REKAPITULASI PERKIRAAN HARGA PEKERJAAN

PEKERJAAN : PENGADAAN WATER TREATMENT PLANT ( WTP )


LOKASI : DINAS PEKERJAAN UMUM DAN TATA RUANG KABUPATEN PENAJAM PASER UTARA
THN ANGGARAN : 2020

NO URAIAN PEKERJAAN JUMLAH BIAYA


( Rp )

A PEKERJAAN SARANA WTP ( SIPIL )


I PEKERJAAN PERSIAPAN 9,895,923
II PEKERJAAN GRAOUND TANK (6,00 X 4,00) 151,040,048
III PEKERJAAN PONDASI FLOKULASI DAN KOAGULASI (2,50 X 1,20) 4,676,137
IV PEKERJAAN PONDASI PH ADJUSTMENT (2,50 X 1,20) 4,676,137
V PEKERJAAN PONDASI MIXING DAN CLARIFIER TANK (5,1 X 2,2) 11,868,547
VI PEKERJAAN PONDASI INTERMEDIATE TANK (2,20 X 2,20) 6,205,564
VII PEKERJAAN PONDASI DUDUKAN FILTER (3,00 X 1,00) 5,206,071
VIII PEKERJAAN PONDASI PRODUCT WATER TANK (6,50 X 3,50) 19,056,387
IX PEKERJAAN RUMAH MESIN 3,15 x 2,15 m 45,812,725
IX PEKERJAAN PONDASI RO SYSTEM (1,50 X 0,80) 2,770,547
XI PEKERJAAN PONDASI DUDUKAN ULTRAFILTRATION (4,50 X 2,20) 10,728,643
XII PEKERJAAN CANOPY DAN PAGAR 52,038,000

SUB TOTAL ( A ) 323,974,730

B PENGADAAN WATER TREATMENT PLANT ( WTP )


I POMPA TRANSFER 180,000,000.00
II FLOKULASI DAN KOAGULASI 508,486,720.00
III PH ADJUSTMENT 353,622,825.00
IV MIXING TANK AND MIXER 48,547,560.00
V CLARIFIER (TUBE SETLER) 65,000,000.00
VI WATER TANK 75,014,000.00
VII POMPA FILTER 96,000,000.00
VIII SAND FILTER 55,425,880.00
IX MULTIMEDIA FILTER 54,486,720.00
X REVERSE OSMOSIS (RO) 550,000,000.00
XI ULTRAFILTRATION 620,000,000.00
XII PRE CHLORINE 95,000,000.00
XIII CARBON FILTER 103,037,701.47
XIV STATIC MIXER 80,000,000.00
XV PRODUCT WATER TANK 117,767,500.00
XVI POMPA DISTRIBUSI 190,000,000.00
XVII PANEL CONTROLE 120,000,000.00

SUB TOTAL ( B ) 3,312,388,906.47

(A) JUMLAH HARGA PEKERJAAN 3,636,363,636


(B) PAJAK PERTAMBAHAN NILAI (PPN)= 10% X (A) 363,636,364
(C) JUMLAH TOTAL HARGA PEKERJAAN = (A) + (B) 4,000,000,000
(D) DIBULATKAN 4,000,000,000
TERBILANG : EMPAT MILYAR RUPIAH
PEMERINTAH
KABUPATEN PENAJAM PASER UTARA

JENIS KEGIATAN :
PENGADAAN SISTEM INSTALASI
(WATER TREATMENT PLAN)
KAPASITAS 150m³
PEKERJAAN :
PENGADAAN SISTEM INSTALASI
(WATER TREATMENT PLAN)
DINAS KESEHATAN
KABUPATEN PENAJAM PASER UTARA

Alamat: Jl. Propinsi, Penajam, Kabupaten Penajam Paser Utara, Kalimantan Timur 76142

TAHUN ANGGARAN
2020
PEMERINTAH
KABUPATEN PENAJAM PASER UTARA

KETERANGAN

- UKURAN GAMBAR MEMAKAISATUAN Mili Meter

COVER

DAFTAR ISI

LAYOUT BANGUNAN
NO REVISI

KEGIATAN
SCHEMATIC
PENGADAAN SISTEM INSTALASI
(WATER TREATMENT PLAN)

LAYOUT WATER TREATMENT PLAN (WTP)


PEKERJAAN
DENAH GROUND TANK
PENGADAAN SISTEM INSTALASI
(WATER TREATMENT PLAN)
DINAS KESEHATAN
POT. GROUND TANK & DETAIL SLOOF, BALOK KABUPATEN PENAJAM PASER UTARA

MENGETAHUI
PONDASI FLOGULASI & KOAGULASI KEPALA DINAS

PONDASI PH ADJUSTMENT

PONDASI BAK MIXING TANK & PONDASI CLARIFIER TANK


..............................
NIP. .......................
PONDASI INTERMEDIATE TANK/WATER TANK DISETUJUI OLEH

PEJABAT PEMBUAT KOMITMEN (PPK)


PONDASI DUDUKAN FILTER

PONDASI PRODUCT WATER TANK

DENAH RUMAH & POTONGAN MESIN/PERALATAN ..............................


NIP. .......................

DIKETAHUI OLEH

TAMPAK RUMAH MESIN/PERALATAN PEJABAT PELAKSANA TEKNIS


KEGIATAN (PPTK)

DETAIL PINTU DAN KUSEN

DENAH ZONA CANOPY ..............................


