O1 A. TUL. UTAMA
L tul = tinggi lantai + 40db
= 3600 + 40(25)
= 4600 mm
Banyak kolom K1 = 4 buah (44
tulangan utama per unit)
Banyak kolom K2 = 5 buah (30
Tinggi lantai = 3600 mm tulangan utama per unit)
Selimut Beton : 40 mm Banyak kolom K3 = 3 buah (36
db = 25 mm tulangan utama per unit)
Total kebutuhan batang = 434 batang
2. Sengkang Lapangan
1/2L = ½ (3600) = 1800 mm
D13-300
1800/300 = 6 keliling
Panjang tulangan = 6 x Keliling
= 6 x 3184,96
mm
= 19109,76
Asumsi sengkang membentuk mm
keliling kolom, 1 keliling
diregangkan sejarak sengkang Panjang total = 57329,28 +
pada keterangan gambar (100 dan 19109,76
300 mm) = 76439,04 mm
Keliling = 2(650) + π D = 1300 + Kebutuhan lente = 7 batang, akan
π(600) = 3184,96 mm
terdapat 6 sambungan
db = 13 mm
Maka panjang total = 76439,04 +
dp = 2,5 db = 32,5 mm
12(40d) = 82679,04 mm
Sisa = 1320,96 mm
2. Sengkang Lapangan
1/2L = ½ (3600) = 1800 mm
D13-300
1800/300 = 6 keliling
Panjang tulangan = 6 (π D)
= 9420 mm
+ 3 lente, 3 sambungan
Panjang total = 33860 + 5(40d)
= 36 m
Sisa = -
2. Sengkang Lapangan
1/2L = ½ (3600) = 1800 mm
D13-300
1800/300 = 6 keliling
Panjang tulangan = 6 (π D)
= 11304 mm
O1 Dik : TB1
D. TUL. UTAMA X1 = Lbentang
= 8000 mm
X2 = ¼ L
= ¼ 8000= 2000 mm
X3 = 15db
= 15 x 25 = 375 mm
X4 = 40db
L = 8000 mm = 40 x 25= 1000mm
Selimut Beton : 40 mm
db = 25 mm
dp = 2,5db = 2,5 x 25 = 62,5 mm L tul = X1 + X2+ X3 + X4
D = dp + 2db = 62,5+ (2.25) = 8000 + 2000+375+1000
= 112,5 mm = 11375 mm 11400 mm
O2 Dik :
X1 = L – 1/8 L
= 8000 – 1000 = 7000 mm
X2 = 40db
= 40 x 25 = 1000 mm
L = 8000 mm
L tul = X1 + 2X2
db = 25 mm
= 7000 + (2 x 1000)
= 9000 mm
O3 Dik :
X1 = L -1/8L =
= 8000 -1000 = 7000 mm
X2 = ¼ L
= ¼ 8000= 2000 mm
X3 = 15db
= 15 x 25 = 375 mm
X4 = 40db
L = 8000 mm = 40 x 25= 1000mm
Selimut Beton : 40 mm
db = 25 mm
dp = 2,5db = 2,5 x 25 = 62,5 mm L tul = X1 + X2+ X3 + X4
D = dp + 2db = 62,5+ (2.25) = 7000 + 2000+375+1000
= 112,5 mm = 10375mm 10400 mm
O4 Dik :
E. TUL.TUMPUAN X1 = ¼ L
= ¼ 8000 = 2000 mm
X2 = 15 db
