STANDAR HARGA SATUAN BAHAN BANGUNAN DAN UPAH KERJA

PEMERINTAH PROVINSI SULAWESI SELATAN


KABUPATEN MAROS
TAHUN 2018

NO BAHAN DASAR SPESIFIKASI SATUAN

1 2 3 4
A BAHAN DASAR
1 Batu Kali m3
2 Chipping/Batu Pecah m3
3 Batu Gunung m3
4 Tanah Timbunan/Urugan m3
PASIR m3
5 Maros m3
6 Bili-bili m3
7 Timbunan / Urugan (Lokal) m3
8 Pasangan (Luar) m3
9 Beton m3
10 Kerikil/Koral Beton m3
11 Sirtu Saring m3
12 Sirtu Sungai m3
13 Kapur Pasangan m3
SEMEN (PC)
14 Semen PC 50 Kg Kg
15 Semen Putih (50 Kg) / Semen Warna Kg
16 Semen PC 40 Kg Kg
17 Batu Merah bh
18 Paving Block 21 x 10,5 x 6 cm K 225 m2
19 Paving Block 21 x 10,5 x 8 cm K 225 m2
20 Paving Block 21 x 10,5 x 8 cm K 250 m2
21 Paving Block 21 x 10,5 x 8 cm K 300 m2
22 Paving Block 21 x 10,5 x 8 cm K 350 m2
23 Paving Block 21 x 10,5 x 8 cm K 400 m2
24 Paving Block 21 x 10,5 x 10 cm K 400 m2
25 Paving Block segi 6 K 225 (10x10x6) cm m2
26 Paving Block segi 6 K 225 (10x10x8) cm m2
27 Grass Blok (54 x 36 x 10) cm m2
28 Topi uskup k 300 Tebal 6 Cm Biji
29 Topi uskup k 300 Tebal 8 Cm Biji
30 Hollow Brick P2B (9 x 19 x 39) cm m2
31 Hollow Brick P2K (9 x 19 x 39) cm m2
32 Kastin K 225 Kecil ( 20 x 25 x 50) cm bh

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
NO BAHAN DASAR SPESIFIKASI SATUAN

1 2 3 4
33 Kastin K 225 Besar ( 25 x 30 x 50) cm bh
34 Kastin K 225 (15 x 30 x 40) cm bh
35 Kastin K 225 (15 x 25 x 50) cm bh
36 Kastin K 225 (15 x 25 x 40) cm bh
37 Panel Pra cetak (5 x 40 x 240 ) cm Lbr
38 Tiang Pra Cetak 1,50 m 3 Susun
39 Tiang Pra Cetak 2,20 m 4 Susun
40 Tiang Pra Cetak 2,50 m 5 Susun
41 Tiang Pra Cetak 3,00 m 6 Susun
42 Tiang Pra Cetak 3,40 m 7 Susun
43 Tiang Pra Cetak 3,50 m 8 Susun
44 Bata Ringan m3
45 Gorong-Gorong 15 x 1 M bh
46 Gorong-Gorong 30 x 1 M bh
47 Gorong-Gorong 50 x 1 M bh
48 Gorong-Gorong 60 x 1 M bh
49 Aspal Beton Mikro ton
50 Aspal Bitumen Kg
B BAHAN KAYU
1 Kayu Klas I Bayam m3
Balok Gergaji Sawmil m3
Balok Gergaji Shansaw m3
Papan Gergaji Sawmil m3
Papan Gergaji Shansaw m3
Kayu Klas I (Sappu/Ulin) m3
Balok Sappu/Ulin m3
2 Kayu Klas II (Kumea)
Papan Sawmil m3
Balok Shansaw m3
3 Kayu Klas II
Papan m3
Balok m3
4 Kayu Klas III
Papan m3
Balok m3
5 Kayu Papan Siri-siri Kls I Sappu (Ulin) / Bayam
Uk. 0.80 x 0.06 x 0.01 m lbr
Uk. 1.00 x 0.06 x 0.01 m lbr
Uk. 1.20 x 0.06 x 0.01 m lbr
Uk. 1.25 x 0.06 x 0.01 m lbr
Uk. 1.50 x 0.06 x 0.01 m lbr
C BAHAN LANTAI

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
NO BAHAN DASAR SPESIFIKASI SATUAN

1 2 3 4
1 Tegel PC
PC Abu-abu 20 x 20 cm bh
PC Abu-abu 30 x 30 cm bh
PC Warna 20 x 20 cm bh
PC Badak 20 x 20 cm bh
PC Badak 30 x 30 cm bh
PC Wafel 20 x 20 cm bh
PC Wafel 30 x 30 cm bh
Plint PC 15 x 20 cm bh
Plint PC 15 x 30 cm bh
Tegel Mozaik 30 x 30 cm bh
2 Tegel Keramik
Putih 10 x 20 cm dos / m2
Warna 10 x 20 cm dos / m2
Putih 30 x 30 cm ( Kasar ) dos / m2
Warna 30 x 30 cm dos / m2

Putih 20 x 25 cm dos / m2

Warna 20 x 25 cm dos / m2
Putih 20 x 20 cm dos / m2
Warna 20 x 20 cm dos / m2
Putih 30 x 30 cm Polos (Setara Mulia) dos / m2
Warna 30 x 30 cm (Setara Essensa) dos / m2
Warna 30 x 30 cm (Setara Asia) dos / m2
Warna 30 x 60 cm (Setara Roman) dos / m2
Putih 40 x 40 cm dos / m2
Warna 40 x 40 cm (Setara Asia/Ina) dos / m2
Warna 50 x 50 cm (Ex. Supermilan) dos / m2
Warna 60 x 60 cm dos / m2
Bt. Alam 20 x 20 cm m2
Lantai Acrylic
Tebal 10 mm Lbr
Tebal 12 mm (2.25 m x 1.2 m) Lbr
Tebal 15 mm Lbr
D BAHAN KACA
Kaca Bening 3 mm m2
Kaca Bening 5 mm m2
Kaca Bening 2 mm m2
Kaca Buram 3 mm m2
Kaca Buram 5 mm m2

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
NO BAHAN DASAR SPESIFIKASI SATUAN

1 2 3 4
Kaca Rayben 3 mm m2
Kaca Rayben 5 mm m2
Kaca Cermin (3 mm) m2
Kaca Cermin (5 mm) m2
Kaca One Way m2
Kaca 8 mm m2
Kaca 10 mm m2
Kaca 12 mm m2
Kaca Nako Lengkap Teralis 7 mata set
E BAHAN BESI
Besi Beton (SI = full )
Ø = 4 mm btg
Ø = 6 mm btg
Ø = 8 mm btg
Ø = 10 mm btg
Ø = 12 mm btg
Ø = 14 mm btg
Ø = 16 mm btg
Ø = 19 mm btg
Ø = 20 mm btg
Besi Ulir
Ø = 12 mm btg
Ø = 14 mm btg
Ø = 16 mm btg
Paku
Paku Biasa (4-10 cm) Kg
Paku Asbes Kg
Paku Seng (Payung) RRC Kg
Paku Skrup 3 1/2" Kg
Paku Skrup 4 " Kg
Paku Payung Berulir 75 mm Kg
Paku Sirap Kg
Paku Beton hitam dos
Paku Beton Putih dos
Paku Atap Spandek Baja BHHP G 550 biji
Paku Seng RRC Uk 5 cm biji
Paku Seng RRC Uk 6 cm biji
Paku Beton / Sappu Uk. 5 cm biji
Paku Beton / Sappu Uk. 6 cm biji
Paku Beton / Sappu Uk. 7 cm biji
Paku Beton / Sappu Uk. 10 cm biji

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
NO BAHAN DASAR SPESIFIKASI SATUAN

1 2 3 4
Kawat
Beton Kg
Nyamuk m
Ayakan Kecil m
Duri roll
Kawat Digalvano
3 mm Kg
4 mm Kg
5 mm Kg
Besi Plat
2 mm = 120 x240 mm lbr
3 mm = 120 x240 mm lbr
Besi H 15 cm 12 m Panjang btg
Besi Strep
30.3 mm = 3 m btg
35.4 mm = 3 m btg
46.4 mm = 3 m btg
40.6 mm = 3 m btg
50.6 mm = 6 m btg
60.6 mm = 6 m btg
Besi Siku = 6 m'
30.30.3 btg
40.40.4 btg
50.50.5 btg
60.60.6 btg
70.70.7 m
40.40.3 btg
50.50.4 btg
Baja Tralis kg
Pipa Besi Kotak Hembos 40 x 40 x2.60 (pjg = 6m) btg
Besi Plat Cakar Ayam uk: 1,2 x 2,4 x 2,6 lbr
Kawat Las Biasa kg
Kawat Las Stainless kg
Kawat Las Listrik kg
Pipa GIP Ø 2,50 medium A m'
Besi Siku 30 x 3 x 30 m'
Pagar Besi Kotak Hembos Uk : unit
7,5x3,75,2,6 Tinggi 1,1 0 m + Biaya Pasang
Roda Pintu Besi bh
Engsel Pintu Dorong Kupu-kupu psg
Besi Beton Biasa Kg
Besi Beton Ulir 24 Kg

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
NO BAHAN DASAR SPESIFIKASI SATUAN

1 2 3 4
Besi Galvanisir m
Besi Pagar BRC 90 x 2,40 m set
Besi Pagar BRC 100 x 2,40 m set
Besi Pagar BRC 120 x 2,40 m set
Besi Pagar BRC 150 x 2,40 m set
Pintu Pagar BRC 90 x 2,40 m set
Pintu Pagar BRC 120 x 2,40 m set
Pintu Pagar BRC 150 x 2,40 m set
Hollow Galfanis 4/4 Kg
Besi Strip 4/0.4 (Plat Baja) Kg

F BAHAN ALUMUNIUM
Alumunium Warna (2" x 1") 6 m m'
Alumunium Warna (3" x 1") 6 m m'
Alumunium Warna (4" x 1") 6 m m'
Baja Ringan Canai Dingin Kg
Web C75.75 m'
Top Span 40 m'
ZA, G550 m'
Main Truss 1.05 TCT m'
Web 0,8 TCT m'
Ancor / Seng Pelapis Genteng m'
Kusen Rangka Aluminium 4" m'
Bingkai Pintu/Jendela Aluminium m'
Aluminium Composite Panel (indoor) m2
Aluminium Composite Panel (out door) m2
Tarikan Pintu Aluminium bh
G BAHAN PIPA
1 Pipa Besi GIP
Ø1/2 " - 6 m Tbl 1,4 mm btg
Tbl 2,2 mm
Tbl 2,6 mm btg
Ø3/4 " - 6 m Tbl 2,4 mm btg
Tbl 2,6 mm btg
Ø1 " - 6 m Tbl 2,4 mm btg
Ø1 1/2 " - 6 m Tbl 2,4 mm btg
Ø2"-6m Tbl 2,4 mm btg
Ø 2 1/2 " - 6 m Tbl 3 mm btg
Ø3"-6m Tbl 3 mm btg
2 Pipa Paralon PVC
Ø 1/2 " - 4 m AW btg
Ø 3/4 " - 6 m AW btg

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
NO BAHAN DASAR SPESIFIKASI SATUAN

1 2 3 4
Ø 1 " - 6m AW btg
Ø1 1/2 " - 6 m AW btg
Ø 2 " - 6 m AW btg
Ø 2 1/2 " - 6 m AW btg
Ø 3 " - 6m AW btg
Ø 4 " - 6m AW btg
Ø 5 " - 6m AW btg
Ø 6 " - 6m AW btg
Ø 8 " - 6m AW btg
Ø 10 " - 6m AW btg
3 Pipa Paralon PVC (Setara Wavin)
Ø 1/2 " - 4 m AW (Setara Wavin) btg
Ø 3/4 " - 4 m AW btg
Ø 1 " - 4 m AW btg
Ø1 1/2 " - 4 m AW btg
Ø 2 " - 4 m AW btg
Ø 2 1/2 " - 4 AW btg
Ø 3 " - 4m AW btg
Ø 4 " - 4m AW btg
Ø1 1/2 " - 4 m D btg
Ø2"-4mD btg
Ø 2 1/2 " - 4 D btg
Ø 3 " - 4m D btg
Ø 4 " - 4m D btg
4 Jenis Batang D Untuk Saluran Pembuangan Air
Ø 1/2 " - 4m btg
Ø 3/4 " - 4m btg
Ø 1 " - 4m btg
Ø 11/2" - 4m btg
Ø 2 " - 4m btg
Ø 21/2" - 4m btg
Ø 3 " - 4m btg
Ø 4 " - 4m btg
Ø 5 " - 4m btg
Ø 6 " - 4m btg
Ø 8 " - 4m btg
Ø 10 " - 4m btg
5 Jenis Batang C Untuk Instalasi Listrik
Ø 5/8 " - 4m btg
Ø 3/4 " - 4m btg
Ø 1 " - 4m btg
Ø 11/2" - 4m btg

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
NO BAHAN DASAR SPESIFIKASI SATUAN

1 2 3 4
6 Pipa Sambungan Lurus
Ø 2" bh
Ø 3" bh
Ø 1/2" bh
Ø 21/2" bh
Ø 3/4" bh
Ø 1" bh
7 Pipa Sambungan L
Ø 1/2" bh
Ø 3/4" bh
Ø 1" bh
Ø 2" bh
Ø 21/2" bh
Ø 3" bh
Pipa GIP medium A Ø 2" btg
Pipa GIP medium A Ø 3" btg
Pipa GIP medium A Ø 4" btg
Pipa GIP medium B Ø 2" btg
Pipa GIP medium B Ø 3" btg
Pipa GIP medium B Ø 4" btg
Pipa Penguras / Pembuangan Air Bak m
G BAHAN LANGIT-LANGIT
Eternit 100 x 100 cm lbr
Calsiboard lbr
Woodplank 20 x 400 cm, T = 8 mm lbr
Woodplank 30 x 400 cm, T = 8 mm lbr
Tripleks
122 x 244 x 0,2 cm lbr
122 x 244 x 0,3 cm lbr
122 x 244 x 0.4 cm lbr
122 x 244 x 0,6 cm lbr
122 x 244 x 0,9 cm lbr
Tripleks Pintu 200 x 90 cm lbr
Tripleks Melamin
122 x 244 x 0,3 cm lbr
Multipleks 12 mm lbr
Multipleks 10 mm lbr
Multipleks 6 mm lbr
Multipleks 9 mm lbr
Tripleks 3 mm lbr
Tripleks 4 mm lbr
Tripleks Sungkai lbr

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
NO BAHAN DASAR SPESIFIKASI SATUAN

1 2 3 4
Acoustic 40 x 60 @ lbr
Teakwood
122 x 244 x 0,3 cm
Hard Board 122 x 244 cm
Teakwood Pintu 90 x 200 cm Tbl 3 mm lbr
Asbes Plat Harfeks lbr
200 x 100 x 0,3 cm lbr
List Profil
2 x 3 cm = 4 m btg
3 x 3 cm = 4 m btg
4 x 4 cm = 4 m btg
4 x 5 cm = 4 m btg
5 x 5 cm = 4 m btg
Plafon PVC Motif tbl 8 mm lbr
Plafon PVC Motif tbl 5 mm lbr
List Profil PVC Besar btg
List Profil PVC Sedang btg
List Profil PVC Kecil btg
Gypsum Board lbr
HPL Polos Lbr
HPL Urat Kayu Lbr
HPL Art From Lbr
H BAHAN ATAP
Genteng
Beton Warna bh
Keramik bh
Asbes Gelombang lbr
Harfeks (15 x 85 x 0,5) lbr
Karet Pelapis Genteng m2
Asbes Genteng lbr
Sirap ikat / m2
Seng Gelombang
BWG 33" BJLS 0,20 mm kaki
BWG 30" BJLS 0,22 mm kaki
BWG 31" BJLS 0,25 mm kaki
BWG 28" BJLS 0,35 mm kaki
BJLS Licin 0,30 mm 40 x 180 lbr
BJLS Licin 0,35 lbr
Setara Genteng Royal Polos bh
Setara Genteng Nusantara Polos bh
Bubungan Setara Royal Polos bh
Bubungan Setara Nusantara Polos bh

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
NO BAHAN DASAR SPESIFIKASI SATUAN

1 2 3 4
Seng Superdeck
180 x 70 cm - 10 kaki lbr
180 x 70 cm - 8 kaki lbr
180 x 70 cm - 7 kaki lbr
180 x 70 cm - 6 kaki lbr
Seng Alumunium Gelombang
SWG 32"0,27 mm kaki
SWG 32"0,31 mm kaki
SWG 32"0,38 mm kaki
Setara Sakura Roof 70 x 80 cm lbr
Setara Perkasa Roof 80 x 120 cm lbr
Setara Rotho Roof 70 x 80 cm lbr
Setara Multi Roof Licin 80 x 100 cm lbr
Setara Multi roof kasar 80 x 100 cm lbr
Setara Surya Roof Licin 70 x 80 cm lbr
Setara Surya Roof Kasar 70 x 80 cm lbr
Setara Prisma Roof lbr
Seng Plastik (Fiber) kaki
Fiber Semen (Harflex)
Super 240 x 108 x 0,6 cm lbr
Super 180 x 108 x 0,6 cm lbr
Ekonomi 240 x 92 x 0,5 cm lbr
Ekonomi 180 x 92 x 0,5 cm lbr
Mini 240 x 105 x 0,4 cm lbr
Mini 180 x 105 x 0,4 cm lbr
Super 240 x 105 x 0,5 cm lbr
Super 180 x 105 x 0,4 cm lbr
Nook / Bubungan
Beton Warna bh
Keramik bh
Asbes bh
Setara Multi roof Licin 90 cm lbr
Multi Roof kasar 90 cm lbr
Setara Surya Roof Licin 90 cm lbr
Surya Roof Licin 40 cm lbr
Setara Sakura Roof 90 cm lbr
Alm SWG 28" - 180 cmc lbr
Alm SWG 28" - 105 cmc lbr
Nok Steel Gelombang
Super - 180 cm bh
Mini - 105 cm bh
Ekonomi - 95 cm bh

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
NO BAHAN DASAR SPESIFIKASI SATUAN

1 2 3 4
Nok Steel Rata
Super - 180 cm bh
Mini - 105 cm bh
Ekonomi - 95 cm bh
Nok 1/2 Lingkaran bh
Karet Pelapis Genteng roll
Ukuran 55 m
Ukuran 90 m
Penangkal Petir set
Spandek Baja BHP Color Bond G 550 m2
Spandek Type G 300 m2
Spandek Baja BHP Zinc Alume G 550 bh
Spandek polos = 0,25 lbr
Spandek polos = 0,3 lbr
Spandek polos = 0,35 lbr
Spandek polos = 0,4 lbr
I BAHAN PENGGANTUNG
Kunci Tanam bh
Setara Union 1 x slag bh
SetaraUnion 2 x slag bh
Setara Yale 2 x slag bh
Yale 2 x slag bh
Kunci Bulat (asli) bh
Kunci Pintu KM/WC Ses (asli) bh
Kunci Pintu Merk Ses (asli)
Penggantung
Hak angin Kecil bh
Hak angin Besar bh
Grendel Kecil bh
Grendel Besar bh
Grendel Pintu Dobel bh
Engsel Pintu Biasa bh
Engsel Jendela Biasa psg
door Holder set
Expanyolet Tempel / Door Closer (Otomatis) set
Engsel Jendela Kuningan Setara 777 psg
Engsel Daun Pintu Koboi psg
Engsel Daun Pintu Kuningan Setara 777 psg
Expanyolet bh
Expanyolet Tanam daun Pintu (Otomatis) psg
Kunci Pintu Aluminium bh
Engsel Pintu Aluminium bh

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
NO BAHAN DASAR SPESIFIKASI SATUAN

1 2 3 4

J BAHAN SANITER
Kloset Duduk Standart bh
Kloset Jongkok Biasa bh
Wastafel bh
Wastafel Cuci Piring Logam bh
Pompa Tangan Terpasang bh
Pompa Mesin bh
Urinoar Setara Ex. KIA/Toto (Lengkap) bh
Bak Mandi Fiber unit
Reservoir=1/2 m3 bh
Reservoir=1 m3 bh
Reservoir=2 m3 bh
Kran Air Biasa bh
Stop Kran Biasa 1/2-1" bh
Stop Kran Kristal 1/2 " bh
Stop Kran Kristal 1 1/2 " bh
Stop Kran Kristal 2 " bh
Stop Kran Pembilas bh
Bak Air Fiberglass (Tangki) 1 m3 unit
Bak Air Fiberglass (Tangki) 2 m3 unit
Hand Shower bh
Kloset Duduk Setara Ex Toto/KIA set
Kloset Duduk Setara Ex Toto/KIA Warna Lengkap set
Kloset Jongkok Setara Ex KIA bh
Kotak Sambungan bh
Kran Air Stainless Steel bh
Kran Air Tarik Merah bh
Pintu Panil Bayam lbr
Pintu Panil PVC bh
Pintu Panil WC lbr
Tempat Sabun Setara Ex Toto (11x11) cm bh
Urinoir set
Sekat Urinoir Aluminium set
Washbashin (Ukuran Besar) bh
Washbashin (Ukuran Kecil) bh
Wastafel American Standard/KIA bh
Wood Filler Kg
Wood Stain Kg
Sending Sealer Kg
Clear Kg
Shower Tray (1x1) cm Kualitas I set

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
NO BAHAN DASAR SPESIFIKASI SATUAN

1 2 3 4
Shower Tray (1x1) cm Kualitas II set
Shower Tray (1x1) cm Kualitas III set
BAHAN FINISHING / CAT
Cat Tembok / Plafond
Setara Avitex Kg
Setara Metrolite Kg
Setara Klimex Kg
Setara Vinilex Nippon Paint Kg
Setara Dulux Ltr
Cat Dasar Setara Merk Mowilex ltr
Setara Mowilex (Dinding Dalam) ltr
Setara Mowilex (Dinding Luar) ltr
Dempul Kayu Kg
Plamur Tembok Kg
Waterprofing Kg
Setara No Drop Kg
Cat Kayu
Setara Glotex Kg
Setara Avian Kg
Palatone Ltr
Setara I C I. Dulux Kg
Politur Kg
Meni kayu / besi Kg
Minyak Cat Biasa Ltr
Thinner A Kg
Thinner B Kg
Cat Dasar Kg
Cat Atap
Setara A G A Kg
Setara Yoko Kg
Lem Seng Ltr
Amplas/Kertas Kosong lbr
Residu/Alcater 10 Ltr
Setara Lem Fox Kg
Realing Stainless Steel m
Tangga Putar Baja m
Alco Panel m2
K BAHAN INSTALASI LISTRIK
Pipa union untuk Kabel
5/8" - 4 m btg
3/4" - 4 m btg
11/2" - 4 m btg

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
NO BAHAN DASAR SPESIFIKASI SATUAN

1 2 3 4
1" - 4 m btg
Kabel Listrik
Type NYK roll
1 1/2 mm roll
2 1/2 mm
Type NYY
2 x 1 1/2 mm roll
2 x 2 1/2 mm roll
2 x 4 mm roll
Type NYM
2 x 2 1/2 mm m
2 x 3 1/2 mm m
Lampu TL Biasa
1 x 20 wat bh
2 x 20 wat bh
1 x 40 wat bh
2 x 40 wat bh
Lampu Pijar
25 Wat bh
40 Wat bh
60 Wat bh
100 Wat bh
Lampu taman Mercury bh
Lampu Mercury 20 Wat bh
Lampu Downlight kecil bh
Lampu RM 2 x 20 Wat bh
Lampu RM 2 x 36 Wat bh
Lampu Setara Sanex SL-14 bh
Lampu SL 25 Wat Setara Nasional bh
Lampu SL 9 Wat Setara Philips bh
Lampu SL 23 Wat Setara Nasional bh
Lampu TL 20 Wat bh
Lampu TL 1 x 36 Wat Merk Setara Nasional bh
Lampu TL 2 x 20 Wat bh
Lampu TL GCL 32 Wat Setara Philips/Baret bh
Lampu Downlight Besar bh
Lampu LED mtr
Lampu Kotak bh
Lampu TL 2 x 20 Wat Setara philips bh
Shakelar Phase
Tunggal Putih (Setara Broco) bh
Double Putih (Setara Broco) bh

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
NO BAHAN DASAR SPESIFIKASI SATUAN

1 2 3 4
Triple (Setara Broco) bh
Tunggal Putih (Setara Panasonic) bh
Double Putih (Setara Panasonic) bh
Triple (Setara Panasonic) bh
Stop Kontak
Stop Kontak bh
Stop Kontak AC bh
Stop Kontak TV bh
MCB 32 Amp Setara MG bh
MCB 6 Amp Setara MG bh
Zakering Case Lokal Biasa
Lokal 2 Group Automat bh
Lokal 3 Group Biasa bh
Panil Box ( Lengkap ) set
Fitting Elips Putih bh
Travo 3 Ampere bh
Travo 10 Ampere bh
L BAHAN PELUMAS
Gemuk ( Grease ) kg
Olie SAE 90 Ltr
Solar Ltr
Bensin Premium Ltr
Minyak Tanah Ltr
M LAIN - LAIN
Indoor Unit VRV,type Wall kap : 7 500 BTU /h unit
Indoor Unit VRV,type Wall kap : 9 500 BTU /h unit
Indoor Unit VRV,type Wall kap : 29 100 unit
Indoor Unit VRV,type Wall kap : 24 200 unit
Indoor Unit VRV,type Cassete kap : 24 200 B1 unit
Indoor Unit VRV,type Cassete kap : 30 700 unit
Indoor Unit VRV,type Cassete kap : 38 200 unit
Indoor Unit VRV,type Cassete kap : 47 800 B1 unit
Drymix pasangan bata Ex.PM-110 Setara @ 40 kg zak
Drymix plesteran Ex.PM-210 Setara @ 40 kg zak
Drymix acian Ex.PM-310 Setara @ 40 kg zak
mini pile 20x20 dan 25x25 btg
Bambu Perancah/Dolken Ø 8-10/400 cm btg
PABX5 Line dan 24 Cabang set
Timah Solder kg
Ijuk ikat / Kg
Polytene 125 mikron m2
Kawat Las Kg

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
NO BAHAN DASAR SPESIFIKASI SATUAN

1 2 3 4
Minyak Bekisting Ltr
Mur/Baut bh
Sealant Tube
Karet Pelapis Kaca m
Rangka metal hollow 40.40.2 mm m
List Gypsum m
Kuas bh
Floor Drain bh
Skrup fixer bh
Sealtape m
Pintu (Kaca Temper + Acces.) bh
Railing Tangga (Temper Glass + Access.) m
IPAL (ABR) bh
Manhole + GT bh
Floor Deck m2
GRC m2
Besi Baja C/Profil Kg
Plafon PVC Motif tbl 7 mm lbr
Logo Pemkab Maros bh
Logo DPRD Kab. Maros bh
Font cm
Air ltr
L UPAH KERJA
Pekerja Orang/Hr
Tukang
Tukang Orang/Hr
Tukang Batu Orang/Hr
Tukang Cat Orang/Hr
Tukang Listrik Orang/Hr
Tukang Pipa Orang/Hr
Tukang Besi Orang/Hr
Kepala Tukang
Kepala Tukang Orang/Hr
Kepala Tukang Kayu Orang/Hr
Kepala Tukang Listrik Orang/Hr
Kepala Tukang Cat Orang/Hr
Kepala Tukang Pipa Orang/Hr
Kepala Tukang Besi Orang/Hr
Mandor Orang/Hr
Operator Orang/Hr
Pembantu Operator Orang/Hr
Sopir Orang/Hr

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
NO BAHAN DASAR SPESIFIKASI SATUAN

1 2 3 4
Pembantu Sopir Orang/Hr
Mekanik Orang/Hr
Pembantu Mekanik Orang/Hr
Penjaga Gudang Orang/Hr
Penjaga Malam Orang/Hr

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
1. Wilayah I : Kec. Maros Baru, Turikale, Lau, Bontoa,
PAH KERJA
Mandai, Marusu, Bantimurung dan
Simbang
2. Wilayah II : Kec. Camba, Cenrana, Tanralili, dan
Moncongloe
3. Wilayah III : Kec. Mallawa, dan Tompobulu
* Harga
lokasi ini adalah yang
proyek terjangkau kendaraan roda em
dapat
(Dalam Rupiah (Rp) dihitung sendiri oleh perencana dan
disesuaikan dengan jarak dan
HARGA

137,812.50
301,875.00
146,632.50 SSSS
103,083.75

121.275,00
137.812,50
128.992,50
162.750,00
303.187,50
333.506,25
187.425,00
170.887,50
242.500,00

1.261,26
1.819,13
1.267,88
544,95
54.573,75
60.637,50
66.701.25
74.970,00
84.892,50
109.390,05
112.178,85
48,510,00
54.573,75
145,530,00
5,512,50
5,512,50
36.988,88
42,446,25
24,255,00

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
lokasi proyek dapat
(Dalam Rupiah (Rp) dihitung sendiri oleh perencana dan
disesuaikan dengan jarak dan
HARGA

5
36,382,50
27,562,50
30.318,75
24,806,25
137,812,50
209.475,00
248.062,50
292.162,50
330.750,00
374.850,00
441.000,00
787.500,00
132.300,00
192.937,50
275.625,00
330.750,00
879.243,75
11.025,00

11.521.125,00
7.882.875,00
13.946.625,00
8.489.250,00

12.127.500,00

6.058.500,00
4.410.000,00

3.969.000,00
3.638.250,00

2.590.875,00
2.205.000,00

2.756,25
2.921,63
3.307,50
3.858,75
4.134,38

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
lokasi proyek dapat
(Dalam Rupiah (Rp) dihitung sendiri oleh perencana dan
disesuaikan dengan jarak dan
HARGA

1.940,40
3.274,43
3.638,25
2.789,33
3.153,15
3.395,70
3.698,89
3.274,43
7.519,05
8.731,80

46.690,88
53.361,00
53.361,00
60.031,13

53.361,00

56.029,05
53.361,00
56.312,55
45.356,85
226.874,25
60.031,13
181.912,50
77.373,45
66.701,25
90.666,45
187.645,50
220.500,00

2.094.750,00
2.425.500,00
2.976.750,00

99.225,00
132.300,00
0,00
120.062,25
253.575,00

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
lokasi proyek dapat
(Dalam Rupiah (Rp) dihitung sendiri oleh perencana dan
disesuaikan dengan jarak dan
HARGA

5
146.742,75
220.114,13
253.575,00
330.750,00
533.610,00
330.750,00
418.950,00
496.125,00
400.474,31

18.676,35
40.020,75
60.031,13
86.711,63
114.726,15
180.093,38
213.444,00
293.485,50
333.506,25

129.543,75
174.746,25
303.738,75

21.334,40
26.680,50
26.680,50
22.945,23
28.014,53
33.350,63
20.010,38
26.680,50
13.340,25
2.401,25
133,40
166,75
266,81
366,86
500,26
933,82

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
lokasi proyek dapat
(Dalam Rupiah (Rp) dihitung sendiri oleh perencana dan
disesuaikan dengan jarak dan
HARGA

24.012,45
26.680,50
19.950,00
180.093,38

24.012,45
24.012,45
24.012,45

375.375,00
787.500,00
4.273.500,00

24.012,45
26.680,50
42,688.80
38.953,53
49.625,73
58.296,89

100.051.88
166.753,13
280.145,25
182.155,05
188.218,80
103.326,30
121.498,65
21.829,50
133.402,50
1.091.475,00
23.625,00
42.446,25
30.450,00
25.200,00
1.470,00
0,00
0,00
28.875,00
26.250,00
10.694,25
11.884,95

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
lokasi proyek dapat
(Dalam Rupiah (Rp) dihitung sendiri oleh perencana dan
disesuaikan dengan jarak dan
HARGA

5
26.250,00
630.000,00
656.250,00
708.750,00
606.375,00
1.050.000,00
1.260.000,00
1.417.500,00
6.366,94
23.042,25

60.637,50
72.765,00
93.381,75
13.893,17
9.738,38
6.063,75
6.269,92
6.570.07
6.470,03
66.701,25
127.338,75
103.083,75
0,00
0,00
37.485,00

73.500,00
94.500,00
115.500,00
126.000,00
168.000,00
152.250,00
183.750,00
236.250,00
341.250,00
393.750,00

18.375,00
28.875,00

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
lokasi proyek dapat
(Dalam Rupiah (Rp) dihitung sendiri oleh perencana dan
disesuaikan dengan jarak dan
HARGA

5
45.937,50
55.125,00
42.000,00
47.250,00
52.500,00
78.750,00
667.012,50
1.165.331,48
1.876.851,90
2.914.965,90

20.010,38
26.250,00
36.018,15
63.350,00
80.500,00
126.00,00
148.750,00
183.050,00
41.475,00
51.100,00
64.750,00
83.125,00
131.250,00

19.950,00
26.250,00
36.750,00
37.275,00
53.025,00
65.625,00
84.000,00
136.500,00
236.250,00
278.250,00
472.500,00
126.000,00

8.925,00
30.561,30
39.656,93
116.666,55

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
lokasi proyek dapat
(Dalam Rupiah (Rp) dihitung sendiri oleh perencana dan
disesuaikan dengan jarak dan
HARGA

6.300,00
8.662,50
2.625,00
7.612,50
2.887,50
3.335,06

2.625,00
3.150,00
3.675,00
5.775,00
7.612,50
10.672,20
606.375,00
1.267.875,00
0,00
236.250,00
367.500,00
472.500,00

27.125,00
69.300,00
75.250,00
94.500,00

49.358,93
60.031,13
71.662,50
88.200,00
115.500,00
42.000,00

106.722,00
203.962,50
166.753,13
93.381,75
133.402,50
60.031,13
73.371,38
126.732,38

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
lokasi proyek dapat
(Dalam Rupiah (Rp) dihitung sendiri oleh perencana dan
disesuaikan dengan jarak dan
HARGA

5
80.041,50

120.062,25
100.051,88
68.250,00

0,00

11.157,30
14.795,55
19.646,55
24.465,00
31.167,68
173.423,25
124.031,25
133.402,50
128.066,40
106.722,00
66.150,00
181.912,50
203.962,50
225.225,00

36.625,05
11.576,25
48.752,55
66.701,25
8.489,25
33.350,63
30.318,75

7.519,05
7.519,05
10.672,20
18.433,80
54.816,30
73.007,55
2.534,65
2.801,45
2.868,16
2.801,45

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
lokasi proyek dapat
(Dalam Rupiah (Rp) dihitung sendiri oleh perencana dan
disesuaikan dengan jarak dan
HARGA

154.019,25
145.408,73
98.175,00
82.005,00

8.731,80
9.944,55
11.157,30
46.690,88
60.031,13
42.688,80
100.051,88
113.392,13
56.029,05
66.701,25
86.711,63
15.750,00

76.645,80
53.603,55
59.667,30
52.026,98
51.178,05
48.752,55
61.486,43
54.209,93

24.497,55
15.435,00
60.880,05
84.892,50
86.625,00
50.935,50
31.500,00
36.382,50
56.635,43
46.327,05

39.050,55
29.348,55
22.072,05

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
lokasi proyek dapat
(Dalam Rupiah (Rp) dihitung sendiri oleh perencana dan
disesuaikan dengan jarak dan
HARGA

32.986,80
27.529,43
26.923,05
46.933,43
525.000,00
6.306,30
12.370,05
3.395.700,00
234.070,75
96.413,63
89.743,50
41.343,75
46.856,25
51.817,50
57.330,00

182.155,05
275.536,80
60.637,50
0,00
63.000,00
210.000,00
0,00

11.157,30
26.250,00
25.710,30
34.199,55
53.361,00
40.020,75
34.684,65
137.812,50
275.073,75
9.338,18
60.031,13
13.340,25
31.500.00
26.250.00
0,00
0,00

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
lokasi proyek dapat
(Dalam Rupiah (Rp) dihitung sendiri oleh perencana dan
disesuaikan dengan jarak dan
HARGA

733.713,75
246.794,63
333.506,25
233.454,38
347.513,51
2.001.304,31
2.534.914,31
315.000,00
826.875,00
1.200.889,20
2.427.925,50
46.957,68
60.297,93
148.837,50
1.600.830,00
3.134.958,75
91.875,00
2.401.245,00
2.401.245,00
315.000,00
0,00
53.361,00
31.500,00
0,00
210.000,00
266.805,00
100.051,88
472.500,00
1.041.862,50

49.875,00
63.000,00
60.375,00
60.375,00

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
lokasi proyek dapat
(Dalam Rupiah (Rp) dihitung sendiri oleh perencana dan
disesuaikan dengan jarak dan
HARGA

21.000,00
20.010,38
15.523,20
16.493,40
90.713,70
49.612,50
61.365,15
93.381,75
20.010,38
64.033,20
73.920,00
55.125,00

53.361,00
53.361,00
45.720,68
80.284,05
53.361,00
13.340,25
6.670,13
26.680,50
24.012,45
26.680,50

93.381,75
86.771,63
97.262,55
32.744,25
60.880,05
36.382,50
1.091.475,00
3.031.875,00
716.625,00

15.765,75
20.616,75
30.318,75

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
lokasi proyek dapat
(Dalam Rupiah (Rp) dihitung sendiri oleh perencana dan
disesuaikan dengan jarak dan
HARGA

5
29.106,00

303.430,05
424.705,05

643.000,05
869.784,30
364.067,55

6.063,75
10.308,38

85.135,05
133.645,05
113.028,30
180.942,30

6.306,30
7.519,05
11.157,30
11.763,68
388.322,55
242,550,00
25.467,75
315.315,00
375.952,50
85.498,88
145.530,00
61.850,25
103.083,75
54.573,75
133.402,50
84.892,50
194.040,00
76.954,50
66.150,00
84.892,50
253.575,00

16.008,30
24.297,55

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
lokasi proyek dapat
(Dalam Rupiah (Rp) dihitung sendiri oleh perencana dan
disesuaikan dengan jarak dan
HARGA

5
48.510,00
22.584,71
36.514,80
59.755,50

30.561,30
25.875,00
30.561,30
72.765,00
66.701,25

91.198,80
103.326,30
54.573,75
12.370,05
38.587,50
60.637,50

30.318,75
30.561,30
5.650,00
6.950,00
11.245,50

12.621.319,00
13.531.319,00
16.478.819,00
17.368.919,00
24.301.419,00
25.024.219,00
25.282.519,00
26.270.519,00
66.000,00
58.449,51
63.283,68
250.000,00
14.332,50
3.759.525,00
24.255,00
24.255,00
3.638,25
30.318,75

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
lokasi proyek dapat
(Dalam Rupiah (Rp) dihitung sendiri oleh perencana dan
disesuaikan dengan jarak dan
HARGA

5
6.112,26

14.000,00
4.000,00

9.350.000,00
2.750.000,00
69.227.272,73
2.866.154,55
115.000,00
850.000,00

141.625,00
8.000.000,00
10.000.000,00
10.000,00
500,00

85.000,00

120.000,00
120.000,00
120.000,00
120.000,00
120.000,00
120.000,00

120.000,00
120.000,00
120.000,00
120.000,00
120.000,00
120.000,00
130.000,00
120.000,00
85.000,00
120.000,00

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
lokasi proyek dapat
(Dalam Rupiah (Rp) dihitung sendiri oleh perencana dan
disesuaikan dengan jarak dan
HARGA

5
85.000,00
120.000,00
85.000,00
85.000,00
85.000,00

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
. Maros Baru, Turikale, Lau, Bontoa,

. Camba, Cenrana, Tanralili, dan

. Mallawa, dan Tompobulu


h yang terjangkau kendaraan roda empa

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
STANDAR HARGA SATUAN BAHAN BANGUNAN DAN UPAH KERJA
PEMERINTAH PROVINSI SULAWESI SELATAN
KOTA MAKASSAR
TAHUN 2018

NO BAHAN DASAR SPESIFIKASI

1 2 3
A. BAHAN ATAP
1 Genteng Flat Corak / garis/ Natural (tidak dicat) 33x39x20 cm - 10 Bh/M2
2 Genteng Flat Corak / garis/ Warna Standar 33x39x20 cm - 10 Bh/M2
3 Genteng Flat Corak / garis/ Warna Spesial 33x39x20 cm - 10 Bh/M2
4 Genteng Elabana Natural (tidak dicat) 42x33x15 cm - 9 Bh/M2
5 Genteng Elabana Warna Standar 42x33x15 cm - 9 Bh/M2
6 Genteng Elabana Warna Spesial 42x33x15 cm - 9 Bh/M2
7 Genteng Kiat Beton Natural (tidak dicat) 36x32x15 cm - 12 Bh/M2
8 Genteng Kiat Beton Warna Standar 36x32x15 cm - 12 Bh/M2
9 Genteng Kiat Beton Warna Spesial 36x32x15 cm - 12 Bh/M2
10 Genteng Kiat Beton Warna Khusus 36x32x15 cm - 12 Bh/M2
11 Genteng Garuda Permata Natural (tidak dicat) 42x33x15 cm - 9 Bh/M2
12 Genteng Garuda Permata Warna Standar 42x33x15 cm - 9 Bh/M2
13 Genteng Garuda Permata Warna Spesial 42x33x15 cm - 9 Bh/M2
14 Genteng Royal Permata Natural (tidak dicat) 38x31x15 cm - 12 Bh/M2
15 Genteng Royal Permata Warna Standar 38x31x15 cm - 12 Bh/M2
16 Genteng Royal Permata Warna Spesial 38x31x15 cm - 12 Bh/M2
17 Nok Genteng Biasa tanpa warna
18 Nok Genteng Keramik
19 Atap Genteng Keramik Standar
20 Atap Genteng Keramik Warna
21 Nok Segi Natural (tidak dicat) 35x27x15 cm - 3,3 Bh/M'
22 Nok Segi Warna Standar 35x27x15 cm - 3,3 Bh/M'
23 Nok Segi Warna Spesial 35x27x15 cm - 3,3 Bh/M'
24 Nok Segi Warna Khusus 35x27x15 cm - 3,3 Bh/M'
25 Nok Bulat Natural (tidak dicat) 30x24x15 cm - 3,5 Bh/ M'
26 Nok Bulat Warna Standar 30x24x15 cm - 3,5 Bh/ M'
27 Nok Bulat Warna Spesial 30x24x15 cm - 3,5 Bh/ M'
28 Nok Samping/T.Flat Natural (tidak dicat) 2,5 Bh/ M'
29 Nok Samping/T.Flat Warna Standar 2,5 Bh/ M'
30 Nok Samping/T.Flat Warna Spesial 2,5 Bh/ M'
31 Nok Samping/T.Flat Warna Khusus 2,5 Bh/ M'
32 Nok Cabang 3/Ujung Natural (tidak dicat)
33 Nok Cabang 3/Ujung Warna Standar
34 Nok Cabang 3/Ujung Warna Spesial
35 Nok Genteng Multi Roof Kasar, pjg 80 cm
36 Nok Genteng Multi Roof Licin, pjg 80 cm

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
37 Nok Genteng Surya, pjg 80 cm
38 Nok Genteng Sakura, pjg 80 cm
39 Genteng Metal Multi Roof Kasar pjg. 77, lb. 100 cm
40 Genteng Metal Multi Roof Kasar pjg 77, lb. 80 cm
41 Genteng Metal Multi Roof Licin pjg 77 lb. 100 cm
42 Genteng Metal Multi Roof Licin pjg 77 lb. 80 cm
43 Genteng Metal Surya Licin pjg 77 lb, 80 cm
44 Genteng Metal Sakura Kasar pjg 77 lb, 80 cm
45 Genteng Metal Star Licin pjg 77 lb. 80 cm
46 Seng BWG 33 BJLS 0,20 MM
47 Seng BWG 28 BJLS 0,35 MM
48 Seng Gelombang bjls 0,35 (6 Kaki)
49 Seng Gelombang bjls 0,30 (6 Kaki)
50 Seng Gelombang bjls 0,25 (6 Kaki)
51 Seng Gelombang bjls 0,20 (7 Kaki)
52 Seng Gelombang bjls 0,20 (10 Kaki)
53 Seng Plat bjls 0,35 (6 KK)
54 Seng Plat bjls 0,30 (6 KK)
55 Seng Plat bjls 0,20 (6 KK)
56 Seng Fiber
57 Fiber Semen Harflex ( 240x105x0,4 )
58 Eternit Jibesmen 1 m x 1 m
59 Eternit Harflex 1 m x 1 m
60 Eternit Atrisco 1 m x 1 m
61 Karet Lapis Paku Asbes
62 Karet Talang (50 cm)
63 Karet Lapisan Genteng ( 50 cm)
64 Karet Lapisan Genteng ( 90 cm)
65 Karet Lapisan Genteng Tipis (110 mm) Uk. 1 x 20 m
66 Karet Lapisan Genteng Tebal (150 mm) Uk. 1 x 20 m
67 Onduline panjang 2 m + baut
68 Nok onduline 1 m
69 Ondulclear 95 x 2 m + baut
B. BAHAN DASAR
1 Batu Kali
2 Batu kali Belah
3 Batu Gunung
4 Batu gunung Belah 10 - 15 cm
5 Batu Pecah 7 - 10 cm
6 Batu Pecah 5 - 7 cm
7 Batu Pecah 3 - 5 cm
8 Batu Pecah 2 - 3 cm
9 Batu Pecah 1- 2 cm
10 Batu Pecah 0,5 - 1 cm
11 Batu Merah Standar
12 Bata Ringan
13 Batako 40x20x10 cm - 13 Bh/M2

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
14 Roster Beton 15 x 30 cm
15 Roster Keramik 15 x 30 cm
16 Glass Block
17 Gravel
18 Pasir Kasar/Pasir Beton/Pasir Pasangan
19 Sirtu A
20 Sirtu B
21 Sirtu C
22 Pasir Timbunan
23 Tanah Timbunan
24 Kerikil Sungai
25 Semen 50 kg (Tonasa) P,C
26 Semen 40 kg (Tonasa) P,C
27 Semen (Bosowa 40 kg) PC
28 Semen Tiga Roda 40 Kg PC
29 Semen Holcim 40 Kg PC
30 Semen Putih 40 kg per sak
31 Pigmen Warna
32 Semen Nat Tegel
33 Water Proofing
34 Paku jembatan
35 Plastik untuk beton
36 Batu Kecil Gravel Batu Pecah atau Batu Tumbuk (Batu Gunung)
C. BAHAN BAMBU DAN GORONG - GORONG
1 Bambu - Petung
2 Bambu - Besar
3 Bambu - Sedang
4 Bambu - Kecil
5 Rotan Pengikat
6 Gorong-gorong ᶲ 30/ m
7 Gorong-gorong ᶲ 40/ m
8 Gorong-gorong ᶲ 70/ m
9 Gorong-gorong ᶲ 80/ m
D 'BAHAN BESI
1 Angker Mur Baut Kecil
2 Angker Baut Tinggi 70 cm
3 Baut Diameter 12 mm x 10 cm (stainless) wf 150
4 Baut Diameter 12 mm x 12,50 cm (stainless)
5 Baut Diameter 12 mm x 18 cm
6 Baut Diameter 12 mm x 20 cm
7 Baut Diameter 12 mm x 25 cm
8 Baut Diameter 12 mm x 30 cm
9 Baut Skrup
10 Baut Baja
11 Besi Streep 30 x 3 mm
12 Besi Hollow 40.60.1,2 mm P = 6 m
13 Besi Hollow 40.60.1 mm P = 6 m
14 Besi Hollow 40.40. 2 mm P = 6 m /40.40. 1,8 P = 6 m

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
15 Besi Hollow 40.40.1,5 mm P = 6 m
16 Besi Hollow 40.20.2 mm P =6 m 40.1,6 mm P =6 m
17 Besi Hollow 40.20.1,5 mm P =6 m
18 Besi Hollow 40.20.1,2 mm P = 6 m 40.20.1 mm P = 6 mm
19 Besi Hollow 20.20.1,5 mm P = 6 m
20 Plat Besi Kembang 2,3 mm
21 Besi Metal Stud L. 76 mm
22 Besi Siku L. 30.30.3/ 2,8 mm banci
23 Besi siku L. 40.40.4/ 3,8 mm
24 Besi siku L. 50.50.5/ 4,8 mm
25 Besi Siku L. 60. 60. 6/ 5,8 mm
26 Besi Siku L. 70. 70. 7 / 6,8 mm
27 Besi Siku L. 70.70.6 / 5 mm
28 Besi Siku L.100.100.10
29 Besi Beton Polos 6 mm ( 0, 22 kg / M' ) (5,7)
30 Besi Beton Polos 8 mm ( 0,39 kg / M' ) (7,8)
31 Besi Beton polos 10 mm ( 0, 62 kg / M' ) (9,8)
32 Besi Beton Polos 12 mm ( 0, 89 kg / M' ) (11,8)
33 Besi Beton 14 mm ( 1, 21 kg / M' ) (13,8)
34 Besi Beton 16 mm ( 1, 39 kg / M' ) (15,8)
35 Besi Beton 19 mm ( 2, 23 kg / M' )
36 Besi Beton 20 mm ( 2, 46 kg / M' )
37 Besi Beton Ulir Dia 8 mm ( 0, 39 kg / M' ) ulir 10 full
38 Besi Beton Ulir Dia. 16 mm SNI
39 Besi Plat 1,5mm 1,2 mm
40 Besi Plat 2 mm (1,8)
41 Besi Plat 2,5mm
42 Besi Plat 3 mm (2,8)
43 Besi Plat 3,5mm
44 Besi Plat 4 mm
45 Besi Plat 4,5mm
46 Besi Plat 5 mm (4,8)
47 Besi Plat 5,5mm
48 Besi Plat 6 mm (5,8)
49 Besi Plat 8 mm (7,8)
50 Besi Plat 9 mm 10 mm (9,8)
51 Baja Tulangan ( Polos ) U24 ᶲ 6
52 Baja Tulangan ( Polos ) U24 ᶲ 8
53 Baja Tulangan ( Polos ) U24 ᶲ 10
54 Baja Tulangan ( Polos ) U24 ᶲ 12
55 Baja Tulangan ( Polos ) U24 ᶲ 16
56 Baja Tulangan ( Polos ) U24 ᶲ 16
57 Baja Tulang ( Ulir ) D32, D39 16
58 Baja Tulang ( Ulir ) D32, D39 18
59 Beugel kap V Plat Besi
60 Kawat Ikat Beton 1 roll 20 Kg
61 Kawat Dul ( 1 Roll = M ')

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
62 Kawat Ram Lubang 3,0 cm ( Rang Armonika )
63 Kawat Nyamuk plastik Rang 1 cm L. 1,20 Rang 2 cm
64 Kawat Nyamuk Aluminium
65 Kawat Nyamuk Baja
66 Kawat Las 2,6 nikko
67 Kawat Saringan Pasir / Ayakan
68 Kawat Bronjong
69 Karet Untuk Pintu dan Jendela Aluminium PVC
70 Door Closer Set
71 Kanopi Polycarbonite + Rangka Besi Tempa Biasa 400 per roll
72 Kanopi Polycarbonite + Rangka Besi Tempa Biasa 500
73 Lem Kayu Dan Karet ( Fox ) Besar ( 800 gr )
74 Lem Karet ( Fox ) Besar 450 10 kg
75 Lem Seng
76 Lembaran Atap Ploycarbonite untuk Kanopi Tebal 6 mm
77 Lembaran Atap Ploycarbonite untuk Kanopi Tebal 5 mm
78 Paku Campuran ( 5-10 cm )
79 Paku Asbes dan Karet
80 Paku 5 cm 7 cm 10 cm
81 Paku ( 1 1/2 - 2 1/2 cm ) ( setara Paku 2-3 cm )
82 Paku 4 cm
83 Paku 2-3 cm
84 Paku Sirap ( Setara Paku 2-3 cm )
85 Paku Seng ( 1 kg/ Dos )
86 Paku Skrup 5 cm
87 Paku Skrup Besi Hollow - 1000 Biji Per dos ( bdrilling 450 b = 4,5 cm )
88 Paku skrup Gyapsum - 500 biji per dos bungkus
89 Paku Jembatan
90 Paku Beton 5 cm
91 Paku Beton 6 cm
92 Paku Beton 7 cm - 10 cm
93 Paku Payung Berulir ( 1 kg/ Dos )
94 Paku Asbes Berulir
95 Paku Asbes Biasa
96 Paku Tripl ( Setara Paku 2-3 cm)
97 Paku Eter ( Setara Paku 2-3 Cm )
98 Paku Ripet
99 Skamp ( Paku Tembak Hollow alumunium )
100 pagar Jadi Besi ( Tinggi 1 M )
101 Pagar Pracetak - 5 panel
102 Pagar Pracetak - 6 panel
103 Pagar Pracetak - 7 panel
104 Tiang Beton untuk 5 Daun
105 Tiang Beton untuk 6 Daun
106 Tiang Beton untuk 7 Daun
107 Rangka Baja Ringan 0,75
108 Spandek 0,25 silver
109 Spandek 0,35 silver

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
110 Spandek 0,4 silver
111 Spandek 0,45 0,35
112 Nok Spandek
113 Hollow Aluminium Rangka Plafond 0,25 (2x4)
114 Hollow Aluminium Rangka Plafond 0,3 2x4/4x4
115 Hollow Aluminium Rangka Plafond 40 X 20 X 2 mm
116 Hollow Aluminium Rangka Plafond 40 X 40 X 2 mm
117 Hollow Aluminium Rangka Plafond 40 X 20 X 8 mm
118 Kawat Penggantung Hollow Aluminium
119 Aluminium 4'' Brown - 6 Meter
120 Aluminium 3'' Brown - 6 Meter
121 Aluminium Slimar 4'' Brown Untuk Daun Jendela
122 Aluminium Slimar 3'' Brown Untuk Daun Jendela
123 Pas. Kusen Aluminium 4'
124 Pas. Daun Jendela Alumunium + Kaca Tabel 5 mm + Karet dan Sealent
125 Pas. Daun Pintu Aluminium panil Kaca Tebal 5 mm ( Lengkap Accessories )
126 Pintu KM/WC Alumunium ( lengkap Accessories ) lebar 6 cm
127 Pintu KM/WC PVC kw.1( lengkap Accessories ) lebar 10 cm
128 Pintu fiberglass KM/WC
129 Pintu KM/WC bahan PVC Lengkap Accessories ex MASPION star
E. BAHAN FINISHING :
1 Cat Minyak Afduner 1kg
2 Cat Kayu Ex Avian (0,9 kg)
3 Cat Minyak Ex Emco
4 Cat kKayu Ex Mowilex 1kg
5 Cat Minyak
6 Cat Minyak Super klg
7 Cat Kayu Dulux 1kg
8 Cat Dasar 3,5 kg 1kg
9 Cat Dasar Meni 3,5 Kg 1kg
10 Cat Meni Glatik 3,5 kg
11 Cat Tenner
12 Cat Genteng Cap Belmas 1kg
13 Cat Genteng yoko 4kg
14 Cat Genteng Biasa AGA (4 kg)
15 Cat Genteng Minyak Nippon 2,5 liter
16 Cat Residu/ cloter (10 kg) 30.000/ kg
17 Cat seng Nippon (2,5 kg)
18 Cat Tembok Sahara / Kembang / Postek Aries (25 Kg)
19 Cat Tembok Wintex / Maxilite (5kg)
20 Cat Tembok ICI
21 Cat Tembok Mowilex (Cat Dalam ) 2,5 Kg sof
22 Cat Tembok Mowilex (Cat Luar ) 2,5 Kg gelap & terang
23 Cat Tembok Aries 5kg
24 Cat Minyak Avian
25 Cat Tembok Kimex (5kg)
26 Cat Tembok Dulux (luar) 2,5 kg
27 Cat Tembok Warna Kuning , Hitam ,Merah (Belmax)

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
28 Vernis/Plitur (24 Klg)
29 Cat Altex
30 Cat Anti Lumut (Aquaseal) (Klg 20kg) Nodrop 20 kg
31 Cat Anti Lumut (No drop) (Klg 20 kg)
32 Cat Dasar Glatik kembang 1 kg
33 Plamur Tembok Boyo Dan Setara (5kg)
34 Minyak Cat (af Dunner)
35 Dempul Kayu Cap Kuning / Merah (1 Kg) klg
36 Dempul Ex Impra
37 Dempul Ex Isamu
38 Tenner A ( Ex Avian) super
39 Minyak Te Botol
40 Kertas Gosok
41 Pewarna Natural
42 pewarna brown
43 Pewarna Ex Impra
44 Wood Filler Ex Impra
45 Clear
46 Clear ex Impra
47 Sending
48 Sending ex Impra
49 Cat Kayu Ex Dullux Mengkilap
50 Melamin Ex Impra
51 Cat Air Untuk Genteng, Bataco, Paving Block (AGA)
52 Cat Minyak Untuk Genteng, Bataco, Paving Block (AGA)
53 Kuas 2" (Eterna)
54 Kuas 3" (Eterna)
55 Kuas 4" (Eterna)
56 Bahan Anti Karat
57 Comice - 20 kg (dingding eksterior )
58 Comice - 20 kg (dingding interior)
59 Lem Fox Kaleng
60 Lem Efoxi
61 Perban Conpon
62 Bubuk + air pelarut Ex Aqugart untuk Waterproofing
63 Cat Waterproof eks aquaproo- kw.1
64 Cat waterproof- biasa
65 Cat Marka Jalan aries gold 5kg

F BAHAN KAYU
1 Kayu Kls. I Bayam (balok) Chain Saw
2 Kayu Kls. I Bayam (balok) Sawmill
3 Kayu Kls. I Ulin (papan)
4 Kayu Kls. I Ulin (tiang)
5 Kayu Kls. I Bayam (papan) Shain Saw
6 Kayu Kls I Bayam(papan) sawmil
7 Kayu Klas. II Samarinda (papan)/ Lokal
8 Kayu Klas. II Samarinda (balok)/ Lokal

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
9 Kayu Kls. III Kapur (balok)/ Kemiri
10 Kayu Kls. III (papan)
11 Kayu Mangga/Kemiri (papan)
12 Kayu Kumea Balok
13 Kayu Kumea Papan
14 Kayu lapis Tripleks Lapis Kayu Lainnya Uk. (0,4 x 122 x 244)cm
15 Kayu lapis Tripleks Lapis Kayu Lainnya Uk. (0,3 x 122 x 244)cm
16 Kayu lapis Tripleks Lapis Kayu Lainnya Uk. (0,6 x 122 x 244)cm
17 Kayu lapis Tripleks Lapis Kayu Lainnya (18 mm)
18 Kayu lapis Tripleks Lapis Kayu Lainnya (12 mm)
19 Kayu lapis Tripleks Lapis Kayu Lainnya ( 9 mm)
20 Kayu lapis Tripleks Lapis Kayu Lainnya 2 mm
21 Kayu lapis Tripleks Lapis Kayu Mewah jati Teakwood (0,3 x 122 x 244) cm
G BAHAN PENGGANTUNG
1 Engsel Baja
2 Engsel Kuningan 4 Lubang
3 Engsel Stainless Steel
4 Engsel H3 Lubang
5 Engsel Kupu-kupu
6 Engsel antik jendela
7 Engsel Pintu Biasa (Merk 777)
8 Engsel Pintu Lemari Biasa
9 Engsel Jendela Biasa (Merk 777)
10 Engsel Jendela Kuningan (merk Kuningan)
11 Engsel Pintu 4" (SES)
12 Engsel Jendela 3"(SES)
13 Engsel Pintu Kuningan SES
14 Gagang Pintu Lemari
15 Grendel jendela Kuningan
16 Grendel Pintu Biasa
17 Grendel Pintu Kuningan/ Vertikal
18 Grendel Pintu Besar
19 Grendel Pintu Tanam (Expanyolet)
20 Kunci Tanam Yale 1 x Putar
21 Kunci Tanam Yale 2 x Putar
22 Kunci Tanam Pintu 2 x Putar Besar Biasa
23 Kunci Tanam Pintu 2 x Putar kecil Biasa
24 Kunci Tanam Pintu 2 x Putar SES
25 Hak Angin Kecil Antik
26 Hak Angin Besar
27 Hak Angin Kecil
28 Kait angin Jendela Alumunium Kualias 1
29 Kait angin Jendela Alumunium biasa
H BAHAN KACA
1 Kaca Bening 3 mm
2 Kaca Bening 5 mm
3 Kaca Bening 6 mm
4 Kaca Bening 8 mm

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
5 Kaca Bening 10 mm
6 Kaca Ryben Tebal 5 mm
7 Kaca Ryben Tebal 6 mm
8 Kaca Ryben Tebal 3 mm
9 Kaca Ryben Tebal 8 mm
10 Kaca Ryben Tebal 10 mm
11 Jendela Nako (Rangka+ Kaca Tebal 5mm) 0,8 m x 0,2 m 4 lbr terpasang + Stand
12 Kaca Es Buram 5 mm/ 10 mm
13 Kaca Lembaran Bening Tidak Berwarna FL Tebal 2 MM
14 Kaca Lembaran Bening Tidak Berwarna FL Tebal 3 MM
15 Kaca Lembaran Bening Tidak Berwarna FL Tebal 5 MM
Ukuran (1221 x 153)
Ukuran (200 x 90)
Ukuran (200 x 100)
Ukuran (213 x 122)
Ukuran (183 x 122)
Ukuran (244 x 183)
Kaca Lembaran Bening Tidak Berwarna FL Tebal 10 MM
16 Kaca Bening 12 mm
I BAHAN SANITER / SALURAN AIR
1 Kloset Duduk Lengkap(putih) Tangki Batu American standart
2 Kloset Duduk Ex KIA Lengkap (warna) Tanhki Batu
3 Kloset Duduk ex TOTO Lengkap Accessories warna Putih
4 Kloset Duduk ex TOTO Lengkap Accessories warna gelap
5 Kloset Jongkok KIA
6 Kloset Jongkok Biasa (American Standar)
7 Wastafel polos / putih lengkap
8 Wastafel warna lengkap
9 Slypon Wastafel Biasa
10 Urinoir Polos /Putih American Standart
11 Urinoir ex TOTO (lengkap)
12 Bak Tube Fiber Biasa
13 Bak Tube Fiber ex TOTO
14 Tangki Air Fiberglass Kap 0,25 M3
15 Tangki Air Fiberglass Kap 0,50 M3
16 Tangki Air Fiberglass Kap 1 M3
17 Tangki Air Alumunium Kap 1 M3
18 Kran Air Kuningan DIA 3/4 Biasa
19 Kran Air Kuningan DIA 1/2 Biasa
20 Kran Air Vernrkel DIA 3/4 Biasa
21 Kran Air Antik DIA 1/2
22 Bak Cuci Piring Stain -Kosong Tanpa Saluran Pembuangan & Kran Air
23 Kran air 2 / Biasa / bisa
24 Seal Tape
25 Bak Mandi
26 Kloset Jongkok Biasa
27 Wallpaper & Penutup Dinding

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
28 Foil (Kertas Alumunium Foil)
29 Kloset Duduk (Data)
30 Kloset Jongkok TOTO (Putih)
J BAHAN LANGIT-LANGIT
1 Teakwood 120 x 240 cm t.3mm
2 Triplex 3 mm 120 x 240 cm
3 Triplex 4 mm 120 x 240 cm
4 Triplex 5 ml
5 Triplex 6 mm 120 x 240 cm
6 Triplex 7 ml
7 Triplex 10 ml
8 Triplex 15 ml
9 Triplex 20 ml
10 Triplex Ukuran Pintu
11 Triplex Melamin 120 x 240 cm 3 mm
12 Teakwood 120 x 240 cm t.4mm
13 Multiplex 120 x 240 cm t. 6 mm
14 Multiplex 120 x 240 cm t. 9 mm
15 Multiplex 120 x 240 cm t. 12 mm
16 Multiplex 120 x 240 cm t. 18 mm
17 Gypsum Board 122x244x tebal 9 mm ex Jayaboard untuk Plafond Gpyro
18 Kalsiboard tebal 4 mm
19 Lambriziring t:4mm, (4m')
20 HPL
21 Les Kayu Profil Lebar 5 cm ( 4 M' )
22 Les Kayu Profil Lebar 3 cm ( 4 M' )
23 Les Kayu Profil Lebar 11/2 cm ( 4 M' )
24 Les Kayu 1 x 10 x 400 cm
25 Les Kayu Profil 4 x 4 x 400 cm
26 Les Kayu Biasa 0,5 x 3 cm
27 Les Gypsum Polos
28 Les Gypsum Polos - Kecil
29 Les Gypsum Motif - Kecil - lebar 7 cm/10 cm
30 Les Gypsum - Sedang
31 Les Gypsum - lebar 10 cm
32 Les Gypsum - Besar - lebar 15 cm
33 Les Gypsum Profil
34 Beding Gypsum - Kecil
35 Beding Gypsum - Sedang
36 Beding Gypsum - Besar
K BAHAN LANTAI
1 Tegel PC 30 x30 cm
2 Tegel Motif 30 x30 cm
3 Tegel Keramik Putih 10 x 20 cm
4 Tegel Keramik Putih 20 x 20 cm
5 Tegel Keramik Putih 20 x 25 cm
6 Tegel Keramik Putih 30 x 30 cm
7 Tegel Keramik Putih 40 x 40 cm

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
8 Tegel Keramik Putih 50 x 50 cm
9 Tegel Keramik Putih 60 x 60 cm Ex Granito
10 Tegel Keramik Putih 60 x 60 cm Ex Garuda
11 Tegel Keramik Putih 30 x 60 cm Ex Granito
12 Tegel Keramik Warna 60 x 60 cm Ex Granito Top Gress Top Gress
13 Tegel Keramik Warna 60 x 60 cm EX Garuda
14 Tegel Keramik warna 30 x 60 cm Ex Garuda
15 Tegel Keramik Putih 30 x 60 cm
16 Tegel Keramik Warna 20 x 20 cm
17 Tegel Keramik Warna 30 x 30 cm
18 Tegel Keramik Warna 20 x 25 cm
19 Tegek Keramik Warna 40 x 40 cm
20 Tegek Keramik Warna 50 x 50 cm
21 Tegek Keramik Warna 60 x 60 cm
22 Tegek Keramik Warna 30 x 60 cm
23 Granit Uku 60 x 185 c60 x 185 cm Dasar Putih
24 Granit Uku 60 x 185 cm Dasar Hitam Dasar Hitam
25 Granit ukuran 30 x 30 cm
26 Granit ukuran 40 x 40 cm Granito
27 Granit ukuran 60 x 60 cm
28 Keramik WC 20 x 20 cm
29 Keramik WC 20 x 25 cm
30 Keramik WC 30 x 30 cm
31 Keramik uku 40 x 40 cm
32 Keramik Warna uk. 25 x 40 cm
33 Batu Alam 10 x 20 cm Polos /
34 Batu Alam 20 x 20 cm Polos
35 Batu Alam Motif Sirip/Garis-garis di pahat 10x30 cm/ 10x30 cm
36 Batu Alam Motif Sirip/Garis-garis di pahat 20x40 cm 20x40 cm
37 Batu Alam ukuran 10 x 20 cm Polos 30 x 60 cm
38 Marmer Ukuran Slabs(type Burito/acaro/Great I)
39 Marmer Ukuran Slabs(type Burito/acaro/Great II)
40 Marmer Ukuran Slabs(type Burito/acaro/Great III)
41 Marmer Ukuran 60 x 60 cm (Type Burito/Acaro/Great I) / 60 x 100 CM
42 Marmer Ukuran 60 x 60 cm (Type Burito/Acaro/Great II) / 60 x 130 CM
43 Marmer Ukuran 60 x 60 cm (Type Burito/Acaro/Great III) / 40 x 40 CM
44 Marmer Ukuran 30 x 30 cm (Type Burito/Acaro/Great I) / 30 x 60 CM
45 Marmer Ukuran 30 x 30 cm (Type Burito/Acaro/Great II)
46 Marmer Ukuran 30 x 30 cm (Type Burito/Acaro/Great III)
47 Ubin Lantai dari Tanah Liat diglazur Accura 40 x 40 cm
48 Ubin Lantai dari Tanah Liat diglazur KIA Polos 40 x 40 cm
49 Ubin Lantai dari Tanah Liat diglazur Keramik Merk Arwana
50 Ubin Lantai dari Tanah Liat diglazur Asiatile Kw 40 x40 cm
51 Ubin Lantai dari Tanah Liat diglazur Impresso uku. 40 x40 cm
52 Ubin Lantai dari Tanah Liat diglazur Masterina Polos uku. 30 x 30 cm
53 Ubin Lantai dari Tanah Liat diglazur Mulia KW 1 uku. 30 x 30 cm
54 Ubin Lantai dari Tanah Liat diglazur Kia Polos uku. 30 x 30 cm

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
55 Ubin Lantai dari Tanah Liat diglazur Asia Tile Kw 1 uku. 30 x 30 cm
56 Ubin Lantai dari Tanah Liat diglazur Impresso Kw 1 uku. 30 x 30 cm
57 Ubin Lantai dari Tanah Liat diglazur Accura Kw 1 uku. 30 x 30 cm
58 Ubin Lantai dari Tanah Liat diglazur Masterina Kw 1 uku. 30 x 30 cm
59 Ubin Lantai dari Tanah Liat diglazur Mulia Kw 1 uku. 30 x 30 cm
L BAHAN LAIN-LAIN
1 Paving Blok Segi Empat 6 cm ( K 225 )
2 Paving Blok Segi Empat 6 cm ( K 250 ) Standar
3 Paving Blok Segi Empat 6 cm ( K 250 ) Warna
4 Paving Blok Segi Empat 6 cm ( K 300 ) Standar
5 Paving Blok Segi Empat 6 cm ( K 300 ) Warna
6 Paving Blok Segi Empat 8 cm ( K 225 ) Standar
7 Paving Blok Segi Empat 8 cm ( K 225 ) Warna
8 Paving Blok Segi Empat 8 cm ( K 250 ) Standar
9 Paving Blok Segi Empat 8 cm ( K 250 ) Warna
10 Paving Blok Segi Empat 8 cm ( K 300 ) Standar
11 Paving Blok Segi Empat 8 cm ( K 300 ) Warna
12 Paving Blok Segi Empat 8 cm ( K 400 ) Standar
13 Paving Blok Segi Empat 8 cm ( K 400 ) Warna
14 Paving Blok Segi Empat 10 cm ( K 300 ) Standar
15 Paving Blok Segi Empat 10 cm ( K 300 ) Warna
16 Paving Blok Segi Empat 10 cm ( K 400 ) Standar
17 Paving Blok Segi Empat 10 cm ( K 400 ) Warna
18 Paving Blok SegiTiga Uskup 6 cm
19 Paving Blok SegiTiga Uskup 8 cm
20 Paving Blok Segi Enam 8 cm ( K 225 ) Standar
21 Paving Blok Segi Enam 8 cm ( K 225 ) Warna
22 Paving Blok Segi Enam 8 cm ( K 300 ) Standar
23 Paving Blok Segi Enam 8 cm ( K 300 ) Warna
24 Paving Blok Segi Enam 8 cm ( K 400 ) Standar
25 Paving Blok Segi Enam 8 cm ( K 400 ) Warna
26 Paving Kombinasi 6 cm ( K 300 )
27 Paving 20 x 20 8 cm ( K 300 )
28 1 tegel pedestrian untuk pengarah difabel 30 x 30
29 Paving Ubin Motif Balok P28 Cm, L 28 Cm, T 7 Cm Standar
30 Paving Ubin Motif Balok P28 Cm, L 28 Cm, T 7 Cm Merah/ Hitam
31 Paving Ubin Motif Balok P28 Cm, L 28 Cm, T 7 Cm Kuning/Hijau/coklat
32 Paving Ubin Motif Bulat Coin P28 Cm, L 28 Cm, T 7 Cm Standar
33 Paving Ubin Motif Bulat Coin P28 Cm, L 28 Cm, T 7 Cm Merah/ Hitam
34 Paving Ubin Motif Bulat Coin P28 Cm, L 28 Cm, T 7 Cm Kuning/Hijau/coklat
35 Paving Ubin Motif Bulat Coin P28 Cm, L 28 Cm, T 7 Cm Standar
36 Paving Ubin Motif Bulat Coin P28 Cm, L 28 Cm, T 7 Cm Merah/ Hitam
37 Paving Ubin Motif Bulat Coin P28 Cm, L 28 Cm, T 7 Cm Kuning/Hijau/coklat
38 Grass Block 8 cm Standar
39 Kanstin Type Segi 10-15 x 3 0 x 40 cm - 2,5 Bh/M'
40 Kanstin Type Kotak 10 x 2 0 x 40 cm - 2,5 Bh/M'

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
41 Kanstin Type Kotak 10 x 2 5 x 50 cm - 2 Bh/M'
42 Kanstin Pracetak 60 x 25 x 15 cm
43 Kanstin Pracetak Segitiga 40 x 20 x 10 cm
44 Kanstin Pracetak 15 x 20 x 40 cm
45 Kanstin Pracetak 15 x 25 x 40 cm
46 Kanstin Pracetak 15 x 30 x 40 cm
47 Kanstin Pracetak 15 x 30 x 50 cm 15x25x50cm
48 Kanstin Pracetak 12 x 25 x 40 cm
49 Kanstin Pracetak 25 x 30 x 50 cm 20x30x50cm
50 Kanstin Pracetak 22 x 25 x 60 cm
51 U Ditch L : 20 cm, T: 20 cm, P:60 cm
52 U Ditch L : 30 cm, T: 40 cm, P:80 cm
53 U Ditch L : 40 cm, T: 50 cm, P:100 cm
54 U Ditch L : 50 cm, T: 50 cm, P:100 cm
55 U Ditch L : 60 cm, T: 60 cm, P:100 cm
56 U Ditch L : 70 cm, T: 80 cm, P:100 cm
57 U Ditch L : 80 cm, T: 100 cm, P:100 cm 5 TON
58 U Ditch L : 100 cm, T: 120 cm, P:100 cm 5 TON
59 Guter Crub 2.5 Bh/M'
60 Topi Uskup T = 6 cm
61 Topi Uskup T = 8 cm 3 Bh/M'
62 Tali Nilon
63 Aspal Emulsi
64 Aspal Bitumen
65 Aspal Curah (ton)
66 Aspal Drum 1 Drum. 155 kg / Drum
67 Aspal cement
68 B.0
69 Solar Non Industri
70 Solar Industri
71 Minyak Pelumas
72 Bensin
73 Minyak bakesting
74 Mortar
75 Filler/abu batu M3
76 Kerosen/Minyak Tanah
77 Beton Mutu K500
78 Beton Mutu K450
79 Beton Mutu K400
80 Beton Mutu K350
81 Beton Mutu K300
82 Beton Mutu K275
83 Beton Mutu K 250
84 Beton Mutu K 225
85 Beton Mutu K175
86 Beton Mutu K125
87 Box Culvert L 40 Cm, T 50 Cm, P 100 Cm Tebal : 13 cm Besi Single

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
88 Box Culvert L 40 Cm, T 50 Cm, P 100 Cm Tebal : 13 cm Besi Double
89 Box Culvert L 50 Cm, T 50 Cm, P 100 Cm Tebal : 14 cm Besi Single
90 Box Culvert L 50 Cm, T 50 Cm, P 100 Cm Tebal : 14 cm Besi Double
91 Box Culvert L 60 Cm, T 60 Cm, P 100 Cm Tebal : 15 cm 5 TON Besi Single
92 Box Culvert L 60 Cm, T 60 Cm, P 100 Cm Tebal : 15 cm Besi Double
93 Box Culvert L 80 Cm, T 80 Cm, P 100 Cm Tebal : 16 cm 5 TON Besi Single
94 Box Culvert L 200 Cm, T 200 Cm, P 100 Cm Tebal : 25 cm 5 TON Besi Single
95 Box Culvert L 200 Cm, T 200 Cm, P 100 Cm Tebal : 25 cm Besi Double
96 Deuker T 6 cm, L 60 cm
97 Deuker T 6 cm, L 80 cm
98 Deuker T 10 cm, L 60 cm
99 Deuker T 10 cm, L 80 cm
100 Deuker T 12 cm, L 60 cm
101 Deuker T 12 cm, L 80 cm
102 Deuker T 15 cm, L 60 cm
103 Deuker T 15 cm, L 80 cm
104 Sewa C. Pump Standard
105 Sewa C. Pump Long Boom
106 Plastik Untuk Beton L.1M P. 40 M =65.000/ L.1,20M P.25 M = 100.000
107 Kantung Plastik Uk 46 Isi 50
108 Kantung Plastik Uk 15 Isi 10
109 Aspal (Asphal grade 60/70)
110 Aspal (curah grade 60/70 Lokal) 6 drum
U-Ditch (ukuran lain)
111 B600 x H400 x L1200 ; tebal = 70 mm 1.2 M Berat 0,360 ton
112 B600 x H500 x L1200 ; tebal = 70 mm 1.2 M Berat 0,400 ton
113 B600 x H600 x L1200 ; tebal = 70 mm 1.2 M Berat 0,440 ton
114 B600 x H700 x L1200 ; tebal = 70 mm 1.2 M Berat 0,490 ton
115 B600 x H800 x L1200 ; tebal = 70 mm 1.2 M Berat 0,530 ton
116 B800 x B600 x L1200 ; tebal = 70 mm 1.2 M Berat 0,490 ton
117 B800 x B700 x L1200 ; tebal = 70 mm 1.2 M Berat 0,540 ton
118 B800 x B800 x L1200 ; tebal = 70 mm 1.2 M Berat 0,580 ton
119 B800 x B1000 x L1200 ; tebal = 70 mm 1.2 M Berat 0,670 ton
120 B1000 x H800 x L1200 ; tebal =100 mm 1.2 M Berat 0,980 ton
121 B1000 x H1000 x L1200 ; tebal =100 mm 1.2 M Berat 1,090 ton
Tutup U-Ditch
122 B600 x L600 : Tebal = 70 mm 0,6 M Berat 0,063 Ton
123 B800 x L600 : Tebal = 70 mm 0,6 M Berat 0,084 Ton
124 B1000 x L600 : Tebal = 100 mm 0,6 M Berat 0,150 Ton
B500 x H500 x L1000 : Tebal = 80 mm 1 M Berat 0,468
RC Panel / Pagar Beton
125 Column Precast Kolom 200 x 200 x 4000 4 M Berat 0,400 Ton
126 Wall Precast / Dinding 80 x 2920 x 450 2,9 M Berat 0,260 Ton
127 Paving Blok Segi Empat Ukuran P 21 cm L.10,5 cm 6 cm K 400
128 Paving Blok Segi Empat Ukuran P 21 cm L.10,5 cm 8 cm K 400
129 Paving Blok Segi Empat Ukuran P 21 cm L.10,5 cm 10 cm K 400
130 Hexagon (Segi Enam) Ukuran 6 cm
131 Urug (terima jadi) Ukuran 8 cm

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
132 Pemasangan
M ALAT BANTU PEMELIHARAAN
1 Sekop
2 Gerobak Dorong Artco
3 Betel
4 Palu
5 Sendok Semen
6 Sikat Baja
7 Cerek Aspal
8 Garu
9 Sapu Lidi
10 Drum Pemasak Aspal
11 Kayu Bakar
12 Cangkul
13 Gergaji Kayu Cap Mata
14 Sekop Sampah Merk VTR
15 Sekop Cap Mata
16 Palu / Martil Uk. 1,5 inci
N BAHAN PIPA DAN SUMUR BOR
1.A PIPA PRALON PVC 1/2 Inci -4M
( SII ) 3/4 Inci -4M
1 Inci -4M
1 1/4 Inci -4M
1 1/2 Inci -4M
2 Inci -4M
2 1/2 Inci -4M
3 Inci -4M

