94


Besi tunggal Bg, Ø8 -12,5 33.54

4 PLAT DAK T.12CM 8.33 Bg, Ø10 -10 102.75 102.75


Besi tunggal

5 PLAT LANTAI T.12CM 8.33 Bg, Ø10 -12,5 82.20 134.808


Besi rangkap Bg, Ø8 -12,5 52.61

6 PLAT LANTAI T.15CM 6.67 Bg, Ø10 -12,5 65.76 131.52


Besi rangkap Bg, Ø10 -12,5 65.76
Disetujui Oleh :
Pejabat Pembuat Komitmen (PPK)

LALU MAWAR, SE.


Nip :19571231 198301 1 003

Mengetahui :
Kepala Dinas Perindustrian Dan Perdagangan
Kabupaten Lombok Barat

H. JOKO WIRANTO, SE
Nip :19581210 198503 1 014
PERHITUNGAN VOLUME PEKERJAAN
:
:
:

URAIAN PERHITUNGAN VOLUME HASIL PERHITUNGAN


NO URAIAN PEKERJAAN GAMBAR/SKETSA KET
PEKERJAAN M¹ M² M³ Buah Ls
1 2 3 4 5 6 7 8 9 10
I PEKERJAAN PERSIAPAN
1 Pembersihan Lahan Luas Lahan = 11m x 20m = 220m² 220
2 Pemasangan Bouwplank Panjang Bouplank = ((8.5m+2m)+(6m+2m)) x 2sisi 37
3 Penyediaan Air Kerja = 37m¹ 1
4 Administrasi & Dokumentasi 1

II PEKERJAAN GALIAN TANAH & URUGAN


1 Galian Tanah Pondasi
Panjang Total Pondasi 16.00
Tinggi 0.85
Lebar 0.9
Volume Total = (0,85 x 0,9)m² x 15.57m¹ 12.24

2 Urugan Tanah Kembali


Volume Total = 1/4 x 11.91 m³ 3.06

3 Urugan Pasir Dibawah Pondasi


Panjang Total Pondasi 16
Tinggi 0.05
Lebar 0.9
Volume Total = (0,05 x 0,9) m² x 15.57¹ 0.72

4 Urugan Pasir Dibawah Lantai


a). Tipe I
Luas Bangunan = 45,3 m² 45.3
Tebal 0.2
Volume = 0,2 m¹ x 45,3 m² 9.06
b). Tipe II
Luas Bangunan = 9,45 m² 9.45
Tebal 0.1
Volume = 0,1 m¹ x 9,45 m² 0.945
Volume Total 10.005

III PEKERJAAN PASANGAN & PLESTERAN


1 Pasangan Batu Kosong/Aanstamping
Panjang Total Pondasi 16
Tinggi 0.2
Lebar 0.9
Volume Total = (0,1 x 0,9) m² x 55,65 m¹ 2.88

2 Pasangan Pondasi Batu Karang


a). Tipe I
Panjang Pondasi 16
Lebar Atas Pondasi 0.3
Lebar Bawah Pondasi 0.7
Tinggi 0.6
Volume = (((0,3+0,7) m¹ x 0,6 m¹)/2) x 45,1 m¹ 4.8
b). Tipe II
Panjang Pondasi 10.55
Lebar Atas 0.225
Lebar Bawah 0.7
Tinggi 0.6
Volume = (((0,225+0,7) m¹ x 0,6 m¹)/2) x 10,55 m¹ 2.9276
Volume Total 7.73

3 Pasangan Tembok Biasa


a). Luas Kusen
a). Tipe P1
Jumlah 2
Tinggi 2.05
Lebar 0.9
Luas = (2,05 x 0,9) m² x 2 unit 3.69
URAIAN PERHITUNGAN VOLUME HASIL PERHITUNGAN
NO URAIAN PEKERJAAN GAMBAR/SKETSA KET
PEKERJAAN M¹ M² M³ Buah Ls
1 2 3 4 5 6 7 8 9 10
b). Tipe P2
Jumlah 2
Tinggi 2.05
Lebar 1
Luas = (2,05 x 1) m² x 2 unit 4.1
c). Tipe P3
Jumlah 1
Tinggi 2.05
Lebar 0.8
Luas = (2,05 x 0,8) m² x 1 unit 1.64
d). Tipe J1
Jumlah 1
Tinggi 1.75
Lebar 2.32
Luas = (1,75 x 2,32) m² x 1 unit 4.06
e). Tipe J2
Jumlah 1
Tinggi 1.65
Lebar 1.35
Luas = (1,65 x 1,35) m² x 1 unit 2.2275
f). Tipe J3
Jumlah 1
Tinggi 1.15
Lebar 1.55
Luas = (1,55 x 1,15) m² x 1 unit 1.7825
g). Tipe J4
Jumlah 2
Tinggi 1.15
Lebar 0.7
Luas = (0,7 x 1,15)m² x 2 unit 1.61
h). Tipe BV1
Jumlah 3
Tinggi 0.5
Lebar 0.74
Luas = (0,74 x 0,5) m² x 3 unit 1.11
i). Tipe BV2
Jumlah 2
Tinggi 0.5
Lebar 0.9
Luas = (0,9 x 0,5) m² x 2 unit 0.9
j). Tipe BV3
Jumlah 7
Tinggi 0.5
Lebar 0.42
Luas = (0,42 x 0,5) m² x 7 unit 1.47
k). Tipe BV4
Jumlah 1
Tinggi 0.5
Lebar 1.53
Luas = (1,53 x 0,5) m² x 1 unit 0.765
l). Tipe Pintu Cor
Jumlah 1
Tinggi 2.5
Lebar 1.35
Luas = (1,35 x 2,5) m² x 1 unit 3.375
Luas Total 26.73

b). Pasangan Tembok Biasa

Tinggi 3.775
Panjang 9.2
Luas = (9,2 x 3,775) m² 34.73

Tinggi 3.625
Panjang 6.5
Luas = (6,5 x 3,625) m² 23.5625

Tinggi 4.07
Panjang 8.24
Luas = (8,24 x 4,07) m² 33.5368

Tinggi 3.65
Panjang 4.33
Luas = (4,33 x 3,65) m² 15.8045
URAIAN PERHITUNGAN VOLUME HASIL PERHITUNGAN
NO URAIAN PEKERJAAN GAMBAR/SKETSA KET
PEKERJAAN M¹ M² M³ Buah Ls
1 2 3 4 5 6 7 8 9 10
Tinggi 3.3
Panjang 7.33
Luas = (7,33 x 3,3) m² 24.189

Tinggi 3.2
Panjang 9.5
Luas = (9,5 x 3,2) m² 30.4
Luas Total Pas. Tembok Kotor 162.223
Luas Total Pas. Tembok Biasa 135.493
= Pas. T. Kotor - Luas Kusen
c). Gewel
a). Gewel 1
Tinggi 1.225
Panjang 3.1
Luas= 1/2 x (1.225m x 3.1m) 1.89875
b). Gewel 2
Tinggi 1.375
Panjang 3.5
Luas= 1/2 x (1.375m x 3.5m) 2.40625
c). Gewel 3
Tinggi 1.27
Panjang 4.17
Luas= 1/2 x (1.27m x 4.17m) 2.64795
d). Gewel 4
Tinggi 1.69
Panjang 4.33
Luas= 1/2 x (1.67m x 4.33m) 3.65885
e). Gewel 5
Tinggi 1.7
Panjang 4.33
Luas= 1/2 x (1.7m x 4.33m) 3.6805
Luas Total Gewel 14.2923
Luas Total Pas. Tembok & Gewel 149.785

4 Plesteran Tembok Biasa


a). Pasangan Tembok
Luas Total Tembok Biasa 135.493
Luas Plesteran Tembok 270.986
b). Pasangan Gewel
Luas Total Gewel 14.2923
Luas Plesteran Gewel 14.2923
Luas Total Plesteran Tembok 285.278

5 Plesteran Pondasi Tepi Luar


Tinggi Pondasi 0.6
Panjang 29
Luas Total = 0.6m x 29m 17.4

6 Plesteran Beton Campuran


a). Kolom Teras
Jumlah 14
Tinggi 3
Lebar 0.15
Tebal 0.05
Luas= ((0.15m+0.05m)x2sisi)x3mx14bh 16.8
b). Cor Beton Teras Depan
Panjang 2
Lebar 3
Luas = (2m x 3m) x 2 sisi 12

Panjang 1
Lebar 3.5
Luas = (1m x 3.5m) x 2sisi 7

Panjang 9.15
Lebar 0.1
Luas = (9.15m x 0.1m) 0.915
Luas Total 19.915
c). Cor Beton Teras Belakang
Panjang 3
Lebar 1.15
Luas = (1.15m x 3m) x 2sisi 6.9
URAIAN PERHITUNGAN VOLUME HASIL PERHITUNGAN
NO URAIAN PEKERJAAN GAMBAR/SKETSA KET
PEKERJAAN M¹ M² M³ Buah Ls
1 2 3 4 5 6 7 8 9 10
Panjang 4.15
Lebar 0.1
Luas = 4.15m x 0.1m 0.415
Luas Total 7.315

d). Konsol
a). Konsol Depan
Panjang 2.32
Lebar 0.4
Luas = (2.32m x 0.4m) x 2sisi 1.856

Panjang 3.22
Lebar 0.1
Luas = 3.22m x 0.1m 0.322

Panjang 2.32
Lebar 0.1
Luas = (2.32m x 0.1m) x 3sisi 0.696
Luas Total 2.874
b). Konsol Samping Kanan
Panjang 3.69
Lebar 0.5
Luas = (3.69m x 0.5m) x 2sisi 3.69
Panjang 6.69
Lebar 0.1
Luas = 6.69m x 0.1m 0.669
Luas Total 4.359
c). Konsol Samping Kiri
Panjang 1.58
Lebar 0.5
Luas = (0.79m x 0.5m) x 2sisi 1.58

Panjang 3.58
Lebar 0.1
Luas = 3.58m x 0.1m 0.358
Luas Total 1.938
d). Konsol Belakang
Panjang 1.4
Lebar 0.5
Luas = (1.4m x 0.5m) x 2sisi 1.4

Panjang 3.4
Lebar 0.1
Luas = 3.4m x 0.1m 0.34
Luas Total 1.74
Luas Total Konsol 10.911
Luas Total Plesteran Beton 54.941

7 Acian Tembok
Luas Total Plesteran 357.619
Luas Total Acian 357.619

IV PEKERJAAN BETON
1 Cor Beton Sloof 15/25
Panjang 16
Tinggi 0.25
Lebar 0.15
Volume Total = 45,1m x 0,2m x 0,15m 0.6

2 Cor Beton Sloof 10/22.5


Panjang 10.55
Tinggi 0.1
Lebar 0.225
Volume Total = 10,55m x 0,1m x 0,225m 0.23738

3 Cor Beton Ring Balk 15/15


Panjang 78.923
Tinggi 0.15
Lebar 0.15
Volume Total = 10,55m x 0,1m x 0,225m 1.77577
URAIAN PERHITUNGAN VOLUME HASIL PERHITUNGAN
NO URAIAN PEKERJAAN GAMBAR/SKETSA KET
PEKERJAAN M¹ M² M³ Buah Ls
1 2 3 4 5 6 7 8 9 10
4 Cor Beton Kolom Praktis 15/15
Tinggi 60.95
Lebar 0.15
Tebal 0.15
Volume Total = 60,95m x 0,15 x 0,15m 1.37138

