01
SIAP-IMS
INSTRUKSI KERJA
COLD START UP
UNIT JASA O&M PLTU BANJARSARI
I. FUNG SI SO P :
- Sebagai pedoman operator dalam melaksanakan operasi pembangkit PLTU BANJARSARI
sehingga dapat terlaksana secara aman,efisien,handal dan tepat waktu.
V. SUPERVISI :
- Pelaksanaan start / stop di supervisi oleh leader shift produksi
a. Parameter Boiler
Items Unit BMCR
Drum Working Pressure Mpa.g 15.05
Superheated Steam Flow Rate t/h 440
Superheated Steam Outlet Pressure Mpa.g 13.8
oC
Superheated Steam Outlet Temperature 540
Reheated Steam Flow t/h 359
Reheated Steam Outlet Pressure Mpa.g 2.44
Reheated Steam Inlet Pressure Mpa.g 2.59
oC
Reheated Steam Outlet Temperature 540
oC
Reheated Steam Inlet Temperature 326
oC
Feed Water Temperature 249
oC
Exhaust Gas Temperature 140
oC
Air Temperature at Air Heater Inlet 35
PT PEMBANGKITAN JAWA BALI SERVICES No.Dokumen : IK-BJ-5.1.3.01
b. Parameter Turbine
Parameter Unit Normal Minimum Maksimum Shutdown Keterangan
Temperatur main 450 Shutdown
C 530-545 510 549
steam >563 manual
Pressure main
MPa 13.2 13.9
steam
Pressure reheat
MPa 2.3-2.5 2.7
steam
Temp.reheat 450 Shutdown
C 530-543 520 549
steam >563 manual
Temp.exhaust HP
C
casing
Temp.exhaust LP 80
Shutdown
casing C (auto water 120
manual
spray)
Pressure
kPa 7 147 196
condenser
Diff. expansion HP -3.2
mm -3 +6
& IP +6.2
Diff. expansion LP mm +8 +8.2
Axial displacement -1.05 -1.65
mm
+0.6 +1.2
Vibrasi shaft mm 0.076 0.125 0.25
Vibrasi cover Shutdown
mm 0.03 0.05 0.08
bearing manual
Pressure lube oil 0.115 0.07
0.03
0.14- AC oil DC oil
MPa Turning gear
0.18 pump auto pump auto
stop
start start
Pressure EH oil 11.2
MPa 13-14 12.5 14 9.5 Interlock start
pompa
Temp.lube oil C 40-45
Temp. oil return
C < 65 75
bearing
Level Condenser mm 600 400 1100 Trip CEP
Level Deaerator 1900-
mm 1900 2300 1200 Trip BFP
2300
Pressure 0.9
Deaerator MPa 0.816 0.85 Safety valve
kerja
Hot state 22 38 60
2 Pastikan
persediaan
minyak solar
cukup
3 Pastikan Level
bed sand (pasir
kuarsa) di
furnace cukup.
Ketinggian
800mm dengan
ukuran pasir
0.3mm
PT PEMBANGKITAN JAWA BALI SERVICES No.Dokumen : IK-BJ-5.1.3.01
4 Pastikan
persediaan air
demin cukup
(Boiler Water
Treatment
System in
service)
P
U
M
P
I Boiler Start-
Up
Note :
- Total air flow >25%
- Bed temperature
<540
- Furnace pressure
normal
- Drum level normal
- All burner valve close
- All coal feeder stop
- No MFT
- purging time 300 sec
Note:
- Supply oil pressure
normal >3.2Mpa,
- Waktu untuk oil leakage
test adalah 120 sec
- Total air flow >25% B-
MCR
Note :
- All SA fan control
damper minimum open
5%
- Total air flow min
68248NM3/h by adjusting
SA fan inlet damper
- Amati pembakaran,
monitor perubahan oxygen
(O2) dan atur volume
udara untuk memastikan
pembakaran stabil.
- Atur pembakaran dan
kenaikan temperature bed
boiler antara 60-80C/h.
- Atur outlet flue gas
temperature air duct burner
920 dan air chamber
temperature harus di bawah
950C dan drum wall
temperature ratio t<50/h
untuk menjaga over
temperature di pipa SH/RH.
b. Warming-Up :
b. Warming-up - Setelah proses ignition
(Pressure selesai, segera buka
Rise) turbine bypass system.
- Bukaperlahan bypass
valve untuk menaikkan
pressure steam
- Ketika pressure steam
drum di 0.069- 0.103Mpa,
fully close venting valve
dan drain valve:
Drum venting
Rear pass roof wall
header vent
LTS outlet header vent
PSH outlet header vent
LTR outlet header vent
PRH inlet header vent
HTS outlet header vent
Rear pass lower header
drain
Drain lower header left
dan right roof wall
PSH inlet header drain
HTS inlet header drain
HTR inlet header drain
LTR inlet header drain
berdasarkan referensi
chemical dan buka
intermittent blowdown
valve bila diperlukan
- Ketika SH steam flow lebih
dari 10% B-MCR, close
semua drain valve.
- Posisikan in service
desuperheating water
sesuai kebutuhan.
- Infokan dengan operator
turbine untuk starting feed
water pump, isi air ke
boiler melalui bypass
sesuai kondisi steam drum
water level.
- Infokan ke operator turbine
untuk rolling turbine pada
saat : SH pressure 1.0 -
2Mpa, SH temperature
300C, Reheat steam
temperature 237C
II Turbine Start
Preparation
- Main steam
pressure 1.0
2Mpa
- Main steam
temperature 1.2 Kliktombol control GV
280C - Settarget speed 500 rpm
300C Set speed up ratio 100
rpm/min lalu klik ON
- Condenser
Cold state : 100
vacuum
rpm/min
41.325Kpa Warm state : 150
rpm/min
Hot state : 250
rpm/min
1.6 Pertahankantekananvaccum
di nilai normal
2.2 Ketikaputaran
mencapai1200 rpmtahan
sekitar 30 menit,
lakukaninspeksi unit
secarakeseluruhan
5 MOVEMENT
TEST MSV DAN
GOVERNING
VALVE (GV)
KETERANGAN :
WarnaMERAH di DCS tanda START / RUN &WarnaHIJAU tanda di DCS STOP (untuk
POMPA / FANS)
WarnaMERAH di DCS tanda OPEN &WarnaHIJAU tanda di DCS CLOSE ( untuk VALVE /
DAMPER )
REFERENSI:
1. Manual OPERATION INSTRUCTION for 2 x 135MW Superhigh Pressure CFB Boilers, DONGFANG
BOILER GROUP CO. ,LTD.
2. TURBINE OPERATION MANUAL for 2 x 135MW Volumn I, CHINA NATIONAL ELECTRIC
ENGINEERING CO. ,LTD.
PT PEMBANGKITAN JAWA BALI SERVICES No.Dokumen : IK-BJ-5.1.3.01
LEMBAR PENGESAHAN
I. DISUSUN
II. DIPERIKSA
III. DISAHKAN