1.B. PIPA PRALON uPVC 1/2 " -6M S - 10


3/4 " -6M S - 10
1" -6M S - 10
1 1/4 " -6M S - 10
1 1/2 " -6M S - 10
2" -6M S - 10
3" -6M S - 10
3" -6M S - 12.5
4" -6M S - 12.5

2 1/2 " -6M S - 10


S - 10
S - 12.5
S - 12.5

3" -6M S - 10
S - 10
S - 12.5
S - 12.5

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
4" -6M S - 10
S - 10
S - 12.5
S - 12.5

1C Pipa SUPRALON PVC 1/2" -6M S-8


S - 10 MOF
S - 12,5 MOF

3/4" -6M S-8


S - 10 MOF
S - 12,5 MOF

1" -6M S-8


S - 10 MOF
S - 10

-6M S-8
S - 10 MOF
S - 12,5

1 1/2" -6M S-8


S - 10 MOF
S - 12,5 MOF
S - 16

2" -6M S-8


S - 10 MOF
S - 10 RR
S - 12,5 MOF
S - 12,5 RR
S - 16

2 1/2" -6M S-8


S-8
S - 10 MOF
S - 10 RR
S - 12,5 MOF
S - 12,5 RR
S - 16
S - 16

3" -6M S-8


S-8
S - 10 MOF
S - 10 RR
S - 12,5 MOF
S - 12,5 RR

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
S - 16
S - 16

4" -6M S-8


S-8
S - 10 MOF
S - 10 RR
S - 12,5 MOF
S - 12,5 RR
S - 16
S - 16

1D Pipa MASPION PVC 3/8 " S - 6,3


S-8
S - 10
S - 12,5

1/2" S - 6,3
S-8
S - 10
-6M S - 12,5

3/4" S - 6,3
S-8
S - 10
-6M S - 12,5

1" S - 6,3
S-8
S - 10
S - 10
-6M S - 10 Mof

1 1/4" S - 6,3
S-8
S - 10
-6M S - 10 Mof
S - 12,5

1 1/2" S - 6,3
S-8
S - 10
-6M S - 10 Mof
S - 12,5
-6M S - 12,5 Mof
S - 16

2" S-8

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
S-8
S - 10
-6M S - 10 Mof
S - 10
-6M S - 10 RR
S - 12,5
-6M S - 12,5 Mof

2 1/2" S-8
S-8
S - 10
-6M S - 10 Mof
S - 10
-6M S - 10 RR
S - 12,5
-6M S - 12,5 Mof
S - 12,5
-6M S - 12,5 RR
S - 16
S - 16

3" S-8
S-8
S - 10
-6M S - 10 Mof
S - 10
-6M S - 10 RR
S - 12,5
-6M S - 12,5
-6M S - 12,5 RR
S - 16
S - 16
4" S-8
S-8
S - 10
-6M S - 10 Mof
S - 10
-6M S - 10 RR
S - 12,5
-6M S - 12,5 Mof
S - 12,5
-6M S - 12,5 RR
S - 16
S - 16

5" -6M S - 10 Mof


-6M S - 10 RR

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
6" -6M S - 10 Mof
-6M S - 10 RR
-6M S - 12,5 RR

8" -6M S - 10 Mof


-6M S - 10 RR
-6M S - 12,5 Mof
-6M S - 12,5 RR

10" -6M S - 10 Mof


-6M S - 10 RR
-6M S - 12,5 Mof
-6M S - 12,5 RR

12" -6M S - 10 Mof


-6M S - 10 RR
-6M S - 12,5 Mof

14" -6M S - 10 RR
-6M S - 12,5 RR

16" -6M S - 10 RR
-6M S - 12,5 RR

18" -6M S - 10 RR
-6M S - 12,5 RR

20" -6M S - 10 RR
-6M S - 12,5 RR

24" -6M S - 10 RR
-6M S - 12,5 RR

28" -6M S - 12,5 RR

1E Pipa Wavin SNI Wavinsafe 1/2" -4M S - 10 / 10 Bar (1,0 Mpa )


3/4" -4M S - 10 / 10 Bar (1,0 Mpa )
1" -4M S - 10 / 10 Bar (1,0 Mpa )
11/4" -4M S - 10 / 10 Bar (1,0 Mpa )
11/2" -6M S - 10 / 10 Bar (1,0 Mpa )

2" -6M S - 10 / 12,5 Bar (12,5 Mpa )


3" -6M S - 10 / 12,5 Bar (12,5 Mpa )
4" -6M S - 10 / 12,5 Bar (12,5 Mpa )
6" -6M S - 10 / 12,5 Bar (12,5 Mpa )

2" -6M S - 12,5 / 10 Bar (1,0 Mpa )


3" -6M S - 12,5 / 10 Bar (1,0 Mpa )

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
4" -6M S - 12,5 / 10 Bar (1,0 Mpa )
6" -6M S - 12,5 / 10 Bar (1,0 Mpa )

11/2" -6M S - 12,5 / 8 Bar (0,8 Mpa )

1F Pipa Wavin SNI Wavinlok 2" -6M S - 10 / 12,5 Bar (12,5 Mpa )
3" -6M S - 10 / 12,5 Bar (12,5 Mpa )
4" -6M S - 10 / 12,5 Bar (12,5 Mpa )
6" -6M S - 10 / 12,5 Bar (12,5 Mpa )
8" -6M S - 10 / 12,5 Bar (12,5 Mpa )
10" -6M S - 10 / 12,5 Bar (12,5 Mpa )
12" -6M S - 10 / 12,5 Bar (12,5 Mpa )
16" -6M S - 10 / 12,5 Bar (12,5 Mpa )
20" -6M S - 10 / 12,5 Bar (12,5 Mpa )
24" -6M S - 10 / 12,5 Bar (12,5 Mpa )

2" -6M S - 12,5 / 10 Bar (1,0 Mpa )


3" -6M S - 12,5 / 10 Bar (1,0 Mpa )
4" -6M S - 12,5 / 10 Bar (1,0 Mpa )
6" -6M S - 12,5 / 10 Bar (1,0 Mpa )
8" -6M S - 12,5 / 10 Bar (1,0 Mpa )
10" -6M S - 12,5 / 10 Bar (1,0 Mpa )
12" -6M S - 12,5 / 10 Bar (1,0 Mpa )
16" -6M S - 12,5 / 10 Bar (1,0 Mpa )
20" -6M S - 12,5 / 10 Bar (1,0 Mpa )
24" -6M S - 12,5 / 10 Bar (1,0 Mpa )

1G Pipa GIP ( Galvanis ) 1/2" -6M


Med.A Super sni 3/4" -6M
1" -6M
1 1/4" -6M
1 1/2" -6M
2" -6M
21/2" -6M
3" -6M
4" -6M
5" -6M
6" -6M
8" -6M
10" -6M
12" -6M
16" -6M

1H Pipa GIP ( Galvanis ) 1/2" -6M


Med.A 3/4" -6M
1" -6M
1 1/4" -6M

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
1 1/2" -6M
2" -6M
21/2" -6M
3" -6M
4" -6M

1I Pipa GIP ( Galvanis ) 1/2" -6M


Med.B 3/4" -6M
1" -6M
1 1/4" -6M
1 1/2" -6M
2" -6M
21/2" -6M
3" -6M
4" -6M

1J Pipa PE 100 1/2" -6M SDR 17 PN 10


3/4" -6M SDR 17 PN 11
1" -6M SDR 17 PN 12
1 1/4" -6M SDR 17 PN 13
1 1/2" -6M SDR 17 PN 14
2" -6M SDR 17 PN 15
21/2" -6M SDR 17 PN 16
3" -6M SDR 17 PN 17

2 JENIS "D" UNTUK SALURAN 3/4" -4M


PEMBUANGAN AIR 1" -4M
1 1/2" -4M
2" -4M
21/2" -4M
3" -4M
4" -4M
5" -4M
6" -4M
8" -4M
10" -4M

3 PIPA JENIS "C' UNTUK 5/8 Inci -4M


INSTALASI LISTRIK 3/4 Inci -4M
PIPA PVC 1/2" (M.P.)
PIPA PVC 3/4 " (Maspion)
PIPA PVC 1 "
PIPA PVC 2 "
PIPA PVC 2 1/2
PIPA PVC Wavin Kual D(4"x 4 M)
PIPA PVC Winlon Kual D (4"'x 4 M)
PIPA PVC vinilon Kual D (4'' x 4 M)

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
PIPA PVC Maspion Kual D ( 4"x 4 M)
Plastik Lembaran dari Polimer Etilena (Polos Lebar 1 M)
Pipa PVC Wavin Kual D (4 x 4 M)
Pipa PVC Maspion Kual AW ( 4 x 4 M)
Pipa PVC Maspion Kual D( 4 x 4 M)
Pipa PVC Wavin AW ( 4 x 4 M)
Pipa PVC Wavin Kual D (4 x 4 M)
Pipa PVC Maspion Kual (4 x 4 M)
Pipa PVC Pravilon 4 Inci
Pipa PVC Pravilon End 6 Mi

4 PIPA PVC KLAS B ( PIPA LIMBAH ) SUPRALON


Pipa PVC Klas B RRJ 2" 6M
Pipa PVC Klas B RRJ 3" 6M
Pipa PVC Klas B RRJ 4" 6M

5 AKSESORIS UNTUK PIPA KELAS B SUPRALON


Elbow RRJ 90 2"
Elbow RRJ 90 3"
Elbow RRJ 90 4"
Tee RRJ 2"
Tee RRJ 3"
Tee RRJ 4"
Endcap/ Dop 2"
Endcap/ Dop 3"
Endcap/ Dop 4"

6 Pipa Beton
ᶲ 40 Panjang 110 cm, tebal 7 cm NRCP
ᶲ 40 Panjang 110 cm, tebal 7 cm RCP
ᶲ 60 Panjang 110 cm, tebal 8 cm NRCP
ᶲ 60 Panjang 110 cm, tebal 8 cm RCP
ᶲ 80 Panjang 110 cm, tebal 9 cm NRCP
ᶲ 80 Panjang 110 cm, tebal 9 cm RCP
ᶲ 100 Panjang 110 cm, tebal 10 cm NRCP
ᶲ 100 Panjang 110 cm, tebal 10 cm RCP

7 Pipa Instalasi 5/8


8 Pipa Listrik 5/8
9 Sambungan Pipa Lurus 1/2
10 Sambungan Pipa L 1/2
11 Sambungan Pipa Besi 3/4"T
12 Knee 3/4"
13 Knee 1"
14 Knee PVC Diameter 2"
15 Saringan Pasir
16 Saringan Kotoran
17 Saringan Kotoran Kamar Mandi - Bahan Plastik (Floor Drain)

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
18 Saringan Kotoran Kamar Mandi - Bahan Besi/Kuningan (Floor Drain)
19 Lem FOX
20 Lem Pipa PVC
21 Lem Pipa PVC
22 Lem Besi - kw 1
23 Lem Besi - biasa
24 Talang PVC
25 Double Nipple GIV 1/2"
26 Double Nipple GIV 3/4"
27 Double Nipple 4"
28 Doubble Nipple 2"
29 Dop PVC 3/4"
30 Dop PVC 1"
31 Dop PVC 2"
32 Dop PVC 4"
33 Elbow GIV 3/4"
34 Elbow GIV 2"
1 1/4" -6M
1 1/2" -6M
2" -6M
21/2" -6M
3" -6M
4" -6M
5" -6M
6" -6M
8" -6M
10" -6M
12" -6M
16" -6M

O DAFTAR HARGA UNTUK PIPA DAN ALAT BANTU BESI


1 KNEE BESI 1/2"
3/4"
1"

2 PIPA BESI MEDIUM A. SUPER 1/2"


3/4"
1"
2'
3"
4"

3 PIPA GALVANISIR A. SUPER 1/2"


3/4"
1"
2'

4 STOP KRAN - BIASA 1/2"

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
3/4"
1"

5 STOP KRAN - KW.1 1/2"


3/4"
1"

6 TEE 1/2"
3/4"

7 V. KNIE 3/4"
1"

8 V NEPLE 3/4"
1"

9 WATER MUR 1/2"


10 WATER MUR 3/4"
11 Pipa Gip 1 1/2" (air bersih)
12 Pipa Baja Hitam -6M 1/2" tbl=2 mm
13 Pipa Baja Putih -6M 1/2" tbl=2 mm
14 Pipa Baja Hitam -6M 3/4" tbl=2 mm
15 Pipa Baja Putih -6M 3/4" tbl=2 mm
16 Pipa Baja Hitam -6M 1" tbl=2 mm
17 Pipa Baja Putih -6M 1" tbl=2 mm
18 Pipa Baja Hitam -6M 2" tbl=2 mm
19 Pipa Baja Putih -6M 2" tbl=2 mm
20 Pipa Baja Hitam -6M 3" tbl=2 mm
21 Pipa Baja Putih -6M 3" tbl=2 mm
22 Pipa Baja Hitam -6M 4" tbl=2 mm
23 Pipa Baja Putih -6M 4" tbl=2 mm
24 Pipa PVP dlm 2" Resapan
25 Pipa PVP dlm 3" Resapan
26 Pipa PVP dlm 4" Resapan
P MATERIAL POMPA
1 Pompa Air Shimiznu130 ( 125 Wat )
2 Pompa Air Shimizu 230 ( 200 Wat )
3 Pompa Air Panasonik 130 Jak ( 125 Wat )
4 Pompa Air Panasonik 200 Jak
5 Pompa Air Sanyo 137 AC
6 Pompa Air Sanyo PH 130 AC
7 Pompa Air Wasser 139 EA
8 Pompa Air Lakoni 129 A
9 Pompa Air Inoto I Hp + Kabel 50 Meter
10 Pompa Air Evak I Hp
11 Pompa Air Franklin I Hp
12 Pompa Wasser 60 Ea
13 Pompa Wasser 169 EA

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
14 Pompa Air Tsutumi 3
15 Mesin Las Hambatan dari Logam Otomatis (Las Listrik Yanmar TS 155 C 13 H
16 Generator SET ABB Mesin Diesel 8,5 PK Yanmar
17 Generator SET ABB Mesin Diesel 8,5 PK Kubota
Q BAHAN INSTALASI LISTRIK
1 Aram Lampu kap Hijau
2 Aram Mercury
3 Balon HPIT 250 W PH
4 Balon HPIT 400 W PH
5 Balon HPLN 125 W PH
6 Balon HQL 80 Wat Osram
7 Balon Neon panjang TL 40 / 36 W PH
8 Balon Son T 150 W
9 Balon Son T 250 W
10 Balon Son T 400 W
11 Body HPIT 400 W Lengkap
12 Body Lampu Taman TO-2
13 Body Lampu Taman TO-1
14 Balon HPLN 250 W
15 Body Mercury Hannock
16 Body Balon Son.T
17 Begel Per Pasang u/tiang beton
18 Begel Per Pasang u/tiang Besi
19 Box Panel Meter
20 Box Panel Distribusi
21 Contactor 80 A Mitsubishi
22 Contactor 100 A Mitsubishi
23 Fitting Mercury E 27
24 Fitting Lampu Eletra segi Empat
25 Fitting Lampu Taman E 27
26 Fitting Lampu E 40
27 Fotosell 6 A
28 Ignitor HPIT 400 W ( SI.51 ) PH
29 Injektor 3 Kutub
30 Injektor SN 58
31 Isolasi Kabel Tanah (Bahan Karet)
32 Isolasi Unibell
33 Kabel NYA - 1 x 1,5 mm (Eterna)
34 Kabel NYA - 1 x 1,5 mm (Eterna)
35 Kabel NYA - 1 x 2,5 mm (Eterna)
36 Kabel NYA - 1 x 2,5 mm (Eterna)
37 Kabel NYA - 1 x 2,5 mm (Extrana)
38 Kabel NYA - 1 x 2,5 mm (Extrana)
39 Kabel NYY 4 x 10 mm
40 Kabel NYY 4 x 6 mm
41 Kabel NYY 2 x 2,5 mm
42 Kabel WLC NYY 3 x 1,5 mm (Untuk Sumur Bor)
43 Kabel NYM 2 x 1,5 mm

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
44 Kabel NYM 2 x 1,5 mm
45 Kabel NYM 2 x 1,5 mm
46 Kabel NYM 2 x 1,5 mm
47 Kabel NYM 2 x 2,5 mm
48 Kabel NYM 2 x 2,5 mm
49 Kabel NYM 2 x 2,5 mm
50 Kabel NYM 2 x 2,5 mm
51 Kabel NYFGBY 4 x 6 mm
52 Kabel NYFGBY 4 x 10 mm
53 Kabel NYFGBY 4 x 16 mm
54 Kabel Twistik 2 x 10 mm
55 Kabel Twistik 2 x 10 mm
56 Kabel Twistik 2 x 16 mm
57 Kabel Twistik 2 x 16 mm
58 Kap E 27 Hijau
59 Kapasitor HPIT 250 W PH
60 Kapasitor HPIT 400 W PH
61 Kapasitor SON T 400 W
62 Kapasitor SON T 250 W
63 Kapasitor SON T 150 W
64 Kapasitor 8 Mf
65 Kapasitor 25 Mf
66 Kapasitor 32 Mf
67 Konektor Double Baut
68 Konektor Kedap Air 1 Baut
69 Kontaktor SN 50/80 Ampere
70 Klem Service Plastik
71 Kawat Seng
72 Lampu Hemat Energi 18 W
73 Lampu Hemat Energi 23 W
74 Lampu Hemat Energi 85 W
75 Lampu Hemat Energi 75 W
76 Lampu Hemat Energi 70 W
77 Lampu Hemat Energi 65 W
78 Lampu Hemat Energi 50 W
79 Lampu LED Hemat Energi 8 W
80 Lampu LED Hemat Energi 10 W
81 Lampu LED Hemat Energi 13 W
82 Lampu Selang Hias
83 MCB 1 A MG 1 Phase
84 MCB 2 - 20 A MG 1 Phase
85 MCB 25 - 32 A MG 1 Phase
86 MCB 1 A 1 Phase
87 MCB 6 A 1 Phase
88 MCB 16 A 1 Phase
89 MCB 20 A 1 Phase
90 MCB 50 A 1 Phase
91 Mour / Baut

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
92 NFB 75 A Mitsubishi 3 Phase
93 NFB 80 A Mitsubishi 3 Phase
94 NFB 100 A Mitsubishi 3 Phase
95 Pipa Gip 1 1/2" (listrik)
96 Rang Lampu Taman TO.2
97 Relay lampu Selang
98 Saklar Engkel In Clipsal
99 Saklar Engkel In Broco
100 Saklar Seri II In Clipsal
101 Saklar Seri II In Broco
102 Skun Kabel 10 mm
103 Skun Kabel 16 mm
104 Skun Kabel 25 mm
105 Skun Kabel 50 mm
106 Selonsong 10
107 Selonsong 16
108 Stop Kontak Broco
109 Stop Kontak Clipsal
110 Terminal Elegram 25mm
111 Tiang PJU 9 M Galvanis Single David
112 Tiang PJU 9 M Galvanis Double David
113 Tiang Besi 7 M
114 Tiang Besi 9 M
115 Tiang Lampu Taman
116 Timer Sweet Thebend
117 Travo HPIT 400 Wat Philips
118 Travo HPLN 125 Wat PH / HQL 80 Wat
119 Travo Son T 400 W
120 Travo Son T 250 W
121 Travo Son T 150 W
122 Travo TL 40 W PH
123 Kabel Listrik NYY (3 x 2,5) MM
124 Bohlam (Lampu Penerangan) TL Simbat 18 W
125 Bohlam (Lampu Penerangan) PCC 23 Wat Ecuat
126 Kawat Galbani Baja Berlapis Seng (Kawat Beton (Bindrad)
127 Kawat Non Galbani Lainnya (Kawat Las)
128 Kawat Galbani Baja Berlapis Seng (Kawat Beton (Bindrad)
129 Stop Kontak dan Soket (Broco 2 Saklar)
130 Control Desk / Meja Kontrol KWH METER 450 WATT
131 Control Desk / Meja Kontrol KWH METER 900 WATT
132 Kabel Listrik NYM (2 MM x 2.5 MM)
133 Kabel Listrik NYA Kabel Listrik NYA ( 1 MM x 2,5 MM)
134 Kabel Listrik NYY (3 x 2,5) MM
135 Kabel Lainnya Eterna (3 x 2,5) 50 M
136 Bohlam (Lampu Penerangan) Philips Pijar 40 Wat
137 Lampu Neon Philips 40 Wat 100 Buah
138 Lampu Neon Philips TL 40 Wat
139 Pipa fleksibel 15 mm saiki

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
140 Tdos
141 Isolasi Kabel
R ALAT PENUNJANG INSTALASI LISTRIK
1 Accumulater Cell Tester
2 Detektor Kabel
3 Helm Proyek
4 Kaos Tangan Kerja
5 Kaos Tangan Tegangan Tinggi 20 KV
6 Kunci Pipa Besar
7 Linggis
8 Mantel Parasut
9 Megger Meter Insulation Tester 3111V
10 Mesin Las Listrik
11 MultiMeter Sanwa asli
12 Pakaian Kerja (Catel Pak)
13 Palu-Palu
14 Pisau Cuter
15 Senter Kepala
16 Sepatu Kerja (listrik)
17 Sepatu Tegangan Tinggi 20 KV
18 Skop
19 Solder
20 Tang Ampere 600 A
21 Tang Press Skun Besar
22 Tang Press Skun Kecil
23 Tangga Aluminium untuk lampu jalan
24 Tangga Bambu 2,5 Meter
25 Tangga Bambu 5 Meter
26 Tangga Fiber
27 Tools Kit
28 Topi

S UPAH KERJA
1 Mandor Lapangan
2 Kepala tukang
3 Kepala Tukang Listrik
4 Tukang Batu /Cat
5 Tukang Kayu / besi
6 Tukang pasang paving
7 Pembantu Sopir
8 Pembantu Mekanik
9 Pembantu Tukang Listrik
10 Pembantu Operator
11 Mekanik
12 Operator Terlatih
13 Pekerja
14 Sopir Terampil
15 Biaya Pasang Canstein

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
16 Biaya Pasang Paving

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
BAHAN BANGUNAN DAN UPAH KERJA
OVINSI SULAWESI SELATAN
A MAKASSAR
AHUN 2018

SATUAN HARGA

4 5

Buah Rp 4,400.00
Buah Rp 5,800.00
Buah Rp 6,300.00
Buah Rp 4,200.00
Buah Rp 5,400.00
Buah Rp 5,800.00
Buah Rp 4,200.00
Buah Rp 5,400.00
Buah Rp 5,800.00
Buah Rp 30,000.00
Buah Rp 4,200.00
Buah Rp 5,400.00
Buah Rp 5,800.00
Buah Rp 4,200.00
Buah Rp 5,400.00
Buah Rp 5,800.00
Buah Rp 15,000.00
Buah Rp 17,000.00
Buah Rp 10,000.00
Buah Rp 15,000.00
Buah Rp 13,860.00
Buah Rp 17,820.00
Buah Rp 19,140.00
Buah Rp 23,100.00
Buah Rp 14,700.00
Buah Rp 18,900.00
Buah Rp 20,300.00
Buah Rp 12,500.00
Buah Rp 16,000.00
Buah Rp 17,250.00
Buah Rp 20,000.00
Buah Rp 85,000.00
Buah Rp 95,000.00
Buah Rp 115,000.00
Buah Rp 57,500.00
Buah Rp 62,500.00

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Buah Rp 27,500.00
Buah Rp 27,500.00
Lembar Rp 104,000.00
Lembar Rp 105,000.00
Lembar Rp 87,000.00
Lembar Rp 90,000.00
Lembar Rp 72,000.00
Lembar Rp 35,000.00
Lembar Rp 30,000.00
kaki Rp 7,200.00
kaki Rp 80,000.00
Lembar Rp 70,000.00
Lembar Rp 77,000.00
Lembar Rp 70,000.00
Lembar Rp 49,000.00
Lembar Rp 72,000.00
Lembar Rp 85,000.00
Lembar Rp 75,000.00
Lembar Rp 53,000.00
KK Rp 18,000.00
Lembar Rp 80,000.00
Lembar Rp 15,000.00
Lembar Rp 18,000.00
Lembar Rp 12,000.00
Biji Rp 7,200.00
M Rp 7,000.00
M Rp 7,000.00
M Rp 10,000.00
Rol Rp 350,000.00
Rol Rp 400,000.00
Lbr Rp 180,000.00
Lbr Rp 90,000.00
Lbr Rp 320,000.00

M3 Rp 320,000.00
M3 Rp 200,000.00
M3 Rp 300,000.00
M3 Rp 200,000.00
M3 Rp 350,000.00
M3 Rp 300,000.00
M3 Rp 300,000.00
M3 Rp 300,000.00
M3 Rp 300,000.00
M3 Rp 300,000.00
Biji Rp 1,000.00
M3 Rp 900,000.00
M2 Rp 4,500.00

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Biji Rp 45,000.00
Biji Rp 45,000.00
Biji Rp 30,000.00
M3 Rp 150,000.00
M3 Rp 225,000.00
M3 Rp 260,000.00
M3 Rp 260,000.00
M3 Rp 260,000.00
M3 Rp 160,000.00
M3 Rp 200,000.00
M3 Rp 325,000.00
Sak Rp 65,000.00
Sak Rp 48,000.00
Zak Rp 47,000.00
Zak Rp 47,000.00
Zak Rp 45,000.00
Sak Rp 70,000.00
Sak Rp 250,000.00
Kg Rp 20,000.00
M2 Rp 49,500.00
kg Rp 30,000.00
M2 Rp 80,000.00
M3 Rp 350,000.00

Batang Rp 100,000.00
Batang Rp 40,000.00
Batang Rp 30,000.00
Batang Rp 25,000.00
Ikat Rp 35,000.00
Buah Rp 175,000.00
Buah Rp 175,000.00
Buah Rp 150,000.00
Buah Rp 175,000.00

Bh Rp 8,700.00
Bh Rp 5,000.00
Batang/Biji Rp 78,200.00
Batang Rp 3,000.00
Batang Rp 35,000.00
Batang Rp 4,000.00
Batang Rp 45,000.00
Batang Rp 5,000.00
Bh Rp 5,500.00
Bh Rp 25,000.00
M'/ Btg Rp 65,000.00
Btg Rp 160,000.00
Btg Rp 160,000.00
Btg Rp 185,000.00

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Btg Rp 135,000.00
Btg Rp 120,000.00
Btg Rp 110,000.00
Btg Rp 85,000.00
Btg Rp 95,000.00
M2 Rp 685,000.00
Btg Rp 48,100.00
Btg Rp 110,000.00
Btg Rp 180,000.00
Btg Rp 260,000.00
Btg Rp 490,000.00
Btg Rp 575,000.00
Btg Rp 625,000.00
Btg Rp 1,200,000.00
Btg Rp 31,000.00
Btg Rp 47,000.00
Btg Rp 70,000.00
Btg Rp 105,000.00
Btg Rp 145,000.00
Btg Rp 180,000.00
Btg Rp 270,000.00
Btg Rp 370,000.00
Btg Rp 70,000.00
Btg Rp 190,000.00
M2 Rp 450,000.00
M2 Rp 600,000.00
M2 Rp 730,000.00
M2 Rp 875,000.00
M2 Rp 1,010,000.00
M2 Rp 1,100,000.00
M2 Rp 1,400,000.00
M2 Rp 1,500,000.00
M2 Rp 1,765,000.00
M2 Rp 1,800,000.00
M2 Rp 2,400,000.00
M2 Rp 2,950,000.00
Batang Rp 25,000.00
Batang Rp 44,000.00
Batang Rp 66,000.00
Batang Rp 100,000.00
Batang Rp 180,000.00
Batang Rp 157,000.00
Batang Rp 165,000.00
Batang Rp 270,000.00
kg Rp 13,800.00
kg Rp 35,000.00
Roll Rp 180,000.00

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
M' Rp 35,000.00
M Rp 25,000.00
M Rp 25,000.00
M Rp 35,000.00
Dos Rp 118,000.00
M Rp 25,000.00
kg Rp 25,000.00
M'/Roll Rp 65,000.00
Unit Rp 190,000.00
M2 Rp 2,250,000.00
M2 Rp 250,000.00
Tube Rp 17,000.00
Tube Rp 450,000.00
M Rp 12,000.00
Roll Rp 1,475,000.00
Roll Rp 3,000,000.00
Kg Rp 18,000.00
Kg Rp 65,000.00
Kg Rp 15,000.00
Kg Rp 25,000.00
Kg Rp 20,000.00
Kg Rp 20,000.00
Kg Rp 25,000.00
Kg Rp 50,000.00
Biji Rp 200,000.00
Dos/ Bgks Rp 145,000.00
Dos/ Bgks Rp 70,000.00
Kg Rp 14,000.00
Dos Rp 15,000.00
Dos Rp 15,000.00
Dos Rp 15,000.00
Kg Rp 65,000.00
Dos Rp 65,000.00
Dos Rp 50,000.00
Kg Rp 20,000.00
Kg Rp 20,000.00
Biji Rp 1,000.00
Bh Rp 15,000.00
M' Rp 400,000.00
M' Rp 450,000.00
M' Rp 500,000.00
M' Rp 550,000.00
Buah Rp 205,000.00
Buah Rp 220,000.00
Buah Rp 250,000.00
M2 Rp 80,000.00
M Rp 36,000.00
M Rp 46,000.00

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
M Rp 52,000.00
M Rp 57,000.00
M Rp 45,000.00
Btg Rp 21,000.00
Btg Rp 30,000.00
Btg Rp 17,500.00
Btg Rp 24,000.00
Btg Rp 50,000.00
Kg Rp 25,000.00
Btg Rp 142,750.00
Btg Rp 185,100.00
Btg Rp 159,500.00
Btg Rp 90,800.00
M' Rp 1,028,700.00
M2 Rp 1,275,600.00
Unit Rp 250,000.00
Unit Rp 250,000.00
Unit Rp 210,000.00
Lembar Rp 220,000.00
Unit Rp 210,000.00

Liter/botol Rp 8,500.00
Kaleng Rp 60,000.00
Kg Rp 65,000.00
Kaleng Rp 42,000.00
Liter Rp 18,000.00
liter Rp 38,000.00
Kg Rp 70,000.00
Kaleng Rp 100,000.00
Kaleng Rp 25,000.00
Kaleng Rp 96,000.00
Kg Rp 60,000.00
Kg Rp 47,000.00
Kaleng Rp 100,000.00
Kaleng Rp 170,000.00
Kaleng Rp 185,000.00
Kaleng Rp 300,000.00
Kaleng Rp 70,000.00
Kg Rp 160,000.00
Kaleng Rp 18,000.00
Kaleng Rp 135,000.00
Kaleng Rp 160,000.00
Kaleng Rp 250,000.00
Kaleng Rp 50,000.00
Liter Rp 58,000.00
Kaleng Rp 85,000.00
Kaleng Rp 275,000.00
kg Rp 80,000.00

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
kg Rp 57,000.00
Kg Rp 132,000.00
Pail Rp 725,000.00
Pail Rp 720,000.00
Kg Rp 30,000.00
Kaleng Rp 50,000.00
Liter Rp 8,000.00
Kg Rp 40,000.00
Kg Rp 40,000.00
Kg Rp 55,000.00
Liter Rp 32,000.00
Liter Rp 8,500.00
Lembar Rp 5,000.00
Kaleng Rp 95,000.00
Kaleng Rp 70,000.00
Kaleng Rp 65,000.00
Kaleng Rp 65,000.00
Kaleng Rp 55,000.00
Ltr Rp 60,000.00
kg Rp 60,000.00
Ltr Rp 60,000.00
Kg Rp 51,700.00
kg Rp 135,000.00
kg Rp 165,000.00
kg Rp 101,500.00
Buah Rp 8,000.00
Buah Rp 12,000.00
Buah Rp 18,000.00
Kg Rp 50,000.00
kg Rp 65,000.00
kg Rp 57,000.00
kg Rp 145,000.00
ltr Rp 170,000.00
Roll/Bh Rp 12,000.00
kg Rp 27,000.00
kg Rp 160,000.00
Liter Rp 132,000.00
kg Rp 67,500.00

M3 Rp 13,000,000.00
M3 Rp 13,500,000.00
M3 Rp 24,200,000.00
M3 Rp 23,100,000.00
M3 Rp 20,000,000.00
M3 Rp 20,000,000.00
M3 Rp 3,750,000.00
M3 Rp 3,500,000.00

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
M3 Rp 1,900,000.00
M3 Rp 2,000,000.00
M3 Rp 2,500,000.00
M3 Rp 7,500,000.00
M3 Rp 8,500,000.00
Lembar Rp 60,000.00
Lembar Rp 50,000.00
Lembar Rp 70,000.00
Lembar Rp 260,000.00
Lembar Rp 160,000.00
Lembar Rp 100,000.00
Lembar Rp 47,000.00
Lembar Rp 115,000.00

Biji Rp 30,000.00
Psg Rp 45,000.00
Psg Rp 40,000.00
Psg Rp 32,900.00
Psg Rp 20,000.00
Psg Rp 15,000.00
Psg Rp 10,000.00
Psg Rp 10,000.00
Psg Rp 8,000.00
Psg Rp 10,000.00
Bh Rp 35,000.00
Bh Rp 25,000.00
Psg Rp 15,000.00
Bh Rp 15,000.00
Bh Rp 25,000.00
Bh Rp 30,000.00
Bh Rp 15,000.00
Bh Rp 60,000.00
Bh Rp 90,000.00
Bh Rp 175,000.00
Bh Rp 175,000.00
Bh Rp 175,000.00
Bh Rp 90,000.00
Bh Rp 295,000.00
Bh Rp 57,500.00
Bh Rp 47,800.00
Bh Rp 50,000.00
Bh Rp 20,000.00
Bh Rp 10,000.00

M2 Rp 110,000.00
M2 Rp 135,000.00
M2 Rp 250,000.00
M2 Rp 330,000.00

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
M2 Rp 440,000.00
M2 Rp 140,000.00
M2 Rp 420,000.00
M2 Rp 110,000.00
M2 Rp 575,000.00
M2 Rp 600,000.00
M2 Rp 54,000.00
M2 Rp 240,000.00
M2 Rp 65,000.00
M2 Rp 155,000.00
M2 Rp 170,000.00
Lembar Rp 185,000.00
Lembar Rp 185,000.00
Lembar Rp 215,000.00
Lembar Rp 270,000.00
Lembar Rp 215,000.00
Lembar Rp 485,000.00
M2 Rp 2,265,000.00
M2 Rp 475,000.00

Unit Rp 1,800,000.00
Unit Rp 2,500,000.00
Unit Rp 2,800,000.00
Unit Rp 2,700,000.00
Bh Rp 285,000.00
Bh Rp 285,000.00
Bh Rp 750,000.00
Bh Rp 685,000.00
Bh Rp 120,000.00
Unit Rp 850,000.00
Unit Rp 1,800,000.00
Bh Rp 250,000.00
Bh Rp 3,500,000.00
Bh Rp 500,000.00
Bh Rp 750,000.00
Bh Rp 1,180,000.00
Bh Rp 3,400,000.00
Bh Rp 35,000.00
Bh Rp 40,000.00
Bh Rp 45,000.00
Bh Rp 250,000.00
Bh Rp 350,000.00
Bh Rp 225,000.00
Bh Rp 5,000.00
Unit Rp 125,000.00
Bh Rp 150,000.00
Rol Rp 300,000.00

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
M Rp 160,000.00
Bh Rp 850,000.00
Bh Rp 350,000.00

Lembar Rp 115,000.00
Lembar Rp 52,000.00
Lembar Rp 65,000.00
Lembar Rp 85,000.00
Lembar Rp 95,000.00
Lembar Rp 140,000.00
Lembar Rp 195,000.00
Lembar Rp 235,000.00
Lembar Rp 285,000.00
Lembar Rp 125,000.00
Lembar Rp 115,000.00
Lembar Rp 150,000.00
Lembar Rp 70,000.00
Lembar Rp 100,000.00
Lembar Rp 165,000.00
Lembar Rp 265,000.00
Lembar Rp 75,000.00
Lembar Rp 77,000.00
Lembar Rp 45,000.00
Lembar Rp 220,000.00
Batang Rp 20,000.00
Batang Rp 36,600.00
Batang Rp 20,000.00
Btg Rp 57,500.00
Btg Rp 31,800.00
Btg Rp 71,100.00
Batang Rp 20,000.00
M' Rp 10,000.00
M' Rp 12,500.00
M' Rp 17,500.00
M' Rp 20,000.00
M' Rp 25,000.00
Batang Rp 25,200.00
M' Rp 10,000.00
M' Rp 15,000.00
M' Rp 25,000.00

Dos Rp 75,000.00
Dos Rp 65,000.00
Dos Rp 65,000.00
Dos Rp 68,000.00
Dos Rp 65,000.00
Dos Rp 50,000.00
Dos Rp 107,000.00

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dos Rp 107,000.00
Dos Rp 225,000.00
Dos Rp 250,000.00
Dos Rp 263,900.00
Dos Rp 265,000.00
Dos Rp 180,000.00
Dos Rp 265,000.00
Dos Rp 165,000.00
Dos Rp 75,000.00
Dos Rp 65,000.00
M2 Rp 60,000.00
M2 Rp 65,000.00
Dos Rp 115,000.00
Dos Rp 250,000.00
Dos Rp 210,000.00
M2 Rp 1,212,200.00
M2 Rp 1,500,000.00
Dos Rp 50,100.00
Dos Rp 184,000.00
Dos Rp 150,000.00
Dos Rp 77,000.00
Dos Rp 58,000.00
Dos Rp 60,000.00
Dos Rp 50,000.00
Dos Rp 85,000.00
M2 Rp 160,000.00
M2 Rp 160,000.00
M2 Rp 165,000.00
3000/bj Rp 170,000.00
M2 Rp 175,000.00
M2 Rp 801,500.00
M2 Rp 629,800.00
M2 Rp 600,000.00
M2 Rp 600,000.00
M2 Rp 468,000.00
M2 Rp 450,000.00
M2 Rp 550,000.00
M2 Rp 240,500.00
M2 Rp 171,800.00
M2 Rp 75,000.00
M2 Rp 70,000.00
M2 Rp 73,500.00
M2 Rp 69,000.00
M2 Rp 65,000.00
M2 Rp 45,000.00
M2 Rp 75,000.00
M2 Rp 55,000.00

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
M2 Rp 55,000.00
M2 Rp 58,000.00
M2 Rp 47,100.00
M2 Rp 43,900.00
M2 Rp 45,000.00

M2 Rp 65,800.00
M2 Rp 68,700.00
M2 Rp 140,000.00
M2 Rp 70,700.00
M2 Rp 150,000.00
M2 Rp 83,900.00
M2 Rp 129,000.00
M2 Rp 87,900.00
M2 Rp 169,100.00
M2 Rp 90,200.00
M2 Rp 180,500.00
M2 Rp 97,800.00
M2 Rp 173,000.00
M2 Rp 128,700.00
M2 Rp 179,500.00
M2 Rp 135,800.00
M2 Rp 197,000.00
M2 Rp 6,200.00
M2 Rp 6,800.00
M2 Rp 87,700.00
M2 Rp 132,800.00
M2 Rp 94,000.00
M2 Rp 158,000.00
M2 Rp 101,600.00
M2 Rp 175,000.00
M2 Rp 95,500.00
M2 Rp 107,000.00
Buah Rp 26,200.00
Buah Rp 16,400.00
Buah Rp 20,800.00
Buah Rp 23,000.00
Buah Rp 16,400.00
Buah Rp 20,800.00
Buah Rp 23,000.00
Buah Rp 16,400.00
Buah Rp 20,800.00
Buah Rp 23,000.00
Bj Rp 30,700.00
M' Rp 87,400.00
M' Rp 76,500.00

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
M' Rp 93,600.00
Buah Rp 56,600.00
Buah Rp 28,700.00
Buah Rp 22,000.00
Buah Rp 36,400.00
Buah Rp 36,400.00
Buah Rp 31,000.00
Buah Rp 40,100.00
Buah Rp 45,000.00
Buah Rp 57,300.00
Buah Rp 97,000.00
Buah Rp 192,000.00
Buah Rp 330,000.00
Buah Rp 445,000.00
Buah Rp 575,000.00
Buah Rp 945,000.00
Buah Rp 1,737,000.00
Buah Rp 2,471,000.00
M' Rp 114,500.00
M' Rp 13,500.00
M' Rp 15,000.00
Kg Rp 5,000.00
Kg Rp 14,900.00
Kg Rp 14,900.00
Kg Rp 14,900.00
kg Rp 1,250,000.00
Kg Rp 14,900.00
M3 Rp 610,000.00
Ltr Rp 5,150.00
Ltr Rp 8,500.00
Ltr Rp 40,000.00
Ltr Rp 6,450.00
Ltr Rp 24,000.00
M3 Rp 720,000.00
M3 Rp 235,000.00
Ltr Rp 13,000.00
M3 Rp 1,060,000.00
M2 Rp 1,005,000.00
M3 Rp 955,000.00
M3 Rp 915,000.00
M3 Rp 870,000.00
M3 Rp 800,000.00
M3 Rp 790,000.00
M3 Rp 760,000.00
M3 Rp 715,000.00
M3 Rp 640,000.00
Buah Rp 1,052,500.00

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Buah Rp 1,316,800.00
Buah Rp 1,229,000.00
Buah Rp 1,360,000.00
Buah Rp 1,762,000.00
Buah Rp 1,400,000.00
Buah Rp 3,717,000.00
Buah Rp 10,096,000.00
Buah Rp 9,927,500.00
M' Rp 137,600.00
M' Rp 203,300.00
M' Rp 234,200.00
M' Rp 175,700.00
M' Rp 202,400.00
M' Rp 269,900.00
M' Rp 360,700.00
M' Rp 480,900.00
M3 Rp 59,000.00
M3 Rp 125,000.00
M2 Rp 1,800.00
Bungkus Rp 100,000.00
Ikat Rp 20,000.00
Drum Rp 11,000,000.00
1 Ton Rp 7,500,000.00

Buah Rp 583,200.00
Buah Rp 641,100.00
Buah Rp 985,000.00
Buah Rp 1,075,000.00
Buah Rp 1,164,000.00
Buah Rp 891,800.00
Buah Rp 953,500.00
Buah Rp 1,514,000.00
Buah Rp 1,737,000.00
Buah Rp 1,548,000.00
Buah Rp 2,471,000.00

Buah Rp 216,700.00
Buah Rp 261,100.00
Buah Rp 332,600.00
Buah Rp 1,254,500.00

Buah Rp 450,000.00
Buah Rp 463,500.00
M2 Rp 65,900.00
M2 Rp 81,600.00
M2 Rp 144,200.00
M2 Rp 28,300.00
M2 Rp 38,500.00

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
M2 Rp 15,000.00

Bh Rp 55,000.00
Bh Rp 490,000.00
Bh Rp 25,000.00
Bh Rp 75,000.00
Bh Rp 20,000.00
Bh Rp 12,000.00
Bh Rp 130,000.00
Bh Rp 15,000.00
Bh Rp 5,000.00
Bh Rp 188,100.00
M3 Rp 52,300.00
Bh Rp 82,500.00
Unit Rp 85,000.00
Unit Rp 9,000.00
Bh Rp 85,000.00
Bh Rp 57,300.00

Batang Rp 28,000.00
Batang Rp 34,000.00
Batang Rp 45,000.00
Batang Rp 59,000.00
Batang Rp 48,000.00
Batang Rp 62,000.00
Batang Rp 90,000.00
Batang Rp 115,000.00

Batang Rp 27,900.00
Batang Rp 42,300.00
Batang Rp 69,600.00
Batang Rp 101,700.00
Batang Rp 255,000.00
Batang Rp 246,900.00
Batang Rp 503,700.00
Batang Rp 415,500.00
Batang Rp 609,900.00

Batang Rp 351,600.00
Batang Rp 374,700.00
Batang Rp 287,400.00
Batang Rp 309,600.00

Batang Rp 525,000.00
Batang Rp 523,800.00
Batang Rp 465,500.00
Batang Rp 440,000.00

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Batang Rp 755,400.00
Batang Rp 783,600.00
Batang Rp 609,900.00
Batang Rp 635,700.00

Batang Rp 20,500.00
Batang Rp 25,450.00
Batang Rp 22,300.00

Batang Rp 32,000.00
Batang Rp 37,750.00
Batang Rp 33,450.00

Batang Rp 48,000.00
Batang Rp 62,300.00
Batang Rp 32,500.00

Batang Rp 85,500.00
Batang Rp 65,000.00
Batang Rp 60,000.00

Batang Rp 128,000.00
Batang Rp 145,500.00
Batang Rp 124,650.00
Batang Rp 104,800.00

Batang Rp 215,000.00
Batang Rp 223,300.00
Batang Rp 242,100.00
Batang Rp 182,950.00
Batang Rp 201,000.00
Batang Rp 159,400.00

Batang Rp 305,000.00
Batang Rp 335,000.00
Batang Rp 318,650.00
Batang Rp 344,750.00
Batang Rp 261,450.00
Batang Rp 286,900.00
Batang Rp 216,400.00
Batang Rp 241,900.00

Batang Rp 432,500.00
Batang Rp 460,500.00
Batang Rp 455,150.00
Batang Rp 483,800.00
Batang Rp 377,800.00
Batang Rp 405,650.00

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Batang Rp 318,000.00
Batang Rp 345,900.00

Batang Rp 655,500.00
Batang Rp 675,000.00
Batang Rp 688,450.00
Batang Rp 722,400.00
Batang Rp 552,800.00
Batang Rp 585,650.00
Batang Rp 475,650.00
Batang Rp 508,650.00

M' Rp 6,000.00
M' Rp 4,500.00
M' Rp 3,000.00
M' Rp 3,000.00

M' Rp 9,000.00
M' Rp 5,500.00
M' Rp 4,200.00
M' Rp 4,000.00

M' Rp 10,000.00
M' Rp 8,500.00
M' Rp 5,400.00
M' Rp 7,000.00

M' Rp 17,500.00
M' Rp 15,000.00
M' Rp 13,500.00
M' Rp 7,500.00
M' Rp 6,500.00

M' Rp 37,000.00
M' Rp 25,000.00
M' Rp 11,000.00
M' Rp 10,000.00
M' Rp 16,000.00

M' Rp 45,000.00
M' Rp 35,900.00
M' Rp 13,000.00
M' Rp 16,000.00
M' Rp 25,000.00
M' Rp 15,000.00
M' Rp 20,500.00

M' Rp 55,500.00

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
M' Rp 57,000.00
M' Rp 17,250.00
M' Rp 37,500.00
M' Rp 225,000.00
M' Rp 32,000.00
M' Rp 234,000.00
M' Rp 40,500.00

M' Rp 79,500.00
M' Rp 83,000.00
M' Rp 61,500.00
M' Rp 46,000.00
M' Rp 70,000.00
M' Rp 43,000.00
M' Rp 48,500.00
M' Rp 32,500.00
M' Rp 57,000.00
M' Rp 35,000.00
M' Rp 49,500.00
M' Rp 35,000.00

M' Rp 105,500.00
M' Rp 115,000.00
M' Rp 90,000.00
M' Rp 37,500.00
M' Rp 97,000.00
M' Rp 230,000.00
M' Rp 60,000.00
M' Rp 80,000.00
M' Rp 50,500.00
M' Rp 65,000.00
M' Rp 75,000.00
M' Rp 175,500.00
M' Rp 165,000.00
M' Rp 85,000.00
M' Rp 55,000.00
M' Rp 145,000.00
M' Rp 60,000.00
M' Rp 110,000.00
M' Rp 47,500.00
M' Rp 115,000.00
M' Rp 335,500.00
M' Rp 95,000.00
M' Rp 105,000.00

M' Rp 140,000.00
M' Rp 146,500.00

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
M' Rp 140,000.00
M' Rp 195,000.00
M' Rp 145,000.00

M' Rp 295,000.00
M' Rp 300,000.00
M' Rp 242,500.00
M' Rp 215,500.00

M' Rp 465,500.00
M' Rp 480,000.00
M' Rp 385,000.00
M' Rp 315,000.00

M' Rp 749,000.00
M' Rp 762,800.00
M' Rp 610,100.00

M' Rp 998,300.00
M' Rp 583,500.00

M' Rp 1,268,900.00
M' Rp 783,800.00

M' Rp 1,583,400.00
6M' Rp 984,000.00

M' Rp 2,001,200.00
M' Rp 1,219,200.00

M' Rp 1,968,100.00
M' Rp 1,968,100.00

M' Rp 2,873,800.00

Batang Rp 23,300.00
Batang Rp 31,700.00
Batang Rp 43,300.00
Batang Rp 64,800.00
Batang Rp 110,000.00

Batang Rp 175,000.00
Batang Rp 355,000.00
Batang Rp 540,000.00
Batang Rp 1,149,300.00

Batang Rp 142,500.00
Batang Rp 295,000.00

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Batang Rp 435,000.00
Batang Rp 935,000.00

Batang Rp 95,000.00

Batang Rp 175,000.00
Batang Rp 370,000.00
Batang Rp 552,500.00
Batang Rp 1,163,800.00
Batang Rp 1,813,300.00
Batang Rp 2,816,400.00
Batang Rp 4,485,500.00
Batang Rp 7,286,600.00
Batang Rp 11,437,100.00
Batang Rp 19,047,100.00

Batang Rp 145,000.00
Batang Rp 305,000.00
Batang Rp 445,500.00
Batang Rp 955,000.00
Batang Rp 1,473,700.00
Batang Rp 2,299,800.00
Batang Rp 3,673,200.00
Batang Rp 5,905,800.00
Batang Rp 9,254,100.00
Batang Rp 15,451,800.00

Batang Rp 165,000.00
Batang Rp 210,000.00
Batang Rp 330,000.00
Batang Rp 420,000.00
Batang Rp 480,000.00
Batang Rp 650,000.00
Batang Rp 850,000.00
Batang Rp 1,100,000.00
Batang Rp 1,700,000.00
Batang Rp 1,650,000.00
Batang Rp 1,850,000.00
Batang Rp 2,850,000.00
Batang Rp 5,500,000.00
Batang Rp 7,100,000.00
Batang Rp 11,120,000.00

Batang Rp 125,000.00
Batang Rp 160,000.00
Batang Rp 210,000.00
Batang Rp 270,000.00

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Batang Rp 310,000.00
Batang Rp 380,000.00
Batang Rp 490,000.00
Batang Rp 625,000.00
Batang Rp 825,000.00

Batang Rp 100,000.00
Batang Rp 125,000.00
Batang Rp 190,000.00
Batang Rp 240,000.00
Batang Rp 250,000.00
Batang Rp 275,000.00
Batang Rp 425,000.00
Batang Rp 500,000.00
Batang Rp 775,000.00

Batang Rp -
Batang Rp -
Batang Rp -
Batang Rp -
Batang Rp 27,500.00
Batang Rp 44,000.00
Batang Rp 62,300.00
Batang Rp 89,200.00

Batang Rp 20,000.00
Batang Rp 27,000.00
Batang Rp 29,000.00
Batang Rp 38,000.00
Batang Rp 50,000.00
Batang Rp 65,000.00
Batang Rp 100,000.00
Batang Rp 170,000.00
Batang Rp 220,000.00
Batang Rp 400,000.00
Batang Rp 670,000.00

Batang Rp 10,000.00
Batang Rp 15,000.00
Batang Rp 20,000.00
Batang Rp 34,000.00
Batang Rp 37,000.00
M' Rp 55,000.00
M' Rp 76,500.00
Batang Rp 120,000.00
Batang Rp 120,000.00
Batang Rp 120,500.00

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Batang Rp 225,000.00
M' Rp 330,000.00
Batang Rp 165,000.00
Batang Rp 410,000.00
Batang Rp 200,500.00
Batang Rp 310,000.00
Batang Rp 125,000.00
Batang Rp 165,500.00
Batang Rp 30,000.00
Batang Rp 35,000.00

Batang Rp 180,000.00
Batang Rp 270,000.00
Batang Rp 345,000.00

Bh Rp 35,000.00
Bh Rp 45,000.00
Bh Rp 65,000.00
Bh Rp 35,000.00
Bh Rp 50,000.00
Bh Rp 95,000.00
Bh Rp 25,000.00
Bh Rp 35,000.00
Bh Rp 45,000.00

Pcs Rp 229,845.00
Pcs Rp 293,590.00
Pcs Rp 371,845.00
Pcs Rp 492,470.00
Pcs Rp 531,630.00
Pcs Rp 736,450.00
Pcs Rp 805,420.00
Pcs Rp 1,207,745.00

Batang Rp 10,000.00
Batang Rp 7,000.00
Bh Rp 7,000.00
Bh Rp 1,500.00
Bh Rp 10,000.00
Bh Rp 12,000.00
Bh Rp 11,000.00
Bh Rp 12,500.00
M' Rp 25,000.00
Bh Rp 20,500.00
Bh Rp 10,000.00

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Bh Rp 22,500.00
Kg Rp 40,000.00
Tube Rp 10,000.00
Kg Rp 65,000.00
Tube Rp 28,000.00
Tube Rp 15,000.00
Meter Rp 105,000.00
Buah Rp 5,000.00
Buah Rp 7,000.00
Buah Rp 125,000.00
Buah Rp 30,000.00
Buah Rp 1,500.00
Buah Rp 3,000.00
Buah Rp 7,000.00
Buah Rp 25,000.00
Buah Rp 15,000.00
Buah Rp 70,000.00
Buah Rp 6,000.00
Buah Rp 8,500.00
Buah Rp 12,500.00
Batang Rp 175,000.00
Batang Rp 190,000.00
Batang Rp 325,500.00
Batang Rp 55,000.00
Batang Rp 1,201,200.00
Batang Rp 1,585,600.00
Batang Rp 140,500.00
Batang Rp 170,000.00
Batang Rp 290,000.00
Batang Rp 620,000.00

Buah Rp 6,000.00
Buah Rp 8,500.00
Buah Rp 12,500.00

Batang Rp 175,000.00
Batang Rp 190,000.00
Batang Rp 325,500.00
Batang Rp 55,000.00
Batang Rp 1,201,200.00
Batang Rp 1,585,600.00

Batang Rp 140,500.00
Batang Rp 170,000.00
Batang Rp 290,000.00
Batang Rp 620,000.00

Buah Rp 45,000.00

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Buah Rp 60,000.00
Buah Rp 95,000.00

Buah Rp 200,000.00
Buah Rp 65,000.00
Buah Rp 90,000.00

Buah Rp 7,500.00
Buah Rp 11,000.00

Buah Rp 8,500.00
Buah Rp 12,500.00

Buah Rp 7,500.00
Buah Rp 10,000.00

Buah Rp 25,000.00
Buah Rp 45,000.00
Batang Rp 7,500.00
Batang Rp 215,500.00
Batang Rp 270,000.00
Batang Rp 275,500.00
Batang Rp 340,000.00
Batang Rp 345,500.00
Batang Rp 442,700.00
Batang Rp 638,200.00
Batang Rp 812,100.00
Batang Rp 1,351,800.00
Batang Rp 1,717,200.00
Batang Rp 1,827,500.00
Batang Rp 2,222,000.00
Batang Rp 62,700.00
Batang Rp 156,800.00
Batang Rp 287,400.00

Buah Rp 520,000.00
Buah Rp 890,000.00
Buah Rp 565,000.00
Buah Rp 615,000.00
Buah Rp 565,000.00
Buah Rp 1,200,000.00
Buah Rp 2,612,500.00
Buah Rp 518,700.00
Buah Rp 2,675,500.00
Buah Rp 5,172,800.00
Buah Rp 10,188,800.00
Buah Rp 640,000.00
Buah Rp 960,000.00

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Buah Rp 3,500,000.00
Unit Rp 26,059,200.00
Unit Rp 19,332,500.00
Unit Rp 18,705,500.00

Bh Rp 75,000.00
Bh Rp 145,000.00
Bh Rp 225,000.00
Bh Rp 250,000.00
Bh Rp 48,500.00
Bh Rp 38,500.00
Bh Rp 15,000.00
Bh Rp 125,000.00
Bh Rp 155,000.00
Bh Rp 165,000.00
Set Rp 835,000.00
Bh Rp 195,000.00
Bh Rp 185,000.00
Bh Rp 85,000.00
Bh Rp 625,000.00
Bh Rp 475,000.00
Bh Rp 75,000.00
Bh Rp 75,000.00
Bh Rp 22,000.00
Bh Rp 744,300.00
Bh Rp 965,000.00
Bh Rp 1,300,000.00
Bh Rp 10,000.00
Bh Rp 4,500.00
Bh Rp 7,000.00
Bh Rp 26,500.00
Bh Rp 85,000.00
Bh Rp 55,000.00
Bh Rp 85,000.00
Bh Rp 65,000.00
Roll Rp 45,000.00
Roll Rp 7,000.00
Meter Rp 189,137.00
Roll Rp 195,000.00
Meter Rp 301,231.00
Roll Rp 295,000.00
Meter Rp 3,500.00
Roll Rp 295,000.00
Meter Rp 65,000.00
Meter Rp 40,000.00
Meter Rp 12,000.00
Meter Rp 9,500.00
Meter Rp 6,500.00

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Roll Rp 635,000.00
Meter Rp 8,500.00
Roll Rp 835,000.00
Meter Rp 8,900.00
Roll Rp 863,059.00
Meter Rp 9,400.00
Roll Rp 877,800.00
Meter Rp 72,500.00
Meter Rp 99,500.00
Meter Rp 135,000.00
Meter Rp 4,800.00
Gaspal Rp 14,400,000.00
Meter Rp 6,850.00
Gaspal Rp 13,700,000.00
Bh Rp 28,200.00
Bh Rp 55,000.00
Bh Rp 55,000.00
Bh Rp 57,500.00
Bh Rp 57,500.00
Bh Rp 67,900.00
Bh Rp 30,000.00
Bh Rp 57,500.00
Bh Rp 67,900.00
Bh Rp 26,100.00
Bh Rp 8,900.00
Bh Rp 700,000.00
Bh Rp 4,200.00
Kg Rp 26,100.00
Bh Rp 30,509.00
Bh Rp 36,542.00
Bh Rp 185,000.00
Bh Rp 134,800.00
Bh Rp 178,000.00
Bh Rp 298,500.00
Bh Rp 158,000.00
Bh Rp 32,500.00
Bh Rp 36,000.00
Bh Rp 41,000.00
Meter Rp 18,000.00
Bh Rp 70,000.00
Bh Rp 54,900.00
Bh Rp 55,000.00
Bh Rp 41,800.00
Bh Rp 41,818.00
Bh Rp 55,000.00
Bh Rp 50,000.00
Bh Rp 156,800.00
Bh Rp 500.00

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Bh Rp 689,700.00
Bh Rp 689,700.00
Bh Rp 765,000.00
Batang Rp 360,400.00
Bh Rp 209,000.00
Bh Rp 26,100.00
Bh Rp 16,700.00
Bh Rp 21,000.00
Bh Rp 26,100.00
Bh Rp 15,700.00
Bh Rp 1,300.00
Bh Rp 2,300.00
Bh Rp 3,500.00
Bh Rp 6,000.00
Bh Rp 3,000.00
Bh Rp 5,000.00
Bh Rp 13,000.00
Bh Rp 33,400.00
Papan Rp 125,000.00
Bh Rp 3,657,500.00
Bh Rp 4,702,500.00
Bh Rp 2,000,000.00
Bh Rp 2,200,000.00
Bh Rp 85,000.00
Bh Rp 425,000.00
Bh Rp 260,000.00
Bh Rp 300,000.00
Bh Rp 455,000.00
Bh Rp 265,000.00
Bh Rp 185,000.00
Bh Rp 41,800.00
Roll Rp 1,316,700.00
Pcs Rp 12,000.00
Pcs Rp 41,000.00
Ton Rp 16,400.00
Kg Rp 31,400.00
Kg Rp 16,700.00
Buah Rp 26,100.00
Buah Rp 118,400.00
Buah Rp 118,400.00
M Rp 9,000.00
M Rp 5,000.00
M Rp 20,000.00
M Rp 15,000.00
Buah Rp 7,300.00
Buah Rp 15,000.00
Buah Rp 15,000.00
Meter Rp 93,600.00

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Buah Rp 5,500.00
Roll Rp 4,000.00

Bh Rp 223,600.00
Bh Rp 9,248,300.00
Bh Rp 22,500.00
Psng Rp 35,000.00
Psng Rp 440,000.00
Bh Rp 552,500.00
Bh Rp 55,000.00
Bh Rp 261,300.00
Bh Rp 4,284,500.00
Bh Rp 950,000.00
Bh Rp 468,200.00
Psng Rp 543,400.00
Bh Rp 50,500.00
Bh Rp 22,500.00
Bh Rp 141,100.00
Psng Rp 489,100.00
Psng Rp 500,600.00
Bh Rp 85,000.00
Bh Rp 60,000.00
Bh Rp 75,000.00
Bh Rp 420,000.00
Bh Rp 252,000.00
Bh Rp 1,500,000.00
Bh Rp 78,400.00
Bh Rp 135,900.00
Bh Rp 6,270,000.00
Set Rp 2,097,000.00
Bh Rp 31,400.00

O/H Rp 176,000.00
O/H Rp 153,000.00
O/H Rp 153,000.00
O/H Rp 141,000.00
O/H Rp 141,000.00
O/H Rp 141,000.00
O/H Rp 117,000.00
O/H Rp 150,000.00
O/H Rp 117,000.00
O/H Rp 164,000.00
O/H Rp 141,000.00
O/H Rp 178,000.00
O/H Rp 113,000.00
O/H Rp 153,000.00
/M' Rp 117,000.00

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
/M2 Rp 153,000.00

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
STANDAR HARGA SATUAN BAHAN BANGUNAN DAN UPAH KERJA
PEMERINTAH PROVINSI SULAWESI SELATAN
KABUPATEN GOWA
TAHUN 2018
Dalam Rupiah (Rp)

NO BAHAN DASAR SPESIFIKASI SATUAN HARGA

1 2 3 4 5

A HARGA BAHAN
1 Acuan dari kayu M3 3,202,500
2 Agregat halus/ Pasir bersih M3 182,400
3 Alat - alat kerja (3set) /set 262,500
4 Atap Metal Sakura Roof Lbr 43,900
5 Alat Metal Roof Lbr 85,785
6 Atap Surya Roof Lbr 51,500
7 Atap Policarbonat M2 62,280
8 Atap Spandek t = 0.2 L = 75 cm M1 37,000
9 Atap Spandek t = 0.3 L = 75 cm M1 47,000
10 atap spandek t= 0.35 L= 75 cm M 1
57,000
11 Genteng Beton buah 12,100
12 Genteng Keramik KIA buah 18,300
13 Genteng Keramik Glazur buah 19,800
14 Genteng Metal berpasir/m 2x4b daun tebal 0.25 jarak reng 38. buah 60,300
15 Bubungan Seng buah 39,900
16 Bubungan Metal Sakura Roof buah 24,500
17 Bubungan Multi Roof buah 53,400
18 Bubungan Nok Genteng Beton buah 29,500
19 Bubungan Surya Roof buah 54,900
20 Nok Genteng Surya Pjg.40 cm buah 39,800
21 Nok Genteng Keramik buah 18,800
22 Nok Genteng Keramik Glazur buah 19,800
23 NOK "C" Colour/ Pcs Tebal 0.25 panjang 75 cm buah 27,100
24 Nat Filler/ tile Grout (bahan pengisi nat-flexible water proofing) kg 19,500
25 Alumnium Composite Panel t= 3 mm (1,22x2,44 M 2) Lembar 442,200
26 Alumnium Composite Panel t= 4 mm (1,22x2,44 M ) 2 Lembar 624,200
27 Kusen Aluminium 3" m' 76,000
28 Kusen Aluminium 4" m' 95,000
29 Rangka jendela kosen Aluminium 3" m' 130,000
30 Rangka Pintu kosen Aluminium 4" m' 255,000
31 Kosen + Pintu Aluminium 4" unit 1,680,000
32 Kusen + Pintu PVC TOILET unit 255,000
33 Aluminium Foil single/ roll 50m roll 475,000
34 Baja profil IWF/ CNP kg 14,500
35 Baja gulungan ukuran ringan kg 27,000
36 Baja baut - baut kg 38,600
37 Baja galvanisir kg 48,200
38 Baja struktur kg 21,670
39 Baja paku paku jembatan kg 25,000
40 Batu Bata Merah buah 625
41 Batu Bata Beton Ringan (9 x 19 x 39)cm (150 bh) m3 900,250
42 Batu Bata Beton Ringan (10 x 20 x 60)cm (83 bh) m3 800,250
43 Batu Bata Beton Ringan (7.5 x 20 x 60)cm (111bh) m3 900,250
44 Batu Tela Uk.20x30x10 buah 3,700
45 Batu Batako 20x40x10 buah 4,700

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)

NO BAHAN DASAR SPESIFIKASI SATUAN HARGA

1 2 3 4 5
46 Batu Gunung M3 154,600
47 Batu Kali Besar/ batu Belah Pondasi M3 154,300
48 Batu Kali Kecil M3 300,000
49 Batu Kerikil Koral M3 262,500
50 Batu Kapur Bongkahan M 3
119,500
51 Abu Batu (Batu Pecah/ Split 0,5 - 1 cm) M3 310,000
52 batu pecah/ Split 1-2 cm M3 265,700
53 Batu Pecah/ Split 2-3 cm M3 257,300
54 Batu pecah 3 - 5 M3 255,200
55 Batu Pecah 5 - 7 M 3
221,600
56 Batu Pecah 7 - 10 M3 180,600
57 Batu Pecah 10 - 15 M3 168,000
58 kerikil berpasir alami (Sirtu Royalti) M3 110,300
59 Kerikil Sirtu M3 125,000
60 Kerikil Sungai Royalti (tidak Disaring) M3 141,500
61 Kerikil Sungai tersaring M3 170,000
62 Bak Air Vibre Glass 'Uk. 55x55x60cm bh 266,000
63 Bak Cuci Stailess Stell 1 mata bh 465,000
64 Bondex/ Floordeck(110cmx700cm) t=0,75mm m 104,000
65 Besi Beton 1/2 Dia. 20 cm bh 50,400
66 Besi U24 (POLOS) kg 15,100
67 Besi U39 (Ulir) kg 15,500
68 besi Dia 6 -12 m bt 31,100
69 besi Dia 8 -12 m bt 49,300
70 besi Dia 10 - 12 m bt 73,100
71 besi Dia 12 -12 m bt 107,000
72 besi ulir dia 13 - 12 m bt 117,300
73 besi ulir dia 16 - 12 m bt 127,500
74 besi ulir dia 19 - 12 m bt 183,600
75 Besi Plat 4' x 8' (0,2x122x244 / 46,7 kg) kg 10,900
76 Besi Tempa m2 370,000
77 Besi Hollow 40.40.0.9 mm P=6 cm bt 67,300
78 Besi Hollow 20.40.0.9 mm P=6 cm bt 58,200
79 Besi Hollow 20x20 - 6m bt 40,800
80 Hollow Alumunium Metal furing rangka Plafond 40x40 4M bt 22,500
81 Hollow Alumunium Metal furing rangka Plafond 20x40 4M bt 16,400
82 Pasangan Rangka Plafond Metal furing 0,4x45x19x4000 m2 77,500
83 Kalsifuring CR 50 x 25 x 4000 (4 M) bt 43,300
84 Kalsifuring CR 38 x 13 x 4000 (4 M) bt 38,800
85 Kalsiscrew 6 x 20 (1500/DOS) dos 134,700
86 Kalsiscrew 8 ~ 10 (1000/DOS) dos 119,300
87 Kalsinail 3~4,5 (kait pada kayu)2000/dos dos 70,900
88 Kawat penggatung hollow aluminium buah 2,100
89 Besi Siku L 40.40.4-(6m) bt 46,000
90 Besi Streep (30x3 mm) bt 37,600
91 Baja Ringan Canal C75.80 sni pj=6 m bt 92,000
92 Baja Ringan Canal C75.75 sni pj=6 m bt 82,000
93 Reng tinggi =28mm T.0,45 pj=6 m bt 37,000
94 Reng tinggi =32mm T.0,45 pj=6 m bt
95 Screw Reng (1 pack/ 1000 pcs) pack 130,000
96 Baut Spandek (1 pack = 500 bh) pack 105,000
97 Pasangan Rangka Atap Baja Ringan m2 183,600

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)

NO BAHAN DASAR SPESIFIKASI SATUAN HARGA

1 2 3 4 5
98 Dynabolt/ pcs 10x80 buah 1,700
99 Roster Beton buah 20,900
100 Roster Kramik buah 63,000
101 Roster kaca/ glassBlock 19x19 buah 31,000
102 Bondex (Floord Deck) t=0,75 m2 110,250
103 Bitumen (Asphalt AC 60/70) kg 13,350
104 Asphalt Curah ton 9,660,000
105 Cat Kayu/ besi (dulux) kg 87,000
106 Cat Kayu/ besi (Avian) kg 56,000
107 Cat tembok KW II/ EX VINILEX (25kg) kg 22,320
108 Cat Tembok KW I/ EX DULUX (5kg) kg 24,700
109 Closet Duduk CW 600 J / SW 660 J Komplit & acc unit 2,250,000
110 Closet Duduk Ex KIA Lengkap (putih) tangki Batu buah 1,617,000
111 Closet jongkok 'type CE 6 ex. Toto unit 300,000
112 dDempul Kayu kg 31,900
113 Dop PVC Ø 4" buah 10,500
114 Dop PVC Ø 3" buah 6,500
115 Dop PVC Ø 2" buah 4,500
116 Door stoper buah 81,200
117 Door Close buah 455,000
118 Elastomer Bearing Pad TYPE 1 (300+350+36) buah 561,800
119 Elastomer Bearing Pad TYPE 2 (300+350+36) buah 730,800
120 Elastomer Bearing Pad TYPE 3 (300+350+36) buah 1,039,500
121 Engsel Jendela pasang 31,800
122 Engsel Pintu 3" buah 35,400
123 Eternit 1 x 1 Tabusmen lbr 19,300
124 Expantion Joint M1 121,300
125 Floot Drain 'TX 1B ex. Toto buah 439,000
126 Flux Oil (untuk emulsi) liter 26,800
127 Aluminium Plat Tipis lembar 10,700
128 Gemuk (Greese) liter 26,900
129 gorong - gorong Beton dia. 30 (tanpa Tulangan) M1 105,000
130 gorong - gorong Beton dia. 40 (tanpa Tulangan) M1 144,400
131 gorong - gorong Beton dia. 60 (tanpa Tulangan) M1 162,100
132 gorong - gorong Beton dia. 80 (tanpa Tulangan) M1 176,800
133 gorong - gorong Beton dia. 100 (tanpa tulangan) M 1
236,300
134 GRC / KALSIBOARD 3,5 x1200 x 2400 lembar 67,500
135 GRC / KALSIBOARD 4,5 x1200 x 2400 lembar 68,900
136 Grendel Jendela buah 10,500
137 Grendel Pintu buah 17,000
138 Gypsum Board 9 mm ; uk 120 x 240 cm lembar 67,000
139 Gerobak Dorong unit 340,000
140 Handle Pintu buah 308,700
141 Les Gypsum Polos M 17,900
142 IJUK ikat 21,600
143 Kaca Polos 3 mm M2 127,000
144 kaca Polos 5 mm M2 152,000
145 Kaca Polos 8 mm M2 202,000
146 Kaca Rayben 3 mm M2 202,000
147 Kaca Rayben 5 mm M2 322,000
148 Kapur Hidrasi M3 179,300
149 Karet Alas Genteng 90 cm M 1
8,100

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)

NO BAHAN DASAR SPESIFIKASI SATUAN HARGA

1 2 3 4 5
150 Kait Angin bh 8,100
151 Kawat Beton/ Bindrat kg 25,300
152 Kawat Las kg 27,000
153 Kawat Ram Ayakan M3 30,100
154 Kayu Kls I (Balok) Jati M3 13,100,000
155 Kayu Kls I (Balok) Sawmil M3 13,755,000
156 Kayu Kls I (Papan) Sawmil (bayam) M3 15,750,000
157 Kayu Kls II (balok) Kamper M3 3,160,000
158 kayu kls II (papan) sawmil M 3
3,969,000
159 kayu Kls III (balok) Meranti M3 2,085,000
160 Kayu Kls III (papan) mal 2/30, 2/40 M3 2,291,100
161 Kayu Kls IV/ Balok Mal 4/6 M3 1,627,500
162 Kayu Dolken dia. 8-10 cm (p=4m) btg 63,000
163 Kayu les Profil 3x3 (4cm) m' 8,300
164 Kayu les Profil 4x4 (4cm) m' 10,000
165 Kayu les Profil 5x5 (4cm) m' 13,200
166 kayu Struktur M3 9,180,000
167 Kayu Bakar M3 186,900
168 Kayu Perancah 5/10-4 Bt 44,700
169 Kayu Balok 3/5 Klas I Bt 62,000
170 kayu Balok 3/5 Klas II Bt 22,000
171 Kayu Balok 4/6 Klas I Bt 102,000
172 Kayu Balok 4/6 Klas II Bt 32,000
173 Kayu Balok 5/7 Klas I Bt 149,000
174 Kayu Balok 5/7 Klas II Bt 47,000
175 Kayu Balok 5/10 Klas I Bt 212,000
176 Kayu Balok 5/10 Klas II Bt 62,000
177 Kayu Balok 5/12 Klas I Bt 307,000
178 Kayu Balok 6/12 Klas I Bt 307,000
179 Kayu Balok 8/12 Klas I 332,000
180 Kayu Papan 2/20 Klas I lembar 242,000
181 Kayu Papan 2/20 Klas II 59,000
182 Kerosine (Minyak Tanah) Liter 12,000
183 Kawat Bronjong 3 mm (1 roll = 50kg) m' 11,000
184 Kawat Bronjong jadi (2x1 x 0,5m) dia. 2,7 mm; 9kg kg 25,500
185 Kawat Bronjong jadi (2x1 x 0,5m) dia. 3 mm; 9kg kg 28,000
186 Kertas Gosok/ Amplas Kayu lembar 7,500
187 Kusen Aluminium 3" Alexindo m' 18,750
188 Klep Diameter 3/4" ex onda buah 40,500
189 Kansteen Beton k.300 (40/30/15) buah 32,000
190 Kran Air SKL 1/2 Inci buah 20,400
191 Kran Dinding type TMN Picarlo buah 61,000
192 Kran Zink 'T 30 AR12NV7N ex. Toto buah 305,000
193 Kran Zink Hwaco 1L Unit 275,000
194 Kunci Tanam Yale 1x putar 132,600
195 Kunci Tanam Yale 2x putar buah 81,600
196 Kwas Cat lembar 20,000
197 Lambriziring t;4 mm (4m') buah 15,000
198 Lampu Hemat Energy 8 Wat buah 60,700
199 Lampu Hemat Energy 14 Wat buah 53,900
200 Lampu Hemat Energy 18 Wat buah 53,800
201 Lampu Hemat Energy 23 Wat buah 66,500
202 Lampu TL 1 x 10 Wat buah 47,300

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)

NO BAHAN DASAR SPESIFIKASI SATUAN HARGA

1 2 3 4 5
203 Lampu TL 1 x 20 Wat buah 52,500
204 Lampu TL 1 x 30 Wat buah 63,000
205 Lampu TL 2 x 18 wat Grille (panasonic) buah 31,500
206 Lampu TL 2 x 36 wat Grille (panasonic) buah 42,000
207 Lem Kayu Fox kg 29,000
208 List Profil 5 cm Gypsum m 25,500
209 List Plafond Datar M1 15,100
210 List Plafond Profil M 1
16,700
211 Mesin Jet Pump kap. 250 Wat Groundfoss unit 1,010,000
212 Mesin Pompa Tekan kap. 150 Wat Ground foss unit 650,000
213 Meni Kayu kg 36,750
214 Minyak Pelumas Liter 47,300
215 Mur Baut 5/8 buah 5,500
216 Pagar Brc 240x120 cm m2 409,500
217 Pagar Brc 240x150 cm m2 446,250
218 Pagar Brc 240x190 cm m2 698,250
219 Tiang dia. 1,5" (tinggi = 120 cm) bh 178,500
220 Tiang dia. 1,5" (tinggi = 150 cm) bh 246,750
221 Tiang dia. 1,5" (tinggi = 190 cm) bh 309,750
222 Uclip bh 1,890
223 Pagar Beton Panel 5 susun m 425,000
224 Pagar Beton Panel 6 susun m 495,000
225 Pagar Beton Panel 7 susun m 575,000
226 Paku 8-2cm kg 19,000
227 Paku5-10 cm kg 20,000
228 Paku 1-3 cm kg 22,000
229 Paku Gypsum kg 31,100
230 Paku Klem kg 23,600
231 Paku Ramset buah 1,100
232 Paku seng kg 32,000
233 Paku Skrup buah 650
234 Paku Beton 8-10 dos 16,300
235 Pasir Beton M3 182,400
236 Pasir Pasang M3 183,400
237 Pasir Urug/ Pasir alas/ pengikat pilihan M3 88,200
238 Pelampung otomatis 1/2" buah 56,500
239 Paving Blok Kotak T.8 cm K.250 (44bh/m2) m2 81,000
240 Paving Blok Kotak T.8 cm K.300 (44bh/m2) m2 86,500
241 Paving Blok Kotak T.8 cm K.350 (44bh/m2) m2 92,000
242 Paving Blok Kotak T.8 cm K.250 Colour (44bh/m2) m2 99,700
243 Paving Blok Kotak T.8 cm K.300 Colour (44bh/m2) m2 105,200
244 Paving Blok Kotak T.8 cm K.350 Colour (44bh/m2) m2 110,700
245 Topi Skrup K.300 bh 6,600
246 Paving Blok segi enam K.250 8cm (35bh/m2) m2 92,000
247 Paving Blok segi enam K.300 8cm (35bh/m2) m2 97,500
248 Paving Blok segi enam K.350 8cm (35bh/m2) m2 104,500
249 Paving Blok segi enam K.250 8cm Colour (35bh/m2) m2 114,000
250 Paving Blok segi enam K.300 8cm Colour (35bh/m2) m2 119,500
251 Paving Blok segi enam K.350 8cm Colour (35bh/m2) m2 124,000
252 Pipa Besi GIP dia. 1/2" SNI, t=2,6 mm; p=6 m bt 103,000
253 Pipa Besi GIP dia. 3/4" SNI, t=2,6 mm; p=6 m bt 131,600
254 Pipa Besi GIP dia. 1 1/4" SNI, t=3,2 mm; p=6 m bt 265,200
255 Pipa Besi GIP dia.2" SNI, t=3,3 mm; p=6 m bt 416,200
256 Pipa Besi GIP dia. 2 1/2" SNI, t=3,3 mm; p=6 m bt 554,900

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)

