TARGET
( VOLUME & PRODUCTIVITY ) Summary :
Highlight : Dispatcher Control Payload & Matching Fleet
Outcome : Capacity ( Payload )
Key Success : Control Under / Over Load
JUMLAH JAM ACTUAL ≤ PLAN ; JUMLAH LOAD ACTUAL ≥ PLAN ; BESAR MUATAN ACTUAL ≥ PLAN
SYLLABUS
• IDENTIFICATION CONCEPT
• LOGIC STATUS CHANGE & CYCLE CHANGE
• LOGIC BY DATA
• IDENTIFICATION BY TRIGGER ( STATUS )
• IDENTIFICATION BY TRIGGER ( CYCLE )
• PRODUCTIVITY BY CYCLE
• MF ( MATCH FACTOR )
LOGIC – IDENTIFICATION CONCEPT
ANALYSIS CONCEPT
Summary :
Highlight : HOURS on Frame makin kebelakang ketersediaan makin berkurang
Concept : Bagaimana Fleet Running Sesuai Plan & Setiap Fleet Running lebih Optimal
Opportunity Optimal : Load Count, Truck Count, Capacity
24 HOURS
1
3 EFFECTIVE HOURS
PRODUCTIVE NON-PRODUCTIVE
VOLUME
LOGIC – IDENTIFICATION CONCEPT
ANALYSIS CONCEPT
3
FLEET RANKING
1 Summary :
FLEET 2
Highlight : Rank Shovel based on Hourly Volume
Outcome : Hourly Sequence
Key Success : High frequency Rank on Plan
FLEET RUNNING
Summary : 4
Digger Highlight : Fleet Running based on DSP ( Matching Fleet & Boundary Compliance )
Hauler Outcome : Target Sequence
Key Success : High Total Fleet & Boundary Compliance FLEET OPTIMUM
Support
Summary :
BOUNDARY FLEET TARGET Highlight : Feedback, Follow Up & Escalation Issue or Opportunity ( Double side & Unlocked )
Outcome : Optimum Target & Composite Base
Summary : Key Success : High Target Compliance & Efficiency
Highlight : DSP ( Fleet, Boundary & Target )
Outcome : Target Sequence Summary :
Key Success : Plan Accuracy Highlight : Achievement with Notes
Outcome : Maximum Achievement against Plan
5
06:53:20
LOG ON
06:59:40
READY
OB Hauling
Input ( Pelaksaan Perawatan Harian ) P2H
START END
WAKTU SHIFT CHANGE : 00:14:40
06:59:40
READY
OB Hauling
11:57:20
DELAY
Meal & Rest
12:39:30
READY
OB Hauling
START END
WAKTU READY : 04:57:40
START END
WAKTU DELAY MAKAN : 00:42:10
LOGIC CYCLE CHANGE
ARRIVE
Backing Trigger :
Start : in Dump Beacon, Directional Change / OEM Reversed, Heading above 120’, Speed > 5 and <15 KM/Hour
End : Manual Assign
Queuing Trigger :
Start : Enter Dump Beacon, Speed < 2 KM/Hour Tipping Trigger :
End : Manual Assign Start : In Dump Beacon after Backing, Speed Zero / OEM Vessel Raised Up
End : Depart from Departure Distance
MUATAN
KOSONGAN
ASSIGN
Waiting Trigger :
Start : Enter/pass Waiting Distance, Speed < 2 KM/Hour ARRIVE
End : Enter Spotting/pass Distance, Directional changed, Heading above 120’, Speed > 5 and <15 KM/Hour
Spotting Trigger :
Start : Enter Spotting/pass Distance, Directional changed, Heading above 120’, Speed > 5 and <15 KM/Hour
End : Enter Loading Distance & Speed Zero / OEM FRONT / BLAST
Loading Single Trigger :
Start : Enter Loading Distance & Speed Zero / OEM
Hanging Trigger : End : Depart from Departure Distance
Start : Last Truck Depart from Departure Distance
End : Next Truck Enter Loading Distance, Speed Zero / OEM
Loading Multi Trigger :
Start : Enter Loading Distance & Speed Zero / OEM