NIP. .......................
KONSULTAN PERENCANA

CANOPY
-

PAGAR HARMONIKA JUDUL GAMBAR

DAFTAR ISI
PONDASI RO SYSTEM

PONDASI ULTRAFILTRATION SKALA NTS SIGN

DIGAMBAR

PERENCANA

TANGGAL -

NO. PROYEK -

NO. GAMBAR 0001 JLH LEMBAR

20
PEMERINTAH
KABUPATEN PENAJAM PASER UTARA

KETERANGAN

- UKURAN GAMBAR MEMAKAISATUAN Mili Meter

NO REVISI

KEGIATAN

PENGADAAN SISTEM INSTALASI


(WATER TREATMENT PLAN)

PEKERJAAN

PENGADAAN SISTEM INSTALASI


(WATER TREATMENT PLAN)
DINAS KESEHATAN
KABUPATEN PENAJAM PASER UTARA

MENGETAHUI

KEPALA DINAS

..............................
NIP. .......................

DISETUJUI OLEH

PEJABAT PEMBUAT KOMITMEN (PPK)

..............................
NIP. .......................

DIKETAHUI OLEH

PEJABAT PELAKSANA TEKNIS


KEGIATAN (PPTK)

..............................
NIP. .......................
KONSULTAN PERENCANA

JUDUL GAMBAR

LAYOUT BANGUNAN

SKALA NTS SIGN

DIGAMBAR

PERENCANA

TANGGAL -

NO. PROYEK -

NO. GAMBAR 0002 JLH LEMBAR

20
PEMERINTAH
KABUPATEN PENAJAM PASER UTARA

KETERANGAN

- UKURAN GAMBAR MEMAKAISATUAN Mili Meter

SCHEMATIC FLOW DIAGRAM

NO REVISI

KEGIATAN
DOSING PUMP
PENGADAAN SISTEM INSTALASI
(WATER TREATMENT PLAN)

PEKERJAAN

PENGADAAN SISTEM INSTALASI


(WATER TREATMENT PLAN)
DINAS KESEHATAN
KABUPATEN PENAJAM PASER UTARA

MENGETAHUI

KEPALA DINAS
DOSING PUMP DOSING PUMP DOSING PUMP

POMPA TRANSFER
POMPA TRANSFER
POMPA TRANSFER

..............................
NIP. .......................

DISETUJUI OLEH

M PEJABAT PEMBUAT KOMITMEN (PPK)

MENUJU STATIK
MIXER

WATER FLOW METER


M

SUPPLY AIR SUNGAI


..............................
NIP. .......................

DIKETAHUI OLEH

PEJABAT PELAKSANA TEKNIS


CHAMBER 1 CHAMBER 2 WATER TANK
TRANSFER TANK TRANSFER TANK KEGIATAN (PPTK)
1600

..............................
NIP. .......................
KONSULTAN PERENCANA

JUDUL GAMBAR
M
SCHEMATIC

SKALA NTS SIGN

DIGAMBAR

PERENCANA

TANGGAL -

NO. PROYEK -

NO. GAMBAR 0003 JLH LEMBAR

20
PEMERINTAH
KABUPATEN PENAJAM PASER UTARA

KETERANGAN

- UKURAN GAMBAR MEMAKAISATUAN Mili Meter

2000 2400 2400 2400 2400 2400 2400 2400

NO REVISI

4000
2500
KEGIATAN
2400

2400
PENGADAAN SISTEM INSTALASI
FLOKULASI & PH ADJUSTMENT (WATER TREATMENT PLAN)

KOAGULASI

1200
1200
COR RABATBETON COR RABATBETON
T=200mm T=200mm

WATER TANK PEKERJAAN


RUMAH MESIN /

RO SYSTEM
PENGADAAN SISTEM INSTALASI
PERALATAN

COR RABATBETON
(WATER TREATMENT PLAN)

T=200mm

1500
DINAS KESEHATAN
Ø1 KABUPATEN PENAJAM PASER UTARA
20
0

CLARIFIER MENGETAHUI
2400

2400
MIXING
(TUBE SETLER)
COR RABATBETON
TANK Ø1200mm x

2200
T=200mm
3500 x 2000 x 2000 mm 800 KEPALA DINAS
1500mm
CHAMBER 2
TRANSFER TANK
6000

1200
..............................
NIP. .......................

DISETUJUI OLEH

PEJABAT PEMBUAT KOMITMEN (PPK)


2400

2400
CHAMBER 1

PONDASI DUDUKAN
TRANSFER TANK
2200
PRODUCT WATER TANK
6000x3000x2000mm

FILTER
3000

COR RABATBETON
T=200mm
WATER TANK ..............................
NIP. .......................
DIM.2000x2000x2000
DIKETAHUI OLEH
2200

COR RABATBETON
T=200mm

PEJABAT PELAKSANA TEKNIS


KEGIATAN (PPTK)
2400

2400
..............................
NIP. .......................
KONSULTAN PERENCANA

2000 2400 2400 2400 2400 2400 2400 2400 -

JUDUL GAMBAR

LAYOUT WTP LAYOUT WTP

SCALE : 1 : 60

SKALA 1 : 60 SIGN

DIGAMBAR

PERENCANA

TANGGAL -

NO. PROYEK -

NO. GAMBAR 0004 JLH LEMBAR

20
PEMERINTAH
KABUPATEN PENAJAM PASER UTARA

KETERANGAN

B
- UKURAN GAMBAR MEMAKAISATUAN Mili Meter

6000 KOLOM PRAKTIS


150x150
150 1800 150 1800 150 1800 150
NO REVISI

150
KEGIATAN

PENGADAAN SISTEM INSTALASI


(WATER TREATMENT PLAN)

622
PEKERJAAN

PENGADAAN SISTEM INSTALASI


(WATER TREATMENT PLAN)

592
DINAS KESEHATAN
KABUPATEN PENAJAM PASER UTARA

MENGETAHUI

KEPALA DINAS

WATER TANK CHAMBER 2 CHAMBER 1


TRANSFER TANK TRANSFER TANK

4000
3700
A A ..............................
NIP. .......................