5 Cor Kolom Teras 5/15


Jumlah 14
Tinggi 3
Lebar 0.15
Tebal 0.05
Volume Total = 3 x 0,15 x 0,05 0.315

6 Cor Beton Teras Depan


Tinggi 0.1
Lebar 2
Tebal 3
Volume = 0,1m x 2m x 3m 0.6

Tinggi 0.1
Lebar 1
Tebal 3.15
Volume = 0,1 x 1m x 3,15m 0.315
Volume Total 0.915

7 Cor Beton Teras Belakang


Tinggi 0.1
Lebar 1.15
Tebal 3
Volume Total = 0,1m x 1,15m x 3m 0.345

8 Cor Beton Konsol


a). Depan
Jumlah 1
Tinggi 0.1
Lebar 0.5
Tebal 2.32
Volume = (0,1 x 0,5) m² x 2,32m x 1 unit 0.116
b). Samping Kiri
Jumlah 2
Tinggi 0.1
Lebar 0.5
Tebal 0.79
Volume = (0,1 x 0,5) m² x 0,79m x 2 unit 0.079
c). Samping Kanan
Jumlah 1
Tinggi 0.1
Lebar 0.5
Tebal 3.69
Volume = (0,1 x 0,5) m² x 3,69m x 1 unit 0.1845
d). Belakang
Jumlah 2
Tinggi 0.1
Lebar 0.5
Tebal 0.7
Volume = (0,1 x 0,5) m² x 0,7m x 2 unit 0.07
Volume Total 0.4495

9 Cor Beton Neut


Jumlah 10
Tinggi 0.1
Lebar 0.05
Tebal 0.12
Volume Total =(0,1 x 0,05) m² x 0,12m x 10 unit 0.006

V PEKERJAAN ATAP & PLAVOND


1 Pasangan Kuda-Kuda Gewel
a). Kaki Kuda-kuda I 5/10
Panjang 10.094
Lebar 0.1
Tebal 0.05
Volume = 10,094m x 0,1m x 0,05 m 0.0505
URAIAN PERHITUNGAN VOLUME HASIL PERHITUNGAN
NO URAIAN PEKERJAAN GAMBAR/SKETSA KET
PEKERJAAN M¹ M² M³ Buah Ls
1 2 3 4 5 6 7 8 9 10
b). Kaki Kuda-kuda II 5/10
Panjang 8.985
Lebar 0.1
Tebal 0.05
Volume = 8,985m x 0,1m x 0,05m 0.0449
c). Kaki Kuda-kuda III 5/10
Panjang 9.981
Lebar 0.1
Tebal 0.05
Volume = 9,981m x 0,1m x 0,05m 0.050
Volume Total 0.145

2 Pasangan Gording 5/10


Jumlah 12
Panjang 7
Lebar 0.1
Tebal 0.05
Volume = (0,1 x 0,05) m² x 7m x 12 unit 0.42

Jumlah 2
Panjang 6.85
Lebar 0.1
Tebal 0.05
Volume = (0,1 x 0,05) m² x 6,85m x 2 unit 0.0685

Jumlah 3
Panjang 4.15
Lebar 0.1
Tebal 0.05
Volume = (0,1 x 0,05) m² x 4,15m x 3 unit 0.06225
Volume Total 0.55075
3 Pasangan Kloos Penahan 5/5
Jumlah 47
Panjang 0.05
Lebar 0.05
Tebal 0.05
Volume Total = (0,05 x 0,05) m² x 0,05m x 47 unit 0.0059
4 Pas. Balok Penahan Gording 5/10
Panjang 2.7
Lebar 0.1
Tebal 0.05
Volume Total = 2,7m x 0,1m x 0,05m 0.0135
5 Pasangan Listplank
Panjang Total 22.894

6 Pasangan Atap Seng BJLS 0,3


a). Luasan Datar Atap
Panjang 1 4
Lebar 1 9.93
Panjang 2 3
Lebar 2 9.17
Luas Total 67.23
b). Luasan Atap (α =21°)
Luas Total = 67,23/ cos 21˚ 72.0131

7 Pasangan Plafond Tripleks


Luas Lantai 54.75
Luas Emperan 22.894
Luas Total 77.644

8 Pasangan List Plafond Profil


Bangunan Induk
Panjang Pondasi 1 45.1
Teras
Panjang Pondasi 2 10.55
Emperan
Panjang Listplank 22.894
Panjang Total 134.19
VI PEKERJAAN KUSEN PINTU & JENDELA
URAIAN PERHITUNGAN VOLUME HASIL PERHITUNGAN
NO URAIAN PEKERJAAN GAMBAR/SKETSA KET
PEKERJAAN M¹ M² M³ Buah Ls
1 2 3 4 5 6 7 8 9 10
1 Kayu Kusen Kelas 1 (5/12)
a). Tipe Kusen P1
Jumlah 2
Panjang 8.2
Lebar 0.12
Tebal 0.05
volume = (0,12 x 0,05) m² x 8,2m x 2 unit 0.0984
b). Tipe Kusen P2
Jumlah 2
Panjang 5.1
Lebar 0.12
Tebal 0.05
Volume = (0,12 x 0,05) m² x 5,1m x 2 unit 0.0612
c). Tipe Kusen P3
Jumlah 1
Panjang 4.9
Lebar 0.12
Tebal 0.05
Volume = (0,12 x 0,05) m² x 4,9m x 1 unit 0.0294
d). Tipe Kusen J1
Jumlah 3
Panjang 2.24
Lebar 0.12
Tebal 0.05
Volume = (0,12 x 0,05) m² x 2,24m x 3 unit 0.04032
e). Tipe Kusen J2
Jumlah 1
Panjang 12.53
Lebar 0.12
Tebal 0.05
Volume = (0,12 x 0,05) m² x 12,53m x 1 unit 0.07518
f). Tipe Kusen J3
Jumlah 1
Panjang 12.95
Lebar 0.12
Tebal 0.05
Volume = (0,12 x 0,05) m² x 12,95m x 1 unit 0.0777
g). Tipe Kusen J4
Jumlah 2
Panjang 6.34
Lebar 0.12
Tebal 0.05
Volume = (0,12 x 0,05) m² x 6,34m x 2 unit 0.07608
h). Tipe Kusen J4
Jumlah 3
Panjang 3.48
Lebar 0.12
Tebal 0.05
Volume = (0,12 x 0,05) m² x 3,48m x 3 unit 0.06264
Volume Total 0.52092

2 Pasangan Daun Pintu Panil Kayu


Jumlah 2
Tinggi 2
Lebar 0.8
Luas Total = 0,8m x 2m x 2 unit 3.2

3 Pasangan Daun Pintu Double Taewood


a). Tipe P2
Jumlah 2
Tinggi 2
Lebar 0.9
Luas = 2m x 0,9m x 2 unit 3.6
b). Tipe P3
Jumlah 1
Tinggi 2
Lebar 0.7
Luas = 2m x 0,7m x 1 unit 1.4
Luas Total 5
URAIAN PERHITUNGAN VOLUME HASIL PERHITUNGAN
NO URAIAN PEKERJAAN GAMBAR/SKETSA KET
PEKERJAAN M¹ M² M³ Buah Ls
1 2 3 4 5 6 7 8 9 10
4 Pasangan Daun Jendela Kaca
a). Tipe J1
Jumlah 1
Tinggi 1.3
Lebar 1.55
Luas = 1,55m x 1,3m x 1 unit 2.015
b). Tipe J2
Jumlah 1
Tinggi 0.6
Lebar 1.55
Luas = 1,55m x 0,6m x 1 unit 0.93
c). Tipe J3
Jumlah 2
Tinggi 1.05
Lebar 0.7
Luas = 0,7m x 1,05m x 2 unit 1.47
d). Tipe J4
Jumlah 2
Tinggi 1.05
Lebar 0.6
Luas = 0,6m x 1,05m x 2 unit 1.26
Luas Total 5.675

5 Pasangan Daun Jendela Kayu


Panjang 0.6
Lebar 1.55
Luas Total = 1,55m x 0,6m 0.93

6 Pasangan Lubang Angin


Jumlah 17
Panjang 0.4
Lebar 0.32
Luas = 0,32m x 0,4m x 17 unit 2.176

Jumlah 1
Panjang 0.8
Lebar 0.4
Luas = 0,4m x 0,8m x 1 unit 0.32
Luas Total 2.496

VII PEKERJAAN LANTAI & KERAMIK


1 Pasangan Tegel Keramik (30/30)
Luas Lantai Utama (Tanpa Km/Wc) 42.3

2 Pasangan Tegel Mozaik (20/20)


Luas Lantai Km/Wc 3

3 Pasangan Tegel Mozaik (30/30)


Luas Lantai Teras 9.45
4 Pasangan Tegel Plint (10/30)
Panjang Tembok 57.14
Lebar Pintu 4.6
Tinggi 0.1
Luas Total = (57,14m - 4,6m) x 0,1m 5.254

5 Pasangan Tegel Keramik (20/20)


Panjang Tembok 6
Lebar Pintu 0.8
Tinggi 1.5
Luas Total = (6m - 0,8m) x 1,5m 7.8

6 Pasangan Lantai Rabat Beton


Luas Lantai 54.75
Tinggi 0.03
Volume Total = 54,75m² x x0,03m 1.6425

VIII PEKERJAAN PENGGANTUNG & PENGUNCI


1 Pasangan Kunci Double Slag 4
2 Pasangan Kunci KM/WC 1
3 Pasangan Grendel Pintu 5
4 Pasangan Grendel Jendela 6
5 pasangan Engsel Pintu 15
6 Pasangan Engsel Jendela 12
7 Pasangan Kait Angin 12
8 Pasangan Mur & Baut 1

IX PEKERJAAN INSTALASI LISTRIK & AIR


1 Lampu TL 20W 6
URAIAN PERHITUNGAN VOLUME HASIL PERHITUNGAN
NO URAIAN PEKERJAAN GAMBAR/SKETSA KET
PEKERJAAN M¹ M² M³ Buah Ls
1 2 3 4 5 6 7 8 9 10
2 Lampu Pijar 25W 2
3 Lampu Pijar 5W 3
4 Saklar Ganda 3
5 Saklar Tunggal 3
6 Stop Kontak 3
7 MCB-BOX 1
8 Pasangan Kloset Duduk 1
9 Pasangan Bak Air Viber 1
10 Kran Air 2
11 Pasangan Floor Drain 1
12 Bak Cuci Piring 1
13 Pasangan Pipa Air 1
14 Pas. SepticTank & Peresapan 1

X PEKERJAAN FINISHING
1 Cat Tembok
Luas Acian Tembok 357.619

2 Cat Plafond
Luas Plafond 77.644

3 Manie Kayu
a). Pada Kusen
Panjang 86.82
Lebar 0.05
Tebal 0.12
Luas = 86,82m x 0,05m x 0,12m 29.5188
b). Pada Listplank
Panjang 22.894
Lebar 0.03
Tebal 0.25
Luas = 22,894m x 0,03m x 0,25m 12.8206
Luas Total 42.3394

4 Cat Kayu
a). Pada Kusen
Luas Manie Kayu Kusen 29.5188
Panjang Kusen 86.82
Lebar 0.12
Luas = 29,519m² - (86,82 x 0,12) m² 19.1004
b). Pada Listplank
Manie Kayu Listplank 12.8206
Panjang Listplank 22.894
Lebar 0.25
Tebal 0.03
Luas = 12,821m² - (22,894m¹ x (0,25+0,03)m¹ 6.41032
Luas Total 25.5107

5 Taek Oil
Luas Daun Pintu & Jendela 17.301
Luas Total 34.602

6 Cat Atap Seng


Luas Atap Seng 72.0131

XI PEKERJAAN SEPTITANK & PERESAPAN


1 Galian Tanah
a). Septitank
Panjang 2.85
Tinggi 1.8


Lebar 1.5
Volume = 2,85m x 1,8m x 1,5m 7.695



Panjang 0.7
 Tinggi 0.7

Lebar 0.7
Volume = 0,7m x 0,7m x 0,7m 0.343
b). Peresapan
Panjang 1.6
Tinggi 1.85
Lebar 1.6
Volume = 1,6m x 1,85m x 1,6m 4.736
Volume Total 12.774

