PROJECT STATIC

FABRIKASI, INSTALASI DAN PEMELIHARAAN KONSTRUKSI


STRUKTUR, PIPA DAN SIPIL DI AREA OPERASI ANJUNGAN
X-RAY DI PT PERTAMINA EP ASSET 3 JATIBARANG FIELD
X-RAY PLATFORM XAP XBP

XAS

le P
P-X
A P
b s e a cab MOL XBP-XA
L XB su 6”
O 5 .8 k m-Ø1
”M ktif )
- Ø 6 (Non A
XD 5 .8 km
XBW
P sub
O L XMA-XA 1.6 sea
- Ø 8” M km cab
6 .44 km le
k
(Non a ble
tif )
A - X AP P- BLG -Ø
8”
a ca L XM LX
A MO
subse 1 2 ” MO O LX
Ø M
km - 6” DW
6 .4 4 G 1 -XA
-BL -Ø
A P km P
OLX 27.8
M f )
1 2” akti
BALONGAN m - Ø (No
n
k
.7
28

XAW
XMA
Latar Belakang
KONTRAK FABRIKASI, INSTALASI DAN PEMELIHARAAN KONSTRUKSI STRUKTUR,
PIPA DAN SIPIL DI AREA OPERASI ANJUNGAN X-RAY
PERIODE 2019 – 2023 DI PT PERTAMINA EP ASSET 3 JATIBARANG FIELD
 NAMA PROYEK : FABRIKASI, INSTALASI DAN PEMELIHARAAN KONSTRUKSI

• STRUKTUR, PIPA DAN SIPIL DI AREA OPERASI ANJUNGAN

• X-RAY SELAMA 730 HARI KALENDER ( Periode 6 Mei 2019 – 4 Mei 2021 )

 NILAI PROYEK : Rp 46.080.000.000 ( By Oas 4650011572 )

 NAMA PROYEK : FABRIKASI, INSTALASI DAN PEMELIHARAAN KONSTRUKSI

• STRUKTUR, PIPA DAN SIPIL DI AREA OPERASI ANJUNGAN

• X-RAY SELAMA 730 HARI KALENDER ( Periode 2 Agustus 2021 – 1 Agustus 2023 )

 NILAI PROYEK : Rp 45.186.787.500 ( By OAS 4650014929 )

Lingkup Kerja
Pekerjaan Perbaikan Anjungan Fasilitas Prodiksi Lepas pantai Pekerjaan Perbaikan Strukture
Pekerjaan Perbaikan Fasilitas Kontruksi Pressure Vessel Pekerjaan Perbaikan Jumping Rope
Pekerjaan Perbaikan Fasilitas Piping / Mchanical Pekerjaan Re-Vamp dan Proyek Khusus Lainnya
Pekerjaan Perbaikan Fasilitas Surface Riser Pekerjaan Elektrikal
Pekerjaan Perbaikan Hot And Cold Insulation Pekerjaan Fabrikasi Dan Instalasi
Pekerjaan Blasting Painting Pekerjaan Penggantian Valve
Pekerjaan Coating Wraping Pekerjaan Hotaping
Pekerjaan Scafolding Pekerjaan Under Water
Latar Belakang
Amandemen A Surat No
• OAS NO. 4650011572 101/EP3700/2020-S0 Perubahan Tarif
Harga Pekerjaan
JASA FABRIKASI, Amandemen C Surat No • Penambahan Nilai Rp
INSTALASI DAN 0878/EP33700/2020-S0 Penambahan 3.916.800.000
PEMELIHARAAN Nila • Penambahan Lingkup
KONSTRUKSI Amandemen Kontrak Bridging Surat Kerja Underwater
STRUKTUR, PIPA No 007/EP002A/SP3MP/2021-S0 • Penambahan Nilai Pr Non
DAN SIPIL DI AREA Ada Sebesar Rp
OPERASI • SURAT NO. 17.479.820.200
ANJUNGAN X-RAY 325/EP3700/2020-S0 • Penambahan Nilai
Kontrak Bridging Sebesar
• Amandemen B Terkait Rp 26.041.937.000
Perubahan harga Periode Pelaksanaan 18
• Periode Pelaksanaan Minyak Mentah Februari 2021 – 16
6 Mei 2019 – 4 Mei dunia, Renegoisasi Agustus 2021
2021 pada potongan harga OAS NO. 4650014929 JASA FABRIKASI,

RE NEGOSIASI sebesar 2.5% Berlaku INSTALASI DAN PEMELIHARAAN


KONSTRUKSI STRUKTUR, PIPA DAN SIPIL
Tmt 1 Mei 2020 DI AREA OPERASI ANJUNGAN X-RAY
Periode Pelaksanaan 2 Agustus 2021 – 1
Agustus 2023 Sebesar Rp
45.186.787.500