NO BAHAN DASAR SPESIFIKASI SATUAN HARGA

1 2 3 4 5
257 Pipa Besi GIP dia. 3" (medium A), t=2,0 mm; p=6 m bt 530,400
258 Pipa Besi GIP dia. 4" (medium A), t=2,8 mm; p=6 m bt 738,500
259 Pipa Besi GIP dia. 5" (medium A), t=3,0mm; p=6 m bt 1,344,400
260 Pipa Besi GIP dia. 6" (medium A), t=3,6 mm; p=6 m bt 1,596,300
261 Pipa Besi Hitam 1/2" SNI t=2,6 mm; p=6m bt 73,500
262 Pipa Besi Hitam 3/4" SNI t=2,6 mm; p=6 m bt 92,800
263 Pipa Besi Hitam 1 1/4" SNI t=3,0 mm p= 6 m bt 174,400
264 Pipa Besi Hitam 1 1/2" SNI t=3,0 mm p= 6 m bt 203,000
265 Pipa Besi Hitam 2" SNI, t=3,0 mm p= 6 m bt 259,000
266 Pipa Besi Hitam 3" Medium A, t=2,0 mm p= 6 m bt 304,000
267 Pipa Besi Hitam 4" Medium A, t=2,8 mm p= 6 m bt 622,200
268 Pipa Besi Hitam 5" Medium A, t=2,8 mm p= 6 m bt 791,500
269 Pipa PVC dia. 1/2" AW 4m m' 5,250
270 Pipa PVC dia. 3/4" AW 4m m' 7,075
271 pipa PVC dia. 1" AW 4m m' 9,650
272 pipa PVC dia. 2" AW 4m m' 22,250
274 pipa PVC dia. 3" AW 4m m' 22,250
276 pipa PVC dia. 4" AW 4m m' 72,500
279 Plamir Kayu kg 33,500
280 Plamir Tembok dulux dan setara (4kg) kg 25,900
281 Plat Besi lembar 446,300
282 Politur Teak Oil kg 49,800
283 Plastik Tipis m2 6,600
284 Pompa Air Sanyo unit 481,500
285 Pompa tangan buah 428,400
286 Premium liter 6,950
287 Residu/ Minyak bekisting liter 53,700
288 ROOF DRAIN Metal buah 35,000
289 Sambungan Pipa Keni 1 inci PVC buah 4,300
290 Sambungan Pipa Keni 1/2 inci PVC buah 3,300
291 Sambungan Pipa Keni 3/4 inci PVC buah 3,300
292 Sambungan Pipa Keni 2 inci PVC buah 26,800
293 Sambungan Pipa Lurus 1/2 inci PVC buah 4,200
294 Sambungan Pipa L. 1/2 inci PVC buah 4,200
295 Saringan Air Bersih m2 47,300
296 Saringan Air Plastik m2 44,100
297 Sealent tube 10,500
298 Seal Tape buah 14,500
299 Semen @ 50kg Semen Indonesia zak 57,900
300 Semen Warna Semen Indonesia zak 15,000
301 Semen Bosowa @ 40kg zak 47,100
302 Semen Tonasa @ 40kg zak 54,100
303 Semen Warna kg 15,800
304 Sendi dan Roll pasang 6,426,000
305 Seng Gelombang BJLS 0,20 (6 kaki) kaki 8,400
306 Seng Gelombang BJLS 0,25 (6 kaki) kaki 11,100
307 Seng Gelombang BJLS 0,30 (6 kaki) kaki 13,400
308 Seng Gelombang BJLS 0,35 (6 kaki) kaki 14,900
309 Seng Gelombang Kecil kaki 7,300
310 Seng Plat BJLS 0,20 30 cm 6 kk lembar 51,400
311 Seng Plat BJLS 0,22 6kk lembar 56,500
312 Seng Plat BJLS 0,30 6kk lembar 62,100
313 Seng Plat BJLS 0,35 6kk lembar 65,300
314 Shower Pray type THX 20 NBPIV ex. Toto unit 249,700

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)

NO BAHAN DASAR SPESIFIKASI SATUAN HARGA

1 2 3 4 5
315 Shower Set type TX 423SZ ex. Toto unit 686,000
316 Slot tanam buah 91,000
317 Skrup Beton/ fixer buah 1,200
318 Solar Industri (non Subsidi) liter 13,800
319 Solar Subsidi 5,650
320 Stand Nako pasang 141,900
321 Stop Kran dia. 1" ex. Onda buah 71,000
322 Selinder buah 85,000
323 Tanah Urug/ Timbunan M3 90,000
324 Tangki Air Fiber 500 liter Excel buah 675,000
325 Tangki Air Fiber 1000 liter Excel buah 1,150,000
326 Tangki Air Fiber 2000 liter Excel buah 2,996,000
327 Teakwood 120 x 240/ 3mm lembar 95,300
328 Tempat Sabun Trisensa buah 44,000
329 Teep Gip Ø 1/2" buah 7,200
330 Teep Gip Ø 2" buah 27,900
331 Teep Gip Ø 3/4" buah 6,300
332 Teep PVC Ø 1/2" buah 3,300
333 Teep PVC Ø 3/4" buah 3,300
334 Teep PVC Ø 1" buah 4,200
335 Teep PVC Ø 1 1/4" buah 8,100
336 Teep PVC Ø 1 1/2" buah 8,600
337 Teep PVC Ø 2" buah 9,700
338 Teep PVC Ø 3" buah 12,900
339 Teep PVC Ø 4" buah 16,100
340 Tegel Keramik 20 x 20 (25 bh/dos) dos 64,000
341 Tegel Keramik 20 x 25 (20 bh/dos) dos 63,000
342 Tegel Keramik 30 x 30 (11 bh/dos) dos 64,500
343 Tegel Keramik 40 x 40 (6 bh/dos) dos 72,500
344 Tegel Keramik 50 x 50 (4 bh/dos) dos 95,000
345 Tegel Keramik 60 x 60 (3 bh/dos) dos 185,000
346 Tegel Keramik anti Slip 20 x 20 dos 63,000
347 Tegel Keramik anti Slip 30 x 30 dos 63,000
348 Granit Tile ( 40 x 40 cm) isi 6 dos 255,000
349 Granit Tile ( 60 x 60 cm) isi 4 dos 294,300
350 Plint Keramik 8 x 30 cm buah 18,500
351 Plint Granitetile 8 x 40 cm buah 20,000
352 Thinner liter 30,000
353 Tripleks 3 mm (120 x 240 cm) lembar 54,100
354 Tripleks 4 mm (120 x 240 cm) lembar 67,600
355 Tripleks 6 mm (120 x 240 cm) lembar 89,900
356 Tripleks 9 mm (120 x 240 cm) lembar 128,400
357 Taekwood 3 mm lembar 78,750
358 Tempat Sabun 'S 11 N Ex Toto buah 48,000
359 Urinoir unit 1,830,000
360 V.KNIE 3/4" (besi) buah 8,500
361 V.KNIE 1" (besi) buah 11,800
362 V. Neple 3/4" (besi) buah 7,600
363 V. Neple 1" (besi) buah 8,400
364 Vernish liter 45,000
365 Wastafel 'LW 240 CJ ex. Toto, Komplit kran & acc unit 643,500
366 Wood Filler (dulux 4kg) kg 22,000
367 woodplank 400 x 30 cm lembar 76,000
368 woodplank 400 x 20 cm lembar 66,000

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)

NO BAHAN DASAR SPESIFIKASI SATUAN HARGA

1 2 3 4 5
369 waterproofing (5kg) kg 17,200
370 Lakban Foil/ roll roll 13,200
371 Box Panel PVC isi 4 MCB legran buah 170,000
372 Down Light/ PLC 13 W buah 95,000
373 Fitting Plafond + Lampu SL (Panasonic) buah 95,500
374 NYY 2 x 1.5 MM2 m' 7,150
375 NYM 3 x 2.5 MM 2 m' 12,372
376 NYM 2 x 2.5 MM2 m' 11,100
377 Outlet TV (broco) buah 51,000
378 Outlet Telephone (Broco) buah 51,000
379 Saklar Tunggal buah 9,000
380 Saklar Ganda buah 37,300
381 Stop Kontak buah 14,200
382 Fitting (elbow, male bush,joint Coupling) buah 18,100
383 pipa dia. 5/8" - 4m (jenis C untuk Instalasi Listrik) bt 10,700
384 pipa dia. 3/4" - 4m (jenis C untuk Instalasi Listrik) bt 34,300
385 Klem Kabel met Clips no.10 buah 180
386 Klem Kabel met Clips no.12 buah 210
387 inbow dos buah 3,800
388 dop PVC 3/4 buah 3,700
389 Seal Tape buah 8,900
390 Isolasi buah 13,500
391 MCB 6 A Legran buah 62,000
392 MCB 4 A Legran buah 67,000
393 Kabel Telephone 4 x 0,5 mm m' 17,600
394 Tee Dus 5/8 bh 12,600
UPAH KERJA
1 Kepala Tukang Org/Hr 137,500
2 Mandor Org/Hr 159,000
3 Mekanik Terampil Org/Hr 137,500
4 Mekanik semi Terampil Org/Hr 116,000
5 Operator terampil Org/Hr 180,500
6 Operator Semi terampil Org/Hr 148,000
7 Pembantu Operator Org/Hr 143,000
8 Sopir Terampil Org/Hr 137,500
9 Sopir Pribadi Org/Hr 137,500
10 Pembantu Sopir Org/Hr 113,000
11 Pekerja Kasar/ Buruh Org/Hr 110,500
12 Pekerja Semi Terampil Org/Hr 113,000
13 Pekerja Terampil/ Pembantu Instalatur Org/Hr 116,000
14 Tukang Batu Org/Hr 132,000
15 Tukang Kayu Org/Hr 132,000
16 Tukang besi Org/Hr 132,000
17 Tukang Cat Org/Hr 132,000
18 Tukang Paving Org/Hr 132,000
19 Tukang Pipa Org/Hr 132,000
20 Tukang Las Org/Hr 132,000
21 Tukang Aluminium Org/Hr 132,000
22 Instalatur Listrik Org/Hr 126,500

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
STANDAR HARGA SATUAN BAHAN BANGUNAN DAN UPAH KERJA
PEMERINTAH PROVINSI SULAWESI SELATAN
KABUPATEN TAKALAR
TAHUN 2018
Dalam Rupiah (Rp)
NO. BAHAN DASAR SPESIFIKASI SATUAN HARGA

1 2 3 4 5
BAHAN DASAR
1 Batu Gunung M3 159,000
2 Batu Kali Utuh M3 152.000
Belah/Kerak M3 210,000
Gravel M3 127,000
3 Batu Pecah 10 - 15 cm M3 305,000
5 - 10 cm M3 330,200
3 - 5 cm M3 342,900
2 - 3 cm M3 355,600
1 - 2 cm M3 381,000
0,5 - 1 cm M3 397,500
4 Batu Kapur / Batu Karang Buah 133,400
5 Batu Bata Kelas I Buah 800
Kelas II M3 600
6 Batu Brojol (untuk brojong) M3 239,000
7 Batu Koral Beton Kali M3 222,000
8 Batu Tempel Hitam M3 125,700
9 Batu Koral Ukuran Besar (Batu Telor) Kg 101,000
10 Filer Kg 2,500
11 Kapur Pasang M3 381,000
12 Kerikil Chipping M3 414,000
13 Kerikil Koral M3 305,000
14 Kerikil Sungai M3 305,000
15 Kerikil Sungai Ayak Tanpa Pasir M3 372,000
16 Krikil/Agregat Kasar M3 344,000
Krikil/Agregat Halus M3 381,000
17 Bahan Agregat Base Kelas A M3 375,000
Kelas B M3 344,000
Kelas C M3 279,000
18 Pasir Urung Timbunan M3 127,000
19 Tanah Timbunan M3 105,000
20 Pasir Beton M3 184,200
21 Pasir Ayak M3 165,100
22 Pasir Batu (Sirtu) M3 155,600
23 Pasir Campuran/Pasangan M3 158,800
24 Sirtu (Tak Ayak) M3 142,900
25 Bahan Timbunan Pilihan M3 114,300
26 Semen : - Tonasa 50 Kg Zak 69,900
40 Kg Zak 57,200
- Bosowa 50 Kg Zak 67,300
40 Kg Zak 54,600
- Tiga Roda 50 Kg Zak 66,700
40 Kg Zak 54,000
- Putih Tiga Roda 40 Kg Zak 98,400
- Holcim 50 kg 70,500
40 kg 57,800
Semen Warna Kg 20,000
27 Readymix Beton Tanpa Pompa (Selang) K500 M3 1,441,000
K400 M3 1,207,000

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)
NO. BAHAN DASAR SPESIFIKASI SATUAN HARGA

1 2 3 4 5
K350 M 3
1,105,000
K300 M3 1,067,000
K225 M3 978,000
K175 M3 876,000
28 Cornice Adhesive Aplus (20 Kg) Zak 88,900
29 Gypsum Compound Aplus 200 (20 Kg) Zak 67,300
Gipro (20 Kg) Zak 101,600

BAHAN KAYU
1 Kayu Kelas I (Bayam)
- Balok M3 11,430,000
- Papan M3 27,940,000
2 Kayu Kelas II
- Balok M3 4,191,000
- Papan M3 4,191,000
3 Kayu Kelas III
- Balok M3 2,159,000
- Papan M3 2,159,000
4 Kayu Kelas IV
- Balok M3 1,270,000
- Papan M3 1,270,000
5 Kayu Lapis 4 mm 8" x 4" Lembar 80,000
6 Kayu Lapis 12 mm 8" x 4" Lembar 196,900

BAHAN ATAP :
1 Atap Asbes
- Gelombang Besar 80 x 180 x 5 mm Lembar 43,000
2 Genteng Metal (sakura) Lembar 37,000
3 Genteng Metal (prisma) Multi Roof Lembar 101,600
4 Baja Ringan
- Profil C M 97,800
- Profil U M 88,900
5 Genteng Harflex
- Polos 115 x 85 x 0,5 cm Lembar 48,300
- Warna 115 x 85 x 0,5 cm Lembar 52,100
6 Genteng Lisplank Polos 3 x 0,25 m Lembar 95,300
Genteng Bubungan Beton Buah 38,100
7 Seng Gelombang
- BWG 33" BJLS 0,20 mm Sermani Kaki 8,500
- BWG 32" BJLS 0,30 mm Sermani Kaki 86,800
- BWG 28" BJLS 0,35 mm Sermani Lembar 99,600
- BWG 33" BJLS 0,20 mm Gajah Lembar 8,700
- BWG 32" BJLS 0,30 mm Gajah Lembar 83,600

8 Seng Gelombang Kecil Sermani Kaki 9,000


Gajah Kaki 7,400
9 Seng Plastik Kaki 15,200
Lasercool Kaki 22,600
11 Seng Plat : - BWG 33" BJLS 0,20 mm Lembar 57,800
- BWG 32" BJLS 0,30 mm Lembar 81,900
- BWG 28" BJLS 0,35 mm Lembar 97,200

BAHAN BAMBU
1 Bambu - Besar (Patung) Batang 47,200
- Sedang (Parring) Batang 33,600
- Kecil Batang 24,100

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)
NO. BAHAN DASAR SPESIFIKASI SATUAN HARGA

1 2 3 4 5
- Bilik Bambu (Kulit) M 2
21,000
- Bilik Bambu (Tanpa Kulit) M2 24,100
- Bilik Bambu Hitam Variasi M3 26,300

BAHAN BESI
1 Besi Beton: - 6 mm SNI Batang 21,600
- 8 mm Batang 38,100
- 10 mm Batang 63,500
- 12 mm Batang 95,300
- 14 mm Batang 120,700
- 16 mm Batang 158,800
- 19 mm Batang 235,000
- 22 mm Batang 304,800
- 25 mm Batang 393,700
2 Besi Beton Ukir 13 mm Batang 108,000
3 Besi Plat : - 2 mm 120 x 240 mm Lembar 508,000
- 3 mm 120 x 240 mm Lembar 762,000
4 Besi Siku : - L.30.30.3.3240 mm Batang 69,900
- L.40.40.4 Batang 82,600
- L.50.50.5 Batang 165,100
- L.60.60.6 Batang 292,100
- L.70.70.7 Batang 444,500
5 Besi Strep : - 1,5 cm Batang 22,900
- 2 cm Batang 29,200
6 Kawat : - Ikat Beton Kg 19,100
- Beton Kg 25,500
- Kasa Nyamuk Plastik M2 25,500
- Saringan Plastik Rol 190,500
- Duri 10 Kg/Glng 158,800
- Beronjong Rol 666,800
- Rang : - 0,25 cm M2 27,900
- 0,4 cm M2 27,900
7 Besi Begel/Bantalan (U/ Kuda-kuda) Buah 27,900
8 Besi Profil C a Pipa Besi Meter 10,800
9 Pagar BRC jadi (lengkap tiang) M2 196,900

BAHAN FINISHING KAYU


1 Amplas Halus Untuk Besi Meter 12,700
2 Amplas Kasar Untuk Kayu Meter 12,700
3 Cat Dasar Gelatik 1 Kg/Klg 34,300
4 Dempul Cap Kucing Asli Kg 38,100
5 Lem Aibon Tube 27,900
6 Meni Kayu Yoko 3,5 kg 108,000
Nippon 69,900
7 Minyak Cat / Afdunner 1 Liter 38,500
8 Thinner A / Super 0,7 Liter 26,700
4 Liter 109,200
9 Politur Boyo 0,5 Liter 40,600
10 Teak Oil 1 Liter 24,800
11 Vernis Vernis Klg/0,5 Ltr 58,400

BAHAN KACA
1 Kaca Bening 3 mm Meter 139,700
5 mm Meter 158,800
2 Kaca Riben 3 mm Meter 152,400
5 mm Meter 165,100

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)
NO. BAHAN DASAR SPESIFIKASI SATUAN HARGA

1 2 3 4 5
BAHAN LANGIT-LANGIT

1 Asbes Plat Harlex :


- Selica Board 122 x 244 x 0,4 cm Lembar 69,900
- Gypsum 120 x 250 t=9 mm ex Lembar 76,200
DN
120 x 250 t=9 mm ex Lembar 76,200
Luar
2 Eternit 100 x 100 cm Lembar 25,400
4 mm M2 -
3 Plafond Asbes Semen 3,5 mm M2 66,700
4 Gypsum 9 mm Lembar 76,200
5 Hard Board 120 x 240 cm Lembar 101,600
6 Kalsiboard 122 x 244 cm Lembar 69,900
7 Cornice Adhesive Aplus 20 Kg 88,900
8 tripleks 122 x 244 x 3 mm Lembar 57,200
122 x 244 x 4 mm Lembar 69,900
122 x 244 x 6 mm Lembar 82,600
122 x 244 x 9 mm Lembar 120,700
122 x 244 x 10 mm Lembar 152,400
122 x 244 x 12 mm Lembar 171,500
Untuk Daun Pintu Lembar 141,000
9 Teak Wood - 122 x 244 x 3 mm Asli Lembar 107,000
Jati Lembar 121,000
10 Multiplex 120 x 240 x 18 mm Lembar 318,000
120 x 240 x 12 mm Lembar 191,000
120 x 240 x 9 mm Lembar 146,000

BAHAN LANTAI
1 Tegel :
- Tegel Mozaik Uk : 30 x 30 cm Motif Buah 78,000
Kaca Motif Lembar 109,200
- teralux : 30 x 30 cm Polos Dos 58,400
2 Keramik 25 x 25 cm Dos 76,200
- Putih 30 x 30 cm Dos 54,600
30 x 60 cm Dos 408,900
40 x 40 cm Dos 58,400
50 x 50 cm Dos 111,800
25 x 25 cm Dos 82,600
30 x 30 cm Dos 69,900
30 x 60 cm Dos 461,000
40 x 40 cm Dos 69,900
50 x 50 cm Dos 121,900
3 Granit
- Standar / Biasa 60 x 60 cm Dos 222,300
- Hugo Motif 60 x 60 cm Dos 247,700
- Hugo Hitam 60 x 60 cm Dos 292,100
- Hugo 100 x 100 cm Dos 768,400
- Ezenza Ivory 60 x 60 cm Dos 330,200
- Ezenza Unica Grey 60 x 60 cm Dos 346,700
- Granito Tile Ezenza :
- Polis 60 x 60 cm M² 292,100
60 x 60 cm Dos
60 x 60 cm Dos
- Unpolis 60 x 60 cm M² 273,100
4 Ubin Porselin Merk KIA ( Dekorasi ) 11 x 11 cm Dos 55,200

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)
NO. BAHAN DASAR SPESIFIKASI SATUAN HARGA

1 2 3 4 5

BAHAN PAKU
1 Paku : - Biasa 1 s/d 4 cm Kg 25,400
- Biasa 5 s/d 10 cm Kg 17,800
- Paku Seng Kg 38,700
RRT Kg 31,800
- Paku Sirap Ikat 24,100
- Paku Payung Berulir 75 mm kg 44,500

2 Paku : - Beton Hitam 3 cm Dos 13,000


5 cm Dos 25,000
7 cm Dos 32,000
- Beton Putih 2,5 - 5 cm Dos 19,000
3 Sekrup : 3 1/2 cm kg 20,300
4 cm kg 20,300

BAHAN SANITER
1 Kloset Duduk TOTO Polos Unit/Set 2,642,000
American Standard Unit/Set 1,905,000
Icepol Unit/Set 1,530,000
KIA Unit/Set 1,905,000
2 Kloset Duduk Keramik TOTO Buah 3,181,000
3 Kloset Jongkok KIA Buah 292,100
TOHO Buah 196,900
TOTO Putih Buah 358,100
TOTO Warna Buah 395,000
American Standard Buah 292,100
4 Kloset Jongkok Keramik Standard Buah 285,800
5 Kloset Jongkok
- Global Polos Buah 158,800
Warna Buah 158,800
6 Kran Air
- Kuningan Ø 1/2" Buah 31,800
- Putih Ø 1/2" Buah 22,900
Ø 3/4" Buah 35,600

7 Kran Wastafel (Washer) Ø 1/2" Buah 325,000

8 Kran Taman TAB 5/8" Buah 95,000


9 Septik Tank Fiber Semen : Type a.85 x 98 x 1,2 cm 295,000
Type b. 106 x 115 x 1,2 cm 472,000
10 Urinoar Keramik Standar Buah 191,000
- TOTO Warna Buah 1,054,000
- American Standard Toto U57M Buah 3,181,000
Kecil Buah 870,000
Sedang Buah 1,207,000
11 Wastafel Polos Buah 489,000
Warna Buah 514,000
12 Wastafel Gantung :
- TOTO Keramik Buah 768,000
- American Standard Keramik Buah 445,000
Keramik Set 1,530,000
ICEPOL Set 1,911,000
13 Bak Mandi Fiber Glas 70 x 70 x 66 ( Biasa ) Buah 286,000
70 x 70 x 66 Buah 1,905,000
14 Bak Mandi Reservoir Fibre Glass Kop 1000 Ltr Batang 1,524,000

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)
NO. BAHAN DASAR SPESIFIKASI SATUAN HARGA

1 2 3 4 5
BETON CETAK
1 Batako Besar 8 x 20 x 30 Buah 3,500
Kecil 8 x 10 x 20 Buah 2,900
2 Beton Segaran ( Belah ) 0-1/2 Ø 10 x 100 cm Batang 27,900
3 Besi Beton Kg 22,900
4 Roster Beton Polos 15 x 25 Buah 10,200
15 x 30 Buah 15,200
15 x 40 Buah 19,700
20 x 20 14,600
30 x 30 20,300
5 Roster Bentuk Ketupat 20 x 30 Buah 18,600
6 Roster Motif Kembang 40 x 40 Buah 39,000
7 Sumur Beton (Tidak Pakai Besi) Ø 50 x 50 cm Buah 83,200
Ø 60 x 50 cm Buah 101,100
Ø 80 x 50 cm Buah 116,500
Ø 90 x 50 cm Buah 134,400
Ø 100 x 50 cm Buah 140,800
8 Buis Beton Ø 20 cm Buah 90,200
9 Batu Pinggir Beton 10 x 20 x 35 Buah 14,600
15 x 35 x 50 Buah 74,300
10 Paving Blok K 300 6 cm M2 69,900
8 cm (10 x 20) M2 82,600
11 Paving Blok Warna 6 cm M2 74,300
8 cm M2 87,000
12 Gorong-gorong Beton Ø 20 cm M2 133,000
Ø 30 cm M2 193,000
Ø 50 cm M2 193,000
13 Castin Paving Blok 20 x 25 x 50 M 48,000
CAT BESI / KAYU
1 Cat Meni Kayu :
- Yoko 3,5 kg Kg 108,000
- Nippon 1 kg Kg 66,000
2 Avian Kg 72,400
CAT SENG / GENTENG
1 Yoku 4 Kg/Klg 111,800
2 Nippon 2,5 Liter 236,200

CAT TEMBOK
1 Nippon Paint
- Vinilex 5 Kg 148,600
5 Kg 174,000
25 Kg 711,000
- Avitex 5 Kg 123,200
25 Kg 584,000
- WTB 2,5 Liter 326,000
2 Mowilex (Interior) 2,5 Liter 237,000
3 Mowilex (Exterior) 2,5 Liter 320,000
4 Dulux Weathershield Klg 332,700
5 Metrolite 3 Liter 120,700
16 Liter 558,800
6 No Drop 1 Kg 63,500
4 Kg 222,300
20 Kg 952,500
7 AGA 4 Kg 209,600
8 Super Paragon 4 Kg 177,800
9 Jotun 4 Kg 203,200
25 Kg 666,800

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)
NO. BAHAN DASAR SPESIFIKASI SATUAN HARGA

1 2 3 4 5

LAIN-LAIN
1 Aspal Bitumen AC 60 / 70 Kg 16,900
Aspal Emulsi Kg 11,800
Aspal Curah Kg 16,900
2 Baja Konstruksi 12 Kg 19,700
3 Casting M 32,400
4 Clamp : Ø 1/2" Buah 1,500
Ø 3/4" Buah 1,500
5 Ijuk Ikat 35,000
6 Instalasi Listrik Titik 126,000
7 Kawat Las Dos 171,500
8 Kunci Tanam : - Union 1x Slang Pasang 116,800
2x Slang Pasang 170,200
- Yale 1x Slang Pasang 158,800
2x Slang Pasang 190,500
- Kuda teerbang Pasang 105,400
9 Lem Fox 300 Gr Kaleng 33,000
600 Gr Kaleng 69,900
2,5 Kg Kaleng 188,000
Lem Pipa Tube 12,700
Lem Seng 15,200
10 Penggantung : - Hak Angin Besar Pasang 25,400
- Hak Angin Kecil Pasang 19,100
- Grendel Kecil Pasang 12,700
- Grendel Besar Pasang 19,100
- Grendel Pintu Pasang 19,100
- Engsel Pintu Pasang 32,000
- Engsel Jendela Pasang 25,400

DAFTAR HARGA UNTUK PIPA DAN ALAT BANTU BESI


1 Pipa Galvanis Ø 3" A Batang 698,500
2 Pipa gip Ø 1" A Batang 222,300
Ø 1 1/2" A Batang 349,300
Ø 2 1/2" A Batang 581,700
3 Pipa Besi GIP PHT Dia 1/2 Inch - 6 M Batang 160,000
( Medium ) Dia 3/4 Inch - 6 M Batang 198,100
Dia 1 Inch - 6 M Batang 382,300
Dia 1 1/2 Inch - 6 M Batang 526,000
Dia 2 Inch - 6 M Batang 826,000
Dia 2 1/2 Inch - 6 M Batang 1,061,000
Dia 3 Inch - 6 M Batang 1,361,000
4 Pipa PVC
- Maspion AW Ø 12 " Batang 24,100
Ø 3/4 " Batang 31,800
Ø2" Batang 82,600
Ø3" Batang 160,000
Ø4" Batang 266,700
- Power Max Ø 1/2 " Batang 25,400
Ø 3/4 " Batang 33,000
Ø1" Batang 44,500
Ø 1 1/4 " Batang 67,300
Ø 1 1/2 " Batang 77,900
Ø2" Batang 99,700
Ø 2 1/2 " Batang 145,500
Ø3" Batang 196,200
Ø4" Batang 325,100

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)
NO. BAHAN DASAR SPESIFIKASI SATUAN HARGA

1 2 3 4 5
Ø5" Batang 538,700
Ø6" Batang 755,700
5 Pipa Paralon PVC Ø 1/2 " - 4 M Batang 36,000
(SII ) Ø 3/4 " - 4 M Batang 42,000
Ø1"-4M Batang 61,000
Ø 1 1/4 " - 6 M Batang 78,000
Ø 1 1/2 " - 4 M Batang 104,000
Ø 2"-4M Batang 148,500
Ø 2 1/2 " - 4 M Batang 188,700
Ø3"-4M Batang 270,000
Ø4"-4M Batang 409,000
Ø5"-4M Batang 564,100
Ø6"-4M Batang 821,000
Ø8"-4M Batang 1,273,100
Ø 10 " - 4 M Batang 1,871,000
6 Pipa jenis " C " untuk Saluran Pembuangan air Ø1"-4M Batang 35,800
Ø 1 1/2 " - 4 M Batang 39,700
Ø21"-4M Batang 46,100
Ø 2 1/2 " - 4 M Batang 69,100
Ø3"-4M Batang 84,500
Ø4"-4M Batang 140,800
Ø5"-4M Batang 208,600
Ø6"-4M Batang 289,300
Ø8"-4M Batang 499,200
Ø 10 " - 4 M Batang 794,900
7 Pipa jenis " C " untuk dinding lapis Ø 5/8 " - 4 M Batang 10,200
Ø 3/4 " - 4 M Batang 26,900
Ø1"-4M Batang 33,900
Ø 1 1/2 " - 4 M Batang 38,400
8 Pipa Blue ( Cold ) PN 12.5 16 mm Meter 12,700
20 mm Meter 17,300
25 mm Meter 24,000
32 mm Meter 36,700
40 mm Meter 59,300
9 Pipa Red ( Hot ) PN 12.5 16 mm Meter 22,700
20 mm Meter 31,300
25 mm Meter 42,000
32 mm Meter 50,700
40 mm Meter 84,000

10 Pipa Blue & Red PN 20 16 mm Meter 25,300


20 mm Meter 36,700

25 mm Meter 48,000
11 Pompa Tangan Buah 171,500

12 Tee, Elbow, Sambungan Buah 5,100


-Tee Copper ( air panas ) T 16 Buah 72,800

T 20 Buah 90,600
- Tee Nylon ( air dingin ) T 20 Buah 20,700

T 25 Buah 28,300
T 32 Buah 51,200

- Tee Expander Copper ( air panas ) T 16 Buah 27,100


T 20 Buah 39,100

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)
NO. BAHAN DASAR SPESIFIKASI SATUAN HARGA

1 2 3 4 5

T 25 Buah 80,400
- Tee Expander Copper ( air panas ) T 16 Buah 8,000

T 20 Buah 8,600
T 25 Buah 13,700

- Elbow Copper ( air panas ) L 16 Buah 48,600


L 20 Buah 63,900

L 25 Buah 91,800
- Elbow Nylon ( air dingin ) L 16 Buah 12,400

L 25 Buah 22,000
L 32 Buah 37,800

- Elbow Expander Copper ( air panas ) T 16 Buah 19,400


T 20 Buah 28,300

T 25 Buah 60,700
- Elbow Expander Plastik ( air dingin ) T 16 Buah 8,000

T 20 Buah 8,600
T 25 Buah 13,700

13 Klem 16 mm Buah 600


20 mm Buah 700

25 mm Buah 800
14 Seal Tape Buah 4,400

15 Ring Expander 16 mm Buah 15,600


20 mm Buah 22,000

25 mm Buah 31,400
16 Coton Plaster Buah 32,100

DAFTAR KELENGKAPAN FIBER SEMEN

1 Eternit Gelombang Mini Uk. Standar : 180 x 80 x Lembar 73,500


Berat Max : 9 Kg
Uk. Standar : 150 x 80
x 0,35 67,600
Berat Max : 7 Kg
Uk. Standar : 210 x 80
x 0,35 87,400
Berat Max : 10 Kg
Uk. Standar : 240 x 80
x 0,35 106,500
Berat Max : 11 Kg
Uk. Standar : 180 x 80
x 0,45 76,500
Berat Max : 9 Kg 22,900
2 Fiber Semen Adrex Gelombang Mini Uk. Standar : 300 x Lembar
150 x 0,4 25,400

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)
NO. BAHAN DASAR SPESIFIKASI SATUAN HARGA

1 2 3 4 5

Berat Max : 9 Kg
2 FIBER SEMEN ARDEX GELOMBANG MINI Uk. Standar : 300 x
150 x 0,4 87,400
Berat Max : 23 Kg
Uk. Standar : 270 x
150 x 0,4 106,500
Berat Max : 21 Kg
Uk. Standar : 240 x
150 x 0,4 126,000
Berat Max : 18 Kg
Uk. Standar : 240 x
150 x 0,4 116.200
Berat Max : 16 Kg
Uk. Standar : 180 x
150 x 0,4 68,100
Berat Max : 13 Kg
Uk. Standar : 180 x
150 x 0,4 87,600
Berat Max : 11 Kg

3 Fiber Semen Lembaran Rata Uk. Standar : 100 x Lembar


100 x 0,27 29,500
Berat Max : 4,5 Kg
Uk. Standar : 200 x
100 x 0,30
Berat Max : 9 Kg 87,400
Uk. Standar : 200 x 48,800
100 x 0,30
Berat Max : 9 Kg
TY 90 (INJ) Uk. Standar : 200 x 39,100
100 x 0,30
Berat Max : 6 Kg
Uk. Standar : 200 x 50 53,700
x 0,30
Berat Max : 5 Kg
Uk. Standar : 200 x 40 54,600
x 0,30
Berat Max : 4 Kg
Uk. Standar : 200 x 40 39,200
x 0,30
Berat Max : 3,3 Kg

4 Fiber Semen SWP/Dinding Lapis Uk. Standar : 270 x Lembar 387,500


100 x 3,5
Berat Max : 62 Kg
Uk. Standar : 240 x 337,100
100 x 3,5
Berat Max : 5,5 Kg
Uk. Standar : 100 x 298,000
100 x 3,5
Berat Max : 3,5 Kg
5 Talang Fiber Semen Talang Setengah
Lingkaran
- Talang Dia Lembar 145,000
Uk. Standar : 250 x
15

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)
NO. BAHAN DASAR SPESIFIKASI SATUAN HARGA

1 2 3 4 5
Berat Max : 16,5 Kg
- Corong Dia Lembar 75,000
Uk. Standar : 15 x 50
Berat Max : 7 Kg
- Penutu Pipa Lembar 75,000
Uk. Standar : 15 x 10
Berat Max : 2 Kg
- Talang Persegi Lembar 75,000
Uk. Standar : 25 x 25
x 200
Berat Max : 16 Kg
- Corong Dia Lembar 75,000
Uk. Standar : 25 x15
x 50
Berat Max : 5,6 Kg

DAFTAR HARGA DASAR UPAH KERJA


1 Operator Greader Org/Hr 180,000
2 Operator Loader Org/Hr 180,000
3 Operator Walls Org/Hr 180,000
4 Pembantu Operator Org/Hr 135,000
5 Sopir Terampil Org/Hr 155,000
6 Mandor Org/Hr 140,000
7 Kepala Tukang Org/Hr 125,000
8 Tukang Org/Hr 125,000
9 Buruh Terampil Org/Hr 100,000
10 Buruh Semi Terampil Org/Hr 90,000
11 Mekanik Org/Hr 180,000
12 Pembantu Mekanik Org/Hr 150,000

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
STANDAR HARGA SATUAN BAHAN BANGUNAN DAN UPAH KERJA
PEMERINTAH SULAWESI SELATAN
KABUPATEN JENEPONTO
TAHUN 2018
Dalam Rupiah (Rp)
NO BAHAN DASAR SPESIFIKASI SATUAN HARGA

1 2 3 4 5
I AGREGAT HALUS
1 Pasir Urug/ Pasir Timbunan M3 140,000
2 Pasar Pasang/ Kali M3 224,000
3 Pasir Beton M3 234,000
4 Pasir Batu ( Sirtu ) M3 210,000
5 Kerikil Koral M3 329,300
6 Kerikil Sungai M3 235,000
7 Kerikil Tersaring M3 313,600
8 Kerikil Sungai Royalti M3 282,200
9 Kerikil Sungai Pecah Tersaring M3 392,000
10 Kerikil Sungai Tidak Tersaring M3 313,600
11 Tanah Timbunan Pilihan M3 132,200
12 Tanah Timbunan Biasa M3 106,300
13 Tanah Liat M3 58,400

II. AGREGAT KASAR


1 Batu Kali M3 241,900
2 Batu Karang Hitam M3 204,100
3 Batun Karang Putih/Batu Gunung M3 203,100
4 Batu Pecah 10-15 cm M3 345,200
5 Batu Pecah 7-10 cm M3 330,100
6 Batu Pecah 5-7 cm M3 415,800
7 Batu Pecah 3-5 cm M3 468,700
8 Batu Pecah 2-3 cm M3 461,200
9 Batu Pecah 1 - 2 cm M3 491,400
10 Batu Pecah 0,5 - 1 cm M3 506,500
11 Batu Belah M3 241,900
12 Batu Bata Standar ( Besar ) Kelas 1 Buah 900
13 Batu Bata Standar Buah 800
14 Kapur Zak 15,200
15 Aspal Kg 10,700

III SEMEN
1 Semen Portland Kg 1,700
2 Semen Putih Kg 3,100
3 Semen Warna Grout Kg 62,400

IV KAYU
1 Kayu Balok Kelas 1 (Bayam) M3 12,936,000
2 Kayu Papan Kelas 1 (Bayam) M3 14,322,000
3 Kayu Balok Kelas II M3 7,854,000
4 Kayu Papan kelas II M3 7,854,000
5 Kayu Balok Kelas III M3 4,389,000
6. Kayu Papan Kelas III M3 4,389,000

V KAYU LAPIS
1 Tripleks 3 mm (Uk. 120 x 240 ) Lembar 79,000
2 Tripleks 4 mm (Uk. 120 x 240 ) Lembar 98,400
3 Tripleks 6 mm (Uk. 120 x 240 ) Lembar 120,200
4 Tripleks 9 mm (Uk. 120 x 240 ) Lembar 184,800

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)
NO BAHAN DASAR SPESIFIKASI SATUAN HARGA

1 2 3 4 5
5 Tripleks 12 mm (Uk. 120 x 240 ) Lembar 217,200
6 Tripleks 15 mm (Uk. 120 x 240 ) Lembar 307,300
7 Tripleks 18 mm (Uk. 120 x 240 ) Lembar 381,200
8 Teakwood Lembar 122,000
9 Kalsiboard tebal 4 mm Lembar 97,200

VI GYPSUN
1 Gypsun (120 x 240 mm) Jaya Board Lembar 90,100

VII LIST PROFIL


1 List Profil K1 A M1 27,700
2 List Profil T 11 M1 25,600
3 List Profil Kayu 7 cm M1 23,300
4 Lambersering 9 cm M1 13,900

VIII PAKU
1 Paku Kayu/Tripleks Uk. 1 - 4 cm Kg 31,000
2 Paku Kayu/Tripleks Uk. 5 - 12 cm Kg 27,700
3 Paku Beton Biasa (semua ukuran) Dos 34,700
4 Paku Beton Bagus (semua ukuran) Dos 69,900
5 Paku Perahu Uk. 1 - 4 cm Kg 46,600
6 Paku Perahu uk. 5 - 12 cm Kg 38,800
7 Paku Asbes Kg 37,300
8 Kawat Beton Kg 27,700

IX SENG
1 Seng Gelombang Bjls 0.25 Sermani Lembar 89,300
2 Seng Gelombang Bjls 0.30 Gajah Lembar 105,600
3 Seng Licin Bjls 0.20 - 6 Kaki Gajah Lembar 93,100
4 Seng Licin Bjls 0.30 - 6 Kaki Jabesemen Lembar 88,500
5 Asbes Gelombang Besar ( 300x102x5 mm ) Jabesemen Lembar 167,700
6 Asbes Gelombang Besar ( 200x102x5 mm ) Jabesemen Lembar 129,100
7 Asbes Gelombang Besar ( 180x102x5 mm ) Jabesemen Lembar 110,000
8 Asbes Gelombang Kecil ( 300x102x5 mm ) Jabesemen Lembar 112,800
9 Asbes Gelombang Kecil ( 270x102x5 mm ) Jabesemen Lembar 98,500
10 Asbes Gelombang Kecil ( 210x102x5 mm ) Jabesemen Lembar 80,000
11 Asbes Gelombang Kecil ( 180x102x5 mm ) Jabesemen Lembar 70,100
12 Asbes Gelombang Kecil ( 150x102x5 mm ) Jabesemen Lembar 68,500
13 Asbes Gelombang Kecil ( 240x102x5 mm ) Jabesemen Lembar 106,500
14 Asbes Nok Gelombang Besar Jabesemen Lembar 72,700
15 Asbes Nok Gelombang Kecl Jabesemen Lembar 47,800
16 Seng Plat 0,35 - 6 Kaki Jabesemen Lembar 86,600

X BESI
1 Besi Profil IWF Kg 16,800
2 Besi Siku L 30 x 30 x 3 mm Batang 98,100
3 Besi Siku L 40 x 40 x 4 mm Batang 161,100
4 Besi Siku L 50 x 50 x 5 mm Batang 291,100
5 Besi Strip Kg 23,300
6 Besi Beton 6 mm (12 m) Batang 39,200
7 Besi Beton 8 mm (12 m) Batang 52,900
8 Besi Beton 10 mm (12 m) Batang 80,300
9 Besi Beton 12 mm (12 m) Batang 111,400
10 Besi Beton 16 mm (12 m) Batang 176,400
11 Besi Beton 19 mm (12 m) Batang 252,000
12 Besi Beton Ulir 10 mm Batang 85,500

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)
NO BAHAN DASAR SPESIFIKASI SATUAN HARGA

1 2 3 4 5
13 Besi Beton Ulir 13 mm Batang 121,100
14 Besi Beton Ulir 16 mm Batang 203,800
15 Besi Beton Ulir 19 mm Batang 264,600
16 Angkur Kg 23,500
17 Besi Beugel/Baut Kg 28,500

XI KERAMIK/TEGEL
1 Keramik Uk. 20 x 20 cm (W.Putih) Mulia M2 85,400
2 Keramik Uk. 30 x 30 cm (W.Muda) Mulia M2 69,300
3 Keramik Dinding Uk. 20 x 25 cm (W.Tua) Asia Tile M2 76,200
4 Keramik Dinding Uk. 20 x 25 cm (W. Muda) Asia Tile M2 80,400
5 Keramik Lantai Uk. 20 x 20 cm (W. Putih) Asia Tile M2 76,200
6 Keramik Lantai Uk. 30 x 30 cm (W. Putih) Asia Tile M2 76,200
7 Keramik Lantai Uk. 40 x 40 cm (W. Putih) Asia Tile M2 106,300
8 Keramik Lantai Uk. 20 x 20 cm (Motif) Roman M2 109,900
9 Keramik Teras /Garansi 30 x 30 cm Materina M2 74,500
10 Keramik Plint 7,5 x 20 cm Buah 18,600
11 Keramik Plint 8 x 25 cm Buah 31,000
12 Kuku Macan Buah 3,500
13 Granit 40 x 40 cm Granito M2 194,000
14 Granit 60 x 60 cm (W. Muda) M2 242,600
15 Granit 60 x 60 cm (W. Tua) M2 346,500
16 Ubin Abu-Abu 20 x 20 M2 55,400
17 Ubin Suoer Hitam 20 x 20 M2 76,200
18 Ubin Badak 30 x 30 M2 79,000

XII KACA
1 Kaca Bening Tebal 3 mm M2 131,900
2 Kaca Bening Tebal 5 mm M2 147,500
3 Kaca Bening Tebal 8 mm M2 201,800
4 Kaca Bening Tebal 10 mm M2 287,200
5 Kaca Rayban Tebal 3 mm M2 100,900
6 Kaca Rayban Tebal 5 mm M2 103,200
7 Kaca Rayban Tebal 6 mm M2 194,000
8 Kaca Rayban Tebal 8 mm M2 341,500
9 Nako Buah 27,700

XIII GENTENG
1 Genteng Beton Biasa Buah 6,200
2 Genteng Kanmuri Glassure Buah 10,900
3 Genteng Kanmuri Biasa Buah 9,300
4 Karet Talang L=55X29 Rol 155,000
5 Karet Talang L=90X29 Rol 195,500
6 Karet Lapis Genteng M2 3,100
7 Genteng Keramik KIA Natural Buah 8,500
8 Genteng Keramik KIA Maroon Buah 14,000
9 Non Keramik KIA Buah 16,300
10 Non Beton Press Buah 9,300
11 Ujung Nok Buah 69,900
12 Genteng Metal Zincalume Kasar 100 x 77 Multiroof M2 186,300
13 Genteng Metal Zincalume Polos 100 x 77 Multiroof M2 150,600
14 Genteng Metal Zincalume Kasar 80 x 77 Suryaroof M2 111,800
15 Genteng Metal Zincalume Polos 80 x 77 Suryaroof M2 104,000
16 Genteng Asbes Buah 54,300

XIV SANRANGAN /BUIS BETON

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)
NO BAHAN DASAR SPESIFIKASI SATUAN HARGA

1 2 3 4 5
1 Dia. 80 x 50 Buah 93,100
2 Dia. 70 x 50 Buah 77,600
3 Dia. 60 x 50 Buah 62,100

XV GORONG-GORONG
1 Dia 1 x 60 Buah 93,100
2 Dia 1 x 50 Buah 77,600
3 Dia 1 x 40 Buah 69,900
4 Dia 1 x 30 Buah 46,600
5 Dia 1 x 20 Buah 31,000
6 Dia 1 x 100 Buah 155,200

XVI PAVING BLOK


1 Uk.6 cm ( 60 bh /m2) M2 93,100
2 Uk.8 cm ( 60 bh /m2) M2 111,800
3 Loster Semen Uk.15 x 30 cm Buah 69,900
4 Loster Semen Uk. 20 x 30 cm Buah 34,700
5 Batako 40 x 20 x10 Buah 4,900
6 Rumput Peking M2 69,300

XVII PIPA
1 Pipa PVC Type AW 1/2" Batang 34,700
2 Pipa PVC Type AW 3/4" Batang 41,600
3 Pipa PVC Type AW 1" Batang 55,400
4 Pipa PVC Type AW 1 1/4' Batang 62,400
5 Pipa PVC Type AW 1 1/2" Batang 76,200
6 Pipa PVC Type AW 2" Batang 94,400
7 Pipa PVC Type AW 1 1/2" Batang 97,000
8 Pipa PVC Type AW 3" Batang 186,900
9 Pipa PVC Type AW 4" Batang 311,100
10 Pipa PVC Type AW 5" Batang 500,700
11 Pipa PVC Type AW 6" Batang 679,600
12 Pipa PVC Type AW 8" Batang 1,093,900
13 Pipa PVC Type C 1/2" Batang 27,700
14 Pipa PVC Type C 3/4" Batang 34,700
15 Pipa PVC Type C 1" Batang 48,500
16 Pipa PVC Type C 2" Batang 59,800
17 Pipa PVC Type C 2 1/2" Batang 75,400
18 Pipa PVC Type C 3" Batang 88,500
19 Pipa PVC Type C 4" Batang 113,300
20 Pipa PVC Type D 1 1/4" Batang 37,600
21 Pipa PVC Type D 1 1/2" Batang 45,800
22 Pipa PVC Type D 2" Batang 60,900
23 Pipa PVC Type D 3" Batang 131,900
24 Pipa PVC Type D 4" Batang 169,000
25 Pipa PVC Type D5" Batang 255,000
26 Pipa PVC Type D 6" Batang 388,700
27 Pipa PVC Type D 8" Batang 652,000
28 Pipa Galvanis Medium GIP 1/2" Batang 236,000
29 Pipa Galvanis Medium GIP 3/4" Batang 307,400
30 Pipa Galvanis Medium GIP 1" Batang 422,200
31 Pipa Galvanis Medium GIP 1 1/4" Batang 552,600
32 Pipa Galvanis Medium GIP 1 1/2" Batang 633,300
33 Pipa Galvanis Medium GIP 2" Batang 838,300
34 Pipa Galvanis Medium GIP 2 1/2" Batang 1,066,400
35 Pipa Galvanis Medium GIP 3" Batang 1,909,400

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)
NO BAHAN DASAR SPESIFIKASI SATUAN HARGA

1 2 3 4 5

XVIII SAMBUNGAN PIPA


1 Knie 90o- 1/2" Buah 4,200
2 Knie 90o- 3/4" Buah 4,200
3 Knie 90o- 1" Buah 4,900
4 Knie 90o-1 1/4" Buah 8,300
5 Knie 90o-1 1/2" Buah 10,400
6 Knie 90o- 2" Buah 11,100
7 Knie 90o- 2 1/2" Buah 11,800
8 Knie 3" Buah 13,900
9 Knie 4" Buah 23,300
10 Knie 5" Buah 62,900
11 Knie 6" Buah 82,400
12 Tee 1/2" Buah 4,200
13 Tee 3/4" Buah 4,900
14 Tee 1" Buah 7,000
15 Tee 1 1/4" Buah 5,500
16 Tee 1 1/2" Buah 7,000
17 Tee 2" Buah 8,800
18 Tee 2 1/2" Buah 14,900
19 Tee 3" Buah 7,500
20 Tee 4" Buah 21,900
21 Tee 5" Buah 65,200
22 Tee 6" Buah 102,500
23 Socket 1/2" Buah 4,200
24 Socket 3/4" Buah 4,200
25 Socket 1" Buah 4,200
26 Socket 1 1/4" Buah 6,900
27 Socket 1 1/2" Buah 4,200
28 Socket 2" Buah 4,900
29 Socket 2 1/2" Buah 6,500
30 Socket 3" Buah 7,900
31 Socket 4" Buah 11,200
32 Socket 5" Buah 32,600
33 Socket 6" Buah 46,600
34 Knie 45o-2" Buah 102,500
35 Knie 45o-2 1/2" Buah 14,000
36 Knie 45o-3" Buah 20,500
37 Knie 45o-4" Buah 37,300

XIX KUNCI
1 Kunci Tanam double Slag/selot pintu Buah 83,800
2 Kunci Tanam Antik Buah 465,700
3 Kunci Lemari Buah 27,700
4 Door Holder Buah 34,700
5 Kunci laci 101 Buah 172,500
6 Kunci laci 808 kecil Buah 18,400
7 Kunci laci 808 besar Buah 23,000
8 Kunci Tanam Silinder Buah 139,700
9 Kunci Kamar Mandi Buah 48,500
10 Engsel Pintu Kuningan 3 " Buah 23,300
11 Engsel Pintu Kuningan 4 " Buah 21,700
12 Engsel Pintu Nilon 3" Buah 13,900
13 Engsel Pintu Nilon 4" Buah 15,500
14 Engsel Stainless Stell 3" Buah 34,900
15 Engsel Stainless Stell 4" Buah 44,200

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)
NO BAHAN DASAR SPESIFIKASI SATUAN HARGA

1 2 3 4 5
16 Grendel Uk.5-10 cm Buah 18,000
17 Grendel Uk.11 -15 cm Buah 23,600
18 Grendel 16 - 20 cm Buah 34,700
19 Kain Angin Kuningan Uk.10-20 cm Buah 23,600
20 Kain Angin Kuningan Uk.21-30 cm Buah 41,600
21 Espagnolet tanam Uk.21-30 cm Buah 34,700
22 Door Clossset Type 81 New Star Buah 204,900
23 Door Stop Lokal Buah 15,500
24 Engsel Pintu 77 Buah 20,800
25 Engsel Jendela 77 Buah 20,800
26 Hak Angin 8" Buah 23,600
27 Lem pipa Kaleng 52,000
28 Meter Rol Buah 100,000
29 Meter Rol Buah 125,000
30 Rel Pintu Dorong Buah 20,800
31 Pintu PVC Buah 504,500
32 Pintu Aluminium Buah 519,800
33 Rooling Door bahan besi M2 554,400
34 Rooling Door Bahan Aluminium M2 465,700
35 Sunscreen Aluminium M2 558,800
36 Pintu Gulung Besi M2 512,300
37 Pintu Besi Baja M2 1,474,700
38 Jendela Besi M2 1,552,300

XX PINTU AIR
1 Pintu Tersier Unit 6,860,700
2 Pintu Romijing b=0,5 m; h = 1 m Unit 18,295,200
3 Pintu Romijing b=0,6 m; h = 1 m Unit 18,447,700
4 Pintu Romijing b=0,7 m; h = 1 m Unit 19,438,700
5 Pintu Romijing b=0,8 m; h = 1 m Unit 22,106,700
6 Pintu Sorong b=1 m; h = 1 m Unit 30,492,000
7 Pintu Sorong b=1 m; h = 1,2 m Unit 32,016,600
8 Pintu Sorong b=1 m; h = 1,25 m Unit 34,650,000
9 Pintu Sorong b=1 m; h = 1,5 m Unit 41,850,000

XXI SANITASI
1 Bak air mandi fiberglasss 0,3 m3 Buah 554,400
2 Kloset Jongkok Standar Buah 831,600
3 Kloset Duduk Standar Lengkap Buah 3,395,700
4 Urinior Buah 1,940,400
5 Wastafel Stabndar Kecil Buah 838,300
6 Wastafel Standar Besar Buah 1,024,500
7 Kran Air wastafel Buah 32,600
8 Kran Air wastafel Buah 65,200
9 Kran Air bak cuci dapur Buah 55,900
10 Tempat Sabun Porselin Buah 1,319,500
11 Tangki Air Fiberglass bulat 500 ltr Paint chrome 0,9 liter Buah 1,940,400
12 Tangki Fiberglass bulat 1000 ltr Paint chrome finish Buah 6,900
13 Sealtape kecil Buah 85,400
14 Pipa Fleksibel Buah

XXII CAT MINYAK


1 Cat Besi/ Kayu warna standar Emco Kg 34,700
2 Cat Besi/ Kayu warna khusus Emco Kg 62,400
3 Cat Besi/Kayu Avian Kg 60,800
4 Cat Tembok Metrolite Kg 28,000

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)
NO BAHAN DASAR SPESIFIKASI SATUAN HARGA

1 2 3 4 5
5 Cat Tembok Interior Warna Standar Mowilex Liter 75,300
6 Cat Tembok Exterior Warna Standar Mowilex Liter 70,700
7 Cat Tembok Interior Warna Standar Dulux Liter 87,000
8 Cat Tembok Exterior Warna Standar Dulux Liter 93,900
9 Cat Meni Biasa Kg 27,200
10 Cat Meni KAYU Kg 31,200
11 Cat 5 kg 225,000
12 Dempul kayu kg 54,300
13 mber cor kecil Buah 10,000
14 Ember cor besar Buah 15,000
15 isolasi pipa Buah 6,000
16 Plamur Kg 27,900
17 Politur 2,5 Liter Liter 68,000
18 Teak Oil 1 Liter Liter 42,700
19 Pernis Liter 32,600
20 Minyak Cat Liter 20,800
21 Thinner A Liter 59,000
22 Thinner Biasa Liter 25,000
23 Spirtus Liter 25,000
24 Wood Filler kg 40,400
25 Amplas lbr 6,900
26 Kuas Roll Buah 19,800
27 Kuas Roll Ace 23,300
28 Kuas 1" Buah 10,000
29 Kuas 1 / 2 Buah 20,800
30 Kuas 4 " Buah 23,600
31 Lem Kayu Fox Kg 27,700
32 Lem Fox Bungkus 22,400
33 Lem Fox Bungkus 16,300
34 Lem Epoxy Pasang 37,000
35 Residu Liter 20,200
36 Minyak Bekisting Liter 13,900

XXIII ELETRICAL
1 Skun 16 mili Batang 3,100
2 Spiral Kabel M' 108,700
3 Kabel Tig Btg 1,000
4 Kabel NYM 2 x 1,5 Roll 388,100
5 Kabel NYM 2 x 2,5 M' 6,900
6 Kabel NYM 2 x 2,5 Eterna Roll 519,800
7 Kabel NYM 3 x 2,5 Eterna Roll 582,100
8 Kabel NYM 3 x 4 Eterna Roll 776,200
9 Kabel NYM 4 x 16 M' 54,300
10 Kabel NYM 4 x 2,5 M' 11,600
11 Kabel NYM 4 x 4 M' 15,500
12 Kabel NYA 10 m M' 13,900
13 BC 50 mm Kg 57,400
14 Spit Tembaga Asli Buah 10,900
15 Tiang Spit Buah 38,800
16 Arde 4 mtr Asli Batang 543,300
17 Down Light Kuning Buah 54,300
18 Down Light Besar Buah 77,600
19 Down Light Sedang Buah 69,900
20 Lampu Merkuri Philips 250 Wat Asli Buah 465,700
21 Fitting Merkuri 250 Wat Buah 77,600
22 Lampu Merkuri Philips 250 Wat Set 1,241,900

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)
NO BAHAN DASAR SPESIFIKASI SATUAN HARGA

1 2 3 4 5
23 Lampu TL 20 Wat Philips Set 77,600
24 Lampu Softone 40 wat Philips Buah 69,900
25 Fitting Batu Buah 18,000
26 Kayu Roset Buah 6,900
27 MCB 16 Grup MG Asli Buah 69,900
28 MCB 10 Grup MG Asli Buah 62,100
29 Rang pasir Meter 20,000
30 Sisir MCB Legrand Buah 31,000
31 Boks MCB 4 GRUP IB Buah 38,800
32 Boks MCB Plastik Grup MCB Asli Set 1,009,000
33 MCB 63 Amp MG Buah 341,500
34 Panel OB+mcb 12 Amp Set 776,200
35 MCB 30 Amp 3 Phase Buah 698,500
36 Saklar 63 Amp Buah 209,600
37 Boks MCB Buah 54,300
38 Panel Kas 30 x 40 cm Unit 100,900
39 Panel kas untuk lampu Merkuri Asli Set 1,319,500
40 Panel Kas Lengkap Asli MG Set 3,259,900
41 kwh 3 Phase Japan Buah 1,241,900
42 MCB + KWH Meter + OK Set 357,000
43 MCB 3 pas Asli MG Buah 1,086,600
44 OMH Saklar Buah 698,500
45 NFB Buah 236,000
46 Engkel IB Buah 18,600
47 Stop Arde IB Mekel Buah 13,900
48 Saklar Seri Makel / Stop Arde Makel Buah 15,200
49 OHN Saklar 60 grup set 388,100
50 Stop Arde + Tedos OB Buah 31,000
51 Steker Arde Buah 15,200
52 Engkel IB Makel Buah 15,500
53 Kabel Arde M' 18,600
54 Saklar Engkel + Tedos Set 46,600
55 Dora Dos Buah 38,800

XXIV UPAH TENAGA KERJA


1 Mandor Org/Hr 130,000
2 Buruh Lapangan Tidak Terlatih Org/Hr 81,000
3 Buruh Lapangan Semi Terlatih Org/Hr 85,000
4 Buruh Lapangan Terlatih Org/Hr 91,000
5 Pekerja Org/Hr 108,000
6 Tukang Batu Org/Hr 108,000
7 Tukang Kayu Org/Hr 108,000
8 Tukang Besi Org/Hr 108,000
9 Tukang Cat Org/Hr 108,000
10 Kepala Tukang Org/Hr 130,000
11 Petugas Satpam Org/Hr 120,000
12 Mekanik Org/Hr 108,000
13 Mekanik Pembantu Org/Hr 108,000
14 Operator Terlatih Org/Hr 108,000
15 Operator Kurang Terlartih Org/Hr 105,000
16 Pembantu Operator Org/Hr 91,000
17 Sopir Terampil Org/Hr 91,000
18 Pembantu Sopir Org/Hr 70,500

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
STANDAR HARGA SATUAN BAHAN BANGUNAN DAN UPAH KERJA
PEMERINTAH PROVINSI SULAWESI SELATAN
KABUPATEN BARRU
TAHUN 2018

NO BAHAN DASAR SPESIFIKASI

1 2 3
A BAHAN DASAR
1 Batu Gunung / Kali
2 Batu Belah/ Chipping
3 Gorong2 Beton dia.80 cm
4 Gorong2 Beton dia.100 cm
5 Paving Block 6 cm
6 Paving Block 8 cm
7 Pasir
8 Timbunan Pilihan
9 Batu Bata
10 Bambu uk.9x19x39 cm
11 Portland Semen batu belah pondasi
* Merk Tonasa
* Mer Bosowa
12 Semen Putih ( 20 kg/zak )

B BAHAN BESI
1 Besi Beton
2 Besi Beton Ǿ 5
3 Besi Beton Ǿ 6
4 Besi Beton Ǿ 8
5 Besi Beton Ǿ 10
6 Besi Beton Ǿ 12
7 Besi Beton Ǿ 14
8 Besi Beton Ǿ 16
9 Besi Beton Ǿ 18
10 Besi Beton Ǿ 20
11 Besi Beton Ǿ 22
12 Kawat Beton
13 Kawat Duri
14 Kawat Ram
15 Mur/Baut diameter 20 mm
16 Mur/Baut diameter 25 mm
17 Mur/Baut diameter 18 mm
18 Mur/Baut diameter 10 mm
19 Beugel U.40.40 mm

Harga Satuan Bahan Bangunan dan Upah KerjaTriwulan IV Tahun 2018


NO BAHAN DASAR SPESIFIKASI

1 2 3
20 Beugel Strip 40.40 mm
21 Paku Gording panjang . 5 cm
5 Paku Biasa 6-10 cm
6 Paku Biasa 2-5 cm
7 Paku Seng Biasa
8 Paku Beton
9 Paku Asbes
10 Paku Les
11 Trali Naco (Besi Batangan)
12 Rangka Naco/Batang

C BAHAN LANTAI DAN DINDING


1 Tegel Keramik Warna 40 x 40 cm
2 Tegel Keramik Warna 60 x 60 cm
3 Tegel Keramik 30 x 30 cm ( Polos )
4 Tegel Keramik 20 x 20 cm (Alur )
5 Tegel Keramik 20 x 20 cm (Polos )
6 Tegel Ubin warna 20 x 20 cm
7 Tegel Plin 10 x 31
8 Paving Blok tebal 6 cm
9 Teakwoond 120 x 240 cm tebal 3 mm
10 Loster Kramik
11 Loster Beton Biasa
12 Loster Beton Kecil

D. BAHAN KAYU
1 Kayu Kelas I Jenis ULIN
Balok
Papan
2 Kayu Kelas I Jenis BAYAM
Balok
Papan
3 Kayu Kelas II Jenis Kapur
Balok
Papan
4 Kayu Kelas II
Balok
Papan
5 Les Kayu Plafond 1 x 4 cm kls II

E BAHAN ATAP

Harga Satuan Bahan Bangunan dan Upah KerjaTriwulan IV Tahun 2018


NO BAHAN DASAR SPESIFIKASI

1 2 3
1 Seng Gelombang BWG 32" BJLS 0,25 mm
2 Seng BWG 33" BJLS 0,20 mm
3 Bumbungan Seng 90 x 180 cm
4 Seng Plat BWG 28"
5 Seng Spandek 0,3
6 Seng Spandek 0,3 Warna
7 Seng Spandek 0,35
8 Seng Spandek 0,35 Warna
9 Seng Spandek 0,4
10 Seng Spandek 0,4 Wana
11 Seng Gelombang BWG 33"
12 Karet Talang
13 Multi Roof
14 Nok Multi Roof
15 Surya Roof
16 Nok Surya Roof
17 Main Trus C 85
18 Reng U Type 41
19 Screw Spandek
20 Screw 12-14x20
21 Screw 10 - 16 x 16
22 Baaut Dinabolt

F BAHAN KACA
1 Kaca Bening Tebal 3 mm
2 Kaca Bening Tebal 5 mm

G BAHAN KUNCI DAN PENGGANTUNG


1 Kunci Tanam 2x Putar
2 Kunci lemari mutu baik
3 Engsel Pintu ( Kuningan)
4 Engsel Jendela ( Kuningan)
5 Grendel Pintu dan Jendela
6 Hak Angin / Hak Angin Lipat / No.7"
7 Pegangan / Tarikan Jendela + Pintu
8 Kait Jendela Jungkit / Kait Angin
9 Gembok no.5

H BAHAN CAT
1 Cat Meni Kayu/Besi
2 Minyak Bekisting
3 Cat Kayu

Harga Satuan Bahan Bangunan dan Upah KerjaTriwulan IV Tahun 2018


NO BAHAN DASAR SPESIFIKASI

1 2 3
4 Cat Besi Merk Avian
5 Minyak Cat ( afduner )
6 Kertas Gosok ( amplas )
7 Cat Tembok
8 Bahan Anti Rayap
9 Rol
10 Clear
11 Plamur
12 Politur
13 Dempul
14 Cat Tembok "Aries"
15 Cat Tembok "Maritex"
16 Cat Tembok "Avitex"

I. BAHAN SANITASI
1 Floor Drain
2 Dol Penguras
3 Closed Jongkok
4 Closed Jongkok
5 Closed Duduk
6 Closed Duduk
7 Urinoir Keramik
8 Waestapel
9 Waestapel
10 Pipa PVC Type D Diameter 4"
11 Pipa PVC Type D Diameter 3"
12 Pipa PVC Type D Diameter 2"
13 Pipa PVC Type D Diameter 3/4"
14 Pipa PVC Type D Diameter 1/2"
15 Pipa PVC Type AW Diameter 4"
16 Pipa PVC Type AW Diameter 3"
17 Pipa PVC Type AW Diameter 2"
18 Pipa PVC Type AW Diameter ¾"
19 Pipa PVC Type AW Diameter ½"
20 Kran Air 1/2" Merek Amico
21 Kran Air 3/4" Merek Amico
22 Sambungan T dan L PVC Dia. 2"
23 Sambungan L 4"
24 Sambungan L 3"
25 Pas. Sambungan Elbo 3/4"
26 Pas. Sambungan Elbo 1/2"
27 Pas. Sambungan T 1/2"

Harga Satuan Bahan Bangunan dan Upah KerjaTriwulan IV Tahun 2018


NO BAHAN DASAR SPESIFIKASI

1 2 3
28 Pas. Sambungan T 3/4"
29 Sambungan T 4"
30 Sambungan T 3"
31 Pas. Socket 3/4"
32 Pas. Sambungan Lurus 1/2"
33 Lem Pipa @45 gram
34 Pompa Air Penampungan Air Excel
35 Pompa Air Shimizu
36 Pelampung Air ONDA
37 Radar Sintung Otomatis Air
38 Tower Penampungan Air T=5,60 m LA=2 m2 B=3 m2

J BAHAN LISTRIK
1 Sekring Kas 2 Grup
2 Saklar Tunggal Broco
3 Saklar Ganda Broco
4 Saklar Tiga
5 Stop Kontak
6 Lampu SL 20 Wat
7 Lampu SL 15 Wat
8 Pintting Lampu Pijar
9 Lampu Pijar 18 Wat "Philips"
10 Lampu Pijar 15 Wat "Philips"
11 Lampu Pijar 40 Wat "Philips"
12 Pipa Pengaman Kabel
13 Kabel NYM 2 x 2.5 mm2
14 Kabel NYM 3 x 2.5 mm2

K BAHAN LANGIT - LANGIT


1 Asbes Semen (Eternit) 1 x 1 Meter 3 mm lbr
2 Triplex (1,20 x 2,40 ) cm t = 3 mm
3 Triplex (1,20 x 2,40 ) cm t = 4 mm
4 Triplex (1,20 x 2,40 ) cm t = 6 mm
5 Triplex (1,20 x 2,40 ) cm t = 9 mm
6 Calsibord
7 Gibsun

L BAHAN JALAN
1 Sirtu
2 Aspal Bitumen
3 Minyak Tanah Industri
4 Karet Elastomerit

Harga Satuan Bahan Bangunan dan Upah KerjaTriwulan IV Tahun 2018


NO BAHAN DASAR SPESIFIKASI

1 2 3
5 Plastik Alas Cor
6 Minyak Pelumas
7 Bronjong jadi 2,7 mm

M SUB BIDANG HARGA UPAH PEKERJAAN KONSTRUKSI


1 Mandor
2 Mekanik
3 Mekanik Pembantu
4 Tukang Kepala
5 Tukang
6 Operator
7 Operator Tak Terlatih
8 Pembantu Operator
9 Sopir
10 Sopir Personil
11 Pembantu Sopir
12 Buruh Tak Terlatih
13 Buruh Agak Terlatih
14 Buruh Terlatih

Harga Satuan Bahan Bangunan dan Upah KerjaTriwulan IV Tahun 2018


A SATUAN BAHAN BANGUNAN DAN UPAH KERJA
RINTAH PROVINSI SULAWESI SELATAN
KABUPATEN BARRU
TAHUN 2018
Dalam Rupiah (Rp)

SATUAN HARGA

4 5

M³ 157,143
M³ 325,000
M' 200,000
M' 240,000
Bj 1,600
2,000
M³ 157,143
M³ 35,000
Buah 650
Btg 20,000

Kg 1,200
Kg 1,125
Kg 3,600

Kg 11,000
Btg 22,000
Btg 30,400
Btg 54,050
Btg 80,500
Btg 115,000
Btg 166,750
Btg 201,300
Btg 166,100
Btg 188,400
Btg 211,700
kg 20,000
roll 175,000
M³ 28,800
Kg 7,200
bh 7,200
bh 6,500
bh 5,000
bh 27,200

Harga Satuan Bahan Bangunan dan Upah KerjaTriwulan IV Tahun 2018


Dalam Rupiah (Rp)

SATUAN HARGA

4 5
bh 22,600
kg 27,900
kg 23,000
kg 25,000
kg 50,000
dos 28,750
kg 45,000
kg 20,700
btg 30,400
daun 20,500

dos 76,000
dos 160,000
dos 60,800
dos 65,800
dos 57,700
dos 65,800
Buah 10,700
biji 2,700
lbr 55,700
Buah 27,000
Buah 20,000
Buah 15,000

M3 13,000,000
M 3
13,500,000

M3 12,000,000
M3 12,500,000

M3 7,000,000
M 3
7,500,000

M3 2,000,000
M3 2,500,000
M' 5,800

Harga Satuan Bahan Bangunan dan Upah KerjaTriwulan IV Tahun 2018


Dalam Rupiah (Rp)

SATUAN HARGA

4 5
lbr 90,300
kaki 9,030
lbr 50,000
lbr 113,200
mtr 40,000
mtr 45,000
mtr 50,000
m 47,500
mtr 52,500
mtr 57,500
kaki 9,800
m 15,000
lbr 85,000
lbr 27,000
lbr 49,000
lbr 39,000
btg 50,300
btg 79,100
dos 65,000
Biji 600
Biji 500
Biji 5,000

M2 45,000
M 2
175,000

Buah 110,000
Pasang 20,300
Buah 25,300
Buah 20,300
Buah 22,600
Pasang 15,000
Buah 10,000
Buah 11,550
Buah 35,000

Kg 27,000
liter 25,000
Kg 58,000

Harga Satuan Bahan Bangunan dan Upah KerjaTriwulan IV Tahun 2018


Dalam Rupiah (Rp)

SATUAN HARGA

4 5
Kg 63,250
Ltr 28,000
Lbr 8,000
kg 65,000
kg/ltr 33,000
buah 25,000
kaleng 63,250
kg 60,800
kg 65,800
kg 35,500
4kg 41,000
kg 66,000
5kg 110,000

Buah 20,000
Buah 15,000
Buah 350,000
Buah 1,050,000
Buah 900,000
Buah 375,000
Buah 500,000
set 1,750,000
Set 450,000
Batang 150,000
Batang 90,000
Batang 65,000
Batang 28,000
Batang 21,000
Batang 260,000
Batang 175,000
Batang 85,000
Batang 30,000
Batang 25,000
Buah 28,800
Buah 35,000
Buah 9,200
Buah 25,000
Buah 13,000
Buah 3,000
Buah 2,500
Buah 3,000

Harga Satuan Bahan Bangunan dan Upah KerjaTriwulan IV Tahun 2018


Dalam Rupiah (Rp)

SATUAN HARGA

4 5
Buah 4,000
Buah 25,000
Buah 13,000
Buah 3,000
Buah 3,000
Tube 65,000
Buah 2,500,000
unit 1,485,000
unit 166,000
buah 74,000
unit 7,500,000

Buah 26,200
Buah 21,300
Buah 26,500
Buah 30,000
Buah 33,000
Buah 52,800
Buah 49,000
Buah 22,600
Buah 45,300
Buah 47,600
Buah 75,500
Batang 12,100
buah 10,500
buah 14,740

Lembar 45,000
Lembar 55,000
Lembar 70,000
Lembar 80,000
Lembar 120,000
Lembar 55,000
M2 75,000

M3 115,000
Kg 13,700
Liter 14,000
Buah 2,063,200

Harga Satuan Bahan Bangunan dan Upah KerjaTriwulan IV Tahun 2018


Dalam Rupiah (Rp)

SATUAN HARGA

4 5
M2 4,700
Ltr 64,700
Kg 280,000

Org/Hr 103,000
Org/Hr 108,000
Org/Hr 79,000
Org/Hr 103,000
Org/Hr 92,000
Org/Hr 105,000
Org/Hr 78,000
Org/Hr 70,500
Org/Hr 110,500
Org/Hr 70,500
Org/Hr 67,000
Org/Hr 67,000
Org/Hr 68,050
Org/Hr 68,050

Harga Satuan Bahan Bangunan dan Upah KerjaTriwulan IV Tahun 2018


STANDAR HARGA SATUAN BAHAN BANGUNAN DAN UPAH KERJA
PEMERINTAH PROVINSI SULAWESI SELATAN
KABUPATEN PANGKAJENE DAN KEPULAUAN
TAHUN 2018
Dalam Rupiah (Rp)

NO JENIS BARANG SPESIFIKASI SATUAN HARGA

1 2 3 4 5
1 Batu Kali
- Utuh M3 128,000
- Batu Pecah 10 - 15 cm M3 184,000
- Batu Pecah 7 - 10 cm M3 215,000
- Batu Pecah 5 - 7 cm M3 242,000
- Batu Pecah 3 - 5 cm M3 265,000
- Batu Pecah 2 - 3 cm M 3
300,000
- Batu Pecah 1 - 2 cm M3 300,000
- Batu Pecah 0,5 - 1 cm M3 400,000
2 Batu Gunung M3 150,000
3 Tanah Timbunan M3 65,000
Timbunan Pilihan M3 90,000
4 Pasir
- Pasir Urug M3 130,000
- Pasir Pasang M3 150,000
- Pasir Pasang Pilihan M3 185,000
- Pasir Beton M3 180,000
5 Krikil
- Krikil Halus M3 125,000
- Krikil Kasar M3 135,000
6 Sirtu
- Sirtu disaring M3 105,000
- Sirtu tidak disaring M3 100,000
7 Kapur Hidrasi M3 115,500
8 Semen
- Semen Putih Zak 55,000
- Semen @ 50 kg Zak 57,000
- Semen @ 40 kg Zak 45,000
9 Batu Merah Buah 500
10 Bata Ringan M3 1,100,000
11 Paving Mar-Mar 20x10x3 cm Biji 1,400
12 Paving Blok Beton Cetak Biji 1,600
13 Pecahan Mar-mar M3 125,000
14 Roster Terawang Buah 15,000

BAHAN ASPAL
1 Aspal Dingin Kg 13,500
2 Aspal Bitumen Kg 13,500
3 Aspal Emulsi (Flux Oil) Kg 13,500

BAHAN KAYU
1 Kayu Kls I (Ulin)
- Balok Gergaji Sawmil M3 13,000,000
- Papan Gergaji Sawmil M3 17,000,000
2 Kayu Kls I (Bayam)
- Balok Gergaji Sawmil M3 10,000,000
- Papan Gergaji Sawmil M 3
17,000,000
3 Kayu Kls I (Kumea)
- Balok Gergaji Sawmil M3 6,500,000
- Papan Gergaji Sawmil M 3
7,500,000
4 Kayu Kls II
- Balok M3 3,700,000
- Papan M3 3,700,000
5 Kayu Kls III
- Balok M3 2,000,000

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)

NO JENIS BARANG SPESIFIKASI SATUAN HARGA

1 2 3 4 5
- Papan M3 2,500,000
- Bambu Batang 30,000

BAHAN LANTAI
1 Tegel PC
- PC Abu - abu 20 x 20 cm Dos 55,000
- PC Abu - abu 30 x 30 cm Dos 50,000
- PC Warna 20 x 20 cm Dos 55,000
- PC Badak 20 x 20 cm Dos 55,000
- Plin 15 x 20 cm Dos 15,000
- Plin 15 x 30 Dos 15,000
2 Tegel Keramik
- Putih 10 x 20 cm Dos 55,000
- Warna 10 x 20 cm Dos 55,000
- Putih 20 x 20 cm Dos 60,000
- Warna 20 x 20 cm Dos 60,000
- Putih 30 x 30 cm Dos 52,000
- Warna 30 x 30 cm Dos 55,000
- Putih 40 x 40 cm Dos 52,000
- Warna 40 x 40 cm Dos 70,000
- Polos 60 x 60 Dos 180,000
- Warna 60 x 60 cm Dos 195,000
- Polos 20 x 60 Dos 140,000
- Warna 20 x 60 cm Dos 180,000
- Polos 60 x 60 Dos 48,500

BAHAN KACA
1 Kaca Bening 3 mm M2 120,000
2 Kaca Bening 2 mm M 2
95,000
3 Kaca Buram 3 mm M2 94,500
4 Kaca Buram 2 mm M2 78,700
5 Riben 3 mm M2 130,000
6 Riben 2 mm M2 165,000
7 Rangka nakop lengkap trali Set 30,000

BAHAN ALUMINIUM
1 Almunium Warna (2x1") Meter 97,800
2 Almunium Warna (3x1") Meter 182,300
3 Almunium Warna (3x2") Meter 47,200
4 Almunium Warna (4x2") Meter 81,900

BAHAN PIPA
1 Pipa Besi GIP
- Ø 1/2" medium A Batang 200,000
- Ø 3/4" medium A Batang 250,000
- Ø 1" medium A Batang 350,000
- Ø 1,5" medium A Batang 500,000
2 Pipa PVC
- Ø 1/2 inci - 4 m Batang 22,000
- Ø 3/4 inci - 4 m Batang 28,000
- Ø 1 inci - 4 m Batang 37,000
- Ø 1,5 inci - 4 m AW Batang 45,000
- Ø 2 inci - 4 m AW Batang 65,000
- Ø 2 1/2 inci - 4 m AW Batang 95,000
- Ø 3 inci - 4 m AW Batang 130,000
- Ø 4 inci - 4 m AW Batang 240,000
3 Pipa PVC Ø 50 (RR) S 12,5 T 10 Bar Batang 160,000
4 Pipa PVC Ø 75 (RR) S 12,5 T 10 Bar Batang 350,000
5 Pipa PVC Ø 100 (RR) S 12,5 T 10 Bar Batang 365,000
6 Pipa PVC Ø 150 (RR) S 12,5 T 10 Bar Batang 792,000
7 Pipa PVC Ø 200 (RR) S 12,5 T 10 Bar Batang 1,331,000
8 Pipa PVC Ø 250 (RR) S 12,5 T 10 Bar Batang 2,082,300
9 Pipa GIV Ø 150 Medium Batang 2,112,000
10 Pipa GIV Ø 250 Medium Batang 5,100,000
11 Pipa GIV Ø 200 Medium Batang 3,600,000

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)