2 Plesteran Transram
a). Septitank
Jumlah 6
Panjang 1.2
URAIAN PERHITUNGAN VOLUME HASIL PERHITUNGAN
NO URAIAN PEKERJAAN GAMBAR/SKETSA KET
PEKERJAAN M¹ M² M³ Buah Ls
1 2 3 4 5 6 7 8 9 10
Lebar 1.5
Luas = 1,2m x 1,5m x 6 unit 10.8

Jumlah 2
Panjang 1.2
Lebar 1
Luas = 1,2m x 1m x 2 unit 2.4

Jumlah 4
Panjang 0.7
Lebar 0.4
Luas = 0,7m x 0,4m x 4 unit 1.12

Jumlah 1
Panjang 0.55
Lebar 0.4
Luas = 0,55m x 0,4m x 1 unit 0.22
b). Peresapan
Jumlah 4
Panjang 0.7
Lebar 1.2
Luas = 0,7m x 1,2m x 4 unit 3.36
Luas Total 17.9

3 Pekerjaan Pasangan Batu Kosong


Panjang 1.2
h
Tebal 0.3
Lebar 1.2
Volume Total = 1,2m x 0,3m x 1,2m 0.432
b
4 Pekerjaan Urugan Pasir/Sirtu
Panjang 1.5
Tebal 2.85
Lebar 0.1
Volume Total = 1,5m x 2,85m x 0,1m 0.4275

5 Pekerjaan Urugan Batu Pecah (5/7)


Panjang 1.2
Tebal 0.3
Lebar 1.2
Volume Total = 1,2m x 0,3m x 1,2m 0.432

6 Pekerjaan Urugan Batu Pecah (3/5 & 2/3)


Panjang 1.2
Tebal 0.3
Lebar 1.2
Volume Total = 1,2m x 0,3m x 1,2m 0.432

7 Pekerjaan Lapisan Ijuk (5cm)


Jumlah 2
Panjang 1.15
Lebar 1.6
Luas = 1,15m x 1,6m x 2 unit 3.68

Jumlah 1
Panjang 1.2
Lebar 1.2
Luas = 1,2m x 1,2m x 1 unit 1.44
Luas Total 5.12
8 Pekerjaan Beton Sloof 15/20
Jumlah 3
Panjang 1.35
Lebar 0.2
Tebal 0.15
Volume = (0,2 x 0,15) m² x 1,35m x 3 unit 0.1215

Jumlah 2
Panjang 2.7
Lebar 0.15
Tebal 0.2
Volume = (0,15 x 0,2) m² x 2,7m x 2 unit 0.162
Volume Total 0.2835

9 Pekerjaan Kolom Praktis (15/15)


Jumlah 6
Panjang 1.5
Lebar 0.15
Tebal 0.15
URAIAN PERHITUNGAN VOLUME HASIL PERHITUNGAN
NO URAIAN PEKERJAAN GAMBAR/SKETSA KET
PEKERJAAN M¹ M² M³ Buah Ls
1 2 3 4 5 6 7 8 9 10
Volume Total = (0,15 x 0,15) m² x 1,5m x 6 unit 0.2025

10 Pekerjaan Kolom (20/20)


Jumlah 4
Panjang 0.7
Lebar 0.2
Tebal 0.2
Volume Total = (0,2 x 0,2) m² x 0,7m x 4 unit 0.112

11 Pekerjaan Beton Ring Balk (15/15)


Jumlah 2
Panjang 2.7
Lebar 0.15
Tebal 0.15
Volume = (0,15 x 0,15)m² x 2,7m x 2 unit 0.1215

Jumlah 3
Panjang 1.35
Volume = (0,15 x 0,15)m² x 1,35m x 3 unit 0.09113

Jumlah 3
Panjang 0.55
Volume = (0,15 x 0,15)m² x 0,55m x 3 unit 0.03713
Volume Total 0.24975

12 Pekerjaan Beton Ring Balk (15/20)


Jumlah 4
Panjang 1.4
Lebar 0.15
Tebal 0.2
Volume Total = (0,15 x 0,2)m² x 1,4m x 4 unit 0.168

13 Pekerjaan Pelat Beton Penutup


Panjang 2.7
Lebar 1.35
Tebal 0.1
Volume = 1,35m x 0,1m x 2,7m 0.3645

Panjang 1.4
Lebar 1.4
Tebal 0.1
Volume = 1,4m x 0,1m x 1,4m 0.196

Panjang 0.55
Lebar 0.55
Tebal 0.1
Volume = 0,55m x 0,1m x 0,55m 0.03025
Volume Total 0.59075

14 Pekerjaan Pipa PVC Ø 4"


Panjang Total 2.75

15 Pekerjaan Pipa Hawa Gip Ø 1,5"


Jumlah Total 1

16 Pekerjaan Pasangan Tembok


a). Septitank
Luas Tembok 14.54
Tebal 0.1
Volume = 0,1m x 14,54 m² 1.454
b). Peresapan
Jumlah 4
Panjang 1.7
Lebar 1.35
Tebal 0.1
Volume = (1,35 x 0,1) m² x 1,7m x 4 unit 0.918
Volume Total 2.372

