NAMA PAKET : .............

PROP / KAB / KODYA : .............


ITEM PEMBAYARAN NO. : : 4.4.(3) PERKIRAAN VOL. PEK. : 1.00
JENIS PEKERJAAN : Bubur Aspal Tipe 2 TOTAL HARGA (Rp.) : 68,000.00
SATUAN PEMBAYARAN : M2 % THD. BIAYA PROYEK :

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

I. UPAH/TENAGA KERJA

1. Pekerja (L01) Jam 0.0530 13,571.43 719.45


2. Mandor (L03) Jam 0.0044 15,000.00 66.27

JUMLAH HARGA TENAGA 785.71

II. BAHAN

1. Abu Batu M05 M3 0.0072 420,000.00 3,043.76


2. Asbuton butir kg 0.00
3. Aspal Emulsi CSS 1 h (Polimer) M10 Kg 2.8840 16,250.00 46,865.00
4. Semen PC M12 Kg 0.1648 1,160.00 191.17
5. Air Bersih M15 liter 1.8128
6. Aditif Emulsifier M16 kg 0.0824 35,000.00 2,884.00

JUMLAH HARGA BAHAN 52,983.93

III. PERALATAN
1. Slurry Paver E01 Jam 0.0044 814,626.72 3,598.75
2. Dump Truck 3,5 ton E08 Jam 0.0177 152,733.83 2,698.91
3. Air Compressor E06 Jam 0.0013 149,901.51 195.18
4 Whell Loader E015 Jam 0.0085 213,889.72 1,817.09

JUMLAH HARGA PERALATAN 8,309.94


SUB JUMLAH I+II+III 62,079.59
IV. LAIN-LAIN

Biaya Umum dan Keuntungan 10% 62,079.59 6,207.96


JUMLAH LAIN-LAIN 6,207.96
JUMLAH HARGA 68,287.54
HARGA SATUAN PEKERJAAN (Dibulatkan) 68,000.00

Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor
mata pembayaran.
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
ITEM PEMBAYARAN NO. : 4.4.(3) E.4.4 (3)
JENIS PEKERJAAN : Bubur Aspal Tipe 2
SATUAN PEMBAYARAN : M2 URAIAN ANALISA HARGA SATUAN

No. URAIAN KODE KOEF. SATUAN KETERANGAN

I. ASUMSI
1 Menggunakan Alat Slurry Paver
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : sedang
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 10.0 Km
5 Jam kerja efektif per-hari Tk 7.00 Jam
6 Aplikasi Slurry t 16.00 kg/m2
7 Lapisan SBST terdiri dari (spesifikasi) :
- Menggunakan Agregat Tipe I, Aspal Emulsi CSS -1h
8 KOMPOSISI BAHAN
Abu Batu FA 70.00%
Slurry Asbuton LGA Asb 0.00%
Semen PC PC 1.00%
Aspal Emulsi CSS 1 h (Polimer) AE 17.50%
Air Bersih Ai 11.00%
Aditif Emulsifier Adf 0.50%
9 Berat Isi Bahan 100%
Agregat D1 1.70 ton/m3
Asbuton LGA D2 0.8 ton/m3
Semen PC D3 2.4 ton/m3
Aspal Emulsi CSS- 1h D4 1.01 ton/m3
Air Bersih 1 ton/m3
10 Faktor kehilangan Material
- Agregat Fh1 1.10
- Aspal Emulsi, Asuton, Semen PC, Aspal Emulsi Fh2 1.03

II. URUTAN KERJA


1 Agregat, Aspal Emulsi dan bahan tambah diangkut
ke lokasi pekerjaan dengan Menggunakan Truck
2 Permukaan Aspal dibersihkan dengan Air Compresor
3 Material Abu batu dan semen dimasukkan ke slurry paver Dengan
menggunakan Whell Loader
4 Aspal Emulsi,air dan Aditif dimasukkan ke coltbin dengan
mesin pengisap
5. Kalibrasi Bukan Colbin untuk masuk ke mixer
6. Penghamparan slurry seal dengan alat paver

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA


1. BAHAN
1.a. Abu Batu (1x FA / D1 x Fh1) M01b 0.00725 m3
1.c Aspal Emulsi CSS- 1h M02 2.884 Kg.
1.d Semen PC M01d 0.1648 Kg.
1.e Air Bersih M05 1.813 liter
1.f Aditif Emulsifier M06 0.082 Kg.