= 15 x 25 = 275 mm
Selimut beton = 40 mm L = 2X1 + 2X2
db = 25 mm = (2 x 2000) + ( 2 x 375 )
L = 8000 mm = 4750 mm
O5 Dik :
F. TUL.LAPANGAN
X1 = ½ L
= ½ 8000 = 4000 mm
X2 = 20 db
Selimut beton = 40 mm = 20 x 25 = 500 mm
db = 25 mm L total = X1 + 2X2 =
L = 8000 mm = 4000 + (2 x 500)
= 5000 mm
O6 Dik : TB2
𝑑𝑝
A. TUL. UTAMA X= + 𝑑𝑏
2
72,5
= 2 + 29 = 65,25 mm
X1 = L – sb – x
= 7800 – 40 – 65,25
= 7694,75 mm
L = 7800 mm X2 = ¼ π D
Selimut Beton : 40 mm = ¼ x 3,14 x 130,5
db = 29 mm = 102,5 mm
dp = 2,5db = 2,5 x 29 = 72,5 mm
X3 = 12db
D = dp + 2db = 72,5+ (2.29) = 12 x 29 = 348 mm
= 130,5 mm
X4 = 40db
= 40 x 29 = 1160 mm
L tul = X1 + X2+ X3 + X4
= 7694,75 + 102,5 +
348+1160
= 9305,25 mm
O7 Dik :
𝑑𝑝
X= + 𝑑𝑏
2
72,5
= + 29 = 65,25 mm
2
X1 = L – sb – x – 1/8 L
= 7000 – 40 – 65,25 - 1000
= 6694,75 mm
L = 7800 mm X2 = ¼ π D
= ¼ x 3,14 x 130,5
Selimut Beton : 40 mm
db = 29 mm = 102,5 mm
dp = 2,5db = 2,5 x 29 = 72,5 mm X3 = 12db
D = dp + 2db = 72,5+ (2.29) = 12 x 29 = 348 mm
= 130,5 mm X4 = 40db
= 40 x 29 = 1160 mm
L tul = X1 + X2+ X3 + X4
= 6694,75 + 102,5 +
348+1160
= 8305,25 mm
O8 Dik :
𝑑𝑝
B. TUL.TUMPUAN 1 X= + 𝑑𝑏
2
72,5
= 2 + 29 = 65,25 mm
X1 = Ltumpuan + Lkolom – sb – x
=1950 +250 - 40 – 65,25
L = 7800 mm = 2094,75 mm
Ltumpuan = ¼ 7800 = 1950 mm X2 = ¼ π D
Selimut Beton : 40 mm = ¼ x 3,14 x 130,5
db = 29 mm = 102,5 mm
dp = 2,5db = 2,5 x 29 = 72,5 mm
X3 = 15db
D = dp + 2db = 72,5+ (2.29)
= 15 x 29 = 435 mm
= 130,5 mm
X4 = 6db
= 6 x 29 = 174 mm
L tul = X1 + X2+ X3 + X4
= 2094,75 + 102,5 +
435+174
= 2806,25 mm
O9 Dik :
C. TUL. LAPANGAN X1 = Llapangan
= 3900 mm
X2 = 20db
= 20 x 29= 580 mm
L tul = X1 + 2X2
L = 7800 mm = 3900 + ( 2 x 580)
Llapangan = ½ L = 3900 mm = 5060 mm
db = 29 mm
1O Dik :
D. TUL.TUMPUAN 2 X1 = 2 Ltumpuan
= 2 x 1950
= 3900 mm
X2 = 15db
= 15 x 29 = 435 mm
L = 7800 mm
Ltumpuan = ¼ 7800 = 1950 mm
L tul = X1 + 2X2
db = 29 mm = 3900 + (2 x 435)
= 4770 mm
11 Dik : TBBL
𝑑𝑝
X= + 𝑑𝑏
2
A. TUL.UTAMA 72,5
= 2 + 29 = 65,25 mm
X1 = L – 2sb – 2x
L = 1000 mm
=1000–(2 x 40)- (2 x 65,25)