Volume Begisting
Keliling Sloof 10
Vol. Begisting 5

XII PEKERJAAN LAIN-LAIN


1 Pembersihan Kembali 1
HARGA DASAR SATUAN BAHAN
Harga Satuan
No. Tenaga Kerja Satuan Keterangan
(Rp.)

1 Air Liter Err:507


2 Alluminium Foil DS m2 Err:507
2 Ampelas Lembar Rp. 5,000.00
3 Atap Aspal Bitumen CT3 Lembar Rp. 199,000.00
4 Underlayment Anti Bocor Atap m2 Rp. 57,000.00
5 Bak Cuci Piring Stainless bh Rp. 1,700,000.00
6 Bambu Batang Rp. 13,000.00
7 Batu Bata Buah Err:507
8 Batu Paras m Rp. 180,000.00
9 Bata Ringan Tebal 7.5 cm Bh Rp. 25,000.00
10 Bata Ringan Tebal 10 cm Bh Rp. 25,000.00
11 Batu Kali / Batu Belah (Sungai / Gunung) M3 Rp. 242,000.00
12 Batang Kelapa Batang Rp. 195,000.00
13 Batu pecah 2-3 cm (1350 Kg/m3) M3 Rp. 316.52
14 Batu pecah 2-3 cm Kg Rp. 427,300.00
15 Batu Granit Kg Rp. 154,500.00
16 Batu Tempel Bh Rp. 211,000.00
17 Baut Kap Ø 1/2 - 8 Buah Rp. 199,200.00
18 Bensin (Industri) Liter Rp. 10,000.00
19 Besi Baja WF Kg Rp. 391,850.00
20 Besi kotak & pipa Kg Rp. 17,000.00
21 Besi Beton Polos Kg Err:507
22 Besi Beton Ulir Kg Err:507
23 Besi Hollow 40.40.2 mm m Rp. 21,300.00
24 Besi Profil Kg Rp. 24,000.00
25 Besi Siku L 30.30.3 Kg Rp. 18,350.00
26 Beton Rooster / Kerawang Buah Rp. 42,500.00
27 Bubungan Atap Aspal Bitumen M' Rp. 35,000.00
28 Cat Clear Nippe 2000 Kg Rp. 88,000.00
29 Cat Duco Nippe 2000 Kg Rp. 108,000.00
30 Cat Dasar Kg Err:507
31 Cat Epoxy Nippe 2000 Kg Rp. 105,000.00
32 Cat Kayu Mengkilat Kg Rp. 140,000.00
33 Cat Menie Kg Rp. 45,000.00
34 Cat Penutup Exterior Setara Jotun Kg Err:507
35 Cat Penutup Interior Setara Jotun Kg Err:507
36 Dempul Kg Rp. 35,000.00
37 Floor Drain Setara Toto Buah Rp. 100,000.00
38 Gypsum ( 120 x 240 cm ) Lembar Rp. 74,000.00
39 Gravel M3 Rp. 375,000.00
40 Granit Uk. 60 x 60 cm Polished m² Rp. 217,000.00
41 Granit Uk. 60 x 60 cm Unpolished m² Rp. 295,000.00
42 Granit Uk. 40 x 40 cm m² Rp. 202,000.00
43 Granit Uk. 60 x 120 cm m² Rp. 472,000.00
44 I j u k Kg Rp. 18,000.00
45 I j u k m3 Rp. 15,000.00
46 Profil Aluminium 3 inch m Rp. 84,900.00
47 Kaca Polos 3 mm m² Rp 210,000
48 Kaca Polos 5 mm m² Rp 300,000
49 Kaca Polos 8 mm m² Rp 375,000
50 Kaca Polos 10 mm m² Rp 399,300
51 Kaca Riben Tebal 3 mm m² Rp 190,000
52 Kaca Riben Tebal 5 mm m² Rp 245,000
53 Kaca Raiben 8 mm m² Rp 300,000
54 Kaca Raiben 10 mm m² Rp 315,000
55 Kaca Buram 3 mm m² Rp 160,000
56 Kaca Buram 5 mm m² Rp 228,000
57 Kaca Buram bermotif 3 mm m² Rp 211,000
58 Kaca Buram bermotif 5 mm m² Rp 261,000
59 Kaca One Way Blue 8 mm m² Rp 300,000
60 Kaca Framless 12 mm m² Rp 540,000
61 Kawat Beton Kg Rp. 25,000.00
62 Kawat Las Kg Rp. 37,400.00
63 Kayu Kelas I (Seumantok/Ulin/dll) M3 Rp. 14,000,000.00
64 Kayu Kelas II (Kamper/Kruing/dll) M3 Rp. 9,500,000.00
65 Kayu Kelas III (Borneo/dll) M3 Rp. 3,000,000.00
66 Kayu Kelas IV (Sengon/dll) M3 Rp. 2,000,000.00
67 Kayu Dolken Ø 8-10/400 cm Batang Rp. 55,000.00
68 Kayu 5 x 7, Kayu Kelas II M3 Rp. 155,000.00
69 Kayu Reng, Kayu Kelas II M3 Rp. 102,000.00
70 Keramik Uk. 20 x 20 cm (Polished) Bh Rp. 4,800.00
71 Keramik Uk. 30 x 30 cm (Polished) Bh Rp. 6,400.00
72 Keramik Uk. 33 x 33 cm (Polished) Bh Rp. 7,400.00
73 Keramik Uk. 40 x 40 cm (Polished) Bh Rp. 8,300.00
74 Keramik Uk. 20 x 20 cm (Unpolished) Bh Rp. 4,600.00
75 Keramik Uk. 30 x 30 cm (Unpolished) Bh Rp. 6,200.00
76 Keramik Uk. 33 x 33 cm (Unpolished) Bh Rp. 7,200.00
77 Keramik Uk. 40 x 40 cm (Unpolished) Bh Rp. 8,100.00
78 Kerosen / Minyak Tanah (Industri) Liter Rp. 12,000.00
79 Kerosen / Minyak Tanah (Subsidi) Liter Rp. 10,000.00
80 Kertas Amplas Lembar Rp. 10,000.00
81 Kerikil (1350 kg/m3) M3 Rp. 238,300.00
82 Kerikil Kg Rp. 316.52
83 Kloset Duduk Keramik Buah Rp. 540,800.00
84 Kloset Jongkok Keramik Buah Rp. 160,000.00
85 Koral Beton M3 Rp. 235,000.00
86 Koral Sikat M2 Rp. 115,000.00
87 Kran Air Dia. 1/2" - 3/4" Bh Rp. 32,000.00
88 Lem Kayu kg Err:507
89 List PVC m' Rp. 32,000.00
90 Minyak Cat Liter Err:507
91 Minyak Bekesting Liter Rp. 3,250.00
92 Minyak Pelumas Liter Rp. 16,600.00
93 Mortar Siap Pakai (MSP) Kg Rp. 1,000.00
94 Mortar Utama 380 ( 40 kg ) Zak Rp. 67,000.00
95 Multipleks 3 mm Lembar Rp. 55,000.00
96 Multipleks 4 mm Lembar Rp. 76,500.00
97 Multipleks 6 mm Lembar Rp. 103,000.00
98 Multipleks 9 mm Lembar Rp. 237,500.00
99 Paku Tripleks Kg Rp. 25,000.00
100 Paku Beton 8" Kotak Rp. 50,000.00
101 Paku Beton 4" Kotak Rp. 45,000.00
102 Paku 12 cm Kg Rp. 20,000.00
103 Paku Kayu 2" - 3" Kg Rp. 25,000.00
104 Paku Biasa 1/2" - 1" Kg Rp. 20,000.00
105 Paku Biasa 5 cm - 10 cm Kg Rp. 20,000.00
106 Paku Biasa 5 cm - 12 cm Kg Rp. 20,000.00
107 Paku Kayu Kg Rp. 25,000.00
108 Paku Reng Kg Rp. 20,000.00
109 Paku Seng Kg Rp. 40,000.00
110 Paku skrup 10 cm Kg Rp. 53,000.00
111 Papan Kayu Kelas I m3 Rp. 15,000,000.00
112 Papan Kayu Kelas II m3 Rp. 9,500,000.00
113 Papan Kayu Kelas III m3 Rp. 3,100,000.00
114 Papan Kayu Plafond Kelas II m3 Rp. 85,000.00
115 Pasir Batu (Sirtu) M3 Rp. 183,300.00
116 Pasir Beton (1400 kg/m3) M3 Rp. 275,000.00
117 Pasir Beton Kg Err:507
118 Pasir Pasang (1400 kg/m3) M3 Err:507
119 Pasir Pasang Kg Rp. 122.00
120 Pasir Urug M3 Err:507
121 Paving Block M2 Rp. 70,000.00
122 Penjaga Jarak Bekesting (Spacer) bh Rp. 20,650.00
123 Pipa Leiding Ø 1" Galvanis Tebal 3.2 mm m' Rp. 50,000.00
124 Pipa Leiding Ø 3/4" Galvanis Tebal 3.2 mm m' Rp. 55,000.00
125 Pipa Leiding Ø 1/2" Galvanis Tebal 3.2 mm m' Rp. 37,450.00
126 Pipa Leiding Ø 1 1/2" Galvanis Tebal 3.2 mm m' Rp. 104,200.00
127 Pipa Leiding Ø 2" Galvanis Tebal 3.2 mm m' Rp. 142,000.00
128 Pipa Leiding Ø 3" Galvanis Tebal 3.2 mm m' Rp. 183,350.00
129 Pipa Leiding Ø 4" Galvanis Tebal 3.2 mm m' Rp. 283,300.00
130 Pipa Leiding Ø 6" Galvanis Tebal 3.2 mm m' Rp. 321,000.00
131 Pipa PVC Ø 1" m' Err:507
132 Pipa PVC Ø 1/2" Kualitas AWE m' Rp. 33,958.00
133 Pipa PVC Ø 1 1/2" m' Rp. 22,500.00
134 Pipa PVC Ø 2" m' Err:507
135 Pipa PVC Ø 2 1/2" m' Rp. 28,750.00
136 Pipa PVC Ø 3" m' Err:507
137 Pipa PVC Ø 3/4" m' Rp. 39,925.00
138 Pipa PVC Ø 4" m' Err:507
139 Plamur Kg Err:507
140 Plat Besi Galvanis 1 mm Lembar Rp. 700,000.00
141 Plat Besi Galvanis 1,2 mm Lembar Rp. 980,000.00
142 Plat Besi Galvanis 1,5 mm Lembar Rp. 1,213,000.00
143 Plat Besi Galvanis 2 mm Lembar Rp. 1,605,000.00
144 Plafond PVC m' Rp. 34,000.00
145 Plint Keramik Granit 10 x 40 m2 Rp. 72,000.00
146 Plint Keramik Granit 10 x 60 m2 Rp. 133,000.00
147 Plywood 4 mm ( Ukuran 90 x 220 cm ) Lembar Rp. 150,000.00
148 Plywood 6 mm Lembar Rp. 160,000.00
149 Plywood 9 mm Lembar Rp. 195,000.00
150 Ramset Buah Rp. 37,100.00
151 Rangka Baja Ringan C75 kg Rp. 37,100.00
152 Rangka Baja Ringan C125 m' Rp. 285,450.00
153 R e s i d u Kg Rp. 8,500.00
154 Roof Light Fibreglass 90 x 180 cm Lbr Rp. 40,000.00
155 Seal Tape Bh Rp. 10,000.00
156 Seng BJLS 0.20 Lbr Rp. 20,000.00
157 Semen @ 40 Kg Zak Rp. 57,000.00
158 Semen @ 40 Kg Kg Rp. 950.00
159 Semen @ 50 Kg Zak Rp. 67,000.00
160 Semen @ 50 Kg Kg Rp. 1,340.00
161 Semen Warna @ 50 zak Zak Rp. 195,000.00
162 Semen Warna @ 50 Kg Kg Rp. 18,000.00
163 Sirap Kayu Bh Err:507
164 Skrup Fixer Bh Rp. 1,400.00
165 Solar (Industri) Liter Rp. 11,450.00
166 Stop Kontak + Instalasi Titik Rp. 17,250.00
167 Storox - 100 Kg Rp. 35,000.00
168 Stut Werk M3 Rp. 2,890,500.00
169 Sealant tube Rp. 30,500.00
170 Tanah Liat M3 Rp. 235,000.00
171 Tanah Timbun M3 Rp. 100,000.00
172 Tanah Timbun Pilihan - Material Jalan M3 Rp. 150,000.00
173 Thiner A Liter Rp. 65,000.00
174 Urinoir Lengkap Bh Rp. 3,250,000.00
175 Wastafel Bh Rp. 1,500,000.00
176 Waterdrain Bh Rp. 60,500.00
177 Waterstop PVC Lebar 150 mm m Rp. 24,500.00
178 Waterstop PVC Lebar 200 mm m Rp. 30,500.00
179 Waterstop Lebar 230 mm - 320 mm m Rp. 38,500.00
180 Wiremesh (Ulir) Dia. 5.0 Lbr Rp. 300,000.00
181 Wiremesh (Ulir) Dia. 6.0 Lbr Rp. 385,999.00
149 Besi Strip tebal 5 mm Kg Err:507
150 Seng Plat 3 x kk bjls 30 Lbr Rp. 45,000.00
150 Atap Apandek 0.30 mm M2 Rp. 47,500.00
151 Paku skrup + Mur bh Rp. 1,350.00
Karet kasment m¹ Rp. 77,000.00
Karet kaca m¹ Rp. 100,000.00
Karet kupingan m¹ Rp. 55,000.00
Engsel bh Rp. 69,000.00
Ram buncist bh Rp. 15,000.00
Paku ripet bh Rp. 300.00
Frime kasment aluminium m¹ Rp. 23,850.00
Frime L kasment aluminium m¹ Rp. 9,350.00
Err:507 Err:507 0%
Err:507 Err:507
Err:507 Err:507
Rp. 199,000.00 199,000
Rp. 57,000.00 57,000
Rp. 1,700,000.00 1,700,000
Rp. 13,000.00 13,000
Err:507 Err:507
Err:507 Err:507
Rp. 25,000.00 25,000
Rp. 25,000.00 25,000
Rp. 242,000.00 242,000
Rp. 195,000.00 195,000
Rp. 316.52 317
Rp. 427,300.00 427,300
Rp. 154,500.00 154,500
Rp. 211,000.00 211,000
Rp. 199,200.00 199,200
Rp. 10,000.00 10,000
Rp. 391,850.00 391,850
Rp. 17,000.00 17,000
Err:507 Err:507
Err:507 Err:507
Rp. 21,300.00 21,300
Rp. 24,000.00 24,000
Rp. 18,350.00 18,350
Rp. 42,500.00 42,500
Rp. 35,000.00 35,000
Rp. 88,000.00 88,000
Rp. 108,000.00 108,000
Err:507 Err:507
Rp. 105,000.00 105,000
Rp. 140,000.00 140,000
Rp. 45,000.00 45,000
Err:507 Err:507
Err:507 Err:507
Rp. 35,000.00 35,000
Rp. 100,000.00 100,000
Rp. 74,000.00 74,000
Rp. 375,000.00 375,000
Rp. 217,000.00 217,000
Rp. 295,000.00 295,000
Rp. 202,000.00 202,000
Rp. 472,000.00 472,000
Rp. 18,000.00 18,000
Rp. 15,000.00 15,000
Rp. 84,900.00 84,900
Rp. 210,000.00 210,000
Rp. 300,000.00 300,000
Rp. 375,000.00 375,000
Rp. 375,000.00 375,000
Rp. 190,000.00 190,000
Rp. 245,000.00 245,000
Rp. 300,000.00 300,000
Rp. 315,000.00 315,000
Rp 160,000 160,000
Rp 228,000 228,000
Rp 211,000 211,000
Rp 261,000 261,000
Rp 300,000 300,000
Rp 540,000 540,000
Rp. 25,000.00 25,000
Err:507 Err:507
Rp. 14,000,000.00 14,000,000
Rp. 9,500,000.00 9,500,000
Rp. 3,000,000.00 3,000,000
Rp. 2,000,000.00 2,000,000
Rp. 55,000.00 55,000
Rp. 155,000.00 155,000
Rp. 102,000.00 102,000
Rp. 4,800.00 4,800
Rp. 6,400.00 6,400
Rp. 7,400.00 7,400
Rp. 8,300.00 8,300
Rp. 4,600.00 4,600
Rp. 6,200.00 6,200
Rp. 7,200.00 7,200
Rp. 8,100.00 8,100
Rp. 12,000.00 12,000
Rp. 10,000.00 10,000
Rp. 10,000.00 10,000
Rp. 238,300.00 238,300
Rp. 316.52 317
Rp. 540,800.00 540,800
Rp. 160,000.00 160,000
Rp. 235,000.00 235,000
Rp. 7,000.00 7,000
Rp. 32,000.00 32,000
Err:507 Err:507
Rp. 32,000.00 32,000
Err:507 Err:507
Rp. 3,250.00 3,250
Rp. 16,600.00 16,600
Rp. 1,000.00 1,000
Rp. 67,000.00 67,000
Rp. 55,000.00 55,000
Rp. 76,500.00 76,500
Rp. 103,000.00 103,000
Rp. 237,500.00 237,500
Rp. 25,000.00 25,000
Rp. 50,000.00 50,000
Rp. 45,000.00 45,000
Rp. 20,000.00 20,000
Rp. 25,000.00 25,000
Rp. 20,000.00 20,000
Rp. 20,000.00 20,000
Rp. 20,000.00 20,000
Rp. 25,000.00 25,000
Rp. 20,000.00 20,000
Rp. 40,000.00 40,000
Rp. 53,000.00 53,000
Rp. 15,000,000.00 15,000,000
Rp. 9,500,000.00 9,500,000
Rp. 3,100,000.00 3,100,000
Rp. 85,000.00 85,000
Rp. 183,300.00 183,300
Rp. 275,000.00 275,000
Err:507 Err:507
Err:507 Err:507
Rp. 122.00 122
Err:507 Err:507
Rp. 70,000.00 70,000
Rp. 20,650.00 20,650
Rp. 50,000.00 50,000
Rp. 55,000.00 55,000
Rp. 37,450.00 37,450
Rp. 104,200.00 104,200
Rp. 142,000.00 142,000
Rp. 183,350.00 183,350
Rp. 283,300.00 283,300
Rp. 321,000.00 321,000
Err:507 Err:507
Rp. 33,958.00 33,958
Rp. 22,500.00 22,500
Err:507 Err:507
Rp. 28,750.00 28,750
Err:507 Err:507
Rp. 39,925.00 39,925
Err:507 Err:507
Err:507 Err:507
Rp. 700,000.00 700,000
Rp. 980,000.00 980,000
Rp. 1,213,000.00 1,213,000
Rp. 1,605,000.00 1,605,000
Rp. 34,000.00 34,000
Rp. 72,000.00 72,000
Rp. 133,000.00 133,000
Rp. 150,000.00 150,000
Rp. 160,000.00 160,000
Rp. 195,000.00 195,000
Rp. 37,100.00 37,100
Rp. 265,540.00 18,350
Rp. 285,450.00 285,450
Rp. 8,500.00 8,500
Rp. 40,000.00 40,000
Rp. 10,000.00 10,000
Rp. 20,000.00 20,000
Rp. 57,000.00 57,000
Rp. 950.00 950
Rp. 67,000.00 67,000
Rp. 1,340.00 1,340
Rp. 195,000.00 195,000
Rp. 18,000.00 18,000
Err:507 Err:507
Rp. 1,400.00 1,400
Rp. 11,450.00 11,450
Rp. 17,250.00 17,250
Rp. 35,000.00 35,000
Rp. 2,890,500.00 2,890,500
Rp. 30,500.00 30,500
Rp. 235,000.00 235,000
Rp. 100,000.00 100,000
Rp. 150,000.00 150,000
Rp. 37,200.00 37,200
Rp. 3,250,000.00 3,250,000
Rp. 1,500,000.00 1,500,000
Rp. 60,500.00 60,500
Rp. 24,500.00 24,500
Rp. 30,500.00 30,500
Rp. 38,500.00 38,500
Rp. 300,000.00 300,000
Rp. 385,999.00 385,999
Err:507 Err:507
Rp. 45,000.00 45,000
Rp. 47,500.00 47,500
Rp. 1,350.00 1,350
Rp. 77,000.00 77,000
100,000 100,000
Rp. 55,000.00 55,000
Rp. 69,000.00 69,000
Rp. 15,000.00 15,000
Rp. 300.00 300
Rp. 23,850.00 23,850
Rp. 9,350.00 9,350
HARGA DASAR SATUAN UPAH