2 ALAT
2.a. SLURRY PAVER E01
Lebar Spreader Box L 3.00 m'
Kapasitas Batch Fb 8,000.00 kg
Kecepatan hampar V 2.00 km/jam
Faktor Efisiensi alat Fa 0.83 -
Waktu Siklus : Ts1
- Hampar T1 60.00 menit
- Muat T2 30.00 menit
- Lain lain T3 20.00 menit
Ts1 110.00 menit
Kap. Prod. / jam = Fb x Fa x 60 Q1 226.36 M2
Ts1+ x t
Koefisien Alat / M2 = 1 : Q1 E01 0.0044 Jam
Berlanjut ke hal. berikut.
ITEM PEMBAYARAN NO. : 4.4.(3) E.4.4 (3)
JENIS PEKERJAAN : Bubur Aspal Tipe 2
SATUAN PEMBAYARAN : M2 URAIAN ANALISA HARGA SATUAN
Lanjutan

No. URAIAN KODE KOEF. SATUAN KETERANGAN

2.b. DUMP TRUCK 3.5 TON E08


Sebagai alat pengangkut bahan di lokasi pekerjaan,
Dump Truck melayani alat Slurry Paver

Kap. Prod./jam = Q2 56.59 m2

Koefisien Alat / m2 = 1 : Q2 E08 0.0177 Jam


2.c Whell Loader

Kapasitas bucket V 1.50 M3


Faktor bucket Fb 0.85 - lepas
Faktor Efisiensi alat Fa 0.83 - kondisi sedang
Waktu Siklus : Ts1
- Memuat dan lain-lain T1 0.45 menit panduan
Ts1 0.45 menit

Kap. Prod. / jam = V x Fb x Fa x 60 Q1 117.71 M3


Ts1 x Bip/Bil
Koefisien Alat / M3 = 1 : Q1 (E15) 0.0085 jam

2.d Air Compressor E015


Lebar penyemprotan b 3.20 M
Kecepatan penyemprotan v 5.00 M/menit
Kapasitas pas 16 M2/menit
Faktor effesiensi kerja Fa 0.80

Kap. Prod. / jam = pas x Fa x 60 Q1 768.00 m2

Koefisien Alat / Ltr = 1 : Q1 E015 0.0013 Jam

2.e. ALAT BANTU


diperlukan : 1.00 Lump Sum
- Kereta dorong = 2 buah
- raker = 3 buah
- Sapu lidi = 2 buah

3. TENAGA
Produksi menentukan : SLURRY PAVER Q3 226.36 M2
Produksi / hari = Tk x Q3 Qt 1,584.55 M2
Kebutuhan tenaga :
- Pekerja P 12.00 orang
- Mandor M 1.00 orang

Koefisien Tenaga / M2 :
- Pekerja = (Tk x P) / Qt (L01) 0.0530 Jam
- Mandor = (Tk x M) / Qt (L02) 0.0044 Jam
Berlanjut ke hal. berikut.
ITEM PEMBAYARAN NO. : 4.4.(3) E.4.4 (3)
JENIS PEKERJAAN : Bubur Aspal Tipe 2
SATUAN PEMBAYARAN : M2 URAIAN ANALISA HARGA SATUAN
Lanjutan

No. URAIAN KODE KOEF. SATUAN KETERANGAN

4. HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT


Lihat lampiran.

5. ANALISA HARGA SATUAN PEKERJAAN


Lihat perhitungan dalam FORMULIR STANDAR UNTUK
PEREKEMAN ANALISA MASING-MASING HARGA
SATUAN.
Didapat Harga Satuan Pekerjaan :

Rp. 68,000.00 / M2.

6. WAKTU PELAKSANAAN YANG DIPERLUKAN


Masa Pelaksanaan : 1 hari

7. VOLUME PEKERJAAN YANG DIPERLUKAN


Volume pekerjaan : 1.00 M2
HARGA DASAR SATUAN UPAH
HARGA
NO. URAIAN KODE SATUAN SATUAN KETERANGAN
( Rp.)