Selimut Beton : 40 mm
= 789,5 mm
db = 29 mm
X2 = ¼ π D
dp = 2,5db = 2,5 x 29 = 72,5 mm = ¼ x 3,14 x 130,5
D = dp + 2db = 72,5+ (2.29)
= 102,5 mm
= 130,5 mm
X3 = 12db
= 15 x 29 = 435 mm
12 Dik :
𝑑𝑝
B. TUL. TUMPUAN X= + 𝑑𝑏
2
72,5
= 2 + 29 = 65,25 mm
X1 = ¼ L + Lkolom – sb - x
= 250 + 250 - 40 - 65,25
L = 1000 mm = 394,75 mm
Ltumpuan = ¼ L = 250 mm X2 = ¼ π D
Selimut Beton : 40 mm = ¼ x 3,14 x 130,5
db = 29 mm = 102,5 mm
dp = 2,5db = 2,5 x 29 = 72,5 mm X3 = 6db
D = dp + 2db = 72,5+ (2.29) = 6 x 29 = 174 mm
= 130,5 mm X4 = 15db
= 15 x 29 = 435 mm
L tul = X1 + X2+ X3 + X4
= 394,75 + 102,5 + 174+ 435
= 1107,25 mm
13 Dik :
C. TUL.LAPANGAN
X1 = Ltumpuan
= 500 mm
L = 1000 mm X2 = 20db
Llapangan = ½ 1000 = 500 mm = 20 x 29 = 580 mm
db = 29 mm
L tul = X1 + 2X2
= 500 + (2 x 580)
=1160 mm
SENGKANG
O1 Dik : TB1
𝑑𝑝
X= + 𝑑𝑏
2
32,5
= + 13 = 19,25 mm
2
X1 = L1 – 2sb -2x
= 400 – (2 x 40) –
(2 x 19,25)
L1 = 400 mm = 261,5 mm
L2 = 600 mm X2 = L2 – 2sb -2x
Selimut Beton : 40 mm = 600 – (2 x40) –
db = 13 mm (2 x 19,25)
dp = 2,5db = 2,5 x 13 = 32,5 = 461,5 mm
mm X3 = ¼ π D
D = dp + 2db = 32,5+ (2.13) = ¼ x 3,14 x 58,5
= 58,5 mm = 49,95 mm
X4 = 3/8 π D
= 3/8 x 3,14 x 58,5
= 68,92 mm
X5 = 6db
= 6 x 13 = 78 mm
O2 Dik : TB2
𝑑𝑝
X= + 𝑑𝑏
2
32,5
= 2 + 13 = 19,25 mm
X1 = L – 2sb – 2x
= 600– 80 – 38,5
L= 600 mm = 484,5 mm
Selimut Beton : 40 mm X2 = ¼ π D
db = 13 mm = ¼ x 3,14 x 58,5
dp = 2,5db = 2,5 x 13 = 32,5 = 49,95 mm
mm X3 = 3/8 π D
D = dp + 2db = 32,5+ (2.13) = 3/8 x 3,14 x 58,5
= 58,5 mm = 68,92 mm
X4 = 6db
= 6 x 13 = 78 mm
O3 Dik : TBBL
𝑑𝑝
X= + 𝑑𝑏
2
40
= 2 + 16 = 36 mm
X1 = L1 - 2sb – 2x
= 600 - 80 – 72
= 448 mm
L1= 600 mm X2 = L2 - 2sb – 2x
L2= 1000 mm = 1000 – 80 – 72
Selimut Beton : 40 mm = 848
db = 16 mm X3 = ¼ π D
dp = 2,5db = 2,5 x 16 = 40 mm = ¼ x 3,14 x 72
D = dp + 2db = 40 + (2.16) = 56,55mm
= 72 mm X4 = 3/8 π D
= 3/8 x 3,14 x 72
= 84,82 mm
X5 = 6db
= 6 x 16 = 96 mm
D10-200
L = 3100 mm dan 4000 mm
Selimut Beton : 25 mm
db = 10 mm
dp = 2,5db = 25 mm
D = dp + 2db = 45 mm
