AGENDA
1. Profil Produksi
2. Biaya
3. Asumsi Harga
4. Insentif
5. Perhitungan Keekonomian
6. Indikator Keekonomian
7. Sensitivitas Keekonomian
1. PROFIL PRODUKSI
Variable component:
1. Block status
2. Field location
3. Reservoir depth
4. Supported infrastructure
5. Reservoir condition
6. CO2
7. H2S
8. Oil specific gravity
9. Local content
10. Production phase
Progressive component:
1. Oil price
2. Cumulative production
VARIABLE SPLIT
Factors Additional Split
The split in most countries ranges from 10 -50% for the contractor
It is negotiable before the contract is signed and is depends on
geopotential, costs, infrastructure, technologies, political stability,
and other factor that may influence the business decision
4. INSENTIF
Tunda
DMO
holiday
C. INSENTIF INTEREST RECOVERY
o Pemerintah :
1. Penerimaan pemerintah / GOI (Government Income) dalam
Present Value
2. Persentase pendapatan pemerintah terhadap keuntungan
(Government take / GT)
3. Persentase pendapatan pemerintah terhadap Gross Revenue
(GSGR)
o Kontraktor :
1. Net Cash flow (NCF)
2. NCF/Gross Revenue
3. Cost Recovery/Gross Revenue
4. Net Present Value (NPV). (Disc. factor 10%)
5. Internal Rate of Return (IRR)
STRUCTURE SYSTEM
Tornado Chart
Spider Diagram
KOMERSIALITAS GAS
Sanksi Umum
Sanksi untuk Pelaksanaan POD I
Sanksi untuk Pelaksanaan POD Selanjutnya
Sanksi untuk Pelaksanaan POFD
Sanksi untuk Pelaksanaan POP
SANKSI UMUM