1. Pekerja (L01) Jam 13,571.43 95,000.00 /hari


2. Tukang (L02) Jam 15,000.00 105,000.00 /hari
3. Mandor (L03) Jam 21,428.57 150,000.00 /hari
4. Operator (L04) Jam 22,142.86 155,000.00 /hari
5. Pembantu Operator (L05) Jam 17,142.86 120,000.00 /hari
6. Sopir / Driver (L06) Jam 17,857.14 125,000.00 /hari
7. Pembantu Sopir / Driver (L07) Jam 12,857.14 90,000.00 /hari
8. Mekanik (L08) Jam 20,714.29 145,000.00 /hari
9. Pembantu Mekanik (L09) Jam 15,000.00 105,000.00 /hari
10. Kepala Tukang (L10) Jam 14,500.00
HARGA DASAR SATUAN BAHAN
HARGA
NO, URAIAN KODE SATUAN SATUAN KETERANGAN
( Rp.)

1 Pasir Pasang (Sedang) M01b M3 180,000.00 Base Camp


2 Pasir Beton (Kasar) M01a M3 180,000.00 Base Camp
3 Pasir Halus (untuk HRS) M01c M3 185,000.00 Base Camp
4 Pasir Urug (ada unsur lempung) M01d M3 65,000.00 Base Camp
5 Batu Kali/Gunung M02 M3 230,000.00 Base Camp
6 Agregat Pecah Kasar M03 M3 380,000.00 Lokasi Pekerjaan
13 Abu Batu M05 M3 420,000.00 Lokasi Pekerjaan
14 Batu Belah / Kerakal M06 M3 245,000.00 Base Camp
15 Gravel M07 M3 180,000.00 Base Camp
16 Bahan Tanah Timbunan M08 M3 60,000.00 Lokasi Pekerjaan
17 Bahan Pilihan M09 M3 145,000.00 Lokasi Pekerjaan
18 Aspal Emulsi CSS-1 h M10 Kg 16,250.00 Lokasi Pekerjaan
19 ASpal Emulsi CQS-1 h M11 Kg 18,500.00 Lokasi Pekerjaan
20 Semen / PC (50kg) M12 Kg 58,000.00 Lokasi Pekerjaan
21 Semen / PC (kg) M12 Kg 1,160.00 Lokasi Pekerjaan
22 Cat Marka (Non Thermoplas) M13 Kg 23,000.00 Lokasi Pekerjaan
23 Cat Marka (Thermoplastic) M14 Kg 35,000.00 Lokasi Pekerjaan
24 Air Bersih M15 Liter 50.00 Lokasi Pekerjaan
25 Aditif Emulsier M16 Kg 35,000.00 Lokasi Pekerjaan
26 Bensin M17 Liter 7,000.00 Lokasi Pekerjaan
27 Solar M18 Liter 9,800.00 Lokasi Pekerjaan
28 Minyak Pelumas / Olie M19 Liter 20,000.00 Lokasi Pekerjaan
29 Laston AC-BC M20 Ton 1,200,000.00 Base Camp
Base Camp
Base Camp
HARGA DASAR SATUAN ALAT
HARGA
NO. JENIS ALAT KODE SATUAN SATUAN SEWA KETERANGAN
( Rp.)