DISETUJUI OLEH

PEJABAT PEMBUAT KOMITMEN (PPK)


592

..............................
NIP. .......................

DIKETAHUI OLEH

700
622

PEJABAT PELAKSANA TEKNIS


KEGIATAN (PPTK)
Besi 4Ø10
150

150
Sengkang Ø10
B

150
..............................
NIP. .......................
KONSULTAN PERENCANA

DENAH GROUND TANK -

SCALE : 1 : 30 DETAIL KOLOM JUDUL GAMBAR

SCALE : 1 : 10 DENAH GROUND TANK

SKALA 1 : 30 SIGN

DIGAMBAR

PERENCANA

TANGGAL -

NO. PROYEK -

NO. GAMBAR 0005 JLH LEMBAR

20
MENUJU STATIK
MIXER

PEMERINTAH
KABUPATEN PENAJAM PASER UTARA
WATER FLOW METER
M KETERANGAN

- UKURAN GAMBAR MEMAKAISATUAN Mili Meter

Penutup MAN HOLE Plat Beton


Wiremesh Ø 8-100
SUPPLY AIR SUNGAI
BESI Ø10-150 BESI Ø10-150

BALOK 200x120 1000 1000 1000 NO REVISI

120
KEGIATAN

900 900 900


PENGADAAN SISTEM INSTALASI
(WATER TREATMENT PLAN)

BESI Ø10-150
PEKERJAAN

BESI Ø10-150 PENGADAAN SISTEM INSTALASI

3120
(WATER TREATMENT PLAN)

3000
3440
DINAS KESEHATAN
2600

2600
KABUPATEN PENAJAM PASER UTARA

WATER TANK CHAMBER 2 CHAMBER 1 MENGETAHUI


TRANSFER TANK TRANSFER TANK
KEPALA DINAS

WATER STOP W.200


SLOOF 150x120
LANTAI KERJA

120
PASIR URUG

100

100
..............................
120 1835 120 1835 120 1850 120 NIP. .......................

DISETUJUI OLEH
6000
PEJABAT PEMBUAT KOMITMEN (PPK)
POTONGAN A-A
SCALE : 1 : 50

BALOK 150x120 BESI Ø10-150


..............................
BESI Ø10-150 NIP. .......................
BALOK 200x120 1000
DIKETAHUI OLEH
120

PEJABAT PELAKSANA TEKNIS


900 KEGIATAN (PPTK)

120 120
6Ø8 4Ø8 120
BESI Ø10-150 4Ø8
CHAMBER 2 Ø6-150 Ø6-150 ..............................
BESI Ø10-150 TRANSFER TANK Ø6-150 NIP. .......................
KONSULTAN PERENCANA
3000

150
3440

150
2600

200 -

JUDUL GAMBAR

POT. GROUND TANK


SLOOF 150x120 DETAIL SLOOF & DETAIL SLOOF, BALOK
SCALE : 1 : 10
LANTAI KERJA DETAIL BALOK
120

PASIR URUG SCALE : 1 : 10


100

SKALA 1 : 50 SIGN
100

DIGAMBAR

120 1820 120 1820 120 -

4000 PERENCANA

-
POTONGAN B-B
SCALE : 1 : 50 TANGGAL -

NO. PROYEK -

NO. GAMBAR 0006 JLH LEMBAR

20
2500
PEMERINTAH
150 2200 150 KABUPATEN PENAJAM PASER UTARA

KETERANGAN

- UKURAN GAMBAR MEMAKAISATUAN Mili Meter

150
FLOKULASI &
KOAGULASI

1200
900
COR RABATBETON
T=200mm

NO REVISI
Sloof 150x200

150
KEGIATAN
Besi 6 Ø 8
Cor Beton Bertulang
Sengkang Ø8-150 150 Besi Ø6-120
PENGADAAN SISTEM INSTALASI
PENAMPANG ATAS PONDASI + 0.200 (WATER TREATMENT PLAN)

SCALE : 1 : 30

± 0.000 PEKERJAAN

B PENGADAAN SISTEM INSTALASI


(WATER TREATMENT PLAN)
Stek Besi
DINAS KESEHATAN
2850 Ø8-200 L.500mm KABUPATEN PENAJAM PASER UTARA

175 150 175 1850 175 150 175 Tanah Urug MENGETAHUI
- 0.500 Pondasi. Batu Kali KEPALA DINAS
- 0.600

175 150 175


Pasir Urug
Tanah Asli
200 Dipadatkan

A A 500 ..............................

1550
550
NIP. .......................
DETAIL A DISETUJUI OLEH

SCALE : 1 : 20 PEJABAT PEMBUAT KOMITMEN (PPK)

175 150 175


DENAH RENCANA PONDASI B ..............................
NIP. .......................
SCALE : 1 : 30
DIKETAHUI OLEH

PEJABAT PELAKSANA TEKNIS


KEGIATAN (PPTK)

