Anda di halaman 1dari 15

INSPECTION, TESTING AND RE-

CERTIFICATION EQUIPMENT AND


INSTALLATION

PT TRANSPORTASI GAS INDONESIA (TGI)


02 NOVEMBER 2021
OUTLINE

• LATAR BELAKANG PEKERJAAN


• LIST PERSONEL
• INSPECTION FLOWCHART
• TIMELINE
LATAR BELAKANG PEKERJAAN

• PT TRANSPORTASI GAS INDONESIA (TGI) ADALAH PEMILIK JALUR PIPA GAS 28”
GRISSIK-SINGAPURA. TGI MENGOPERASIKAN DAN MEMELIHARA JALUR PIPA GAS
ONSHORE DAN OFFSHORE SEPANJANG 467 KM, 3 METERING STASIUN, 5 PIG TRAP
STASIUN DAN 2 LATERAL LINE YANG BERLOKASI DI JAMBI DAN KEPULAUAN
RIAU

• UNTUK INSTALSI DAN PERALATAN YANG TERMASUK DALAM PEKERJAAN RE-


CERTIFICATION CERTIFICATE OF INSPECTION (COI) DAN PERSETUJUAN LAYAK
OPERASI (PLO) INSTALASI GAS METERING STATION YANG BERADA DI RUAS PIPA
GRISSIK – SINGAPURA (BOARDERLINE)
LOKASI PEKERJAAN
• STASIUN METERING TEMPINO – JAMBI
• STASIUN METERING SIMPANG ABADI – JAMBI
• STASIUN COMPRESSOR JABUNG – JAMBI
• STASIUN METERING PANARAN – BATAM
• STASIUN METERING PEMPING - BATAM
ORGANIZATIO
N CHART
LIST PERALATAN DAN INSTALASI
AREA REGIONAL OFFICE 1 - JAMBI
No Item Jumlah Lokasi Keterangan
Kompresor Jabung (1 unit)
1 Bejana Tekan 2 Pembaharuan sertifikat COI
Stasiun Tempino (1 unit)
2 Bejana Tekan 1 Stasiun Simpang Abadi Sertifikat COI Baru dokumen teknis lengkap
3 Katup Pengaman 2 Stasiun Simpang Abadi Sertifikasi COI baru dokumen teknis lengkap
Stasiun Tempino (1 Unit)
4 Peralatan Listrik 2 Stasiun Simpang Abadi (1 Sertifikasi COI baru dokumen teknis lengkap
unit)
Sistem Alat Ukur Serah Terima
5 1 Stasiun Simpang Abadi Pembaharuan Sertifikat COI
(USM)
Stasiun Tempino (1 Unit)
Persetujuan Layak Operasi (sebelumnya
6 Instalasi (PLO) 2 Stasiun Simpang Abadi (1
SKPI)
unit)
  Total 10    
LIST PERALATAN DAN INSTALASI
AREA REGIONAL OFFICE 4 - BATAM

No Item Jumlah Lokasi Keterangan


Stasiun Panaran (3 unit)
1 Bejana Tekan 7 Pembaharuan sertifikat COI
Stasiun Pemping (4 unit)
Stasiun Panaran (1 unit)
2 Bejana Tekan 2 Sertifikasi COI baru dan Re-Engineering
Stasiun Pemping (2 unit)
Stasiun Panaran (12 unit)
3 Katup Pengaman 27 Pembaharuan Sertifikat COI
Stasiun Pemping (15 unit)
4 Jib Crane & Chainblock 2 Stasiun Panaran Pembaharuan Sertifikat COI
5 Overhead Crane 1 Stasiun Panaran Pembaharuan Sertifikat COI
6 Jib Crane & Chainblock 3 Stasiun Pemping Sertifikasi COI baru dan Re-Engineering
7 Monorail Crane 3 Stasiun Pemping Sertifikasi COI baru dan Re-Engineering
8 Overhead Crane 1 Stasiun Pemping Sertifikasi COI baru dan Re-Engineering
  Total 46    
LIST PERALATAN DAN INSTALASI
Pembaharuan Sertifikat Baru + Document Sertifikat Baru + Re-
No Item Total
Sertifikat Teknis lengkap Engineering

1 Bejana Tekan 9 1 2 12

2 Katup Pengaman 27 2 - 29
3 Peralatan Listrik   2 - 2
Sistem Alat Ukur Serah
4 1 - - 1
Terima (USM)
5 Crane 3 - 7 10

6 Instalasi 2 - - 2

TOTAL 42 5 9 56
USER

PT SQ

ARS Migas
& ITP

COMPILE & REVIEW

INSPECTION DOC. OF EACH EQP.

FLOWCHART RE-
ENJINIRING
Y
RE / RLA Report

RECERTIFICATION N
/RLA

EQUIPMENT / COI INSPEKSI &


PENGUJIAN
REVIEW
DOKUMEN RE /
RLA
PEMERIKSAAN
KESELAMATAN
OLEH MIGAS

Close Finding (if Any)

PEMBUATAN
LAPORAN HASIL
INSPEKSI

COI Release
USER

PT SQ

ARS Migas
INSPECTION & ITP

FLOWCHART COMPILE & REVIEW


DOC.