Harga Satuan (Rp.)


No. Tenaga Kerja Kode Satuan
Jam Hari

1.00 Pekerja L.01 OH Rp. 12,000.00 Rp. 96,700.00


2.00 Tukang L.02 OH Rp. 15,700.00 Rp. 126,075.00
3.00 Tukang Gali L.02 OH Rp. 13,000.00 Rp. 104,000.00
4.00 Tukang Batu L.02 OH Rp. 15,600.00 Rp. 124,900.00
5.00 Tukang Kayu L.02 OH Rp. 15,600.00 Rp. 124,900.00
6.00 Tukang Besi L.02 OH Rp. 15,600.00 Rp. 124,900.00
7.00 Tukang Cat / Pelitur L.02 OH Rp. 13,000.00 Rp. 104,000.00
8.00 Tukang Pipa / Operator Pompa L.02 OH Rp. 15,600.00 Rp. 125,000.00
9.00 Tukang Pengayam Bronjong L.02 OH Rp. 15,600.00 Rp. 124,900.00
10.00 Tukang listrik L.02 OH Rp. 18,200.00 Rp. 145,900.00
11.00 Kepala Tukang L.03 OH Rp. 16,200.00 Rp. 129,600.00
12.00 Mandor L.04 OH Rp. 16,500.00 Rp. 132,300.00
13.00 Juru Ukur L.05 OH Rp. 15,600.00 Rp. 125,000.00
14.00 Pembantu Juru Ukur L.06 OH Rp. 11,300.00 Rp. 90,400.00
15.00 Ahli Alat Berat ( Mekanik ) L.07 OH Rp. 14,700.00 Rp. 117,800.00
16.00 Operator L.08 OH Rp. 13,000.00 Rp. 104,000.00
17.00 Pembantu Operator L.09 OH Rp. 12,600.00 Rp. 101,400.00
18.00 Sopir Truck L.10 OH Rp. 13,000.00 Rp. 104,000.00
19.00 Kenek Truk L.11 OH Rp. 11,300.00 Rp. 90,400.00
20.00 Penjaga Malam L.12 OH Rp. 12,100.00 Rp. 97,500.00
21.00 Juru Gambar (Drafter) L.13 OH Rp. 10,300.00 Rp. 83,000.00
22.00 Design Engineer L.15 OH Rp -
23.00 Operator Printer/Plotter L.16 OH Rp -
Jam
Keterangan Kerja
Eff.

8.00 $ 96,700.00
$ 126,075.00
$ 104,000.00
$ 124,900.00
$ 124,900.00
$ 124,900.00
$ 104,000.00
$ 125,000.00
$ 124,900.00
$ 145,900.00
$ 129,600.00
$ 132,300.00
$ 125,000.00
$ 90,400.00
$ 117,800.00
$ 104,000.00
$ 101,400.00
$ 104,000.00
$ 90,400.00
$ 97,500.00
$ 83,000.00
#N/A
#N/A
#N/A
#N/A
#N/A
NO. URAIAN

1 Pekerja

2 Tukang

3 Tukang Batu

4 Kepala Tukang

5 Tukang Kayu

6 Tukang Besi

7 Tukang Las

8 Tukang Gali

9
Tukang Cat / Pelitur
10 Tukang Politur

11 Tukang Listrik

12 Tukang Pipa

13 Sopir

14
Ahli Alat Berat ( Mekanik )
15 Mandor

16
Operator
17 Operator Alat Berat

18 Pembantu Operator

19
Tukang Pipa / Operator Pompa
20
Tukang Pengayam Bronjong
21
Juru Ukur
22
Pembantu Juru Ukur
23
Sopir Truck
24
Kenek Truk
25
Penjaga Malam
26
Juru Gambar (Drafter)
27
Design Engineer
28
Operator Printer/Plotter
KODE SATUAN HARGA SATUAN KET.

L.01 OH Rp. 96,700.00

L.02 OH Rp. 126,075.00

L.02 OH Rp. 124,900.00

L.03 OH Rp. 129,600.00

L.02 OH Rp. 124,900.00

L.02 OH Rp. 124,900.00

L.02 OH Rp. 124,900.00

L.02 OH Rp. 104,000.00

L.02 OH Rp. 104,000.00

L.02 OH Rp. 111,400.00

L.02 OH Rp. 145,900.00

L.02 OH Rp. 125,000.00

L.05 OH Rp. 104,000.00

L.06 OH Rp. 117,800.00

L.04 OH Rp. 132,300.00

L.10 OH Rp. 104,000.00

L.10 OH Rp. 117,800.00

L.10 OH Rp. 101,400.00

125,000
124,900
125,000
90,400
104,000
90,400
97,500
83,000
PEKERJAAN :
LOKASI :
TAHUN :

HARGA SATUAN JUMLAH HARGA


NO URAIAN PEKERJAAN VOLUME SAT. KODE ANALISA
(Rp.) (Rp.)
1 2 3 4 5 6 7

B BANGUNAN POS JAGA


I. PEKERJAAN PERSIAPAN
1 Pengukuran uitzet/pas bouplank 24.000 m¹ SNI A.2.2.1.4 76,579.00 1,837,896.00
Jumlah ( I ) 1,837,896.00
II. PEKERJAAN TANAH DAN URUGAN
1 Galian tanah pondasi batu kali 41.040 m³ SNI A.2.3.1.1 83,415.00 3,423,351.60
2 Urugan tanah kembali 10.260 m³ SNI A.2.3.1.9 60,461.00 620,329.86
3 Urugan pasir dibawah lantai kerja pondasi 5.490 m³ SNI A.2.3.1.11 #REF! #REF!
4 Urugan sirtu dibawah pondasi batu kali, dipadatkan 41.040 m³ SNI A.2.3.1.14 272,186.00 11,170,513.44
5 Urugan pasir dibawah lantai 3.500 m³ SNI A.2.3.1.11 #REF! #REF!
6 Urugan tanah dibawah lantai 38.850 m³ SNI A.2.3.1.11.a 165,366.00 6,424,469.10
Jumlah ( II ) #REF!
III. PEKERJAAN BETON - MUTU K.175
1 Pek. Beton rabat dibawah lantai T.5cm Err:509 m³ SNI A.4.1.1.5 #REF! Err:509
2 Sloof beton bertulang type a - 15/20 0.540 m³ SNI A.4.1.1.5 #REF! #REF!
3 Kolom praktis beton bertulang 15/15 0.189 m³ SNI A.4.1.1.5 #REF! #REF!
4 Kolom praktis beton bertulang 10/10 31.600 m' SNI A.4.1.1.5 #REF! #REF!
5 Balok beton bertulang 10/15 - balok ring 27.000 m' SNI A.4.1.1.5 #REF! #REF!
Jumlah ( III ) Err:509
IV. PEKERJAAN PASANGAN / PLESTERAN
1 Pas. Batu kosong (Aanstamping) 3.420 m³ SNI A.3.2.1.9 #REF! #REF!
2 Pas. Pondasi batu kali camp. 1pc : 5psr 9.500 m³ SNI A.3.2.1.2 #REF! #REF!
3 Pas.Dinding bata 1/2 bt. camp.1pc : 4psr 58.890 m² SNI A.4.4.1.3 #REF! #REF!
4 Plest.beton ,kolom dan balok camp.1pc : 2psr 19.360 m² SNI A.4.4.2.2 #REF! #REF!
5 Plest.dinding bata camp.1pc : 4psr 117.780 m² SNI A.4.4.2.4 #REF! #REF!
6 Acian Pc 7.000 m² SNI A.4.4.2.27 41,419.40 289,935.80
Jumlah ( IV ) #REF!
V. PEKERJAAN KAP/ATAP & LISPLANK
1 Kap kuda-kuda & reng baja ringan (SNI) 49.200 m² SNI A.4.2.1.22 333,264.00 16,396,588.80
2 Atap genteng press mantili 49.200 m² SNI A.4.5.2.41.a 361,574.00 17,789,440.80
3 Bubungan genteng mantili 12.800 m' SNI A.4.5.2.42.a 218,091.00 2,791,564.80
4 Lisplank kalsiplank motip jati - 8mm-20cm 16.400 m' SNI A.4.5.2.44. 156,753.00 2,570,749.20
Jumlah ( V ) 39,548,343.60
VI. PEKERJAAN LANTAI / PLAFOND
a. Pekerjaan Penutup lantai/Dinding
### Pas. Lantai keramik 40x40cm 20.460 m² SNI A.4.4.3.9 #REF! #REF!
### Pas. Lantai keramik 20x20cm anti slip - toilet 1.870 m² SNI A.4.4.3.54 #REF! #REF!
b. Pekerjaan Plafond -
### Plafond kalsiboard T.3,5mm, rangka hollow 40.774 m² SNI A.4.5.1.10 166,002.00 6,768,532.35
### Lisplafond gypsum board 80.500 m SNI A.4.5.1.7 54,989.00 4,426,614.50
Jumlah ( VI ) #REF!
VII. PEKERJAAN KUSEN PINTU/JENDELA / KACA
1 Kusen pintu/jendela rangka kayu klas I 0.173 m³ SNI A.4.6.1.1. #REF! #REF!
2 Daun pintu panil kayu klas II 3.280 m² SNI A.4.6.1.2b #REF! #REF!
3 Daun Pintu Aluminium Toilet 1.374 m² SNI 119,167.88 163,677.08
Jumlah ( VII ) #REF!
VIII. PEKERJAAN BESI/PENGUNCI
1 Kunci tanam 2.000 bh SNI A.4.6.2.2 219,885.60 439,771.20
2 Kunci tanam - toilet 1.000 bh SNI A.4.6.2.2 219,885.60 219,885.60
3 Engsel pintu 9.000 bh SNI A.4.6.2.5 54,025.57 486,230.09
4 Engsel jendela 4.000 bh SNI A.4.6.2.5 54,025.57 216,102.26
### Grendel jendela 4.000 bh SNI A.4.6.2.11 72,515.63 290,062.52
### Grendel pintu 2.000 bh SNI A.4.6.2.11 72,515.63 145,031.26
Jumlah ( VIII ) 1,797,082.93