D10-200
L = 3100 mm
Selimut Beton : 25 mm
db = 10 mm
dp = 2,5db = 25 mm
D = dp + 2db = 45 mm
D10-200
L = 4000 mm
Selimut Beton : 25 mm
db = 10 mm
dp = 2,5db = 25 mm
D = dp + 2db = 45 mm
D10-300
L = 8000 mm
Selimut Beton : 25 mm
db = 10 mm
dp = 2,5db = 25 mm
D = dp + 2db = 45 mm
D10-300
L = 8000 mm
Selimut Beton : 25 mm
db = 10 mm
dp = 2,5db = 25 mm
D = dp + 2db = 45 mm
BAB II
PERHITUNGAN JUMLAH LENTE DAN SISA TULANGAN
1. Perhitungan Kebutuhan Jumlah Batang (lente) Tulangan
TULANGAN UTAMA KOLOM
O1 Diketahui :
Dtul = 25 mm
Ltol = 4600 mm
1 Lente = 12000 mm
Jumlah tulangan = 434 buah
Perhitungan :
12000
1 Lente = 𝐿 𝑡𝑢𝑙
12000
= = 2 buah/lente
4600
Sisa Perlente : 1 lente =12000 - 9200 = 2800 mm
𝑗𝑢𝑚𝑙𝑎ℎ 𝑡𝑢𝑙𝑎𝑛𝑔𝑎𝑛 434
Jumlah lente = 𝑗𝑢𝑚𝑙𝑎ℎ 𝑡𝑢𝑙/𝑙𝑒𝑛𝑡𝑒 = 2 = 217 lente
SENGKANG KOLOM
KoDe Perhitungan Jumlah Lente
O6 Diketahui :
Kolom K1
Dtul = 13 mm
Ltol = 76439,04 mm
1 Lente = 12000 mm
Jumlah kolom = 4 buah
Perhitungan :
Perhitungan :
O8 Diketahui :
Kolom K3 (1 buah terdiri dari 2 subkolom)
Dtul = 13 mm
Ltul = 45216 mm
1 Lente = 12000 mm
Jumlah Kolom = 3 buah
Jumlah subkolom = 6 buah
Jumlah tulangan = 6 buah
Perhitungan :
1 subkolom = 4 lente
Jumlah lente total = 4 x 6 = 24 lente
P-01 Diketahui :
D10-200
Dtul = 10 mm
Ltol = 1153,357 mm
1 Lente = 12000 mm
Jumlah tulangan = (4000/200) + 1 = 21 x 6 = 126 buah
Perhitungan :
12000
1 Lente = 𝐿 𝑡𝑢𝑙
12000
= 1153,357 = 10 buah/lente
Sisa Perlente : 1 lente =12000 – 11533,57 = 466,43 mm
𝑗𝑢𝑚𝑙𝑎ℎ 𝑡𝑢𝑙𝑎𝑛𝑔𝑎𝑛 126
Jumlah lente = 𝑗𝑢𝑚𝑙𝑎ℎ 𝑡𝑢𝑙/𝑙𝑒𝑛𝑡𝑒 = 10 = 13 lente
P-02 Diketahui :
D10-200
Dtul = 10 mm
Ltol = 1956,028 mm
1 Lente = 12000 mm
Jumlah tulangan = (4000/200) + 1 = 21 x 6 = 126 buah
Perhitungan :
12000
1 Lente = 𝐿 𝑡𝑢𝑙
12000
= 1956,028 = 6 buah/lente
Sisa Perlente : 1 lente =12000 – 11736,168 = 263,832 mm
𝑗𝑢𝑚𝑙𝑎ℎ 𝑡𝑢𝑙𝑎𝑛𝑔𝑎𝑛 126
Jumlah lente = 𝑗𝑢𝑚𝑙𝑎ℎ 𝑡𝑢𝑙/𝑙𝑒𝑛𝑡𝑒 = 6 = 21 lente
P-03 Diketahui :
D10-200
Dtul = 10 mm
Ltol = 2181,028 mm
1 Lente = 12000 mm
Jumlah tulangan = (4000/200) + 1 = 21 x 3 = 63 buah
Perhitungan :
12000
1 Lente = 𝐿 𝑡𝑢𝑙