2500 1200

..............................
200

200
NIP. .......................
KONSULTAN PERENCANA

JUDUL GAMBAR

PONDASI
FLOGULASI & KOALUGASI
200 200 200 200

500 1850 500 500 550 500 SKALA 1 : 30 SIGN

2850 1550 DIGAMBAR

POTONGAN A-A POTONGAN B-B -

SCALE : 1 : 30 SCALE : 1 : 30 PERENCANA

TANGGAL -

NO. PROYEK -

NO. GAMBAR 0007 JLH LEMBAR

20
2500 PEMERINTAH
KABUPATEN PENAJAM PASER UTARA

150 2200 150 KETERANGAN

- UKURAN GAMBAR MEMAKAISATUAN Mili Meter

150
PH ADJUSTMENT

1200
900
COR RABATBETON
T=200mm

NO REVISI
Sloof 150x200
KEGIATAN
Besi 6 Ø 8
Cor Beton Bertulang

150
Sengkang Ø8-150 150 Besi Ø6-120
PENGADAAN SISTEM INSTALASI

+ 0.200 (WATER TREATMENT PLAN)

PENAMPANG ATAS PONDASI


SCALE : 1 : 30
± 0.000 PEKERJAAN

PENGADAAN SISTEM INSTALASI

B Stek Besi (WATER TREATMENT PLAN)


DINAS KESEHATAN
Ø8-200 L.500mm KABUPATEN PENAJAM PASER UTARA
2850
Tanah Urug MENGETAHUI

175 150 175 1850 175 150 175 - 0.500 Pondasi. Batu Kali KEPALA DINAS
- 0.600
Pasir Urug

175 150 175


Tanah Asli
200 Dipadatkan
500 ..............................
A A DETAIL A
NIP. .......................

1550
550
DISETUJUI OLEH

SCALE : 1 : 20 PEJABAT PEMBUAT KOMITMEN (PPK)

175 150 175


..............................
NIP. .......................
DENAH RENCANA PONDASI B DIKETAHUI OLEH
SCALE : 1 : 30
PEJABAT PELAKSANA TEKNIS
KEGIATAN (PPTK)

2500 1200 ..............................


NIP. .......................
KONSULTAN PERENCANA
200

200
-

JUDUL GAMBAR

PONDASI
ADJUSTMENT

200 200 200 200


SKALA 1 : 30 SIGN
500 1850 500 500 550 500
DIGAMBAR
2850 1550
-

POTONGAN A-A POTONGAN B-B PERENCANA

SCALE : 1 : 30 SCALE : 1 : 30 -

TANGGAL -

NO. PROYEK -

NO. GAMBAR 0008 JLH LEMBAR

20
B 5150

PEMERINTAH
KABUPATEN PENAJAM PASER UTARA

KETERANGAN

- UKURAN GAMBAR MEMAKAISATUAN Mili Meter

0
20
Ø1

CLARIFIER Sloof 150x200


MIXING
A (TUBE SETLER) A Besi 6 Ø 8
Cor Beton Bertulang
TANK Ø1200mm x

2200
3500 x 2000 x 2000 mm Sengkang Ø8-150 150 Besi Ø6-120
1500mm + 0.200
NO REVISI

± 0.000 KEGIATAN

PENGADAAN SISTEM INSTALASI


(WATER TREATMENT PLAN)

Stek Besi
Ø8-200 L.500mm
Tanah Urug PEKERJAAN

- 0.500 Pondasi. Batu Kali PENGADAAN SISTEM INSTALASI


B (WATER TREATMENT PLAN)
- 0.600 DINAS KESEHATAN
PENAMPANG ATAS PONDASI Pasir Urug KABUPATEN PENAJAM PASER UTARA
SCALE : 1 : 30

Tanah Asli MENGETAHUI


5500 200 Dipadatkan
KEPALA DINAS
175 150 175 2000 175 150 175 2000 175 150 175
500
DETAIL A

175 150 175


SCALE : 1 : 20

..............................
NIP. .......................

DISETUJUI OLEH

PEJABAT PEMBUAT KOMITMEN (PPK)

2550
1550
..............................
NIP. .......................

DIKETAHUI OLEH

PEJABAT PELAKSANA TEKNIS


KEGIATAN (PPTK)

175 150 175


2200
..............................
NIP. .......................
KONSULTAN PERENCANA
DENAH RENCANA PONDASI
SCALE : 1 : 30
-
4876

JUDUL GAMBAR

PONDASI MIXING TANK &


PONDASI CLARIFIER TANK
200 200
500 1550 500
SKALA 1 : 30 SIGN
2550
DIGAMBAR
POTONGAN B-B
-
SCALE : 1 : 30
200 200 200 PERENCANA
500 1726 500 2000 500
-
5226
TANGGAL -

POTONGAN A-A NO. PROYEK -

SCALE : 1 : 30 NO. GAMBAR 0009 JLH LEMBAR

20
2200

100 2000 100


Sloof 150x200
Besi 6 Ø 8
Cor Beton Bertulang

100
PEMERINTAH
Sengkang Ø8-150 150 Besi Ø6-120
KABUPATEN PENAJAM PASER UTARA

+ 0.200 KETERANGAN

- UKURAN GAMBAR MEMAKAISATUAN Mili Meter

± 0.000

WATER TANK Stek Besi


Ø8-200 L.500mm
DIM.2000x2000x2000 2200 Tanah Urug
- 0.500

2000

2200
COR RABATBETON
Pondasi. Batu Kali NO REVISI
T=200mm
- 0.600

200
KEGIATAN
Pasir Urug
PENGADAAN SISTEM INSTALASI
Tanah Asli (WATER TREATMENT PLAN)
200 Dipadatkan
500
PEKERJAAN

DETAIL A PENGADAAN SISTEM INSTALASI


SCALE : 1 : 20 (WATER TREATMENT PLAN)
DINAS KESEHATAN
KABUPATEN PENAJAM PASER UTARA

100
200 200
MENGETAHUI

500 1550 500 KEPALA DINAS


PENAMPANG ATAS PONDASI
2550
SCALE : 1 : 25

POTONGAN B-B
SCALE : 1 : 25

B ..............................
2550 NIP. .......................