NO JENIS BARANG SPESIFIKASI SATUAN HARGA

1 2 3 4 5
12 Pipa GIV Ø 100 Medium Batang 1,089,000
13 Pipa GIV Ø 75 Medium Batang 855,000
14 Pipa GIV Ø 50 Medium Batang 415,000

BAHAN ASESSORIES PIPA


1 Flange Bend 45 GIP Ø 250 Buah 825,000
2 Flange Bend 45 GIP Ø 200 Buah 828,000
3 Flange Bend 45 GIP Ø 150 Buah 704,000
4 Flange Bend 45 GIP Ø 100 Buah 335,000
5 Flange Bend 45 GIP Ø 75 Buah 241,200
6 Flange Bend 45 GIP Ø 50 Buah 201,000
7 Flange Bend 90 GIP Ø 200 Buah 1,035,000
8 Bend CI All Flange 45 Ø 250 Buah 1,201,950
9 Bend CI All Flange 90 Ø 250 Buah 792,000
10 Reducer All Flange Ø 250 x 200 Buah 810,000
11 Reducer All Flange Ø 200 x 150 Buah 585,000
13 Flange Still Ø 250 Buah 575,550
14 Flange Still Ø 200 Buah 293,000
15 Flange Still Ø 150 Buah 162,000
16 Flange Still Ø 100 Buah 123,000
17 Flange Still Ø 75 Buah 96,000
18 Flange Still Ø 50 Buah 58,000
19 Flange Spigot Ø 200 Buah 759,000
20 Flange Spigot Ø 150 Buah 506,000
21 Flange Spigot Ø 100 Buah 310,000
22 Flange Tee 200 x 200 x 75 Buah 1,155,000
23 Flange Tee 150 x 150 x 150 Buah 850,000
24 Flange Tee 100 x 100 x 100 Buah 716,000
25 Flange Socket Ø 250 Buah 1,201,500
26 Flange Socket Ø 200 (RRJ) Buah 820,000
27 Flange Socket Ø 150 (RRJ) Buah 500,000
28 Flange Socket Ø 100 (RRJ) Buah 350,000
29 Flange Socket Ø 75 (RRJ) Buah 250,000
30 Flange Socket Ø 50 (RRJ) Buah 170,000
31 Flange Adaptor Ø 250 Buah 1,665,000
32 Flange Loose Ø 50 mm Buah 49,500
33 Flange Loose Ø 200 mm Buah 202,950
34 Flange Loose Ø 250 mm Buah 405,000
35 Floating Valve Ø 250 Buah 1,350,000
36 Fleksibel Joint Ø 250 Buah 2,430,000
37 Fient Krant Ø 50 Buah 728,100
38 Air Realist Valve Ø 200 Buah 342,000
39 Air Realist Valve Ø 250 Buah 585,000
40 Box Street Ø 200 Buah 81,000
41 Box Street Ø 250 Buah 90,000
42 Dop Ø 250 Buah 693,000
43 Long Bend 90 PVC Ø 200 (RRJ) Buah 350,100
44 Long Bend 45 PVC Ø 250 (RRJ) Buah 364,500
45 Long Bend 22,5 PVC Ø 250 (RRJ) Buah 378,000
46 Long Bend 90 PVC Ø 200 (RRJ) Buah 1,391,000
47 Long Bend 45 PVC Ø 200 (RRJ) Buah 1,605,000
48 Long Bend 22 PVC Ø 200 (RRJ) Buah 2,300,000
49 Long Bend 90 PVC Ø 150 (RRJ) Buah 1,016,000
50 Long Bend 45 PVC Ø 150 (RRJ) Buah 1,284,000
51 Long Bend 22 PVC Ø 150 (RRJ) Buah 1,819,000
52 Long Bend 90 PVC Ø 100 (RRJ) 1,414,000
53 Long Bend 45 PVC Ø 100 (RRJ) 997,000
54 Long Bend 22 PVC Ø 100 (RRJ) 850,000
55 Long Bend 90 PVC Ø 75 (RRJ) Buah 695,000
57 Long Bend 45 PVC Ø 75 (RRJ) Buah 602,000
58 Long Bend 22 PVC Ø 75 (RRJ) Buah 511,000
59 Long Bend 90 PVC Ø 50 (RRJ) Buah 299,000
60 Long Bend 45 PVC Ø 50 (RRJ) Buah 223,000
61 Long Bend 22 PVC Ø 50 (RRJ) Buah 190,000
62 Tes Tee PVC 150 x 150 x 150 Buah 969,000
63 Tes Tee PVC 100 x 100 x 100 Buah 646,000

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)

NO JENIS BARANG SPESIFIKASI SATUAN HARGA

1 2 3 4 5
64 Tes Tee PVC 75 x 75 x 75 Buah 483,000
65 Tes Tee PVC 50 x 50 x 50 Buah 323,000
66 Reduser PVC Ø 150 x 100 Buah 241,000
67 Reduser PVC Ø 75 x 100 Buah 124,000
68 Gate Valve Ø 250 Buah 5,220,000
69 Gate Valve Ø 200 Buah 2,160,000
70 Gate Valve Ø 100 Buah 1,284,000
71 Gate Valve Ø 75 Buah 1,091,000
72 Gate Valve Ø 50 Buah 909,000
73 Gibeoul Joint Cast Iron PN 10 Ø 75 Buah 187,000
74 Gibeoul Joint Cast Iron PN 10 Ø 100 Buah 251,000
75 Gibeoul Joint Cast Iron PN 10 Ø 150 Buah 342,000
76 Gibeoul Joint Cast Iron PN 10 Ø 250 Buah 1,391,000
77 Elbow PVC Ø 25 Buah 5,000
78 Elbow PVC Ø 3/4 Buah 10,000
79 Stop Kran 1/2" Buah 30,000
80 Atap Kran Buah 20,000
81 Knee GIP Ø 1/2" Buah 6,000
82 Socket GIP Ø 1/2" Buah 5,000
83 Double Neppel Buah 5,000
84 Water Meter Ø 15 mm M' 67,500
85 Box Meter Fiber Glas Buah 64,000
86 Isolasi (Tiplon) Buah 5,000
87 Clamp Saddle Ø 50 x 1/2" Buah 30,000
88 Clamp Saddle Ø 100 x 100" Buah 42,000
89 Clamp Saddle Ø 200 Buah 162,000
90 Clamp Pipa Ø 250 Buah 54,000
92 Baut 5/8 x 3" Biji 5,000
95 Baut 3/8 x 3" Biji 3,000
95 Karet Packing Ø 100 Buah 13,200
96 Karet Packing Ø 50 Buah 6,600
97 Menhole pada Ø 200 mm Buah 267,000
98 Menhole pada <150 mm Buah 214,000
99 Kawat Las Kg 25,000
100 Lem Pipa Kg 15,000
101 Bak Fiber / Polyethylene 2 M3 Unit 1,500,000
102 Bak Fiber / Polyethylene 3 M3 Unit 3,500,000
103 Bak Fiber / Polyethylene 4 M3 Unit 5,000,000
104 Bak Fiber / Polyethylene 5 M3 Unit 5,400,000

MEKANIKAL
1 Pompa Air Ø 8" Buah 3,500,000
2 Pompa Air Ø 6" Buah 3,000,000
3 Genset Power Systim 10 KVA Unit 11,550,000
4 Genset Power Systim 5 KVA Unit 5,777,500

BAHAN LANGIT-LANGIT
1 Eternit Lembar 20,000
2 Tripleks
- 122 x 224 X 0.2 cm Lembar 45,000
- 122 x 224 X 0.3 cm Lembar 55,000
- 122 x 224 X 0.6 cm Lembar 80,000
- 122 x 224 X 0.9 cm Lembar 115,000
3 Acoustic 40 x 60 Lembar 20,000
4 Teakwood
- 122 x 224 x 0.3 cm Lembar 115,000
- 80 x 224 x 0.3 cm Lembar 85,000
5 Asbes Plat Harflex
- 200 x 100 x 0.3 cm Lembar 20,000
6 Gipsum Board
- 240 x 120 x 0.3 cm Lembar 60,000
- 240 x 120 x 0.4 cm Lembar 70,000
- 240 x 120 x 0.9 cm Lembar 80,000
7 Calse Board Lembar 65,000
8 Kalsiboard 6 mm Lembar 130,000
9 List Profil

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)

NO JENIS BARANG SPESIFIKASI SATUAN HARGA

1 2 3 4 5
- 4 x 5 cm Meter 8,000
- Lembar Seri M2 82,000
10 Lem Kayu Kg 15,000
11 Hollow Galvavum Rangka Plafond
Hollow Galvavum 2/4 0,3 Btg 20,000
Hollow Galvavum 4/4 0,5 Btg 30,000

BAHAN BESI
1 Besi Tulangan
- Besi Tulang Ulir
Ø 13 x 12 m Kg 12,000
Ø 16 x 12 m Kg 8,443
Ø 19 x 12 m Kg 9,731
- Besi Tulangan Polos
Ø 6 x 12 m Kg 11,000
Ø 8 x 12 m Kg 9,705
Ø 10 x 12 m Kg 9,189
Ø 12 x 12 m Kg 9,193
Ø 14 x 12 m Kg 8,270
2 Besi Profil
- IWF 150 X 12 m Kg 14,500
- IWF 200 X 12 m Kg 14,500
- IWF 250 X 12 m Kg 14,507
- IWF 300 X 12 m Kg 14,500
- IWF 350 X 12 m Kg 14,484
- IWF 400 X 12 m Kg 14,500
- H Beam 100 x 12 m Kg 15,000
- H Beam 150 x 12 m Kg 14,889
- H Beam 200 x 12 m Kg 15,000
- H Beam 250 x 12 m Kg 15,000
- H Beam 300 x 12 m Kg 15,000
- H Beam 350 x 12 m Kg 15,000
- H Beam 400 x 12 m Kg 15,000
- UNP.50 Kg 135,000
- UNP.65 Kg 215,000
- UNP.80 Kg 250,000
- UNP.100 Kg 345,000
- UNP.120 Kg 540,000
- UNP.125 Kg 570,000
- UNP.150 Kg 850,000
- Wiremesh M.8 Kg 10,000
- Wiremesh M.10 Kg 10,500
- Besi Profil Kanal C.125 x 50 x 20 x2,3 Kg 9,686
- Besi Profil Kanal C.150 x 50 x 20 x3,2 Kg 10,170
3 Kawat
- Kawat Beton Kg 25,000
- Kawat Bronjong
* Manual Kg 20,000
* Pabrikasi Kg 350,000
- Kawat Duri Kg 180,000
- Kawat Rang Kg 20,000
- Kawat Las Kg 115,000
4 Paku
- Paku Biasa (5-10) cm Kg 20,000
- Paku Biasa (1-4) cm Kg 23,000
- Paku Asbes Kg 30,000
- Paku Seng Kg 50,000
- Paku Sekrup 3 1/2" Dos 75,000
- Paku Sekrup 4 1/2" Dos 85,000
- Paku Payung Berulir Kg 57,000
- Paku 2 cm Dos 22,000
- Paku Beton Dos 15,000
- Paku Nyamuk M2 20,000
4 Besi Plat
- 2 mm = 120 x 240 mm Lembar 423,000

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)

NO JENIS BARANG SPESIFIKASI SATUAN HARGA

1 2 3 4 5
- 3 mm = 120 x 240 mm Lembar 750,000
- 5 mm = 120 x 240 mm Lembar 1,233,000
- 6 mm = 120 x 240 mm Lembar 1,575,000
- 8 mm = 120 x 240 mm Lembar 2,520,000
5 Besi Strep
- 30.3 mm Batang 16,500
- 35.4 mm Batang 22,000
- 46.4 mm Batang 24,700
- 40.6 mm Batang 27,500
- 50.6 mm Batang 33,000

BAHAN PELUMAS/BBM
1 Oli Mesin SAE 40 Liter 33,000
2 Oli Mesin SAE 10 Liter 49,000
3 Oli Mesin SAE 90 Liter 31,000
4 Bensin Liter 6,450
5 Solar Liter 5,150
6 Solar Industri 11,338
7 Minyak Tanah Liter 10,000

BAHAN ATAP
1 Genteng
- Beton Buah 4,900
- Keramik Buah 15,000
- Asbes Lembar 16,500
- Harfleks (155 x 85 x 0,5 cm) Lembar 9,300
2 Genteng Metal
- Multi Roof Kasar Lembar 90,000
- Multi Roof Halus Lembar 95,000
- Bubungan Multi Roof Kasar Lembar 63,000
- Bubungan Multi Roof Halus Lembar 51,000
- Surya Roof Kasar Lembar 52,000
-Surya Roof Halus Lembar 50,000
- Bubungan Surya Roof Kasar Lembar 35,000
- Bubungan Surya Roof Halus Lembar 39,000
- Sakura Roof Kasar Lembar 50,000
- Sakura Roof Halus Lembar 48,000
- Bubungan Sakura Roof Kasar Lembar 41,000
- Bubungan Sakura Roof Halus Lembar 38,000
3 Asbes Gelombang Kaki 6,000
4 Seng Gelombang
- BWG 34" BJLS 0,20 mm Kaki 7,150
- BWG 33" BJLS 0,22 mm Kaki 7,200
- BWG 32" BJLS 0,30 mm Kaki 8,800
- BWG 38" BJLS 0,35 mm Kaki 9,900
- Atap Metal Sheet Gelombang Kaki 181,000
(Al.Zn Ex.Furmire) T = 0,45 mm
- Atap Spandek 0,35 Natural M' 45,000
- Atap Spandek 0,35 Warna M' 50,000
- Atap Spandek G550 AZ-100 T=0,5 mm M' 55,000
- Nok Spandek G550 AZ-100 T=0,5 mm M'
- Atap Zincatum 0,45 M'
- Nok Zincatum 0,46 M'
- Policarbonat M'
5 Seng Plat M' 20,000
6 Seng Plastik (Fiber) Kaki 12,000
7 Besi Siku
- 30.30.3 Batang 80,000
- 40.40.4 Batang 85,000
- 50.50.5 Batang 145,000
- 60.60.6 Batang 200,000
- 70.70.7 Batang 110,200
- 40.40.3 Batang 57,700
- 50.50.4 Batang 65,600
8 Smar Truss C 75.100 Meter 24,600
9 Smar Truss C 75.75 Meter 14,500

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)

NO JENIS BARANG SPESIFIKASI SATUAN HARGA

1 2 3 4 5
10 Profil Reng U 35.30.40 Meter 6,500
11 Main Truss 1.0.5 TCT Meter 15,200
12 Web 0.8 TCT Meter 14,100
13 Ancor/Seng Pelapis Genteng Roll 110,200
14 Fiber semen (Harflex)
- Super 240 x 108 x 0.6 c Lembar 36,700
- Super 180 x 108 x 0.6 c Lembar 26,200
13 Nok / Bubungan
- Nok genteng beton Buah 4,700
- Nok ganteng asben Buah 4,200
- Nok ganteng keramik Buah 13,100
14 Karet Pelapis Genteng Meter 13,000

BAHAN FINISHING CAT


1 Cat Tembok
- Avitex Kg 21,000
- Metrolite Kg 32,000
- Kimex Kg 16,000
- Dulux Kg
- Mowilex Interior Kg 66,000
- Mowilex Eksterior Kg 106,000
2 Cat Kayu
- Glotex Kg 53,000
- Avian Kg 57,000
- Platone Kg 55,000
- ICI Kg 55,000
- Politur Kg 62,000
- Meni Kg 30,000
- Minyak Cat Kg 35,000
3 Cat Anti Bocor
- Aquaset Kg 48,000
- Aquaprof Kg 56,000
4 Cap Atap
- Yoko Kg 25,000
- AGA Kg 90,000
- Plamur Kg 11,000
- Amplas/Kertas Gosok M 8,000
- Dempul kg 38,000
- Residu kg 5,000
5 Minyak Bikisting Liter 9,000

BAHAN INSTALASI LISTRIK


1 Pipa Union Untuk Kabel
-5/8-4m Batang 13,000
-3/4-4m Batang 30,000
-1"-4m Batang 40,000
-1,5"-4m Batang 40,000
2 Kabel Listrik
Type NYK
-1 1/2 mm Meter 7,500
-2 1/2 mm Meter 10,000
Type NYY
- 2X1 1/2mm Meter 9,500
-2x2 1/2mm Meter 13,000
-2x4 mm Meter 18,000
Type 2X4 mm
- Kabel NYM (3x4) mm Meter 19,000
- Kabel NYM (3x2,5) mm Meter 12,000
- Kabel NYM (2x2,5) mm Meter 9,000
3 Lampu TL
-1x20 w Buah 60,000
-2x20 w Buah 200,000
-1x40 w Buah 110,000
-2x40 w Buah 185,000
4 Lampu Pijar
- 25 Wat Buah 10,000

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)

NO JENIS BARANG SPESIFIKASI SATUAN HARGA

1 2 3 4 5
- 40 wat Buah 10,000
- 60 Wat Buah 10,000
- 100 Wat Buah 10,000
5 Lampu Sorot
- LED 50 Wat Buah 190,000
- LED 140 Wat Buah 1,000,000
- LED 300 Wat Buah 3,000,000
6 Armatur Lampu Set 650,000
7 Kontraktor
-20A Buah 650,000
-32A Buah 650,000
8 Timer Analog Buah 450,000
9 Kilip Kabel Dos 16,000
10 MCB
- 16 A Buah 55,000
- 20 A Buah 50,000
- 25 A Buah 55,000
11 BOX MCB 40 x 60 Buah 650,000
12 Foto Sell Buah 100,000
13 KWH Meter Listrik
- 5500 Wat PB 8,000,000
- 7700 Wat PB 15,000,000
14 Service Klem Buah 5,000
15 Konektor Buah 15,000
16 Sisir MCB Meter 50,000
17 Rel MCB Meter 25,000
18 Aram Buah 120,000
19 Lampu Tanam Mercury Set 120,000
20 Saklar Phase
- Tunggal Putih ( Panasonic ) Buah 14,000
- Tunggal Hitam ( Panasonic ) Buah 28,000
- Ganda Putih Buah 25,000
- Ganda Hitam Buah 42,000
21 Stok Kotak
- Hitam Buah 29,000
- Putih Buah 14,000
22 Skring Case Lokal Biasa
- Lokal 2 Grup Autinatis Buah 5,000
- Lokal 3 Grup Biasa Buah 13,000
9 Fitting Buah 12,000
10 Klem Kabel No.10 Buah 17,000
11 Kabel ITC (2x2x0,6) Buah 14,000
12 Klem Kabel No.12 Buah 13,000
13 Inbow Dos Buah 3,000
14 Las Dop Buah 1,500
15 Isolasi Roll 8,000
16 T-Doas 5/8" Buah 3,000
17 Stop Kontak Telpon Buah 45,000
18 Kontak Sambungan Buah 6,400

UPAH KERJA
1 Mandor Org/Hr 100,000
2 Kepala Tukang Org/Hr 130,000
3 Tukang Org/Hr 110,000
4 Pekerja Org/Hr 90,000
5 Mekanik Terampil Org/Hr 105,000
6 Mekanik Tak Terampil Org/Hr 92,000
7 Operator Terampil Org/Hr 170,000
8 Operator Tak Terampil Org/Hr 120,000
9 Pembangtu Operator Org/Hr 95,000
10 Sopir Truk Org/Hr 100,000
11 Pembantu Sopir Org/Hr 80,000

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
STANDAR HARGA SATUAN BAHAN BANGUNAN DAN UPAH KERJA
PEMERINTAH PRVINSI SULAWESI SELATAN
KOTA PARE-PARE
TAHUN 2018
Dalam Rupiah (Rp)

NO. JENIS BARANG MERK / UKURAN SATUAN HARGA

1 2 3 4 5
A. BAHAN DASAR
1 Aspal Bitumen (drum) Kg 13,500
Aspal Bitumen (curah) Kg 150,000
2 Abu Batu M³ 125,000
3 Batu Kali
* Utuh M³ 125,000
* Split 7 - 10 cm M³ 135,000
* Split 5 - 7 cm M³ 175,000
* Split 3 - 5 cm M³ 180,000
* Split 2 - 3 cm M³ 225,000
* Split 1 - 2 cm M³ 235,000
* Split 0.5 - 1 cm M³ 275,000
4 Batu Gunung M³ 125,000
Batu Border M³ 226,000
5 Timbunan
* Tanah M³ 38,750
* Pilihan M³ 50,000
* Tanah (Quarry) M³ 30,000
* Pilihan (Quarry) M³ 37,500
6 Batu Merah Buah 600
7 Batako 20x40x10 cm Buah 6,500
8 Gorong-gorong
* Diameter 20 cm 6x10x20 M¹ 80,000
* Diameter 30 cm 8x10x20 M¹ 145,000
* Diameter 40 cm Tebal 6 M¹ 185,000
* Diameter 50 cm Tebal 6 M¹ 260,000
* Diameter 60 cm Tebal 6 M¹ 267,000
* Diameter 80 cm Tebal 6 M¹ 384,330
* Diameter 100 cm Tebal 6 M¹ 512,440
9 Kapur Pasangan M³ 86,095
10 Kerikil Galian Royalti M³ 175,000
11 Kerikil Sirtu Royaliti M³ 187,500
12 Pasir
* Urug M³ 100,000
* Pasangan M³ 112,500
* Beton M³ 115,000
13 Paving Blok
* Segi empat 6x10x20 Buah 1,300
* Segi empat 8x10x20 Buah 1,580
* Segi enam Tebal 6 Buah 1,700
* Kacang Tebal 6 Buah 2,000
* Tiga berlian Tebal 6 Buah 1,500
* Bundar Tebal 6 Buah 1,610
14 Roster Krawang Buah 22,000
15 Sirtu M³ 81,250
16 Sirtu royalti M³ 105,000

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)

NO. JENIS BARANG MERK / UKURAN SATUAN HARGA

1 2 3 4 5
17 Ijuk ikat 15,000
B. BAHAN KAYU
1 Kayu Kelas I
* Balok Ulin M³ 12,000,000
* Papan Ulin M³ 12,000,000
* Balok Bayam M³ 8,250,000
* Papan Bayam M³ 12,250,000
2 Kayu Kelas II
* Balok M³ 5,750,000
* Papan M³ 6,150,000
* Balok Kumia M³ 6,000,000
* Papan Kumia M³ 6,500,000
* Balok Kalapi M³ 6,500,000
3 Kayu Kelas III ( Bekisting )
* Balok M³ 1,800,000
* Papan M³ 1,800,000
4 Kayu Lapis
* 4 mm 8" x 4" Lembar 65,000
* 12 mm 8" x 4" Lembar 175,000
5 Kayu Les M' 15,000
6 Bambu Btg 28,000
7 Tripleks
* 0.2 cm 122 x 244 cm Lembar 42,500
* 0.3 cm 122 x 244 cm Lembar 50,000
* 0.4 cm 122 x 244 cm Lembar 65,000
* 0.6 cm 122 x 244 cm Lembar 75,000
* 0.9 cm 122 x 244 cm Lembar 105,000
8 Multipleks
* 6 mm Lembar 80,000
* 10 mm Lembar 150,000
9 List Profil Kayu Btg 15,000
10 Teakwood 4 mm ( 90 x 220 ) Lembar 130,000
C. BAHAN BESI
1 Besi Beton
* d = 4 mm SII-SNI Polos Btg 12,000
* d = 6 mm SII-SNI Polos Btg 27,250
* d = 8 mm SII-SNI Polos Btg 41,250
* d = 10 mm SII-SNI Polos Btg 61,000
* d = 12 mm SII-SNI Polos Btg 88,500
* d = 14 mm SII-SNI Polos Btg 127,500
* d = 16 mm SII-SNI Polos Btg 170,000
* d = 19 mm SII-SNI Polos Btg 195,000
* d = 22 mm SII-SNI Polos Btg 250,000
2 Besi Beton Polos kg 12,500
3 Besi Beton
* d = 10 mm SII-SNI Ulir Btg 57,000
* d = 12 mm SII-SNI Ulir Btg 75,000
* d = 14 mm SII-SNI Ulir Btg 135,000
* d = 16 mm SII-SNI Ulir Btg 180,000
* d = 19 mm SII-SNI Ulir Btg 200,000
* d = 22 mm SII-SNI Ulir Btg 275,000
4 Besi Beton Ulir kg 16,000

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)

NO. JENIS BARANG MERK / UKURAN SATUAN HARGA

1 2 3 4 5
5 Besi Plat
* 2 mm 120x240 mm Lembar 550,000
* 3 mm 120x240 mm Lembar 900,000
6 Besi Strip
* 30.2 mm Btg 20,000
* 30.3 mm Btg 30,000
* 35.4 mm Btg
* 40.4 mm Btg 50,000
* 40.6 mm Btg 75,000
* 50.6 mm Btg
7 Besi Siku
* 30.30.3 Btg 67,500
* 40.40.3 Btg 100,000
* 40.40.4 Btg 125,000
* 50.50.5 Btg 187,000
* 60.60.6 Btg 450,000
* 70.70.7 Btg 550,000
8 Besi Hollow
* Besi Hollow 20.20 Btg 67,500
* Besi Hollow 20.40 Btg 100,000
* Besi Hollow 40.40 Btg 132,500
* Besi Hollow 50.50 Btg 192,500
9 Besi Kotak d = 12 mm kg 15,985
10 Kawat
* Kawat Galvanis 0 3 mm Kg 12,500
* Kawat Galvanis 0 4 mm Kg 12,500
* Kawat Galvanis 0 5 mm Kg 12,500
* Licin 4 mm Kg 25,000
* Beton kg 20,000
* Bronjong d = 6 mm kg 25,000
* Bronjong Pabrikasi Uk. 2x10.5 m¹ Buah 350,000
* Nyamuk Meter 35,000
* Ayakan Kecil Meter 17,500
* Duri 100 m/roll Roll 200,000
12 Kuku Macan d = 1.5" Buah 28,000
d = 1.0" Buah 25,000
d = 0.5" Buah 20,000
13 Tali Seling d = 36 mm M¹ 213,900
d = 32 mm M¹ 157,000
d = 28 mm M¹ 80,500
d = 24 mm M¹ 72,500
d =19 mm M¹ 50,700
14 Paku
* Biasa Kg 17,600
* Asbes kg 51,600
* Seng (Payung) RRT kg 51,600
* Skrup 3½ inci kg 45,000
* Skrup 4 inci kg 60,000
* Payung Berulir 75 mm kg 50,000
* Sirap kg 25,000
* Beton kg 20,000
* Ramset bh 225,000

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)

NO. JENIS BARANG MERK / UKURAN SATUAN HARGA

1 2 3 4 5
15 Baja Ringan (Main Truas) M²
16 Trus Canal / TS C75.75 Taso 6m 85,000
17 Reng U 45. 0.45 6m 55,000
18 Screw 12-16x16 bh 200
19 Screw 12-14x20 bh 250
20 Dyna Bolt 10.80 bh 7,000
21 Aluminium 4 inci (warna) M 119,500
22 Aluminium Composit Panel M² 255,300
23 Besi angkur dia =8 mm kg 10,500
24 Kawat las kg 25,000
25 Saringan Pasir M' 10,000
D. BAHAN LANTAI
1 Tegel PC
* PC Abu-abu 20x20 cm buah 2,308
* PC Abu-abu 30x30 cm buah 5,000
* PC Warna 20x20 cm buah 2,308
* PC Badak 20x20 cm buah 2,308
* PC Badak 30x30 cm buah 5,909
* PC Wafel 20x20 cm buah 2,415
* PC Wafel 30x30 cm buah 6,555
* Plint PC 15x20 cm buah 3,100
* Plint PC 15x20 cm buah 3,100
2 Tegel Mozaik
* Mozaik 30 30x30 cm buah 10,000
* Mozaik 20 20x20 cm buah 42,000
3 Tegel Keramik
* Putih 10x10 cm buah 1,380
* Warna 10x20 cm buah 1,300
* Putih 20x20 cm buah 2,500
* Warna 20x20 cm buah 3,000
* Putih 20x25 cm buah 3,250
* Warna 20x25 cm buah 3,750
* Putih 30x30 cm buah 5,000
* Warna 30x30 cm buah 7,100
* Putih 40x40 cm buah 12,500
* Warna 40x40 cm buah 16,700
* Putih 60x60 cm buah 105,500
* Warna ext Esenza / 60x60 cm buah 117,000
* Plint 11 11x11 cm buah 1,150
* Plint 20 20x25 cm buah 3,180
4 Glass Blok 6/dos dos 137,500
5 Kuku Tegel 180 bj/dos dos 92,500
6 Terasso 30x30 cm buah 70,000
40 x 40 cm buah 85,000
7 Parquet m2 265,000
8 Lem FOX putih kg 18,000
FOX kuning ( karet ) kg 50,000
9 keramik artistik 5 x 20 cm m2 57,500
10 x 20 cm m2 69,000
20 x 20 cm m 2
79,000
10 Granito 60x60 cm m2 210,000

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)

NO. JENIS BARANG MERK / UKURAN SATUAN HARGA

1 2 3 4 5
11 Marmer 100 x 100 cm m2 504,000
40 x 40 cm m 2
430,000
60 x 60 m 2
479,000
12 Batu Tempel / Alam Batu Andesid m2 150,000
Batu Alam m 2
150,000
Batu Paras m 2
235,000
13 Wallpaper lbr 50 cm bh 350,000
14 Floor Hardener kg 10,695
E. BAHAN PIPA
1 Pipa PVC tipe AW
* Pipa PVC Tipe AW Ǿ 1/2" panjang 4 m Btg 20,000
* Pipa PVC Tipe AW Ǿ 3/4" panjang 4 m Btg 25,000
* Pipa PVC Tipe AW Ǿ 1" panjang 4 m Btg 35,000
* Pipa PVC Tipe AW Ǿ 1 1/2" panjang 4 m Btg 64,625
* Pipa PVC Tipe AW Ǿ 1 1/4" panjang 4 m Btg 55,000
* Pipa PVC Tipe AW Ǿ 2" panjang 4 m Btg 82,500
* Pipa PVC Tipe AW Ǿ 2 1/2" panjang 4 m Btg 108,000
* Pipa PVC Tipe AW Ǿ 3" panjang 4 m Btg 142,500
* Pipa PVC Tipe AW Ǿ 4" panjang 4 m Btg 222,500
* Pipa PVC Tipe AW Ǿ 5" panjang 4 m Btg 407,500
* Pipa PVC Tipe AW Ǿ 6" panjang 4 m Btg 525,000
* Pipa PVC Tipe AW Ǿ 8" panjang 4 m Btg 835,000
2 Pipa PVC tipe D
* Pipa PVC Tipe D Ǿ 1 1/4" panjang 4 m Btg 36,125
* Pipa PVC Tipe D Ǿ 1 1/2" panjang 4 m Btg 42,250
* Pipa PVC Tipe D Ǿ 2" panjang 4 m Btg 51,875
* Pipa PVC Tipe D Ǿ 2 1/2" panjang 4 m Btg 62,500
* Pipa PVC Tipe D Ǿ 3" panjang 4 m Btg 70,000
* Pipa PVC Tipe D Ǿ 4" panjang 4 m Btg 102,500
* Pipa PVC Tipe D Ǿ 5" panjang 4 m Btg 180,000
* Pipa PVC Tipe D Ǿ 6" panjang 4 m Btg 250,000
* Pipa PVC Tipe D Ǿ 8" panjang 4 m Btg 450,000
* Pipa PVC Tipe D Ǿ 10" panjang 4 m Btg 765,000
* Pipa PVC Tipe D Ǿ 12" panjang 4 m Btg 1,200,000

3 Pipa jenis Btg C untuk Instalasi Listrik


Φ 5/8 inci - 4 m btg 8,500
Φ 3/4 inci - 4 m btg 22,000
Φ 1 inci - 4m btg 35,000
Φ 1 1/2 inci - 4 m btg 35,000
Φ 2 inci - 4 m btg 45,000
4 Sambungan Pipa
a Knie
* Knie 1/2" Buah 3,000
* Knie 3/4" Buah 4,500
* Knie 1" Buah 6,000
* Knie 1 1/4" Buah 8,000
* Knie 1 1/2" Buah 10,000
* Knie 2" Buah 12,000
* Knie 3" Buah 15,000

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)

NO. JENIS BARANG MERK / UKURAN SATUAN HARGA

1 2 3 4 5
* Knie 4" Buah 25,000
b Lurus
* Lurus 1/2" Buah 3,000
* Lurus 3/4" Buah 4,500
* Lurus 1" Buah 6,000
* Lurus 1 1/4" Buah 8,000
* Lurus 1 1/2" Buah 10,000
* Lurus 2" Buah 12,000
* Lurus 3" Buah 15,000
* Lurus 4" Buah 25,000
c Tee
* Tee 1/2" Buah 3,500
* Tee 3/4" Buah 4,600
* Tee 1" Buah 5,600
* Tee 1 1/4" Buah 8,000
* Tee 1 1/2" Buah 10,000
* Tee 2" Buah 12,500
* Tee 3" Buah 20,000
* Tee 4" Buah 25,000
7 Isolasi Pipa Buah 5,000
F. BAHAN FINISHING CAT
1 Cat Tembok
* Avitex 5 Kg 105,000
* Metrolite 2.5 Kg 95,000
* Mowilex (Luar) 2.5 Kg 240,000
* Mowilex (Dalam) 2.5 Kg 150,000
2 Cat Besi Kg
3 Cat Kayu
* Glotex Kg 49,000
* Avian Kg 57,000
* Politur Kg 55,000
* Meni Kayu Kg 25,000
* Mowilex Liter 75,000
4 Minyak Cat kg 22,000
5 Minyak Bekisting Kg 20,000
6 Cat Atap
* Yoko 4 Kg 99,000
* AGA 4 Kg 180,000
7 Cat Anti Karat Kg 65,000
8 Cat Coating Liter
9 Dempul Kg 30,000
10 Dempul Jadi Kg 25,000
11 Ampelas Lembar 5,000
12 Kuas 4" Buah 20,000
13 Kuas 3" Buah 16,500
14 Kuas 2" Buah 12,500
15 Kuas 1" Buah 6,300
16 Plamir Kayu Kg 32,500
17 Plamir Tembok Kg 37,500
18 Politur Liter 50,000
19 Politur Jadi Liter
20 Vernis Liter 57,500

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)

NO. JENIS BARANG MERK / UKURAN SATUAN HARGA

1 2 3 4 5
21 Pengencer Cat Kayu/Besi Kg 22,000
22 Cat genteng Kg
23 Kuas Roll Buah 40,000
24 Kapur Ayak Bks 46,000
25 Lem Kayu Kg 15,000

G. BAHAN KACA
1 Kaca
* Polos/Bening 2 mm M² 70,000
* Polos/Bening 3 mm M² 95,000
* Polos/Bening 5 mm M² 120,000
* Polos/Bening 8 mm M² 500,000
* Buram 3 mm M² 187,500
* Buram 5 mm 225,000
* Rayben 3 mm M² 105,000
* Rayben 5 mm M² 130,000
* Biru M² 275,000
* Cermin M² 450,000
* Gravire M² 1,000,000
* Lukis Alur M² 900,000
2 Rangka Nako Lengkap Terali 10 mm Set 180,000
3 Seal Besar Buah 60,000
4 Seal Kecil Buah 40,000
5 Sealant Tube 29,450
6 Sealant Kaca Kg 35,000
H. BAHAN LANGIT-LANGIT
1 Eternit 100x100 cm lembar 20,000
2 Tripleks
* 0.2 cm 122x244 cm lembar 40,000
* 0.3 cm 122x244 cm lembar 50,000
* 0.6 cm 122x244 cm lembar 75,000
* 0.9 cm 122x244 cm lembar 105,000
3 Tripleks Melamin 122x244x1.2 cm lembar 67,500
4 Akustik 40x60 cm lembar 52,000
5 Teakwood
* 0.4 cm 122x244 cm lembar 125,000
* 0.3 cm 122x244 cm lembar 130,000
* 0.3 cm 80x244 cm lembar 90,000
6 Hard Board 122x244 cm lembar 220,000
7 Asbes Plat Harfek 0.3 cm 200x100 cm lembar 45,300
8 Papan Gypsum
* 9 mm 120x240 cm lembar 62,500
* 12 mm 120x240 cm lembar 100,000
9 Papan Fiber Semen
* 6 mm 120x240 cm lembar 125,000
* 4 mm 120x240 cm lembar 57,500
10 List Profil Kayu
* 2x3 cm lembar 13,000
* 3x3 cm lembar 15,000
* 4x4 cm lembar 17,000
* 5x5 cm lembar 20,000
11 List Profil Gypsum

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)

NO. JENIS BARANG MERK / UKURAN SATUAN HARGA

1 2 3 4 5
* 17 x 210 cm lembar 27,000
* 12 x 210 cm lembar 25,000
12 Multipleks
* 6 mm lembar 75,000
* 10 mm lembar 110,000
I. BAHAN ATAP
1 Genteng
* Beton Buah 35,000
* Keramik lembar 15,000
* Asbes lembar 45,000
* Harflex (115x0.5) kaki 65,000
2 Asbes Gelombang 5 mm 7 kaki 6,000
3 Seng Kelombang
* BWG 34" BJLS 0.20 mm kaki 6,125
* BWG 33" BJLS 0.22 mm kaki 9,167
* BWG 32" BJLS 0.22 mm kaki 11,667
* BWG 28" BJLS 0.35 mm kaki 14,167
4 Seng Plat
* BJLS 0.30 mm Lembar 65,000
* BJLS 0.28 mm Lembar 80,000
5 Genteng Metal
* Kualitas 1 Lembar 85,000
* Kealitas 2 Lembar 47,000
6 Seng aluminium Gelombang
* SWG 32" 0.27 mm Lembar 20,500
* SWG 32" 0.31 mm Lembar 22,100
* SWG 32" 0.38 mm Lembar 30,613
7 Spandeck / Essar Deck
* 75 cm x 0.40 cm M² 50,000
* 76 cm x 0.40 cm M²
8 Seng Plastik (Fiber) Kaki 15,000
9 Fiber Semen (Harflex)
* Super 240x108x0.6 cm Lembar 72,500
* Super 180x108x0.6 cm Lembar 65,000
* Ekonomi 240x29x0.5 cm Lembar 65,000
* Ekonomi 180x29x0.5 cm Lembar 60,000
* Mini 240x105x0.4 cm Lembar 60,000
* Mini 180x105x0.4 cm Lembar 55,000
* Super 240x105x0.4 cm Lembar 62,500
* Super 180x105x0.4 cm Lembar 57,000
10 Nok / Bubungan
* Genteng Metal Buah 30,000
* Genteng Asbes Buah 25,000
* Genteng Keramik Buah 24,200
* Alm. SWG 28" - 180 cm Lembar 59,000
* Alm. SWG 28" - 105 cm Lembar 40,000
11 Nok Steel Gelombang
* Super 180 cm Buah 50,000
* Mini 105 cm Buah 40,000
* ekonomi 95 cm Buah 20,000
12 Nok Steel Rata
* Super 180 cm Lembar 45,000

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)

NO. JENIS BARANG MERK / UKURAN SATUAN HARGA

1 2 3 4 5
* Mini 105 cm Lembar 25,000
* ekonomi 95 cm Lembar 20,900
13 Nok 1/2 Lingkungan Lembar 37,000
14 Nok Spandek 40 cm
* 40 cm x 0.40 cm 120x240 mm Lembar 57,000
* 30 cm x 0.25 cm 212x240 mm Lembar 38,000
15 Karet Pelapis Genteng
* Lebar 55 cm M¹
* Lebar 90 cm M¹
* Lebar 120 cm M¹
16 Talang Jurai Aluzinc (Baja Ringan)
* Jurai Aluzinc (Baja Ringan) M
* Setengah Lingkaran Btg 45,000
* Segi Empat Btg 25,000
17 Corong Talang
* Setengah Lingkaran Buah 60,000
* Segi Empat Buah 50,000
18 Sambungan Talang Buah 15,000
19 List Plank Papan Semen (superplank)
* 10 x 244 x 0.9 cm Lembar 32,500
* 20 x 244 x 0.9 cm Polos Lembar 65,000
* 30 x 244 x 0.9 cm Polos Lembar 85,000
* 20 x 244 x 0.9 cm Urat Lembar 75,000
* 30 x 244 x 0.9 cm Urat Lembar 110,000
20 Rangka Baja
* Untuk Atap Spandek M² 192,800
* Untuk Atap Genteng Metal M² 201,000
21 Suryaroof Lembar 52,500
22 Multiroof Lembar 83,500
J. BAHAN PENGGANTUNG
1 Door Closer Buah 250,000
2 Door Holder Buah 30,000
3 Floor Drain
* Floor Drain PVC Buah 25,000
* Floor Drain Stainless Buah 25,000
4 Engsel
* Engsel Angin Buah 15,000
* Engsel Jendela Buah 20,000
* Engsel Pintu ( kw 2 ) Buah 17,500
* Engsel Pintu ( kw 1 ) Buah 30,000
* Engsel Kupu-kupu Buah 15,000
* Engsel Lengan Jendela Buah 20,000
5 Kait Angin Buah 22,500
6 Kunci Lemari Buah 25,000
7 Kunci Selot Buah 40,000
8 Kunci Silinder Buah 60,000
9 Kunci Tanam
* Union 2x Slag (Biasa) Buah 35,000
* Benotti 2x Slag (semacamnya) Buah 175,000
* Ses 2x Slag (semacamnya) Buah 250,000
* Ses 1x Slag (semacamnya) Buah 203,500

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)

NO. JENIS BARANG MERK / UKURAN SATUAN HARGA

1 2 3 4 5
10 Spring Knip Buah
11 Gerendel Tanam /Psg 175,000
12 Grendel Biasa Buah 15,000
13 Handle pintu Buah 150,000
14 Rel Pintu Sorong Buah 450,000
15 1 Set Kunci Pintu ( kw 1 ) Buah 200,000
16 1 Set Kunci Pintu ( kw 2 ) Buah 150,000
17 Expanyolet Buah 125,000
Buah

K. BAHAN SANITAIR
1 Kloset duduk KIA (Lengkap) Buah 1,500,000
Toto 1 Tombol 1,850,000
2 Kloset Jongkok KIA Buah 250,000
Toto Warna 370,000
3 Wasthafel Gantung Keramik Buah 750,000
4 Wasthafel Cuci Piring 1 Mata Buah 175,000
5 Wasthafel Cuci Piring 2 Mata Buah 750,000
6 Pompa Tangan Terpasang Buah 139,250
7 Pompa Air Sanyo Buah 1,500,000
8 Urinoir Buah 1,750,000
9 Bak Mandi Fiber Buah 1,000,000
10 Reservoir Fiber = 1 M³ Buah 1,300,000
11 Reservoir Fiber = 2 M³ Buah 2,750,000
12 Stop Kran Buah 10,000
13 Tempat Sabun Keramik Buah 50,000
14 Kran Air
* Biasa Buah 20,500
* Angsa Buah 100,000
* Kristal Buah 150000
* Pembuangan Kolam Buah 20,000
15 Pintu KM/WC (180x70) cm (fiber) Buah 235,000
16 Pintu KM/WC (180x70) cm (alumunium) Buah 250,000
17 Door Closer Buah 187,500
18 Floor drain Buah 25,000
L. BAHAN INSTALASI LISTRIK
1 Pipa Union Untuk Kabel
Φ 5/8 inci - 4 m Btg 8,250
Φ 1 inci - 4 m Btg 37,500
Φ 1 1/2 inci - 4 m Btg 64,500
Φ 2 inci - 4 m Btg 82,000
2 Lampu Neon
* 1x20 W Philips Buah 15,000
* 2x20 W (Pakai Kap) Philips Buah 154,000
* 1 x 36 W Buah 18,000
* 1x40 W Buah 20,000
* 2x36 W (Pakai Kap) Buah 65,000
* 2x40 W (Pakai Kap) Buah 65,000

3 Lampu Pijar
* 24 Wat 9,000
* 25 Wat Buah

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)

NO. JENIS BARANG MERK / UKURAN SATUAN HARGA

1 2 3 4 5
* 40 Wat Buah 10,000
* 42 Wat Buah 10,000
* 52 Wat Buah 10,000
* 60 Wat Buah 10,000
* 100 Wat Buah 25,000
4 Lampu Tanam Mercury (Lam. Jln SON) Buah 225,000
5 Shakelar Phase
* Coklat Buah 55,000
* Putih Tunggal Buah 17,000
* Putih Ganda Buah 26,000
6 Fitting Buah 10,000
7 Exhaust Besar
* Panasonic (dinding) Buah 425,000
* Panasonic (plafond) Buah 450,000
8 Exhaust sedang 26,000
* Panasonic (dinding) Buah 375,000
* Panasonic (plafond) Buah 400,000
9 Down Light
Φ 4 Inci Buah 50,000
Φ 3.5 inci Buah 44,000
10 Travo
* TL 10 Wat Buah 35,000
* TL 20 Wat Buah 40,000
* TL 30 Wat Buah 40,000
11 Lampu SL 32 Wat Buah 60,000
12 Lampu SL 42 Wat Buah 70,000
13 Lampu TL 2 X 18 Wat Buah 28,000
14 Lampu TL 2 X 36 Wat Buah 32,000
15 Lampu SON-T 150 Wat ( komplit set) Set 280,000
16 Lampu HPI.T 250 W /220 V Komplit Set Set 750,000
17 Lampu HPI.T 400 W /220 V Komplit Set Set 750,000
18 Lampu Hias Selang M' 1,400,000
19 Trafo SON.T 150 W /220 V Buah 210,000
20 MCB 6 A Masko/3p Buah 100,000
21 MCB 10 A Scheineider/1p Buah 50,000
22 MCB 25 A Scheineider/1p Buah 56,667
23 MCB 30 A Buah 85,000
24 Kabel NYM 2 x 1,5 mm2 Eterna m' 7,500
25 Kabel NYM 2 x 2,5 mm2 Eterna m' 10,000
26 Kabel NYM 2 x 4 mm2 m' 25,000
27 Kabel NYM 3 x 1,5 mm2
28 Kabel NYM 3 x 2,5 mm2
29 Kabel NYM 3 x 4 mm2
30 Kabel NYM 3 x 1,5 mm2
31 Kabel NYM 3 x 2,5 mm2
32 Kabel NYM 3 x 4 mm2
33 Kabel NYM 4 x 4 mm2
34 Kabel NYM 4 x 6 mm2
35 Kabel NYM 1,5 mm2
36 Kabel NYM 2,5 mm2
37 Kap Hijau E 27
38 Kap Hijau E 40

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)

NO. JENIS BARANG MERK / UKURAN SATUAN HARGA

1 2 3 4 5
39 Ballast TL 36
40 Fitting Lampu Pijar
41 Isolasi Biasa 3 M
42 Kabel Twisted 2 x10 mm
43 Kabel Twisted 2 x16 mm
44 Kapasitor HPI-T
45 Lampu Sorot LED 10 wat
46 Lampu Sorot LED 100 wat
47 Lampu Natal
48 Lampu Selang LED
49 Lampu Sumpit 45 W
50 Lampu Spiral 52 W
51 Lampu LED 3 Wat
52 Lampu LED 3,5 Wat
53 Lampu LED 4 Wat
54 Lampu LED 5 Wat
55 Lampu LED 9 Wat
56 Lampu LED 13 Wat
57 Lampu LED 18 Wat
58 Lampu LED 23 Wat
59 Lampu TL 36 W
60 Lampu TL 20 W
61 MCB 2 A
62 MCB 4 A
63 MCB 6 A
64 MCB 50 A
65 MCB 63 A
66 Stop Kontak 3 mata
67 Terminal 4 mm
68 Timer
69 Paku Sadel
70 Sambungan Fitting( over fitting )
71 Mata gurinda kecil
72 Mata gurinda potong 14'
73 Gurinda Besi
74 Kacamata Las
75 Fotocell 3 A
76 Lampu strip
77 Testpen
78 Obeng Min
79 Obeng Kembang
80 Silicon

M. BAHAN BAKAR MINYAK


1 Pertamax Ltr 8,600
2 Pertalite Ltr 7,700
3 Solar Ltr 5,150
4 Bensin Ltr 6,450
5 Thinner A Ltr 35,000
6 Minyak Cat Kg 20,000

N BAHAN PEREKAT

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)

NO. JENIS BARANG MERK / UKURAN SATUAN HARGA

1 2 3 4 5
1 Semen PC ( 40 kg )
* Tonasa
* Bosowa
* Putih Tiga Roda
2 Semen PC ( 50 kg )
* Tonasa
* Bosowa
* Putih Tiga Roda
3 Semen Warna
4 Perekat untuk walpaper
5 Semen nat

O BAHAN DRAINASE
1 U - Ditch 600 x 600 mm, panjang 1,2 m unit 805,200
2 U - Ditch 800 x 800 mm, panjang 1,2 m unit 1,168,200

P BAHAN BETON PRECAST


1 Tiang pancang pratekan pracetak Ǿ 400 mm Kelas A2(Botom) M' 411,400
spun piles
2 Tiang pancang pratekan pracetak Ǿ 400 mm Kelas A2(Middle) M' 446,600
spun piles
3 Tiang pancang pratekan pracetak Ǿ 500 mm Kelas A2(Botom) M' 618,200
spun piles
4 Tiang pancang pratekan pracetak Ǿ 500 mm Kelas A2(Middle) M' 672,100
spun piles
5 Sheetpile type CCSP W.325.1000 kls A M' 930,000
6 Sheetpile type CCSP W.350.1000 kls A M' 1,072,500

Q UPAH KERJA
1 Mandor Lapangan Orang/Hari 165,000
2 Kepala Tukang Kayu Orang/Hari 141,000
3 Kepala Tukang Batu Orang/Hari 141,000
4 Kepala Tukang Listrik Orang/Hari 141,000
5 Kepala Tukang Cat Orang/Hari 141,000
6 Kepala Tukang Pipa Orang/Hari 141,000
7 Kepala Tukang Besi Orang/Hari 141,000
8 Tukang Kayu Orang/Hari 124,000
9 Tukang Batu Orang/Hari 124,000
10 Tukang Listrik Orang/Hari 124,000
11 Tukang Cat Orang/Hari 124,000
12 Tukang Pipa Orang/Hari 124,000
13 Tukang Besi Orang/Hari 124,000
14 Tukang Listrik Orang/Hari 124,000
15 Tukang Pipa Orang/Hari 124,000
16 Pekerja Orang/Hari 124,000
17 Mekanik Orang/Hari 141,000
18 Sopir Orang/Hari 130,000
19 Pembantu Sopir Orang/Hari 106,000
20 Operator Orang/Hari 141,000
21 Pembantu Operator Orang/Hari 106,000
22 Penjaga Malam Orang/Hari 106,000

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
STANDAR HARGA SATUAN BAHAN BANGUNAN DAN UPAH KERJA
PEMERINTAH PROVINSI SULAWESI SELATAN
KABUPATEN BONE
TAHUN 2018

Dalam Rupiah (Rp)


No BAHAN DASAR SPESIFIKASI SATUAN HARGA

1 2 3 4 5
1 Batu Kali Utuh M3 223,750
-Batu Pecah split 10-15 M3 295,000
-Batu Pecah Split 7 - 10 cm M 3
340,500
-Batu Pecah Split 5 - 7 cm M3 410,000
-Batu Pecah Split 3 - 5 cm M3 440,000
-Batu Pecah Split 2 - 3 cm M 3
520,000
-Batu Pecah Split 1 - 2 cm M 3
550,000
-Batu Pecah Split 0,5 - 1 cm M3 550,000
Abu Batu M 3
752,000
2 Batu Gunung M 3
234,000
3 Tanah Timbunan M3 110,000
4 Pasir Timbunan/Urug M 3
155,000
Pasangan M 3
165,000
Beton M3 183,525
5 Kerikil M3 209,000
6 Sirtu M 3
131,750
7 Kapur Pasangan Zak 70,950
8 Semen (PC) Tonasa 50 Kg Zak 59,500
Tonasa 40 Kg Zak 57,357
Putih Tiga Roda 50 kg Zak 140,250
Bosowa 50 Kg Zak 57,300
Bosowa 40 Kg Zak 56,833
9 Batu Merah Buah 750
10 Batako Press Buah 11,770
11 Paving Blok k225 Persegi Panjang M² 83,825
Segi Enam M² 88,780
Kacang M² 99,000
Paving Blok K250 Persegi Panjang M² 124,500
Segi Enam M² 99,550
Kacang M² 99,550
Paving Blok K300 Persegi Panjang M² 88,350
Segi Enam M² 93,000
Kacang M² 102,300
Diamond (Manual) M² 93,500
Paving Blok K 350 Persegi Panjang M² 104,500
12 Consteen Beton 15 x 25 x 40 ( Press Mesin ) Buah 121,000

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)
No BAHAN DASAR SPESIFIKASI SATUAN HARGA

1 2 3 4 5
15 x 25 x 50 ( Press Mesin ) Buah 125,840
15 x 30 x 40 ( Press Mesin ) Buah 123,200
13 Topi Uskup K300 Buah 5,115
Gress Blok 3 x 45 cm Buah 25,080
Panel Beton 240 x 40 x 5 cm Buah 302,500
Tiang Panel Beton 5 Susun Buah 317,350
b. BAHAN KAYU
1 Kayu Kls I Balok Gergaji Sawmil M3 10,000,000
Papan Gergaji Sawmil M3 11,550,000
Balok Gergaji Sensaw M 3
9,075,000
Papan Gergaji Sensaw M3 9,900,000
2 Kayu Kls II Balok M3 3,837,500
Papan M 3
4,262,500
3 Kayu Kls III Balok M 3
2,500,000
Papan M3 2,750,000
Bambu Batang 24,625

c. BAHAN LANTAI
1 Tegel PC PC Abu-abu 20 x 20 cm Dos 122,250
PC Abu-abu 30 x 30 cm Dos 62,000
PC Warna 20 x 20 cm Dos 68,500
PC Badak 20 x 20 cm Dos 120,000
Pc Badak 30 x 30 cm Dos 66,000
PC Wafel 20 x 20 cm Dos 69,250
PC Wafel 30 x 30 cm Dos 44,000
Plint PC 20 x 20 cm Buah 66,000
Plint PC 30 x 30 cm Buah 71,500
Tegel Mozaik 30 x 30 cm Buah 67,833
2 Tegel Kramik Putih 10 x 20 cm Dos 71,638
Warna 10 x 20 cm Dos 72,417
Putih 20 x 20 cm Dos 69,679
Warna 20 x 20 cm Dos 55,217
Putih 20 x 25 cm Dos 73,938
Warna 20 x 25 cm Dos 59,764
Putih 30 x 30 cm Dos 71,944
Warna 30 x 30 cm Dos 164,450
Putih 40 x 40 cm Dos 148,500
warna 40 x 40 cm Dos 154,000
d. BAHAN KACA
1 Kaca Bening 3 mm M² 118,625
2 Kaca Bening 5 mm M² 133,250
3 Kaca Bening 2 mm M² 96,250
4 Kaca Buram 3 mm M² 177,750
5 Kaca Buram 5 mm M 248,750

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)
No BAHAN DASAR SPESIFIKASI SATUAN HARGA

1 2 3 4 5
6 Kaca Ryben 3 mm M 130,500
7 Kaca Ryben 5 mm M 145,125
8 Kaca / Cermin 122 x 51 cm M 79,625
9 Rangka Nako Tanpa Terali Mata Daun 17,488
8 Rangka Nako Lengkap Terali Daun 83,600
e. BAHAN FINISHING KAYU

Amplas halus untuk besi Amplas Lembar 4,333


Amplas kasar untuk kayu Lembar 3,891
Cat dasar Cap Ayam Kg 31,350
Dempul Kaleng Kecil 34,179
Lem aibon Kg 22,875
Mani kayu Kg 27,806
Minyak cat Liter 19,628
Oker Kg 40,250
Politur cap kayu / Jati Boyo Kg 56,994
Vernis spesial netral warna Kaleng 58,790
f. BAHAN BESI
1 Besi Beton ( SII ) diameter = 4 mm Batang 15,180
Panjang 12 Meter diameter = 6 mm Batang 33,000
diameter = 8 mm Batang 48,217
diameter = 10 mm Batang 70,522
diameter = 12 mm Batang 103,278
diameter = 14 mm Batang 146,163
diameter = 16 mm Batang 192,500
diameter = 19 mm Batang 268,767
diameter = 22 mm Batang 323,150
diameter = 25 mm Batang 435,600
2 Paku Paku biasa 4 - 10 cm Kg 18,040
Paku Asbes Ulir Kg 54,588
Paku Seng (payung) RRT Kg 51,810
Paku Skrup 3 1/2 inci Kg 77,000
Paku Skrup 4 inci Kg 77,000
Paku Payung Berulir 75 mm Kg 57,750
Paku Sirap 1 cm Kg 26,950
Paku Beton 5 - 10 cm putih Dos 38,438
2 - 4 cm hitam Dos 24,200
3 Kawat Beton Kg 24,444
Nyamuk M 24,600
Ayakan Kecil M 22,367
Duri Rol 268,500
4 Besi Plat 2 mm = 120 x 140 mm Lembar 660,000
3 mm = 120 x 140 mm Lembar 780,000
5 Besi Strep 30,3 mm 1 x 3 Batang 22,700
35,4 mm 1 1/2 x 4 Batang 30,700
46,4 mm 2 x 4 Batang 35,000

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)
No BAHAN DASAR SPESIFIKASI SATUAN HARGA

1 2 3 4 5
40,6 mm 2 x 6 Batang 56,700
50,6 mm 2 1/2 x 6 Batang 247,500
6 Besi Siku 30.30.3 Batang 66,500
40.40.4 Batang 70,100
50.50.5 Batang 190,587
60.60.6 Batang 316,250
70.70.7 Batang 388,500
40.40.3 Batang 57,500
50.50.4 Batang 114,750
7 Besi Kanal C 75/75 Batang 99,367
75/65 Batang 79,142
Reng 30/45 Batang 38,000
Besi Plafond 18/38 Batang 48,000
Besi Hallow 15/35 Batang 26,500
35/35 Batang 35,700
3m Batang 9,629
g. BAHAN PIPA
1 Pipa GIP Medium Class SNI / ISO Dia 1/2 inci - 6 m Batang 177,445
Dia 3/4 Inci - 6 m Batang 227,585
Dia 1 Inci - 6 m Batang 295,240
Dia 1/2 Inci - 6 m Batang 439,040
Dia 2 Inci - 6 m Batang 537,386
Dia 2 1/2 Inci - 6 m Batang 679,582
Dia 3 Inci - 6 m Batang 1,165,083
2 Pipa PVC SNI S10 (SCJ) Dia 1/2 Inci - 6 m Batang 29,261
Dia 3/4 Inci - 6 m Batang 43,413
Dia 1 Inci - 6 m Batang 71,645
Dia 1 1/2 Inci - 6 m Batang 167,325
Pipa PVC SNI S10 (RRJ)
Dia 2 Inci - 6 m Batang 275,415
Dia 2 1/2 Inci - 6 m Batang 396,453
Dia 3 Inci - 6 m Batang 556,370
Dia 4 Inci - 6 m Batang 830,720
Dia 6 Inci - 6 m Batang 1,729,500
Dia 8 Inci - 6 m Batang 2,806,513
Dia 10 Inci - 6 m Batang 4,365,214
Dia 12 Inci - 6 m Batang 6,931,335
Dia 14 Inci - 6 m Batang 8,914,570
Pipa PVC SNI S12.5 (RRJ)
Dia 2 Inci - 6 m Batang 231,150
Dia 2 1/2 Inci - 6 m Batang 329,935
Dia 3 Inci - 6 m Batang 466,458
Dia 4 Inci - 6 m Batang 673,458
Dia 6 Inci - 6 m Batang 1,415,995
Dia 8 Inci - 6 m Batang 2,293,575
Dia 10 Inci - 6 m Batang 3,589,265

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)
No BAHAN DASAR SPESIFIKASI SATUAN HARGA

1 2 3 4 5
Dia 12 Inci - 6 m Batang 5,700,435
Pipa PVC Orange SNI ( untuk LimbahDia 4 Inci Buah 485,750
3 PVC Jenis D untuk Saluran PembuanDia 1/2 Inci - 4 m Batang 42,550
Dia 3/4 Inci - 4 m Batang 52,900
Dia 1 Inci - 4 m Batang 55,200
Dia 1 1/2 Inci - 4 m Batang 57,500
Dia 2 Inci - 4 m Batang 69,000
Dia 2 1/2 Inci - 4 m Batang 86,250
Dia 3 Inci - 4 m Batang 100,050
Dia 4 Inci - 4 m Batang 155,250
Dia 5 Inci - 4 m Batang 241,500
Dia 6 Inci - 4 m Batang 310,500
Dia 8 Inci - 4 m Batang 529,000
Dia 10 Inci - 4 m Batang 545,250
4 PVC Jenis C Untuk Instalasi Listrik Clipsal 20 mm² (3m) Batang 13,100
Dia 5/8 Inci - 4 m Batang 18,000
Dia 3/4 Inci - 4 m Batang 28,000
Dia 1 Inci - 4 m Batang 37,250
Dia 1 1/2 Inci - 4 m Batang 99,000
5 Sock Pvc Dia 1/2 Inch Buah 3,500
Dia 3/4 Inch Buah 4,000
Dia 1 Inch Buah 7,000
Dia 1 1/4 Inch Buah 7,000
Dia 1 1/2 Inch Buah 8,000
Dia 2 Inch Buah 9,000
Dia 2 1/2 Inch Buah 9,500
Dia 3 Inch Buah 12,000
Dia 4 Inch Buah 17,000
6 Stop Kran PVC 12,000
Dia 1/2 Inch Buah 12,000
Dia 3/4 Inch Buah 17,000
Dia 1 Inch Buah 40,000
Dia 1 1/4 Inch Buah 47,000
Dia 1 1/2 Inch Buah 67,000
7 Stop Kran Gate Valve (SNI) Merk : Onda
Dia 1/2 Inch Buah 49,725
Dia 3/4 Inch Buah 73,875
Dia 1 Inch Buah 122,750
Dia 1 1/4 Inch Buah 191,750
Dia 1 1/2 Inch Buah 260,750
Dia 2 Inch Buah 364,250
Dia 2 1/2 Inch Buah 605,750
Dia 3 Inch Buah 789,750
Dia 4 Inch Buah 1,554,500
8 Tee Pvc (BIASA)
Dia 1/2 Inch Batang 5,000

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)
No BAHAN DASAR SPESIFIKASI SATUAN HARGA

1 2 3 4 5
Dia 3/4 Inch Batang 7,000
Dia 1 Inch Batang 7,000
Dia 1 1/4 Inch Batang 8,000
Dia 1 1/2 Inch Batang 9,000
Dia 2 Inch Batang 12,000
Tes SNI Dia 4 Inch Buah 127,000
9 Bend 90° Dia 4 Inch Buah 147,000
10 IPAL Fiber Glass ISO 5 m³ Buah 147,000
10 m³ Buah 87,752,550
15 m³ Buah 132,760,250
20 m³ Buah 177,013,000
h. BAHAN LANGIT-LANGIT
1 Enternit 100 x 100 Lokal Harpur Lembar 22,000
2 Tripleks 122 x 244 x 0.2 cm Lembar 52,000
122 x 244 x 0.3 cm Lembar 52,000
122 x 244 x 0.6 cm Lembar 77,000
122 x 244 x 0.9 cm Lembar 105,000
3 Tripleks Melamin 122 x 244 x 0,3 cm Lembar 117,000
4 Teakwood 122 x 244 x 0,3 cm Lembar 87,000
80 x 244 x 0.03 cm Lembar 77,000
5 Akustik 40 x 60 cm Lembar 133,000
6 Hard Board 122 x 244 cm Lembar 257,000
7 Asbes Plat Harflek Lembar 73,500
8 List Profil 2 x 3 cm Batang 14,000
3 x 3 cm Batang 18,000
4 x 4 cm Batang 25,000
4 x 5 cm Batang 26,000
5 x 5 cm Batang 27,000
2 x 3 cm Batang 12,000
3 x 3 cm Batang 14,500
4 x 4 cm Batang 17,000
5 x 5 cm Batang 24,000
6 x 6 cm Batang 25,000
9 Lamber sering klas II 1 x 9 x 400 cm Batang 26,000
10 Plafond GRC T = 4 cm M2 72,000
11 Gypsum board T = 0,8 cm Lembar 70,000
Profil gypsum board Tipe CA (besar) 15 cm Lembar 112,000
Profil gypsum board Tipe CE (besar) 12 cm Lembar 90,000
Profil gypsum board Tipe SL (kecil) 9 cm Lembar 68,000
i. BAHAN ATAP
1 Genteng Beton Lembar 18,500
Keramik (Glasur ) Lembar 189,750
Asbes 0,3 cm Lembar 55,770
Harfles (115 x 85 x 0,5 cm) Lembar 57,640
Spandek G550 AZ T = 0,4 mm M2 57,200
2 Asbes Gelombang (rusa) Kaki 51,700

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)
No BAHAN DASAR SPESIFIKASI SATUAN HARGA

1 2 3 4 5
3 Asbes Gelombang 7,040
BMG 34" -BJLS 0,18 mm Kaki 16,500
BMG 33" -BJLS 0,22 mm Kaki 17,500
BMG 32" -BJLS 0,30 mm Kaki 55,000
BMG 28" -BJLS 0,35 mm Kaki 88,000
4 Sirap Ikat/m2 115,500
5 Seng Gelombang BWG 34" BJLS 0.18 mm 0,20 Ru Kaki 8,250
BWG 33" BJLS 0.22 mm Kaki 8,250
BWG 32" BJLS 0.30 mm Kaki 82,500
BWG 28" BJLS 0.35 mm Kaki/Lbr 93,500
6 Seng Plat BMG 33" - BJLS 0,18 mm Kaki/Lbr 57,750
BMG 32" - BJLS 0,22 mm Kaki/Lbr 85,250
BMG 28" - BJLS 0,35 mm Kaki/Lbr 96,250
7 Seng Super Deck ( Spandek ) 0,3 mm ( Silver ) M1 43,950
0,3 mm (Merah) M1 48,517
180 x 77 cm - 8 kaki Lembar 46,200
180 x 77 cm - 7 kaki Lembar 185,900
180 x 77 cm - 6 kaki Lembar 148,720
8 Seng Aluminium Gelombang SWG 32" 0.27 mm Lembar 146,850
SWG 30" 0.31 mm Lembar 148,500
SWG 28" 0.38 mm Lembar 167,200
9 Seng Plastik (Fiber) 10000 KK Kaki 14,925
10 Fiber Semen (Harlex) Super 240 x 108 x 0.6 cm Lembar 37,400
Super 180 x 108 x 0.6 cm Lembar 19,800
Ekonomi 240 x 92 x 0.5 cm Lembar 130,130
Ekonomi 180 x 92 x 0.5 cm Lembar 130,130
Mini 240 x 105 x 0.4 cm Lembar 111,540
Mini 180 x105 x 0.4 cm Lembar 111,540
Super 240 x 105 x 0.4 cm Lembar 185,900
Super 180 x 105 x 0.4 cm Lembar 120,835
11 Nok/Bubungan Genteng Beton Buah 27,500
Genteng Asbes Lembar 13,200
Genteng Keramik Lembar 13,200
Alm. SWG 28" - 168 cm Lembar 129,800
Alm. SWG 28" - 64 cm Lembar 92,950
Nok Steel Gelombang Super - 180 cm Buah 167,200
Mini - 105 cm Buah 148,720
Ekonomi - 95 cm Buah 102,300
Nok Steel Rada Super - 108 cm Buah 102,300
Mini - 105 cm Buah 111,650
Ekonomi - 95 cm Buah 89,100
Nok 1/2 Lingkaran Buah 68,750
12 Karet Pelapis Genteng 55 cm x 50 m Roll 5,500
Karet Pelapis Genteng 178,750
Atap Spandeq 57,200
Atap Spandeq 51,700

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)
No BAHAN DASAR SPESIFIKASI SATUAN HARGA

1 2 3 4 5
Nok Spandeq 57,200
Nok Spandeq 39,600
Sekrup Atal metal 55,550
Besi Canal C 75 92,017
Reng Baja Ringan 51,150
Besi Hollow 1 77,000
Besi Hollow 3 77,000
Rangka Atap Baja Ringan 193,050

j. Bahan Penggantung
1 Kunci Tanam Union 1 x Slag Buah 111650
Union 2 x Slag Buah 192500
Yale 1 x Slag Buah 114000
Yale 2 x Slag Buah 154000
Kuda Terbang Buah 139370
2 Penggantung Hak Angin Kecil Buah 20.825
Hak Angin Besar Buah 26.325
Grendel Kecil Buah 13800
Grendel Besar Buah 23500
Engsel Pintu Pasang 38500
Engsel Jendela Pasang 28,600
Expanyolet Buah 139,700
k. BAHAN SANITER
1 Kloset Duduk KIA (lengkap) Buah 2,126,667
2 Kloset Duduk Toto Buah 2,487,083
3 Kloset Jongkok Toto Buah 396,700
4 Wasthafel Warna Buah 504,200
5 Wasthafel cuci piring logam Royal Buah 210,375
6 Pompa tangan terpasang Buah 330,000
7 Urinor lengkap Buah 1,296,250
8 Bak Mandi fiber Buah 192,500
9 Reservoir Fiber = 1 m Merk Grand : 1 m3 Fiber Buah 1,265,000
Merk Grand : 1 m3 Stainless Buah 4,180,000
10 Reservoir Fiber = 2 m Buah
11 Stop Kran 1/2 " Buah 30,500
12 Kran Air kuningan Buah 145,750
13 Kran Air putih FIA Buah 33,250
14 Kloset duduk Polas ito Buah 451,000
Warna Buah 306,250
15 Kloset jongkok Polas ito Buah 232,400
Warna Buah 149,250
l BAHAN FINISHING / CAT
1 Cat Tembok Aviatex 5 Kg 106,500
Dulux Luar (Ext) 2,5 Kg 302,500
Dulux Dalam ( Int ) 2,5 Kg 181,500
Metrolite 5 Kg 107,200

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)
No BAHAN DASAR SPESIFIKASI SATUAN HARGA

1 2 3 4 5
Kimex 5 Kg 86,250
Vinikex Nippon Paint 5 Kg 99,000
Mowilex 5 Kg 187,500
Vinotex( standar ) 5 Kg 60,500
Vinotex( special ) 5 Kg 88,000
2 Cat Kayu Glotex Kg 49,200
Avian Kg 61,000
Palatone Kg 57,750
ICI Kg 85,250
Politur Kg 59,800
Meni Kg 26,150
Altex 30,500
Minyak Cat (AVIAN) Liter 29,950
3 Cat Atap/Seng AGA Kg 104,500
Nippon Kg 220,000
Lem Seng Buah 9,700
Yoko 5 Kg 104,900
Amplas/Kertas Gosok Lembar 4,500
Dempul Kg 35,200
Residu Kg/10 27,500
4 Politur kg 67,900
5 Dempul kg 38,500
6 Pamur Tembok Kg 63,100
7 Kertas Gosok lembar 13,700
8 Lem Kayu gram 16,500
9 Minyak Cat liter 22,400
10 Minyak Bekistin liter 11,000
m. BAHAN INSTALASI LISTRIK
1 Pipa Union Untuk Kabel 5/8 inci - 4 m Batang 11,000
1 inci - 4 m Batang 12,950
1 1/2 inci - 4 m Batang 13,000
2 inci - 4 m Batang 28,050
2 Kabel Listrik Tipe NYA
1,5 mm 50 m 121,000
1,5 mm Roll 239,500
2,5 mm 50 m 220,000
2,5 mm Roll 349,700
Tipe NYY
2x1 1/2 mm Roll 770,000
2x2 1/2 mm Roll 1,100,000
2x4 mm Roll 739,200
3 Lampu TL 1x20 W Buah 99,000
2x20 W Buah 247,500
1x40 W Buah 132,000
2x40 W Buah 66,000
4 Lampu Pijar 25 W Buah 21,950

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)
No BAHAN DASAR SPESIFIKASI SATUAN HARGA

1 2 3 4 5
40 W Buah 33,950
60 W Buah 59,085
100 W Buah 100,913
5 Lampu Taman Mercury Buah 550,000
6 Saklar Broco Tunggal Putih Buah 17,400
Tunggal Hitam Buah 22,000
Double Putih Buah 21,350
Double Hitam Buah 17,600
7 Stop Kontak Hitam Buah 17,900
Putih Buah 18,500
8 Zekering Kast Lokal Biasa
Lokal Buah 5,500
Lokal Automatis Buah 49,500
Lokal 2 Group Automat Buah 139,700
Lokal 3 Group Biasa Buah 232,100
9 Fitting Buah 14,000
MCB 6 A Ex Supran Buah 30,750
MCB 32 A Ex Supran Buah 60,500
Panil Box + Accecories + Lengkap Set 111,100
Penangkal Petir Lengkap Set 92,700
n. UPAH KERJA
1 Pekerja Org/hr 97,500
2 Pekerja semi trampil Org/hr 97,500
3 Pekerja trampil Org/hr 127,500
4 Mekanik trampil Org/hr 137,500
5 Mekanik semi trampil Org/hr 120,000
6 Operator trampil Org/hr 146,000
7 Operator semi trampil Org/hr 137,500
8 Pembantu Operator Org/hr 127,500
9 Sopir trampil Org/hr 127,500
10 Sopir semi trampil Org/hr 120,000
11 Pembantu sopir Org/hr 97,500
12 Tukang Tukang Kayu Org/hr 120,000
Tukang Batu Org/hr 120,000
Tukang Cat Org/hr 120,000
Tukang Listrik Org/hr 120,000
Tukang Pipa Org/hr 120,000
Tukang Besi Org/hr 120,000
13 Kepala Tukang Kepala Tukang Kayu Org/hr 146,000
Kepala Tukang Batu Org/hr 146,000
Kepala Tukang Listrik Org/hr 137,500
Kepala Tukang Cat Org/hr 127,500
Kepala Tukang Pipa Org/hr 137,500
Kepala Tukang Besi Org/hr 137,500

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
STANDAR HARGA SATUAN BAHAN BANGUNAN DAN UPAH KERJA
PEMERINTAH PROVINSI SULAWESI SELATAN
KABUPATEN SOPPENG
TAHUN 2018
Dalam Rupiah (Rp)
NO JENIS BARANG SPECIFIKASI SATUAN HARGA

1 2 3 4 5
1 ABU BATU M027 m³ 448,500
2 ALAT - ALAT BANTU ( SET @ 3 ALAT ) M170 Set 292,500
3 ARDE Buah 53,500
4 ASPALT
- Aspalt Bituman M061 Kg 13,200
- Aspalt Curah Kg 17,550
- Aspalt Emulsi Kg 12,025
5 ATAP
- Atap Asbes Gelombang Kaki 8,700
- Atap Genteng Keramik Buah 22,100
- Atap Genteng Metal Multi Roof Lembar 109,850
Sakura Roof Lembar 43,550
Surya Roof Lembar 52,800
- Atap Seng Datar BJLS 0,3 Lembar 65,000
- Atap Fiber M¹ 46,800
- Atap Karet ( Talang / Pelapis Atap ) Lebar 55 Cm M¹ 9,300
- Atap Karet ( Talang / Pelapis Atap ) Lebar 90 Cm M¹ 16,500
- Atap Karet Merah ( Talang / Pelapis Lebar 60 Cm M¹ 13,100
- Atap Seng Gelombang Kecil Kaki 8,150
BJLS (BWG 33) Kaki 8,200
BJLS Lembar 84,500
- Atap Seng Licin Lembar 65,650
- Atap Seng Plat ( Nok / Talang ) Lebar 30 Cm M' 16,000
Lebar 40 Cm M' 19,200
Lebar 50 Cm M' 22,000
Lebar 60 Cm M' 25,800
Lebar 90 Cm M' 43,000
- Atap Seng SPANDEK
- Silver ( AZ 100 ) Tebal 0,30 mm m² 52,000
Tebal 0,35 mm m² 58,500
Tebal 0,40 mm m² 65,000
- Silver ( AZ 150 ) Tebal 0,30 mm m² 51,350
Tebal 0,35 mm m² 56,300
Tebal 0,40 mm m² 62,400
- Warna Tebal 0,30 mm m² 55,000
Tebal 0,35 mm m² 60,600
Tebal 0,40 mm m² 67,100
- Atap Zincalume m² 71,500
- Atap Nok Bubungan m² 41,600
- Atap Nok Genteng Metal Buah 42,250
- Atap Nok Bubungan Genteng Keramik Buah 104,000
- Atap Nok Bubungan Zincalume M' 26,000
- Atap WoodPlank m² 123,500
6 BAJA
- Baja Konstruksi M165 Kg 65,000
- Baja Tulangan Beton M167 Kg 32,500

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)
NO JENIS BARANG SPECIFIKASI SATUAN HARGA

1 2 3 4 5
7 BAK MANDI
- Fibre Glass 70 x 70 x 66 Buah 221,000
Kap 1000 Ltr Buah 1,950,000
- Reservoir Stainless Stell 500 M3 Buah 1,040,000
8 BAMBU - Batang 27,625
9 BATU
- Batu Alam m² 234,000
- Batu Gunung m³ 205,075
- Batu Kali m³ 227,500
- Batu Merah/ Batu Bata Biji 800
- Batu Pecah 0,5 - 1,0 cm M026 m³ 500,500
- Batu Pecah 1 - 2 cm M025 m³ 461,500
- Batu Pecah 2- 3 cm M024 m³ 390,000
- Batu Pecah 3 - 5 cm M023 m³ 357,500
- Batu Pecah 5 - 7 cm M022 m³ 357,500
- Batu Pecah 7 - 10 cm M021 m³ 357,500
- Batu Pecah 10 - 15 cm M020 m³ 325,000

10 BESI
- Besi Beton Polos DIA 6 mm DIA 6 mm Batang 37,500
DIA 8 mm Batang 55,200
DIA 10 mm Batang 83,000
DIA 12 mm Batang 114,075
- Besi Beton Ulir DIA 13 mm DIA 14 mm Batang 172,250
- Besi Galvanis DIA 13 mm Batang 247,000
- Besi Strep M164 Batang 45,500
30,3 mm Batang 42,250
- Besi Siku 30,30,3 mm Batang 42,250
40,40,4 mm Batang 123,500
50,50,5 mm Batang 175,500
- Besi Hollow 20.40.0,25 Batang 91,000
2x4 Batang 94,250
- Besi Main Truss C75.80 M' 91,000
- Besi GOC (Reng+Skoring Angin) 0.43 mm M' 84,500
- Besi L Braket M' 28,080
- Besi Dynabolt Buah 6,500
- Besi Self Drilling Screw Buah 1,950
- Besi Aluminium 3''x 1 1/2" M' 123,500
4"x 1 1/2" M' 203,500
11 BETON ROSTER/ KERAWANG Biji 84,500
12 BEUGEL JEMBATAN M187 Bh 76,050
13 BRONJONG PABRIKASI Unit 487,500
14 BRONJONG LOKAL Unit 585,000
15 BUIS BETON Buah 65,000
16 CAT
- Cat Atap Minyak 4 Kg 106,350
- Cat Besi 1 Kg 73,850
- Cat Genteng/ Seng 4 Kg Yoko Kg 127,800
- Cat Jembatan Avian Kg 73,200
- Cat Kayu Avian Kg 73,450
- Cat Manie/ Kayu Kg 28,600
- Cat Tembok Anti Lumut Altex 5 Kg 54,400