12000
= 2181,028 = 5 buah/lente
Sisa Perlente : 1 lente =12000 – 10905,14 = 1094,86 mm
𝑗𝑢𝑚𝑙𝑎ℎ 𝑡𝑢𝑙𝑎𝑛𝑔𝑎𝑛 63
Jumlah lente = 𝑗𝑢𝑚𝑙𝑎ℎ 𝑡𝑢𝑙/𝑙𝑒𝑛𝑡𝑒 = 5 = 13 lente
P-04 Diketahui :
D10-200
Dtul = 10 mm
Ltot = 15008,186 mm (penyambungan 2 batang)
1 Lente = 12000 mm
Panjang potongan 1 = 12000 mm
Panjang potongan 2 = 3008,186 mm
Tulangan lapis atas:
Jumlah tulangan potongan 1 = (2000/200) + 1 = 11 x 6 = 66 buah
Jumlah tulangan potongan 2 = (2000/200) + 1 = 11 x 6 = 66 buah
Tulangan lapis bawah:
Jumlah tulangan potongan 1 = (24000/200) + 1 = 121 buah
Jumlah tulangan potongan 2 = (24000/200) + 1 = 121 buah
Perhitungan :
P-05 Diketahui :
D10-300
Dtul = 10 mm
Ltol = 2278,357 mm
1 Lente = 12000 mm
Jumlah tulangan = (1550/300) + 1 = 6 x 4 = 24 buah
Jumlah tulangan = (2000/300) + 1 = 7 x 4 = 28 buah
Jumlah tulangan total = 24 + 28 = 52 buah
Perhitungan :
12000
1 Lente = 𝐿 𝑡𝑢𝑙
12000
= 2278,357 = 5 buah/lente
Sisa Perlente : 1 lente =12000 – 11391,785 = 608,215 mm
𝑗𝑢𝑚𝑙𝑎ℎ 𝑡𝑢𝑙𝑎𝑛𝑔𝑎𝑛 52
Jumlah lente = = = 11 lente
𝑗𝑢𝑚𝑙𝑎ℎ 𝑡𝑢𝑙/𝑙𝑒𝑛𝑡𝑒 5
P-06 Diketahui :
D10-300
Dtul = 10 mm
Ltotal = 4181,028 mm
1 Lente = 12000 mm
Jumlah tulangan = (1550/300) + 1 = 6 x 2 = 12 buah
Jumlah tulangan = (2000/300) + 1 = 7 x 2 = 14 buah
Jumlah tulangan total = 12 + 14 = 26 buah
Perhitungan :
12000
1 Lente = 𝐿 𝑡𝑢𝑙
12000
= 4181,028 = 2 buah/lente
Sisa Perlente : 1 lente = 12000 – 8362,056 = 3637,944 mm
𝑗𝑢𝑚𝑙𝑎ℎ 𝑡𝑢𝑙𝑎𝑛𝑔𝑎𝑛 26
Jumlah lente = 𝑗𝑢𝑚𝑙𝑎ℎ 𝑡𝑢𝑙/𝑙𝑒𝑛𝑡𝑒 = 2 = 13 lente
P-07 Diketahui :
D10-300
Dtul = 10 mm
Ltot = 25475,243 mm (penyambungan 3 batang)
1 Lente = 12000 mm
Panjang potongan 1 = 12000 mm
Panjang potongan 2 = 12000 mm
Panjang potongan 3 = 1475,243 mm
Tulangan lapis atas:
Jumlah tulangan potongan 1 = (775/300) = 2 x 4 = 8 buah
= (1000/300) = 3 x 4 = 12 buah
Total = 8 + 12 = 20 buah
Jumlah tulangan potongan 2 = (775/300) = 2 x 4 = 8 buah
= (1000/300) = 3 x 4 = 12 buah
Total = 8 + 12 = 20 buah
Jumlah tulangan potongan 3 = (775/300) = 2 x 4 = 8 buah
= (1000/300) = 3 x 4 = 12 buah
Total = 8 + 12 = 20 buah
Perhitungan :