DISETUJUI OLEH
175 150 1900 150 175
PEJABAT PEMBUAT KOMITMEN (PPK)
150 175

2200

200
..............................
NIP. .......................
A A DIKETAHUI OLEH

PEJABAT PELAKSANA TEKNIS


KEGIATAN (PPTK)
2550
1900

..............................
200 200 NIP. .......................
KONSULTAN PERENCANA

500 1550 500


-
2550

JUDUL GAMBAR

POTONGAN A-A PONDASI INTERMEDIATE TANK /


SCALE : 1 : 25 WATER TANK
175 150

SKALA 1 : 25 SIGN

DIGAMBAR

B PERENCANA

DENAH RENCANA PONDASI TANGGAL -

SCALE : 1 : 25 NO. PROYEK -

NO. GAMBAR 0010 JLH LEMBAR

20
PEMERINTAH
KABUPATEN PENAJAM PASER UTARA

KETERANGAN

- UKURAN GAMBAR MEMAKAISATUAN Mili Meter

B 3350
175 150 175 2350 175 150 175

3000

175 150 175


NO REVISI

KEGIATAN

PONDASI DUDUKAN PENGADAAN SISTEM INSTALASI

1550
(WATER TREATMENT PLAN)

1200
A A

550
FILTER
COR RABATBETON

175 150 175


PEKERJAAN
T=200mm

PENGADAAN SISTEM INSTALASI


(WATER TREATMENT PLAN)
DINAS KESEHATAN
KABUPATEN PENAJAM PASER UTARA

B MENGETAHUI
DENAH RENCANA PONDASI PENAMPANG ATAS PONDASI
SCALE : 1 : 30
KEPALA DINAS
SCALE : 1 : 30

3000
..............................
NIP. .......................

DISETUJUI OLEH

PEJABAT PEMBUAT KOMITMEN (PPK)

Sloof 150x200
Besi 6 Ø 8
Cor Beton Bertulang
Sengkang Ø8-150 150 Besi Ø6-120
+ 0.200
200 200 ..............................
NIP. .......................
500 2350 500 ± 0.000 DIKETAHUI OLEH
3350
PEJABAT PELAKSANA TEKNIS
POTONGAN A-A KEGIATAN (PPTK)
SCALE : 1 : 30 Stek Besi
Ø8-200 L.500mm
1000 Tanah Urug
- 0.500 Pondasi. Batu Kali ..............................
200

- 0.600 NIP. .......................

Pasir Urug KONSULTAN PERENCANA

Tanah Asli -
200 Dipadatkan
500 JUDUL GAMBAR

200 200
DETAIL A PONDASI
DUDUKAN FILTER
500 550 500 SCALE : 1 : 20
1550
SKALA 1 : 30 SIGN
POTONGAN B-B
SCALE : 1 : 30 DIGAMBAR

PERENCANA

TANGGAL -

NO. PROYEK -

NO. GAMBAR 0011 JLH LEMBAR

20
Sloof 150x200 PEMERINTAH
KABUPATEN PENAJAM PASER UTARA
Besi 6 Ø 8
Cor Beton Bertulang KETERANGAN
Sengkang Ø8-150 150 Besi Ø6-120
+ 0.200 - UKURAN GAMBAR MEMAKAISATUAN Mili Meter

B
6500

± 0.000

Stek Besi
Ø8-200 L.500mm
Tanah Urug
NO REVISI
- 0.500 Pondasi. Batu Kali KEGIATAN

- 0.600 PENGADAAN SISTEM INSTALASI


Pasir Urug (WATER TREATMENT PLAN)

Tanah Asli

3500
PRODUCT WATER TANK 200 Dipadatkan
A 6000x3000x2000mm A PEKERJAAN
500
PENGADAAN SISTEM INSTALASI
DETAIL A (WATER TREATMENT PLAN)
DINAS KESEHATAN
SCALE : 1 : 20 KABUPATEN PENAJAM PASER UTARA

MENGETAHUI

KEPALA DINAS

PENAMPANG ATAS PONDASI


SCALE : 1 : 40 B
..............................
NIP. .......................

DISETUJUI OLEH

PEJABAT PEMBUAT KOMITMEN (PPK)

PRODUCT WATER TANK


PRODUCT WATER TANK (MATERIAL FRP)
(MATERIAL FRP) 5000x3000x2000mm
..............................
6000x3000x2000mm NIP. .......................

DIKETAHUI OLEH

PEJABAT PELAKSANA TEKNIS


KEGIATAN (PPTK)

6500 3500

..............................
NIP. .......................
KONSULTAN PERENCANA

200 200
-
200 200 200 200
500 1425 500 2000 500 1425 500 500 2850 500

6850 3850
JUDUL GAMBAR
POTONGAN B-B
POTONGAN A-A SCALE : 1 : 40
SCALE : 1 : 40 PONDASI
PRODUCT WATER TANK

SKALA 1 : 40 SIGN

DIGAMBAR

PERENCANA

TANGGAL -

NO. PROYEK -

NO. GAMBAR 0012 JLH LEMBAR

20
PEMERINTAH
KABUPATEN PENAJAM PASER UTARA

KETERANGAN

- UKURAN GAMBAR MEMAKAISATUAN Mili Meter

NO REVISI

KEGIATAN

B B + 0.400 PENGADAAN SISTEM INSTALASI


(WATER TREATMENT PLAN)
Trassram
Sloof 200x150

tumpuan
Ø10-120
Besi 6Ø8 Lantai
Spesi PEKERJAAN
Stek Besi
Sengkang Ø8-150 ±0.000
Pasir Urug
± 0.000
Ø8-500 L.300mm PENGADAAN SISTEM INSTALASI

150
- 0.100 (WATER TREATMENT PLAN)
DINAS KESEHATAN

lapangan
- 0.200 KABUPATEN PENAJAM PASER UTARA
Rabat Beton

Ø10-150
Tanah Asli MENGETAHUI

Tanah Urug KEPALA DINAS

Pondasi. Batu Kali - 0.700

tumpuan
- 0.800

Ø10-120
Pasir Urug
Tanah Asli
Dipadatkan 200 Besi 4Ø10 Besi 4Ø8
150
500 Sengkang Ø10 Sengkang Ø8 ..............................