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)
NO JENIS BARANG SPECIFIKASI SATUAN HARGA

1 2 3 4 5
Nodrop 4 kg 58,300
- Cat Tembok Putih 4 Kg 26,500
Maritex 4 Kg 19,850
Nippon Paint Kg 32,500
Mowlex Kg 140,800
17 CALSIBOR 4 mm Lembar 87,000
6.0 mm Lembar 113,425
18 DEMPUL KAYU YOKO 0,8 kg 35,100
19 DOOR CLOSER Buah 26,650
20 ENGSEL JENDELA Pasang 21,200
21 ENGSEL PINTU Pasang 29,250
22 ETERNIT Lembar 22,750
23 FILLER Kg 54,000
24 FLOOR DRAIN Plastik Buah 9,425
Stainless Buah 22,200
25 GAGANG NAKO Daun 45,500
26 GLASS BLOCK Buah 35,750
27 GORONG - GORONG BETON Dia. 80 cm M1 520,000
Dia. 60 cm M1 494,000
Dia. 40 cm M1 253,500
Dia. 30 cm M1 221,000
28 GRENDEL BIASA/ PENDEK (JENDELA) Buah 11,800
29 GRENDEL PANJANG (PINTU) Buah 32,175
30 GYPSUM BOARD Lembar 91,000
31 HAAG ANGIN Biasa Pasang 12,700
Motif Pasang 30,875
32 K A C A 296,725

- Kaca Nako Hitam Lengkap set / 7 Daun 296,725


- Kaca Nako Putih Lengkap set / 7 Daun 289,250
- Kaca Nako Hitam Lembar 25,500
- Kaca Nako Putih Lembar 23,800
- Kaca Tebal 3 mm Hitam m² 195,000
- Kaca Tebal 3 mm Putih m² 175,500
- Kaca Tebal 5 mm Hitam m² 214,500
- Kaca Tebal 5 mm Putih m² 198,250
33 K A P U R Kg 9,600
34 KARET PELAPIS ATAP Lebar 110 cm 130,000
35 K A W A T

- Kawat Bronjong M 162 Kg 19,500


- Duri 70 Meter Roll 214,400
- Beton Kg 28,000
36 K A Y U
- Kayu Bakar M 070 m³ 195,000
- Kayu Kelas l Balok m³ 11,505,000
Papan m³ 15,600,000
- Kayu Kelas ll ( Balok ) Balok m³ 3,555,000
Papan m³ 3,900,000
Papan Jati m³ 3,575,000
- Kayu Kelas lll Papan m³ 1,950,000
- Kayu Kelas lV Papan m³ 1,690,000

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)
NO JENIS BARANG SPECIFIKASI SATUAN HARGA

1 2 3 4 5
- Kayu Lapis 2 cm Lembar 78,000
- Kayu Lapis 1,20 cm Lembar 50,700
- Kayu Lapis 0,9 cm Lembar 91,000
Uk. 122 x 240 cm
- Kayu Less Profil 3 cm M' 5,000
5 cm M' 6,500
- Kayu Les M' 17,550
- Kayu Untuk Jembatan M 181 m³ 6,630,000
- Kayu Kelas lll Untuk Perancah M 180 m³ 1,950,000
- Kayu Kumia Balok m³ 8,352,500
Papan m³ 7,020,000
- Kayu Kalafi Balok m³ 7,345,000
Papan m³ 7,800,000
37 KERIKIL SUNGAI M 014 Lembar 5,850
38 KERTAS GOSOK
39 K L O S E T
- Kloset Duduk Biasa Tanpa Tabung Buah 812,500
- Kloset Duduk Keramik Tanpa Tabung Buah 1,061,000
Pakai Tabung Buah 2,022,800
- Kloset Jongkok Keramik Standar Buah 171,600
- Kloset Jongkok Toto Buah 469,000
- Kloset Jongkok Keramik Toto Buah 517,200
40 KRAN AIR Biasa bh 23,400
Besi bh 29,300
bh 81,250
41 KUAS Biasa Buah 16,250
Roll Buah 32,500
42 KUNCI PINTU
- Kunci Pintu Besar Micol Buah 184,000
- Kunci Pintu Sedang Micol Buah 135,500
- Kunci Pintu Kecil Buah 97,500
43 KUSEN PINTU FIBER ( KM/WC )
- Fiber Set 347,500
- Almunium Wingking Door Set 524,000
- Alma Motif 70 x 200 Set 1,303,900
44 LES PLAFON GYPSUM M1 78,325
45 M I N Y A K
- Minyak Cat M 0092 Liter 26,975
- Minyak Cat Thinner Liter 35,425
- Minyak Pelumas M 185 Liter 37,700
46 MUR BAUT 25 cm Buah 7,150
M 188 Buah 10,400
47 P A K U
- Paku Biasa 1 Kg 23,075
- Paku Jembatan 5 cm Dos 45,500
- Paku Seng 1 Kg 33,500
- Paku Triplex ( Sirap ) 1 Kg 29,700
- Paku Uk. 5 cm - 7 cm Kg 20,700
- Paku Ulir Kg 34,600
- Paku Gypsum Kg 39,000
48 P A S I R
- Pasir Beton m³ 170,625

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)
NO JENIS BARANG SPECIFIKASI SATUAN HARGA

1 2 3 4 5
- Pasir Pasangan m³ 308,750
- Pasir Urug ( Timbunan ) m³ 292,500
49 PAVING BLOCK
- Tebal 8 cm K 400 m² 104,000
K 300 m² 101,400
K 225 m² 98,800
K 175 m² 97,500
- Tebal 6 cm K 300 m² 100,100
K 225 m² 97,500
K 175 m² 84,500
- Berlian K 175 m² 84,500
Pipa dan Assesories Pipa
- Dop 4 " bh 20,800
- Dop 3 " bh 14,000
- Dop 2 " bh 10,400
- Dop 1 " bh 6,825
- Dop 1/2 " bh 3,000
- Dop drag dalam 3/4 " bh 3,700
- Dop drag luar 3/4 " bh 3,700
- Faucet Elbow 1/2 " bh 3,575
- Knee / Elbow PVC 4 " bh 23,864
- Knee / Elbow PVC 3" bh 15,000
- Knee / Elbow PVC 2 " bh 10,300
- Knee / Elbow PVC 1 " bh 6,400
- Knee / Elbow PVC 1/2 " bh 3,300
- Socket 4 " bh 20,500
- Socket 3 " bh 16,400
- Socket 2 " bh 12,000
- Socket 1 " bh 7,500
- Socket 1/2 " bh 3,300
- Socket 2 x 1/2 " bh 8,700
- Socket 2 x 2 1/2 " bh 14,950
- Socket Drag Luar 1/2 x 3/4 " bh 6,825
- Socket Valve 1/2 " bh 3,575
- Socket Valve 3 x 2 1/2 " bh 29,000
-Tee PVC 4 " 28,700
-Tee PVC 3" 19,500
-Tee PVC 2 " 12,000
-Tee PVC 1 " 5,000
-Tee PVC 1/2 " 3,600
-Tee PVC 4 " 28,700
-Tee PVC . 3/4 " x 1/2 " 7,900
- Gate Valve 1/2" 3,900
- Gate Valve 3/4" 26,000
- Gate Valve 1" 17,550
- Gate Valve 1/2" 84,700
- Gate Valve 2" 122,200
- Double Nipple GI 1/2" 13,000
- Double Nipple PVC 1/2" 3,900
Err:509 6,500
50 PIPA PVC SC ( TYPE AW ) UK.4 M
- Pipa PVC Dia 1/2" Batang 27,500

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)
NO JENIS BARANG SPECIFIKASI SATUAN HARGA

1 2 3 4 5
- Pipa PVC Dia 3/4" Batang 34,700
- Pipa PVC Dia 1" Batang 45,800
- Pipa PVC Dia 1 1/4" Batang 67,700
- Pipa PVC Dia 1 1/2" Batang 80,400
- Pipa PVC Dia 2" Batang 106,000
- Pipa PVC Dia 2 1/2" Batang 133,700
- Pipa PVC Dia 3" Batang 185,000
- Pipa PVC Dia 4" Batang 304,500
- Pipa PVC Dia 6" Batang 656,500
- Pipa PVC Dia 8" Batang 877,500
51 PIPA PVC SC ( TYPE AW ) UK. 4 M
- Pipa PVC Dia 1 1/4" AW Batang 34,600
- Pipa PVC Dia 1 1/2" AW Batang 40,500
- Pipa PVC Dia 2" AW Batang 62,200
- Pipa PVC Dia 2 1/2" AW Batang 80,000
- Pipa PVC Dia 3" AW Batang 102,000
- Pipa PVC Dia 4" AW Batang 157,000
52 PLAMUR
PLAMUR BOYO 25 Kg 216,600
SKIN COAT ( APLUS ) INTERIOR 20 Kg 78,700
EXTERIOR 20 Kg 95,000
53 POMPA AIR MESIN 1,534,000
- SHIMIZU OTOMATIS 260 BIT Set 721,500
- SHIMIZU OTOMATIS 130 BIT Set 503,100
- SHIMIZU ( TANPA TABUNG ) 128 BIT Set 108,200
54 RESIDU Liter 79,500
55 RANG
- Harmonika 46,200
- Loket 1" 32,900
- Pasir 10 x 10 35,000
56 RANGKA ATAP BAJA RINGAN
- Tebal 0,75 mm m² 292,500
- Tebal 1,00 mm m² 325,000
57 RANGKA FLAFOND BAJA RINGAN ( TERPASANG ) m² 260,000
58 S E M E N
- Semen Bosowa 40 Kg Zak 58,900
- Semen Bosowa 50 Kg Zak 72,300
- Semen Putih Zak 78,000
- Semen Tonasa 40 Kg Zak 61,500
- Semen Tonasa 50 Kg Zak 74,500
- Semen Warna 1 kg 25,800
59 SHOWER Set 178,750
60 S I R T U m³ 151,000
61 TEMPAT SABUN ( SOAP HOLDEN )
#NAME? Buah 45,500
#NAME? Buah 54,700
62 TEGEL
- Tegel Keramik 20 x 20 cm Motif Dos 84,700
Putih Dos 78,500
Polos Dos 81,300
- Tegel Keramik 20 x 25 cm Motif Dos 84,600
Putih Dos 80,700

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)
NO JENIS BARANG SPECIFIKASI SATUAN HARGA

1 2 3 4 5
- Tegel Keramik 25 x 40 cm Motif Dos 98,000
- Tegel Keramik 30 x 30 cm Motif Dos 88,800
Putih Dos 70,600
Kasar Dos 89,700
- Tegel Keramik 30 x 60 cm Motif Dos 235,000
Putih Dos 195,000
Kasar Dos 93,300
- Tegel Keramik 40 x 40 cm Motif Dos 93,700
Putih Dos 79,700
Kasar Dos 98,200
- Tegel Keramik 50 x 50 cm Kasar Dos 195,000
Motif Dos 126,750
10 x 40 cm Dos 25,100
63 TIMBUNAN Biasa m³ 97,500
Pilihan m³ 162,500
64 TRIPLEKS 3 mm Lembar 71,000
4 mm Lembar 89,000
6 mm Lembar 105,000
65 URINOAR KERAMIK STANDAR Buah 444,000
66 WASHTAFEL Aluminium Buah 418,600
Keramik + Sifon Buah 2,191,800
Kaca Buah 3,087,500
5.3 PERALATAN PERTUKANGAN
1 BOR MESIN Modern Set 390,000
2 CATOK KAYA Buah 260,000
3 Err:509 Buah 10,900
Err:509 Buah 22,100
4 Err:509 Buah 65,400
Err:509 Buah 70,525
5 GERGAJI MESIN Modern Set 661,700
6 MESIN PROFIL Modern Set 812,500
7 MESIN KETAM Modern Set 374,500
8 MESIN ROLL 5m Buah 36,800
10 m Buah 134,500
9 PAHAT KAYU Buah 32,900
10 PALU - PALU Buah 48,800
11 SIKU Buah 27,300
5.4 BAHAN DAN PERALATAN KELISTRIKAN
1 BALON DAN LAMPU
- PHILIPS 5 Wat Buah 88,800
11 Wat Buah 39,000
18 Wat Buah 41,600
23 Wat Buah 44,200
75 Wat Buah 46,800
- PHILIPS ULIR ( HELIX ) 42 Wat Buah 57,200
- PHILIPS ULIR ( EKOTONE ) 45 Wat Buah 156,600
- PHILIPS KAPSUL ( ESENSIAL ) 50 Wat Buah 450,000
- CHIYODA Neon 20 Wat Buah 49,400
Neon 40 Wat Buah 55,900
Pijar 5 - 15 Wat Buah 58,500
Pijar 2 5 - 40 Wat Buah 61,100
Pijar 50 - 70 Wat Buah 65,000

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)
NO JENIS BARANG SPECIFIKASI SATUAN HARGA

1 2 3 4 5
Pijar 75 - 100 Wat Buah 68,900
- Lampu TL
1 x 20 Wat Buah 110,000
2 x 20 Wat Buah 205,000
1 x 40 Wat Buah 210,000
2 x 40 Wat Buah 255,000
- LAMPU SOROT 300 W Buah 985,000
- LAMPU MERCURY Kuning 250 W Buah 750,000
Putih 250 W Buah 850,000
- LAMPU HIAS SELANG Warna warni Set 250,000
2 BIT SAMBUNGAN Buah 105,600
3 FITTING Merk : BROCO Buah
- Fitting Amatir 40 Wat No 5040 Buah 21,000
- Fitting Amatir 60 Wat 5060 Buah 23,500
- Fitting Amatir 100 Wat 5100 Buah 30,000
- Fitting Gantung 216 C 1 Buah 17,500
- Fitting Kombinasi 226 Buah 18,500
- Fitting Plafon 220 Buah 20,000
- Fitting E 27 Vato Buah 20,000
- Fitting ML Vato Buah 20,000
4 FOTO SHELL CHIYODA Buah 188,000
EGI Buah 75,000
SELCON Buah 105,000
SELCON Buah 125,000
5 FUSO BOX
- 1 GROUP 711 Buah 6,900
- 2 GROUP 712 Buah 25,100
- 3 GROUP 713 Buah 34,600
6 GARDEN LIGHTNING MR. 171 C Buah 13,500
271 VC Buah 23,760
7 HANDLE KODOKAN Uk : 100 Ampere Buah 1,170,000
8 LAST ( HIGH POWER FACTOR ) NHC 155 C Buah 1,970,100
NHC 255/405 C Buah 2,640,000
9 INSTALASI LISTRIK Lampu jalan Titik 75,000
10 ISOLASI PLASTIK Besar Buah 13,000
Kecil Buah 6,500
11 KABEL - KABEL
- Kabel Alphone Uk : 1 x 15 x 0,6 Meter 475,000
1 x 27 x 0,6 Meter 750,000
- Kabel NYA 1 x 1,5 mm Meter 3,300
1 x 2,5 mm Meter 4,620
- Kabel NYM 2 x 1,5 mm Meter 6,600
2 x 2,5 mm Meter 10,500
2 x 4 mm Meter 2,600
2 x 6 mm Meter 3,900
- Kabel NYY 2 x 1,5 mm Meter 13,860
2 x 2,5 mm Meter 19,800
- Kabel Oval uk : 1 Tali Rol 812,500
- Kabel Saur Uk : 3 Tali Rol 1,650,000
Uk : 4 m/m Rol 3,390,000
- Kabel Tanam Uk : 12 x 2,5 m/m KMI Meter 9,900
- Kabel Televisi Meter 61,750

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)
NO JENIS BARANG SPECIFIKASI SATUAN HARGA

1 2 3 4 5
12 KONTRAKTOR 60 KV Buah 145,200
13 MCCB 50 A - 65 A Buah 455,000
65 A- 100 A Buah 715,000
100 A -200 A Buah 1,430,000
14 OTOMATIS 6A-10A/16A Buah 91,000
20A Buah 97,500
15 OTOMATIS PENGATUR - Set 55,000
16 PANEL BOX INSTALASI Buah 531,900
17 PASRONG 16A/20A/16A Buah 546,000
35A/63A Buah 3,341,000
18 PIPA INSTALASI PARALON Uk : 5/8 Inchi Batang 11,700
0,75" Batang 16,900
1" Batang 15,500
19 SAKLAR
- Saklar Engkel Broco Buah 21,450
- Saklar Ganda MR 271V Buah 27,300
- Saklar Gantung Buah 7,800
- Saklar Kontak Buah 45,500
- Saklar Seri Broco Buah 55,900
- Saklar Tunggal MR 271V Buah 28,600
- Saklar l GRP Buah 22,750
- Saklar ll GRP Buah 61,750
- Saklar ll I GRP 146,250
- Saklar 3 fase GRP 1,657,500
20 STAND LAMPU JALAN 3/4 inch pjg 1 mtr 97,500
21 STOP KONTAK
- Stop Kontak Arde Putih No. 6130 Buah 25,500
- Stop Kontak 3 Pas Arde 633 BB Buah 26,000
- Stop Kontak Lobang 1 lubang Buah 10,500
- Stop Kontak Untuk AC No. 2310 Buah 17,000
- Stop Kontak Arde 6100 Buah 12,000
- Stop Kontak Arder Tutup 6122 Buah 61,500
- Stop Kontak Ganda MR 371 V Buah 49,500
- Stop Kontak Tunggal Broco Buah 44,000
5.1. DAFTAR UPAH KERJA
1 PEKERJA L 106 Orang/Hari 102,000
2 MANDOR L 061 Orang/Hari 146,000
3 TUKANG BATU/ KAYU/ BESI L 079 Orang/Hari 140,500
4 KEPALA TUKANG BATU/ KAYU/ BESI L 073 Orang/Hari 155,000
5 PENGAYAM L 107 Orang/Hari 121,000
6 MEKANIK L 071 Orang/Hari 166,500
7 PEMBANTU MEKANIK L 072 Orang/Hari 100,500
8 OPERATOR TERAMPIL L 081 Orang/Hari 166,500
9 OPERATOR KURANG TERAMPIL L 081 Orang/Hari 140,500
10 PEMBANTU OPERATOR L 083 Orang/Hari 100,500
11 SUPIR TERAMPIL L 091 Orang/Hari 166,500
12 SUPIR KURANG TERAMPIL L 092 Orang/Hari 150,000
13 PEMBANTU SUPIR L 099 Orang/Hari 100,500
14 BURUH LAPANGAN TAK TERAMPIL L 101 Orang/Hari 100,500
15 BURUH LAPANGAN SEMI TERAMPIL L 103 Orang/Hari 113,500
16 BURUH LAPANGAN TERAMPIL L 106 Orang/Hari 113,500

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
STANDAR HARGA SATUAN BAHAN BANGUNAN DAN UPAH KERJA
PROVINSI SULAWESI SELATAN
KABUPATEN WAJO
TAHUN 2018
(Dalam Rupiah (Rp)

NO JENIS BARANG SPECIFIKASI SATUAN HARGA ( Rp )

1 2 3 4 5
A.BAHAN DASAR
1 Semen PC 50 Kg Zak 65,050
2 Semen Warna Kg 25,310
3 Batu Bara Merah Bh 890

B.BAHAN BESI
1 Kawat Ikat Beton Kg 24,250
2 Paku Biasa 5-10 cm Kg 19,080
3 Paku Biasa 2,5-4 cm Kg 24,750
4 Paku Seng Kg 42,750
5 Paku beton Persegi 5 - 10 Cm Kg 23,580

C.BAHAN LANTAI DAN DINDING


1 Tegel Keramik 30 x 30 Polos Doz 42,333
2 Tegel Keramik 40 x 40 Polos Doz 65,604
3 Tegel Keramik 25 x 25 Polos Doz 64,720
4 Tegel Keramik 20 x 20 Polos Doz 67,300
5 Tegel Granit Warna 60 x 60 Cm Doz 186,730

D.BAHAN ATAP
1 Atap Spandek Zincalium 0,35 mm silver M' 48,360
2 Non Spandek 45 cm 0,30 M' 34,080
3 Genteng Metal (sakura roof) 0,70 x 0,80 Lbr 37,990
4 Non Genteng Metal Bh 36,300
5 Seng Gelombang BWG 33" Bjls 0,3 KK 9,910
6 Seng Plat Bjls 0,30 Lbr 65,750
7 Kanal Metal CV 75/75 Setara " TASO " M' 87,830
8 Reng 0,45 Panjang 6 M Setara " TASO " M' 52,220
9 Dynabolt 10 x 5 mm Bh 2,870
10 Karet Pelapis L 55 mm M' 74,430
11 Talang Air Listrik bh 94,900

E.BAHAN KACA
1 Kaca Bening 3 mm m² 128,630
2 Kaca Bening 5 mm m² 138,630
3 Kaca Ryben 3 mm m² 139,620
4 Kaca Ryben 5 mm m² 139,620
5 Cermin m² 138,630
6 Silicone Sealant Ultraglaze ex GE TUBE 15,250

F.BAHAN KUNCI DAN PENGGANTUNG


1 Kunci Tanam " SES " setara bh 268,250
2 Kunci tanam Biasa 2 Slag bh 180,940
3 Kunci Lemari Mutu Baik bh 18,250
4 Handle Pintu bh 200,380
5 Engsel Pintu Biasa bh 20,920
6 Engsel Jendela Bh 13,630
7 Grendel Pintu Bh 45,920
8 Grendel Jendela Bh 25,380
9 Hak Angin/ Kait-Kait Bh 10,960

G.BAHAN CAT
1 Meni 1 Kg "PERAHU" Klg 48,610

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
(Dalam Rupiah (Rp)

NO JENIS BARANG SPECIFIKASI SATUAN HARGA ( Rp )

1 2 3 4 5
2 Cat Kayu "AVIAN" (1 Kg) Klg 58,570
3 Minyak Cat "AVIAN" Klg 47,140
4 Plamur tembok Alcaplast 20 Kg Klg 199,430
5 Plamur Kayu Kucing Klg 42,240
6 Cat Tembok Setara " METROLITE " ( 3 Ltr ) Klg 97,240
7 Cat Tembok Setara " MOWILEX " (2,5 Ltr ) Luar Klg 270,570
8 Cat Tembok Setara " METROLITE " ( 2,5 Ltr ) Dalam Klg 250,730
9 Cat Seng/ Genteng 4 Kg Klg 107,490
10 Bahan Anti Rayap 10 Kg Klg 190,730
11 Lem Kayu 800 gram Klg 49,070
12 Cat Water Profing Merk " Dulux Watershield " 2,5 Ltr Klg 275,570
13 Ter Residu 1 Kg Klg 33,070
14 Kertas Gosok ( Amplas ) M' 12,650
15 Kuas 1 " Bh 4,500
16 Kuas 2,5 " Doz 10,310
17 Kuas 3 " Doz 12,310

H.BAHAN SANITASI
1 Floor Drain " Plastik " Bh 12,650
2 Kloset Duduk "TOTO" Bh 3,000,000
3 Kloset Jongkok "TOTO" Bh 427,150
4 Wastafel Set 531,430
5 Wastafel Lengkap Set 2,098,000
6 Urinoir 1 Set Lengkap Set 3,047,150
7 Stop Kran 1/2 " Biasa Bh 13,620
8 Stop Kran 3/4 " Biasa Bh 18,420
9 Kran Air Double + Shower Bh 153,870
10 Krai Air Shower Bh 81,620
11 Kram Air 1/2 " ONDA Bh 24,000
12 Kram Air 3/4 " ONDA Bh 36,500
13 Jet Washer " TOTO " Bh 263,990
14 Seal Tape Bh 5,150
15 Bak Penampungan Air Kap. 1 M3 Bh 1,324,520
16 Bak Penampungan Air Kap. 2 M3 Bh 2,761,540

H.BAHAN LISTRIK
1 Skring Box 1 Lubang Bh 50,130
2 Panel MCB Bh 30,130
3 mcb 6A-10A Bh 60,130
4 Stop Kontak "PANASONIC" Bh 17,360
5 Saklar Ganda "PANASONIC" Bh 26,360
6 Saklar Tunggal " PANASONIC " Bh 16,110
7 Lampu CPL Kapsul 8 Wat " PHILIPS Bh 29,000
8 Lampu CPL Kapsul 15 Wat " PHILIPS Bh 35,250
9 Lampu CPL Kapsul 18 Wat " PHILIPS Bh 39,250
10 Lampu CPL Kapsul 23 Wat " PHILIPS Bh 41,500
11 Kap Industri HDK + Lampu HPLN 80 Wat Bh 85,470
12 Kap Industri HDK + Lampu HPLN 150 Wat Bh 50,470
13 Lampu Down Light Plafond Bh 37,750
14 Fitting Lampu Bh 10,110
15 Stand Lampu Tanam Bh 130,370
16 Lampu TL 20 Wat Bh 13,000
17 PIPA PVC diameter 5/8" - 4 M Bh 9,990
18 Kabel NYY 2 x 2,5 mm Bh 148,820
19 Kabel NYY 2 x 1,5 mm Bh 96,570
20 panel Box Bh 500,130
21 inbuw Duz Bh 4,110
22 Sekring 16 A Bh 60,110

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
(Dalam Rupiah (Rp)

NO JENIS BARANG SPECIFIKASI SATUAN HARGA ( Rp )

1 2 3 4 5
J.BAHAN LANGIT-LANGIT
1 Gypsum Board Lbr 58,730
2 Calsiboard 35 mm Lbr 73,230
3 List Profil Kayu Bh 48,000
4 Sekrup Gibsum Bh 43,980
5 Plaster Gypsum M' 8,480
6 Besi Hollow 40x 40 mm Bh 30,820
7 Besi Hollow 20x 40 mm Bh 24,660
8 Lem Gypsum 20 Kg ( comice Aplus ) Kg 84,950
9 Paku Gypsum Kg 23,480
10 Tripleks 122 x 244 x 0,3 mm Lbr 57,980
11 Tripleks 122 x 244 x 0,4 mm Lbr 72,980
12 Tripleks 122 x 244 x 0,6 mm Lbr 84,230
13 Multipleks 122 x 244 x 0,8 mm Lbr 113,730
14 Teakwood 122 x 244 x 0,3 mm Lbr 153,730

K.PAVING BLOK
1 Paving Blok ( Kotak) K.300 T=8 Cm ( 44 Buah /M2 ) m² 87,190
2 Paving Blok ( Kotak) K.300 T=6 Cm ( 44 Buah /M2 ) m² 73,850
3 Paving Blok ( Kotak) K.400 T=8 Cm ( 44 Buah /M2 ) m² 82,190
4 Paving Blok ( Kotak) K.400 T=6 Cm ( 44 Buah /M2 ) m² 70,850

L.PIPA
1 Pipa GIP ( 6 meter )
(Sekelas Med.A)
- Dia 50 mm (1 1/2") tebal 2 mm Btg 359,100
- Dia 63 mm (2") tebal 2 mm Btg 455,000
- Dia 75 mm (2 1/2") tebal 2 mm Btg 587,000
- Dia 90 mm (3") tebal 2,9 mm Btg 766,600
- Dia 110 mm (4") tebal 2,9 mm Btg 1,107,300
- Dia 125 mm (5") tebal 2,9 mm Btg 2,297,100
- Dia 160 mm (6") tebal 2,9 mm Btg 1,793,200
2 Pipa GIP ( 6 meter )
(Sekelas Med.B)
- Dia 50 mm (1 1/2") tebal 1,5 mm Btg 255,100
- Dia 63 mm (2") tebal 1,5 mm Btg 299,000
- Dia 75 mm (2 1/2") tebal 2,0 mm Btg 600,000
- Dia 90 mm (3") tebal 2,0 mm Btg 1,093,100
- Dia 110 mm (4") tebal 2,0 mm Btg 1,416,900
3 Pipa PVC
- Dia 1/2" - 4,00 M Btg 37,000
- Dia 3/4" - 4,00 M Btg 44,000
- Dia 1" - 4,00 M - AW Btg 60,000
- Dia 1 1/2" - 4,00 M - AW Btg 86,500
- Dia 2" - 4,00 M - AW Btg 108,000
- Dia 3" - 4,00 M - AW Btg 199,400
- Dia 4" - 4,00 M - AW Btg 326,900
- Dia 6" - 4,00 M - AW Btg 732,200
4 PIPA PVC SNI T.12,5 bar - S.10 (Join Pipa Dengan Soket Pemyambungan Lem)
- Dia 63 mm (2") - 6 M Btg 175,000
- Dia 90 mm (3") - 6 M Btg 330,000
- Dia 110 mm (4") - 6 M Btg 480,000
- Dia 160 mm (6") - 6 M Btg 990,000
- Dia 160 mm (8") - 6 M Btg 1,506,400
5 PIPA PVC SNI T.12,5 bar - S.10 (Join Pipa Dengan Soket Penyambungan Ring karet)
- Dia 63 mm (2") - 6 M Btg 180,000
- Dia 90 mm (3") - 6 M Btg 335,800
- Dia 110 mm (4") - 6 M Btg 472,300
- Dia 160 mm (6") - 6 M Btg 1,015,000

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
(Dalam Rupiah (Rp)

NO JENIS BARANG SPECIFIKASI SATUAN HARGA ( Rp )

1 2 3 4 5
- Dia 200 mm (8") - 6 M Btg 1,606,400
6 PIPA PVC SNI T.10 bar - S.12,5 (Join Pipa Dengan Soket Pemyambungan Lem)
- Dia 50 mm (1 1/2") - 6 M Btg 103,100
- Dia 63 mm (2") - 6 M Btg 146,800
- Dia 90 mm (3") - 6 M Btg 280,000
7 PIPA PVC SNI T.10 bar - S.12,5 (Join Pipa Dengan Soket Pemyambungan Ring karet)
- Dia 50 mm (1 1/2") - 6 M 160,000
- Dia 63 mm (2") - 6 M Btg 290,000
- Dia 90 mm (3") - 6 M Btg 400,000
- Dia 110 mm (4") - 6 M Btg 815,000
- Dia 160 mm (6") - 6 M Btg 1,340,000
- Dia 200 mm (8") - 6 M Btg 1,406,400
8 FLANGE GIP/STEEL (sist. Las)
- Flange Gip/Steel f 2" Bh 49,500
- Flange Gip/Steel f 3" Bh 66,000
- Flange Gip/Steel f 4" Bh 82,500
- Flange Gip/Steel f 6" Bh 115,500
- Flange Gip/Steel f 8" Bh 203,500
7. TEE GIP/STEEL (sist. Las)
- Tee Gip/Steel f 2" Bh 41,250
- Tee Gip/Steel f 3" Bh 80,850
- Tee Gip/Steel f 4" Bh 134,750
- Tee Gip/Steel f 6" Bh 346,500
- Tee Gip/Steel f 8" Bh 605,000
8. BEND GIP/STEEL (sist. Las)
- Bend Gip/Steel 90o f 2" Bh 22,000
- Bend Gip/Steel 90o f 3" Bh 49,500
- Bend Gip/Steel 90o f 4" Bh 82,500
- Bend Gip/Steel 90o f 6" Bh 247,500
- Bend Gip/Steel 90o f 8" Bh 495,000
9. BEND GIP/STEEL (sist. Las)
- Bend Gip/Steel 45o f 2" Bh 16,500
- Bend Gip/Steel 45o f 3" Bh 41,250
- Bend Gip/Steel 45o f 4" Bh 62,150
- Bend Gip/Steel 45o f 6" Bh 170,500
- Bend Gip/Steel 45o f 8" Bh 352,000
10. FLANGE TEE GIP
- Flange Tee GIP f 4" x 4" Bh 302,500
- Flange Tee GIP f 6" x 6" Bh 357,500
- Flange Tee GIP f 8" x 8" Bh 715,000
- Flange Tee GIP f 10" x 10" Bh 1,017,500
11. Flange Bend GIP
- Flange Bend Gip/Steel 90o f 2" Bh 192,500
- Flange Bend Gip/Steel 90o f 3" Bh 269,500
- Flange Bend Gip/Steel 90o f 4" Bh 385,000
- Flange Bend Gip/Steel 90o f 6" Bh 577,500
- Flange Bend Gip/Steel 90o f 8" Bh 852,500
12. Flange Bend GIP
- Flange Bend Gip/Steel 45o f 2" Bh 159,500
- Flange Bend Gip/Steel 45o f 3" Bh 236,500
- Flange Bend Gip/Steel 45o f 4" Bh 319,000
- Flange Bend Gip/Steel 45o f 6" Bh 412,500
- Flange Bend Gip/Steel 45o f 8" Bh 715,000
13. Stub End / Stub Flange PE 100
- Stub End / Stub Flange PE 100 f 63 mm (2") Bh 115,500
- Stub End / Stub Flange PE 100 f 90 mm (3") Bh 231,000
- Stub End / Stub Flange PE 100 f 110 mm (4") Bh 280,500
- Stub End / Stub Flange PE 100 f 160 mm (6") Bh 445,500
- Stub End / Stub Flange PE 100 f 200 mm (8") Bh 836,000

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
(Dalam Rupiah (Rp)

NO JENIS BARANG SPECIFIKASI SATUAN HARGA ( Rp )

1 2 3 4 5
14. Flange Spigot
- Flange Spigot Ǿ 2" Bh 207,350
- Flange Spigot Ǿ 3" Bh 278,850
- Flange Spigot Ǿ 4" Bh 350,350
- Flange Spigot Ǿ 6" Bh 693,550
- Flange Spigot Ǿ 8" Bh 1,215,500
15. Flange Socket (Soket Penyambung lem & Ring Karet)
- Flange Socket Ǿ 2" (63 mm SC) Bh 115,500
- Flange Socket Ǿ 3" (90 mm SC) Bh 247,500
- Flange Socket Ǿ 4" (110 mm SC) Bh 302,500
- Flange Socket Ǿ 6" (160 mm SC) Bh 467,500
- Flange Socket Ǿ 2" (63 mm RR) Bh 126,500
- Flange Socket Ǿ 3" (90 mm RR) Bh 258,500
- Flange Socket Ǿ 4" (110 mm RR) Bh 313,500
- Flange Socket Ǿ 6" (160 mm RR) Bh 522,500
- Flange Socket Ǿ 8" (200 mm RR) Bh 1,265,000
16. TEE PVC SNI - 3 x Socket Rubber Ring
- Tee PVC Ø 2" x 2" Bh 93,500
- Tee PVC Ø 3" x 3" Bh 371,800
- Tee PVC Ø 3" x 2" Bh 328,900
- Tee PVC Ø 4" x 4" Bh 614,900
- Tee PVC Ø 4" x 3" Bh 529,100
- Tee PVC Ø 4" x 2 " Bh 500,500
- Tee PVC Ø 6" x 6" Bh 929,500
- Tee PVC Ø 6" x 4" Bh 993,850
17. TEE PVC SNI - Socket
- Tee PVC Socket Ø 8" x 8" Bh 819,500
- Tee PVC Socket Ø 8" x 6" Bh 786,500
- Tee PVC Socket Ø 8" x 4" Bh 786,500
- Tee PVC Socket Ø 8" x 3" Bh 786,500
18. Bend HDPE PE 100 45 o Ø 2" Bh 121,000
19 Bend HDPE PE 100 90 o Ø 2" Bh 134,200
20 LONG BEND DOUBLE SOCKET (solvent cament}
- Ø 2" (63 mm) x 45º Bh 49,500
- Ø 2" (63 mm) x 90º Bh 85,250
21 LONG BEND DOUBLE SOCKET (rubber ring}
- Ø 2" (63 mm) x 45º Bh 79,200
- Ø 3" (63 mm) x 90º Bh 126,500
22 LONG BEND SOCKET / SPIGOT (rubber ring}
- Ø 2" (63 mm) x 45º Bh 185,900
- Ø 3" (90 mm) x 45º Bh 286,000
- Ø 4" (110 mm) x 45º Bh 398,750
- Ø 6" (160 mm) x 45º Bh 806,850
- Ø 8" (200 mm) x 45º Bh 1,401,400
23 LONG BEND SOCKET / SPIGOT (rubber ring}
- Ø 2" (63 mm) x 90º Bh 185,900
- Ø 3" (90 mm) x 90º Bh 286,000
- Ø 4" (110 mm) x 90º Bh 398,750
- Ø 6" (160 mm) x 90º Bh 806,850
- Ø 8" (200 mm) x 90º Bh 1,401,400
24 REDUCER PE 100
- Reducer PE 100 Ø 3" x 2" Bh 148,500
- Reducer PE 100 Ø 4" x 2" Bh 192,500
- Reducer PE 100 Ø 4" x 3" Bh 209,000
- Reducer PE 100 Ø 6" x 3" Bh 374,000
- Reducer PE 100 Ø 6" x 4" Bh 401,500
25 REDUCER PVC SNI - Socket Solvent Cement
- Reducer PVC Ø 3" x 1 1/2" Bh 71,500
- Reducer PVC Ø 3" x 2" Bh 77,000

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
(Dalam Rupiah (Rp)

NO JENIS BARANG SPECIFIKASI SATUAN HARGA ( Rp )

1 2 3 4 5
- Reducer PVC Ø 4" x 2" Bh 92,950
- Reducer PVC Ø 4" x 3" Bh 107,250
26 REDUCER PVC SNI - Rubber Ring
- Reducer PVC Ø 4" x 3" Bh 171,600
- Reducer PVC Ø 6" x 4" Bh 291,500
- Reducer PVC Ø 8" x 6" Bh 467,500
- Reducer PVC Ø 10" x 6" Bh 803,000
- Reducer PVC Ø 10" x 8" Bh 819,500
27 DOP PE 100
- Dop PE Ø 2" Bh 52,250
- Dop PE Ø 3" Bh 82,500
- Dop PE Ø 4" Bh 115,500
- Dop PE Ø 6" Bh 181,500
- Dop PE Ø 8" Bh 797,500
28 DOP/CAP PVC SNI (Slovent Cement)
- Dop PVC Ø 1/2" 28,600
- Dop PVC Ø 2" Bh 35,750
- Dop PVC Ø 3" Bh 42,900
- Dop PVC Ø 4" Bh 100,100
- Dop PVC Ø 6" Bh 137,500
29 DOP/CAP PVC SNI (Rubber Ring)
- Dop PVC Ø 2" Bh 27,500
- Dop PVC Ø 3" Bh 38,500
- Dop PVC Ø 4" Bh 60,500
- Dop PVC Ø 6" Bh 137,500
30 CLAMP SADDLE GIP/STELL
- Clamp Saddle Ø 2" x 3/4" Bh 35,750
- Clamp Saddle Ø 2" x 1 1/2" Bh 33,000
- Clamp Saddle Ø 4" x 3/4" Bh 71,500
- Clamp Saddle Ø 6" x 3/4" Bh 107,250
- Clamp Saddle Ø 6" x 1 1/2" Bh 104,500
31 STOP KRAN KUNINGAN
- Stop Kran Ǿ 2" Bh 302,500
- Stop Kran Ǿ 3" Bh 935,000
32 Air Valve
- Air Valve Ǿ 2" Bh 264,000
- Air Valve Ǿ 3" Bh 302,500
- Air Valve Ǿ 4" Bh 357,500
- Air Valve Ǿ 6" Bh 495,000
33 Gate Valve
- > Gate Valve Ǿ 2" Bh 999,900
- > Gate Valve Ǿ 3" Bh 1,384,350
- > Gate Valve Ǿ 4" Bh 2,663,650
- > Gate Valve Ǿ 6" Bh 2,035,000
34 Check Valve
> Check Valve Ǿ 1 1/2" 398,200
- > Check Valve Ǿ 2" Bh 3,712,500
- > Check Valve Ǿ 3" Bh 1,802,900
- > Check Valve Ǿ 4" Bh 3,608,000
- > Check Valve Ǿ 6" Bh 3,575,000
35 Gibeoul Joint
- Gibeoul Joint Cast Iron PN 10 Ǿ 3" Bh 250,250
- Gibeoul Joint Cast Iron PN 10 Ǿ 4" Bh 350,350
- Gibeoul Joint Cast Iron PN 10 Ǿ 6" Bh 672,100
- Gibeoul Joint Cast Iron PN 10 Ǿ 8" Bh 1,215,500

36 Karet Packing

- Karet Packing Ǿ 2" Bh 15,950

- Karet Packing Ǿ 3" Bh 18,150

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
(Dalam Rupiah (Rp)

NO JENIS BARANG SPECIFIKASI SATUAN HARGA ( Rp )

1 2 3 4 5

- Karet Packing Ǿ 4' Bh 20,350

- Karet Packing Ǿ 6" Bh 26,400

- Karet Packing Ǿ 8" Bh 34,650

36 - Bout/Moer 5/8 x 3" Bh 5,500

37 - Bout/Moer 3/8 x 3" Bh 4,400

38 - Water Meter Ǿ 15 MM Bh 291,500

39 - Box Meter Fiber Glass Bh 46,750

40 - Lem Pipa Bh 82,500

41 - Teplon/Solatip Ledeng Bh 2,750


42 PEMASANGAN SAMBUNGAN RUMAH
Stop Kran Ǿ 1/2" Bh 77,000
Knee GIP Ǿ 1/2" Bh 11,000
Katup Searah ( Check Valve ) Ǿ 1/2" Bh 89,650
Water Meter Ǿ 15 MM 1/2 ( Setara Bestini, AMNB,ONDA) Bh 258,500
Plung Kran Ǿ 1/2" ( Setara YUTA ) Bh 144,100
Kran Ǿ 1/2" Bh 22,000
Pipa GIP Ǿ 1/2" 2 mm Bh 157,300
Clamp Saddle Ǿ 3" x 1/2" Bh 57,200
Clamp Saddle Ǿ 2" x 1/2" Bh 35,750
Teplon/Solatip Ledeng Bh 3,300

43 Batu Gunung m³ 496,500


44 Batu kali m³ 383,700
45 Tanah Timbungan m³ 80,000
46 Kerikil ayak beton m³ 335,400
47 Batu 500,700
Batu Belah 10 -15 cm m³ 498,600
Batu Belah 7 -10 cm m³ 496,600
Batu Pecah 3 - 5 cm ( Crusher ) m³ 523,100
Batu Pecah 2 - 3 cm ( Crusher ) m³ 600,400
Batu Pecah 1 - 2 cm ( Crusher ) m³ 632,400
Batu Pecah 0,5 - 1 cm ( Crusher ) m³ 632,400
Abu Batu ( Filler ) Kg 1,000
48 Gorong- Gorong
Gorong - Gorong beton Dia 60 cm ( Bertulang ) M' 360,000
Gorong - Gorong beton Dia 80 cm ( Bertulang ) M' 530,000
Gorong - Gorong beton Dia 100 cm ( Bertulang ) M' 740,000
Gorong - Gorong beton Dia 60 cm M' 170,000
Gorong - Gorong beton Dia 80 cm M' 250,000
Gorong - Gorong beton Dia 100 cm M' 330,000
49 Pasir
Pasir Urug m³ 142,800
Pasir Pasangan m³ 264,300
Pasir Beton m³ 338,200
50 Sirtu / Kerikil Sungai m³ 316,200
51 Material Timbunan Pilihan m³ 226,000
52 Aspal Bitumen ( Drum ) Kg 16,000
53 Aspal Bitumen ( Curah ) Kg 15,000
54 Minyak Flux Liter 3,800
Minyak Tanah ( Industri ) Liter 15,100
55 Kayu Bakar m³ 188,200
56 Kawat Bronjong ( Pabrikasi Uk.2x1x0,5 M" ) bh 483,800
57 Baut + Mour ( Dia 14 mm , P = 15 cm ) bh 4,300
58 Baut + Mour ( Dia 17 mm , P = 15 cm ) bh 5,400
59 Baut + Mour ( Dia 19 mm , P = 30 cm ) bh 10,800

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
(Dalam Rupiah (Rp)

NO JENIS BARANG SPECIFIKASI SATUAN HARGA ( Rp )

1 2 3 4 5
60 Besi Tulangan ( Polos ) kg 17,200
61 Besi Tulangan ( Ulir ) kg 19,200
62 Alat-alat Bantu 3 Set Set 275,000
63 Kayu untuk perancah ( Kapok, Kemiri, Piawing ) m³ 2,144,500
64 Kayu m³
Kayu Kelas I ( Bayam ) m³ 12,644,500
Kayu Kelas I ( Kumia, Kalapi ) m³ 7,644,500
Kayu Kelas II ( Baramming, Batau, Nato ) m³ 4,144,500
Kayu Kelas III ( Lapi- Lapi ) m³ 3,644,500
65 Minyak Diesel/ Solar Liter 6,000
66 Solar/ Industri Liter 9,500
67 Bensin/Premium Liter 7,000
68 Minyak Pelumas Liter 57,100
69 Kuku Macan Dia. 1,5" Bh 46,300
70 Kuku Macan Dia. 1,0" Bh 22,100
71 Kuku Macan Dia. 0,5" Bh 15,100
72 Kabel/ Tali Sling Baja Dia 36 mm M' 181,700
73 Kabel/ Tali Sling Baja Dia 28 mm M' 85,000
74 Kabel /Tali Sling Baja Dia 24 mm M' 67,200
75 Kabel Pengaku Dia 16 mm M' 48,600
76 Jarum Keras 1,5" Bh 1,494,300
77 Jarum Keras 1,0" Bh 662,200
78 Beugel Plat Baja M' 88,200
79 Sadle Kabel Bh 881,500
80 Besi UNP 10 ( P = 6 m' ) Btg 450,000
81 Besi UNP 8 ( P = 6 m' ) Btg 350,000
82 Besi UNP 6 ( P = 6 m' ) Btg 325,000
83 Besi Siku ( P = 6 m, T=3 mm ) Btg 90,000
84 Besi Siku ( P = 6 m, T=5 mm ) Btg 200,000
85 Plastik Alas M2 3,500

DAFTAR HARGA SATUAN UPAH


1 Pekerja Org/Hari 86,800
2 Tukang Org/Hari 101,500
3 Mandor Org/Hari 101,500
4 Operator Terampil Org/Hari 106,400
5 Pembantu Operator Org/Hari 88,900
6 Sopir Terampil Org/Hari 101,500
7 Pembantu Sopir Org/Hari 86,800
8 Mekanik Terampil Org/Hari 106,400
9 Pembantu Mekanik Org/Hari 88,900
10 Kepala Tukang Org/Hari 106,400
11 Buruh Tak Terampil Org/Hari 86,800
12 Buruh Semi Terampil Org/Hari 88,200
13 Buruh Terampil Org/Hari 88,900
14 Tukang Batu Org/Hari 101,500
15 Tukang Cat Org/Hari 101,500
16 Tukang Kayu Org/Hari 101,500
17 Tukang Besi Org/Hari 101,500
18 Operator Semi Terampil Org/Hari 101,500
19 Sopir Pribadi Org/Hari 101,500

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
STANDAR HARGA SATUAN BAHAN BANGUNAN DAN UPAH KERJA
PEMERINTAH PROVINSI SULAWESI SELATAN
KABUPATEN SIDENRENG RAPPANG
TAHUN 2018

Dalam Rupiah (Rp)

No JENIS BARANG SPESIFIKASI SATUAN HARGA

1 2 3 4 5
Bahan Dasar
Aspal
Aspal Bitumen (drum) kg 22,436
Aspal Bitumen (curah) kg 21,563
Abu Batu M³ 375,417
Batu
Batu Gunung M³ 173,250
Batu Kali Utuh 7-10 cm M³ 204,960
Batu Kali Quary 5-7 cm M³ 52,500
Krikil 3-5 cm M³ 180,000
Sirtu
Sirtu M³ 155,250
Sirtu ( Quarry ) M³ 120,750
Sirtun Olahan M³ 191,087

Batu Merah Uk.Besar Buah 660


Batu Merah Uk.Kecil Buah 550
Bata Ringan M³ 1,146,705
Bata Blok 21x10,5x6 cm - 60 bh/m2 M³ 32,665
Batako 40x20x10 cm - 13 bh/m2 M³ 67,515

Cipping
Split 7 - 10 cm M³ 206,850
Split 5 - 7 cm M³ 196,350
Split 3 - 5 cm M³ 220,500
Split 2 - 3 cm M³ 263,235
Split 1 - 2 cm M³ 295,050
Split 0,5 - 1 cm M³ 315,000

Timbunan
Tanah biasa M³ 50,050
Tanah Pilihan M³ 65,450
Tanah Humus M³ 146,300
Tanah (Quarry M³ 19,250
Pilihan (Quarry) M³ 24,486

Pasir

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)

No JENIS BARANG SPESIFIKASI SATUAN HARGA

1 2 3 4 5
Pasir Timbunan / Urugan M³ 60,375
Pasir Pasangan M³ 138,000
Pasir Saringan M³ 129,938
Pasir Beton M³ 129,938
Pasir Quarry M³ 96,250

Semen
Porlant Cement ( Tonasa ) 50 Kg Zak 60,270
Porlant Cement ( Tonasa ) 40 Kg Zak 51,030
Porlant Cement ( Bosowa ) 40 Kg Zak 49,874
Semen Keramik ( Nat ) Kg 16,800
Semen Warna Zak 110,250

Beton Pra Cetak


Kansteen Beton 15 x 20 x 40 Buah 30,550
15 x 25 x 40 Buah 32,603
15 x 30 x 40 Buah 35,018
15 x 30 x 50 Buah 69,069
Panel Pagar Buah
Beton Ready Mix K225 M³
Paving Blok
Segi Empat Tbl.6 cm K.225 66,990
Segi Empat Tbl.6 cm K.250 Standar M² 66,990
Segi Empat Tbl.6 cm K.250 Warna M² 90,090
Segi Empat Tbl.6 cm K.300 Standar M² 86,625
Segi Empat Tbl.6 cm K.300 Warna M² 85,995
Kacang Tbl. 6 cm K.225 M² 66,990
Kacang Tbl. 8 cm K.250 Standar M² 71,610
Kacang Tbl. 6 cm K.250 Warna M² 81,900
Kacang Tbl. 6 cm K.300 Standar M² 86,625
Kacang Tbl. 6 cm K.300 Warna M² 115,763
Segi Enam Tbl. 6 cm K.250 Standar M² 71,610
Segi Enam Tbl. 6 cm K.250 Warna M² 64,000
Segi Enam Tbl. 6 cm K.300 Standar M²
Segi Empat Tbl.8 cm K.250 Standar M² 69,300
Segi Empat Tbl.8 cm K.300 Standar M² 71,610
Kacang Tbl. 6 cm K.250 Standar M² 69,300
Kacang Tbl. 8 cm K.300 Standar M² 71,610
Segi Enam Tbl. 8 cm K.250 Standar M² 69,300
Segi Empat Tbl.10 cm K.250 Standar M² 69,300
Segi Empat Tbl.10 cm K.300 Standar M² 71,610

Loster
Loster Beton 15 x 20 Buah 47,250

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)

No JENIS BARANG SPESIFIKASI SATUAN HARGA

1 2 3 4 5
Loster Beton 15 x 20 Buah 63,000
Loster Beton Buah 20,580
Loster Keramik Buah 78,750
Grass Block 40 x 25 x 10 cm Buah 99,750
Glas Blok Buah 37,047
Gorong- Gorong
Diameter 20 cm 6x10x20 Buah 66,150
Diameter 30 cm 8x10x20 Buah 99,225
Diameter 40 cm Tebal 6 Buah 132,300
Diameter 50 cm Tebal 6 Buah 165,480
Diameter 60 cm Tebal 6 Buah 198,450
Ijuk Ikat 24,250
Water Profing
Jenis Membran + Pasang M² 294,000
Aquaroop Kg 29,400
Nodroop Ltr 29,820
Aqua Seal' Ltr 46,200
Plastik Beton M² 129,150
Lem Fox Putih Kg 21,000

Bahan Kayu
Kayu Kelas l
* Balok Ulin M³ 14,616,000
* Papan Ulin M³ 15,750,000
* Balok Bayam M³ 10,500,000
* Papan Kumia M³ 6,825,000
Kayu Kelas ll
Balok/Papan M³ 3,675,000
Kayu Kelas III
Balok/Papan M³ 2,625,000
Tripleks
2 mm Lembar 43,890
3 mm Lembar 55,440
4 mm Lembar 75,075
6 mm Lembar 80,850
9 mm Lembar 132,825
12 mm Lembar 205,950
Teakwod Lembar 98,175
Lembrasering Standar 4m Btg 23,100
Kayu Lapis Btg 6,825
4 mm 63,000
12 mm 201,600
Bambu 33,075
Rotan Pengikat 29,453

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)

No JENIS BARANG SPESIFIKASI SATUAN HARGA

1 2 3 4 5
Kayu Dolken dia 8-10/4 meter 36,750

BAHAN LANTAI/DINDING
Bahan Lantai
Ezenza
Granit/ Marmer
Tegel Granito ex.Granito 60 x 60 cm Dos 265,250
Tegel Granito Warna Terang (Cina) 60 x 60 cm Dos 155,925
Tegel Granito Warna Gelap ( Cina ) 60 x 60 cm Dos 205,590
Tegel Granit Ex.Granito 30 x 60 cm Dos 330,330
Granite Star White Inpor M² 1,282,050
Granit Ex.Ezenza 60 x 60 cm Dos 300,300
Tegel Keramik
Tegel Keramik Polos 40 x 40 cm Dos 75,075
Tegel Keramik Warna 40 x 40 cm Dos 75,075
Tegel Keramik Polos 30 x 30 cm Dos 63,525
Tegel Keramik Warna 30 x 30 cm Dos 75,075
Tegel Keramik Polos 20 x 20 cm Dos 63,525
Tegel Keramik Warna 20 x 20 cm Dos 63,525
Tegel Keramik Polos 25 x 20 cm Dos 63,525
Tegel Keramik Warna 25 x 20 cm Dos 63,525
Tegel Plint
Plint Granit Impor 10 x 60 Buah 28,350
Plint Granit Impor 10 x 40 Buah 28,350
Kuku Tegel Buah 13,860
Batu Koral Bks 315,000
Bahan Dinding

Tegel Keramik Polos 20 x 20 cm Dos 63,525


Tegel Kleramik Warna 20 x 20 cm Dos 63,525
Tegel Keramik Polos 25 x 20 cm Dos 63,525
Tegel Kleramik Warna 25 x 20 cm Dos 63,525
Tegel Keramik Polos 25 x 40 cm Dos 86,625
Tegel Keramik 30 x 60 cm Dos 138,600
Tegel Keramik 18 x 27 Dos 94,500
Batu Alam/Tempel Batu Alam M² 207,900
Batu Andesit M² 254,100
Batu Paras M² 254,100

BAHAN ATAP/PLAFOND ( Langit-Langit )


Bahan Atap
Seng
Seng BJLS 0.30 mm Lembar 66,990
Seng BJLS 0.28 mm Lembar 75,075

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)

No JENIS BARANG SPESIFIKASI SATUAN HARGA

1 2 3 4 5
Seng Gelombang BJLS 34" BJLS
Lembar 51,975
0,18 MM 6,7 kk
Seng Gelombang BJLS 33" BJLS
Lembar 48,510
0,22 MM 6,7 kk
Seng Gelombang BJLS 32" BJLS
Lembar 86,625
0,35 MM 10 kk
Seng Gelombang BJLS 28" BJLS
Lembar 98,175
0,30 MM 10 kk
Seng Zingagalume / Spandek Tebal 2,5 mm m' 32,340
Tebal 3 mm m' 42,735
Tebal 3,5 mm m' 48,510
Tebal 4 mm m' 48,510
Genteng Metal
Maxi Group Lembar 28,350
Genteng Metal Permukaan Halus Lembar 78,750
Genteng Metal Permukaan Kasar Lembar
Genteng Keramik/Beton
Genteng Beton Buah 18,900
Genteng Keramik Buah 36,750

Nok
Nok Atap Zinggalume 44,730
Nok Atap Metal Sheet
Nok Genteng Beton 47,250
Nok Genteng Keramik 78,750
Nok Aluminium SWG 28"-180 cm 44,730
Nok Aluminium SWG 28"-180 cm
List Plank Semen ( super Plank )
10 x 244x 0,9 cm lembar 34,125
10 x 244x 0,9 cm lembar 57,750
10 x 244x 0,9 cm lembar 68,250
Wood Plank 10 x 244x 0,9 cm lembar 120,750
Rangka Atap
Baja Ringan ( Kuda- Kuda ) 0.60 Btg 60,375
0.70 Btg 67,620
0.75 Btg 72,450
1.00 Btg 120,750
Rangka Atap
Baja Ringan ( Rink ) 25.00 Btg 30,188
3.00 Btg 33,810
Bahan Talang
Talang Jural Alunzinc (Baja Ringan ) M' 55,755
Setengah Lingkaran M' 55,755
Segiempat M' 47,250

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)

No JENIS BARANG SPESIFIKASI SATUAN HARGA

1 2 3 4 5

Talang PVC
Setengah Lingkaran Dia 6 Buah 55,755
Dia 8 Buah 47,250
Segi Empat
Karet Pelapis Genteng
Lebar 55 cm M' 10,500
Lebar 90 cm M' 19,425
Lebar 120 cm M' 26,250

Corong Talang PVC


Setengah Lingkaran 85,680
Segi Empat 40,215

Bahan Plafond Kg
Penutup Plafond Lembar
Eternit 100 x 100 Lembar 28,350
Asbes 100 x 100 M1 30,450
Gypsum Board Tbl 9 mm Lembar 78,750
Gypsum Board Tbl 12 mm 110 x 220 97,650
Calsiboard 120 x 240 92,400
Tripleks Melamin
Lest Profil Kayu 2 x 3 cm m1 6,064
3 x 3 cm m1 9,096
4 x 4 cm m1 13,571
5 x 5 cm m1 18,191
Rangka Plafon
Hollow Kelas 1 ( Galvanis )
2x4 Btg 34,178
4x4 Btg 60,638
4x6 Btg 66,150
6x6 Btg 73,868

Hollow Kelas 2
2x4 Btg 25,200
4x4 Btg 57,750
HPL 220,500
Lem HPL (Fox Kining ) Kaleng Besar 137,550
UB 888/400 Compoud Zak
Cornis Zak
Isolasi Gypsum ( Paper Tape ) Roll 15,750
Screws /Sekrup dos
Kertas Amplas Lembar 5,250

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)

No JENIS BARANG SPESIFIKASI SATUAN HARGA

1 2 3 4 5
BAHAN BESI/BAJA
Besi Beton SNI
* d=5 mm Btg 20,475
* d=6 mm 0,22 kg/m1 Btg 27,720
* d=8 mm 0,39 kg/m1 Btg 43,575
* d=10 mm 0,62 kg/m1 Btg 68,775
* d=12 mm 0,89 kg/m1 Btg 100,164
* d=14 mm 1,21 kg/m1 Btg 151,719
* d=16 mm 1,39 kg/m1 Btg 185,400
* d=19 mm 2,23 kg/m1 Btg 231,584
* d=22 mm 2, 46 kg/m1 Btg 409,020
Besi Beton Polos Kg 13,650
Besi Beton Ulir Kg 14,490
Besi Siku
Besi Siku 30.30.3 Btg 69,300
Besi Siku 40.40.4 Btg 103,950
Besi Siku 40.40.3 Btg 10,710
Besi Siku 50.50.4 Btg 150,675
Besi Siku 50.50.5 Btg 181,125
Besi Siku 60.60.6 Btg 265,650
Besi Siku 70.70.7 Btg 404,250
Besi Siku 100.100.10 Btg 1,016,400
Besi Hollow Medium A
1,5 x 1,5 Btg 55,750
20 x 20 Btg 69,300
20 x 40 Btg 80,850
40 x 40 Btg 115,500
40 x 60 Btg 161,700
50 x 50 Btg 161,700
60 x 60 Btg 236,775
Besi Strip Btg
30,2 mm 1x4 Btg 26,250
30,3 mm 1x5 Btg 38,118
35,4 mm 1x6 Btg 49,035
40,4 mm 2x6 Btg 60,165
40,6 mm 2x8 Btg 69,930
50,6 mm 1,5 x 6 Btg 87,780
Besi Hollow Medium B
20 x 20 Btg 35,700
20 x 40 Btg 53,550
40 x 40 Btg 68,250
40 x 60 Btg 78,750
50 x 50 Btg 89,250
60 x 60 Btg

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)

No JENIS BARANG SPESIFIKASI SATUAN HARGA

1 2 3 4 5
Besi Hollow Galvanis
20 x 20 Btg
20 x 40 Btg
40 x 40 Btg
40 x 60 Btg
50 x 50 Btg
60 x 60 Btg
Besi Hollow Stailiss 20 x 20 Btg 144,900
20 x 40 Btg 213,675
40 x 40 Btg 288,750
20 x 60 Btg 314,213
Besi Plat Stailiss
Baja Pofil Kg 18,900

Besi Plat
* 1,5 mm Lembar 367,200
* 2 mm Lembar 472,500
* 2,5 mm Lembar 546,000
* 3 mm Lembar 640,500
* 3, 5 mm Lembar 766,500
* 4 mm Lembar 882,000
* 4,5 mm Lembar 966,000
* 5 mm Lembar 1,345,575
* 6 mm Lembar 1,599,675
* 8 mm Lembar 2,100,000
* 9 mm Lembar 2,336,250
Tali Sleng
d = 36 mm M' 225,750
d = 32 mm M' 147,000
d = 28 mm M' 89,775
d = 24 mm M' 81,900
d = 19 mm M' 58,485
d = 38 mm M' 204,750
Kawat Las Dos 94,500
Jarum Pengeras 2" Buah 2,268,000
1,5 " Buah 1,652,700
1" Buah 787,500
Kuku Macan d= 1, 5 Buah 73,500
d=1,0 Buah 38,115
d=0,5 Buah 28,613
Kawat
Licin 4 mm kg 21,000
Beton kg 176,850
Bronjong d= 6mm kg 37,800

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)

No JENIS BARANG SPESIFIKASI SATUAN HARGA

1 2 3 4 5
Bronjong Pabrikasi Uk 2x10,5 mm Buah
Nyamuk Plastik Meter 19,950
Ayakan Kecil Meter 19,950
Duri 100 m/roll Roll 147,000
Paku
Biasa Kg 17,850
Asbes Kg 17,850
Seng (Payung)RRT Kg 31,500
Skrup besi hollow Dos/Bks 68,250
Skrup Biji 26,250
Payung Berulir Kg 31,500
Sirap Kg 26,250
Beton Kg 33,075
Ramset biji 525
Baut Baja 30,608
BAHAN ALUMINIUM
Almunium 4 Inci ( warna ) 154,665
Almunium Composit Panel 315,000
Almunium Color Pintu & Jendela 12,600
Kusen Aluminium 4'x1 3/4"(YKK) M'
Kusen Aluminium 3'x1 1/2"(YKK) M'
Kusen Aluminium 2"x1 " M'

KACA
Bening 3 mm M² 105,000
Bening 5 mm M² 115,500
Buram 3 mm M² 107,730
Buram 5 mm M² 315,000
Rayben 3 mm M² 115,500
Rayben 5 mm M² 141,750
Biru 5 mm M² 155,925
Rangka Nako Lengkap Terali Mata 21,000
Seal Besar Untuk Kaca Tube 36,750
Seal Kacil Untuk Kaca Tube 31,500
Sealant Kls 1 Tube 68,250
PENGGANTUNG/JENDELA/PINTU
Kunci Tanam
Union 2x Slag ( Biasa ) Buah 68,250
Benotti 2 Slag ( Semacamnya ) Buah 168,000
Ses 2x Slag ( Semacamnya ) Buah 219,450
Ses 1x Slag ( Semacamnya )
Kunci Sloot Buah 15,750
Kunci Lemari Buah 11,650
Penggantung

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)

No JENIS BARANG SPESIFIKASI SATUAN HARGA

1 2 3 4 5
Hak Angin Kecil ( Pasangan ) Buah 14,238
Hak Angin Besar ( Pasangan ) Buah 21,000
Grendel
Grendel Kecil Buah 12,810
Grendel Kecil Buah 24,150
Grendel Besar Buah 34,650
Grendel Tanam Buah 49,088
Grendel Kodok Buah 35,700
Engsel Pintu
Engsel Pintu Biasa Pasang 10,868
Engsel Pintu Ex.SES Pasang 27,300
Engsel Jendela Buah 17,325
Engsel Jendela ex.SES Pasang 21,000
Expaynolet
Handel Pintu Aluminium Buah 157,500
Hak Angin Buah 10,500
Handel Pintu Bossini Buah 68,250
Arcel Stainless Buah 273,000
Stainless Buah 307,650
Tarikan Jendela Buah 10,500

BAHAN SANITASI

1 Pipa Besi GIP 1/2 inci - 6 m btg 71,663


3/4 inci - 6 m btg 86,625
1 inci - 6 m btg 102,638
1 1/2 inci - 6 m btg 165,375
2 inci - 6 m btg 270,113
2 1/2 inci - 6 m btg 392,490
3 inci - 6 m btg 407,925

2 Pipa Superalon PVC AW Panjang 4 Mtr


1/2 inci 4 m btg 24,255
3/4 inci 4 m btg 30,870
1 inci - 4 m btg 49,613
1 1/2 inci - 4 m btg 60,638
2 inci - 4 m btg 82,688
2 1/2 inci - 4 m btg 93,713
3 inci - 4 m btg 187,425
4 inci - 4 m btg 253,575

3. Pipa PVC Panjang 4 mtr AW


1/2 inci btg 18,900
3/4 inci btg 18,900

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)

No JENIS BARANG SPESIFIKASI SATUAN HARGA

1 2 3 4 5
1 inci btg 47,250
1 1/2 inci btg 52,500
2 inci btg 68,250
2 1/2 inci btg 84,000
3 inci btg 115,500
4 inci btg 189,000
5 Inci btg 367,500
6 Inci btg 505,000

4 Pipa PVC Panjang 4 Mtr D untuk Saluran


2 inci 47,250
2 1/2 inci 68,250
3 inci 78,750
4 inci 126,000
5 Inci
6 Inci 257,775

5 Pipa jenis Btg C Untuk Instalasi Listrik


5/8 inci - 4 m btg 9,135
3/4 inci - 4 m btg 14,280
1 inci - 4 m btg 19,425
1 1/2 inci - 4 m btg 20,580
2 inci - 4 m btg 27,510
6 Sambungan Pipa
Lurus 1/2 Inci Buah 1,575
Knie 1/2 Inci Buah 2,100
Tee 1/2 Inci Buah 2,100
Lurus 3/4 Inci Buah 2,100
Knie 3/4 Inci Buah 2,625
Tee 3/4 Inci Buah 3,150
Lurus 2 Inci Buah 3,150
Knie 2 Inci Buah 4,200
Tee 2 Inci Buah 5,250
Lurus 3 Inci 5,250
Knie 3 Inci 8,400
Tee 3 Inci 9,450
Lurus 4 Inci 13,650
Knie 4 Inci 10,500
Tee 4 Inci 15,750

Kloset Duduk Lengkap Ex.KIA(Warna ) Buah 2,727,900


Kloset Duduk Lengkap Ex.TOTO(Warna ) Buah 3,037,650
Kloset Jongkok Buah 326,025
Wastahafel Gantung Keramik(Warna) Buah 630,000

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)

No JENIS BARANG SPESIFIKASI SATUAN HARGA

1 2 3 4 5
Wastahafel Cuci Piring 1 Mata Biasa Buah 210,000
Wastahafel Cuci Piring 2 Mata Biasa Buah 630,000
Wastahafel Cuci Piring 1 Mata Buah 630,000
Wastahafel Cuci Piring 2 Mata Buah 1,260,000
Pompa Air PS 130 Bit Ex. Simisu/SANYO Buah 2,100,000
Pompas Air Ex.Simizu Sumur Dangkal Buah 573,300
Urinior Buah 840,000
Backtup
Biasa Fiber Buah 2,415,000
Ex.Toto Keramik Buah 4,567,000
Hand Shower Mini Buah 220,500
Shower Gantung Untuk Mandi Gantung Buah 688,500
Shower Tempel Untuk Mandi Stainless Buah 1,365,000
Bak Mandi Fiber Buah 400,050
Rezervoir Fiber= 0,5 M3 Buah 866,250
Rezervoir Fiber= 1 M3 Buah 1,455,300
Rezervoir Fiber= 2 M3 Buah 2,625,000
Stop Kran Besi Buah
1/2 Inci Pvc Buah 20,066
Kuningan Buah 49,350
3/4 Inci Pvc Buah 26,250
Kuningan Buah 58,800
1 Inci Pvc Buah 58,800
Kuningan Buah 136,500
2 Inci Pvc 126,000
Kuningan 273,000
Tempat Sabun Keramik Buah 36,750
Kran Air Buah
Biasa Buah 15,750
Angsa Biasa Buah 126,000
Kls I Buah 892,500
Wastafel Biasa Buah 126,000
Kls I Buah 892,500
Kristal Buah 108,780
Pembuangan Kolam Buah 4,000
Pintu KM/WC (180 x170 )cm Aluminum Buah 892,500
Pintu KM/WC (180 x170 )cm Lengkap Buah 288,750
Pintu KM/WC (180 x170 )cm Zinggalume Buah 252,000
Kelas 1 Buah 577,500
Kelas 2 Buah 252,000
Floor Drain Stainless Kelas I Buah 183,750
Kelas II Buah 47,250
Floor Drain PVC Biasa Buah 18,900
Kelas I Buah 89,250

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)

No JENIS BARANG SPESIFIKASI SATUAN HARGA

1 2 3 4 5

Bahan Finishing Cat


Cat Dasar Ex.Andurcoat Liter 89,513
Cat Tembok
Interior
Ex. Dulux Kg 37,800
Ex.Mowilex Kg 37,800
Ex.Jotun Kg 50,400
Avitex Kg 16,800
Metrolite Kg 32,243
Ex.Aries Gold Kg 9,387
Exterior Ex. Dulux Kg 75,600
Ex.Mowilex Kg 73,500
Ex.Jotun Kg 76,650
Cat Besi/Kayu
Auto Lux Liter 68,250
Suzuka Liter 63,000
mowilex Liter 57,110
Dulux Liter 49,560
Meni Besi Kg 18,209
Sending Sungkay Liter 59,850
Inpra Liter 59,850
Cat Clear Ex.Impra Kg 63,000
Cat Clear Dop Liter 68,250
Wood Filler Ex.Impra Kg 63,000
Glotex Kg 45,675
Avian Kg 57,750
Politur Kg 57,750
Meni Kayu Kg 18,218
Cat Atap/Genteng
Yoko Kg 20,948
AGA Kg 27,038
Avitex 33,994
Acicryl 54,915
Mowilex Liter 67,694
Dulux Liter 111,794
Plamur Merah Zak 63,000
Yoko Kg 4,200
Scancoat Kg 3,780
Dempul Besi/Kayu
Dempul Mobil Besar Klg 115,500
Dempul Mobil Sedang Klg 57,750
Dempul Mobil Kecil Klg 36,750

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)

No JENIS BARANG SPESIFIKASI SATUAN HARGA

1 2 3 4 5
Dempul Impra Klg 36,750
Dempul Isamu Klg 57,750
Dempul Kayu Klg 34,808

Minyak Cat
Afdunner Liter 8,400
Thinner Bias Liter 20,790
Thinner A 9 Ex.Avian ) 5 Kg Liter 126,000
Thinner Super Liter 29,400

BAHAN LISTRIK
Lampu Jalan Buah 4,989,600
Tiang PJU Octagonal Galvanis Single 9 Mtr Buah 6,142,500
Tiang PJU Octagonal Galvanis Duble 9 Mtr Buah 5,526,675
Tiang PJU Octagonal Galvanis Decoratif Tinggi 9 Mtr Double Buah 7,856,415
Tiang PJU Octagonal Galvanis Decoratif Tinggi 9 Mtr Single Buah 15,642,900
Lampu LED 150 Wat/220 V AC Buah 13,800,150
Lampu LED 120 Wat/220 V AC Buah 63,000
Kapasitor HPIT 250 W H Buah 71,190
Kapasitor HPIT 400 W PH Buah 71,190
Kapasitor SON T 400 W PH Buah 71,190
Kapasitor SON T 400 W Buah 71,190

Bahan Listrik Bangunan


Kuku Macan Buah 34,650
Pipa Union Untuk Kabel
5/8 Inci - 4 m Btg 8,925
1 Inci - 4 m Btg 18,270
1 1/2 Inci - 4 m Btg 22,785
2 Inci- 4 m Btg 28,350
Kabel Listrik
Kabel NYY
1 x 1 1/2 mm2 roll 309,750
1 x 2 1/2 mm2 m1 40,950
2 x 1 1/2 mm2 m1 14,128
2 x 2 1/2 mm2 m1 14,700
3 x 1 1/2 mm2 m1 14,333
3 x 2 1/2 mm2 m1 17,640
Lampu
Neon Buah
1 x 20 W Kap Biasa Buah 126,000
2 x 20 W (Pakai Kap ) Buah 171,780
1 x 40 W Kap Biasa Buah 138,750
2 x 40 W (Pakai Kap ) Buah 286,335

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)

No JENIS BARANG SPESIFIKASI SATUAN HARGA

1 2 3 4 5
lampu Pijar Buah
25 Wat Buah 10,500
40 Wat Buah 26,250
kapsul Ex.Philips 5 Wat Buah 39,900
18 Wat Buah 48,300
25 Wat Buah 58,800
MCB
MCB 6 A Buah 71,715
MCB 10 A Buah 99,750
MCB 30 A Buah 378,000
Shakelar Phase
Biasa Tunggal Buah 7,875
Biasa Ganda Buah 14,175
Broco Tunggal Buah 17,325
Broco Ganda Buah 24,255
Klipsal/ Panasonic Tunggal Buah 28,350
Klipsal/ Panasonic Ganda Buah 36,750
STOP KONTAK
Biasa ( Tempel ) Buah 4,725
Broco ( Tempel ) Buah 24,255
Klipsal /Panasonic ( Tanam ) Tunggal Buah 28,350
Klipsal /Panasonic ( Tanam ) Ganda Buah 36,750
Fitting
Keramik Buah 21,053
Biasa Buah 3,675
Kembang Buah 23,100
Cup Down Light 4 inc Buah 54,600
3 inc Buah 44,100
5 inc Buah 66,150

BAHAN BAKAR MINYAK


Premium Industri Ltr 8,925
Pelumas Ltr 16,695
Solar Ltr 5,150
Solar Industri Ltr 7,900
Pertamax Ltr 8,450
Minyak Tanah Ltr
Minyak Tanah Industri Ltr
Pertalite Ltr 7,700

UPAH KERJA
Pekerja Orang/Hari 86,500
Tukang :
Tukang Kayu Orang/Hari 103,000

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)

No JENIS BARANG SPESIFIKASI SATUAN HARGA

1 2 3 4 5
Tukang Batu Orang/Hari 103,000
Tukang Cat Orang/Hari 103,000
Tukang Listrik Orang/Hari 103,000
Tukang Pipa Orang/Hari 98,700
Tukang Besi Orang/Hari 103,000
Operator/Driver
Sopir Orang/Hari 111,500
Pembantu Sopir Orang/Hari 97,500
pembantu Masinis Orang/Hari 97,500
Operator Terlatih Orang/Hari 113,500
Operator Kurang Terlatih Orang/Hari 97,500
Mekanik Orang/Hari 120,000
Kepala Tukang
Kepala Tukang Kayu Orang/Hari 130,000
Kepala Tukang Batu Orang/Hari 130,000
Kepala Tukang Cat Orang/Hari 130,000
Kepala Tukang Listrik Orang/Hari 130,000
Kepala Tukang Pipa Orang/Hari 130,000
Kepala Tukang Besi Orang/Hari 130,000
Mandor Orang/Hari 130,000

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
STANDAR HARGA SATUAN BAHAN BANGUNAN DAN UPAH KERJA
PEMERINTAH PROVINSI SULAWESI SELATAN
KABUPATEN BULUKUMBA
TAHUN 2018
Dalam Rupiah (Rp)
NO JENIS BARANG SPESIFIKASI SATUAN HARGA

1 2 3 4 5
A. BAHAN DASAR
1 Batu Kali :
Utuh m³ 200,000
Batu Pecah 7 - 10 cm m³ 400,000
Batu Pecah 5 - 7 cm m³ 400,000
Batu Pecah 3 - 5 cm m³ 400,000
Batu Pecah 2 - 3 cm m³ 400,000
Batu Pecah 1 - 2 cm m³ 414,000
Batu Pecah 0,51 - 1 cm m³ 420,000
2 Batu Merah Buah 650
3 Batu Gunung m³ 197,000
4 Batu Alam
Andesit Biasa m² 226,000
Andesit Susun Sirih m² 205,000
Andesit Halus m² 196,000
Andesit Gelombang m² 211,000
Batu Candi Permukaan Rata m² 190,000
Batu Palimanag Kuning m² 196,000
Batu Hijau Sukabumi m² 186,000
Batu Gali Green m² 181,000
Batu Bali Napoli m² 196,000
Paras Jokja Besar m² 196,000
Batu Cirebon Beraturan m² 160,000
Batu Cirebon Tak Beraturan m² 91,000
5 Tanah Timbunan m² 100,000
6 Pasir
Timbunan/Urung m³ 147,000
Pasangan m³ 218,000
Beton m³ 225,000
7 Kerikil m³ 170,000
8 Sirtu m³ 175,000
9 Kapur Pasangan BKS 3,200
10 Semen PC
Ordinary Portland Cement (OPC 50 Kg) Kg 1,380
Portland Pozzoland Cement (PPC 40 Kg) Kg 1,500
Portland Compisito Cement (PCC 50 Kg) Kg 1,400
Putih Tiga Roda @ 40 Kg Kg 3,400
Semen Nat Putih Kg 27,000
Semen Nat Warna Kg 27,000

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)
NO JENIS BARANG SPESIFIKASI SATUAN HARGA

1 2 3 4 5
11 Paving Blok Lokal
Tebal 6 cm Biji 1,230
Tebal 8 cm Biji 1,300
Model Berlian Biji 1,600
12 Gorong - Gorong
d=30cm;pjg 1 m Biji 111,000
d=40cm;pjg 1 m Biji 130,000
d=60cm;pjg 0,5 m Biji 111,000
d=70cm;pjg 0,5 m Biji 121,000
d=80cm;pjg 0,5 m Biji 132,000
B. HARGA ASPAL /HOTMIX
1 Aspal (Esso Penetration) 60/70 ( 155 Kg/drum Kg 7,419
2 Aspal ( Iran Penetration ) 60/70 ( 183 Kg/drum Kg 6,557
3 Aspal Shell (Penetration) 60/70 ( 155 Kg/drum Kg 8,065
4 Aspal Pertamina (Penetration) 60/70 ( 155 Kg/drum Kg 7,419
5 Aspal Caltex (Penetration) 60/70 ( 155 Kg/drum Kg 7,419
6 Aspal Araco (Penetration) 60/70 ( 200 Kg/drum ) Kg 6,250
7 Hotmix ATB Ton 1,085,000
8 Hotmix AC-BC Ton 1,111,000
9 Hotmix AC-WC Ton 1,150,000
10 Hotmix III-Laston Ton 1,202,000
11 Hotmix III-Laston Spec Ton 1,306,000
12 Hotmix HRS Ton 1,293,000
13 Hotmix Sand Sheet Ton 1,423,000
14 Hotmix Sand Sheet Spec Ton 1,527,000
15 Tack Coat/Emulsi Liter 12,600
16 Prime Coat Liter 16,000
C. BAHAN KAYU
1 Kayu Kelas l
Balok Gergaji Sawmil m³ 10,000,000
Papan Gergaji Sawmil m³ 10,750,000
2 Kayu Kelas ll
Balok m³ 6,450,000
Papan m³ 6,450,000
3 Kayu Kelas lll
Balok m³ 4,680,000
Papan m³ 4,680,000
4 Kayu Kelas lV
Balok m³ 3,430,000
Papan m³ 3,430,000
D. BAHAN LANTAI
Tegel Keramik
Putih 10 x 20 cm Dos 73,000
Putih 10 x 20 cm Dos 73,000
Warna 10 x 20 cm Dos 73,000