RECERTIFICATION RE-
ENJINIRING
Y
RE / RLA Report

INSTALLATION / N /RLA

INSPEKSI & REVIEW


PLO PENGUJIAN
PEMERIKSAAN
DOKUMEN RLA

KESELAMATAN
OLEH MIGAS

Close Finding (if Any)

PEMBUATAN
LAPORAN HASIL
INSPEKSI
ARS
Permohonan
Penerbitan
PLO

Proses PLO
Release
RE-ENGINEERING DAN RESIDUAL LIFE
ASSESSMENT
• RE-ENGINEERING DILAKUKAN UNTUK PERALATAN/INSTALASI YANG TIDAK
MEMILIKI DOKUMEN TEKNIS DAN/ATAU TIDAK DIKETAHUI UMUR LAYAN
DESAIN. (PERATURAN MENTERI ESDM NO 18 TAHUN 2018 PASAL 25)

• PERALATAN/INSTALASI YANG SUDAH MELEWATI UMUR LAYAN DESAIN BISA


TETAP DIGUNAKAN SETELAH DILAKUKAN PENILAIAN SISA UMUR LAYAN
(RESIUDUAL LIFE ASSESSMENT) DAN DINYATAKAN DAPAT DIPERPANJANG UMUR
LAYANNYA (PERATURAN MENTERI ESDM NO 18 TAHUN 2018 PASAL 23
Nov-21 Dec-21 Jan-22
No Activity Qty Unit Target (Days)
W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4

1 Kick of Meeting 1 Lot 1


2 ARS Migas dan ITP 1 Lot 14
3 Prepared Personel Administration Permit 1 Lot 3

4 Inspection and Testing


a. Area Regional Offi ce 1 - Jambi
Bejana Tekan 3 unit 13
Compile document and review 3 unit 1
Field Inspection (Kompresor Jabung) 1 unit 1
Field Inspection (Stasiun Tempino) 1 unit 1
Field Inspection (Stasiun Simpang Abadi) 1 unit 1
Migas Inspection (Pemeriksaan Keselamatan) 3 unit 3
Reporting 3 unit 5
COI Issued 3 unit 1

TIMELINE Katup Pengaman


Compile document and review
2
2
unit
unit
7
1

INSPECTION
Field Inspection (Stasiun Simpang Abadi) 2 unit 1
Migas Inspection (Pemeriksaan Keselamatan) 2 unit 3
Reporting 2 unit 1
COI Issued 3 unit 1

REGIONAL Peralatan Listrik


Compile document and review
2
3
unit
unit
13
1

OFFICE 1 JAMBI Field Inspection (Stasiun Tempino)


Field Inspection (Stasiun Simpang Abadi)
1
1
unit
unit
1
1
Migas Inspection (Pemeriksaan Keselamatan) 2 unit 3
Reporting 2 unit 2
COI Issued 2 unit 1

Sistem Alat Ukur Serah Terima (USM) 1 unit 9


Compile document and review 1 unit 1
Field Inspection (Stasiun Simpang Abadi) 1 unit 2
Migas Inspection (Pemeriksaan Keselamatan) 1 unit 3
Reporting 1 unit 2
COI Issued 1 unit 1

Instalasi (PLO) 2 unit 30


Compile document and review 2 unit 2
Field Inspection (Stasiun Tempino) 1 unit 3
Field Inspection (Stasiun Simpang Abadi) 1 unit 3
Migas Inspection (Pemeriksaan Keselamatan) unit 3
Reporting unit 10
Draft ARS Surat Permohonan Penerbitan PLO 2 unit 14
Proses Penerbitan PLO by Migas 2 unit 10
Nov-21 Dec-21 Jan-22
No Activity Qty Unit Target (Days)
W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4
b. Area Regional Office 4 - Batam
Bejana Tekan 9 unit 20
Compile document and review 9 unit 2
Re-Engineering 2 unit 10
Field Inspection (Stasiun Panaran) 4 unit 2
Field Inspection (Stasiun Pemping 5 unit 2
Migas Inspection (Pemeriksaan Keselamatan) 9 unit 3
Reporting 9 unit 5
COI Issued 9 unit 1
TIMELINE
INSPECTION Katup Pengaman 27 unit 20
Compile document and review 27 unit 2
REGIONAL Field Inspection (Stasiun Panaran) 12 unit 4
OFFICE 4 Field Inspection (Stasiun Pemping 15 unit 5
Migas Inspection (Pemeriksaan Keselamatan) 27 unit 3
BATAM Reporting 27 unit 5
COI Issued 27 unit 1

Crane 10 unit 59
Compile document and review 10 unit 2
Re-Engineering 7 unit 21
Field Inspection (Stasiun Panaran) 3 unit 7
Field Inspection (Stasiun Pemping 7 unit 15
Migas Inspection (Pemeriksaan Keselamatan) 10 unit 3
Reporting 10 unit 10
COI Issued 10 unit 1
INSPECTION TEST PLAN

1. INSPECTION TEST PLAN BEJANA TEKAN

2. INSPECTION TEST PLAN KATUP PENGAMAN

3. INSPECTION TEST PLAN PERALATAN LISTRIK

4. INSPECTION TEST PLAN SYSTEM ALAT UKUR SERAH TERIMA

5. INSPECTION TEST PLANT PESAWAT ANGKAT

6. INSPECTION TEST PLAN INSTALASI


TERIMA KASIH