150
NIP. .......................

DENAH RUMAH MESIN


A DETAIL A DISETUJUI OLEH

SCALE : 1 : 50 DETAIL KOLOM


SCALE : 1 : 30
SCALE : 1 : 30
PEJABAT PEMBUAT KOMITMEN (PPK)

ATAP DAK BETON


+ 3.150 ATAP DAK BETON
+ 3.150
RING BALK 150x150 RING BALK 150x150

+3.000
+ 3.000 +3.000
+ 3.000
..............................
NIP. .......................

DIKETAHUI OLEH
+ 2.400 + 2.400
PEJABAT PELAKSANA TEKNIS
VENTILASI
KEGIATAN (PPTK)

+ 1.800 + 1.800

..............................
NIP. .......................
KONSULTAN PERENCANA
PAS. BATU BATA PAS. BATU BATA

+ 0.400 + 0.400 -
PAS. BATU BATA TRASSRAM PAS. BATU BATA TRASSRAM

SLOOF 200x150
±0.000 ± 0.000 SLOOF 200x150
±0.000 ± 0.000
JUDUL GAMBAR
RABAT BETON RABAT BETON

STEK BESI Ø8-500 - 0.200 STEK BESI Ø8-500 - 0.200 DENAH RUMAH &
PAS. BATU KALI PAS. BATU KALI

PASIR URUG
LANTAI KERAMIK 300x300mm
SPESI
PASIR URUG
LANTAI KERAMIK 300x300mm
SPESI
POTONGAN MESIN / PERALATAN
PASIR URUG PASIR URUG

TANAH URUG
TANAH ASLI
- 0.800 TANAH URUG
TANAH ASLI
- 0.800
SKALA 1 : 50 SIGN

DIGAMBAR

PERENCANA

POTONGAN A-A POTONGAN B-B -

SCALE : 1 : 50 TANGGAL -
SCALE : 1 : 50
NO. PROYEK -

NO. GAMBAR 0013 JLH LEMBAR

20
PEMERINTAH
KABUPATEN PENAJAM PASER UTARA

KETERANGAN
+ 3.150 + 3.150 - UKURAN GAMBAR MEMAKAISATUAN Mili Meter

+ 3.000 + 3.000

+ 2.400
+ 2.400
+ 2.200
+ 1.800 NO REVISI
+ 1.800 KEGIATAN

PENGADAAN SISTEM INSTALASI


(WATER TREATMENT PLAN)
PINTU BESI + 1.200

PEKERJAAN

PENGADAAN SISTEM INSTALASI


(WATER TREATMENT PLAN)
DINAS KESEHATAN
KABUPATEN PENAJAM PASER UTARA

± 0.000 ± 0.000 MENGETAHUI

KEPALA DINAS

- 0.200 - 0.200
TAMPAK DEPAN TAMPAK BELAKANG
SCALE : 1 : 40 SCALE : 1 : 40

..............................
NIP. .......................

+ 3.150 DISETUJUI OLEH

PEJABAT PEMBUAT KOMITMEN (PPK)


+ 3.000

+ 2.400
..............................
NIP. .......................

DIKETAHUI OLEH
+ 1.800 PEJABAT PELAKSANA TEKNIS
KEGIATAN (PPTK)

..............................
NIP. .......................
KONSULTAN PERENCANA

-
± 0.000
JUDUL GAMBAR

- 0.200 TAMPAK RUMAH


MESIN / PERALATAN
TAMPAK SAMPING KANAN & KIRI
SCALE : 1 : 40
SKALA 1 : 40 SIGN

DIGAMBAR

PERENCANA

TANGGAL -

NO. PROYEK -

NO. GAMBAR 0014 JLH LEMBAR

20
PEMERINTAH
KABUPATEN PENAJAM PASER UTARA

KETERANGAN

- UKURAN GAMBAR MEMAKAISATUAN Mili Meter

NO REVISI

KEGIATAN

PENGADAAN SISTEM INSTALASI


(WATER TREATMENT PLAN)

PEKERJAAN

PENGADAAN SISTEM INSTALASI


(WATER TREATMENT PLAN)
DINAS KESEHATAN
KABUPATEN PENAJAM PASER UTARA

MENGETAHUI

KEPALA DINAS

..............................
NIP. .......................

DISETUJUI OLEH

PEJABAT PEMBUAT KOMITMEN (PPK)

..............................
NIP. .......................