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)
NO JENIS BARANG SPESIFIKASI SATUAN HARGA

1 2 3 4 5
Putih 20 x 20 cm Dos 62,000
Warna 20 x 20 cm Dos 62,000
Putih 20 x 25 cm Dos 62,000
Warn 20 x 25 cm Dos 49,000
Putih 30 x 30 cm Dos 75,000
Warna 30 x 30 cm Dos 97,000
Putih 40 x 40 cm Dos 269,000
Warna 40 x 40 cm Dos 156,000
Warna 50 x 50 cm Dos 263,000
Warna 60 x 60 cm Dos 13,000
Tegel Print 10 x 40 cm Lbr 16,000
E. BAHAN KACA
Kaca Bening 3 mm Uk.152 x 122 cm Meter 72,000
Kaca Buram 5 mm Uk.152 x 122 cm Meter 103,000
Kaca Ryben 3 mm Uk.152 x 122 cm Meter 77,000
Kaca Ryben 5 mm Uk.152 x 122 cm Meter 103,000
Rangka Nako Lengkap Terali 7 Mata Set/Daun 132,000
F. BAHAN BESI
Besi Beton
Polos Kg 26,000
Ulir Kg 26,000
Paku
Paku Biasa Kg 17,000
Paku Asbes Kg 59,000
Paku Seng (Payung) RRT Dos 54,000
Paku Skrub 31/2 Inci Dos 65,000
Paku Skrub 4 Inci Biji 800
Paku Payung 75 mmung Berulir Kg 30,000
Paku Sirap 3 cm Kg 27,000
Paku Beton Hitam 7 cm Dos 43,000
Paku Beton Hitam 10 cm Dos 48,000
Paku Beton Putih Dos 27,000
Kawat
Beton Kg 27,000
Nyamuk Meter 27,000
Ayakan Kecil Meter 32,000
Duri 7 kg Roll 153,000
Duri 10 kg Roll 185,000
Besi PLAT
2 mm=120 x 240 mm Lembar 645,000
3 mm=120 x 240 mm Lembar 968,000
Besi STREP
1 x 4 cm ; L=3 m Batang 12,000
1 x 5 cm ; L=3 m Batang 14,000
1 1/4 x 5 cm; L= 3 m Batang 22,000

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)
NO JENIS BARANG SPESIFIKASI SATUAN HARGA

1 2 3 4 5
1 1/2 x 5 cm ; L=3 m Batang 26,000
2 x 6 cm; L 3 m Batang 129,000
Besi SIKU Batang
30.30.3 Batang 49,000
40.40.4 Batang 69,000
40.40.3 Batang 91,000
50.50.4 Batang 88,000
50.50.5 Batang 156,000
60.60.6 Batang 276,000
70.70.7 Batang 366,000
Besi Type C (Rangka Baja Ringan) 6 m
Canal 8 cm x 0,75 , P = 5,8 meter Batang 85,000
Canal 8 cm x 0,65 , P = 5,8 meter Batang 60,000
Besi HOLLOW (Baja Ringan)
20 x 40 x 0,25 ; P=5,8 meter Batang 22,000
20 x 40 x 0,30 ; P=5,8 meter Batang 28,000
20 x 40 x 0,35 ; P=5,8 meter Batang 27,000
Besi Hollow (Galvanis)
Hollow Tipis Uk 20 x 40 ,L=6 m Batang 59,000
Hollow B Uk. 20 x 40 , L = 6 m Batang 75,000
Hollow A Uk.20 x 40, L = 6 m Batang 62,000

Hollow Tipis Uk 15 x 30, L=6m Batang 49,000


Hollow B uk 15 x 30, L=6 m Batang 51,000
Hollow A uk 15 x 30, L=6 m Batang 62,000
Hollow Tipis Uk 20 x 40, L=6m Batang 47,000
Hollow B uk 20 x 40, L=6 m Batang 56,000
Hollow A uk 20 x 40, L=6 m Batang 84,000

Hollow Tipis Uk 30, L=6 m Batang 55,000


Hollow B Uk 30, L=6 m Batang 66,000
Hollow A Uk 30, L=6 m Batang 96,000

Hollow Tipis Uk 40, L=6 m Batang 81,000


Hollow B Uk 40, L=6 m Batang 102,000
Hollow A Uk 40, L=6 m Batang 134,000

UNP : 5 L=6 m Batang 183,000


UNP : 6,5=6 m Batang 290,000
UNP : 8=6 m Batang 323,000
UNP :10=6 m Batang 430,000
UNP :12=6 m Batang 645,000
G BAHAN PIPA
1 Pipa PVC Air Bersih
Pipa Peralon PCV

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)
NO JENIS BARANG SPESIFIKASI SATUAN HARGA

1 2 3 4 5
ɸ 1/2' - 4 m Batang 25,000
ɸ 3/4' - 4 m AW Batang 32,000
ɸ 1' - 4 m AW Batang 45,000
ɸ 1,5' - 4 m AW Batang 69,000
ɸ 2' - 4 m AW Batang 87,000
ɸ 2,5' - 4 m AW Batang 124,000
ɸ 3' - 4 m AW Batang 175,000
ɸ 4' - 4 m AW Batang 290,000
2 Pipa Untuk Saluran Pembuangan Air
ɸ 1/2 Inci - 4 m Batang 25,000
ɸ 3/4 Inci - 4 m Batang 32,000
ɸ 1 Inci - 4 m Batang 45,000
ɸ 1 1/2 Inci - 4 m Batang 48,000
ɸ 2 Inci - 4 m Batang 59,000
ɸ 2 1/2 Inci -4 m Batang 81,000
ɸ 3 Inci - 4 m Batang 102,000
ɸ 4 Inci - 4 m Batang 151,000
Pipa Untuk Instalasi Listrik
ɸ 5/8 Inci - 4 m Batang 11,000
H. BAHAN LANGIT - LANGIT
1 Eternit 100 x 100 Set 21,000
2 Tripleks
122 x 244 x 0.2 cm Lembar 46,000
122 x 244 x 0.3 cm Lembar 54,000
122 x 244 x 0.4 cm Lembar 69,000
122 x 244 x 0.6 cm Lembar 76,000
122 x 244 x 0.9 cm Lembar 124,000
3 Tripleks Melamin
122 x 244 x 0.3 cm Lembar 73,000
4 Teakwood
80 x 244 x 0.3 cm Lembar 126,000
122 x 244 x 0.3 cm Lembar 134,000
Karsiboard Lembar 70,000
Gipsum Lembar 70,000
Les Gipsum Lembar 56,000
5 Har Board 122 x 244 cm Lembar 70,000
6 Asbes Plat Harfeks
200 x 100 x 0.0 cm Lembar 68,000
7 List Propil
2 x 3 cm /4 m Batang 9,000
3 x 3 cm /4 m Batang 11,000
4 x 4 cm /4 m Batang 15,000
4 x 5 cm /4 m Batang 16,000
I. BAHAN ATAP
1 Genteng

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)
NO JENIS BARANG SPESIFIKASI SATUAN HARGA

1 2 3 4 5
Asbes Gelombang 7 Kaki Lembar 68,000
2 Seng Gelombang Kecil
BJLS 0.20 mm Kaki 7,000
BJLS 0.30 mm Lembar 70,000
BJLS 0.30 mm Color 6 Kaki Lbr 65,000
3 Seng Plat
BJLS 0.30 mm 90 x 180 Lembar 48,000
BJLS 0.30 mm 40 x 180 Lembar 54,000
4 Spandek
Spandek Silver
Spandek t=0,30 Meter 43,000
Spandek t=0,35 Meter 48,000
Spandek Warna
Spandek t=0,30 Meter 54,000
Spandek t=0,35 Meter 59,000
Baut Driling Biji 650
5 Atap Metal
Sakura Roof Lembar 35,000
Seng Plastik (Fiber) Kaki 16,000
6 Atap Metal Sakura Roof Kaki 32,000
7 Calsiplank /Woodplank Kaki
Polos 108,000
Motif Kaki 114,000
16 Calsiplank /Woodplank
Polos Meter 81,000
Motif Meter 86,000
J. BAHAN PENGGANTUNG
1 Kunci Tanam
1 Slag Buah 322,000
2 Penggantung
Hak Angin Kecil Buah 22,000
Hak Angin Besar Buah 32,000
Grendel Kecil Buah 9,000
Grendel Besar Buah 38,000
Engsel Pintu Buah 38,000
Engsel Jendela Buah 27,000
Door Close Buah 161,000
K. BAHAN SANITER
Kloset Jongkok Buah 172,000
Kloset Duduk DATA Buah 430,000
Westafel Warna Buah 323,000
Westafel Cuci Piring Logam Buah 194,000
Urinoir Lengkap Buah 833,000
Bak Mandi Fiber Buah 376,000
Reservoir Fiber= 1 M3 Buah 1,400,000

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)
NO JENIS BARANG SPESIFIKASI SATUAN HARGA

1 2 3 4 5
Reservoir Fiber= 2 M3 Buah 3,000,000
Reservoir Stainiess Stell= 1 m3 Buah 4,250,000
Stop Kran 3/4 Buah 81,000
Kran Air 3/4 Buah 38,000
L. POMPA AIR
Mesin Pompa
Pompa Mesin Kecil
Manual Buah 484,000
Outomatic Buah 634,000
Pompa Mesin Besar
Manual Buah 914,000
Outomatic Buah 3,550,000
M. BAHAN FINISHING/ CAT
1 Cat Tembok
Cat Dasar Kg 23,000
Cat Kilap Kg 23,000
Cat Nippon ( Weatherbond ) Kg 92,000
2 Cat Kayu
Cat Dasar Kg 134,000
Cat Kilap Liter 134,000
Politur
SP3 Kg 59,000
Warna Kg 62,000
Meni Kg 81,000
Minyak Cat Liter 29,000
Minyak Cat Botol 8,000
3 Cat Atap
Cat Dasar Kg 220,000
Cat Kilap Liter 220,000
Lem Seng Liter 16,000
Amplas/ Kertas Gosok Lembar 11,000
Dempul Kg 43,000
Residu Liter 24,000
Kuas Besar Buah 3,000
Kuas Kecil Buah 19,000
Gerobak Dorong Buah 516,000
N. BAHAN INSTALASI LISTRIK
Kabel Listrik
1 Type NYA (full)
1 1/2 mm Roll 215,000
2 1/2 mm Roll 269,000
2 Type NYY
2x 1 1/2 mm Roll 430,000
2x2 2 1/2 mm Roll 591,000
3 Lampu TL

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)
NO JENIS BARANG SPESIFIKASI SATUAN HARGA

1 2 3 4 5
1x18 W Buah 16,000
2x18 W Buah 32,000
1x40 W Buah 19,000
2x40 W Buah 38,000
4 Lampu Pijar
24 W Buah 51,700
42 W Buah 71,700
52 W Buah 106,700
100 W Buah 173,300
Lampu Taman Mercury Buah 400,000
5 Lampu Pijar
Lampu Sorot 20 Wat + set Buah 134,000
6 Saklar Phase
Tunggal Putih Buah 16,000
Double Putih Buah 25,000
7 Stop Kontak
Hitam Buah 31,000
Putih Buah 24,000
8 Zekering Kast Lokal Biasa
Lokal 2 Group Automat Buah 16,000
Fitting Buah 11,000
O. UPAH KERJA
Pekerja:
Pekerja Tak Terlatih Org/Hari 71,000
Pekerja Kurang Terlatih Org/Hari 77,000
Pekerja Terampil Org/Hari 85,000
Tukang
Tukang Kayu Org/Hari 100,000
Tukang Batu Org/Hari 100,000
Tukang Cat Org/Hari 100,000
Tukang Llstrik Org/Hari 100,000
Tukang Pipa Org/Hari 100,000
Tukang Besi Org/Hari 100,000
Kepala Tukang Org/Hari 100,000
Kepala Tukang Kayu Org/Hari 120,000
Kepala Tukang Batu Org/Hari 120,000
Kepala Tukang Listrik Org/Hari 120,000
Kepala Tukang Cat Org/Hari 120,000
Kepala Tukang Pipa Org/Hari 120,000
Kepala Tukang Besi Org/Hari 120,000
Mandor Org/Hari 120,000

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
STANDAR HARGA SATUAN BAHAN BANGUNAN DAN UPAH KERJA
PEMERINTAH PROVINSI SULAWESI SELATAN
KABUPATEN SINJAI
TAHUN 2018

Dalam Rupiah (Rp)

NO JENIS BARANG SPESIFIKASI SATUAN HARGA

1 2 3 4 5
A. BAHAN DASAR
1. Batu kali
Utuh m² 237,500
- Split 7-10 cm m² 381,250
- Split 5 - 7 cm m² 400,000
- Split 3 - 5 cm m² 437,500
- Split 2 - 3 cm m² 475,000
- Split 1-2 cm m² 500,000
- Split 0,5 - 1 cm m² 531,250
2. Batu gunung m² 212,500
3. Batu Alam
Andesit Biasa m² 224,838
Andesit Susun Sirih m² 230,945
Andesit Halus m² 219,842
Andesit Gelombang m² 238,162
Batu Candi Permukaan Rata m² 189,308
Batu Palimanan Kuning m² 199,856
Batu Hijau Suka Bumi m² 170,988
Batu Bali Green m² 201,522
Batu Bali Napoli m² 207,628
Paras Jogja Besar m² 213,735
Batu Cirebon Beraturan m² 177,095
Batu Cirebon Tidak Beraturan m² 92,156
4. Batu Quarry (Ukuran Cruisher) M-010 m³ 279,799
Batu Belah 10-15 cm m³ 331,983
Batu Pecah 5-7 cm m³ 388,609
Batu Pecah 3-5 cm m³ 451,342
Batu Pecah 2-3 cm m³ 595,683
Batu Pecah 1-2 cm m³ 586,800
Batu Pecah 0.5-1 cm m³ 629,547
Royalty-Batu Quarry MR-10 m³ 189,863
Royalty-Kerikil Galian MR-11 m³ 180,426
Kerikil Sungai-Royalti MR-12 m³ 252,596
Sirtu-Royalty MR-42 m³ 180,426
Gorong-gorong Beton pipa 60 cm M' Lari 1,082,555
Gorong-gorong Beton pipa 80 cm M' Lari 1,262,980
5. Tanah Timbunan

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)

NO JENIS BARANG SPESIFIKASI SATUAN HARGA

1 2 3 4 5

Bahan Timbunan/ Pengikat pilihan M-040


m³ 76,612
6. Pasir
Pasir ayak Untuk Beton M-041 m³ 265,809
- Timbunan / Urug m³ 158,220
- Pasangan m³ 165,076
- Beton m³ 184,589
7. Kerikil m³ 171,404
8. Sirtu m³ 158,220
9. Kapur Pasangan Zak 105,480
Kapur Hidrasi M-081 m³ 73,836
10 Semen (PC)
- Tonasa 50 Kg Zak 72,500
- Tonasa 40 Kg Zak 60,000
- Putih Tiga Roda 50Kg Zak 156,250
- Bosowa 50 Kg Zak 71,250
- Bosowa 40 Kg Zak 64,800
12 Semen Putih (50 Kg) Zak 58,750
13 Batu merah Buah 116,875
14 Paving Blok 750
Urugan Pilihan M-050 m³ 144,341
Bitumen ( Asphalt ) M-061 Kg 16,888
Bitumen ( Asbuton ) M-062 Ton 16,888
Kerosine M-065 Ltr 15,011
15 Paving Blok Mutu (K 175)
Tebal 6 cm M2 54,900
Tebal 8 cm M2 61,067
Berlian M2 61,067
16 Paving Blok Mutu (K 225)
Tebal 6 cm M2 58,625
Tebal 8 cm M2 63,510
17 Paving Blok Mutu (K 300)
Tebal 6 cm M2 67,174
Tebal 8 cm M2 73,281
18 Paving Blok Mutu (K400) M2 79,387
19 Topiuskup (K 225) Biji 4,275
20 Kanstin 20X25X50 Biji 44,579
21 Buis Beton
d=20 cm Biji 243,558
d=30 cm Biji 295,871
d=40 cm Biji 377,670
d=50 cm Biji 446,705
d=60 cm Biji 510,522
22 Aspal AC 60/70 Kg 13,100
B. BAHAN KAYU

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)

NO JENIS BARANG SPESIFIKASI SATUAN HARGA

1 2 3 4 5
1 Kayu Kls I (Bayam)
- Balok Gergaji Sawmil m³ 11,281,250
- Papan Gergaji Sawmil m³ 11,875,000
- Balok Gergaji Sawmil m³ 11,281,250
- Balok Gergaji Sawmil m³ 11,875,000
2 Kayu Kls II (Kalapi)
- Balok m³ 8,312,500
- Papan m³ 8,906,250
3 Kayu Kls III
- Balok m³ 3,562,500
- Papan m³ 4,156,250
4 Kayu Bakar M-070 m³ 360,852
5 Acuan dari Kayu M-180 m³ 1,804,256
C. BAHAN LANTAI
1. Tegel PC
Tegel PC Abu-Abu 20 x 20 cm Dos 57,000
Tegel PC Abu-Abu 30 x 30 cm Dos 77,188
Tegel PC Warna 20 x 20 cm Dos 65,313
Tegel PC Badak 20 x 20 cm Buah 3,331
Tegel PC Badak 30 x 30 cm Buah 3,331
Tegel PC Wafel 20 x 20 cm Buah 3,442
Tegel PC Wafel 30 x 30 cm Buah 3,441
Tegel Plint PC 15 x 20 cm Buah 3,497
Tegel Plint PC 15 x 30 cm Buah 7,772
Tegel Mozaik 30 x 30 cm Buah 15,882
2. Tegel Keramik
Tegel Keramik Putih 10 x 20 cm Dos 83,125
Tegel Keramik Warna 10 x 20 cm Dos 89,063
Tegel Keramik Putih 20 x 20 cm Dos 77,188
Tegel Keramik Warna 20 x 20 cm Dos 73,281
Tegel Keramik Putih 20 x 25 cm Dos 73,281
3. Tegel Keramik Warna 20 x 25 cm Dos 77,188
Tegel Keramik Putih 30 x 30 cm Dos 73,281
Tegel Keramik Warna 30 x 30 cm Dos 86,604
Tegel Keramik Putih 40 x 40 cm Dos 65,313
Tegel Keramik Warna 40 x 40 cm Dos 71,250
Tegel Keramik Warna 50 x 50 cm Dos 106,875
Tegel Keramik Warna 60 x 60 cm Dos 285,000
D. BAHAN KACA
Kaca Bening 3 mm M' 190,000
Kaca Bening 5 mm M' 213,750
Kaca Bening 2 mm M' 51,630
Kaca Buram 3 mm M' 118,248
Kaca Buram 5 mm M' 130,462
Kaca Buram 3 mm M' 122,134

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)

NO JENIS BARANG SPESIFIKASI SATUAN HARGA

1 2 3 4 5
Kaca Bening DG 5 mm M' 118,248
Kaca Bening 3 mm M' 119,914
Kaca Bening 5 mm M' 128,241
Kaca Bening 2 mm M' 51,630
Rangka Nako Lengkap Terali Set 13,879
Kaca Ryben 3 mm M' 201,875
Kaca Ryben 5 mm M' 225,625
Rangka Nako Lengkap Terali 7 Mata Set/Daun
427,470
E. BAHAN BESI
1 Besi Beton
Besi Beton d = 4 mm Batang 22,818
Besi Beton d = 6 mm Batang 34,975
Besi Beton d = 8 mm Batang 49,500
Besi Beton d = 10 mm Batang 67,313
Besi Beton d = 12 mm Batang 134,903
Besi Beton d = 14 mm Batang 166,250
Besi Beton d = 16 mm Batang 213,750
Besi Beton d = 19 mm Batang 332,500
Besi Beton d = 22 mm Batang 475,000
2 Besi Ulir
Besi Beton d = 12 mm Batang 100,150
Besi Beton d = 16 mm Batang 192,972
Besi Beton d = 19 mm Batang 335,870
3 Paku
Paku Biasa Kg 20,818
Baja Paku-Paku Jembatan M-166 Kg 36,085
Paku Asbes Dos 36,085
Paku Seng (payung) RRT Dos 47,500
Paku Skrup 3 1/2 Inci Biji 27,758
Paku Skrup 4 inci Biji 34,697
Paku Payung Berulir 75 mm Kg 39,971
Paku Sirap Kg 36,085
Paku Beton Dos 48,854
Paku Beton Hitam Dos 18,320
Paku Beton Putih Dos 51,630
4 Kawat
Kawat Beton Kg 29,978
Baja Anyaman Bronjong M-062 Kg 36,085
Kawat Nyamuk M'/Roll 20,541
Kawat Ayakan kecil M'/Roll 16,100
Kawat Duri Roll 148,438
5 Besi Plat
Besi Plat 2 mm = 120 x 240 mm Lembar 1,054,797
Besi Plat 2 mm = 120 x 240 mm Lembar 1,276,859

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)

NO JENIS BARANG SPESIFIKASI SATUAN HARGA

1 2 3 4 5
Besi H 15 cm Panjang 12 cm Batang 5,662,594
6 Besi Strep
Besi Strep 30,3 mm Batang 46,078
Besi Strep 35,4 mm Batang 52,185
Besi Strep 46,4 mm Batang 54,960
Besi Strep 40,6 mm Batang 99,928
Besi Strep 50,6 mm Batang 136,013
7 Besi Siku
Besi Siku 30,30.3 Batang 113,252
Besi Siku 40.40.4 Batang 138,789
Besi Siku 50.50.5 Batang 173,486
Besi Siku 60.60.6 Batang 243,158
Besi Siku 70.70.7 Batang 343,087
Besi Siku 40.40.3 Batang 920,490
Besi Siku 40.40.4 Batang 146,000
Besi Siku 50.50.4 Batang 146,000
8 Tulangan Besi M-167 Kg 19,986
9 Besi Tipe C (Rangka Baja Ringan) 6
Lebar 10, Tebal 1,8-2,00 mm Batang 141,565
Lebar 12,5, Tebal 1,8-2,00 mm Batang 171,543
Lebar 15, Tebal 1,8-2,00 mm Batang 243,158
F BAHAN PIPA
1 Pipa GIP Medium A
Pipa Besi GIP *1/2 Inci 6m Batang 218,511
Pipa Besi GIP *3/4 Inci 6m Batang 295,678
Pipa Besi GIP *1 Inci 6m Batang 359,521
Pipa Besi GIP *2 Inci 6m Batang 810,308
Pipa Besi GIP *3 Inci 6m Batang 1,492,260
Pipa Besi GIP *4 Inci 6m Batang 1,989,680
2 Pipa Paralon PVC
Pipa Paralon PVC *1/2 Inci 4m Batang 26,982
Pipa Paralon PVC *3/4 Inci 6m Batang 36,975
Pipa Paralon PVC *1 Inci 6m Batang 43,637
Pipa Paralon PVC *1 1/2 Inci 6m Batang 64,733
Pipa Paralon PVC *2 Inci 6m Batang 85,273
Pipa Paralon PVC *2 1/2 Inci 6m Batang 134,127
Pipa Paralon PVC *3 Inci 6m Batang 175,486
Pipa Paralon PVC *4 Inci 6m Batang 224,063
Pipa Paralon PVC *5 Inci 6m Batang 348,979
Pipa Paralon PVC *6 Inci 6m Batang 376,730
Pipa Paralon PVC *8 Inci 6m Batang 487,462
Pipa Paralon PVC *10 Inci 6m Batang 695,493
3 Pipa Untuk Saluran Pembuangan Air

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)

NO JENIS BARANG SPESIFIKASI SATUAN HARGA

1 2 3 4 5
Jenis Btg D Untuk Saluran
Pembuangan Air *1/2 Inci 4m Batang
22,818
Jenis Btg D Untuk Saluran
Pembuangan Air *3/4 Inci 4m Batang
29,758
Jenis Btg D Untuk Saluran
Pembuangan Air *1 Inci 4m Batang
46,413
Jenis Btg D Untuk Saluran
Pembuangan Air *1 1/2 Inci 4m Batang
119,243
Jenis Btg D Untuk Saluran
Pembuangan Air *2 Inci 4m Batang
187,034
Jenis Btg D Untuk Saluran
Pembuangan Air *2 1/2 Inci 4m Batang
269,474
Jenis Btg D Untuk Saluran
Pembuangan Air *3 Inci 4m Batang
385,502
Jenis Btg D Untuk Saluran
Pembuangan Air *4 Inci 4m Batang
578,474
Jenis Btg D Untuk Saluran
Pembuangan Air *5 Inci 4m Batang
933,275
Jenis Btg D Untuk Saluran
Pembuangan Air *6 Inci 4m Batang
1,238,672
Jenis Btg D Untuk Saluran
Pembuangan Air *10 Inci 4m Batang
3,000,620
4 Pipa Untuk Instalasi Listrik
Pipa Jenis Btg Untuk Instalasi Listrik
*5/8 Inci 4m Batang
15,789
Pipa Jenis Btg Untuk Instalasi Listrik
*3/4 Inci 4m Batang
32,534
Pipa Jenis Btg Untuk Instalasi Listrik
*1 Inci 4m Batang
51,409
Pipa Jenis Btg Untuk Instalasi Listrik
*1 1/2 Inci 4m Batang
119,249
G. BAHAN LANGIT-LANGIT -
1 Eternit 100 x 100 cm Set 27,758
2 Triplex -
Triplex 122 x 244 x 0,2 cm Lembar 55,516
Triplex 122 x 244 x 0,3 cm Lembar 62,733
Triplex 122 x 244 x 0,6 cm Lembar 97,152
Triplex 122 x 244 x 0,9 cm Lembar 152,668
3 Triplex Melamin 122 x 244 x 0,3 cm Lembar 97,152
4 Accustic 40 x 60 cm Lembar 77,722
5 Teakwood
Teakwood 122 x 244 x 0,3 cm Lembar 124,910
Teakwood 80 x 244 x 0,3 cm Lembar 97,569
Karsiboard Lembar 83,273
Gypsum Lembar 98,563

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)

NO JENIS BARANG SPESIFIKASI SATUAN HARGA

1 2 3 4 5
Les qipsum Lembar 33,648
6 Hard Board 122 x 244 cm Lembar 102,843
7 Asbes Plat Harfex 200 x 100 x 0,3 cm Lembar 55,904
8 List Profill
List Profill 2 x 3 cm 4M 16,100
List Profill 3 x 3 cm 4M 16,665
List Profill 4 x 4 cm 4M 22,206
List Profill 4 x 5 cm 4M 27,758
H. BAHAN ATAP
1 Genteng
Genteng Beton Buah 12,213
Genteng Keramik Buah 37,751
Genteng Asbes Lembar 207,073
Genteng Harflex (115 x 85 x 0,5 cm) Lembar 48,229
Asbes Gelombang 7 kaki Lembar 72,225
2 Seng Gelombang BWG
Seng Gelombang BWG 34" BJLS 0,18 mm Kaki 7,772
Seng Gelombang BWG 33" BJLS 0,22 mm Kaki 8,660
Seng Gelombang BWG 32" BJLS 0,30 mm Kaki 9,438
Seng Gelombang BWG 28" BJLS 0,35 mm Kaki 10,548
Bitumen Gelombang 200 x 95 x 0,3 cm Lembar 183,535
Bitumen Genteng 106 x 40 x 0,3 cm Lembar 84,939
Nok Bitumen 50 x 90 x 0,3 cm Lembar 116,028
3 Atap Metal Lembar 65,925
4 Asbes Genteng Lembar 37,445
5 Seng Plastik (Fiber) Kaki/Lbr 17,813
6 Sirap Ikat/M2 348,083
7 Seng Plat
Seng Plat BJLS 0,30 mm Kaki/Lbr 81,110
Seng Plat BJLS 0,28 mm Kaki/Lbr 74,170
Seng Plat BJLS 0,35 mm Kaki/Lbr 88,604
8 Seng Super Deck
Seng Super Deck 180 x 70 cm 10 kaki Lembar 221,925
Seng Super Deck 180 x 70 cm 8 kaki Lembar 142,815
Seng Super Deck 180 x 70 cm 7 kaki Lembar 125,411
Seng Super Deck 180 x 70 cm 6 kaki Lembar 91,130
9 Seng Aluminium Gelombang SWG

Seng Aluminium Gelombang SWG 32" 0,27 mm Lembar


96,404
Seng Aluminium Gelombang SWG 30" 0,31 mm Lembar
94,295
Seng Aluminium Gelombang SWG 28" 0,38 mm Lembar
102,206
10 Fiber Semen (Harflex)

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)

NO JENIS BARANG SPESIFIKASI SATUAN HARGA

1 2 3 4 5
Fiber Semen (Harflex) Super 240 x 108 x 0,6 mm Lembar 135,238
Fiber Semen (Harflex) Super 180 x 108 x 0,6 mm Lembar 88,049
Fiber Semen (Harflex) Ekonomi 240 x 92 x 0,5 mm Lembar 92,490
Fiber Semen (Harflex) Ekonomi 180 x 92 x 0,4 mm Lembar 83,608
Fiber Semen (Harflex) Mini 240x 105 x 0,4 mm Lembar 83,608
Fiber Semen (Harflex) Mini 180 x 92 x 0,5 mm Lembar 74,170
Fiber Semen (Harflex) Super 140 x 105 x 0,4 mm Lembar 91,935
Fiber Semen (Harflex) Super 180 x 105 x 0,4 mm Lembar 88,049
11 Nok/Bubungan Genteng
Nok/Bubungan Genteng Beton Buah 44,747
Nok/Bubungan Genteng Asbes Buah 69,174
Nok/Bubungan Genteng Keramik Buah 53,074
12 Aluminium SWG
Aluminium SWG 28" 180 cm Lembar 86,939
Aluminium SWG 28" 105 cm Lembar 70,839
13 Nok Steel Gelombang/Rata
Nok Steel Gelombang Super 180 cm Buah 114,808
Nok Steel Gelombang Mini 105 cm Buah 104,149
Nok Steel Gelombang Ekonomi 95 cm Buah 70,284
Nok Steel Rata Super 108 cm Buah 66,953
Nok Steel Rata Mini 105 cm Buah 54,185
Nok Steel Rata Ekonomi 95 cm Buah 61,402
Nok 1/2 Lingkaran Buah 36,975
14 Karet Pelapis Genteng Roll 451,897
Karet Pelapis 55 M Meter 11,103
Karet Pelapis 90 M Meter 11,103
I. BAHAN PENGGANTUNG
1 Kunci Tanam
Kunci Tanam Union 1 x Slag Buah 199,301
Kunci Tanam Union 2 x Slag Buah 305,336
Kunci Tanam Yale 1 x Slag Buah 87,715
Kunci Tanam Yale 2 x Slag Buah 128,796
2 Kunci Tanam Kuda Terbang Buah 84,700
3 Penggantung
Penggantung Hak Angin Kecil Buah 13,324
Penggantung Hak Angin Besar Buah 17,765
Grendel Kecil Buah 14,434
Grendel Besar Buah 16,655
4 Engsel
Engsel Pintu Buah 35,308
Engsel Jendela Buah 26,648
Engsel Staenless Grandino EK G3 Buah 210,959
Engsel Staenless Grandino EK G2 Buah 190,974
Engsel Staenless Grandino EK G1 Buah 125,465
Engsel Biasa EB 070 Paloma Buah 165,076

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)

NO JENIS BARANG SPESIFIKASI SATUAN HARGA

1 2 3 4 5
Engsel Biasa Solid EK 09 (4BB) SN Buah 98,818
Engsel Biasa Solid EK 02 (2BB) CHR Buah 52,740
Engsel Biasa Solid EK 01 (2 BB) CHR Buah 92,267
Engsel Biasa EB 035 Paloma Buah 105,480
Expanyonet Buah 257,370
J. BAHAN SANITER
1 Kloset Duduk KIA (Lengkap) Buah 2,109,594
2 Kloset Jongkok Buah 299,562
3 Wasthafel Warna Buah 593,323
4 Wasthafel Cuci Piring Logam Buah 514,213
5 Pompa Tangan Terpasang Buah 355,994
5 Pompa Mesin Buah 1,898,634
6 Urinor Lengkap Buah 1,004,114
7 Bak Mandi Fiber Buah 444,125
8 Reservoir Fiber 1m Buah 1,221,344
9 Reservoir Fiber 3m Buah 3,997,125
10 Stop Kran Buah 44,413
11 Kran Air Buah 38,861
K. BAHAN FINISHING / CAT
1 Cat Tembok
1 Cat Tembok Aviatex 5 kg 106,369
Metrolite 5 kg 126,910
Kimex 5 kg 92,490
Vinikex Nippon Paint 5 kg 81,387
Dulux 5 kg 164,661
2 Cat Tembok Interior Dulux Pearl Glo 2.5 Ltr 265,699
Dulux Pentalite Standar 2.5 Ltr 203,244
Catylac 5 Kg 201,856
Catylac 25 Kg 974,634
Metrolite 16 Ltr / Pail 528,288
3 Cat Tembok Eksterior Dulux 2.5 Ltr 348,418
Dulux 20 Ltr 2,160,448
Mowilex 2.5 Ltr 244,881
Mowilex 20 Ltr 1,963,047
4 Cat Kayu Glotex Kg 64,938
Avian Kg 67,313
Dulux 1 Kg 57,516
Mowilex 1 Kg 92,490
Catylac 1 Kg 57,516
Palatone Kg 53,630
ICI Kg 78,612
Politur Kg 67,313
Meni Kg 34,656
Minyak Cat Liter 31,423
5 Cat Atap AGA 92,490

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)

NO JENIS BARANG SPESIFIKASI SATUAN HARGA

1 2 3 4 5
Lem Seng 134,127
Plamur 38,085
Amplas / Kertas Gosok 4,886
Dempul 46,531
Residu 64,733
6 Cat Untuk Pekerjaan Baja Jembatan M-090 Kg 21,430
I. BAHAN INSTALASI LISTRIK
1 Pipa Ion Untuk Kabel 5/8 inci - 4 m Batang 7,217
1 inci - 4 m Batang 23,872
1 1/2 inci - 4 m Batang 35,530
2 inci - 4 m Batang 34,420
2 Kabel Listrik
Type NYK 1 1/2 mm Roll 333,094
2 1/2 mm Roll 760,564
Type NYY 2 x 1 1/2 mm Roll 677,291
2 x 2 1/2 mm Roll 843,838
2 x 4 mm 388,609
3 Lampu TL 1 x 20 W Buah 99,928
2 x 20 W Buah 133,238
1 x 40 W Buah 127,686
2 x 40 W Buah 165,437
4 Lampu Pijar 25 W Buah 33,309
40 W Buah 61,067
60 W Buah 116,583
100 W Buah 207,628
Taman Mercury Buah 388,609
6 Saklar Phase Tunggal Putih Buah 24,982
Tunggal Hitam Buah 19,430
Double Putih Buah 27,758
Double Hitam Buah 22,206
7 Stop Kontak Hitam Buah 27,758
Putih Buah 29,978
8 Zekering Kast Lokal Biasa Buah 23,317
Lokal 2 Group Automat Buah 91,601
Lokal 3 Group Biasa Buah 105,480
Fitting Buah 11,103

A UPAH KERJA -
1 Pekerja Pekerja Org/hr 92,000
Buruh Org/hr 92,000
Pembantu Masinis Org/hr 97,500
Penjaga Gudang Org/hr 97,500
2 Tukang : Tukang Kayu Org/hr 113,500
Tukang Batu Org/hr 113,500

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)

NO JENIS BARANG SPESIFIKASI SATUAN HARGA

1 2 3 4 5
Tukang Cat Org/hr 113,500
Tukang Listrik Org/hr 113,500
Tukang Pipa Org/hr 103,000
Tukang Besi Org/hr 105,000
3 Kepala Tukang : Kepala Tukang Kayu Org/hr 140,500
Kepala Tukang Batu Org/hr 140,500
Kepala Tukang Listrik Org/hr 140,500
Kepala Tukang Cat Org/hr 140,500
Kepala Tukang Pipa Org/hr 140,500
Kepala Tukang Besi Org/hr 140,500
Mandor Org/hr 140,500
4 Penjaga Malam Org/hr 108,000

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
STANDAR HARGA SATUAN BAHAN BANGUNAN DAN UPAH KERJA
PEMERINTAH PROVINSI SULAWESI SELATAN
KABUPATEN BANTAENG
TAHUN 2018

(Dalam Rupiah (Rp)

NO. URAIAN SPESIFIKASI SATUAN HARGA


SATUAN

1 2 3 4 5

A BAHAN DASAR
1 Batu kali
- Utuh m³ 195,000
- Batu pecah 7 - 10 cm m³ 308,100
- Batu pecah 5 - 7 cm m³ 332,800
- Batu pecah 3 - 5 cm (Manual) m³ 340,600
- Batu pecah 3 - 5 cm (Cruser) m³ 390,000
- Batu pecah 2 - 3 cm (Manual) m³ 422,500
- Batu pecah 2 - 3 cm (Cruser) m³ 455,000
- Batu pecah 1 - 2 cm (Cruser) m³ 520,000
2 Batu gunung m³ 234,000
3 Tanah timbunan pilihan m³ 130,000
4 Tanah timbunan biasa m³ 97,500
5 Tanah timbunan humus m³ 195,000
6 Pasir urug/timbunan m³ 130,000
7 Pasir Pasangan m³ 260,000
8 Kerikil sungai m³ 195,000
9 Sirtu m³ 260,000
10 Kapur pasangan Zak 78,000
11 Semen tonasa @ 50 kg Zak 78,000
12 Bosowa @ 40 Kg Zak 58,500
13 Batu merah Bh 780
14 Batu beton ringan Bh 11,050
15 Paveing blok t. 6 cm M2 97,500
16 Paveing blok t. 8 cm M2 117,000
17 Plastik bening alas beton M2 7,800
18 Gorong-gorong dia. 60 cm Bh 130,000
19 Gorong-gorong dia. 80 cm Bh 162,500
20 Gorong-gorong dia. 100 cm Bh 260,000
21 Gorong-gorong dia. 60 , tul Ø 12 mm Bh 455,000
22 Gorong-gorong dia. 80 cm tul Ø 12 mm Bh 585,000
23 Gorong-gorong dia. 100 cm tul Ø 12 mm Bh 715,000

B BAHAN KAYU
1 Kayu kls I
- Balok gergaji swalmil m³ 13,000,000
- Papan gergaji swalmil m³ 14,300,000

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
(Dalam Rupiah (Rp)

NO. URAIAN SPESIFIKASI SATUAN HARGA


SATUAN

1 2 3 4 5
- Balok gergaji chansow m³ 13,000,000
- Papan gergaji chansow m³ 14,300,000
2 Kayu kls II
- Balok m³ 4,550,000
- Papan m³ 4,550,000
3 Kayu kls III
- Balok m³ 3,250,000
- Papan m³ 3,250,000
4 Bambu Btg 32,500
5 Kayu Kelas IV m³ 2,600,000

C BAHAN LANTAI
1 Tegel PC
- Abu-abu 20 x 20 cm Dos 79,500
- Abu-abu 30 x 30 cm Dos 83,000
- Warna 20 x 20 cm Dos 81,500
- Badak 20 x 20 cm Dos 83,500
- Badak 30 x 30 cm Dos 85,500
- Wafel 20 x 20 cm Dos 68,000
- Wafel 30 x 30 cm Dos 73,500
- Plint PC 15 x 20 cm Dos 72,500
- Plint PC 15 x 30 cm Dos 84,000
2 Tegel mozaik 30 x 30 cm Dos 104,000
3 Tegel keramik
- Putih 10 x 20 cm Dos 91,000
- Warna 10 x 20 cm Dos 97,500
- Putih 20 x 20 cm Dos 62,400
- Warna 20 x 20 cm Dos 78,000
- Putih 20 x 25 cm Dos 62,400
- Warna 20 x 25 cm Dos 78,000
- Putih 30 x 30 cm Dos 62,400
- Warna 30 x 30 cm Dos 71,500
- Putih 40 x 40 cm Dos 65,000
- Warna 40 x 40 cm Dos 78,000
- Warna 60 x 60 Dos 208,000
4 Granit ezensa 30 x 30 Dos 416,000
5 Granit ezensa 40 x 40 Dos 455,000
6 Granit ezensa 60 x 60 Dos 520,000
7 Batu alam paliman Bh 15,600

D BAHAN KACA
1 Kaca bening 3 mm m² 143,000
2 Kaca bening 5 mm m² 162,500
3 Kaca buram 2 mm m² 130,000
4 Kaca buram 3 mm m² 130,000

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
(Dalam Rupiah (Rp)

NO. URAIAN SPESIFIKASI SATUAN HARGA


SATUAN

1 2 3 4 5
5 Kaca buram 5 mm m² 325,000
6 Kaca ryben 3 mm m² 195,000
7 Kaca ryben 5 mm m² 227,500
8 Kaca Tempered 15 mm m² 3,510,000
9 Glass block Bh 32,500
10 Kaca nako (rangka nako + terali besi) daun 19,500
11 Loster Angin 15/25 Bh 22,100
12 Loster Angin 15/30 Bh 22,100
13 Loster Karawang Bh 22,100

E BAHAN BESI DAN BAJA


1 Besi beton Kg 13,000
2 Besi Beton Ulir 0 15,600
3 Paku biasa Kg 19,500
4 Paku asbes Kg 39,000
5 Paku seng (payung) RRT Kg 32,500
6 Paku sekrup 3 1/2 inc Kg 130,000
7 Paku sekrup 4 inc Kg 19,500
8 Paku 3-7 Kg 39,000
9 Paku payung berulir Kg 39,000
10 Paku sirap Kg 39,000
11 Paku Beton Dos 58,500
12 Kawat beton Kg 19,500
13 Rang Nyamuk m² 71,500
14 Rang Ayakan kecil m² 19,500
15 Kawat Duri @ 10Kg Roll 208,000
16 Kawat harmonika, #3 cm m² 45,500
17 Besi plat 2mm = 4 x 8 m Lbr 650,000
18 Besi plat 3mm = 4 x 8 m Lbr 1,007,500
19 Besi strep 3 x 30 mm - 6 m Kg 110,500
20 Besi strep 4 x 40 mm - 6 m Kg 143,000
21 Besi strep 5 x 30 mm - 6 m Kg 162,500
22 Besi strep 5 x 50 mm - 6 m Kg 227,500
23 Besi strep 6 x 50 mm - 6 m Kg 292,500
24 Besi siku 30,30,3 - 6 m Btg 84,500
25 Besi siku 40,40,4 - 6 m Btg 110,500
26 Besi siku 50,50,5 - 6 m Btg 227,500
27 Besi siku 60,60,6 - 6 m Btg 377,000
28 Besi siku 70,70,7 - 6 m Btg 422,500
29 Besi siku 40,40,3 - 6 m Btg 65,000
30 Besi siku 50,50,4 - 6 m Btg 110,500
31 Besi Baja H Beam 125 x 125 x 6,5 x 9 cm Kg 17,550
32 Besi Baja H Beam 150 x 150 x 7 x 10 cm Kg 17,550
33 Besi Baja Kanal UNP "U" 6,5 x 42 x 5 x 6 m' btg 279,500
Besi Baja Kanal UNP "U" 70 x 40 x 5 x 6 m' btg 305,500

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
(Dalam Rupiah (Rp)

NO. URAIAN SPESIFIKASI SATUAN HARGA


SATUAN

1 2 3 4 5
34 Besi Hollow 40 x 60, t = 1 mm 6m 188,500
35 Besi Hollow 40 x 40 t = 1 mm 6m 123,500
36 Besi Hollow 20 x 40 t = 1 mm 6m 97,500
37 Besi Hollow 20 x 20 t = 1 mm 6m 58,500
38 Baja Tralis m² 500,500
39 Kawat Bronjong (Pabrikan) m³ 487,500
40 Baut Baja Kg 22,750
41 Besi Galvanisir Kg 22,750
42 Paku Jembatan Kg 32,500
43 Besi Tempa m² 325,000
44 Rangka Atap Baja Ringan m² -
45 Baja Ringan (CNP) 75 x 0.75 M 19,500

F BAHAN PIPA
I Pipa PVC AW ###
Diameter 2 " Meter 11,960
Diameter 3 " Meter 24,960
Diameter 4 " Meter 41,210
Diameter 6 " Meter 97,500
Diameter 8 " Meter 162,500
Diameter 10 " Meter 249,210
Diameter 12 " Meter 357,500
II Pipa PVC S-10
1 Diameter 1/2 " 6,890
2 Diameter 3/4 " Meter 9,100
3 Diameter 1" Meter 14,625
4 Diameter 1 1/4 " Meter 19,955
5 Diameter 1 1/2 " Meter 31,525
6 Diameter 2 " Meter 52,455
7 Diameter 3 " Meter 104,780
8 Diameter 4 " Meter 156,520
9 Diameter 6 " Meter 325,780
10 Diameter 8 " Meter 528,710

III Pipa PVC S-12,5


1 Diameter 1/2 " Meter 4,810
2 Diameter 3/4 " Meter 7,150
3 Diameter 1" Meter 10,400
4 Diameter 1 1/4 " Meter 18,980
5 Diameter 1 1/2 " Meter 26,780
6 Diameter 2 " Meter 43,030
7 Diameter 3 " Meter 87,750
8 Diameter 4 " Meter 128,310
9 Diameter 6 " Meter 274,105
10 Diameter 8 " Meter 532,610

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
(Dalam Rupiah (Rp)

NO. URAIAN SPESIFIKASI SATUAN HARGA


SATUAN

1 2 3 4 5

IV Pipa GIP SNI Medium A


1 Diameter 1/2 " Meter 26,000
2 Diameter 3/4 " Meter 36,920
3 Diameter 1" Meter 56,420
4 Diameter 1 1/4 " Meter 72,670
5 Diameter 1 1/2 " Meter 83,460
6 Diameter 2 " Meter 112,710
7 Diameter 2 1/2 " Meter 151,710
8 Diameter 3 " Meter 219,505
9 Diameter 4 " Meter 283,660
10 Diameter 6 " Meter 407,940

V Pipa GIP Medium B


1 Diameter 1/2 " Meter 16,250
2 Diameter 3/4 " Meter 20,540
3 Diameter 1" Meter 26,000
4 Diameter 1 1/4 " Meter 32,500
5 Diameter 1 1/2 " Meter 37,960
6 Diameter 2 " Meter 48,750
7 Diameter 2 1/2 " Meter 67,210
8 Diameter 3 " Meter 86,710

VI Pipa HDPE (PE 100 / PN 10)


1 Diameter 1" Meter 16,335
2 Diameter 2" Meter 46,862
3 Diameter 3" Meter 93,730
4 Diameter 4" Meter 148,623
5 Diameter 6" Meter 328,640
6 Diameter 8" Meter 522,578
7 Diameter 10" Meter 806,802
8 Diameter 12" Meter 1,213,404
9 Diameter 16" Meter 1,890,054

VII Pipa Air Limbah SDR 41


1 Diameter 3" Meter 37,050
2 Diameter 4" Meter 73,190
3 Diameter 6" Meter 141,700
4 Diameter 8" Meter 216,905
5 Diameter 10" Meter 344,695
6 Diameter 12" Meter 536,640
7 Diameter 16" Meter 869,180
8 Diameter 20" Meter 1,352,130

VIII Pipa Jenis Batang C untuk instalasi

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
(Dalam Rupiah (Rp)

NO. URAIAN SPESIFIKASI SATUAN HARGA


SATUAN

1 2 3 4 5
listrik
1 Pipa dia. 5/8" 4 M btg/4m 9,750
2 Pipa dia. 3/4" 4 M btg/4m 15,600
3 Pipa dia. 1 1/2" 4 M btg/4m 15,600

IX Asessories Pipa
TEE
1 PVC Ø ¾" Buah 6,500
2 PVC Ø 1½" Buah 39,000
3 PVC Ø 2" Buah 78,000
4 PVC Ø 3" Buah 198,900
5 GIP Ø ½" Buah 6,500
6 GIP Ø ¾" Buah 10,400
7 GIP Ø 1¼" Buah 23,400
8 GIP Ø 1½" Buah 30,550
9 GIP Ø 2" Buah 46,475
KNEE 90°
1 PVC Ø 1½" Buah 22,750
2 PVC Ø 2" Buah 32,500
3 PVC Ø 3" Buah 45,500
4 GIP Ø ½" Buah 5,688
5 GIP Ø ¾" Buah 7,605
6 GIP Ø 1¼" Buah 18,200
7 GIP Ø 1½" Buah 23,725
8 GIP Ø 2" Buah 37,700
9 GIP Ø 3" Buah 107,250
KNEE 45°
1 PVC Ø 1½" Buah 26,000
2 PVC Ø 2" Buah 35,750
3 PVC Ø 3" Buah 54,600
4 GIP Ø 1½" Buah 28,600
5 GIP Ø 2" Buah 40,950
6 GIP Ø 3" Buah 131,300
REDUCER
1 PVC Ø 1½" x 1" Buah 19,500
2 PVC Ø 2" x 1" Buah 35,750
3 PVC Ø 2" x 1½" Buah 35,750
4 PVC Ø 3" x 1½" Buah 84,500
5 PVC Ø 3" x 2" Buah 78,000
6 PVC Ø 4" x 1½" Buah 107,250
7 PVC Ø 4" x 2" Buah 100,750
8 PVC Ø 4" x 3" Buah 100,750
9 GIP Ø 1½" x 1" Buah 22,750
10 GIP Ø 2" x 1" Buah 29,250
11 GIP Ø 2" x 1½" Buah 29,250

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
(Dalam Rupiah (Rp)

NO. URAIAN SPESIFIKASI SATUAN HARGA


SATUAN

1 2 3 4 5
12 GIP Ø 3" x 1½" Buah 84,500
13 GIP Ø 3" x 2" Buah 84,500
14 GIP Ø 4" x 1½" Buah 149,500
15 GIP Ø 4" x 2" Buah 149,500
16 GIP Ø 4" x 3" Buah 149,500
DOP (CAP)
1 PVC Ø ½" Buah 4,550
2 PVC Ø ¾" Buah 7,150
3 PVC Ø 1" Buah 12,350
4 PVC Ø 2" Buah 17,160
5 PVC Ø 3" Buah 22,360
CLAMP SADLE
1 Clam sadle 3" x 1/2" Buah 47,125
2 Clam sadle 2" x 1/2" Buah 29,250
3 Clam sadle 1 1/2" x 1/2" Buah 24,375
VALVE SOCKET (Sock Drat Luar)
1 GIP Ø 1" Buah 9,750
2 GIP Ø 1½" Buah 19,500
3 GIP Ø 2" Buah 27,950
4 GIP Ø 2½" Buah 42,900
5 GIP Ø 3" Buah 71,500
6 GIP Ø 4" Buah 116,350
FLANGE
1 GIP Ø 1" Buah 52,000
2 GIP Ø 1½" Buah 58,500
3 GIP Ø 2" Buah 67,600
4 GIP Ø 2½" Buah 78,000
5 GIP Ø 3" Buah 87,750
6 GIP Ø 4" Buah 104,000
FAUCET SOCKET (Sock Drat Dalam)
1 GIP Ø 1" Buah 10,400
2 GIP Ø 1½" Buah 19,500
3 GIP Ø 2" Buah 29,250
4 GIP Ø 2½" Buah 50,050
5 GIP Ø 3" Buah 71,500
6 GIP Ø 4" Buah 116,350
SOCKET
1 PVC Ø 2" 22,750
2 PVC Ø 3" Buah 45,500
3 GIP Ø ½" Buah 4,875
4 GIP Ø ¾" Buah 5,850
5 GIP Ø 1¼" Buah 14,300
6 GIP Ø 1½" Buah 17,225
7 GIP Ø 2" Buah 25,025
8 GIP Ø 2½" Buah 43,875

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
(Dalam Rupiah (Rp)

NO. URAIAN SPESIFIKASI SATUAN HARGA


SATUAN

1 2 3 4 5
9 GIP Ø 3" Buah 65,000
OVER SOCKET Buah
1 GIP Ø 2" x 1½" 29,250
DOUBLE NEPLE Buah -
1 GIP Ø 1½" 20,800
2 GIP Ø 2" Buah 26,975
3 GIP Ø 3" Buah 74,913
WATER MOER Buah
1 GIP Ø 1½" 53,625
2 GIP Ø 2" Buah 74,750
3 GIP Ø 3" Buah 143,000
KRAN AIR Buah -
1 GIP Ø ½" 17,875
2 GIP Ø ¾" Buah 23,400
WATER METER Buah -
1 Water meter Ø1/2" (Standar PDAM) 292,500
GATE VALVE (Stop Kran)
1 GIP Ø 1/2" Kuningan Buah 49,400
2 GIP Ø 3/4" Kuningan Buah 71,500
3 GIP Ø 1¼" Kuningan Buah 162,500
4 GIP Ø 1½" Kuningan Buah 234,000
5 GIP Ø 2" Kuningan Buah 341,250
6 GIP Ø 3" Kuningan Buah 867,750
7 GIP Ø 4" Kuningan Buah 1,430,000
CHECK VALVE (Klep Tidur)
1 GIP Ø ½" Kuningan Buah 51,350
2 GIP Ø 1¼" Kuningan Buah 182,000
3 GIP Ø 1½" Kuningan Buah 263,250
4 GIP Ø 2" Kuningan Buah 393,250
ASCCESORIES LAIN-LAIN -
1 Foot Valve Ø 1½" Kuningan Buah 195,000
2 Foot Valve Ø 2" Kuningan Buah 292,500
3 Air Valve 1½" Buah 292,500
4 Air Valve Ø 2" Buah 292,500
5 Lem Pipa 1/2 kg Buah 48,750
6 Seal Tape Buah 26,000
VALVE ALL FLANGE -
1 Valve All Flange Ø 8" Buah 12,272,000
2 Valve All Flange Ø 6" Buah 6,817,200
3 Valve All Flange Ø 4" Buah 3,389,100
4 Valve All Flange Ø 3" Buah 2,355,600
5 Valve All Flange Ø 2" Buah 1,562,600
CHECK VALVE ALL FLANGE -
1 Check Valve All Flange Ø 8" Buah 8,543,600
2 Check Valve All Flange Ø 6" Buah 5,401,500

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
(Dalam Rupiah (Rp)

NO. URAIAN SPESIFIKASI SATUAN HARGA


SATUAN

1 2 3 4 5
3 Check Valve All Flange Ø 4" Buah 2,909,400
4 Check Valve All Flange Ø 3" Buah 2,025,400
5 Check Valve All Flange Ø 2" Buah 1,298,700
BUTTERFLY VALVE
1 Buterfly Valve Ø 8" Buah 4,695,600
2 Buterfly Valve Ø 6" Buah 3,091,400
3 Buterfly Valve Ø 4" Buah 2,167,100
4 Buterfly Valve Ø 3" Buah 1,748,500
5 Buterfly Valve Ø 2" Buah 1,387,100
GILBOULT JOINT CI
1 Gilboult Joint CI Ø 350 mm Buah 2,017,600
2 Gilboult Joint CI Ø 300 mm Buah 971,100
3 Gilboult Joint CI Ø 250 mm Buah 933,400
4 Gilboult Joint CI Ø 200 mm Buah 660,400
5 Gilboult Joint CI Ø 150 mm Buah 367,900
6 Gilboult Joint CI Ø 100 mm Buah 208,000
7 Gilboult Joint CI Ø 75 mm Buah 145,600
8 Gilboult Joint CI Ø 50 mm Buah 137,800
FLANGE STEEL
1 Flange steel Ø 400 mm 1,193,140
2 Flange steel Ø 350 mm Buah 850,850
3 Flange steel Ø 300 mm Buah 705,640
4 Flange steel Ø 250 mm Buah 612,690
5 Flange steel Ø 200 mm Buah 391,040
6 Flange steel Ø 150 mm Buah 328,770
7 Flange steel Ø 100 mm Buah 163,150
8 Flange steel Ø 75 mm Buah 135,460
9 Flange steel Ø 50 mm Buah 97,370
BEND 90 STEEL ALL FLANGE
1 Bend 90 Steel all flange Ø 400 mm Buah 3,878,680
2 Bend 90 Steel all flange Ø 350 mm Buah 2,681,770
3 Bend 90 Steel all flange Ø 300 mm Buah 1,749,670
4 Bend 90 Steel all flange Ø 250 mm Buah 1,201,200
5 Bend 90 Steel all flange Ø 200 mm Buah 693,940
6 Bend 90 Steel all flange Ø 150 mm Buah 314,080
7 Bend 90 Steel all flange Ø 100 mm Buah 147,160
8 Bend 90 Steel all flange Ø 75 mm Buah 69,680
9 Bend 90 Steel all flange Ø 50 mm Buah 42,900
BEND 45 STEEL ALL FLANGE
1 Bend 45 Steel all flange Ø 400 mm Buah 2,346,240
2 Bend 45 Steel all flange Ø 350 mm Buah 2,210,260
3 Bend 45 Steel all flange Ø 300 mm Buah 1,110,720
4 Bend 45 Steel all flange Ø 250 mm Buah 872,430
5 Bend 45 Steel all flange Ø 200 mm Buah 426,140
6 Bend 45 Steel all flange Ø 150 mm Buah 213,720

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
(Dalam Rupiah (Rp)

NO. URAIAN SPESIFIKASI SATUAN HARGA


SATUAN

1 2 3 4 5
7 Bend 45 Steel all flange Ø 100 mm Buah 90,610
8 Bend 45 Steel all flange Ø 75 mm Buah 59,800
9 Bend 45 Steel all flange Ø 50 mm Buah 23,400
BEND 90 SOCKET DRAFT
1 Bend 90 Socket Drat Ø 6" Buah 903,344
2 Bend 90 Socket Drat Ø 4" Buah 216,015
3 Bend 90 Socket Drat Ø 3" Buah 119,184
4 Bend 90 Socket Drat Ø 2" Buah 40,950
BEND 45 SOCKET DRAFT
1 Bend 45 Socket Drat Ø 6" 864,071
2 Bend 45 Socket Drat Ø 4" Buah 248,300
3 Bend 45 Socket Drat Ø 3" Buah 144,300
4 Bend 45 Socket Drat Ø 2" Buah 50,700
SOCKET DRAFT Buah
1 Socket Drat Ø 150 mm 426,400
2 Socket Drat Ø 100 mm Buah 133,900
3 Socket Drat Ø 75 mm Buah 81,900
4 Socket Drat Ø 50 mm Buah 29,770
5 Socket Drat Ø 25 mm Buah 7,150
6 Socket Drat Ø 20 mm Buah 5,200
BELL CAP
1 Bell Cap PVC Ø 8" Buah 790,075
2 Bell Cap PVC Ø 6" Buah 604,175
3 Bell Cap PVC Ø 4" Buah 306,735
4 Bell Cap PVC Ø 2 1/2" Buah 172,900
5 Bell Cap PVC Ø 2" Buah 120,835
CAP HDPE
1 Cap HDPE Ø 4" Buah 102,310
2 Cap HDPE Ø 3" Buah 76,310
3 Cap HDPE Ø 2" Buah 46,540
BELL TEE BELL
1 Bell Tee Bell Ø 6" 1,394,250
2 Bell Tee Bell Ø 6" x 4" Buah 1,115,400
3 Bell Tee Bell Ø 6" x 3" Buah 1,115,400
4 Bell Tee Bell Ø 4" Buah 557,700
5 Bell Tee Bell Ø 4" x 3" Buah 557,700
6 Bell Tee Bell Ø 4" x 2" Buah 557,700
7 Bell Tee Bell Ø 2 1/2" Buah 278,850
8 Bell Tee Bell Ø 3" x 2" Buah 348,985
9 Bell Tee Bell Ø 2" Buah 139,425
TEE SEGMENTED
1 Equal Tee Segmented HDPE Ø 315 x 315 mm Buah 5,205,200
2 Unequal Tee Segmented HDPE Ø 315 x 280 mm Buah 5,205,200
3 Unequal Tee Segmented HDPE Ø 315 x 225 mm Buah 4,926,350
4 Equal Tee Segmented HDPE Ø 280 x 280 mm Buah 2,602,600

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
(Dalam Rupiah (Rp)

NO. URAIAN SPESIFIKASI SATUAN HARGA


SATUAN

1 2 3 4 5
5 Unequal Tee Segmented HDPE Ø 280 x 210 mm Buah 3,048,500
6 Equal Tee Segmented HDPE Ø 200 x 200 mm Buah 1,301,300
7 Unequal Tee Segmented Ø HDPE 200 x 150 mm Buah 1,207,700
8 Equal Tee Segmented HDPE Ø 160 x 160 mm Buah 780,780
9 Unequal Tee Segmented HDPE Ø 160 x 110 mm Buah 604,240
10 Equal Tee Segmented HDPE Ø 110 x 110 mm Buah 269,620
11 Unequal Tee Segmented HDPE Ø 110 x 75 mm Buah 260,260
12 Equal Tee Segmented HDPE Ø 90 x 90 mm Buah 195,000
13 Unequal Tee Segmented HDPE Ø 90 x 65 mm Buah 176,670
14 Equal Tee Segmented HDPE Ø 65 x 65 mm Buah 87,490
FLANGE BELL END PVC
1 Flange Bell End PVC Ø 12" Buah 5,762,900
2 Flange Bell End PVC Ø 10" Buah 3,718,000
3 Flange Bell End PVC Ø 8" Buah 2,602,600
4 Flange Bell End PVC Ø 6" Buah 1,673,100
5 Flange Bell End PVC Ø 4" Buah 929,500
6 Flange Bell End PVC Ø 2 1/2" Buah 557,700
7 Flange Bell End PVC Ø 2" Buah 464,750
FLANGE SPIGOT PVC
1 Flange Spigot PVC Ø 12" Buah 5,577,000
2 Flange Spigot PVC Ø 10" Buah 3,346,200
3 Flange Spigot PVC Ø 8" Buah 2,416,700
4 Flange Spigot PVC Ø 6" Buah 1,487,200
5 Flange Spigot PVC Ø 4" Buah 836,550
6 Flange Spigot PVC Ø 2 1/2" Buah 464,750
7 Flange Spigot PVC Ø 1/2" Buah 371,800
BELL 90 BEND PVC
1 Bell Bend 90 PVC Ø 12" Buah 4,368,000
2 Bell Bend 90 PVC Ø 10" Buah 2,416,700
3 Bell Bend 90 PVC Ø 8" Buah 1,301,300
4 Bell Bend 90 PVC Ø 6" Buah 743,600
5 Bell Bend 90 PVC Ø 4" Buah 325,325
6 Bell Bend 90 PVC Ø 2 1/2" Buah 93,080
7 Bell Bend 90 PVC Ø 2" Buah 55,770
BEND 90 SEGMENTED HDPE
1 Bend 90 Segmented HDPE Ø 12" Buah 5,297,500
2 Bend 90 Segmented HDPE Ø 10" Buah 1,913,600
3 Bend 90 Segmented HDPE Ø 8" Buah 957,450
4 Bend 90 Segmented HDPE Ø 6" Buah 576,290
5 Bend 90 Segmented HDPE Ø 4" Buah 278,850
6 Bend 90 Segmented HDPE Ø 3" Buah 185,900
7 Bend 90 Segmented HDPE Ø 2" Buah 94,900
BELL 45 BEND PVC
1 Bell Bend 45º PVC Ø 12" Buah 3,532,100
2 Bell Bend 45º PVC Ø 10" Buah 1,859,000

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
(Dalam Rupiah (Rp)

NO. URAIAN SPESIFIKASI SATUAN HARGA


SATUAN

1 2 3 4 5
3 Bell Bend 45º PVC Ø 8" Buah 1,301,300
4 Bell Bend 45º PVC Ø 6" Buah 743,600
5 Bell Bend 45º PVC Ø 4" Buah 325,325
6 Bell Bend 45º PVC Ø 3" Buah 92,950
7 Bell Bend 45º PVC Ø 2" Buah 55,770
BEND 45 SEGMENTED HDPE
1 Bend 45º Segmented PE Ø 315 mm Buah 4,089,800
2 Bend 45º Segmented PE Ø 250 mm Buah 1,561,560
3 Bend 45º Segmented PE Ø 200 mm Buah 780,780
4 Bend 45º Segmented PE Ø 150 mm Buah 474,110
5 Bend 45º Segmented HDPE Ø 110 mm Buah 241,670
6 Bend 45º Segmented HDPE Ø 90 mm Buah 158,080
7 Bend 45º Segmented HDPE Ø 63 mm Buah 87,490
BELL BEND 22,50 PVC
1 Bell Bend 22,5º PVC Ø 12" Buah 2,788,500
2 Bell Bend 22,5º PVC Ø 10" Buah 1,673,100
3 Bell Bend 22,5º PVC Ø 8" Buah 929,500
4 Bell Bend 22,5º PVC Ø 6" Buah 418,275
5 Bell Bend 22,5º PVC Ø 4" Buah 148,720
6 Bell Bend 22,5º PVC Ø 2 1/2" Buah 74,360
7 Bell Bend 22,5º PVC Ø 2" Buah 41,860
BELL REDUCER PVC
1 Bell Reducer PVC SNI Ø 12" x 10" Buah 1,598,740
2 Bell Reducer PVC SNI Ø 10" x 8" Buah 743,600
3 Bell Reducer PVC SNI Ø 8" x 6" Buah 464,750
4 Bell Reducer PVC SNI Ø 8" x 4" Buah 534,495
5 Bell Reducer PVC SNI Ø 4" x 3" Buah 120,770
6 Bell Reducer PVC SNI Ø 2 1/2" x 2" Buah 65,000
REDUCER SEGMENTED HDPE
1 Reducer Segmented PE Ø 315 x 250 mm Buah 2,163,850
2 Reducer Segmented PE Ø 315 x 200 mm Buah 2,044,900
3 Reducer Segmented PE Ø 250 x 200 mm Buah 1,394,250
4 Reducer Segmented PE Ø 250 x 150 mm Buah 1,162,200
5 Reducer Segmented PE Ø 200 x 150 mm Buah 743,600
6 Reducer Segmented PE Ø 200 x 100 mm Buah 705,900
7 Reducer Segmented HDPE Ø 110 x 90 mm Buah 185,900
8 Reducer Segmented HDPE Ø 90 x 63 mm Buah 111,540
REDUCER STEEL
1 Reducer Steel Ø 400 x 300 mm Buah 2,043,600
2 Reducer Steel Ø 250 x 200 mm Buah 454,350
3 Reducer Steel Ø 250 x 150 mm Buah 521,560
4 Reducer Steel Ø 250 x 100 mm Buah 807,170
5 Reducer Steel Ø 200 x 150 mm Buah 314,080
6 Reducer Steel Ø 200 x 100 mm Buah 382,330
7 Reducer Steel Ø 150 x 100 mm Buah 192,530

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
(Dalam Rupiah (Rp)

NO. URAIAN SPESIFIKASI SATUAN HARGA


SATUAN

1 2 3 4 5
8 Reducer Steel Ø 100 x 75 mm Buah 80,600
FLANGE STEEL
1 Flange steel buta Ø 400 mm Buah 776,100
2 Flange steel buta Ø 350 mm Buah 564,200
3 Flange steel buta Ø 300 mm Buah 462,800
4 Flange steel buta Ø 250 mm Buah 458,120
5 Flange steel buta Ø 200 mm Buah 305,370
6 Flange steel buta Ø 150 mm Buah 197,080
7 Flange steel buta Ø 100 mm Buah 121,940
8 Flange steel buta Ø 75 mm Buah 93,080
9 Flange steel buta Ø 50 mm Buah 73,970
CLAMP SADLE
1 Clamp Sadle Ø 150 x 25 mm Buah 61,620
2 Clamp Sadle Ø 100 x 25 mm Buah 42,744
3 Clamp Sadle Ø 75 x 25 mm Buah 32,370

G BAHAN PLAFON DAN PARTISI


1 Eternit 100 x 100 x 0,2 26,000
2 Tripleks lbr -
- 122 x 244 x 0,2 cm 50,700
- 122 x 244 x 0,3 cm lbr 62,400
- 122 x 244 x 0,6 cm lbr 93,600
- 122 x 244 x 0,9 cm lbr 143,000
- 122 x 244 x 1,8 cm lbr 357,500
3 Tripleks melamin lbr -
- 122 x 244 x 0,2 cm 97,500
4 Acustic 40 x 60 lbr 58,500
5 Teakwood lbr -
- 122 x 244 x 0,3 cm 149,500
- 80 x 244 x 0,3 cm lbr 78,000
6 Hard board 122 x 244 cm 18 mm lbr 325,000
7 Asbes plat harflex 200 x 100 cm lbr 110,500
8 Gipsum board lbr
- 240 x 120 x 0,3 cm 88,400
- 240 x 120 x 0,4 cm lbr 91,000
- 240 x 120 x 0,9 cm lbr 97,500
9 List Profil Kayu lbr -
- 2 x 3 cm 11,700
- 3 x 3 cm btg/4 m' 13,000
- 4 x 4 cm btg/4 m' 19,500
- 4 x 5 cm btg/4 m' 32,500
List Profil Gypsum btg/4 m' -
- 7/7 20,800
- 7/10 m' 22,100
- 7/16 m' 24,700

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
(Dalam Rupiah (Rp)

NO. URAIAN SPESIFIKASI SATUAN HARGA


SATUAN

1 2 3 4 5
- 13/15 m' 26,000
List PVC m' -
- 58 x 32 mm 31,200
- 32 x 32 mm btg/2 m' 24,700
- 26 x 30 mm btg/2 m' 20,800
10 Lambrisering btg/2 m' 338,000
11 Plafon dan Partisi PVC m² -
- Tebal 1 cm 260,000
- Tebal 0,8 cm lbr 221,000
- List Samping lbr 117,000
- List Sambungan 4m 117,000
12 GRC t = 0,6 mm (1,20 x 2,40) 4m 175,500
13 Kalsiboard (0,35 mm x 1,2 x 2,4) lbr 91,000
Kalsiboard (0,8 mm x 0,3 x 3) lbr 97,500
Kalsiplank Jati (0,8 mm x 0,3 x 3) lbr 100,750
Baja Ringan 4 meter
- 2 x 4 x 0.25 btg 20,800
- 4 x 4 x 0.30 btg 26,000
- 2 x 4 x 0.25 btg 32,500
- 4 x 4 x 0.30 btg 39,000

H BAHAN ATAP
1 Genteng
- Tanah Liat 3,900
- Beton Bh 13,000
- Keramik Bh 15,600
- Asbes Bh 65,000
- Harflex (115 x 85 x 0,5) lbr 58,500
2 Asbes gelombang lbr 13,000
3 Sirap Kaki 143,000
4 Seng gelombang Ikat/M2 -
- BWG 34" BJLS 0,20 mm 7,800
- BWG 32" BJLS 0,30 mm Kaki 13,000
- BWG 28" BJLS 0,35 mm Kaki 14,300
5 Seng plat BJLS Galvanis Kaki -
- BJLS 0,4 mm 1,219 x 1 m 182,000
- BJLS 0,5 mm 1,219 x 1 m m' 221,000
- BJLS 0,6 mm 1,219 x 1 m m' 247,000
- BJLS 0,7 mm 1,219 x 1 m m' 260,000
6 Polycarbonate m' 130,000
7 Atap Fiber m² 45,500
8 Atap Zincalum, t=0.3 mm m² 58,500
9 Nok Bubungan m² -
- Genteng beton 32,500
- Genteng asbes Bh 39,000

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
(Dalam Rupiah (Rp)

NO. URAIAN SPESIFIKASI SATUAN HARGA


SATUAN

1 2 3 4 5
- Genteng keramik Bh 54,600
- Nok Zincalum Bh 58,500
10 Karet pelapis genteng 55 cm x 30 m Bh 487,500
11 List Plank sejenis Woodplank Roll -
- Polos 4m 65,000
- Motif 4m 97,500

I BAHAN PENGGANTUNG
1 Kunci tanam
- Union 1 x slag 91,000
- Union 2 x slag Bh 130,000
- Yale 1 x slag Bh 120,900
- Yale 2 x slag Bh 123,500
- Kuda terbang Bh 97,500
2 Penggantung -
- Hak angin kecil Bh 19,500
- Hak angin besar Bh 32,500
- Grendel kecil Bh 26,000
- Grendel besar Bh 39,000
- Engsel pintu Bh 39,000
- Engsel jendela Psg 26,000
- Expanyolet Psg 88,400
3 Door closer Bh 195,000
4 Door Stopper Bh 26,000

J BAHAN SANITER
1 Samb. PDAM 2,600,000
2 Closet duduk KIA (Lengkap) unit 2,730,000
3 Closet duduk TT (Lengkap) Set 2,990,000
4 Closet jongkok Set 403,000
5 Wasthafel Bh 325,000
6 Wasthafel cuci piring logam 1 mata Bh 552,500
7 Pompa tangan terpasang Bh 604,500
8 Urinoir sejenis TT Bh 3,354,000
9 Bak mandi fiber Bh 426,400
10 Reservoir fiber 1 m3 Bh 1,755,000
11 Reservoir fiber 2 m3 Bh 3,510,000
12 Reservoir fiber 3 m3 Bh 4,550,000
13 Kran wasthafel stanless Bh 110,500
14 Kran urinoir Bh 162,500
15 Floordrain Besi Bh 156,000
Floordrain Plastik Bh 65,000
16 Soap holder Bh 65,000
17 Kitchen set Bh 1,495,000
18 Kran Air 3/4 m' 32,500

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
(Dalam Rupiah (Rp)

NO. URAIAN SPESIFIKASI SATUAN HARGA


SATUAN

1 2 3 4 5
19 Kusen Pintu Fiber + Daun pintu Bh 286,000

K BAHAN FINISHING
1 Cat tembok sejenis Dulux Interior Kg 130,000
Cat tembok sejenis Dulux Eksterior Kg 156,000
2 Cat kayu sejenis glotex Kg 78,000
3 Cat atap sejenis No Drop Kg 65,000
4 Cat Besi Sejenis Avian Kg 71,500
5 Wallpaper M2 91,000
6 Lem Perekat Kg 71,500
7 HPL Motif lbr 247,000
8 Parket M2 613,600
9 Plint Parket m 293,800
10 Plamur tembok Zak 72,800
11 Cat dasar (meni kayu) Kg 39,000
12 Cat Jembatan Kg 13,000
13 Minyak cat ltr 49,400
14 Minyak Flux Ltr 13,000
15 Pelumas Ltr 39,000
16 Solar Ltr 7,085
17 Bensin Ltr 8,385
18 Politur Kg 71,500
19 Dempul Kg 32,500
20 Kertas gosok (amplas) lbr 13,000
21 Residu Ltr/Kg 45,500
22 Okar Kg 32,500
23 Spiritus ltr 26,000
24 Aspal Cair Kg 17,420
25 Aspal Buton Ton 17,550,000

L BAHAN INSTALASI LISTRIK


1 Peng. Samb. Listrik KWH 1300 Unit 3,250,000
2 Box Panel PVC isi 4 MCB Bh 65,000
3 MCB 6A Bh 78,000
4 MCB 4A Bh 78,000
5 Kabel NYM 2 x 2,5 mm2 m 15,600
6 Kabel NYM 3 x 2,5 mm2 m 15,600
7 Kabel Telephone 4 x o,5 mm m 5,200
8 Isolasi Bh 6,500
9 Saklar tunggal Bh 19,500
10 Saklar ganda Bh 35,750
11 Stop Kontak Bh 48,750
12 Outlet TV Bh 35,750
13 Outlet Telephone Bh 48,750
14 Downlight / PLC 13 wat Bh 52,000

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
(Dalam Rupiah (Rp)

NO. URAIAN SPESIFIKASI SATUAN HARGA


SATUAN

1 2 3 4 5
15 Fitting Plafound + Lampu Bh 10,400
16 Lampu TL 2 x 18 wat grille Set 299,000
17 Lampu TL 2 x 36 wat grille Set 487,500

M UPAH KERJA
1 Pekerja hari 92,000
2 Tukang hari -
- Tukang kayu hari 130,000
- Tukang Batu hari 130,000
- Tukang Cat hari 130,000
- Tukang Listrik hari 167,500
- Tukang Pipa hari 130,000
- Tukang Besi hari 130,000
- Tukang Las hari 130,000
- Tukang Landscaping hari 130,000
- Tukang Profil hari 130,000
3 Kepala Tukang
- Kepala Tukang kayu hari 162,000
- KepalaTukang Batu hari 162,000
- KepalaTukang Cat hari 162,000
- KepalaTukang Listrik hari 216,000
- KepalaTukang Pipa hari 189,000
- KepalaTukang Besi hari 173,000
- KepalaTukang Las hari 173,000
- KepalaTukang Landscaping hari 189,000
- KepalaTukang Profil hari 189,000
4 Mandor hari 170,000
5 Masinis hari 130,000
6 Pembantu Masinis hari 90,500
7 Penjaga Gudang hari 115,000
8 Penjaga malam hari 115,000

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
STANDAR HARGA SATUAN BAHAN BANGUNAN DAN UPAH KERJA
PEMERINTAH PROVINSI SULAWESI SELATAN
KABUPATEN SELAYAR
TAHUN 2018
(Dalam Rupiah (Rp)

NO JENIS BAHAN SPESIFIKASI SATUAN HARGA

1 2 3 4
A. BAHAN DASAR
1 Batu Gunung
Batu Gunung (Quarry) M³ 83,600
Batu Gunung M³ 284,300
2 Batu Kali M³
Batu Kali (quarry ) M³ 83,600
Utuh M³ 284,300
Split 7-10 cm M³ 284,300
Split 5-7 cm M³ 250,000
Split 3-5 cm M³ 200,000
Split 2-3 cm M³ 442,300
Split 1-2 cm M³ 442,300
Split 0,5-1 cm M² 450,000
Split 10-15 cm M³ 250,000
3 Batu Pecah Produksi Luar Kabupaten
Agregat Kasar M³ 650,000
Agregat Halus M³ 700,000
4 Batu Belah M³ 250,000
5 Batu Gunung Quarry M³ 83,600
6 Tanah
* Timbunan / Urug / Tanah pilihan / M³ 111,400
Berbatu ( quarry)
* Timbunan / Urug / Tanah pilihan / M³ 287,500
Berbatu
* Timbunan / Urug / Tanah biasa /( quarry) M³ 111,400
* Timbunan / Urug / Tanah biasa (perkota kecamatan) M³ 201,300
* Sirtu (quarry ) M³ 139,200
* Sirtu ( perkota kecamatan ) M³ 230,000
7 Pasir
Pasir (Quarry) M³ 178,160
Pasir ( perkota kecamatan ) M³ 176,890
Pasir Pasangan /Pasir Beton ( quarry ) M³ 178,200
Pasir pasangan / Pasir Beton ( per kota kecamatan ) M³ 236,300
8 Kerikil
* Sirtu/ kerikil Berpasir Alami (tidak di ayak ) M³ 230,000
* Kerikil Sungai ( tidak disaring ) M³ 230,000
* Kerikil sungai / batu kali kecil ( disaring ) 300,000
* Kerikil Sungai pecah ( disaring ) M³ 402,500
* Gorong - Gorong Dia.80 cm ( bertulang ) M³ 537,900
9 Kapur
Kapur Bakar /Hidrasi Karung 14,500
Batu Kapur ( bongkahan ) M³ 178,200
10 Semen kg 1,700
11 Semen Waterproof kg 25,000
12 Batu Bata ( quarry ) buah 1,000
13 Batako ( quarry ) buah 4,100
14 Paving Blok Segi Empat buah 2,000
15 Paving Blok Segi Enam buah 3,200