RAB HAL. 33
HARGA SATUAN JUMLAH HARGA
NO URAIAN PEKERJAAN VOLUME SAT. KODE ANALISA
(Rp.) (Rp.)
1 2 3 4 5 6 7

IX. PEKERJAAN PENGECATAN/FINISHING


1 Cat dinding (Exterior) 64.000 m² SNI A.4.7.1.10 58,559.97 3,747,838.34
2 Cat dinding (Interior) 39.465 m² SNI A.4.7.1.10.a 58,608.00 2,312,935.42
3 Cat plafond 40.774 m² SNI A.4.7.1.11 40,847.00 1,665,487.41
4 Cat kayu (kusen/jendela) 6.181 m² SNI A.4.7.1.12 388,404.23 2,400,881.88
5 Cat kayu (Lisplank) 3.608 m² SNI A.4.7.1.12 388,404.23 1,401,362.44
6 Polituran (Daun pintu) 5.960 m² SNI A.4.7.1.11 40,847.00 243,448.12
Jumlah ( IX ) 11,771,953.60
X. PEKERJAAN INST. LISTRIK
1 Instalasi titik stop kontak 2.000 ttk LS.MEP.1.1.3 179,224.54 358,449.08
2 Instalasi titik lampu 5.000 ttk LS.MEP.1.1.2 179,224.54 896,122.70
3 Saklar tunggal 2.000 bh LS.MEP.1.1.4 48,873.00 97,746.00
4 Stop kontak 2.000 bh LS.MEP.1.1.6 51,073.00 102,146.00
5 Lampu SL 25 watt 3.000 bh ls 35,000.00 105,000.00
6 Lampu SL 18 watt 2.000 bh ls 26,000.00 52,000.00
7 Vitingan Lampu 5.000 bh ls 13,000.00 65,000.00
8 Box Sekring + Arde 1.000 unit ls 275,000.00 275,000.00
Jumlah ( X ) 1,951,463.78
XI. PEKERJAAN SANITAIR & INST. AIR
a. Pekerjaan Sanitair
1 Closet jongkok porselint 1.000 unit SNI A.5.1.1.1 1,157,159.00 1,157,159.00
2 Pembuatan septictank 1.000 unit ls 2,150,000.00 2,150,000.00
3 Pembuatan peresapan 1.000 unit ls 1,500,000.00 1,500,000.00
4 b. Pekerjaan Plumbing/Pipa - -
5 Pipa PVC Ø 1/2'' Aw 2.000 m' SNI A.5.1.1.25 31,039.14 62,078.28
6 Pipa PVC Ø 3/4'' Aw 4.000 m' SNI A.5.1.1.26 34,339.14 137,356.56
7 Floor drain/saringan air 1.000 bh SNI A.5.1.1.36 126,955.00 126,955.00
8 Kran Jetcloset 1.000 bh SNI A.5.1.1.35 97,924.00 97,924.00
Jumlah ( XI ) 5,231,472.84

REKAPITULASI
PEKERJAAN : PEMBANGUNAN RUMAH GURU MAN IC ( MADRASAH ALIYAH NEGERI INSAN CENDEKIA )
LOKASI : KEC. SAKRA - KAB. LOMBOK TIMUR
TAHUN ANGGARAN : 2017

`
NO JENIS PEKERJAAN JUMLAH

1 2 3

B BANGUNAN POS JAGA


I. PEKERJAAN PERSIAPAN Rp. 1,837,896.00
II. PEKERJAAN TANAH DAN URUGAN Rp. #REF!
III. PEKERJAAN BETON - MUTU K.175 Rp. Err:509
IV. PEKERJAAN PASANGAN / PLESTERAN Rp. #REF!
V. PEKERJAAN KAP/ATAP & LISPLANK Rp. 39,548,343.60
VI. PEKERJAAN LANTAI / PLAFOND Rp. #REF!
VII. PEKERJAAN KUSEN PINTU/JENDELA / KACA Rp. #REF!
VIII. PEKERJAAN BESI/PENGUNCI Rp. 1,797,082.93
IX. PEKERJAAN PENGECATAN/FINISHING Rp. 11,771,953.60
X. PEKERJAAN INST. LISTRIK Rp. 1,951,463.78
XI. PEKERJAAN SANITAIR & INST. AIR Rp. 5,231,472.84
JUMLAH BIAYA KONSTRUKSI Rp. #REF!

RAB HAL. 34
HARGA SATUAN JUMLAH HARGA
NO URAIAN PEKERJAAN VOLUME SAT. KODE ANALISA
(Rp.) (Rp.)
1 2 3 4 5 6 7

D RABAT KELILING BANGUNAN, SUMUR & URUGAN LUAR BANGUNAN


I. PEKERJAAN RABAT KELILING BANGUNAN RUMAH GURU
1 Urugan pasir dibawah rabat 3.856 m³ SNI 2835-2008 - 6.11 250,293.00 965,129.81
2 Pas.Trasram bata 1/2 bt. camp.1pc : 3psr 15.900 m² SNI 6897-2008 - 6.8 116,392.30 1,850,637.57
3 Cor rabat beton T.6cm 2.314 m³ SNI 7394-2008 - 6.1 #VALUE! #VALUE!
4 Plest.trasram bata camp.1pc : 3psr 10.600 m² SNI 2837-2008 - 6.3 66,035.54 699,976.72
5 Plest.rabat beton camp.1pc : 3psr 38.560 m² SNI 2837-2008 - 6.3 66,035.54 2,546,330.42
Jumlah ( I ) #VALUE!
II. PEKERJAAN RABAT KELILING BANGUNAN POS JAGA
1 Urugan pasir dibawah rabat 1.866 m³ SNI 2835-2008 - 6.11 250,293.00 467,046.74
2 Pas.Trasram bata 1/2 bt. camp.1pc : 3psr 7.920 m² SNI 6897-2008 - 6.8 116,392.30 921,827.02
3 Cor rabat beton T.6cm 1.114 m³ SNI 7394-2008 - 6.1 #VALUE! #VALUE!
4 Plest.trasram bata camp.1pc : 3psr 5.280 m² SNI 2837-2008 - 6.3 66,035.54 348,667.65
5 Plest.rabat beton camp.1pc : 3psr 18.560 m² SNI 2837-2008 - 6.3 66,035.54 1,225,619.62
Jumlah ( II ) #VALUE!
III. PEKERJAAN SUMUR BUIS 2 UNIT - RUMAH GURU
1 Galian tanah pondasi 62.800 m³ SNI 2835-2008 - 6.8 230,191.50 14,456,026.20
2 Urugan tanah kembali 15.700 m³ SNI 2835-2008 - 6.9 25,273.09 396,787.51
1 Pek. Pas.Buis beton Ø 80cm 20.000 m¹ SNI 04-2008 - 6.15.1 371,129.50 7,422,590.00
2 Pek. beton bertulang plat penutup T.10cm 0.628 m³ SNI 7394-2008 - 6.50.1 #VALUE! #VALUE!
3 Penyedotan/Pembersihan air sumur 1.000 unit Ls 1,490,000.00 1,490,000.00
Jumlah ( III ) #VALUE!
IV. PEKERJAAN URUGAN LUAR BANGUNAN
1 Urugan tanah - LUAR BANGUNAN RUMAH GURU 138.000 m³ SNI 2835-2008 - 6.11a 150,333.00 20,745,954.00
2 Urugan tanah - LUAR BANGUNAN POS JAGA 40.310 m³ SNI 2835-2008 - 6.11a 150,333.00 6,059,923.23
Jumlah ( IV ) 26,805,877.23

REKAPITULASI
PEKERJAAN : PEMBANGUNAN RUMAH GURU MAN IC ( MADRASAH ALIYAH NEGERI INSAN CENDEKIA )
LOKASI : KEC. SAKRA - KAB. LOMBOK TIMUR
TAHUN ANGGARAN : 2017

`
NO JENIS PEKERJAAN JUMLAH

1 2 3

D RABAT KELILING BANGUNAN, SUMUR & URUGAN LUAR BANGUNAN


I. PEKERJAAN RABAT KELILING BANGUNAN RUMAH GURU Rp. #VALUE!
II. PEKERJAAN RABAT KELILING BANGUNAN POS JAGA Rp. #VALUE!
III. PEKERJAAN SUMUR BUIS 2 UNIT - RUMAH GURU Rp. #VALUE!
IV. PEKERJAAN URUGAN LUAR BANGUNAN Rp. 26,805,877.23
JUMLAH BIAYA KONSTRUKSI Rp. #VALUE!

RAB HAL. 35
Rekapitulasi Analisa Harga Satuan Daerah
Provinsi Nusa Tenggara Barat
Tahun 2022

KODE ITEM
SNI A.2.2.1 PERSIAPAN
SNI A.2.2.1.2 Pagar Sementara Dari Seng Gelombang Tinggi 2 Meter (K3)
SNI A.2.2.1.4 Pengukuran dan Pemasangan Bouwplank
SNI A.2.2.1.9 Pembersihan Lapangan dan Perataan
SNI A.2.2.1.10 Pembuatan Steger/Perancah Dari Bambu (K3)
SNI A.2.2.1.13 Pembongkaran Beton Bertulang
SNI A.2.2.1.14 Pembongkaran Dinding Tembok Bata
SNI A.2.2.1.15 Pembongkaran keramik
SNI A.2.2.1.16 Pembongkaran kloset
SNI A.2.2.1.17 Pembongkaran kusen pintu & jendela
SNI A.2.2.1.18 Pembongkaran Rangka Atap/ Reng/ Kaso
SNI A.2.2.1.19 Pembongkaran genteng
SNI A.2.2.1.20 Pembongkaran Instalasi Listrik & Armartur

SNI A.2.3.1 TANAH


SNI A.2.3.1.1 Menggali Tanah Biasa Sedalam 1 m
SNI A.2.3.1.2 Menggali Tanah Biasa Sedalam 2 m
SNI A.2.3.1.3 Menggali Tanah Biasa Sedalam 3 m
SNI A.2.3.1.5 Menggali Tanah Cadas Sedalam 1 m
SNI A.2.3.1.7 Pengerjaan Stripping Tanah Sampai Dengan 1 m
SNI A.2.3.1.8 (K3) Pembuangan Tanah Sejauh 30 meter
SNI A.2.3.1.9 Pengurugan Kembali Galian Tanah
SNI A.2.3.1.10 (K3) Pemadatan Tanah ( Per 20 cm )
SNI A.2.3.1.11 Pengurukan Dengan Pasir Urug
SNI A.2.3.1.11.a Pengurukan Dengan Tanah Urug
SNI A.2.3.1.13 Pemasangan Lapisan Ijuk Tebal 10 cm Untuk Bidang Resapan
SNI A.2.3.1.14 Pengurukan Sirtu Padat

SNI A.3.2.1 PONDASI


SNI A.3.2.1.2 Pemasangan Pondasi Batu Belah Campuran 1 SP : 4 PP
SNI A.3.2.1.9 Pemasangan Batu Kosong ( Aanstamping )
SNI A.3.2.1.10 Pemasangan Pondasi Siklop, 60% Beton Campuran 1 SP : 2 PB : 3 Kr dan 40% Batu Bela
SNI A.3.2.1.11 Pemasangan Pondasi Sumuran, Diameter 100 cm