End : OEM other Truck
LOGIC – CYCLE TRIGGER GPS Satellite
PRODUCTION ZONE
BREAKDOWN – PA %
Identification :
Trigger : Unit Status Change to Maintenance ( Schedule or Un-schedule )
Highlight : Un-Schedule Frequency & Duration
STATUS CHANGE
Identification :
Trigger : Unit Status Change to Non Operation Condition
Highlight : Un-Planned / In-Plan or Budget / Non Budget with No Engine Running
Identification :
Trigger : Unit Status Change to Non Production Condition STANDBY – UA %
Highlight : Un-Planned with Engine Running
1 Front Identification :
Condition :
1. Waiting Time [ ✘︎]
2. Spotting Time [ ✘︎]
3. Loading Time [ ✓ ]
4. Frequency Truck at Shovel [ ✘︎]
Cycle Occurred :
5. Truck Arrive, Truck Frequency Lo to Ideal, Late Loading
6. Truck Arrive, Truck Frequency High, Late Loading
2 Truck Used Identification ( Under - Over ) : 2 Truck Used Identification ( Under - Over ) : 2 Truck Used Identification ( Under - Over ) :
Under Condition : Over Condition : Road / Dump Condition :
1. Hanging Time [ ✘︎] 1. Waiting Time [ ✘︎] 1. Hanging Time [ ✘︎]
2. Waiting Time [ ✓ ] 2. Hanging Time [ ✓ ] 2. Waiting Time [ ✘︎]
3. Speed [ ✓ ] 3. Speed [ ✓ ] 3. Speed [ ✘︎] ( Or )
4. Dumping Time ( Queuing, Backing, Tipping ) [ ✓ ] 4. Dumping Time ( Queuing, Backing, Tipping ) [ ✓ ] 4. Dumping Time ( Queuing, Backing, Tipping ) [ ✘︎]
5. Frequency Truck at Shovel [ ✘︎] 5. Frequency Truck at Shovel [ ✘︎] 5. Frequency Truck at Shovel [ ✘︎]
Cycle Occurred : Cycle Occurred : Cycle Occurred :
6. Last Truck Departure to Next Truck Arrive 6. Last Truck Departure to Next Truck Arrive 6. Last Truck Departure to Next Truck Arrive
7. Truck Arrive, Truck Frequency Lo 7. Truck Arrive, Truck Frequency high 7. Truck Arrive, Truck Frequency Lo and high
8. Match Factor Lo 8. Match Factor High 8. Match Factor Lo to High
4 Road Identification :
Condition :
1. Speed [ ✘︎]
2. Hanging Time [ ✘︎]
3. Waiting Time [ ✘︎]
4. Frequency Truck at Shovel [ ✘︎]
Cycle Occurred :
5. Truck Arrive, Truck Frequency Lo to Ideal, Late Loading
6. Truck Arrive, Truck Frequency High, Late Loading
Truck Factor :
Condition :
1. Truck Capacity Summarized based on Payload Full time Range :
against Material Type Condition :
1. 60 minutes in Hourly Full Time
TF ( TRUCK FACTOR ) X 60
SHOVEL PRODUCTIVITY = ---------------------------------------------
( LOADING + HANGING TIME in Minutes )
TF ( TRUCK FACTOR ) X 60 X E
SHOVEL PRODUCTIVITY = -------------------------------------
( LOADING TIME in Minutes )
nTRUCK X LOAD
MF ( Match Factor ) =
nSHOVEL X ( SPOT + LOAD + HAULING + BACKING + TIPPING + TRAVELLING )
SCOPE OF WORK :
Waktu Travel Hauler dalam keadaan kososngan
Productivity by Cycle Waktu Hauler diisi terhitung Material menyentuh ( Single Distance )
Vessel sampai keluar dari Departure Distance
Waktu Hauler diisi terhitung Material menyentuh
Waktu Preparasi Hauler Maneuver ke Area Loading Vessel sampai keluar dari Departure Distance
Truck ( Multi Distance & Trigger )