B BAHAN KAYU
1 Kayu Kelas I
Balok M³ 11,038,000
Papan M³ 14,773,900
Kayu Ulin Besi untk kontruksi M³ 6,538,700
2 Kayu Kelas II
Balok M³ 5,084,000
Papan M³ 5,580,000
3 Kayu Kelas III
Balok M³ 3,728,000
Papan M³ 4,142,300
Kayu Perancah /Acuan ( Papan Mal ) M³ 2,096,000
C BAHAN LANTAI
Tegel Mozaik 30 x 30 Dos 63,000

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
(Dalam Rupiah (Rp)

NO JENIS BAHAN SPESIFIKASI SATUAN HARGA

1 2 3 4
Tegel Granit 60 x 60 Dos 178,000
Tegel Kramik
Putih 10 x 20 Dos 63,000
Warna 10 x 20 Dos 63,000
Putih 20 x 20 Dos 63,000
Warna 20 x 20 Dos 55,000
Putih 20 x 25 Dos 66,000
Warna 20 x 25 Dos 70,000
Putih 30 x 30 Dos 63,000
Warna 30 x 30 Dos 66,000
Putih 40 x 40 Dos 73,000
Warna 40 x 40 Dos 74,000
Paving Blok
Segi empat ( bata ) buah 2,000
Segi Enam buah 3,200
D BAHAN KACA
* 2 mm 66 x 132 Lbr 55,700
* 3 mm 66 x 132 Lbr 83,600
* 5 mm 66 x 132 Lbr 114,900
Kaca Bening 3 mm M² 138,000
Kaca Bening 5 mm M² 188,000
Kaca Bening 2 mm M² 55,700
Kaca Buram 5 mm M² 311,800
Kaca Buram 3 mm M² 278,400
Kaca Ryben 3 mm M² 104,700
Kaca Ryben 5 mm M² 157,000
Kaca / Cermin 3 mm M² 135,000
Kaca / Cermin 5 mm M² 190,000
BAHAN BESI
1 Besi Beton Polos
Ø 6 mm ( full ) Btg 32,000
Ø 8 mm ( full ) Btg 51,000
Ø 10 mm ( full ) Btg 77,000
Ø 12 mm ( full ) Btg 114,300
Ø 14 mm ( full ) Btg 159,000
Ø 16 mm ( full ) Btg 190,000
2 Besi tulangan beton dan kawat baja
* Besi Beton Polos ( Baja tulangan U24 polos ) kg 10,900
* Besi Beton Ulir ( Baja tulangan U24 polos ) kg 11,000
* Baja Tralis/ Gulung kg 18,700
* Baja Konstruksi kg 18,600
* Baja Galvanis kg 15,200
* Baut Baja 15 cm Btg 3,100
* Baut Baja 20 cm Btg 3,800
* Baut Baja 25 cm Btg 3,900
* Baut Baja 30 cm Btg 5,300
* Pengikat Begel ( kawat ) Kg 23,000
3 PAKU
Paku Tripleks Kg 21,000
Paku Seng 3 cm Kg 28,000
Paku Seng 5 cm Kg 28,000
Paku Seng 7 cm Kg 30,500
Paku Biasa Kg 19,500
Paku biasa 5 cm 1 Kg 14,400
Paku Asbes Kg 32,100
Paku Seng RRT Kg 26,500
Paku Jembatan Kg 26,500
Paku skrup 3 ½ inci Kg 29,400
Paku Payung Berulir 75 mm Kg 24,300
Paku Skrup 4 Inci Kg 30,400
Paku Sirap Kg 18,200
Paku Beton Kg 37,000
4 Kawat
Beronjong Gulung 783,400
Beton Kg 21,500
Las ( Asetilen ) roll 11,700
Nyamuk M 14,800
Duri roll 169,000
Ayakan Kecil M 16,500

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
(Dalam Rupiah (Rp)

NO JENIS BAHAN SPESIFIKASI SATUAN HARGA

1 2 3 4
Las Listrik Kg 49,500
5 Besi Plat
2 x 1200 x 2400 mm Lbr 674,000
3 x 1200 x 2400 mm Lbr 991,000
4 x 1200 x 2400 mm Lbr 1,334,000
6 Besi Strep
( 40 x 1 x 6000 ) mm Btg 34,000
( 50 x 1 x 6000 ) mm Btg 46,000
( 50 x 2 x 6000 ) mm Lbr 153,000
( 70 x 2 x 6000 ) mm Btg 185,000
7 Besi Siku
30 x 30 x 3000 mm Btg 70,000
60 x 60 x 6000 mm Btg 331,000
40 x 40 x 3000 mm Btg 115,000
50 x 50 x 4000 mm Btg 204,000
8 Tiang Besi
7m Btg 950,000
11 m Btg 3,750,000
9 Besi Hollow (40 x 40 ), tebal 2,5 mm ( pagar ) Btg 140,000
Lebar 15,Tebal 1,8 – 2,00 mm
10 Kalsiboard M²
BAHAN PIPA
1 Pipa Besi GIP ( MEDIUM A )
Tebal Btg
3/4" - 6 m Btg 211,700
1" - 6 m Btg 297,000
1 1/2 - 6 m Btg 448,600
1" - 6 mm Btg 296,923
2" - 6 mm Btg 562,300
2 1/2" - 6 m Btg 818,200
3" - 6 m Btg 979,300
4" - 6 m Btg 1,358,300
6" - 6 m Btg 2,211,200
8" - 6 m Btg 5,433,100
Tipis
1 1/2" - 6 m Btg 369,600
3/4" - 6 m Btg 186,400
1" - 6 m Btg 259,100
2" - 6 m Btg 461,200
2 Pipa Besi GIP ( MEDIUM B )
1" - 6 m Btg 183,300
1 1/2" - 6 m Btg 268,500
2" - 6 m Btg 341,200
2 1/2" - 6 m Btg 436,000
3" - 6 m Btg 518,100
4" - 6 m Btg 663,400
6" - 6 m Btg 1,547,800
8" - 6 m Btg 2,988,200
3 Pipa PVC ( AW )
1/4" - 4 m Btg
1/2" - 4 m Btg 18,200
3/4" - 4 m Btg 25,300
1" - 4 m Btg 33,400
1 1/2" - 4 m Btg 39,000
2" - 4 m Btg 88,500
2 1/2" - 4 m Btg 125,000
3" - 4 m Btg 172,000
4" - 4 m Btg 284,000
5" - 4 m Btg
6" - 4 m Btg 633,000
8" - 4 m Btg 1,073,000
4 PIPA PVC ( SNI )
1/2" - 6 m Btg 24,300
3/4" - 6 m Btg 42,500
1" - 6 m Btg 78,900
1 1/2" - 6 m Btg 127,400
2" - 6 m Btg 200,200
2 1/2" - 6 m Btg 345,700
3" - 6 m Btg 412,500

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
(Dalam Rupiah (Rp)

NO JENIS BAHAN SPESIFIKASI SATUAN HARGA

1 2 3 4
4" - 6 m Btg 618,700
5" - 6 m Btg
6" - 6 m Btg 1,297,900
8" - 6 m Btg 2,019,600
10" - 6 m Btg
3 inchi - 6 m Btg 73,330
4 inchi - 6 m Btg 87,996
6 inchi - 6 m Btg 102,662
5 PIPA PARALON PVC
Diameter 1" ( SNI ) Btg 20,800
Diameter 1 1/2" ( SNI ) Btg 21,700
Diameter 2" ( SNI ) Btg 28,500
Diameter 3" ( SNI ) Btg 51,200
Diameter 4" ( SNI ) Btg 85,300
3/4 - 4 m Btg 15,800
1" - 4 mm Btg 31,600
1 1/2" - 4 mm Btg 25,300
2" - 4 mm Btg 35,400
3" - 4 mm Btg 55,600
6 Pipa Paralon PVC . PVC PARALON Std s-10 scj @:
Diameter 1/2" Btg 18,900
Diameter 3/4" Btg 27,900
Diameter 1" Btg 45,000
Diameter 1 1/4" Btg 62,800
Diameter 1 1/2" Btg 100,200
7 Pipa PVC Paralon Std.S 12.5 SCJ@ 5 mtr /btg :
Diameter 2" Btg 154,800
Diameter 2 1/2" Btg 222,400
Diameter 3" Btg 326,800
Diameter 4" Btg 478,200
Diameter 5" Btg 781,700
Diameter 6" Btg 1,031,100
Diameter 8" Btg 1,603,300
8 Pipa PVC Paralon Std.S 12.5 SCJ@ 6 mtr /btg :
Diameter 2" Btg 160,200
Diameter 2 1/2" Btg 228,800
Diameter 3" Btg 334,500
Diameter 4" Btg 488,500
Diameter 5" Btg 794,500
Diameter 6" Btg 1,049,100
Diameter 8" Btg 1,630,300
9 TANGKI FIBER
Tangki fiberglass Kap. 1 m3 Buah 1,500,000
Tangki fiberglass Kap. 2 m3 Buah 3,032,400
Tangki fiberglass Kap. 3 m3 Buah 4,043,200
10 Jenis Batang D untuk saluran pembuangan air :
1/2 inci - 4 m Btg 16,200
3/4 inci - 4 m Btg 23,300
1 inci - 4 m Btg 32,400
1 1/2 inci - 4 m Btg 35,400
2 inci - 4 m Btg 45,500
2 1/2 inci - 4 m Btg 60,800
3 inci - 4 m Btg 73,800
4 inci - 4 m Btg 91,900
5 inci - 4 m Btg 128,900
6 inci - 4 m Btg 214,300
8 inci - 4 m Btg 318,200
10 inci - 4 m Btg 428,800
11 Pipa Jenis Batang C untuk Intalasi Listrik :
5/ inci - 4 m Btg 21,200
3/4 inci - 4 m Btg 26,300
1 inci - 4 m Btg 30,200
1 1/2 inci - 4 m Btg 41,600
12 Klep Dia 3/4 buah 25,000
13 Tangki Air 2000 Ltr buah 2,500,000
Tangki Air 1000 Ltr buah s
Tangki Air 500 Ltr buah 712,500
Pelampung otomatis buah 40,000

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
(Dalam Rupiah (Rp)

NO JENIS BAHAN SPESIFIKASI SATUAN HARGA

1 2 3 4
G BAHAN LAINNYA
1 Aspal / Bitumen ( ex Pertamina ) Kg 15,200
Aspal Buton Ton 707,600
Minyak Flux / Flux Oil Ltr 7,500
Kerosin /Minyak Tanah Ltr 14,200
Kayu Bakar M3 126,400
Oil/ Minyak Pelumas Liter 25,800
Grease( Gemuk ) Liter 29,200
Solar/ Minyak Diesel Liter 9,100
Bensin/ Premium Liter 8,100
Royalty - Batu Quarry M³ 19,200
Royalty - Kerikil Galian M³ 19,200
Royalty - Kerikil Sungai M³ 19,200
Royalty - Sirtu M³ 19,200
Alat-Alat Bantu /Kerja set 93,000
Expantion Joint M 377,800
Geotextile Non Woven M² 37,800
Geotextile Moven M² 43,600
Fender Karet Ban Mobil ( lokal ) UNIT 1,162,500
Bollard Kapasitas 10 Ton ( Lokal ) UNIT 930,000
Geotextite Density 200 gr /M2 Lbr 56,800
Geogrid Density 300 gr / M2 M² 35,300
Tiang pancang Beton Praktekan dia 40 cm M 727,700
Tiang pancang Beton Praktekan dia 45 cm M 778,900
Peralatan Utama Kincir Angin Lengkap Acc;Kap 10 KW
Set 180,680,800
Peralatan Utama PLTS Angin Lengkap Acc;Kap 10 KW Set 367,334,100
Kabel Tray NYY 4 x 50 mm 2 M 123,300
Instalasi Penangkal Petir Set 19,350,900
Peralatan Utama IPA 40 it/det dng sistem Backwash Set 2.265.725,20
Peralatan Utama IPA 20 it /det dng sistem Backwash Set 1.434.803,80
Peralatan Utama IPA10 L/det dng sistem Backwash Set 918.277.600
Water Meter Induk DIA 12" unit 56,103,100
Panel Induk unit 47,705,800
Panel Intake unit 36,140,900
Peralatan lab ( PH test. Sisa Chlour ) unit 15,642,700
Peralatan Utama Pompa Air Tanpa Mesin ( PTAM ) unit 79,091,100
Gate Valve dia 150 MM Buah 2,021,300
Karbon Calgon untuk Salinitas @ 20 kg /zak kg 125,000
Meganese green sand zak 2,500,000
Ultra Violet Sterilver set 4,375,000
Membran Produkasi set 10,000,000
Sambungan Pipa Stainless 1/2 set 1,250,000
AVR Dinamo Denyo unit 8,125,000
Mengana Zeolit zak

H BAHAN PLAFOND
1 Eternit 100 X 100 Lembar 20,200
2 Tripleks
122 X 244 x 0.2 cm Lbr 41,000
122 X 244 x 0.3 cm Lbr 58,000
122 X 244 x 0.6 cm Lbr 91,000
122 X 244 x 0.9 cm Lbr 129,000
3 Tripleks Melamin
122 X 244 x 0.3 cm Lbr 70,800
Accoustic 40 X 60 Lbr 80,900
4 Teakwood
80 X 244 x 0.3 cm Lbr 111,200
122 X 244 x 0.3 cm Lbr 73,600
5 Hard Board 122 X 244 cm Lbr 97,700
6 Asbes Plat Harfeks
200 X 100 X 0.3 cm Lbr 45,100
7 List Profil
2 x 3 cm / 4 m M 5,300
3 x 3 cm / 4 m M 5,700
4 x 4 cm / 4 m M 6,200
8 Besi Hollow ( Rangka Plafond )
(40x40x6000) mm, tebal = 0,35 mm Btg 37,000
(40x20x6000) mm, tebal = 0,20 mm Btg 28,000

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
(Dalam Rupiah (Rp)

NO JENIS BAHAN SPESIFIKASI SATUAN HARGA

1 2 3 4
Gypsumboard t.9 mm Lembar 65,000
List profil 5 cm Gypsum M 13,000
Rangka Plafond Metal Furing M² 25,000

I BAHAN ATAP
1 Genteng
Beton Buah 10,300
Caisboard Lembar 68,000
Keramik Buah 11,100
Asbes Lbr 30,800
Harfles (115X85x0.5 cm) Lbr 35,800
Genteng Metal Multy Roof Lbr 83,200
Genteng Metal Surya Roof Lbr 49,700
Genteng Metal Sakura Roof Lbr 41,600
2 Asbes Gelombang Kaki 6,000
3 Sirap Ikat 20,600
4 Seng licin Lbr 46,700
5 Seng gelombang
Sermani Kaki 7,300
Cap Gajah Duduk Kaki 6,600
BWG 34" BJLS 0.20 mm Kaki 5,600
BWG 32"BJLS 0.30 mm Kaki 9,300
BWG 28"BJLS 0.35 mm Kaki 11,600
6 Seng Plat
BJLS 0.30 mm Lbr 40,500
BJLS 0.28 mm Lbr 64,000
7 Seng Super Deck
180 X 70 cm – 10 kaki Lbr 137,400
180 X 70 cm – 8 kaki Lbr 121,700
180 X 70 cm – 7 kaki Lbr 91,600
180 X 70 cm – 6 kaki Lbr 90,200
8 Seng Aluminium Gelombang
SWG 32” 0.27 mm Lbr 33,500
SWG 30” 0.31 mm Lbr 43,000
SWG 28” 0.38 mm Lbr 50,100
9 Seng Plastik (Fiber) Lbr 45,800
10 Fiber Semen (Harflex)
Super 240 X 108 X 0.6 cm Lbr 44,100
Super 180 X 1082 X 0,5 cm Lbr 28,700
Ekonomi 240 X 92 X 0.5 cm Lbr 44,100
Ekonomi 180 X 92 X 0.5 cm Lbr 28,700
Mini 240 X 105 X 0.4 cm Lbr 36,500
Mini 180 X 92 X 0.5 cm Lbr 28,300
11 Nok/Bubungan
Genteng Beton Bh 10,300
Genteng Asbes Bh 30,800
Genteng Keramik Bh 45,700
Metal Multi Roof Lbr 33,400
Metal Sakura Roof Lbr 33,400
Alm. SWG 28” -180 cm Lbr 30,500
Alm. SWG 28” –105 cm Lbr 33,400
Nok Steel Gelombang Bh 30,500
Super – 180 cm Lbr 29,000
Mini – 105 cm Lbr 53,100
Ekonomi – 95 cm Lbr 40,200
Nok Steel Rata Lbr 34,400
Super – 108 cm Bh 54,800
Mini – 105 cm Bh 80,500
12 Nok ½ Lingkaran Bh 37,600
13 Karet Pelapis Genteng M 29,700
14 Atap Metal Spandex( warna ) tebal ;0,3 mm M 7,800
M 45,000
J BAHAN PENGGANTUNG
1 Kunci Tanam
Union 1 x Slag Pasang 35,800
Union 1 x Slag Pasang 40,100
Yale 1 x Slag Pasang 65,800
Yale 1 x Slag Pasang 90,200
Kuda Terbang Pasang 44,800

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
(Dalam Rupiah (Rp)

NO JENIS BAHAN SPESIFIKASI SATUAN HARGA

1 2 3 4
2 Penggantung
Hak Angin Kecil Pasang 2,600
Hak Angin Besar Pasang 7,900
Grendel Pasang 45,800
Engsel Pintu Pasang 25,000
Expanyolet Pasang 45,800

K BAHAN SANITER
1 Closet Duduk
Biasa ( Tanpa Tabung ) Bh 510,000
Standar ( dengan Tabung ) Bh 1,145,000
American Standar Bh 1,655,000
Toto Bh 3,050,000
2 Closet Jongkok Unit 101,000
3 Wasthafel Bh 361,400
4 Wasthafel cuci piring logam Bh 361,400
5 Pompa Tangan Terpasang Bh
6 Urinoir Bh 626,700
7 Bak Mandi fiber Bh 319,700
8 Reservoir fiber = 1 m3 Bh 1,144,800
9 Reservoir Stainless stell = 1 m3 Bh 2,906,100
10 Stop Kran Bh 20,000
11 Kran Air Bh 18,000
12 Shower Set Bh 45,000
13 Shower Spray Bh 45,000
14 Floodrain Bh 55,000
15 Tempat Sabun Bh 30,000
16 Kran Zink Bh 45,000
17 Kran Cabang Shower Bh 150,000
18 Pompa Air Unit 5,000,000

L BAHAN INSTALASI LISTRIK


1 Pipa Union Untuk Kabel
5/8 inchi - 4 Meter Batang 6,100
1 Inchi - 4 Meter Batang 29,500
1,5 Inchi- 4 meter
2 inchi - 4 meter Batang 27,300
2 Kabel Listrik Type NYK (Full)
1,5 mm Roll 202,200
2,5 mm Roll 283,100
2 x 1,5 mm Roll 510,600
2 x 2,5 mm Roll 606,337
3 Type NYY
2 X 1 ½ mm Roll 859,200
2 X 2 ½ mm Roll 1,400,000
2 X 4 mm Roll
4 Lampu TL
1 X 20 W Bh 29,500
2 X 20 W Bh 123,500
1 X 40 W Bh 44,200
2 X 40 W Bh 321,000
5 Lampu Pijar
40 W Bh 11,000
6 TL Sumpit / Lampu Visicom
Lampu sumpit 5 Wat Bh 32,400
Lampu sumpit 3 Wat Bh 36,960
Lampu sumpit 11 Wat Bh 39,600
Lampu sumpit 14 Wat Bh 42,000
Lampu sumpit 18 Wat Bh 45,600
Lampu sumpit 23 Wat Bh 52,800
Lampu sumpit 28 Wat Bh 69,600
Lampu sumpit 60 Wat Bh 202,200
Lampu sumpit 58 Wat Bh 196,000
Lampu sumpit 60 Wat Bh 202,200
Lampu sumpit 68 Wat Bh 201,600
Lampu sumpit 100 Wat Bh
7 Lampu Ulir
Lampu Ulir 5 Wat Bh 35,840
Lampu Ulir 8 Wat Bh 36,960

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
(Dalam Rupiah (Rp)

NO JENIS BAHAN SPESIFIKASI SATUAN HARGA

1 2 3 4
Lampu Ulir 12 Wat Bh 41,440
Lampu Ulir 15 Wat Bh 44,800
Lampu Ulir 20 Wat Bh 47,040
Lampu Ulir 24 Wat Bh 55,193
Lampu Ulir 25 Wat Bh 58,956
Lampu Ulir 32 Wat Bh 66,000
Lampu Ulir 36 Wat Bh 224,000
Lampu Ulir 65 Wat Bh 244,560
8 Lampu Taman Mercury Bh 329,200
9 Saklar Phase
Tunggal Putih Bh 18,000
Tunggal Hitam Bh 7,000
Double Putih Bh 27,000
Double Hitam Bh 15,000
10 Stop Kontak
Hitam Bh 16,000
Putih Bh 25,000
11 Zekering Kast Lokal Biasa
Lokal 2 Group Automat Bh 123,500
Lokal 3 Group Biasa Bh 126,800
12 Fitting Biasa Bh 19,000
13 Fitting Downlight
Diameter 3" Bh 40,000
Diameter 4" Bh 50,000

M BAHAN FINISHING /CAT


1 Cat Tembok
Avitex 5 Kg 97,000
Metrolaite 25 Kg 490,000
Corolex 1 Kg 43,500
Aries 5 Kg 71,250
Kimex 1 Kg 17,600
Vinilex Nippon Paint 1 Kg 26,900
Dulux 1 Kg 25,700
2 Cat Kayu
Glotex Kg 63,000
3 Flat Beck Truck 3-4 M3 Jam 411,000
4 Track Loader 75-100 HP Jam 336,000
5 Three Wheel Roller 6-8 Ton Jam 341,000
6 Pedestrian Roller Jam 77,000
7 Jack Hammer Jam 42,000
8 Fulvi Mixer Jam 840,000
9 Concerete Pump Jam 284,000
10 Trailer 20 Ton Jam 350,000
11 Pile Drive + Hammer Jam 189,000
12 Bore Pile Machine 2.000 M Jam 1,007,000
13 Asphalt Liquid Mixer 5 HP, 1000 L Jam 59,000
14 Tronton Jam 436,000
15 Cold Milling Jam 598,000
16 Rock Drill Breaker Jam 74,000
17 Slip From Paver Jam 243,000
18 Concrete Pan Mixer 600 L Jam 347,000
19 Concrete Breaker 20 M3/Jam Jam 564,000
20 Asphalt Tanker 4.000 L Jam 403,500
21 Cement Tanker 4.000 L Jam 367,000
22 Vibrating Rammer Jam 71,000
23 Truck Mixer ( agitator ) Jam 701,000
24 Asphalt Liquid Mixer 40 HP,2.000 L Jam 119,000
25 Batching Plant 8.000 L Jam 557,000
26 Pedestrian Roller Jam 62,560
27 Asphalt Liquid Mixer Jam 46,989
28 Trailler 15 Ton Jam 275,772
29 Batching Plant Jam 570,556
30 Dump Truck 3,5 Ton Jam 264,500
31 Dump Truck 3,5 Ton Jam 43,100

Q BAHAN ALUMINIUM
1 Kusen dan pintu OVC toilet Unit 195,000
2 Engsel Buah 11,750

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
(Dalam Rupiah (Rp)

NO JENIS BAHAN SPESIFIKASI SATUAN HARGA

1 2 3 4
3 Handle Pintu Buah 10,500
4 Selinder Buah 17,500
5 Slop Tanam Buah 50,000
6 Kait Angin Buah 4,000
7 Grendel Buah 6,000

R UPAH KERJA
Pekerja RP/Hari 89,100
Tukang Kayu RP/Hari 144,800
Tukang Batu RP/Hari 144,800
Tukang Cat RP/Hari 144,755
Tukang Listrik RP/Hari 144,800
Tukang Besi RP/Hari 144,800
Tukang Pipa RP/Hari 144,800
Kepala Tukang Kayu RP/Hari 167,100
Kepala Tukang Batu RP/Hari 146,500
Kepala Tukang Cat RP/Hari 167,100
Kepala Tukang Listrik RP/Hari 167,100
Kepala Tukang Besi RP/Hari 167,100
Kepala Tukang Pipa RP/Hari 167,100
Mandor RP/Hari 183,800
Pembantu Mekanik RP/Hari 89,100
Penjaga Gudang RP/Hari 144,800
Penjaga Malam RP/Hari 144,800
Mekanik terampil RP/Hari 167,100
Mekanik Semi Termapil RP/Hari 144,800
Operator Terampil RP/Hari 167,100
Operator Semi Terampil RP/Hari 144,800
Pembantu Operator RP/Hari 83,600
Sopir Terampil RP/Hari 167,100
Sopir Pribadi RP/Hari 144,800
Buruh Tak Terampil RP/Hari 89,100
Buruh Semi Terampil RP/Hari 100,300
Buruh Terampil RP/Hari 122,500

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
STANDAR HARGA SATUAN BAHAN BANGUNAN DAN UPAH KERJA
PEMERINTAH PROVINSI SULAWESI SELATAN
KABUPATEN PINRANG
TAHUN 2018

Dalam Rupiah (Rp)


No JENIS BAHAN SPESIFIKASI SATUAN HARGA

1 2 3 4 5
BAHAN DASAR
1 Batu Kali / Gunung
Utuh m³ 150,000
split 3-5 cm m³ 210,000
split 2-3 cm m³ 240,000
split 1-2 cm m³ 281,000
2 Tanah Timbunan m³
3 Pasir m³
Timbunan Urug m³ 81,500
Pasangan m³ 97,200
Beton ( Abu Batu ) m³ 100,000
4 Kerikil Sungai m³ 162,000
5 Sirtu 130,000
6 Semen Potland
Semen PC 50 Kg/ Tonasa Kg 1,188
Semen PC 40 Kg/ Bosowa Kg 1,075
Scream Coat 20 Kg Zak 70,000
7 Kapur
Kapur Pasangan m³
8 Air Ltr 500

BAHAN CETAKAN
1 Batu Merah Uk.5x10x20 cm Buah 650
2 Paving Blok
Paving Blok Standar m² 52,500
Paving Blok K 200 m² 80,000
Paving Blok K 300 m² 86,000
Paving Blok K 400 m² 105,000
3 Gorong- Gorong
Gorong - Gorong 20" Buah 150,000
Gorong - Gorong 30" Buah 200,000
Gorong - Gorong 40" Buah 250,000
Gorong - Gorong 50" Buah 300,000
Gorong - Gorong 60" Buah 350,000
4 Rooster
Model ( Ukuran kecil ) Buah Rp 15,000
Model ( Ukuran sedang ) Buah 25,000

BAHAN BAKAR MINYAK


1 Premium/Bensin Ltr 6,450
2 Solar Ltr 5,150
3 Solar Industri Ltr
4 Minyak Bekisting Ltr
5 Minyak Pelumas Ltr 32,000

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)
No JENIS BAHAN SPESIFIKASI SATUAN HARGA

1 2 3 4 5
BAHAN PENUTUP LANTAI DAN DINDING
1 Keramik Lantai
Ukuran 20 x 20 cm Polos Buah 2,200
Ukuran 20 x 20 cm Motif/Tekstur Buah 2,600
Ukuran 30 x 30 cm Putih Buah 3,909
Ukuran 30 x 30 cm Warna Buah 5,909
Ukuran 30 x 30 cm Motif/Tekstur Buah 5,909
Ukuran 40 x 40 cm Putih Buah 7,500
Ukuran 40 x 40 cm Warna Buah 9,167
Ukuran 40 x 40 cm Motif/Tekstur Buah 10,833
Ukuran 50 x 50 cm Putih Buah 19,688
Ukuran 50 x 50 cm Warna Buah 21,250
Ukuran 50 x 50 cm Motif/Tekstur Buah 24,938
Ukuran 60 x 60 cm SNI Polos Buah 43,333
Ukuran 60 x 60 cm SNI Motif/ Tekstur Buah 46,667
Ukuran 60 x 60 cm Ext.Esenza ( Polos ) Buah 61,250
Ukuran 60 x 60 cm Ext.Esenza (Motif ) Buah 70,000
2 Keramik Dinding
Ukuran 20 x 25 cm Polos Buah 2,888
Ukuran 20 x 25 cm Motif Buah 5,455
Ukuran 25 x 40 cm Polos Buah 7,875
Ukuran 25 x 40 cm Motif Buah 13,333
Ukuran 30 x 60 cm Ext.Platinum Buah 19,250
3 Lantai Granite
Ukuran 60 x 60 cm Polos Buah 150,000
Ukuran 60 x 60 cm Motif Buah 160,000
4 Batu Alam
Batu Alam Paras Yogya 15 x 15 m² 220,000
Batu Alam Andesit Polos Bakar 15 x 30 m² 220,000
Batu Alam Andesit Bintik Bakar 15 x 30 m² 220,000
Batu Alam Candi Merah 10 x 20 m² 189,000
Batu alam palimanan 10 x 20 m² 200,000
Wali Cladding Kombinasi 20 x 50 m² 280,000

BAHAN PLUMBING DAN SANITARY


1 Pipa PVC - Type AW
ø 1/2 " Inci - 4 m Btg 18,000
ø 3/4 " Inci - 4 m Btg 22,000
ø 1 " Inci - 4 m Btg 25,000
ø 1 1/2 " Inci - 4 m Btg 45,000
ø 2 " Inci - 4 m Btg 60,000
ø 2 1/2 " Inci - 4 m Btg 80,000
ø 3 " Inci - 4 m Btg 115,000
ø 4 " Inci - 4 m Btg 185,000
ø 6 " Inci - 4 m Btg 425,000
ø 8 " Inci - 4 m Btg 750,000
Pipa PVC /Pipa Limbah 4 Inci -6 m Btg 450,000
Pipa PVC /Pipa Limbah 3 Inci -6 m Btg 350,000
ø 2 " Inci -Panjang 6 m S10 Bar 12,5 Btg 165,000
ø 2 " Inci -Panjang 6 m S12,5 Bar 10 Btg 115,000
ø 3 " Inci -Panjang 6 m S12 Bar 10 Btg 240,000
2 Pipa PVC -Type D

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)
No JENIS BAHAN SPESIFIKASI SATUAN HARGA

1 2 3 4 5
ø 1 1/4 " Inci - 4 m Btg 25,000
ø 1 1/2 " Inci - 4 m Btg 35,000
ø 2 " Inci - 4 m Btg 40,000
ø 2 1/2 " Inci - 4 m Btg 50,000
ø 3 " Inci - 4 m Btg 60,000
ø 4 " Inci - 4 m Btg 90,000
ø 5 " Inci - 4 m Btg 150,000
ø 6 " Inci - 4 m Btg 200,000
ø 8 " Inci - 4 m Btg 375,000
ø 10 " Inci - 4 m Btg 700,000
ø 12 " Inci - 4 m Btg 980,000
3 Pipa PVC- Type Wavin ( s 10 Tekanan Nominal 10 Bar ( 1,0 mpa ) 4 m )
ø 1/2 " Inci Btg 14,280
ø 3/4" Inci Btg 21,000
ø 1 " Inci Btg 25,000
ø 1 1/4" Inci Btg 35,000
ø 2 " Inci Btg 198,030
ø 3 " Inci Btg 384,615
ø 4 " Inci Btg 578,340
ø 6 " Inci Btg 1,227,870
ø 8 " Inci Btg 1,937,250

BAHAN CAT DAN FINISHING


1 Cat Tembok
Cat Tembok ( Kualitas Standar ) ext.Aries Kg 12,600
Cat Tembok ( Kualitas menengah ) ext.Metrolite Kg 25,000
Cat Tembok Interior ext Mowilex (2,5 liter) Ltr 60,000
Cat Tembok Eksterior ext Mowilex (2,5 liter) Ltr 100,000
Cat Precoat Varnish Batu Alam ( Solven 2,5 liter Ltr 120,750
Cat Precoat Varnish Batu Alam ( Solven 1 Liter Ltr 75,000
Plamur Tembok Zak Zak 55,000
2 Cat Kayu dan Besi
Cat Dasar Kayu 0,7 kg Kg 20,000
Cat Dasar Besi 0,7 kg Kg 20,000
Cat Kayu dan Besi ( Alvian ) Kg 57,000
Cat Kayu dan Besi ( Al-tex ) Kg 45,000
Cat Melamin ( Impra ) 5 kg Ltr 250,000
Cat Melamin Biasa Ltr 45,000
Cat Anti Karat Kg 65,000
Politur Ltr 65,000
Dempul Kg 35,000
Thinner Avian Ltr 35,000
Pengencer Cat/ Thinner Literan Ltr 15,000
Meni Kayu 0,7 kg Kg 20,000
Meni Besi 0,7 kg Kg 20,000
Vernis Ltr 65,000
Lem Kayu Kg 15,000
3 Cat Atap dan Waterproofing
Roof Paint Mowilex 4 Kg Ltr 180,000
Cat atap yoko 4 Kg Kg 95,000
Cat Atap dan Waterproofing No-Drop 4 Kg Ltr 180,000
Waterproofing Biasa Ltr

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)
No JENIS BAHAN SPESIFIKASI SATUAN HARGA

1 2 3 4 5
4 Kuas
Kuas 1" Buah 4,000
Kuas 2" Buah 7,000
Kuas 3" Buah 10,500
Kuas 4" Buah 15,750
5 Ampelas Lbr 8,500

BAHAN BESI
1 Besi Beton Polos ( SNI ) Kg 8,500
d = 6 mm btg 25,000
d = 8 mm btg 37,500
d = 10 mm btg 59,000
d = 12 mm btg 87,500
d = 14 mm btg 120,000
d = 16 mm btg 160,000
d = 19 mm btg 225,000
d = 22 mm btg 263,500
2 Besi Beton Ulir ( SNI ) Kg 9,000
d = 8 mm btg 47,250
d = 10 mm btg 65,000
d = 12 mm btg 127,500
d = 14 mm btg 130,000
d = 16 mm btg 165,000
d = 19 mm btg 225,000
d = 22 mm btg 320,000
3 Besi Kotak ( Metal Hollow )
ukuran 20 x 20 x0,3 mm panjang 6 m btg 45,000
ukuran 20 x 40 x0,3 mm panjang 6 m btg 80,000
ukuran 40 x 40 x0,3 mm panjang 6 m btg 105,000
ukuran 40 x 60 x0,3 mm panjang 6 m btg
ukuran 60 x 60 x 1,10 mm btg
4 Besi Baja Ringan
Galvalum
Truss Profil c-75, tebal 0,80 mm btg
Truss Profil c-75, tebal 0,75 mm btg 70,000
Truss Profil c-75, tebal 0,60 mm btg 65,000
Truss taso profil C-75 btg 85,000
Hollow 20 x20 (plafond ) btg 27,500
Hollow 20 x40 (plafond ) btg 21,000
Hollow 40 x40 (plafond ) btg
Galvanis
Truss Profil c-75, tebal 0,80 mm btg 92,400
Truss Apro Profil C=6 m btg 101,640
Aksesories baja ringan
Screw baja ringan buah 500
Dynabolt buah 2,000
Skrup Fixer Dos 50,000
5 Besi Plat
2 mm = 120 x 240 mm Lbr 450,000
3 mm = 120 x 240 mm Lbr 600,000
5 mm = 120 x 240 mm Lbr
6 Besi Siku

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)
No JENIS BAHAN SPESIFIKASI SATUAN HARGA

1 2 3 4 5
30 x 30 x 3 mm kg 60,000
40 x 40 x 3 mm kg 97,000
40 x 40 x 4 mm kg 90,000
50 x 50 x 5 mm kg 165,000
60 x 60 x 6 mm kg
70 x 70 x 7 mm kg 275,000
7 Paku
Paku Kayu kg 20,000
Paku Beton kg 31,500
Paku Seng ( Payung ) kg 50,000
Paku Skrup kg 75,000
Paku Asbes kg 70,000
Paku
KawatSirap kg 30,188
8
Beton Kg 25,000
Duri m 16,800
Kawat Las kg 115,000
Ayakan Kecil m² 28,875
Bronjong Kg 19,425
9 Profil Aluminium
Profil Aluminium Natural 4" 6m Btg 50,000
Profil Aluminium Natural 8" Btg 250,000
Profil daun jendela aluminium Btg 145,000
Aluminium Strip 03 mm Btg 110,000
Kusen Aluminium Btg 200,000
Rooling Door Aluminium m² 500,000
Rooling Door Besi m³ 400,000
Sealant tube 50,000
10 Rangka Nako Lengkap m

BAHAN PIPA
1 Pipa Besi
1.1 GIP(galvanize iron pipe )
Medium A ( Panjang 6 M )
Medium A ø 1/2 inchi btg 127,339
Medium A ø 3/4 inchi btg 175,628
Medium A ø 1 inchi btg 242,964
Medium A ø 1 1/2 inchi btg 339,606
Medium A ø 2 inchi btg 410,461
Medium A ø 3 inchi btg 721,586
Medium A ø 4 inchi btg 1,000,519
Medium A ø 5 inchi btg 1,648,238
Medium A ø 6 inchi 2,206,313
Medium A ø 8 inchi 4,410,000

Medium B ( Panjang 6 M )
Medium B ø 1/2 inchi btg 63,000
Medium B ø 3/4 inchi btg 95,000
Medium B ø 1 inchi btg 159,863
Medium B ø 1 1/2 inchi btg 210,000
Medium B ø 2 inchi btg 225,000

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)
No JENIS BAHAN SPESIFIKASI SATUAN HARGA

1 2 3 4 5
Medium B ø 3 inchi btg 400,000
Medium B ø 4 inchi btg 500,000
1.2 BSP ( Black Steel Pipe )
1/2 inci - 6 m tebal 2 mm
3/4 inci - 6 m tebal 2 mm
1 inci - 6 m tebal 2 mm
2 inci - 6 m tebal 2 mm
3 inci - 6 m tebal 2 mm
4 inci - 6 m tebal 2 mm
6 inci - 6 m tebal 2 mm

2 Tipe C ( Instalasi Listrik )


5/8 inci - 4 m Maspion Btg 9,900
3/4 inci - 4 m Btg
1 inci - 4 m Btg 18,585
1 1/2 inci - 4 m Btg 22,785
2 inci - 4 m Btg 29,190
3 Isolasi Pipa Buah 10,000
4 Lem Pipa Buah 12,500

BAHAN UNTUK LANGIT -LANGIT


1 Eternit 100 x 100 cm Lbr 20,000
2 Papan Gypsum
Gypsum 120 x 240 x 12 mm Lbr 170,000
3 Papan Fiber Semen ( GRC )
GRC 120 X 240 X 6 mm Lbr 72,765
4 Cotton Plaster Lbr 10,000
5 BJLS
Seng Gelombang BWG 34" BJLS 0,20 Kaki
mm 7,560
Seng Gelombang BWG 33" BJLS 0,22 Kaki
mm 8,925
Seng Gelombang BWG 32" BJLS 0,22 Kaki
mm 49,875
Seng Gelombang BWG 28" BJLS 0,35 Kaki
mm 78,750
Seng Aluminium Gelombang SWG Kaki
32"0,27 mm 29,085
Seng Aluminium Gelombang SWG Kaki
32"0,31 mm 34,230
Seng Aluminium Gelombang SWG Kaki
32"0,38 mm 43,785
Seng Plastik ( Serat Fiber ) Lbr 73,500
6 Seng Plat
Seng Plat BJLS 0,30 mm m' 50,000
Seng Plat BJLS 0,28 mm m' 75,000
7 Genteng Metal
ex.Multi Roof Lbr 87,150
ex.Perkasa Roof Lbr
ex.surya Roof Lbr 50,820
ex.intiroof Lbr
8 Metal Deck/Spandeck

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)
No JENIS BAHAN SPESIFIKASI SATUAN HARGA

1 2 3 4 5
Spandek Polos 0,40 mm
Spandek Polos 0,35 mm
Spandek Polos 0,30 mm
Spandek Polos 0,25 mm
Spandek Warna 0,40 mm
Spandek Warna 0,35 mm
Spandek Warna 0,30 mm
Spandek Warna 0,25 mm
9 Seng Plastik ( Fiber )
Fiber Glass ( Jabes ) 180 x 92 cm Lbr 63,000
Fiber Glass ( Jabes ) 200 x 92 cm Lbr 91,875
10 Nok /Bubungan
Nok Metal ext Multi Roof Lbr 42,000
Nok Metal ext Perkasa Roof Lbr 29,400
Nok Metal ext Surya Roof Lbr 23,625
Genteng Metal Buah 28,000
11 Nok Spandeck 40 cm
40 cm x 0,40 cm m 20,000
30 cm x 0,25 cm m
12 Karet Pelapis Genteng lebar 110 cm roll
13 List Plank Papan Semen ( Superplank )
Listplank Tekstur Kayu Lbr 99,750
Listplank Calsiboard Lebar 20 cm Lbr 68,250

BAHAN KACA, KUNCI DAN


PENGGANTUNG
1 Kaca
Kaca Bening 3 mm m² 100,000
Kaca Bening 5 mm m² 130,000
Kaca Rayben 3 mm m² 120,000
Kaca Rayben 5 mm m² 130,000

2 Kunci
Kunci Silinder KM/WC ( Kualitas Buah 50,000
biasa )
Kunci Silinder KM/WC ( Kualitas Buah 100,000
biasa )
Kunci Tanam Biasa ( antik ) Buah 120,000
Kunci Tanam 2x Slag Buah 180,000
Kunci Tanam 3x Slag Buah
3 Handle Pintu
Handle Pintu Biasa (Handel Buah 80,000
Pintu+Kunci)
Kualitas standar Buah 100,000
Kualitas Sedang Buah 150,000
Kualitas Baik(Handel Pintu Stainless + Buah 300,000
Kunci
Kualitas Baik (Handel Pintu Stainless + 150,000
Kunci
Handel Pintu Stainless (Kualitas Baik) Buah 300,000
4 Hak Angin
Hak Angin -Kecil ( Pasangan ) Buah 10,500

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)
No JENIS BAHAN SPESIFIKASI SATUAN HARGA

1 2 3 4 5
Hak Angin -Besar ( Pasangan ) Buah 15,750
5 Grendel
Grendel Kecil - 3 " Buah 10,000
Grendel Sedang - 6 " Buah 15,000
Grendel Besar - 12" Buah
Kualitas Standar Buah 20,000
Kualitas Sedang Buah 35,000
Kualitas Baik Buah 50,000
Grendel Tanam ( Kotak ) Buah 35,000
6 Engsel Pintu Buah 15,000
7 Engsel Jendela Buah 10,000
8 Engsel Kupu-Kupu Buah 15,000
9 Expaynolet Buah 135,000
10 Door Closer Buah 225,000
11 Door Stop Buah 20,000
12 Sekrup Fixer Buah 3,000
13 Kusen Aluminium 4" ( Putih ) Buah 275,000
14 Kusen Aluminium 4" (Coklat ) Buah 350,000
15 Kait Angin Buah 15,000
16 Pintu Aluminium Putih Buah 275,000
17 Pintu Aluminium Coklat Buah 550,000
18 Pintu Aluminium + Kusen Buah 900,000
19 Rolling Door Aluminium Buah
20 Rolling Door Besi ( pakai besi plat ) m 750,000
21 Rolling Door Besi ( Biasa ) m 500,000
22 Pintu Lipat Aluminium ( folding door ) m 750,000
23 Pintu Lipat Besi ( Folding Door ) m 750,000

BAHAN LAIN-LAIN
1 Minyak Tanah Ltr
2 Pelumas Ltr 29,000
3 Solar Industri Ltr 8,900
4 Solar Ltr 6,950
5 Premium Ltr 6,950
6 Paving Blok
Paving Blok Standar m² 52,500
Paving Blok K-250 m² 75,600
Paving Blok K-300 m² 84,000
Paving Blok 8 cm warna K-400 m² 105,000
BAHAN SANITER
1 Kloset Duduk
ex. TOTO ( 1 Tombol ) Set 1,800,000
ex. TOTO ( 2 Tombol ) Set 2,600,000
2 Kloset Jongkok
ex.TOTO Set 360,000
Standar Set 150,000
3 Washtafel
ex.Data Set 385,875
Tanam Persegi Empat( standar ) Set 200,000
Tanam Bulat ( standar ) Set 200,000
4 Bak Cuci Piring 1 Lubang ( sink )

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)
No JENIS BAHAN SPESIFIKASI SATUAN HARGA

1 2 3 4 5
Kualitas set 950,000
Kualitas Standar set 650,000
5 Bak Cuci Piring 2 Lubang ( sink )
Kualitas tebal set 975,000
Kualitis Tipis
6 Urinoir Buah 300,000
7 Bak Air Fiber 1000 Ltr Buah 1,200,000
8 Tangki Air Fiber - 1/2 m³ Buah 1,155,000
9 Tangki Air Fiber - 2 m³ Buah 2,940,000
10 Tangki Air Fiber 600 Ltr Buah ###
11 Tangki Air Stainless steel -1/2 m³ Maspion Buah 2,900,000
12 Tangki Air Stainless steel -1 m³ Maspion Buah 3,750,000
13 Tangki Air Stainless steel -1,5 m³ Maspion Buah 5,000,000
14 Kran Air
Stainless steel kualitas baik Buah 100,000
Stainless steel kualitas biasa Buah 50,000
Biasa Buah 25,000
15 Floor Drain stainless steel
Floor Drain kualitas standar Buah 55,000
Floor Drain kualitas sedang Buah 65,000
Floor Drain kualitas baik Buah 120,000
16 Waterdrain Buah 50,000
17 Pintu KM/WC PVC ( Standar ) Buah 300,000
18 Mesin Pompa Air
ex.Shimizu Set 550,000

BAHAN INSTALASI LISTRIK


1 Kabel Listrik
Kabel Tiostik 2x10 mm m' 12,000
Kabel Tiostik 2x16 mm m' 17,000
TYPE NYA
1,5 mm roll 190,000
2,5 mm roll 295,000
2 x 1,5 mm m' 11,500
2 x 2,5 mm m' ###
3 x 1,5 mm m' 13,650
3 x 2, 5 mm m' 16,800
TYPE NYM
2 x 1,5 mm m' 7,500
2 x 2,5 mm m' 12,000
2 x 4 mm m' 22,000
3 x 1,5 mm m' ###
3 x 2, 5 mm m' ###
3 x 4 mm m' 28,000
3 x 6 mm m' 35,000
TYPE NYY
2 x 2,5 mm m' 15,000
3 x 1,5 mm m' 17,000
3 x 2, 5 mm m' 22,000
3 x 4 mm m' 34,000
4 x 4 mm m' 30,000

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)
No JENIS BAHAN SPESIFIKASI SATUAN HARGA

1 2 3 4 5
4 x 6 mm m' 42,000
4 x 10 mm m' 88,000
LAMPU
Lampu LED 40 Wat Hwalite Buah 2,750,000
Lampu LED 90 Wat Hwalite Buah 4.850.000
Lampu LED 120 Wat Hwalite Buah 6.735.000
Lampu LED 100 Wat Sky Buah 1.450.000
Balon LHE 42 Wat Visicom Buah 115,000
Balon LHE 45 Wat Hamochs Buah 125,000
Balon TL Buah 25,000
2 Photo Sel Buah 75,000
3 Konektor Buah 15,000
4 Kap Lampu Buah 50,000
5 Trafo 40 Wat TL Buah 55,000
6 Pitting Lampu Buah ###
7 Pitting TL Buah 45,000
8 Stater TL Buah 10,000
9 Sok Pitting over Buah 25,000
10 Kontraktor 60 Ampere Buah 750,000
11 Tiang Arm Buah 175,000
12 MCB 35 Ampere Buah 145,000
13 Isolasi Unibel Buah 10,000
14 Servis Dial Clamp Buah 12,000
15 Safety Belt Buah 1,550,000
16 Clamp meter Buah 2,500,000
17 Behel Tiang Besi Buah 65,000
18 Behel Tiang Beton Buah 85,000
19 LAMPU NEON
Lampu Neon 1x40 wat ( kap biasa) ext.Philips Set 120,000
Lampu Neon 1x20 wat ( kap biasa) ext.Philips Set 85,000
Lampu Neon 2x40 wat ( kap tanam) ext.Philips Set 240,000
Lampu Neon 2x20 wat ( kap tanam) ext.Philips Set 99,750
20 LAMPU HEMAT ENERGI ( Kualitas Baik )
Lampu hemat energi 28 Wat ext.Philips Buah 60,000
Lampu hemat energi 23 Wat ext.Philips Buah 50,000
Lampu hemat energi 18 Wat ext.Philips Buah 45,000
Lampu hemat energi 14 Wat ext.Philips Buah 40,000
Lampu hemat energi 11 Wat ext.Philips Buah 35,000
21 KAP DOWN LIGHT
Diameter 5 Inchi Buah
Diameter 4 Inchi Buah 55,000
Diameter 3 Inchi ( Kualitas Baik ) Buah 45,000
Diameter 5 Inchi ( Kualitas Sedang ) Buah 40,000
22 SAKLAR PHASE
Saklar Phase Tunggal ext.Broco Buah 17,850
Saklar Phase Double ext.Broco Buah 28,350
Saklar Phase Tunggal panasonic Buah 16,000
Saklar Phase Double panasonic Buah 25,000
Stop Kontak Tunggal ext.Broco Buah 18,000
Stop Kontak Double ext.Broco Buah 17,850
23 Stop Kontak

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)
No JENIS BAHAN SPESIFIKASI SATUAN HARGA

1 2 3 4 5
Kualitas Baik panasonic Buah 16,000
Kualitas Sedang ext.Broco Buah 15,000
24 Sekering
Box MCB Buah 35,000
MCB Tunggal Buah 25,000
MCB 10 A Buah 47,000
MCB 25 A Buah 60,000
MCB 60 A Buah 682,500
MCB 30 A Buah 367,500
MCB 2 Group 2 A Buah 138,350
MCB 2 Group 10 A Buah 68,825
Lokal 2 Group Biasa Buah 68,825
Lokal 2 Group Outomatic Buah 95,025

BAHAN KAYU
1 Kayu Kelas I
Balok( Bayam ) m³ 12,500,000
Papan ( Bayam ) m³ 15,000,000
Balok ( Kumia ) m³ 6,500,000
Papan ( Kumia ) m³ 6,500,000
2 Kayu Kelas II ( Jenis Kayu Merah )
Balok m³ 3.500.000
Papan m³ 3.500.000
3 Kayu Kelas III ( Jenis Kayu Putih )
Balok m² 2.500.000
Papan m³ 2.500.000
4 Tripleks
122 x 244 x 0,4 cm lbr 55,000
122 x 244 x 0,6 cm lbr 79,800
122 x 244 x 0,9 cm lbr 110,250
5 Tripleks Melamin lbr 178,500
6 Teakwood lbr 98,175
7 Bambu Btg 40,000
8 List Profil Kayu
2 x 3 cm lbr 15,000
3 x 3 cm lbr 20,000
4 x 4 cm lbr 20,000
5 x 5 cm lbr 25,000
9 Lem Kayu kg 30,000

UPAH KERJA
Pekerja Org / hari 106,000
Tukang
Tukang kayu Org / hari 120,500
Tukang batu Org / hari 120,500
Tukang cat Org / hari 120,500
Tukang listrik Org / hari 120,500
Tukang pipa Org / hari 120,500
Tukang besi Org / hari 120,500
Kepala tukang
Kepala tukang kayu Org / hari 140,500
Kepala tukang batu Org / hari 140,500

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)
No JENIS BAHAN SPESIFIKASI SATUAN HARGA

1 2 3 4 5
Kepala tukang cat Org / hari 140,500
Kepala tukang listrik Org / hari 140,500
Kepala tukang pipa Org / hari 140,500
Kepala tukang besi Org / hari 140,500
Mandor Org / hari 122,700
Mekanik Org / hari 122,700
Sopir Org / hari 116,700
Pembantu sopir Org / hari 111,500
Operator terlatih Org / hari 120,500
Operator kurang terlatih Org / hari 106,000
Pembantu operator Org / hari 106,000
Pembantu masinis Org / hari 106,000
Penjaga Gudang Org / hari 106,000
Penjaga Malam Org / hari 106,000

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
STANDAR HARGA SATUAN BAHAN BANGUNAN DAN UPAH KERJA
PEMERINTAH PROVINSI SULAWESI SELATAN
KABUPATEN ENREKANG
TAHUN 2018
Dalam Rupiah (Rp)
NO JENIS BARANG SPESIFIKASI SATUAN HARGA

1 2 3 4 5
1 Amplas Lbr 5,500
2 Aspal Cair Kg 14,000
3 Abses Gelombang Besar Lbr 83,800
4 Abses Gelombang Kecil Lbr 80,200
5 Abses 3 mm uk. 100 x 100 Lbr 22,570
6 Aspal Bitumen Lt 13,000
7 Aspal Emulsi Lt 12,000
8 Baja Struktural Kg 28,713
9 Baja Tulangan Beton Kg 11,241
10 Batako uk. 20 x 40 x 10 Biji 2,095
11 Baut Baja Kg 18,800
12 Besi Galvanisasi Kg 18,793
13 Besi Profil Ca Pipa Besi Dai 2" m' 15,380
14 Beton Roster / Karawang Biji 40,315
15 Bubungan Abses Gib. Besar Lbr 30,395
16 Besi Beton d = 4 mm Btg 33,125
d = 6 mm Btg 33,125
d = 8 mm Btg 62,155
d = 10 mm Btg 96,280
d = 12 mm Btg 138,595
d = 14 mm Btg 202,750
d = 16 mm Btg 432,070
d = 19 mm Btg 576,760
d = 22 mm Btg 650,470
18 Paku Paku Biasa Kg 21,888
Paku Asbes Kg 38,950
Paku Seng (Payung) RRT Kg 27,075
Paku Skrup 3 1/2 inch Kg 28,030
Paku Skrup 4 inch Kg 26,665
Paku Payung Berulir 75 mm Kg 38,950
Paku Sirap Kg 25,983
Paku Beton Hitam Dos 38,950
Paku Beton Putih Dos 20,523
19 Kawat Beton Kg 32,125
Nyamuk Mtr 19,840
Ayakan Kecil Mtr 25,300
Duri Kg 19,840
20 Besi Plat 2mm = 120 x 240 mm Lbr 671,628
3mm = 120 x 240 mm Lbr 951,453
Besi H 15 cm 12 m panjang Btg 6,222,400
21 Besi Strep 30,3 mm Btg 33,078
35,4 mm Btg 47,410
46,4 mm Btg 52,553
40,6 mm Btg 49,140
50,6 mm Btg 67,658
22 Besi Siku 30.30.3 Btg 88,725
40.40.4 Btg 95,550
40.40.3 Btg 103,105
50.50.4 Btg 114,025
50.50.5 Btg 120,850
60.60.6 Btg 142,690
70.70.7 Btg 230,733

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)
NO JENIS BARANG SPESIFIKASI SATUAN HARGA

1 2 3 4 5
23 Besi Tipe C (Rangka Baja Ringan) Lebar 10, tebal 1,8 - 2,00 mm Btg 262,128
6 meter Lebar 12,5 tebal 1,8 - 2,00 mm Btg 286,000
Lebar 15 tebal 1,8 - 2,00 Btg 361,090
24 Besi Type C Ninoruss untuk Atap -
- Genteng atau Multiroof C.85.68, Reng 41 Bentang 5 s/d 7 M2 296,253
- Genteng atau Multiroof C.85.68, Reng 41 Bentang 9 s/d 11 M2 328,330
- Seng atau Spandeck C.85.68, Reng 41 Bentang 5 s/d 8 M2 288,063
- Seng atau Spandeck C.85.68, Reng 41 Bentang 9 s/d 11 M2 320,072
25 Genteng Metal Sakura Roof Lbr 59,100
26 Genteng Metal Surya Roof Lbr 74,700
27 Genteng Metal Multi Roof Lbr 92,900
28 Bubungan Genteng Metal M 56,500
29 Atap Spendek -
Tebal 0.3 Lbr 74,700
Tebal 0.35 Lbr 81,200
104,600
30 Gypsum Lbr 104,600
31 Sekrup Gypsum Isi 1000 perkotak Ktk 138,400
32 Aplus Cornice Compound Adhesive zak 20 kg Kg 80,940
33 Calsibox Lbr 95,500
34 Bubungan Abses Gib. Kecil Lbr 44,800
35 Bubungan Genteng Beton Bh 8,920
36 Bubungan Genteng Keramik Bh 49,118
37 Bubungan Seng Multi Roof Lbr 63,520
38 Buis Beton 1/2 Dia. 20 cm M 63,520
39 Bak Air Penampungan Veber isi 1 m3 Bh 1,330,000
40 Bak Air Penampungan Veber isi 0,6 m3 Bh 1,050,000
41 Bak Air kolam veber Bh 366,550
42 Cat Atap Seng (AGA) Isi 5 Kg Klg 188,000
43 Cat Meni Kayu Kg 32,125
44 Cat Minyak Kg 45,775
45 Cat Seng Minyak Isi 5 Kg Klg 79,900
46 Cat Tembok
- Cat Tembok Maritex Sejenisnya Kg 20,523
- Cat Tembok Mitroleit Kg 28,713
47 Cat Besi Kg 59,425
48 Cat Untuk Pekerjaan Jembatan Kg
49 Corong Talang Setengah Lingkaran Bh 93,550
50 Corong Talang Segi Empat Bh 93,550
51 Dempul Kayu Klg 38,950
52 Engsel Jendela Kuningan Psg 25,300
53 Engsel Pintu Kuningan Psg 38,950
54 Embo Doz Bh 2,048
55 Eternit 1 X 1 T . 33 mm Lbr 22,570
56 Engkel Stop kontak Bh 33,490
57 Genteng Beton Bh 6,873
58 Genteng Keramik Bh 10,285
59 Gorong-gorong beton 100 cm M¹ 407,500
60 Gorong-gorong beton 60 cm M¹ 305,125
61 Gorong-gorong beton 80 cm M¹ 355,630
62 Gorong-gorong beton 30 cm M¹ 202,750
63 Gorong-gorong beton 40 cm M¹ 253,255
64 Grendel Jendela 3,000
65 Grendel Kupu-kupu Jendela Bh 5,000
66 Grendel Kodok Jendela Bh 12,337
67 Hak Angin Psg 5,187
68 Instalasi Listrik Titik 305,125
69 Jarum Pengeras 1 1/2" Inc 509,875

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)
NO JENIS BARANG SPESIFIKASI SATUAN HARGA

1 2 3 4 5
70 Jarum Pengeras 1" Inc 305,125
71 Jarum Pengeras 1/2" Inc 202,750
72 Jarum Pengeras 3 1/6" Inc 202,750
73 Jarum Pengeras 3/4" Inc 28,713
74 Jarum Pengeras 5/16" Inc 8,238
75 Kaca Bening 3 mm M2 79,900
76 Kabel Tunggal 1,5 Isi 100 mtr rool 261,445
77 Kaca Bening 5 mm M2 130,405
78 Kaca Warna Biru M2 223,225
79 Kaca Ryben 3 mm M2 120,850
Kaca Ryben 5 mm M2 141,325
Kaca Ryben 7 mm M2 1,124,125
80 Kap TL 20 Wat Bh 131,088
81 Kap TL 10 Wat Bh 181,593
82 Kni M3 2,048
83 Kapur Ayak M3 85,360
84 Karet Roll M¹ 10,285
Karet Roll Lebar 55 cm M¹ 10,285
Karet Roll lebar 90 cm M¹ 16,428
Karet Roll 120 cm M¹ 17,110
85 Kawat Baja (bindraat) Kg 32,125
86 Kawat Berduri Kg 32,808
Kawat Berduri 100 M Roll 240,970
87 Kawat digelvano Kg 22,570
88 Kayu bakar M3 754,210
88 Kayu Kelas I / Balok (Bayam) m3 14,600,000
89 Kayu Kelas I / Papan (Bayam) m3 15,800,000
90 Kayu Kelas II / Balok m3 5,600,000
Kayu Kelas II / (Lokal) m3 9,018,000
91 Kayu Kelas III (Lokal) m3
Kayu Kelas III (Lokal) Balok m3 4,580,000
Kayu Kelas III (Lokal) Papan m3 5,100,370
92 Kayu Kelas IV untuk bagesting m3 3,570,205
93 Kayu Perancah m3 2,362,863
94 Kayu Lapis 4 mm uk. 8" x 4" Lbr 92,185
95 Kayu Lapis 12 mm uk.8" x 4" Lbr 18,475
96 Kayu Lapis 4 mm uk. 120" x 240" Lbr 66,250
97 Kayu Struktural (Ulin) m3 18,545,000
98 knee Bh 1,502
99 Klin 1 1/2" inc 104,470
1" inc 57,378
1/2" inc 57,378
3/4" inc 14,380
100 Kloset Biasa Bh 141,325
Kloset Duduk CW 600 J/SW 660 J KOMPLIT & ACC Unit 3,158,678
Kloset Jongkok type CE 6 ex.Toto Unit 254,545
Duduk Keramik Set 1,881,700
Jongkok Kramik Set 390,438
101 Kran Air Biasa Bh 26,665
Angsa Bh 66,250
Kristal Bh 63,520
Pembuangan Kolam Bh 18,475
102 Kuas Besar 4 inc Bh 14,380
Kecil 2 inc Bh 8,190
Sedang 3 inc Bh 10,285
Roll Bh 18,475
103 Kuku Tegel isi 80 biji Dos 100,375
104 Kunci Pintu 2 X Putar Bh 141,325

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)
NO JENIS BARANG SPESIFIKASI SATUAN HARGA

1 2 3 4 5
105 Lampu Pijar Chiyoda 5 wat Bh 4,773
10 wat Bh 5,460
25 wat Bh 6,143
40 wat Bh 6,825
60 wat Bh 5,508
75 wat Bh 6,463
100 wat Bh 8,238
200 wat Bh 16,428
106 Lampu Pijar Philips 5 wat Bh 6,825
10 wat Bh 6,873
25 wat Bh 8,238
40 wat Bh 9,193
60 wat Bh 10,285
75 wat Bh 11,650
100 wat Bh 21,888
200 wat Bh 18,475
107 Lampu Neon Chiyoda TL 10 Wat Bh 25,300
TL 20 Wat Bh 22,570
TL 40 wat Bh 30,760
108 Lampu Neon Philips TL 10 Wat Bh 11,650
TL 20 Wat Bh 18,475
TL 40 wat Bh 28,440
109 Lampu sumpit biasa 5 wat Bh 11,650
8 wat Bh 18,475
11 wat Bh 28,713
14 wat Bh 33,490
18 wat Bh 15,745
20 wat Bh 41,680
23 wat Bh 43,728
110 Lampu Sumpit Philips 5 wat 45,775
8 wat Bh 48,505
11 wat Bh 52,600
14 wat Bh 53,965
18 wat Bh 56,013
20 wat Bh 58,743
23 wat Bh 58,980
35 wat Bh 139,278
45 wat Bh 194,560
111 Lampu TS 23 wat Bh 76,488
28 wat Bh 100,375
36 wat Bh 139,515
58 wat Bh 217,765
40 wat Bh 17,793
20 wat Bh 15,745
112 Lampu Mercury 250 wat Bh 85,678
500 wat Bh 131,770
hpln 250 wat Bh 84,678
hpln 400 wat Bh 131,770
son h 220 wat Bh 301,030
son h 250 wat Bh 359,043
Son T 250 wat Bh 336,520
Son T 400 wat Bh 390,438
113 Lampu Sorot 500 wat set 154,975
150 wat set 92,185
Balon Visicom 36 wat Bh 141,325
114 Lampu Siang 21,888
115 Kabel EYM 2 x 1,5 mm m1 6,873
2 x 2,5 mm m1 10,285

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)
NO JENIS BARANG SPESIFIKASI SATUAN HARGA

1 2 3 4 5
2 x 4 mm m1 17,110
116 Kabel NYY 3x 4 mm m1 23,253
4 x 4 mm m1 32,808
2 x 6 mm m1 29,395
4 x 6 mm m1 42,363
2 x 10 mm m1 45,093
4 x 10 mm m1 75,805
2 x 1,5 mm m1 7,508
2 x 2,5 mm m1 10,285
117 Kabel Serabut rol 202,750
Tunggal rol 252,255
118 Kabel Twistik 2 x 10 mm m1 7,555
2 x 16 mm m1 12,968
119 Travo Mercury 250 wat Bh 202,750
400 wat Bh 296,253
120 Travo TL 40,315
121 Fitting Pijar Biasa Gantung Bh 5,460
Batu Gantung Bh 17,110
122 Fitting TL Bh 10,285
123 Fitting Mercury Biasa Gantung Bh 32,808
Batu Gantung Bh 32,808
124 Kap Lampu Pijar Bh 32,808
TL Bh 85,360
Mercury Gantung Bh 37,585
125 Fhoto Sell 3.A Bh 86,725
6.A Bh 116,755
126 Saklar Biasa Bh 18,475
MCB 2 A Bh 55,330
MCB 4 A Bh 55,330
MCB 6 A Bh 55,330
MCB 10 A Bh 55,330
MCB 16 A Bh 55,330
MCB 20 A Bh 55,330
MCB 3 phasa 25 A Bh 277,825
Kontraktor 3 phasa 25 A Bh 343,345
Kontraktor 3 phasa 16 A Bh 238,240
Timer 16 A Bh 600,695
127 Konektor 10 mm Bh 8,920
16 mm Bh 13,698
24 mm Bh 21,888
128 Stand Lampu TL Bh 76,488
Mercury Bh 123,580
129 Terminal Kabel 12 mm Bh 7,555
16 mm Bh 13,698
25 mm Bh 35,538
130 Panel Uk. 40 x 60 x 15 Bh 547,413
Uk. 30 x 40 x 15 Bh 311,950
131 Tangga Bambu Uk. 7 m Bh 154,975
Uk. 9 m Bh 233,463
132 Stater Bh 3,413
133 Isolasi Kabel Bh 8,238
134 Tang Kombinasi Bh 76,488
135 Obeng Test Bh 21,888
136 Avometer Bh 782,875
137 Settibell Bh 625,900
138 Betel Bh 18,475
139 Les Kayu (profil) M¹ 8,873
140 Lem Seng M¹ 100,375

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)
NO JENIS BARANG SPESIFIKASI SATUAN HARGA

1 2 3 4 5
141 Loster Kaca Bh 65,250
Keramik 30 x 30 Bh 96,233
142 Multiplex 5 mm Lbr 202,750
10 mm Lbr 134,500
143 Multiroof Lbr 202,068
144 Pagar BRC Tipe EP (T.0.9M) M¹ 305,125
BRC Tipe HD (T.0.9M) M¹ 202,750
145 Tiang Pagar BRC Btg

146 Paving Blok (T.8 cm K225 Model Batu Bata Biji 2,730
Model Kacang Biji 2,730
Model Tiga Berlian Biji 2,730
Model Segi Enam Biji 3,413
147 Penutup Talang Bh 8,238
148 Peralatan Gambar Teknik Mesin gambar (Bova A2) 5,484,125
Kaki meja gambar A2 2,451,185
Meja Gambar A2 1,626,725
Drawing Pen Rotring isi 4 885,250
Segi Tiga Set 145,468
Pensil 3,413
Tinta Warna 28,030
Penghapus 100,375
Jangka Huruf(Aluminium) 96,280
Mal lingkaran 587,680
Mal Simbol 587,680
Mal Huruf 587,680
Busur Derajat Plastik(Besar) 86,725
149 Peralatan bengkel Batu Sendok Spesi Besar 23,935
Sendok Spesi Sedang 23,935
Sendok Spesi Kecil 23,935
Pensil 3,413
Unting-Unting 47,823
Water Pas Aluminium 47,823
Selang Air 10 Meter 8,238
Siku Baja kecil 33,490
Ember 17,793
Palu Besi 57,378
Betel 15,745
Catut 37,585
Jangka Sorong 292,840
Mikrometer 489,400
Dial indikator 878,425
Mistar Baja (1 Meter) 96,280
Mistar Siku 47,823
Mistar Baja (30 cm) 43,728
Echol Chair No.2(Wood) 250,525
Echol Chair No.3(Wood) 387,025
Echol Chair No.4(Wood) 407,500
Echol Chair No.5(Wood) 407,500
Echol Chair No.6(Wood) 407,500
Echol Chair No.6(Wood) 407,500
Echol Chair No.2(Wood) 576,760
Echol Chair No.3(Wood) 576,760
Echol Chair No.4(Wood) 605,425
Echol Chair No.5(Wood) 605,425
Echol Chair No.6(Wood) 605,425
150 Vernis Kayu Kg 55,330
151 Pion Beton Bh 26,665

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)
NO JENIS BARANG SPESIFIKASI SATUAN HARGA

1 2 3 4 5
152 Pipa Plastik PVC 25 mm Btg 102,375
PVC 50 mm Btg 172,673
PVC 75 mm Btg 264,128
153 Pipa Gip DIA 1" M¹ 326,918
DIA 1 1/2" M¹ 388,343
DIA 2" M¹ 510,510
154 Pipa PVC AW DIA 1/2" M¹ 6,715
DIA 3/4" M¹ 7,789
DIA 1" M¹ 8,864
DIA 2" M¹ 20,145
DIA 3" M¹ 216,942
DIA 4" M¹ 325,758
DIA 5" M¹ 142,191
DIA 6" M¹ 188,846
DIA 8" M¹ 335,095
DIA 10" M¹ 511,235
DIA 12" M¹ 732,927
155 Pipa Instalasi Listrik Btg 12,333
156 Plamur Tembok Kg 81,265
157 Pompa Tangan Bh 55,330
158 Kawat Ram Galvanis Uk. 1 x 1 m M¹ 28,713
Uk. 1,5 x 1 m M¹ 49,188
159 Sambungan Talang Bh 8,238
Sambungan Pipa Keni 2' Bh 4,143
Sambungan Pipa Keni 3' Bh 10,286
Sambungan Pipa Keni 4' Bh 14,380
Sambungan Pipa Lurus 2' Bh 4,143
Sambungan Pipa Lurus 3' Bh 8,238
Sambungan Pipa Lurus 4' Bh 16,428
Sambungan Pipa Tee 2' Bh 9,603
Sambungan Pipa Tee 3' Bh 11,650
Sambungan Pipa Tee 4" Bh 18,475
160 Saklar tunggal Broco Bh 40,000
Saklar ganda Broco Bh 55,000
161 Semen semen putih kg 2,500
162 Seng Gelombang BJLS 0,20 Kaki 7,825
Gelombang BJLS 0,30 Kaki 9,739
Licin BJLS 0,20 Lbr 69,526
Licin BJLS 0,30 Lbr 111,730
Plat BJLS 0,20 Lbr 59,663
Plat BJLS 0,30 Lbr 110,930
163 starter 20 wat Bh 4,825
40 wat Bh 6,825
164 Stop Kontek Bh 22,570
165 Tear Kg 18,475
166 Tali Sling 1 1/2" inc 324,235
1" inc 181,593
1/2" inc 83,722
3 1/6" inc 22,570
3/4" inc 90,455
5/16" inc 32,490
167 Tarikan Jendela Bh 4,095
168 Teak Oil Kg 18,840
169 Teak Wood 3 mm Lbr 181,593
170 Tegel Plint 15 x 30 Bh 76,624
Keramik 30 x 30 Bh 59,289
Keramik 40 x 40 Bh 83,722
Mosaik 20 x 20 Bh 76,624

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)
NO JENIS BARANG SPESIFIKASI SATUAN HARGA

1 2 3 4 5
Mosaik 30 x 30 Bh 76,624
PC 20 x 20 Bh 76,624
Plint Keramik 20 x 20 Dos 76,624
Plint Keramik 15 x 20 Dos 76,624
Plint Keramik 11 x 11 Dos 76,624
Porselin 15 x 15 Dos 74,167
Keramik 30 x 30 Polos Dos 58,060
Keramik 30 x 30 Kembang Dos 60,790
Keramik 40 x 40 Polos Dos 60,790
Keramik 40 x 40 Kembang Dos 41,680
Keramik 20 x 20 Polos Dos 62,155
Keramik 20 x 20 Kembang Dos 61,473
Keramik 10 x 20 Polos Dos 55,330
Terasso 30 x 30 Bh 85,360
171 Tempat Sabun Porselin Bh 59,425
172 Tinner Super Ltr 45,775
173 Topi Uskup (T.8 cm K225) Biji 6,625
174 Travo TL 10 wat Bh 29,030
20 wat Bh 39,950
40 wat Bh 41,680
175 Tripleks 3 mm Lbr 70,072
176 Washtafel Cuci Piring 1 mata Bh 292,840
2 mata Bh 500,600
177 Washtafel Gantung Keramik Bh 430,705
178 Talang Setengah Lingkaran Btg 89,455
179 Talang Segi Empat Btg 73,075
180 Unior Keramik Standar Bh 1,244,525
181 Batu Kali (Besar) m³ 327,237
182 Batu Gunung/ Batu Belah Ukuran Crusher m³ 296,000
183 10-15 cm m³ 334,600
184 5-7 cm m³ 356,200
185 3-5 cm m³ 377,800
186 2-3 cm m³ 400,400
187 1-2 cm m³ 431,800
188 0.5-1 cm m³ 475,000
189 kerikil Sirtu m³ 332,566
190 Sirtu Gunung m³ 198,000
191 Sirtu Kali m³ 332,566
192 Timbunan Pilihan m³ 144,000
193 Tanah Timbunan m³ 100,000
194 Pasir Ayak Beton m³ 249,096
195 Pasir Pasang m³ 240,598
196 Sirtu Royalti m³ 153,000
197 Krikil Sungai Royalti m³ 175,000
198 Timbunan Pengikat Pilihan/ pasir timbunan m³ 152,450
199 Semen Tonasa 40kg 75,744
200 Semen Semen Indonesia 50kg 65,513
201 Semen Bosowa 40kg 72,757
202 Semen Warna Semen Indonesia KG 2
203 Semen Putih kg 2,296
204 Besi Beton Polos u-24 KS kg 11,836
205 Besi Beton Polos u-39 KS Kg 13,295
206 Kawat Bendrat Kg 31,920
207 Batu Merah bh 929
208 Kayu Cetakan m³ 3,000,000
209 Kayu Kelas I m³
210 sekelas Ulin m³ 17,700,000
211 sekelas Bayam m³ 13,792,000

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)
NO JENIS BARANG SPESIFIKASI SATUAN HARGA

1 2 3 4 5
212 Sekelas Jati m³ 8,004,167
213 Sekelas Kumea m³ 8,528,400
214 Kayu Kelas II kamper m³ 5,216,374
215 Papan Kelas I m³ 18,789,200
216 Papan Kelas II m³ 9,800,000
217 Kayu Kelas III meranti m³ 3,623,828
218 Aspal Bitumen kg 12,708
219 Kawat Bronjong 1x1x2m bh 386,135
220 1 x 0.5 x 2 m bh 371,112
221 Galvanis 1 x 1 x 2 bh 593,896
222 Galvanis 1 x 0.5 x 2 bh 571,550
223 Paku Beton kg 35,802
224 Paku Campuran Kg 23,025
225 Paku Payung/ Seng Kg 27,442
226 Atap Seng BJLS 0.18 mm (BWG 34) /6 kk 54,843
227 0.22 mm (BWG 33) /6 kk 95,195
228 0.30 mm (BWG 32) /6 kk 67,960
229 0.35 mm (BWG 28) /6 kk 94,195
230 Seng Bubungan Lbr 67,960
231 Minyak Tanah Industri Liter 11,700
232 Minyak Bakar Industri Liter 11,700
233 Solar In dustri Liter 11,700
234 Bensin Industri Liter 11,700
235 Minyak Pelumas Liter 391,500
236 Alat-alat Bantu Set 163,200

UPAH PEKERJA
238 Pekerja Org/ Hr 67,000
239 Mandor Org/ Hr 97,500
240 Kepala Tukang Org/ Hr 125,000
241 Tukang Org/ Hr 117,500
242 Mandor lapangan Org/ Hr 97,500
243 Mekanik Org/ Hr 101,000
244 Mekanik Pembantu Org/ Hr 90,000
245 Operator Terampil Org/ Hr 117,500
246 Operator Semi Terampil Org/ Hr 113,000
247 Pembantu Operator Org/ Hr 103,500
248 Sopir Maretial/Truk Org/ Hr 113,000
249 Pembantu Sopir/ Kernek Org/ Hr 101,500
250 Buruh Lp. Tak Terlatih Org/ Hr 67,850
251 Buruh Lap. Semi terlatih Org/ Hr 78,200
252 Buruh Lap. terlatih Org/ Hr 83,000
256 Operator Terampil Org/ Hr 120,000
257 Operator Semi Terampil Org/ Hr 115,100
258 Pembantu Operator Org/ Hr 105,500
259 Sopir Maretial/Truk Org/ Hr 115,500
260 Pembantu Sopir/ Kernek Org/ Hr 103,250
261 Buruh Lp. Tak Terlatih Org/ Hr 69,000
262 Buruh Lap. Semi terlatih Org/ Hr 80,500
263 Buruh Lap. terlatih Org/ Hr 85,000

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
STANDAR HARGA SATUAN BAHAN BANGUNAN DAN UPAH KERJA
PEMERINTAH PROVINSI SULAWESI SELATAN
KABUPATEN TANA TORAJA
TAHUN 2018
Dalam Rupiah (Rp)
No JENIS BARANG SPESIFIKASI SATUAN HARGA

1 2 3 4 5
1 Pasir pasangan / Beton m³ 278,000
2 Batu Gunung m³ 150,000
3 Batu Kali (Batu belah) m³ 278,000
4 Batu Kerikil m³ 305,000
5 Batu Pecah (Stone Cruisser) : Ukuran 0,5 - 1 cm m³ 389,000
Ukuran 1 - 2 cm m³ 389,000
Ukuran 2 - 3 cm m³ 389,000
Ukuran 3 - 5 cm m³ 389,000
Ukuran 5 - 7 cm m³ 389,000
Ukuran 7 - 10 cm m³ 389,000
Ukuran 10 - 15 cm m³ 389,000
6 Sirtu (Pasir dan Batu) m³ 200,000
7 Pasir Timbunan / urungan m³ 223,000
8 Timbunan Tanah Biasa m³ 110,000
9 Timbunan Pilihan m³ 150,000
10 Aggregate Penutup m³ 100,000
11 Aggregate Halus m³ 120,000
12 Aggregate Kelas A m³ 145,000
13 Batu Kali Bulat m³ 150,000
14 Batu Bata (Rappang) Biji 1,000
15 Batu Bata (Palopo) Biji 1,000
16 Batu Vaving Block ( T =6cm ) Biji 1,700
17 Batu Vaving Block ( T=8cm ) Biji 1,800
18 Batako 20 x 40 cm Biji 3,500
19 Semen Bosowa PC 40 kg zak 46,000
PC 50 kg zak 65,000
20 Semen Tiga Roda PC 50 kg zak 59,000
21 Semen Tonasa PC 50 kg zak 60,000
22 Semen Putih Tiga Roda zak 64,000
23 Kapur zak / 5 kg 70,000
24 Amplas / Kertas Gosok Halus Lembar 2,500
Kasar Lembar 2,500
25 Asbes Gelombang Kaki 5,600
26 Nok Asbes Lbr 15,000
27 Bak Mandi Fiber Glass Bh 210,000
28 Bak Reservoir 1000 liter Bh 1,300,000
29 Baut 10 cm Bj 4,000
12 - 15 cm Bj 4,500
20 cm Bj 5,000