1 SLURRY PAVER E01 Jam 814,626.72


2 DUMP TRUCK 3.5 TON E08 Jam 152,733.83
3 COMPRESSOR 4000-6500 L\M E06 Jam 149,901.51
4 WHELL LOADER E015 Jam 213,889.72
5 TANDEM ROLLER E018 Jam 465,587.93
6 ASPHALT SPRAYER E05 Jam 71,315
TENAGA KAPASITAS HARGA ALAT YANG DIPAKAI NILAI FAKTOR BIAYA PASTI PER JAM BIAYA OPERASI PER JAM KERJA TOTAL
ALAT ALAT ALAT JAM SISA PENGEM- BIAYA ASURANSI TOTAL BAHAN BAKAR & PELUMAS PERBAIKAN & PERAWATAN UPAH TOTAL BIAYA
UMUR KERJA HARGA ALAT BALIAN PENGEM- DAN BIAYA BAHAN MINYAK OPERATOR PEMBANTU BIAYA SEWA ALAT
ALAT 1 TAHUN ALAT MODAL BALIAN LAIN-LAIN PASTI / JAM BAKAR PELUMAS BIAYA KOEF. BIAYA / SOPIR OPERATOR OPERASI PER
MODAL / SOPIR / JAM JAM KERJA
(HP) - (Tahun) (Tahun) (Jam) (Rp.) (Rp.) - (Rp.) (Rp.) (Rp.) Lt/HP/Jam Ltr/HP/Jam (Rp.) - (Rp.) (Rp.) (Rp.) (Rp.) (Rp.) KET.
No. JENIS PERALATAN KODE f1 x HP x 1 Orang 1 Orang
ALAT i(1+i)^A (B - C) x D 0.002 x B 0.125 0.01 Harga BBM 0.125 (g1 x B') Per Per
(10% X B) ----------- ----------- ----------- (e1 + e2) s/d s/d + s/d ----------- Jam Kerja Jam Kerja F+G+H+I E+J
(1+i)^A-1 W W 0.175 0.02 f2 x HP x 0.175 W = =
Harga Olie Rp0.0 Rp0.0
HP Cp B A W B C D e1 e2 E f1 f2 F g1 G H I J K L
1 2 2a 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23

1. SLURRY PAVER E01 220.0 8,000.0 kg/batch 3,500,000,000 5.0 1,600.0 3,500,000,000 350,000,000 0.23097 454,731.63 4,375.00 459,106.63 0.1250 0.0100 313,500.00 0.1250 2,734.38 22,142.86 17,142.86 355,520.09 814,626.72
2. DUMP TRUCK 3.5 TON E08 50 3.5 ton 380,000,000 5 2,000 380,000,000 38,000,000 0.23097 39,496.69 380.00 39,876.69 0.1250 0.0100 71,250.00 0.1250 23,750.00 17,857.14 0.00 112,857.14 152,733.83
3. COMPRESSOR 4000-6500 L\M E06 60 5000 L/M 150,000,000 5 2,000 150,000,000 15,000,000 0.23097 15,590.80 150.00 15,740.80 0.1250 0.0100 85,500.00 0.1250 9,375.00 22,142.86 17,142.86 134,160.71 149,901.51
4. WHELL LOADER E015 96 1.5 M3 250,000,000 5 2,000 250,000,000 25,000,000 0.26380 29,677.22 250.00 29,927.22 0.1250 0.0100 122,400.00 0.1250 26,562.50 17,142.86 12,857.14 183,962.50 213,889.72
3. TANDEM ROLLER E018 82 8.1 Ton 250,000,000 5 2,000 250,000,000 25,000,000 0.26380 29,677.22 250.00 29,927.22 0.1250 0.0100 21,375.00 0.1250 15,625.00 14,500.00 134,160.71 435,660.71 465,587.93
5. ASPHALT SPRAYER E05 6.5 850 Liter 95,000,000 5 2000 95,000,000 9,500,000 0.23097 9,874.17 95.00 9,969.17 0.1750 0.0200 13,747.50 0.1750 8,312.50 22,142.86 17,142.86 61,345.71 71,314.89

KETERANGAN : 1. Tingkat Suku Bunga = 5.00 % per-tahun


2. Upah Operator / Sopir / Mekanik = 22,143 Rupiah per-orang/jam
3. Upah Pembantu Operator/Sopir/Mekanik = 17,143 Rupiah per-orang/jam
4. Harga Bahan Bakar Bensin = 7,000 Rupiah per-liter
5. Harga Bahan Bakar Solar = 9,800 Rupiah per-liter
6. Minyak Pelumas = 20,000 Rupiah per-liter
7. Pajak Pertambahan Nilai (PPN) diperhitungkan pada Lembar Rekapitulasi Biaya Pekerjaan
URAIAN ANALISA ALAT

No. URAIAN KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN
1. Jenis Peralatan SLURRY PAVER E01
2. Tenaga Pw 220.0 HP
3. Kapasitas Cp 8,000.0 kg/batch
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 1,600.0 Jam
c. Harga Alat B 3,500,000,000 Rupiah
5. Alat Yang Dipakai : a. Umur Ekonomis A' 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W' 1,600.0 Jam
c. Harga Alat (*) B' 3,500,000,000 Rupiah