• REALISASI ANGGARAN PELAKSANAAN KONTRAK PERIODE 6 MEI 2019 – 4 MEI 2021 , DIMANA
ANGGARAN TERSEBUT LEBIH CEPAT TER REALISASI SEBELUM MASA JANGKA WAKTU PELAKSANAAN
DAN PERJANJIAN SELESAI DAN TERDAPAT PENAMBAHAN NILAI SEBESAR Rp 21.396.620.200
• REALISASI ANGGARAN PELAKSANAAN KONTRAK PERIODE PELAKSANAAN 18 FEBRUARI 2021 – 18
AGUSTUS 2021 NILAI SEBESAR Rp 26.041.937.000
HSSE Performance Record
HSSE Target Pencapaian 2019 -2021 Pencapaian 2022

0 Fatality Rate 0 0

0 LTIFR 0 0

85 % Follow Up Finding 90 % 100%

1x/Project Internal Audit 0 1

1x / Bulan HSE Campaign 24 7

100 % Kehadiran Tool Box Meeting 100 % 100 %

1 Obs /Minggu/Pers Hazard Observation 791 349

Re-Medical
100 % Check Up 100 % 100 %

Emergency
1x / 1 Tahun Drill 2 1

2x / 1 Tahun MWT 2 1
HSE Performance Record
PARAMETER MEI - DES 2019 JAN - DES 2020 JAN - DES 2021 JAN - AGT 2022 CUMMULATIVE

Man Hours 28528 101881 88606 396745 615760

Fatality Case 0 0 0 0 0

Loss Time Inccident 0 0 0 0 0

Safety Inspection 53 116 48 206 423

HSE Audit 0 0 0 1 1

Hazard Observation 94 385 312 349 1140

Permit System 57 79 151 49 336

MWT 1 0 1 0 2

Emergency Drill 0 0 1 1 2
FABRIKASI, INSTALASI DAN PEMELIHARAAN KONSTRUKSI
DI AREA OPERASI ANJUNGAN X-RAY

STRATEGI OPERASI

OFFSHORE AREA :
XAS, XAPF, XAW, XBPF, XBW,
XD & XMA

ONSHORE AREA :
OPF BALONGAN & JATIBARANG FIELD
FABRIKASI, INSTALASI DAN PEMELIHARAAN KONSTRUKSI
DI AREA OPERASI ANJUNGAN X-RAY
No Diskripsi Jumlah Satuan
1 Kariawan tetap 2 Person
2 Kariawan Kontrak 5 Person
3 Os Reguler 14 Person
4 Os Oncall 34 Person
TOTAL POB 55 Person
BISNIS PROSES FABRIKASI, INSTALASI DAN PEMELIHARAAN
KONSTRUKSI
DI AREA OPERASI ANJUNGAN X-RAY

START 01

PHASE 01
02 PREPARATIO
N & PERMIT

PHASE 02
SURVEY 03 07 BAPP PERAWATAN ADM & INVOICE

04 PHASE 03 PHASE 07 06
DETERMINE EXCECUTION
SOW

PHASE 04
PHASE 05 PHASE 06
PROPOSAL
SCHEDULE, DESIGN
05 APPROVAL SCHEDULE, WORK ORDER
& COMMERCIAL DESIGN & COST ESTIMASI ISSUED
FABRIKASI, INSTALASI DAN PEMELIHARAAN KONSTRUKSI
DI AREA OPERASI ANJUNGAN X-RAY

Engineering WO Client

Purchasing Expediting Logistic


01 02 03

Monitor Fabrikasi dan Pengiriman semua Raw


Menggunakan Workshop
Material sesuai dengan Material ke Workshop
dan Fasilitas di Mundu
Mundu / Marunda/ Mitra
dan Marunda Time Schedule
konntrak Payung
Pengadaan Jasa Fabrikasi Meninjau dan
Pengiriman Output
dan Material sesuai Melaporkan Kinerja Mitra Fabrikasi untuk Installation
Requisition kerja
Penerimaan, Pengiriman,
Mengoptimalkan Asset Penyimpanan dan
Elnusa Pengendalian Material
Melakukan Kontrak
Payung

FABRIKASI DAN INSTALASI


FABRIKASI, INSTALASI DAN PEMELIHARAAN KONSTRUKSI
DI AREA OPERASI ANJUNGAN X-RAY OAS 4650011572, OAS 4650014929
FABRIKASI, INSTALASI DAN PEMELIHARAAN KONSTRUKSI
DI AREA OPERASI ANJUNGAN X-RAY

