B. UAV Mapping
01. Ground Control Point (GCP) 30 GCP 40,000,000
02. Data Acquisition and Data Processing
( 1x Team Leader, 1x Pilot, 1x Surveyor) 30 KM 25,000,000
03. Bench Mark 10 titik 35,000,000
04. Pengolahan DTM dan Kontur 600 Ha 21,000,000
05. Pembuatan Cross Section 600 Cross 12,000,000
06. Pembuatan Long Section 1 Long 5,000,000
06. Digitasi 600 Ha 19,000,000
07. Layouting 600 Cross 15,000,000
08. Reporting Ls 5,000,000
TOTAL BIAYA UAV 177,000,000
Syarat Pembayaran
1) 30% Sebelum mobilisasi (Uang Muka)
2) 50% Setelah tim melakukan Demobilisasi, Laporan Lapangan
3) 20% Setelah Laporan final
ESTIMASI JADWAL KEGIATAN UAV BALIKPAPAN
V BALIKPAPAN
GW CL GW CL GW CL
1 7 10 6 19
2 7 11 6 20
3 7 12 7 21
4 7 13 4 22
5 6 14 5 23
6 6 15 3 24
7 7 16 6 25
8 3 17 26
9 4 18 27
1 2 3 4 5 6 7 8 9 10
6 3 9,10 6
1 1 9 1 6 4 1 4 2 4
11 12 13 14 15 16
8,10 6,7,8 8 5,8, 10 2,8
6 2 4 3 1 5
365
5000
1,825,000