Dimensi Dam
V=PXLXH 300 X 90 X 7
INPUT HARIAN
8,000.00
1.00 CIRCULATE PP (80%)
INPUT HARIAN DARI
2,500.00
2.00 DARI PIT
FAKTOR HILANG (1 %)
PENGUAPAN DAN 1,890.00
REMBESAN
VOLUME RATA-RATA
(A + B) - (C +
HARIAN DAM
= 189,000.00 + 10,500.00 - 8,000.00 +
= 189,610.00
116,630.49 46,784.72
163,415.21
D)
1,890.00