DIKETAHUI OLEH

PEJABAT PELAKSANA TEKNIS


KEGIATAN (PPTK)

..............................
NIP. .......................
KONSULTAN PERENCANA

-
DETAIL PINTU & JENDELA
SCALE : 1 : 30 JUDUL GAMBAR

DETAIL PINTU &


KUSEN

SKALA 1 : 40 SIGN

DIGAMBAR

PERENCANA

DENAH PENULANGAN PLAT DAK ATAP -

-
TANGGAL
SCALE : 1 : 40 NO. PROYEK -

NO. GAMBAR 0015 JLH LEMBAR

20
PEMERINTAH
KABUPATEN PENAJAM PASER UTARA

KETERANGAN

- UKURAN GAMBAR MEMAKAISATUAN Mili Meter

2000 2400 2400 2400 2400 2400 2400 2400

NO REVISI

4000
2500
KEGIATAN
2400

2400
PENGADAAN SISTEM INSTALASI
FLOKULASI & PH ADJUSTMENT (WATER TREATMENT PLAN)

KOAGULASI

1200
1200
COR RABATBETON COR RABATBETON
T=200mm T=200mm

WATER TANK PEKERJAAN


RUMAH MESIN /

RO SYSTEM
PENGADAAN SISTEM INSTALASI
PERALATAN

COR RABATBETON
(WATER TREATMENT PLAN)

T=200mm

1500
DINAS KESEHATAN
Ø1 KABUPATEN PENAJAM PASER UTARA
20
0

CLARIFIER MENGETAHUI
2400

2400
MIXING
(TUBE SETLER)
COR RABATBETON
TANK Ø1200mm x

2200
T=200mm
3500 x 2000 x 2000 mm 800 KEPALA DINAS
1500mm
CHAMBER 2
TRANSFER TANK
6000

1200
..............................
NIP. .......................

DISETUJUI OLEH

PEJABAT PEMBUAT KOMITMEN (PPK)


2400

2400
CHAMBER 1

PONDASI DUDUKAN
TRANSFER TANK
2200
PRODUCT WATER TANK
6000x3000x2000mm

FILTER
3000

COR RABATBETON
T=200mm
WATER TANK ..............................
NIP. .......................
DIM.2000x2000x2000
DIKETAHUI OLEH
2200

COR RABATBETON
T=200mm

PEJABAT PELAKSANA TEKNIS


KEGIATAN (PPTK)
2400

2400
..............................
NIP. .......................
KONSULTAN PERENCANA

2000 2400 2400 2400 2400 2400 2400 2400 -

JUDUL GAMBAR

ZONA CANOPY DENAH ZONA CANOPY

SCALE : 1 : 60

SKALA 1 : 60 SIGN

DIGAMBAR

PERENCANA

TANGGAL -

NO. PROYEK -

NO. GAMBAR 0016 JLH LEMBAR

20
8730
820 2370 2350 2370 820

PEMERINTAH

820
KABUPATEN PENAJAM PASER UTARA

KETERANGAN

- UKURAN GAMBAR MEMAKAISATUAN Mili Meter

1844
NO REVISI

KEGIATAN

1950
PENGADAAN SISTEM INSTALASI
(WATER TREATMENT PLAN)

PEKERJAAN

9228

145
PENGADAAN SISTEM INSTALASI
(WATER TREATMENT PLAN)

700
DINAS KESEHATAN
KABUPATEN PENAJAM PASER UTARA

400
1950

294
MENGETAHUI

KEPALA DINAS

3802
3952

3063
2463

2463
1844
..............................
NIP. .......................

DISETUJUI OLEH

PEJABAT PEMBUAT KOMITMEN (PPK)

200
220
130
3794 3794
820

TAMPAK SAMPING KIRI


SCALE : 1 : 60

..............................
NIP. .......................
DENAH CANOPY DIKETAHUI OLEH
SCALE : 1 : 60

8730 PEJABAT PELAKSANA TEKNIS


KEGIATAN (PPTK)

145
722

700
400 80

..............................
400

294
NIP. .......................

405 600 600 600 600 405 405 600 600 600 600 405 KONSULTAN PERENCANA

-
3802

3802
3952

3952
3063

JUDUL GAMBAR
2463

2463
2400

CANOPY

SKALA 1 : 60 SIGN
300
DIGAMBAR
200
220

220
350

130

130
-

3440 3460 3794 3794 PERENCANA

-
TAMPAK DEPAN TAMPAK SAMPING KANAN
SCALE : 1 : 60 SCALE : 1 : 60 TANGGAL -

NO. PROYEK -

NO. GAMBAR 0017 JLH LEMBAR

20
PEMERINTAH

Kawat Pengikat DETAIL A Pengikat Besi Ø 8


KABUPATEN PENAJAM PASER UTARA

KETERANGAN

Pipa Besi Ø1/2" + 1.350 - UKURAN GAMBAR MEMAKAISATUAN Mili Meter

+ 1.300

Plate t=5mm
Nuts 12mm
Kunci Gembok
Kawat Harmonika
Kawat Harmonika Kawat Harmonika NO REVISI

KEGIATAN
Pengaku Besi Ø 8
Kait Harmonika DETAIL KUNCI PAGAR
SCALE : 1 : 10

Kawat Pengikat Pengikat Besi Ø 6 PENGADAAN SISTEM INSTALASI


(WATER TREATMENT PLAN)
Pipa Besi Ø1/2" Pipa Besi Ø1/2"

Pipa Besi Ø1" Pipa Besi Ø1" + 0.300


PEKERJAAN
Pasangan Bata merah + 0.150
PENGADAAN SISTEM INSTALASI
Sloof Uk. 15x15 cm ± 0.000 (WATER TREATMENT PLAN)
Sengkang Ø6 - 200 DINAS KESEHATAN
Lantai Kerja KABUPATEN PENAJAM PASER UTARA

Tanah Asli - 0.200 MENGETAHUI


Dipadatkan
- 0.300 KEPALA DINAS

- 0.350
300 2100 300 300

DETAIL A
TAMPAK MUKA DALAM SCALE : 1 : 20 ..............................
SCALE : 1 : 20 NIP. .......................