SNI A.4.1.1. BETON


SNI A.4.1.1.1 Membuat Beton Mutu f'c = 7.4 MPa (K-100), Slump (12 ± 2 ) cm, w/c = 0.87
SNI A.4.1.1.2 Membuat Beton Mutu f'c = 9.8 MPa (K-125), Slump (12 ± 2 ) cm, w/c = 0.78
SNI A.4.1.1.3 Membuat Beton Mutu f'c = 12.2 MPa (K-150), Slump (12 ± 2 ) cm, w/c = 0.72
SNI A.4.1.1.4 Membuat Lantai Kerja Beton Mutu f'c = 7.4 MPa (K-100), Slump (3 - 6 ) cm, w/c = 0.87
SNI A.4.1.1.5 Membuat Beton Mutu f'c = 14.5 MPa (K-175), Slump (12 ± 2 ) cm, w/c = 0.66
SNI A.4.1.1.6 Membuat Beton Mutu f'c = 16.9 MPa (K-200), Slump (12 ± 2 ) cm, w/c = 0.61
SNI A.4.1.1.7 Membuat Beton Mutu f'c = 19.3 MPa (K-225), Slump (12 ± 2 ) cm, w/c = 0.58
SNI A.4.1.1.8 Membuat Beton Mutu f'c = 21.7 MPa (K-250), Slump (12 ± 2 ) cm, w/c = 0.56
SNI A.4.1.1.9 Membuat Beton Mutu f'c = 24.0 MPa (K-275), Slump (12 ± 2 ) cm, w/c = 0.53
SNI A.4.1.1.10 Membuat Beton Mutu f'c = 26.4 MPa (K-300), Slump (12 ± 2 ) cm, w/c = 0.52
SNI A.4.1.1.11 Membuat Beton Mutu f'c = 28.8 MPa (K-325), Slump (12 ± 2 ) cm, w/c = 0.49
SNI A.4.1.1.12 Membuat Beton Mutu f'c = 31.2 MPa (K-350), Slump (12 ± 2 ) cm, w/c = 0.48
SNI A.4.1.1.13 Membuat Beton Kedap Air Dengan Strorox - 100
SNI A.4.1.1.17 Pembesian 10 Kg Dengan Besi Beton Polos
SNI A.4.1.1.17.a Pembesian 10 Kg Dengan Besi Beton Ulir
SNI A.4.1.1.18. Pemasangan 10 Kg Kabel Presstressed Polos/Strands
SNI A.4.1.1.18.a Pemasangan 10 Kg Kabel Presstressed Ulir/Strands
SNI A.4.1.1.19 Pemasangan 10 Kg Jaring Kawat Baja (Wiremesh), Wiremesh Dia. 5 mm
SNI A.4.1.1.19.a Pemasangan 10 Kg Jaring Kawat Baja (Wiremesh), Wiremesh Dia. 6 mm
SNI A.4.1.1.20 Pemasangan Bekesting Untuk Pondasi
SNI A.4.1.1.21 Pemasangan Bekesting Untuk Sloof
SNI A.4.1.1.22 Pemasangan Bekesting Untuk Kolom
SNI A.4.1.1.23 Pemasangan Bekesting Untuk Balok
SNI A.4.1.1.24 Pemasangan Bekesting Untuk Lantai
SNI A.4.1.1.25 Pemasangan Bekesting Untuk Dinding
SNI A.4.1.1.26 Pemasangan Bekesting Untuk Tangga

SNI A.4.2.1. Besi & Aluminium


SNI A.4.2.1.1 Pemasangan Besi profil
SNI A.4.2.1.20 Pemasangan rangka besi hollow 1x40.40.2mm, modul 60 x 120 cm, untuk partisi
SNI A.4.2.1.21 Pemasangan rangka besi hollow 1x40.40.2mm, modul 60 x 120 cm, untuk Plafond
SNI A.4.2.1.22 (K3) Pemasangan Atap Pelana Rangka Atap Baja Canal Dingin Profil C75
SNI A.4.2.1.22.a (K3) Pemasangan Atap Pelana Rangka Atap Baja Canal Dingin Profil C125
SNI A.4.2.1.23 (K3) Pemasangan atap jurai rangka atap baja canai dingin Profil C75
SNI A.4.2.1.24 Pembesian 1kg dengan besi polos
SNI A.4.2.1.25 Memasang 1kg dengan besi baja WF
SNI A.4.2.1.26 Memasang 1kg dengan besi kotak
SNI A.4.2.1.27 Memasang 1kg dengan besi pipa
SNI A.4.2.1.28 Mengerjakan 100kg pekerjaan perakitan
SNI A.4.2.1.29 Mengerjakan 1cm dengan las listrik
SNI A.4.4.1. PASANGAN
SNI A.4.4.1.1 Pemasangan Dinding Bata Merah (5x11x22) cm Tebal 1 Batu Camp. 1 SP : 2 PP
SNI A.4.4.1.2 Pemasangan Dinding Bata Merah (5x11x22) cm Tebal 1 Batu Camp. 1 SP : 3 PP
SNI A.4.4.1.3 Pemasangan Dinding Bata Merah (5x11x22) cm Tebal 1 Batu Camp. 1 SP : 4 PP
SNI A.4.4.1.7 Pemasangan Dinding Bata Merah (5x11x22) cm Tebal 1/2 Batu Camp. 1 SP : 2 PP
SNI A.4.4.1.8 Pemasangan Dinding Bata Merah (5x11x22) cm Tebal 1/2 Batu Camp. 1 SP : 3 PP
SNI A.4.4.1.9 Pemasangan Dinding Bata Merah (5x11x22) cm Tebal 1/2 Batu Camp. 1 SP : 4 PP
SNI A.4.4.1.10 Pemasangan dinding bata ringan T = 10 cm
SNI A.4.4.1.10.a Pemasangan dinding bata ringan T = 7.5 cm
SNI A.4.4.1.23 Pemasangan Dinding Terawang (Rooster) 12 x 11 x 24 Campuran 1 SP : 4 PP

ASHP A.4.4.2. PLESTER & ACI


SNI A.4.4.2.2 Pemasangan Plesteran 1 SP : 2 PP Tebal 15 mm
SNI A.4.4.2.3 Pemasangan Plesteran 1 SP : 3 PP Tebal 15 mm
SNI A.4.4.2.4 Pemasangan Plesteran 1 SP : 4 PP Tebal 15 mm
SNI A.4.4.2.14 Pemasangan Plesteran 1 SP : 3 PP Tebal 20 mm
SNI A.4.4.2.15 Pemasangan Plesteran 1 SP : 4 PP Tebal 20 mm
SNI A.4.4.2.20 Pemasangan Plesteran Skoning 1 SP : 3 PP Tebal 10 mm
SNI A.4.4.2.23 Pemasangan Plesteran Ciprat 1 SP : 2 PP
SNI A.4.4.2.27 Pemasangan Acian
SNI A.4.4.2.28 Pemasangan Plesteran Dengan Mortar Siap Pakai (MSP)
SNI A.4.4.2.29 Pemasangan Plesteran Acian Mortar Siap Pakai (MSP)

SNI A.4.4.3. PENUTUP LANTAI & DINDING


SNI A.4.4.3.9 Pemasangan Lantai Ubin Granit Ukuran 40 cm x 40 cm
SNI A.4.4.3.13 Pemasangan Lantai Ubin Teralux Marmer Ukuran 60 cm x 60 cm Polished
SNI A.4.4.3.13.a Pemasangan Lantai Ubin Teralux Marmer Ukuran 60 cm x 60 cm Unpolished
SNI A.4.4.3.28 Pemasangan Plint Ubin Teralux Marmer Ukuran 10 cm x 60 cm
SNI A.4.4.3.29 Pemasangan Plint Ubin Teralux Marmer Ukuran 10 cm x 40 cm
SNI A.4.4.3.54 Pemasangan 1 m2 Dinding Keramik 20 cm x 20 cm
SNI A.4.4.3.54.a Pemasangan 1 m2 Dinding Keramik 20 cm x 40 cm
SNI A.4.4.3.54.b Pemasangan 1 m2 Dinding Granit 60 cm x 120 cm
SNI A.4.4.3.55.a Pemasangan 1 m2 Koral Sikat
SNI A.4.4.3.55.b Pemasangan 1 m2 Paving Block (K200)
SNI A.4.4.3.57 Pemasangan 1 m2 Dinding Batu Paras

SNI A.4.5.1. LANGIT-LANGIT


SNI A.4.5.1.7 Pemasangan 1 m2 Langit-Langit Gypsum Board Ukuran ( 120 x 240 x 9 ) mm, Tebal 9 m
SNI A.4.5.1.8 Pemasangan 1 m2 Langit-Langit Bahan PVC
SNI A.4.5.1.10 Pemasangan 1 m2 Rangka Langit-Langit Besi Hollow 40.40 mm

SNI A.4.5.2. ATAP


SNI A.4.5.2.7 Pemasangan 1 m2 Roof Light Fibreglass 90 x 180 cm
SNI A.4.5.2.34 Pemasangan 1 m2 Atap Sirap Kayu
SNI A.4.5.2.41.a Pemasangan 1 m2 Atap Aspal Bitumen
SNI A.4.5.2.42.a Pemasangan 1 m' Nok Atap Aspal Bitumen
SNI A.4.5.2.32.a Pemasangan 1 m2 Atap Zincalume (Spandek)
SNI A.4.5.2.43. Pemasangan 1 m2 Atap Seng Gelombang
SNI A.4.5.2.43.a Pemasangan 1 m' Nok Atap Seng
SNI A.4.5.2.44. Pemasangan 1 m' Listplank ukuran (2 x 20) cm, Kayu Klas II

SNI A.4.6.1. KAYU


SNI A.4.6.1.1. Pembuatan dan pemasangan 1 m3 kusen pintu dan kusen jendela, kayu kelas I
SNI A.4.6.1.2a Pembuatan dan pemasangan 1 m3 kusen pintu dan kusen jendela, kayu kelas II
SNI A.4.6.1.2b Pembuatan dan pemasangan 1 m2 daun pintu panel, kayu kelas II
SNI A.4.6.1.3. Pembuatan dan pemasangan 1 m2 daun pintu panel, kayu kelas I
SNI A.4.6.1.4. Pembuatan dan pemasangan 1 m2 pintu dan jendela kaca

SNI A.4.7.1. FINISHING


SNI A.4.7.1.10 Pengecatan 1 m2 Tembok Baru ( 1 Lapis Plamur, 1 Lapis Cat Dasar, 2 Lapis Cat Penutup )
SNI A.4.7.1.10.a Pengecatan 1 m2 Tembok Baru ( 1 Lapis Plamur, 1 Lapis Cat Dasar, 2 Lapis Cat Penutup )
SNI A.4.7.1.11 Pengecatan 1 m2 Tembok Lama ( 1 Lapis Cat Dasar, 2 Lapis Cat Penutup )
SNI A.4.7.1.12 Pengecatan 1m2 dengan cat duco