B. BIAYA PASTI PER JAM KERJA


1. Nilai Sisa Alat = 10 % x B C 350,000,000 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A' D 0.23097 -


(1 + i)^A' - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = ( B' - C ) x D E 454,731.63 Rupiah
W'

b. Asuransi, dll = 0.002 x B' F 4,375.00 Rupiah


W'

Biaya Pasti per Jam = (E+F) G 459,106.63 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Ms H1 269,500.00 Rupiah

2. Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x Mp I 44,000.00 Rupiah

3. Perawatan dan = (12,5 % - 17,5 %) x B' K 2,734.38 Rupiah


perbaikan W'
4. Operator = ( 1 Orang / Jam ) x U1 L 22,142.86 Rupiah
5. Pembantu Operator = ( 3 Orang / Jam ) x U2 M 17,142.86 Rupiah

Biaya Operasi per Jam = (H+I+K+L+M) P 355,520.09 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) T 814,626.72 Rupiah

E. LAIN - LAIN
1. Tingkat Suku Bunga i 5.00 % / Tahun
2. Upah Operator / Sopir U1 22,142.86 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 17,857.14 Rp./Jam
4. Bahan Bakar Bensin Mb 7,000.00 Liter
5. Bahan Bakar Solar Ms 9,800.00 Liter
6. Minyak Pelumas Mp 20,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
No. URAIAN KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN
1. Jenis Peralatan DUMP TRUCK 3.5 TON E08
2. Tenaga Pw 50.0 HP
3. Kapasitas Cp 3.5 ton
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 380,000,000 Rupiah
5. Alat Yang Dipakai : a. Umur Ekonomis A' 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W' 2,000.0 Jam
c. Harga Alat (*) B' 380,000,000 Rupiah

B. BIAYA PASTI PER JAM KERJA


1. Nilai Sisa Alat = 10 % x B C 38,000,000 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A' D 0.23097 -


(1 + i)^A' - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = ( B' - C ) x D E 39,496.69 Rupiah
W'

b. Asuransi, dll = 0.002 x B' F 380.00 Rupiah


W'

Biaya Pasti per Jam = (E+F) G 39,876.69 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Ms H 61,250.00 Rupiah

2. Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x Mp I 10,000.00 Rupiah

3. Perawatan dan (12,5 % - 17,5 %) x B' K 23,750.00 Rupiah


perbaikan = W'

4. Sopir = ( 1 Orang / Jam ) x U1 L 17,857.14 Rupiah

Biaya Operasi per Jam = (H+I+K+L+M) P 112,857.14 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 152,733.83 Rupiah

E. LAIN - LAIN
1. Tingkat Suku Bunga i 5.00 % / Tahun
2. Upah Sopir U1 17,857.14 Rp./Jam
3. Upah Pembantu / Pmb.Sopir U2 12,857.14 Rp./Jam
4. Bahan Bakar Bensin Mb 7,000.00 Liter
5. Bahan Bakar Solar Ms 9,800.00 Liter
6. Minyak Pelumas Mp 20,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
No. URAIAN KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN
1. Jenis Peralatan COMPRESSOR 4000-6500 L\M E06
2. Tenaga Pw 60.0 HP
3. Kapasitas Cp 5,000.0 L/M
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 150,000,000 Rupiah
5. Alat Yang Dipakai : a. Umur Ekonomis A' 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W' 2,000.0 Jam
c. Harga Alat (*) B' 150,000,000 Rupiah

B. BIAYA PASTI PER JAM KERJA


1. Nilai Sisa Alat = 10 % x B C 15,000,000 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A' D 0.23097 -


(1 + i)^A' - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = ( B' - C ) x D E 15,590.80 Rupiah
W'

b. Asuransi, dll = 0.002 x B' F 150.00 Rupiah


W'

Biaya Pasti per Jam = (E+F) G 15,740.80 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Ms H 73,500.00 Rupiah

2. Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x Mp I 12,000.00 Rupiah

3. Perawatan dan (12,5 % - 17,5 %) x B' K 9,375.00 Rupiah


perbaikan = W'