DISETUJUI OLEH
150 PEJABAT PEMBUAT KOMITMEN (PPK)
+ 1.350 Ø6 - 200 + 1.350
+ 1.300 4Ø6 + 1.300

150
..............................
NIP. .......................

DIKETAHUI OLEH

PEJABAT PELAKSANA TEKNIS


KEGIATAN (PPTK)
Pengaku Besi Ø 8
DETAIL SLOOF
Kawat Harmonika SCALE : NTS
Pipa Besi Ø 1"

Pipa Besi Ø1/2" Pipa Besi Ø 1/2"

Pipa Besi Ø1" + 0.300 + 0.300 ..............................


NIP. .......................
KONSULTAN PERENCANA
+ 0.150 Pasangan Bata merah + 0.150
± 0.000 Sloof Uk. 15x15 cm ± 0.000 -

Lantai Kerja
Cor Beton - 0.150 JUDUL GAMBAR
- 0.200 Tanah Asli
Pasir Urug Dipadatkan PAGAR BRC
- 0.300 - 0.200
Tanah Asli
Dipadatkan
- 0.350
SKALA 1 : 20 SIGN
300 1700 300 150 DIGAMBAR

TAMPAK PINTU PAGAR 250 -

SCALE : 1 : 20 PERENCANA

TANGGAL -
TAMPAK SAMPING
NO. PROYEK -
SCALE : 1 : 20
NO. GAMBAR 0018 JLH LEMBAR

20
PEMERINTAH
KABUPATEN PENAJAM PASER UTARA

B 1850
KETERANGAN

- UKURAN GAMBAR MEMAKAISATUAN Mili Meter

175 150 175 850 175 150 175

1500

175 150 175 150 175 150 175


A A RO SYSTEM NO REVISI

KEGIATAN

1150

800
PENGADAAN SISTEM INSTALASI
(WATER TREATMENT PLAN)

COR RABATBETON
T=200mm
PEKERJAAN

PENGADAAN SISTEM INSTALASI


(WATER TREATMENT PLAN)
DINAS KESEHATAN
KABUPATEN PENAJAM PASER UTARA

B PENAMPANG ATAS PONDASI MENGETAHUI

KEPALA DINAS

DENAH RENCANA PONDASI SCALE : 1 : 20


Besi 6 Ø 8
Sloof 150x200
Cor Beton Bertulang
SCALE : 1 : 20 Sengkang Ø8-150 150 Besi Ø6-120
+ 0.200

± 0.000 ..............................
NIP. .......................

DISETUJUI OLEH

Stek Besi PEJABAT PEMBUAT KOMITMEN (PPK)


Ø8-200 L.500mm
Tanah Urug
- 0.500 Pondasi. Batu Kali
1500 800 - 0.600
Pasir Urug
..............................
Tanah Asli NIP. .......................

200
200 Dipadatkan DIKETAHUI OLEH

500 PEJABAT PELAKSANA TEKNIS


KEGIATAN (PPTK)
DETAIL A
SCALE : 1 : 20

..............................
NIP. .......................
KONSULTAN PERENCANA

-
200 200
200 200
500 150 500 JUDUL GAMBAR
500 850 500
1150 PONDASI
1850 RO SYSTEM
POTONGAN B-B
POTONGAN A-A SCALE : 1 : 20
SKALA 1 : 20 SIGN
SCALE : 1 : 20
DIGAMBAR

PERENCANA

TANGGAL -

NO. PROYEK -

NO. GAMBAR 0019 JLH LEMBAR

20
4500

150 4200 150

Sloof 150x200

150
PEMERINTAH
Besi 6 Ø 8 KABUPATEN PENAJAM PASER UTARA
Cor Beton Bertulang
Sengkang Ø8-150 150 Besi Ø6-120
KETERANGAN

+ 0.200 - UKURAN GAMBAR MEMAKAISATUAN Mili Meter

± 0.000

Stek Besi
PONDASI DUDUKAN Ø8-200 L.500mm

2200
2500
ULTRAFILTRATION - 0.500
Tanah Urug
NO REVISI
Pondasi. Batu Kali
COR RABATBETON KEGIATAN
T=200mm - 0.600
Pasir Urug PENGADAAN SISTEM INSTALASI
(WATER TREATMENT PLAN)
Tanah Asli
200 Dipadatkan
500 PEKERJAAN

DETAIL A PENGADAAN SISTEM INSTALASI


(WATER TREATMENT PLAN)

150
SCALE : 1 : 20 DINAS KESEHATAN
KABUPATEN PENAJAM PASER UTARA

PENAMPANG ATAS PONDASI MENGETAHUI


SCALE : 1 : 30
KEPALA DINAS

B
4850
175 150 4200 150 175

2500

150 175
..............................

200
NIP. .......................

DISETUJUI OLEH

PEJABAT PEMBUAT KOMITMEN (PPK)

A A 200 200

..............................
500 1850 500
2200 NIP. .......................

2850 2850 DIKETAHUI OLEH

POTONGAN B-B PEJABAT PELAKSANA TEKNIS


KEGIATAN (PPTK)
SCALE : 1 : 30

..............................
NIP. .......................
KONSULTAN PERENCANA
175 150

-
4500

JUDUL GAMBAR

200
B
PONDASI
DENAH RENCANA PONDASI ULTRAFILTRATION
SCALE : 1 : 30

SKALA 1 : 30 SIGN

DIGAMBAR

-
200 200 200
PERENCANA

500 1675 500 1675 500 -

4850 TANGGAL -

NO. PROYEK -
POTONGAN A-A NO. GAMBAR 0020 JLH LEMBAR
SCALE : 1 : 30
20

Anda mungkin juga menyukai