SNI A.5.1.1. PLUMBING


SNI A.5.1.1.1 Pemasangan 1 Buah Kloset Duduk
SNI A.5.1.1.2 Pemasangan 1 Buah Kloset Jongkok Porselen
SNI A.5.1.1.5 Pemasangan 1 Buah Wastafel
SNI A.5.1.1.4 Pemasangan 1 Buah Urinoir
SNI A.5.1.1.16 Pemasangan 1 Buah Bak Kontrol Pasangan Bata 30 x 30 Tinggi 35 cm
SNI A.5.1.1.17 Pemasangan 1 Buah Bak Kontrol Pasangan Bata 60 x 60 Tinggi 65 cm
SNI A.5.1.1.25 Pemasangan 1 m' Pipa PVC Tipe AW Diameter 1/2"
SNI A.5.1.1.26 Pemasangan 1 m' Pipa PVC Tipe AW Diameter 3/4"
SNI A.5.1.1.27 Pemasangan 1 m' Pipa PVC Tipe AW Diameter 1"
SNI A.5.1.1.28 Pemasangan 1 m' Pipa PVC Tipe AW Diameter 1 1/2"
SNI A.5.1.1.29 Pemasangan 1 m' Pipa PVC Tipe AW Diameter 2"
SNI A.5.1.1.30 Pemasangan 1 m' Pipa PVC Tipe AW Diameter 2 1/2"
SNI A.5.1.1.31 Pemasangan 1 m' Pipa PVC Tipe AW Diameter 3"
SNI A.5.1.1.32 Pemasangan 1 m' Pipa PVC Tipe AW Diameter 4"
SNI A.5.1.1.33 Pemasangan 1 buah bak cuci piring stainless
SNI A.5.1.1.35 Pemasangan 1 Buah Kran Air Diameter 1/2" atau 3/4"
SNI A.5.1.1.36 Pemasangan 1 Buah Floor Drain

Independen
AI 001 Membuat Letter Channel 3D + LED

Daun Pintu Aluminium Toilet


SNI A.4.6.2.17 Pemasangan 1 m2 Kaca Polos Tebal 5 mm
SNI A.4.6.2.18 Pemasangan 1 m2 Kaca Polos Tebal 8 mm
LS ALMC.1.1.1 Daun Jendela kaca 5 mm, Frame Aluminium Uk. 75 x 140 cm
LS ALMC.1.1.2 Daun Jendela kaca 5 mm, Frame Aluminium Uk. 63 x 120 cm
LS ALMC.1.1.3 Daun Jendela kaca 5 mm, Frame Aluminium Uk. 75 x 120 cm
LS ALMC.1.1.4 Daun Ventilasi kaca 5 mm, Frame Aluminium Uk. 57 x 80 cm
LS ALMC.1.1.5 Daun Ventilasi kaca 5 mm, Frame Aluminium Uk. 57x50 cm
LS ALMC.1.1.6 Daun Ventilasi kaca 5 mm, Frame Aluminium Uk. 57x88 cm
LS ALMC.1.1.7 Daun Ventilasi kaca 5 mm, Frame Aluminium Uk. 57x75 cm
LS ALMC.1.1.8 Daun Ventilasi kaca 5 mm, Frame Aluminium Uk. 57x63 cm
LS ALMC.1.1.9 Daun Jendela kaca 5 mm, Frame Aluminium Uk. 63 x 120 cm
LS DP.1.1.1 Daun Pintu multiplek Ukuran 90x205 cm
LS DP.1.1.2 Daun Pintu multiplek Ukuran 82x205 cm
LS DP.1.1.3 Daun Pintu multiplek Ukuran 150x205 cm
LS ALMC.1.1.10 Daun Pintu kaca Ukuran 90x205 cm
LS ALMC.1.1.11 Daun Pintu kaca Ukuran 150x205 cm
Lapisan HPL Daun Pintu
SNI A.4.6.2.2 Pemasangan 1 buah kunci tanam biasa
SNI A.4.6.2.2 a Pemasangan 1 buah kunci tanam biasa untuk pintu doble
SNI A.4.6.2.4 Pemasangan 1 buah kunci tanam pintu gesr
SNI A.4.6.2.5 Pemasangan 1 buah engsel pintu
SNI A.4.6.2.5 a Pemasangan 1 buah engsel pintu dobel
SNI A.4.6.2.11 Pemasangan 1 buah grendel
SNI A.4.6.2.11 a Pemasangan 1 buah grendel expagnyolet
SNI A.4.6.2.10 Pemasangan 1 buah door closer
SNI A.4.6.2.10 a Pemasangan 1 buah handle pintu
SNI A.4.6.2.10 b Pemasangan 1 buah handle pintu geser
SNI A.4.6.2.14 Pemasangan 1 buah rel pintu dorong
LS.MEP.1.1.1 Pemasangan 1 buah lampu downlight
LS.MEP.1.1.2 Pekerjaan instalasi titik lampu
LS.MEP.1.1.3 Pekerjaan instalasi stop kontak
LS.MEP.1.1.4 Pekerjaan memasang saklar tunggal
LS.MEP.1.1.5 Pekerjaan memasang saklar ganda
LS.MEP.1.1.6 Pekerjaan memasang stop kontak
LS.MEP.1.1.7 Pekerjaan memasang stop kontak
LS.MEP.1.1.8 instalasi dan stop kontak 4 pin 3 phase
LS.MEP.1.1.9 instalasi kabel daya dari mdp ke sdp
LS.MEP.1.1.10 Pemasangan exhaust fan
SNI A.5.1.1.1 Pemasangan 1 buah closet duduk
SNI A.5.1.1.1 a Pemasangan 1 buah wastafel
SNI A.5.1.1.1 b Pemasangan 1 buah wastafel kamar mandi
SNI A.5.1.1.25 Pemasangan 1m pipa PVC type AW d 1/2"
SNI A.5.1.1.26 Pemasangan 1m pipa PVC type AW d 3/4"
LS.MEP.1.1.11 socket rj 45
ga Satuan Daerah
ggara Barat
22

SATUAN HARGA

m2 Rp 372,050
m1 Rp 76,579
m2 Rp 17,913
m2 Rp 438,496
m3 Rp 1,515,260
m3 Rp 757,630
m² Rp 6,773
bh Rp 24,184
m³ Rp 141,401
m² Rp 29,511
m² Rp 12,092
Titik Rp 11,364

m3 Rp 83,415
m3 Rp 102,281
m3 Rp 121,439
m3 Rp 169,306
m2 Rp 6,046
m3 Rp 36,557
m3 Rp 60,461
m3 Rp 60,461
m3 Rp 198,366
m3 Rp 165,366
m2 Rp 117,138
m3 Rp 272,186

m3 Rp 872,989
m3 Rp 526,626
1 SP : 2 PB : 3 Kr dan 40% Batu Bela m3 Rp 2,983,460
m3 Rp 933,472

(12 ± 2 ) cm, w/c = 0.87 m3 Rp 987,826


(12 ± 2 ) cm, w/c = 0.78 m3 Rp 1,011,796
p (12 ± 2 ) cm, w/c = 0.72 m3 Rp 1,030,463
100), Slump (3 - 6 ) cm, w/c = 0.87 m3 Rp 909,678
p (12 ± 2 ) cm, w/c = 0.66 m3 Rp 1,052,654
p (12 ± 2 ) cm, w/c = 0.61 m3 Rp 485,474,687
p (12 ± 2 ) cm, w/c = 0.58 m3 Rp 493,007,892
p (12 ± 2 ) cm, w/c = 0.56 m3 Rp 489,259,940
p (12 ± 2 ) cm, w/c = 0.53 m3 Rp 483,170,812
p (12 ± 2 ) cm, w/c = 0.52 m3 Rp 480,827,329
p (12 ± 2 ) cm, w/c = 0.49 m3 Rp 473,864,139
p (12 ± 2 ) cm, w/c = 0.48 m3 Rp 471,052,716
m3 Rp 901,865
Kg Rp 17,878
Kg Rp 19,149
Kg Rp 17,200
Kg Rp 18,478
Wiremesh Dia. 5 mm Kg Rp 337,721
Wiremesh Dia. 6 mm Kg Rp 434,211
m2 Rp 118,909
m2 Rp 127,159
m2 Rp 318,089
m2 Rp 333,764
m2 Rp 439,089
m2 Rp 340,656
m2 Rp 301,500

Kg Rp 48,995
ul 60 x 120 cm, untuk partisi m2 Rp 250,291
ul 60 x 120 cm, untuk Plafond m2 Rp 297,354
al Dingin Profil C75 m2 Rp 333,264
al Dingin Profil C125 m2 Rp 495,517
ingin Profil C75 m2 Rp 384,519
Kg Rp 20,478
Kg Rp 554,788
Kg Rp 39,370
Kg Rp 39,370
Kg Rp 851
Cm Rp 608
al 1 Batu Camp. 1 SP : 2 PP m2 Rp 267,116
al 1 Batu Camp. 1 SP : 3 PP m2 Rp 258,165
al 1 Batu Camp. 1 SP : 4 PP m2 Rp 251,855
al 1/2 Batu Camp. 1 SP : 2 PP m2 Rp 130,255
al 1/2 Batu Camp. 1 SP : 3 PP m2 Rp 125,846
al 1/2 Batu Camp. 1 SP : 4 PP m2 Rp 123,413
m2 Rp 285,030
m2 Rp 285,030
24 Campuran 1 SP : 4 PP m2 Rp 1,469,981

m2 Rp 71,490
m2 Rp 69,497
m2 Rp 68,080
m2 Rp 76,815
m2 Rp 90,773
m1 Rp 73,240
m2 Rp 53,903
m2 Rp 41,419
m2 Rp 63,898
m2 Rp 41,598

m2 Rp 1,565,163
cm x 60 cm Polished m2 Rp 243,728
cm x 60 cm Unpolished m2 Rp 1,099,638
m1 Rp 274,490
m1 Rp 234,076
m2 Rp 326,414
m2 Rp 243,556
m2 Rp 913,374
m2 Rp 222,536
m2 Rp 134,746
m2 Rp 367,674

ran ( 120 x 240 x 9 ) mm, Tebal 9 m m2 Rp 54,989


m2 Rp 261,611
m2 Rp 166,002

m2 Rp 53,570
m2 Rp 6,991,176
m2 Rp 361,574
m1 Rp 218,091
m2 Rp 92,936
m2 Rp 58,266
m' Rp 44,053
m' Rp 156,753

kusen jendela, kayu kelas I m3 Rp 23,744,754


kusen jendela, kayu kelas II m3 Rp 17,755,254
, kayu kelas II m3 Rp 1,057,672
, kayu kelas I m3 Rp 1,275,472
m3 Rp 1,133,876

apis Cat Dasar, 2 Lapis Cat Penutup ) m2 58,560


apis Cat Dasar, 2 Lapis Cat Penutup ) m2 58,608
2 Lapis Cat Penutup ) m2 40,847
m2 388,404

bh Rp 1,157,159
bh Rp 522,033
bh Rp 2,193,813
bh Rp 3,848,447
30 Tinggi 35 cm bh Rp 490,782
60 Tinggi 65 cm bh Rp 867,846
m' Rp 71,088
m' Rp 81,262
m' Rp 40,896
m' Rp 58,147
m' Rp 74,345
m' Rp 78,696
m' Rp 74,433
m' Rp 97,877
bh Rp 1,987,417
bh Rp 97,924
bh Rp 126,955

Cm Rp 45,690

UNIT 119,168
m' 389,330
m' 484,037
UNIT 1,944,251
UNIT 1,668,846
UNIT 1,787,963
UNIT 1,408,152
UNIT 1,061,685
UNIT 1,354,871
UNIT 1,254,570
UNIT 1,161,986
UNIT 1,668,846
UNIT 1,404,072
UNIT 1,403,346
UNIT 1,644,658
UNIT 2,580,953
UNIT 4,127,069
m2 1,922,149
UNIT 219,886
UNIT 361,511
bh 117,916
bh 54,026
bh 98,298
bh 72,516
bh 129,166
bh 331,484
bh 161,589
bh 120,746
bh 291,082
titik 184,940
titik 179,225
titik 179,225
titik 48,873
titik 66,198
titik 51,073
titik 98,098
titik 1,676,546
titik 106,293
titik 616,419
buah 3,476,334
buah 1,347,834
buah 2,766,834
m' 31,039
m' 34,339
buah 169,598

Anda mungkin juga menyukai