FINANSIAL

OFFSHORE AREA :
XAS, XAPF, XAW, XBPF, XBW,
XD & XMA

ONSHORE AREA :
OPF BALONGAN & JATIBARANG FIELD
PROYEKSI LABA / RUGI PROYEK
PROYEKSI LABA / RUGI PROYEK
PERFORMANCE OM STATIK 2019 – 2021
100,000
93,519 92,304
90,000
84,061
81,843
80,000
DESC WIN IMP TD AGS 22
70,000 REV 46,620 93,519 92,304
COST 41,392 84,061 81,843
60,000 GP 5,228 9,458 10,460
GPM 11.2% 10.1% 11.3%
50,000 46,620
41,392
40,000

30,000

20,000

9,458 10,460
10,000
5,228

0
REV COST GP

WIN IMP TD AGS 22


PROYEKSI LABA / RUGI PROYEK
PROSENTASE NILAI KONTRAK
PROYEKSI LABA / RUGI PROYEK
PERFORMANCE OM STATIK TO DATE AUGUST 2022 WIN TD AUG 22
50,000 REV 45,187 25,732
45,187
45,000 COST 40,492 25,219
40,492
40,000 GP 4,694 512
35,000 GPM 10.4% 2.0%
30,000
25,732 25,219
25,000
20,000
15,000
10,000
4,694
5,000
512
0
REV COST GP

WIN TD AUG 22

Estimasi Revenue OAS 4650014929

8,000 7,496
7,000
6,328
6,000
5,000
4,060
4,000
3,000
2,000
1,332
1,000
0
SEP OCT NOV DEC
FABRIKASI, INSTALASI DAN PEMELIHARAAN KONSTRUKSI
DI AREA OPERASI ANJUNGAN X-RAY

STRATEGI PEKERJAAN
FABRIKASI, INSTALASI DAN PEMELIHARAAN KONSTRUKSI
DI AREA OPERASI ANJUNGAN X-RAY
Workshop
Marunda

• Fabrication Area
• Blasting & Painting Area
• Hydrotest & NDT Area
2 LUAS :
• Packaging Area 10.000 m2
• Personnel Ready
3 • Location : Jl. KBN Marunda, Cilincing,
Jakarta Timur

1 • Office

224 Km
FABRIKASI, INSTALASI DAN PEMELIHARAAN KONSTRUKSI
DI AREA OPERASI ANJUNGAN X-RAY

Sandblasting Area Hydrotest Area Painting Area

Fabrication & Packaging Area Material Warehouse


FABRIKASI, INSTALASI DAN PEMELIHARAAN KONSTRUKSI
DI AREA OPERASI ANJUNGAN X-RAY

One gate system access Yard tool Pressure Test Area Ruang Mekanik
Meeting room
control

Ruang kantor 2 lantai Ruangan Lab IE Area Limbah B3 Area Spooling Cable Ruang material

Ruang Bunker
Radioactive Storage Chemical
FABRIKASI, INSTALASI DAN PEMELIHARAAN KONSTRUKSI
DI AREA OPERASI ANJUNGAN X-RAY

Organization
MANPOWER Chart &
Responsibility
Project
Engineering Management
Construction
System
Quality
Project
Procurement Management
Handover
System
GAMBARAN UMUM

Agreed Target
(PEP – Elnusa)

SISA WAKTU JANGKA PERJANJIAN 0 HARI KALENDER

SISA WAKTU JANGKA PELAKSANAAN 0 HARI KALENDER

JANGKA WAKTU PELAKSANAAN 180 HARI KALENDER ( 18 Februari 2021 – 16 Agustus 2021 )

JANGKA WAKTU PERJANJIAN 230 HARI KALENDER ( 18 Februari 2021– 5 Oktober 2021 )

Time Performance kontrak OAS 4650014577


FABRIKASI, INSTALASI DAN PEMELIHARAAN KONSTRUKSI
DI AREA OPERASI ANJUNGAN X-RAY
Workshop
Mundu

• Fabrication Area
• Workshop Equipment Complete 2
LUAS :
6.723m2
• Personnel Ready
3 • Location : Jl. Raya Mundu,
Kedokanbunder, Indramayu
• Office (609.4
1 m2)

37 Km
FABRIKASI, INSTALASI DAN PEMELIHARAAN KONSTRUKSI
DI AREA OPERASI ANJUNGAN X-RAY

TRANSITION PHASE

• PMT
RECRUITMENT • Manpower Existing
• Permit

COMPLETION DATE
30 JUNI 2019
• Welding Machine
• Generator Set
• Air Compressor
WORKSHOP • Painting Tools
• Scafolding & Rigging
• Hand Tools