4. Operator = ( 1 Orang / Jam ) x U1 L 22,142.86 Rupiah


5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 17,142.86 Rupiah

Biaya Operasi per Jam = (H+I+K+L+M) P 134,160.71 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 149,901.51 Rupiah

E. LAIN - LAIN
1. Tingkat Suku Bunga i 5.00 % / Tahun
2. Upah Operator / Sopir U1 22,142.86 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 17,142.86 Rp./Jam
4. Bahan Bakar Bensin Mb 7,000.00 Liter
5. Bahan Bakar Solar Ms 9,800.00 Liter
6. Minyak Pelumas Mp 20,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT

No. URAIAN KODE KOEF. SATUAN KET.

A. URAIAN PERALATAN
1. Jenis Peralatan WHEEL LOADER 1.0-1.6 M3 E015
2. Tenaga Pw 96.0 HP
3. Kapasitas Cp 1.5 M3
4. Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 250,000,000 Rupiah

B. BIAYA PASTI PER JAM KERJA


1. Nilai Sisa Alat = 10 % x B C 25,000,000 Rupiah

2. Faktor Angsuran Modal = i x (1 + i)^A D 0.26380 -


(1 + i)^A - 1
3. Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = (B-C)xD E 29,677.22 Rupiah
W

b. Asuransi, dll = 0.002 x B F 0.00 Rupiah


W

Biaya Pasti per Jam = (E+F) G 29,677.22 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar = (12%-15%) x Pw x Ms H 117,600.00 Rupiah

2. Pelumas = (2.5%-3%) x Pw x Mp I 4,800.00 Rupiah

Biaya bengkel (6.25% dan 8.75%) x B J 10,938 Rupiah


W

3. Perawatan dan (12,5 % - 17,5 %) x B K 15,625.00 Rupiah


perbaikan = W

4. Operator = ( 1 Orang / Jam ) x U1 L 22,142.86 Rupiah


5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 12,857.14 Rupiah

Biaya Operasi per Jam = (H+I+K+L+M) P 183,962.50 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) S 213,639.72 Rupiah

E. LAIN - LAIN
1. Tingkat Suku Bunga i 10.00 % / Tahun
2. Upah Operator / Sopir U1 22,142.86 Rp./Jam
3. Upah Pembantu Operator / Pmb.Sopir U2 12,857.14 Rp./Jam
4. Bahan Bakar Bensin Mb 7,000.00 Liter
5. Bahan Bakar Solar Ms 9,800.00 Liter
6. Minyak Pelumas Mp 20,000.00 Liter
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
DAFTAR KUANTITAS DAN HARGA

SATKER : SATUAN KERJA PELAKSANAAN JALAN NASIONAL WILAYAH I PROV.SULSEL


NAMA PAKET : PEREVENTIF JALAN IMPA IMPA - TARUMPAKKAE
TARGET : 11.000 M
T.ANGGARAN : 2018
NO.
MATA PERKIRAAN HARGA SATUAN
URAIAN PEKERJAAN SATUAN KUANTITAS
PEMBAYARAN (Rupiah)
a b c d e

DIVISI 1. UMUM

1.2 Mobilisasi LS 1.00 #REF!


1,8(1) Manajemen dan Keselamatan Kerja LS 1.00 #REF!
1.17 Pengamanan Lingkungan Hidup LS 1.00 #REF!
1.21 Manajemen Mutu LS 1.00 #REF!

Jumlah Harga Pekerjaan DIVISI 1 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)

DIVISI 6. PERKERASAN ASPAL

6.1 (1) Lapis Resap Pengikat - Aspal Cair Liter 256.00 #REF!
6.3(6a) Laston Lapis Antara (AB-BC) Ton 20.40 #REF!
Skh 1.6.12 Penghamparan Lapis Penutup Bubur Aspal Emulsi tipe 1, CSS-1h M2 66,000.00 68,000.00

Jumlah Harga Pekerjaan DIVISI 6 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)
DAFTAR KUANTITAS DAN HARGA

JUMLAH HARGA
(Rupiah)
f=dxe

#REF!
#REF!
#REF!
#REF!

#REF!

#REF!
#REF!
4,488,000,000.00

#REF!