Anda di halaman 1dari 11

PERHITUNGAN HPP

(HARGA POKOK PRODUKSI)


OLEH : Hery Murnawan
HPP = OTK + OBK + OP + OOC
 CONTOH :
 PRODUK TERBUAT DARI PIPA DENGAN UKURAN 50 CM
102 M1 101 M2 101 M3 100
= 1%
M-1 O-1 Wp = 10 menit P = = =102
1 0 1
=0%
M-2 O-2 Wp = 5 menit P = = =101

= 1%
M-3 O-3 P = = =101
Wp = 12 menit
PERHITUNGAN JUMLAH MESIN

𝑡 𝑃
DIMANA :
= waktu proses

𝑁𝑖= ×
P= bahan baku
D= jam kerja mesin
E = efisiensi mesin (0,8 – 0,9)

60 𝐷.𝐸 =2,6 = 3 MESIN

=1,17 = 2 MESIN

=2,8 = 3 MESIN
MENGHITUNG UMUR MESIN
 MESIN 1
 HARGA = 10.000.000
10 juta
 UMUR = 5 TAHUN
 PERAWATAN = 500.000/BULAN
 1 TAHUN = 250 HARI KERJA 500 ribu
 SISA = 2.000.000 0 5
1 2 3 4
 10.000.000 – 2.000.000 = 8.000.000
 PENYUSUTAN → 8.000.000/5 TAHUN = 1.600.000
2 juta

 PERAWATAN = 500.000 +
 TOTAL = 2.100.000

 BIAYA MESIN/HARI = /mesin/hari


 Untuk 3 mesin = 3 x 8400 = 25.200 /hari
MENGHITUNG UMUR MESIN
 MESIN 2
 HARGA = 15.000.000
15 juta
 UMUR = 5 TAHUN
 PERAWATAN = 600.000/BULAN
 1 TAHUN = 250 HARI KERJA 600 ribu
 SISA = 3.000.000 0 5
1 2 3 4
 15.000.000 – 3.000.000 = 12.000.000
 PENYUSUTAN → 12.000.000/5 TAHUN = 2.400.000
3 juta

 PERAWATAN = 600.000 +
 TOTAL = 3.000.000

 BIAYA MESIN/HARI = /mesin/hari


 Untuk 2 mesin = 2 x 12000 = 24.000 /hari
MENGHITUNG UMUR MESIN
 MESIN 3
 HARGA = 12.000.000
12 juta
 UMUR = 5 TAHUN
 PERAWATAN = 400.000/BULAN
 1 TAHUN = 250 HARI KERJA 400 ribu
 SISA = 4.000.000 0 5
1 2 3 4
 12.000.000 – 4.000.000 = 8.000.000
 PENYUSUTAN → 8.000.000/5 TAHUN = 1.600.000
4 juta

 PERAWATAN = 400.000 +
 TOTAL = 2.000.000

 BIAYA MESIN/HARI = /mesin/hari


 Untuk 3 mesin = 3 x 8000 = 24.000 /hari
BIAYA MESIN/PRODUK

MESIN BIAYA MESIN/HARI KAPASITAS HPP

1 25.200 102 278

2 24.000 101 238

3 24.000 101 238

TOTAL BIAYA MESIN/PRODUK 754


BIAYA TENAGA KERJA
BIAYA TENAGA KERJA / MESIN
 MESIN 1 = 3 MESIN  M1 = 3 X 100.000 = 300.000
 MESIN 2 = 2 MESIN  M2 = 2 X 100.000 = 200.000
 MESIN 3 = 3 MESIN  M3 = 3 X 100.000 = 300.000 +
 TOTAL = 800.000

Outout = 100 unit


Onkos tenaga kerja = unit
Perhitungan bahan baku
 Bahan baku pipa 6 meter = 600 cm
 Harga 180.000
 Lonjor pipa = 12 bb OBB = BIAYA BAHAN BAKU + BIAYA BAHAN BAKU
 Keb. BB = = 8,5 lonjor PEMBANTU
=Rp 15.300 + Rp 1.500
 Hpp bb = = Rp15.300 = Rp 16.800

 Baban pembantu
 2 baut =Rp750
 2 mur =Rp750
 Total = 2 x 750 = Rp1500
OVERHEAD COST
 M1 = 800 WATT X 8 X 20 = 128.000 (128 KW)
 M2 = 200 WATT X 8 X 20 = 32.000 (32 KW)
 M3 = 500 WATT X 8 X 20 = 80.000 (80 KW)
 1 KWH = 4000
 M1 = 4000 X 128 = 512.000
 M2 = 4000 X 32 = 128.000
 M3 = 4000 X 80 = 320.000 +
TOTAL = 960.000/ BULAN
 KAPASITAS = 100 X 20 HARI = 2.000 UNIT
 Onkos overheat = = 480/ unit

HARGA JUAL 40 %= 45.220


Harga Pokok Produksi

HPP = OTK + OBK + OP + OOC


= 8.000 + 16.800 + 754 + 480
= 25.234
Harga Jual estimasi keuntungan 50% :

Harga Jual = Rp 25.234 x 150% = Rp 37.851

Anda mungkin juga menyukai