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)
No JENIS BARANG SPESIFIKASI SATUAN HARGA

1 2 3 4 5
25 cm Bj 5,000
30 cm Bj 6,000
30 Baugel I Bj 12,000
U Bj 15,000
31 Gorong - gorong (buis beton) Diameter 100 cm m³ 600,000
pakai tulang : Diameter 80 cm m^1 500,000
Diameter 60 cm m^1 400,000
Diameter 40 cm m^1 300,000
Diameter 30 cm m^1 250,000
Diameter 20 cm m^1 200,000
32 Gorong - gorong - Diameter 100 cm m^1 550,000
tidak pakai tulang : - Diameter 80 cm m^1 470,000
- Diameter 60 cm m^1 370,000
- Diameter 40 cm 280,000
33 Kayu Kelas I
- Balok Jati m³ 11,500,000
- Papan ( Sawmil ) m³ 16,000,000
34 Kayu Kelas II
- Papan kamper m³ 7,350,000
35 Kayu Kelas II
- Balok m³ 4,000,000
- Papan ( Sawmil ) m³ 4,000,000
36 Kayu Kelas III
- Balok Meranti m³ 3,000,000
- Papan m³ 3,000,000
37 Kayu Kelas IV
- Balok Terentang m³ 2,100,000
- Papan Pinus m³ 1,900,000
38 Tripleks - Tebal 2 mm lbr 39,000
- Tebal 3 mm lbr 52,000
- Tebal 4 mm lbr 62,000
- Tebal 6 mm lbr 73,000
39 Plywood 4 mm lbr 64,000
40 Teakwood lbr 75,000
41 Bahan Besi dan Kawat
- Kawat Berduri Roll 180,000
- Kawat Pengikat Kg 22,000
- Kawat Licin Diameter 3 mm Kg 22,000
Diameter 4 mm Kg 22,000
Diameter 5 mm Kg 22,000
- Kawat Bronjong 50 kg Roll 650,000
- Kawat Nyamuk mtr 12,000
- Kawat Ayak mtr 17,000
- Besi Beton Polos Kg 14,000
- Besi Beton Ulir Kg 15,000

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)
No JENIS BARANG SPESIFIKASI SATUAN HARGA

1 2 3 4 5
- Besi Beton 6 mm - biasa 1 Btg = 9 mtr btg 24,000
- SNI 1 Btg = 12 mtr btg 27,000
- Besi Beton 8 mm - biasa 1 Btg = 9 mtr btg -
- SNI 1 Btg = 12 mtr btg 43,000
- Besi Beton 10 mm - biasa 1 Btg = 9 mtr btg 56,000
- SNI 1 Btg = 12 mtr btg 60,000
- Besi Beton 12 mm - biasa 1 Btg = 9 mtr btg -
- SNI 1 Btg = 12 mtr btg 85,000
- Besi Beton 14 mm SNI btg 138,000
- Besi Beton 16 mm SNI btg 165,000
- Besi Beton 19 mm SNI btg 255,000
- Besi Beton 20 mm SNI btg 275,000
- Besi Beton 22 mm SNI btg 310,000
- Besi Beton 24 mm SNI btg 400,000
- Besi Beton 30' btg 625,000
- Besi Beton 32' btg 785,000
- Besi Kanal UNP 80x45x5xPj 6 m btg 285,000
- Besi Kanal UNP 100x50x5xPj 6 m btg 427,000
- Besi Kanal UNP 120x55x7xPj 6 m btg 495,000
42 Besi Siku Panjang 6 m : - L 25/25 Tebal 2,5 mm btg 47,000
- L 30 / 30 tebal 3 mm btg 65,000
- L 40 / 40 tebal 4 mm btg 65,000
- L 50 / 50 tebal 5 mm btg 95,000
- L 60 / 60 tebal 6 mm btg 220,000
43 Besi Beton Ulir Diameter 13 mm Kg 17,000
44 Besi Provin C Diameter 2" mtr 118,000
45 Besi Strip / plat gepeng btg 600,000
46 Besi Plat : 2 mm x 120mm x 240mm Lbr 750,000
3mm x 120mm x 240mm Kg 32,000
47 Paku Biasa 2 cm Kg 22,000
3 cm Kg 20,000
4 cm Kg 20,000
5 cm Kg 18,000
6 cm Kg 18,000
7 cm Kg 18,000
10 cm Kg 18,000
48 Paku Beton Hitam Hitam Kg 37,000
49 Paku Beton Putih 2 cm Dos 17,000
3 cm Dos 17,000
4 cm Dos 17,000
5 cm Dos 17,000
7 cm Dos 17,000
50 Paku Seng Kg 22,000
51 Paku Sekrup Dos 11,000
52 Plat Aluminium 2 x 1 m tebal 0,7 mm Lbr 250,000

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)
No JENIS BARANG SPESIFIKASI SATUAN HARGA

1 2 3 4 5
2 x 1 m tebal 0,9 mm Lbr 300,000
2 x 1 m tebal 1,0 mm Lbr 400,000
53 Seng Gelombang
- Gelombang Besar Merk Gajah Kaki 6,800
- Gelombang Kecil Merk Gajah Kaki 6,755
54 Seng Polos Merk Gajah Lbr 50,000
55 Atap Plastik :
- Warna Putih Arcylic 6 Kaki Lbr 45,000
- Fiber Glass/6 VK Lbr 48,000
56 Atap Seng Warna 6 Kaki Lbr 60,000
57 Atap Seng Biasa
Kode 28 RUSA / SERMANI Kaki 77,000
Kode 31 RUSA / SERMANI Kaki 57,000
Kode 33 GAJAH Kaki 6,300
RUSA / SERMANI Kaki 6,700
58 Atap Multiroof Berglazur Lbr 82,000
Polos Lbr 82,000
59 Atap Suryaroof Berglazur Lbr 33,000
Polos Lbr
60 Atap Sakuraroof Berglazur Lbr 33,000
Polos Lbr 48,000
61 Paku Atap Seng Genteng Metal Kg 27,000
62 Eternik Ukuran 3 mm Lbr 8,000
63 Tegel Keramik - Uk. (10 x 20) cm Dos 55,000
- Uk. (20 x 20) cm Dos 60,000
- Uk. (20 x 25 ) cm Dos 57,000
- Uk. (30 x 30) cm Dos 59,000
- Uk. (40 x 40) cm Dos 62,000
64 Kuku Tegel 1 cm m 6,000
10 cm Bh 500
65 Melamin 2 mm Lbr 56,000
3 mm Lbr 79,000
66 Bahan Terase
- PC Uk. (30 x 30) cm Bh 57,000
- Pintu Angin Uk. (20 x 20) cm Lookster Keramik Bh 35,000
- Pintu Angin Uk. (30 x 30) cm Lookster Keramik Bh 55,000
66 Bahan Kaca :
a. Kaca Polos - Tebal 2 mm m2 85,000
- Tebal 3 mm m2 90,000
- Tebal 5 mm m2 115,000
b. Kaca Reiben : - Tebal 3 mm m2 110,000
- Tebal 5 mm m2 131,000
c. Kaca Naco Polos : - Ukuran 60 x 100 Set 203,000
- Ukuran 50 x 100 Set 190,000
d. Kaca Nako Reben Set 185,000

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)
No JENIS BARANG SPESIFIKASI SATUAN HARGA

1 2 3 4 5
e. Nako (7 mata) lengkap Set 175,000
67 Vermika Lbr 55,000
68 Kait Angin 10" Btg 10,000
8" Btg 10,000
Kacetra Psg 12,000
69 Kunci Pintu / Taman : Napoli Set 40,000
Kodai Set 75,000
Jangkar 9702 RRC/692 Set 75,000
Golden Set 65,000
Freeder (Kunci Kembar) Set 125,000
Cavel (besar) Set 150,000
70 Grendel Antik 2 Psg 45,000
71 Grendel Biasa Besar Bh 15,000
Kecil Bh 12,000
72 Tarikan Antik Jendela Set 7,500
73 Engsel Biasa (H) sedang Psg 10,000
74 Engsel SES Psg 20,000
75 Engsel Jendela Psg 25,000
76 Engsel Pintu Kupu-Kupu Psg 40,000
77 Eternit 3 mm Lbr 20,000
78 Cat Tembok Aries Kg 9,400
Avitex Kg 21,000
Metrolite Kg 28,000
Vinotex Kg 17,000
Tiger 5 Kg 40,000
79 Cat Genteng Ayam (4 kg) Kg 15,000
Yoko (4 kg) 4 Kg 86,000
Nippon (5 kg) Kg 185,000
80 Cat Kayu Avian Liter 55,000
Glotex Kg 57,000
81 Cat Besi Padma Kg 8,500
82 Cat Maritex Kg 54,000
83 Cat Kominax Kg 33,000
84 Cat Meni Kayu/Besi Kg 34,000
85 Dempul Kayu Kg 21,000
86 Dempul Tembok Kg 47,500
87 Minyak Berkisting Ltr 1,900
88 Minyak Cat Biasa Ltr 17,000
Thinner Super Ltr 35,000
89 Plamur Boyo Kg 9,000
Kucing Kg 30,000
Perahu Kg 14,000
90 Kuas Biasa 1" Bh 9,000
2 1/2" Bh 11,000
3" Bh 12,000

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)
No JENIS BARANG SPESIFIKASI SATUAN HARGA

1 2 3 4 5
4" Bh 16,000
Kecil Bh 6,000
Besar Bh 27,000
91 Kuas Roll Bh 25,000
92 Bahan Sanitasi
a. Closet Jongkok : type CE 6 ex.Toto unit 390,000
- Merk KIA Type Ex Bh 215,000
- Merk Top DX Global Bh 80,000
- Merk INA Bh 165,000
- Merk Toto Bh 280,000
- Merk Imperial Bh 90,000
b. Closet Duduk CW 600 J /SW 660 J Komplit & acc unit 2,310,000
- Merk Toto Type CE 7 Bh 1,500,000
- Merk D - Euro Set 750,000
c. Wastafel Kenplok - Merk KIA Type Ex Set 450,000
- Urinoar Keramik Standard Bh 175,000
Aluminium 2 Lubang Bh 320,000
d. Tempat Cuci Piring - Merk Viega 1 Lubang Bh 180,000
- Merk viega 2 Lubang Bh 380,000
93 Bak Mandi Fiber glass 70 x 70 x Cap Kuda Bh 225,000
94 Kran Air Kuningan 1/2" Bh 20,000
3/4" Bh 25,000
95 Lampu Philips Sumpit 5 Wat Bh 27,000
8 Wat Bh 29,000
14 Wat Bh 33,000
18 Wat Bh 35,000
96 Colokan Lampu Besar Bh 10,000
Kacil Bh 5,000
97 Saklar Bundar Bh 8,000
Segi Empat Bh 10,000
98 Stop Kontak Putih Bh 10,000
99 Vitting Lampu Biasa Bh 5,000
Plafond Bh 20,000
100 Lem Fox 150 gr Tube 7,500
101 Lem Pipa Bh 9,000
102 Gaji/Upah - Mandor Lapangan Org/hari 108,000
- Mekanik Org/hari 86,500
- Mekanik Pemnbantu Org/hari 70,500
- Kepala Tukang Org/hari 130,000
- Tukang Org/hari 108,000
- Operator Terlatih Org/hari 86,500
- Pembantu Operator Org/hari 70,500
- Sopir Truk Org/hari 81,000
- Sopir Porsenil Org/hari 70,500
- Pembantu Sopir Org/hari 65,000

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)
No JENIS BARANG SPESIFIKASI SATUAN HARGA

1 2 3 4 5
- Buruh Terampil Org/hari 86,500
- Buruh Semi Terampil Org/hari 76,000
- Buruh Tak Terampil Org/hari 70,500

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
STANDAR HARGA SATUAN BAHAN BANGUNAN DAN UPAH KERJA
PEMERINTAH PROVINSI SULAWESI SELATAN
KABUPATEN TORAJA UTARA
TAHUN 2018
Dalam Rupiah (Rp)

NO BAHAN-BAHAN BANGUNAN SPESIFIKASI SATUAN HARGA

1 2 4 5 6
1 Aggregate HALUS M3 250,000
kelas A M3 250,000
PENUTUP M3 200,000
2 Atap Plastik : - Warna Putih 6 Kaki lbr 90,000
- Fiber Glass lbr 75,000
3 Atap Senk 5 Kaki lbr 32,000
6 Kaki lbr 38,000
7 Kaki lbr 44,000
8 Kaki lbr 50,000
9 Kaki lbr 56,000
10 Kaki lbr 61,000
5 Kaki lbr 35,000
6 Kaki lbr 48,000
7 Kaki lbr 51,400
8 Kaki lbr 55,000
9 Kaki lbr 61,650
10 Kaki lbr 68,500
4 Atap Licin lbr 85,000
Kasar lbr 115,000
Licin lbr 50,000
Sakura Roof lbr 35,000
5 Batu Bata Palopo biji 800
Rappang biji 800
6 Batu(Batu Belah Gunung M3 300,000
7 Bahan Cat
- Cat Tembok Tiger 5 Kg 67,000
- Metro Lite 5 Kg 152,000
- Cat Tembok Nagaitex Kg 72,000
- Dempul Tembok Boyo 5 Kg 77,000
- Platon Cat Besi/Cat Perak/Blok Kg 132,000
- Pelumas Oli Mesran Ltr 42,000
- Cat Minyak Avian/Glotes Kg 63,000
- Cat Dasar TL 1 Kg YOKO Kg 42,000
- Pylex a (pilox) Botol 32,000
- Cat Glotex Kg 70,000
8 Batu Kali Bulat M3 200,000
9 Bambu Parrin Batang 50,000
10 Batu Pecah Uk 3-5 cm M3 320,000
Uk 2-3 cm M3 350,000

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)

NO BAHAN-BAHAN BANGUNAN SPESIFIKASI SATUAN HARGA

1 2 4 5 6
Uk 1-2 cm M3 400,000
Uk 0,5-1 cm M3 400,000
11 Batu Vaving Block (T=6 cm) T=6 cm M2 110,000
T=8 cm M2 120,000
12 Bahan Sanitasi
a. Closet Jongkok ITO Global Buah 160,000
KIA Type Ex Buah 300,000
TOP DX Global Buah 150,000
INA Buah 300,000
TOTO Buah 420,000
IMPERIAL Buah 130,000
b. Closet Duduk Standart Set 180,000
Complet Set 2,400,000
Complet Set 1,300,000
c. Westafel Kenplok Complet Buah 700,000
Standart Buah 700,000

d. Tempat cuci Piring 1 lobang Buah 450,000


2 Lobang Buah 750,000
e. Bak Mandi Fibre glass 70x70x66 Buah 350,000
f. Bak reservoar fibre glass kap 1000 ltr Buah 1,300,000
13 Besi Siku Panjang 6 M
L 25/25 tebal 2,5 mm btg 97,000
L 30/30 tebal 3 mm btg 100,000
L 40/40 tebal 4 mm btg 150,000
L 50/50 tebal 5 mm btg 300,000
L 60/60 tebal 6 mm btg 325,000
14 Bahan Besi dan Kawat
Kawat beton roll/Kg 25,000
Kawat berduri Kg 30,000
Kawat pengikat Kg 30,000
Kawat bronjong 50 Kg roll 1,000,000
Kawat bronjong 1m 300,000
Kawat nyamuk m 35,000
Kawat Ayak m 30,000
Besi beton 6 mm 9m btg 22,000
12 m btg 75,000
Besi beton 8 mm SNI 8 mm btg 47,000
Besi beton 10 mm 10 mm btg 57,000
btg 63,000
Besi beton 12 mm btg 85,000
btg 96,000
Besi beton 14 mm btg 150,000
Besi beton 16 mm btg 180,000
Besi beton 19 mm btg 250,000

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)

NO BAHAN-BAHAN BANGUNAN SPESIFIKASI SATUAN HARGA

1 2 4 5 6
Besi beton 22 mm btg 400,000
Besi beton 24 mm btg 450,000
Besi kanal UNP 80x45x5xPj 6 m btg 330,000
Besi kanal UNP 100x50x5xPj 6 m btg 430,000
15 Besi Strip/plat gepeng
(1 1/4x4 1/3) Plat Panjang 4 m btg 35,000
(1 1/2x4 1/3) Plat Panjang 4 m btg 40,000
(2 1/2x5 1/3) Plat4 m btg 65,000
16 Besi Plat:
Ukuran ( 4 x 8 ) plat tebal 1.2 mm lbr 400,000
Ukuran ( 4 x 8 ) plat tebal 3 mm lbr 900,000
17 Bahan Kaca:
a.Kaca Polos
Tebal 2 mm Uk. 1x1m m2 80,000
Tebal 3 mm m2 110,000
Tebal 5 mm m2 110,000
b.Kaca Reiben
Tebal 3 mm m2 120,000
Tebal 5 mm m2 140,000
c.Kaca Naco Polos:
Ukuran 60 x 100 Lbr 232,000
Ukuran 50 X 100 Lbr 210,000
18 Bahan Terasa
Pc 30 x 30 cm Buah 55,000
Pintu Angin 20 x 20 cm Buah 50,000
Pintu Angin 30 x 30 cm Buah 65,000
19 Besi Beton Ulir diameter 13 mm batang 135,000
20 Beton Roster/karawang 45,000
21 Gorong-gorong (buis beton)pakai Tulang
Diameter 100 cm 1/2 m Pakai besi M¹ 1,500,000
Diameter 80 cm 1,000,000
Diameter 60 cm 1 m pakai besi M¹ 625,000
Diameter 40 cm M¹ 350,000
Diameter 30 cm M¹ 300,000
Diameter 20 cm M¹ 250,000
22 Gorong-gorong (buis beton)
tidak pakai tulang :
Diameter 100 cm 1/2 m Pakai besi M¹ 650,000
Diameter 60 cm 1 m pakai besi M¹ 450,000
Diameter 30 cm 1m M¹ 225,000
23 Generator 10 KVA + Landasan Unit 6,000,000
24 Generator 15 KVA + Landasan Unit 9,000,000
25 Generator 20 KVA + Landasan Unit 6,250,000
26 Generator 30 KVA + Landasan Unit 8,000,000
27 Generator 40 KVA + Landasan Unit 9,000,000

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)

NO BAHAN-BAHAN BANGUNAN SPESIFIKASI SATUAN HARGA

1 2 4 5 6
28 Kabel Distribusi 2 x 10 mm mtr 5,000
29 Kabel Induk 2 x 16 mm mtr 55,000
2 x 25 mm mtr 40,000
4 x 16 mm mtr 13,000
4 x 35 mm mtr 20,000
4 x 70 mm mtr 35,000
30 Kapur 5 Kg Zak 25,000
31 Kerikil Saring M3 450,000
32 Pasir pasangan/Beton M3 300,000
33 Pasir Timbunan/urungan M3 300,000
34 Semen 50 Kg zak 63,000
50 Kg Zak 63,000
50 Kg Zak 65,000
35 Semen putih Zak 100,000
36 Sirtu (pasir dan batu) Zak 300,000
37 Timbunan Pilihan M3 200,000
Tanah Biasa M3 150,000
38 Kayu Kelas 1
- Balok Bayam M3 13,000,000
- Papan ( Sawmil) Bayam M3 13,000,000
- Lembar Sering M3 4,000,000
39 Kayu Kelas II
- Balok Kalapi M3 7,000,000
- Papan ( Sawmil ) M3 7,000,000
40 Kayu Kelas III
- Balok Betau M3 3,500,000
- Papan M3 3,500,000
41 Kayu Kelas IV
Nato 3,500,000
- Balok Pinus M3 2,100,000
- Papan Pinus 4x25x2 cm M3 2,100,000
42 Paku Biasa
2cm kg 30,000
3cm kg 23,000
4cm kg 20,000
5cm kg 18,000
7cm kg 18,000
43 Paku Beton
3 cm dos 28,000
4 cm dos 30,000
5 cm dos 35,000
6 cm dos 40,000
7 cm dos 45,000
10 cm dos 60,000
44 Paku Seng Gelombang Kecil kg 55,000

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)

NO BAHAN-BAHAN BANGUNAN SPESIFIKASI SATUAN HARGA

1 2 4 5 6
45 Paku Seng Gelombang Besar kg 40,000
46 Paku Atap Seng Genteng Metal kg 50,000
47 Eternit Ukuran 1x1 m M2 25,000
48 Pipa
- Pipa GIP diameter 1" T.S. Batang 300,000
- Pipa GIP diameter 1 1/2" T.S. Batang 420,000
- Pipa GIP diameter 2" T.S. Batang 500,000
- Pipa PVC diameter 1/2". Batang 30,000
- Pipa PVC diameter 3/4" AW. Batang 40,000
- Pipa PVC diameter 2" AW. Batang 90,000
- Pipa PVC diameter 3" AW. Batang 180,000
- Pipa PVC diameter 4" AW. Batang 280,000
49 Panel Kontrol Unit 3,500,000
50 Penggantung/Pengunci
Kunci Pintu/Taman
Kunci Pintu/Taman Set 100,000
Kunci Pintu/Taman Set 95,000
Kunci Pintu/Taman Set 75,000
Kunci Pintu/Taman Set 80,000
Kunci Pintu/Taman Set 140,000
Kunci Pintu/Taman Set 140,000
Kunci Pintu/Taman Set 120,000
Kunci Pintu/Taman Set 140,000
Kunci Pintu/Taman Set 140,000
- Kunci Yale Set 175,000
- Kunci Antik A/C itali Merk Top Set 150,000
- Kunci Set 85,000
- Grendel Antik 2 Psg 10,000
- Tarikan antik Jandela Set 10,000
- Engsel Psg 20,000
- Engsel Psg 30,000
51 SENG GELOMBANG
- Seng BJLS 0,20 6k lbr 41,000
- Seng BJLS 0,20 6k lbr 38,000
- Seng BJLS 0,25 6k lbr 65,000
- seng BJLS 0,35 6k lbr 88,000
52 Seng Plat
- Seng BJLS 0,20 lbr 60,000
- Seng BJLS 0,20 lbr 58,000
- Seng BJLS 0,25 lbr 70,000
- Seng BJLS 0,35 lbr 90,000
53 Tripleks
- Tebal 2 mm lbr 45,000
- Tebal 3 mm lbr 57,000
- Tebal 4 mm lbr 67,000

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)

NO BAHAN-BAHAN BANGUNAN SPESIFIKASI SATUAN HARGA

1 2 4 5 6
- Tebal 6 mm lbr 105,000
54 Keramik Asia Tile
1. Untuk Lantai
- Uk. ( 10x20 ) cm Putih Polos DOS 60,000
- Uk. ( 20x20 ) cm Putih Polos M2 65,000
- Uk. ( 30x30 ) cm Putih Polos M2 65,000
- Uk. ( 40x40 ) cm Putih Polos M2 65,000
2. Untuk Dinding M2
- Uk. ( 10x10 ) cm M2 65,000
- Uk. ( 20x20 ) cm M2 65,000
- Uk. ( 20x25 ) cm M2 65,000
IV PIPA DAN ACCESSORIES
I PIPA DAN ACCESSORIES PVC
1 PIPA GALVANIS
- 1/2" GIP/SNI btg 180,000
- 3/4" GIP/SNI btg 215,000
- 1" GIP/SNI btg 330,000
- 1 1/4" GIP/SNI btg 380,000
- 1 1/2" GIP/SNI btg 480,000
- 2" GIP/SNI btg 600,000
- 3" GIP/SNI btg 950,000
- 4" GIP/SNI btg 1,250,000
- 6" GIP/SNI btg 1,950,000
- 8" GIP/SNI btg 2,450,000
- 10" GIP/SNI btg
2 PIPA PVC WAVIN AW
4m/ Btg
- 1/2" SNI btg 25,000
- 3/4" SNI btg 30,000
- 1" SNI btg 45,000
- 1 1/2" SNI btg 75,000
- 2" SNI btg 95,000
- 3" SNI btg 180,000
- 4" SNI btg 280,000
- 6" SNI btg 525,000
- 8" SNI btg 1,025,000
- 10" SNI btg 1,500,000
3 FAUCET SOCKET PVC
- 1/2" Jls / SII Buah 3,000
- 3/4" Jls / SII Buah 4,000
-1 Jls / SII Buah 5,000
4 FAUCET ELBOW PVC
- 1/2" Jls / SII Buah 4,500
- 3/4" Jls / SII Buah 5,500
-1 Jls / SII Buah 6,500

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)

NO BAHAN-BAHAN BANGUNAN SPESIFIKASI SATUAN HARGA

1 2 4 5 6
5 FAUCET TEE PVC
- 1/2" X 1/2" Jls / SII Buah 5,000
- 3/4" X 3/4" Jls / SII Buah 7,500
- 1 X 1" Jls / SII Buah 10,000
6 LEM SOLVEN CEMEN PVC
- Lem Botol ( 45 gr ) Botol 13,000
- Lem Tube ( 45 gr ) Tube 8,000
7 TS TEE PVC
- 1/2 X 1/2" Jls / Sll Buah 6,000
- 3/4 X 1/2" Jls / Sll Buah 8,000
8 TS CAP / DOP PVC
- 1/2 " Jls / SII Buah 5,000
- 3/4" Jls / SII Buah 6,000
- 1" Jls / SII Buah 7,000
- 1 1/4" Jls / SII Buah 7,000
- 1 1/2" Jls / SII Buah 9,000
- 2" Jls / SII Buah 15,000
- 2 1/2" Jls / SII Buah 14,000
- 3" Jls / SII Buah 30,000
- 4" Jls / SII Buah 55,000
- 6" Jls / SII Buah 75,000
- 8" Jls / SII Buah 150,000
9 TS REDUCING SOCKET PVC
- 3/4 X 1/2" Jls / SII Buah 7,500
- 1 X 1/2" Jls / SII Buah 10,000
- 1 X 3/4" Jls / SII Buah 15,000
10 TS ELBOW PVC
- 1/2" Jls / SII Buah 5,000
- 3/4" Jls / SII Buah 5,000
- 1" Jls / SII Buah 7,500
- 1 1/4" Jls / SII Buah 10,000
- 1 1/2" Jls / SII Buah 15,000
- 2" Jls / SII Buah 20,000
- 2 1/2" Jls / SII Buah 30,000
- 3" Jls / SII Buah 40,000
- 4" Jls / SII Buah 45,000
11 VALVE SOCKET PVC
- 1/2" Jls / SII Buah 4,000
- 3/4" Jls / SII Buah 4,000
- 1" Jls / SII Buah 6,000
- 1 1/4" Jls / SII Buah 10,000
- 1 1/2" Jls / SII Buah 15,000
- 2" Jls / SII Buah 22,500
- 2 1/2" Jls / SII Buah 30,000
- 3" Jls / SII Buah 45,000

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)

NO BAHAN-BAHAN BANGUNAN SPESIFIKASI SATUAN HARGA

1 2 4 5 6
- 4" Jls / SII Buah 55,000
ii ACESSORIS PIPA GALPANIS/BESI
1 BEND 90' / BOCH GIP Buah 10,000
- 1/2" GIP/SNI Buah 15,000
- 3/4" GIP/SNI Buah 20,000
- 1" GPI Buah 30,000
- 1 1/4"
2 BALL VALVE / STOP KRAN
- 1/2" Kuningan/SNI Buah 60,000
- 3/4" Kuningan/SNI Buah 75,000
- 1" Kuningan/SNI Buah 125,000
- 1 1/4" Kuningan/SNI Buah 200,000
- 1 1/2" Kuningan/SNI Buah 330,000
- 2" Kuningan/SNI Buah 380,000
- 2 1/2" Kuningan/SNI Buah 480,000
- 3" Kuningan/SNI Buah 750,000
- 4" Kuningan/SNI Buah 1,300,000
3 DOP / CAP
- 1/2" GIP Buah 6,000
- 3/4" GIP Buah 10,000
- 1" GIP Buah 15,000
4 ISOLASI / SEAL TAPE SNI Roll 5,000
5 CLAMP SADDLE
- 2 X 1/2" GIP Buah 42,500
- 2 X 3/4" GIP Buah 42,500
- 2 X 1" GIP Buah 42,500
- 2 1/2 X 1/2" GIP Buah 45,000
- 2 1/2 X 3/4" GIP Buah 45,000
- 2 1/2 X 1" GIP Buah 45,000
- 3 X 1/2" GIP Buah 50,000
-3 X 3/4" GIP Buah 50,000
- 3 X 1" GIP Buah 50,000
- 3 X 1 1/2" GIP Buah 50,000
- 3 X 2" GIP Buah 75,000
- 4 X 1/2" GIP Buah 55,000
- 4 X 3/4" GIP Buah 55,000
- 4 X 1" GIP Buah 60,000
- 4 X 1 1/2" GIP Buah 70,000
- 4 X 2" GIP Buah 80,000
- 6 X 1/2" GIP Buah 175,000
- 6 X 3/4' GIP Buah 175,000
- 6 X 1" GIP Buah 175,000
- 6 X 1 1/2" GIP Buah 175,000
- 6 X 2" GIP Buah 250,000
- 6 X 3" GIP Buah 250,000

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)

NO BAHAN-BAHAN BANGUNAN SPESIFIKASI SATUAN HARGA

1 2 4 5 6
- 8 X 1/2" GIP Buah 270,000
- 8 X 3/4" GIP Buah 270,000
- 8 X 1" GIP Buah 300,000
- 8 X 2" GIP Buah 300,000
- 8 X 3" GIP Buah 300,000
- 8 X 4" GIP Buah 420,000
6 DOUBLE NIPPLE
- 1/2" GIP Buah 10,000
- 3/4" GIP Buah 12,500
- 1" GIP Buah 17,500
- 1 1/4" GIP Buah 20,000
- 1 1/2" GIP Buah 27,500
- 2" GIP Buah 45,000
- 2 1/2" GIP Buah 55,000
- 3" GIP Buah 75,000
- 4" GIP Buah 125,000
7 PLUG CLOSE END
- 1/2" GIP Buah 10,000
- 3/4" GIP Buah 15,000
- 1" GIP Buah 20,000

8 KNIE / ELBOW 45"


- 1/2" GIP/SNI Buah 10,000
- 3/4" GIP/SNI Buah 12,500
- 1" GIP/SNI Buah 15,000
- 1 1/4" GIP Buah 20,000
- 1 1/2" GIP Buah 27,500
- 2" GIP Buah 45,000
- 2 1/2" GIP Buah 55,000
- 3" GIP Buah 95,000
- 4" GIP Buah 125,000
9 SOCKET
- 1/2" GIP Buah 10,000
- 3/4" GIP Buah 15,000
- 1" GIP Buah 20,000
- 1 1/4" GIP Buah 25,000
- 1 1/2" GIP Buah 30,000
- 2" GIP Buah 40,000
- 2 1/2" GIP Buah 60,000
- 3" GIP Buah 100,000
- 4" GIP Buah 150,000
10 KUNCI PIPA 1/2 S/D 1 1/4 SNI Buah 125,000
11 SNEY PYPA 1/2 S/D 1 1/4 SNI Buah 400,000
12 BOX METER FIBER ALINCO/SNI Buah 75,000
13 BOX METER BESI PLAT Standart/SNI Buah 375,000

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)

NO BAHAN-BAHAN BANGUNAN SPESIFIKASI SATUAN HARGA

1 2 4 5 6
14 WATER METER BR
- 1/2" MB/SNI Buah 175,000
- 3/4" MB/SNI Buah 225,000
- 1" MB/SNI Buah 500,000
15 WATER METER LINFLOW 1/2" Kuningan/SNI Buah 400,000
16 WATER METER BESTINI 1/2" Kuningan/SNI Buah 300,000
17 WATER METER ONDA 1/2" Kuningan/SNI Buah 350,000
18 TAWAS AL2 03 ≥ 17% Kg 5,000
19 KAPURIT SODA CLORINE 60% Kg 31,000
20 KARET PAKKING Standard/ 5 mm Meter 200,000
UPAH KERJA
Gaji/Upah
Mandor lapangan org/hari 140,500
Mekanik org/hari 162,000
Mekanik pembantu org/hari 81,000
Kepala Tukang org/hari 162,000
Tukang org/hari 140,500
Operator Terlatih alat Berat org/hari 162,000
Pembantu Operator alat berat org/hari 108,000
Sopir Truk org/hari 162,000
Sopir Personil org/hari 108,000
Pembantu Sopir org/hari 108,000
Buruh Terampil org/hari 81,000
Semi Buruh Terampil org/hari 70,500
Buruh Tak Terampil org/hari 65,000

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
STANDAR HARGA SATUAN BAHAN BANGUNAN DAN UPAH KERJA
PEMERINTAH PROVINSI SULAWESI SELATAN
KABUPATEN LUWU
TAHUN 2018

(Dalam Rupiah (Rp)


NO JENIS BAHAN SPESIFIKASI SATUAN HARGA
1 2 3 4 5
BAHAN DASAR
1 Aspal Aspal Bitumen Kg 24,500
Aspal Curah ( Low Emultion ) Ton 23,348,000
Aspal Buton ( Tambah Agregat ) Ton 18,258,000
Aspal Hotmix ( HRS ) M³ 3,091,000
2 Batu Kali
Utuh M³ 193,700
Batu pecah 3 - 5 cm M³ 525,000
Batu pecah 2 - 3 cm M³ 537,500
3 Batu Gunung M³ 433,333
4 Batu Merah Buah 845
5 Tanah Timbunan M³ 59,800
6 Pasir
Timbunan / Urug M³ 162,500
Pasangan M³ 137,800
Beton M³ 172,900
Pasir ( Sirtu ) M³ 71,500
7 Kerikil Anyak tanpa pasir M³ 208,000
8 Aplux 20 Kg ( Luar ) Zak 97,500
20 Kg ( Dalam ) Zak 81,900
9 Semen PC 50 Kg ( Semen Tonasa ) Zak 84,500
PC 50 Kg ( Semen Bosowa ) Zak 84,500
PC 40 Kg ( Semen Tonasa ) Zak 67,600
PC 40 Kg ( Semen Bosowa ) Zak 65,000
Putih 50 kg Zak 195,000
Warna Zak 32,500
10 Paving Blok Mutu Balok M² 165,000
Segi 6 M² 175,000
Tiga Berlian M² 177,000
11 Topiokus ( K 225 ) Buah 22,400
12 Kanstin 20 x 25 x 50 Buah 78,400
13 Buis Beton d=20 cm Biji 243,100
d=30 cm Biji 269,100
d=40 cm Biji 321,100
d=50 cm Biji 366,600
d=60 cm Biji 399,100
14 Batu Alam
Andesit Biasa M² 237,900
Andesit Susun Sirih M² 351,000
Andesit Halus M² 234,000
Andesit Gelombang M² 247,000
Batu Candi Permukaan Rata M² 221,000
Batu Palimanan Kuning M² 227,500

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
(Dalam Rupiah (Rp)
NO JENIS BAHAN SPESIFIKASI SATUAN HARGA
1 2 3 4 5
Batu Hijau Sukabumi M² 214,500
Batu Bali Green M² 201,500
Batu Bali Napoli M² 214,500
Paras Jokja Besar M² 217,000
Batu Cirebon Beraturan M² 182,000
Batu Cirebon Tidak Beraturan M² 156,000

BAHAN KAYU
1 Kayu Kelas I
Balok Gergaji Sansaw M³ 5,525,000
Papan Gergaji Sansaw M³ 5,570,500
2 Kayu Kelas II
Balok M³ 3,850,000
Papan M³ 3,948,000
3 Kayu Kelas III
Balok M³ 3,080,000
Papan M³ 3,178,000
4 Kayu Jembatan Balok Gelagar 25 cm x 29x4m M³ 5,913,875
Papan Jembatan 23 cm x 3 cm x 4 m M³ 5,913,875
Papan Jembatan gentung 23cmx22c M³ 5,913,875
Balok Jembatan Gantung 5cmx10cmx M³ 5,913,875
Balok Jembatan Gantung 5cmx7cmx2 M³ 5,913,875
BAHAN LANTAI
1 Tegel PC Abu-abu 20 x 20 cm ( motif ) Dos 91,000
30 x 30 cm ( polos ) Dos 97,500
2 Tegel Badak 20 x 20 cm Dos 107,900
30 x 30 cm Dos 113,100
3 Tegel Plint PC 15 X 20 cm Dos 87,100
15 x 30 cm Dos 87,100
4 Tegel Mozaik 30 x 30 cm Dos 331,500
5 Tegel Wafel 20 x 20 cm Dos 84,500
30 x 30 cm Dos 97,500
1 Tegel Keramik
Putih 10 X 20 cm Dos 97,500
Warna 10 X 20 cm Dos 101,400
Putih 20 X 20 cm Dos 92,300
Warna 20 X 20 cm Dos 84,500
Putih 20 X 25 cm Dos 84,500
Warna 20 X 25 cm Dos 88,400
Putih 30 X 30 cm Dos 84,500
Warna 30 X 30 cm Dos 91,000
Putih 40 X 40 cm Dos 84,500
Warna 40 X 40 cm Dos 97,500
Warna 50 x 50 Dos 110,500
Warna 60 x 60 Dos 234,000

BAHAN KACA
1 Kaca Buram Tebal 3 mm lbr 175,500
Tebal 5 mm lbr 195,000

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
(Dalam Rupiah (Rp)
NO JENIS BAHAN SPESIFIKASI SATUAN HARGA
1 2 3 4 5
2 Kaca Bening Tebal 3 mm lbr 175,600
Kaca Buram 5 mm Tebal 5 mm lbr 223,600

3 Kaca Rayben Tebal 3 mm lbr 230,200


Tebal 5 mm lbr 258,000
4 Kaca Nako Lengkap terali 7 mata set/daun 232,700

BAHAN BESI
1 Besi Beton
Ø 4 mm Btg 23,400
Ø 6 mm Btg 39,000
Ø 8 mm Btg 62,400
Ø 10 mm Btg 88,400
Ø 12 mm Btg 127,400
Ø 14 mm Btg 182,000
Ø 16 mm Btg 208,000
Ø 19 mm Btg 299,650
Ø 20 mm Btg 416,650
2 Paku
Paku Biasa Kg 23,400
Paku Asbes Kg 32,500
Paku Seng (payung) RRT Kg 58,500
Paku skrup 3 ½ inci Dos 45,500
Paku Skrup 4 Inci Dos 45,500
Paku Payung Berulir 7 cm Dos 58,500
Paku Sirap Kg 78,000
Paku Beton Hitam Dos 58,500
Paku Beton Putih Dos 26,000
Paku tripleks Kg 26,000
3 Kawat
Beton Kg 32,500
Bronjong Kg 42,250
Rang Besar 90 cm Mtr 32,500
Ayak Kecil 90 cm Mtr 32,500
Duri 10 Kg roll 240,500
Nyamuk Mtr 32,000
4 Besi Siku
30.30.3 Btg 68,900
40.40.4 Btg 76,700
40.40.3 Btg 97,500
50.50.4 Btg 101,400
50.50.5 Btg 128,700
60.60.6 Btg 247,000
70.70.7 Btg 367,900
5 Baut Baut Kayu 12 mm , pjg 15 cm Buah 5,850
Baut Kayu 12 mm , pjg 20 cm Buah 7,150
Baut Kayu 12 mm , pjg 25 cm Buah 10,400
Baut Kayu 12 mm , pjg 30 cm Buah 11,700
6 Besi Plat
polos Lbr 1,245,000

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
(Dalam Rupiah (Rp)
NO JENIS BAHAN SPESIFIKASI SATUAN HARGA
1 2 3 4 5
kembang Lbr 1,293,500
7 Besi Ulir
diameter 13 mm Btg 132,600
diameter 16 mm Btg 197,600
diameter 19 mm Btg 279,500
8 Besi Strep
30.3 mm Btg 59,800
35.4 mm Btg 92,950
46.4 mm Btg 165,750
40.6 mm Btg 120,900
50.6 mm Btg 199,550

9 Besi Tipe C (Rangka Baja Ringan) 6 m


Lebar 10, tebal, 1,8 -2,00 mm Btg 267,800
Lebar 12,5, tebal 1,8 -2,00 mm Btg 283,400
Lebar 15,Tebal 1,8 – 2,00 mm Btg 360,750
Taso, 75 x 75 mm Btg 126,750

BAHAN PIPA
1 Pipa Besi GIP
ؽ Inci – 6 m Btg 74,100
Ø ¾ Inci – 6 m Btg 92,300
Ø 1Inci – 6 m Btg 120,900
Ø 2 Inci – 6 m Btg 178,100
Ø 2 ½ Inci – 6 m Btg 422,500
Ø 3 Inci – 6 m Btg 604,500
2 Pipa PVC Air Bersih
Ø ½ Inci – 4 m Btg 26,000
Ø ¾ Inci – 4 m Btg 39,000
Ø 1 Inci – 4 m Btg 45,500
Ø 1½ Inci – 4 m Btg 58,500
Ø 2 Inci – 4 m Btg 71,500
Ø 2 ½ Inci – 4 m Btg 97,500
Ø 3 Inci – 4 m Btg 136,500
Ø 4 Inci – 4 m Btg 188,500
Ø 5 Inci – 4 m Btg 286,000
Ø 6 Inci – 4 m Btg 383,500
Ø 8 Inci – 4 m Btg 630,000
Ø 10 Inci – 4 m Btg 1,072,500
3 Pipa untuk Saluran Pembuangan Air
Ø ½ Inci – 4 m Btg 39,600
Ø ¾ Inci – 4 m Btg 46,100
Ø 1 Inci – 4 m Btg 56,500
Ø 1 ½ Inci – 4 m Btg 58,500
Ø 2 Inci – 4 m Btg 84,500
Ø 2 ½ Inci – 4 m Btg 110,500
Ø 3 Inci – 4 m Btg 156,000
Ø 4 Inci – 4 m Btg 227,000
Ø 5 Inci – 4 m Btg 260,000
Ø 6 Inci – 4 m Btg 299,000

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
(Dalam Rupiah (Rp)
NO JENIS BAHAN SPESIFIKASI SATUAN HARGA
1 2 3 4 5
Ø 8 Inci – 4 m Btg 500,500
Ø 10 Inci – 4 m Btg 1,950,000
Pipa Jenis Btg C Untuk Instalasi Listrik
4
Ø 5/8 Inci – 4 m Btg 19,500
Ø ¾ Inci – 4 m Btg 39,000
BAHAN LANGIT-LANGIT
1 Eternit 100 X 100 cm Lbr 45,500
2 Tripleks
122 X 244 x 0.3 cm Lbr 82,500
122 X 244 x 0.6 cm Lbr 115,000
122 X 244 x 0.9 cm Lbr 167,000
122 X 244 x 0.3 cm Lbr 115,000
3 Tripleks Melamin 82,500
122 X 244 x 0.3 cm Lbr 115,000
4 Multipleks
Ukuran 4 mm Lbr 115,000
Ukuran 6 mm Lbr 130,900
Ukuran 9 mm Lbr 140,500
5 Teakwond Ukuran 122x244x0,3 cm Lbr 182,000
Ukuran 80 x 200 x 0,6 cm Lbr 110,500
6 Asbes Plat Harfeks
200 X 100 X 0.3 cm Lbr 84,500
7 List Profil
2 x 3 cm / 4 m Btg 27,600
3 x 3 cm / 4 m Btg 33,100
4 x 4 cm / 4 m Btg 42,100
5 x 5 cm / 4 m Btg 46,600
8 Lambrasering Ukuran 3x 4 cm, 4 m M³ 3,055,000
Ukuran 3x 4 cm, 4 m M³ 3,224,000
Ukuran 3x 4 cm, 4 m M³ 3,523,000
9 Hard Board 122 x 244 cm Lbr 126,100
10 Gamacca 50 x 120 cm Lbr 88,400
11 Accoestic 40 x 60 cm Lbr 96,200
12 Calsiboard Lbr 91,000
13 Gypsum Lbr 104,000
14 Lee Gypsum Lbr 70,200
BAHAN ATAP
1 Genteng
Beton , flat Buah 20,150
Keramik , nok Buah 65,000
Kaca, flat Lbr 94,250
Tanah Buah 5,850
2 Sirap Ikat 57,200
3 Seng gelombang
BJLS 0.18 mm Kaki 8,840
BJLS 0.22 mm Kaki 9,490
BJLS 0.30 mm Kaki 28,600
BJLS 0.35 mm Kaki 35,100
4 Seng Plat

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
(Dalam Rupiah (Rp)
NO JENIS BAHAN SPESIFIKASI SATUAN HARGA
1 2 3 4 5
BJLS 0,32 mm Lbr 117,000
BJLS 0,22 mm Lbr 71,500
5 Seng Plastik Laserlite 8 kk Lbr 110,500
6 Seng Super Deck
180 X 70 cm – 10 kaki Kaki 65,000
180 X 70 cm – 8 kaki Kaki 28,600
180 X 70 cm – 7 kaki Kaki 63,700
180 X 70 cm – 10 kaki Kaki 104,000
7 Seng Spandek
0,25 mm Meter 46,800
0,30 mm Meter 53,300
0,35 mm Meter 59,800
0,40 mm Meter 66,300
8 Genteng Metal
Sakura roof Meter 45,500
Surya Roof Meter 66,300
Multi Roof Meter 149,500
Tiara Rood Meter 123,500
9 Fiber Semen (Harflex)
Super 240 X 108 X 0.6 cm Kaki 153,400
Super 180 X 108 X 0.6 cm Kaki 107,900
Ekonomi 240 X 92 X 0.5 cm Kaki 120,900
Ekonomi 180 X 92 X 0.4 cm Kaki 110,500
Mini 240 X 105 X 0.4 cm Kaki 108,550
Mini 180 X 92 X 0.5 cm Kaki 121,550
Super 240 X 105 X 0.4 cm Kaki 117,000
Super 180 X 105 X 0.4 cm Kaki 111,800
10 Nok Steel Gelombang
Super – 180 cm Bh 91,000
Mini – 105 cm Bh 74,100
Ekonomi – 95 cm Bh 37,700
14 Nok Steel Rata
Super – 108 cm Bh 89,700
Mini – 105 cm Bh 72,150
Ekonomi – 95 cm Bh 36,400
15 Nok ½ Lingkaran Bh 71,500
16 Karet Pelapis Genteng
Ukuran 55 mtr 14,500
Ukuran 90 Mtr 16,600

BAHAN PENGGANTUNG
1 Kunci Tanam ( Biasa )
1 x Putar Unit 97,500
1 x Putar Unit 136,500
2 Kunci Tanam
1 Slag Buah 227,500
Double Slag Buah 305,500
3 Penggantung ( Biasa )
Hak Angin Kecil Bh 13,000
Hak Angin Besar Bh 22,100

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
(Dalam Rupiah (Rp)
NO JENIS BAHAN SPESIFIKASI SATUAN HARGA
1 2 3 4 5
Grendel Kecil Bh 13,000
Grendel Besar Bh 35,100
Engsel Pintu Bh 49,400
Engsel Jendela Bh 37,700
Expanyolet Bh 172,900

BAHAN SANITER
Kloset Duduk Toto set 2,925,000
Kloset Jongkok Toto Bh 507,000
Wasthafel warna Toto/keramik unit 487,500
Wasthafel cuci piring logam 1 lubang Bh 585,000
Wasthafel cuci piring logam 2 lubang Bh 624,000
Pompa Mesin Bh 728,000
Pompa tangan terpasang Bh 3,061,500
Urinoir lengkap Bh 1,560,000
Bak Mandi fiber oval uk. 55 x 55x60 ( 120 liter ) Bh 689,000
Bak Mandi fiber oval uk.66x66x70 ( 220 liter ) Bh 858,000
Reservoir fiber = 1 m3 Bh 1,644,500
Reservoir Stainless stell = 1 m3 Bh 5,785,000
Stop Kran Bh 19,500
Kran Air Bh 32,500
Floor Drain Bh 32,500

BAHAN FINISHING/CAT
1 Cat Tembok
Cat Dasar 20 kg ( No Drop ) Kaleng 851,500
Cat Kilap Cat kilap 2,5 liter Kaleng 286,000
2 Cat Kayu
Cat Dasar 3 liter Kaleng 117,000
Cat Kilap 1 kg Kaleng 74,100
Palatone Ltr 86,400
ICI Kg 109,473
Politur Kg 78,000
Meni 3,5 kg Kg 107,900
Minyak Cat Ltr 39,000
3 Cat Besi 1 kg Kaleng 78,000
Supermetal Kaleng 111,800
4 Cat Atap
Cat Dasar Kg 390,000
Lem Seng Kg 15,600
Plamur Kg 15,600
Amplas/Kertas Gosok Lbr 42,900
Dempul Kg 9,750
Residu Ltr 123,500
Cat Kilap Kg
BAHAN INSTALASI LISTRIK
Kabel Listrik
1 Type NYA (Full)
1 ½ mm Roll 305,000
2 ½ mm Roll 417,000

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
(Dalam Rupiah (Rp)
NO JENIS BAHAN SPESIFIKASI SATUAN HARGA
1 2 3 4 5
2 Type NYY
2 X 1 ½ mm Roll 663,000
2 X 2 ½ mm Roll 822,500
2 X 4 mm Roll 687,500
3 Lampu TL
1 X 20 W Bh 98,000
2 X 20 W Bh 127,000
1 X 40 W Bh 121,000
2 X 40 W Bh 154,000
4 Lampu Pijar
25 W Bh 36,000
40 W Bh 60,000
60 W Bh 110,000
100 W Bh 192,000
Lampu Taman Mercury Bh 389,500
5 Saklar Phase
Tunggal Putih Bh 27,000
Tunggal Hitam Bh 22,000
Double Putih Bh 30,000
Double Hitam Bh 25,000
6 Stop Kontak
Hitam Bh 30,000
Putih Bh 32,000
7 Zekering Kast Lokal Biasa
Lokal 2 Group Automat Bh 87,000
Lokal 3 Group Biasa Bh 99,500
Fitting Bh 19,500

BAHAN JEMBATAN GANTUNG


1 Beugul U-10 mm Bh 18,375
2 Baut Baja U-15 mm Bh 40,425
U-20 mm Bh 52,325
U-35 mm Bh 81,879

3 Besi Plat 1 mm Lbr 661,500


5 mm Lbr 559,335
6 mm Lbr 867,300
7 mm Lbr 157,500
8 mm Lbr 1,427,370
23 mm Kembang Lbr 1,359,750
4 Jarum Keras Besar, Warfel Unit 28,000
Kecil, Warfel Unit 15,600
5 Tarif Baja ( Slink ) 1/2" Meter 89,700
3/4" Meter 149,800
1" Meter 194,040
1,5" Meter 269,885

TARIF /SEWA PERALATAN

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
(Dalam Rupiah (Rp)
NO JENIS BAHAN SPESIFIKASI SATUAN HARGA
1 2 3 4 5
Unit/ Hari 300.000-
1 Dump/ Truck 600.000
PC 100 Unit/ Jam 250.000-
2 Escavator 400.000
PC 200 Unit/ Jam 350.000-
550.000
D3 Unit/ Jam 250.000-
3 Buldozer 500.000
D6 Unit/M² 325.000-
600.000
4 Mesin Gilas 8 -16 ton Kerikil Unit/M² 1.250-4.500
Aspal Unit/M² 1.500-5.000
5 Mesin Gilas 6-8 ton Kerikil Unit/M² 800-4.000
Aspal Unit/M² 1.000-4.000
6 Tandem Roller 6/8 Kerikil Unit/M² 1.000-4.000
Aspal Unit/M² 1.200-4.500
7 Vibro Roller Unit/ Jam 418,950
300.000-
8 Motor Grader Unit/ Jam 500.000
2.000.000-
9 Aspal Mixing Plan Unit/ Hari 4.000.000
150.000-
10 Genset 30 V Unit/ Hari 500.000
200.000-
11 Water Tanker Unit/ Hari 400.000
200.000-
12 Wheel Loader Unit/ Jam 400.000
200.000-
13 Komposser Unit/ Hari 400.000
100.000-
14 Jack Hammer Unit/ Jam 350.000
350.000-
15 Aspal Sprayyer Unit/M² 700.000
250.000-
16 Molen Unit/ Hari 500.000
150.000-
17 Hand Steamer Unit/ Hari 450.000
300.000-
18 Stone Cruisher Unit/ Hari 550.000
100.000-
19 Cutting Drill Unit/ Hari 350.000
150.000-
20 Chain Saw Unit/ Hari 350.000
170.000-
21 Amro Truck Unit/ Hari 400.000
200.000-
22 Lavatory Truck Unit/ Hari 400.000
200.000-
23 Sky Walker Unit/ Hari 400.000

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
(Dalam Rupiah (Rp)
NO JENIS BAHAN SPESIFIKASI SATUAN HARGA
1 2 3 4 5
BIAYA ANGKUT/TRONTON
650.000-
1 Jarak 0 -15 km Unit/ Jarak 1.100.000
1.200.000-
2 Jarak 16- 25 km Unit/ Jarak 2.700.000
2.700.000-
3 Jarak 26 -40 km Unit/ Jarak 4.700.000
5.640.000-(+
4 Jarak > 40 km Unit/ Jarak 100.00/ km )

UPAH KERJA
1 Pekerja Org/hr 115,000
2 Tukang :
Tukang Listrik Org/hr 138,000
Tukang Batu Org/hr 138,000
Tukang Kayu Org/hr 138,000
Tukang Besi Org/hr 138,000
Tukang Pipa Org/hr 138,000
Tukang Cat Org/hr 138,000
Tukang Kaca Org/hr 138,000
Tukan Aluminium Org/hr 138,000
3 Kepala Tukang
Kepala Tukang Listrik Org/hr 172,500
Kepala Tukang Batu Org/hr 172,500
Kepala Tukang Kayu Org/hr 172,500
Kepala Tukang Besi Org/hr 172,500
Kepala Tukang Pipa Org/hr 172,500
Kepala Tukang Cat Org/hr 172,500
Kepala Tukang Besi Org/hr 172,500
4 Mandor Org/hr 207,000
5 Mekanik Org/hr 287,500
6 Pembantu Mekanik Org/hr 207,000
7 Penjaga Gudang Org/hr 138,000
8 Penjaga Malam Org/hr 138,000
9 Operator Alat Berat Terlatih Org/hr 425,000

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
s
STANDAR HARGA SATUAN BAHAN BANGUNAN DAN UPAH KERJA
PEMERINTAH PROVINSI SULAWEI SELATAN
KABUPATEN LUWU UTARA
TAHUN 2018

Dalam Rupiah (Rp)


No Jenis Bahan Spesifikasi Satuan Harga

1 2 3 4 5

A. HARGA BAHAN LOKAL


MATERIAL BETON CETAK
1 Batu Bata Ukuran Tebal Buah 750
2 Batako Buah 3,750
4 Gorong-gorong 40 cm Buah 166,500
5 Gorong-gorong 60 cm Buah 258,500
6 Gorong-gorong 80 cm Buah 300,000
7 Gorong-gorong 100 cm Buah 350,000
8 Kapur Bakar Zak 77,500
9 Paving Blok Bentuk Persegi, t = 8.cm (K-300) m² 100,000
10 Paving Blok Bentuk Persegi, t = 8.cm (K-250) m² 95,000
11 Paving Pengunci ( topi uskup ) t = 8 cm m²
Kansten Pres
50 x 25 x 15 cm Buah 40,000
40 x 20 x 15 cm Buah 28,000
40 x 30 x 15 cm Buah 37,500
12 Rooster Beton Uk.20 x 30 Buah 25,000
13 Rooster Beton Uk.20 x 40 Buah 30,000
14 Rooster Beton Uk.20 x 35 Buah 20,000
15 Rooster Beton Uk.25 x 40 Buah 30,000
16 Rooster Beton Uk.18 x 18 Buah 12,000
17 Rooster Beton Uk.25 x 25 Buah 15,000

MATERIAL KAYU /BAMBU


1 Bambu Btg 15,000
2 Kayu Klas - 1 ( Jati, Merbau ) m³ 11,000,000
3 Kayu Klas - II ( Lokal ) m³ 3,150,000
4 Kayu Klas - III ( Lokal ) m³ 2,500,000
5 Kayu Klas - IV ( Lokal ) m³ 1,800,000

B.HARGA BAHAN NON LOKAL


1 Aspal Bitumen Kg 13,500
Material Pipa dan Accessories ( PVC-4 m )
2 Accessories Pipa PVC 1 " (Shock)
/2
Buah 4,000
Accessories Pipa PVC " (Shock)
3/4
Buah 4,500
Accessories Pipa PVC 1" (Shock) Buah 6,000

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)
No Jenis Bahan Spesifikasi Satuan Harga

1 2 3 4 5
Accessories Pipa PVC 2" (Shock) Buah 8,500
Accessories Pipa PVC 3" (Shock) Buah 14,000
Accessories Pipa PVC 4" (Shock) Buah 23,000
Accessories ( tee )
Accessories Pipa PVC 1/2" (Tee) Buah 4,000
Accessories Pipa PVC 3/4" (Tee) Buah 4,500
Accessories Pipa PVC 1" (Tee) Buah 6,000
Accessories Pipa PVC 2" (Tee) Buah 10,000
Accessories Pipa PVC 3" (Tee) Buah 16,000
Accessories Pipa PVC 4" (Tee) Buah 29,000

Accessories ( Elbow )
Accessories Pipa PVC 1/2" (Elbow) Buah 4,000
Accessories Pipa PVC 3/4" (Elbow) Buah 4,500
Accessories Pipa PVC 1" (Elbow) Buah 6,000
Accessories Pipa PVC 2" (Elbow) Buah 9,000
Accessories Pipa PVC 3" (Elbow) Buah 14,500
Accessories Pipa PVC 4" (Elbow) Buah 24,500
Pipa PVC
Pipa PVC 5/8". 4 m btg 14,000
Pipa PVC 1/2" AW Merk Wavin, 4 m btg 26,500
Pipa PVC 3/4" AW Merk Wavin, 4 m btg 40,500
Pipa PVC 1" AW Merk Wavin, 4 m btg 54,500
Pipa PVC 1 1/2" AW Merk Wavin, 4 m btg 76,500
Pipa PVC 1 1/2" D Merk Wavin, 4 m btg 60,000
Pipa PVC 2" AW Merk Wavin, 4 m btg 84,000
Pipa PVC 2" D Merk Wavin, 4 m btg 65,000
Pipa PVC 3" AW Merk Wavin, 4 m btg 151,000
Pipa PVC 3" D Merk Wavin, 4 m btg 138,000
Pipa PVC 4" AW Merk Wavin, 4 m btg 250,000
Pipa PVC 4" D Merk Wavin, 4 m btg 164,000
Pipa GIP
Pipa GIP Medium B 1/2"-4m btg 96,000
Pipa GIP Medium B 3/4" - 4m btg 148,000
Pipa GIP Medium B 1"-4m btg 188,000
Pipa GIP Medium B 1.1/2" - 4m btg 240,000
Pipa GIP Medium B 2" - 4m btg 293,000
Pipa GIP Medium B 2.1/2" - 4m btg 356,000
Pipa GIP Medium B 3" - 4m btg 450,000
Pipa GIP Medium B 4" - 4m btg 550,000
Pipa GIP Medium B 6" - 4m btg 750,000
Pipa GIP Medium A 3/4" - 4m btg 200,000
Pipa GIP Medium A 1" - 4m btg 250,000
Pipa GIP Medium A 1.1/2" - 4m btg 350,000
Pipa GIP Medium A 2" - 4m btg 450,000

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)
No Jenis Bahan Spesifikasi Satuan Harga

1 2 3 4 5
Pipa GIP Medium A 3" - 4m btg 750,000
Pipa GIP Medium A 4" - 4m btg 850,000
Pipa GIP Medium A 6" - 4m btg 1,250,000
Amplas Halus / Kertas Gosok lbr 3,500

MATERIAL LOGAM
Baja Ringan
c -0,75 x 0,75 mm/6 m' Btg 91,500
c -0,75 x 0,80 mm/6 m' Btg 101,500
Reng Baja Ringan ( keci) 0,35 x 0,45 Btg 65,500
mm/6 m'
Reng Baja Ringan ( keci) 0,35 x 0,45 Btg 61,000
mm/6 m'
Rangka Plafond Metal Furing 35,000
Baja Tulangan Kg 10,800
Kawat Duri Buah 203,000
Kawat Pengikat Beton Buah 26,000
Kawat Licin / galvano Buah 40,000
Kawat Ram Harmonika 2 mm Buah 37,500
Baut
Baut 10 cm Buah 4,500
Baut 12 -15 cm Buah 6,000
Baut 20 cm Buah 7,500
Baut 25 cm Buah 8,100
Baut 30 cm Btg 9,500
Sekrup Baja Ringan
Sekrup 12-14 x 20 Buah 700
Sekrup 10 - 16 x 16 Buah 750
Besi Plat
1,2 mm x 120 cm x 240 cm Buah 387,500
1,5 mm x 120 cm x 240 cm Buah 487,500
2 mm x 120 cm x 240 cm Buah 696,500
3 mm x 120 cm x 240 cm Buah 950,000
4 mm x 120 cm x 240 cm Buah 1,300,000
Besi Siku
Besi Siku 30 x 30 x 3 Btg 80,000
Besi Siku 40 x 40 x 3 Btg 101,500
Besi Hollow ( Panjang 6 M )
1,5 X 3,6 Btg 101,500
2 X 4 -0,25 mm Btg 110,000
3x3 Btg 131,000
4 x 4 -0,25 mm Btg 181,000
4,5 x 7,5 Btg 250,000
2x 4 -0,30 Btg 110,000
5 x 10 Btg 305,000

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)
No Jenis Bahan Spesifikasi Satuan Harga

1 2 3 4 5
4 x 4 -0,30 Btg 150,000
50 x 50 x 4 Btg 175,000
50 x 50 x 5 Btg 200,000
Besi Beton
Besi Beton Ф 6 Btg 32,000
Besi Beton Ф 8 Btg 48,000
Besi Beton Ф 10 Btg 70,000
Besi Beton Ф 12 Btg 103,000
Besi Beton Ф 14 Btg 155,500
Besi Beton Ф 16 Btg 201,000
Besi Beton Ф 19 Btg 301,000
Jarum Pengunci Slink
Ф 1/4" ( jarum keras ) Buah 25,000
Ф 1/2" ( jarum keras ) Buah 30,000
Ф 3/4" ( jarum keras ) Buah 60,500
Ф 1" ( jarum keras ) Buah 88,500
Ф 1 1/4" ( jarum keras ) Buah 85,000
Ф 1 1/2" ( jarum keras ) Buah 90,000
Ф 2" ( jarum keras ) Buah 120,000
Klem Slink
Ф 1/4"( Kuku Macan ) Buah 7,000
Ф 1/2"( Kuku Macan ) Buah 15,000
Ф 3/4"( Kuku Macan ) Buah 20,000
Ф 1"( Kuku Macan ) Buah 25,000
Ф 1 1/4"( Kuku Macan ) Buah 30,000
Ф 1 1/2"( Kuku Macan ) Buah 35,000
Ф 2"( Kuku Macan ) Buah 45,000
Tali Slink
Tali Slank Ф 1/4" M 20,000
Tali Slank Ф 1/2" M 36,000
Tali Slank Ф 3/4" M 66,000
Tali Slank Ф 1" M 83,500
Tali Slank Ф 1 1/4" M 121,000
Tali Slank Ф 1 1/2" M 171,000
Paku/ Sekrup
Paku Beton Hitam 5 cm Dos 54,000
Paku Beton Putih 1- 3 cm Dos 33,000
Paku Beton Putih 5- 10 cm Dos 54,500
Paku Biasa 1- 3 cm Kg 28,500
Paku Biasa 5- 7 cm Kg 23,000
Paku Biasa 8- 12 cm Kg 20,500
Paku Sekrup 1- 3 cm Dos 25,000
Paku Sekrup 5 -10 cm dos 69,000
Paku Seng Kg 53,000
Paku Seng Ulir Kg 52,500

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)
No Jenis Bahan Spesifikasi Satuan Harga

1 2 3 4 5

MATERIAL CAT DAN FINISHING


Cat Tembok Metrolite Kg 53,000
Cat Tembok Aries Kg 16,000
Cat Tembok Avitex Kg 53,000
Cat Atap Kg 84,000
Cat Anti Bocor No Drop Kg 59,000
Cat Minyak Avian Ltr 60,500
Cat Meni Kayu Ltr 34,000
Cat Meni Besi Ltr 45,000
Dempul Kayu Kg 43,000
Kuas Eterna 1" Buah 7,500
Kuas Eterna 2 1/2 " Buah 12,000
Kuas Eterna 3" Buah 16,500
Kuas Eterna 4" Buah 22,500
Kuas Roll Lbr 33,000
Amplas Halus /Kertas Gosok Lbr 5,500
Amplas kasar /Kertas Gosok Lbr 5,500
Plamor ( Boyo ) Kg 12,500
Plamor ( Ablus ) zak 67,500
Lem Fox Putih 150 Gram Tube 15,000
Lem Fox Putih 500 Gram Tube 21,500
Lem Pipa Isarplas ( 45 gram ) Buah 27,500
Minyak Pelumas ( Oil ) Ltr 38,000
Minyak Tanah Ltr 12,500
Minyak cat Kg 32,000
Minyak Cat ( Thinner Super ) Kg 38,000
Pelitur Kg 65,000

MATERIAL ELETRIKAL
Cok Lampu Besar Buah 12,500
Cok Lampu Kecil Buah 6,500
Kabel Listrik NYM 1 x 2,5 mm Roll 355,000
Kabel Listrik NYM 2 x 1,5 mm Roll 655,000
Kabel Listrik NYM 2 x 2,5 mm Roll 885,000
Kabel Listrik NYM 3 x 2,5 mm Roll 995,000
Kabel Listrik Eterna 3x 2.5 mm Roll 1,285,000
Box Panel isi 2 MCB 24,000
Box Panel isi 4 MCB 45,000
MCB 4 A 45,000
MCB 6 A 51,000
Isolator 2,500
Saklar Tunggal 26,000
Saklar Ganda 36,500
Stop Kontak Besar 29,500

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)
No Jenis Bahan Spesifikasi Satuan Harga

1 2 3 4 5
Stop Kontak Kecil 18,500
Down Light 61,500
Fitting Plafon Buah 16,500
Lampu Philips Sumpit 5 wat Buah 34,000
Lampu Philips Sumpit 8 wat Buah 40,000
Lampu Philips Sumpit 14 wat Buah 50,000
Lampu Philips Sumpit 18 wat Buah 65,000

ATAP DAN RANGKA ATAP


Genteng Multi Roof Lbr 27,600
Genteng Multi Roof Glasur Lbr 29,600
Genteng Sakura Roof Lbr 62,000
Genteng Surya Roof Lbr 51,000
Nok Genteng Multi Roof Lbr 30,000
Nok Genteng Sakura Roof Lbr 51,200
Nok Genteng Surya Roof Lbr 23,000
Seng Gelombang Kecil Sermani Kaki 20,000
Seng Gelombang Besar Sermani Kaki 18,000
Seng Gelombang Besar Gajah Berlian Kaki 21,400
Seng Gelombang kecil Gajah Berlian Kaki 56,800
Seng Gelombang polos Gajah Berlian Lbr 28,000
Seng Polos Sermani Lbr 36,000
Seng Kumira Kaki 62,000
Spandec
Spandec 0,25 mm M' 38,500
Spandec 0,30 mm M¹ 43,000
Spandec 0,35 mm M¹ 48,500
Spandec 0,40 mm M¹ 58,000
Spandec 0,25 mm ( Warna ) M¹ 42,000
Spandec 0,30 mm ( Warna ) M¹ 47,000
Spandec 0,35 mm ( Warna ) M¹ 52,000
Spandec 0,40 mm ( Warna ) Buah 56,000

MATERIAL PELAPIS,PARTISI DINDING /PLAFOND


Eternit 3 mm Lbr 62,000
Lipslank calsiboard Lbr 80,000
Calsiboard Lbr 78,500
Gypsum
* ex Jayaboard 9 mm Lbr 81,500
* ex Elephant 9 mm 1,20 x 2,40 Lbr 96,500
* ex Knauf 9 mm 1,20 x 2,40 Lbr 89,000
Tripleks
* Tripleks 2 mm Lbr 46,000
* Tripleks 3 mm Lbr 55,000
* Tripleks 4 mm Lbr 62,000

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)
No Jenis Bahan Spesifikasi Satuan Harga

1 2 3 4 5
* Tripleks 5 mm Lbr 73,000
* Tripleks 6 mm Lbr 91,500
* Tripleks 9 mm Lbr 130,000
* List Profil 5 cm M' 25,000
Material Kaca
* Kaca Bening Tebal 2 mm m² 81,000
* Kaca Bening Tebal 3 mm m² 91,500
* Kaca Bening Tebal 5 mm m² 191,000
* Kaca Bening Tebal 8 mm m² 900,000
Pintu /Jendela
* Engsel Jendela
* Engsel Pintu Kupu-Kupu
* Grandel Besar ( Biasa ) 12"
* Grandel Besar ( Biasa ) 4" M 168,000
* Kait Angin Besar Buah 2,650,000
* Kait Angin Kecil Buah 430,000
* Kunci Tanam Merk 2 x Slag Kodal
* Kunci Tanam Merk 2 x Slag Napoli
* Kunci Tanam Merk 2 x Slag Union

MATERIAL PENUTUP LANTAI


Keramik Biasa Uk.20 cm x 20 cm M' 68,000
Keramik Biasa Uk.20 cm x 25 cm M' 74,500
Keramik Biasa Uk.30 cm x 30 cm M' 71,000
Keramik Biasa Uk.40 cm x 40 cm ( putih ) M' 77,000
Keramik Biasa Uk.40 cm x 40 cm ( warna ) M' 80,000
Kuku Tegel Buah 1,000
Melamin Lbr 98,000
Plint Keramik 10 cm x 30 cm Buah 68,000
Plint Keramik 10 cm x 40 cm Buah 22,500

MATERIAL SANITAIR
Bak Mandi Fiber Glass Buah 550,000
Bak Reservoir Kapasitas 1000 Ltr Buah 1,450,000
Bak Reservoir Kapasitas 500 Ltr Buah 920,000
Bath Tub Keramik Buah
Floor Drain Buah 21,000
Kloset Duduk ( menggunakan
tabung ) 2,550,000
Kloset Duduk Buah 773,000
Kloset Jongkok Buah 220,000
Kloset Jongkok Toto Buah 385,500
Kran Air Kuningan 1/2 " Buah 32,000
Kran Air Kuningan 3/4 " Buah 39,000
Kran Dinding 1/2" 72,000

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)
No Jenis Bahan Spesifikasi Satuan Harga

1 2 3 4 5
Kran Dinding 3/4" 84,500
Kran zink /wasthafel 1/2" 183,000
Kran zink /wasthafel 3/4" 127,000
Mesin Jet Pump Unit 734,000
Mesin Pompa Unit 640,000
Pintu Vinil Set 610,000
Pintu Aluminium Set 544,500
Shower Set Set 550,000
Shower Spray Buah 131,500
Stop Kran 1" Buah 550,000
Urinoir Buah 2,705,000
Whastafel Keramik Gantung Buah 469,000

MATERIAL PELEKAT
Semen Bosowa PC (40 ) Kg Zak 52,500
Semen Bosowa PC (50 ) Kg Zak 63,500
Semen Tonasa PC (40 ) Kg Zak 54,000
Semen Tonasa PC (50 ) Kg Zak 67,000
Semen Tiga Roda PC ( 40 ) Kg Zak 51,000

PIPA GIP
* Pipa GIP Medium A 3/4" - 6 m
* Pipa GIP Medium A 1" - 6 m

* Pipa GIP Medium A 1 1/2" - 6 m

* Pipa GIP Medium A 2" - 6 m


* Pipa GIP Medium A 3" - 6 m
* Pipa GIP Medium A 4" - 6 m
* Pipa GIP Medium A 6" - 6 m

ACCESSORIES PIPA GIP


Sambungan Pipa GIP 2" ( Sock ) Buah 39,000
Sambungan Pipa GIP 21/2" ( Sock ) Buah
58,000
Sambungan Pipa GIP 3" ( Sock ) Buah 75,000
Sambungan Pipa GIP 4" ( Sock ) Buah 115,000
Sambungan Pipa GIP 6" ( Sock ) Buah 298,000
Pelampung Hydran Buah 82,500
Stop Kran PVC 12,5 - Ǿ 6 " Buah 2,145,000
Stop Kran PVC 12,5 - Ǿ 4" Buah 605,400
Stop Kran Pipa GIP Ǿ 6" Buah 5,087,500
Stop Kran Pipa GIP Ǿ 4" Buah 1,995,700
Stop Kran Pipa GIP Ǿ 3" Buah 1,038,400
Stop Kran Pipa GIP Ǿ 2" Buah 356,950
Stop Kran Pipa GIP Ǿ 1" Buah 129,000

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)
No Jenis Bahan Spesifikasi Satuan Harga

1 2 3 4 5
Double Nipple GIP -1/2" Buah 6,300
Double Nipple GIP -3/4" Buah 8,000
Double Nipple GIP -1" Buah 9,500
Double Nipple GIP - 1 1/2" Buah 15,000
Double Nipple GIP -1 1/4" Buah 23,000
Double Nipple GIP -2" Buah 30,000
Double Nipple GIP -2 1/2" Buah 50,000
Double Nipple GIP -3" Buah 103,000
Double Nipple GIP -4" Buah 125,400
Double Nipple GIP -5" Buah 253,000
Double Nipple GIP -6" Buah 429,000
Clamp Saddle Ǿ 4 x 1/2 " Buah 55,300
Clamp Saddle Ǿ 3 x 1/2 " Buah 47,400
Clamp Saddle Ǿ 2 x 1/2 " Buah 41,350
Clamp Saddle Ǿ 1 x 1/2 " Buah 28,600
Air Palve 1.1/2" Buah 592,250
Air Palve 2" Buah 669,500
Air Palve 3" Buah 1,039,500
Reducer 2" x 1" PVC Buah 8,250
Reducer 2" x 3" PVC Buah 18,300

C. Harga Bahan Lokal Jenis Mineral Bukan Logam dan Batuan


1 Pasir Pasang m³ 115,000
2 Batu Kali m³ 265,000
3 Kerikil Saring m³ 265,000
4 Sirtu m³ 115,000
5 Tanah Urug / Timbunan m³ 100,000
6 Batu Pecah 0,5 - 1 cm m³ 350,000
8 Batu Pecah 2 - 3 cm m³ 325,000

D. UPAH KERJA
1 Buruh Terlatih Org/Hari 100,000
2 Tukang Org/Hari 120,000
3 Kepala Tukang Org/Hari 125,000
4 Mandor Lapangan Org/Hari 130,000
5 Mekanik Terlatih Org/Hari 20,000
6 Mekanik Pembantu Org/Hari 120,000
7 Operator Terlatih Org/Hari 200,000
8 Operator Pembantu Org/Hari 120,000
9 Sopir Org/Hari 150,000
10 Mekanik Terlatih Org/Hari 103,000
11. Mekanik Pembantu Org/Hari 86,500
7 Operator Terlatih org 140,000

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
STANDAR HARGA SATUAN BAHAN BANGUNAN DAN UPAH KERJA
PEMERINTAH PROVINSI SULAWESI SELATAN
KOTA PALOPO
TAHUN 2018

Dalam Rupiah (Rp)

No. JENIS BARANG SPESIFIKASI SATUAN HARGA

1 2 3 4 5
1. BAHAN BANGUNAN
A.1BAHAN DASAR
Abu batu - 330.800

2 Batu Kali - Spilt 1 - 2 Cm m³ 432.950
3 Batu kali - Spilt 2 - 3 Cm m³ 449.400
4 Batu kali (Leveransir) - m³ 183.800
5 Batu kali (Quarry) - m³ 181.736
6 Batu Looster - Ukuran 20 x 20 Buah 13.100
7 Batu Looster - Ukuran 20 x 20 Buah 13.100
8 Batu Looster Model
- Ukuran Bintang
20 x 304 Buah 15.800
9 Batu Looster - Ukuran 20 x 35 Buah 16.800
10 Batu Looster - Ukuran 20 x 50 Buah 24.700
11 Batu Looster - Ukuran 24 x 24 Buah 15.900
12 Batu Looster - Ukuran 25 x 25 Buah 18.000
13 Batu Looster Model
- Ukuran Kembang
25 x 40 Buah 21.900
14 Batu Looster Model
- Ukuran Kotak
40 x 40 Buah 70.200
15 Batu merah - Buah 675
16 Batu pecah - Spilt 0,5 - 1 Cm m³ 325.500
17 Batu pecah - Spilt 10 - 15 Cm m³ 325.500
18 Batu pecah - Spilt 3 - 5 Cm m³ 325.500
19 Batu pecah - Spilt 5 - 7 Cm m³ 325.500
20 Batu pecah - Spilt 7 - 10 Cm m³ 325.500
21 Batu pecah (Leveransir) - Spilt 1 - 2 Cm m³ 367.500
22 Batu pecah (Leveransir) - Spilt 2 - 3 Cm m³ 367.500
23 Batu pecah (Quarry) - Spilt 1 - 2 Cm m³ 406.900
24 Batu pecah (Quarry) - Spilt 2 - 3 Cm m³ 420.000
25 Gorong-gorong Gorong-gorong Buah 396.700
26 Gorong-gorong diameter 100 cm (*)
Gorong-gorong Buah 140.500
27 Gorong-gorong diameter 20 cm (*)
Gorong-gorong Buah 157.500
28 Gorong-gorong diameter 20 cm (*)
Gorong-gorong Buah 210.000
29 Gorong-gorong diameter 20 cm (*)
Gorong-gorong Buah 183.800
30 Gorong-gorong diameter 30 cm (*)
Gorong-gorong Buah 101.100
31 Gorong-gorong diameter 30 cm (*)
Gorong-gorong Buah 236.300
32 Gorong-gorong diameter 40 cm (*)
Gorong-gorong Buah 262.500
33 Gorong-gorong diameter 40 cm (*)
Gorong-gorong Buah 341.300
34 Gorong-gorong diameter 50 cm (*)
Gorong-gorong Buah 168.500
35 Gorong-gorong diameter 50 cm (*)
Gorong-gorong Buah 367.500
36 Gorong-gorong diameter 60 cm (*)
Gorong-gorong Buah 168.500
37 Gorong-gorong diameter 60 cm (*)
Gorong-gorong Buah 401.460
diameter 80 cm (*)

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)

No. JENIS BARANG SPESIFIKASI SATUAN HARGA


38 Gorong-gorong Gorong-gorong Buah 224.700
39 Gorong-gorong diameter 80 cm (*)
Gorong-gorong Buah 357.000
40 Gorong-gorong diameter 80 cm (*)
Gorong-gorong Buah 89.900
41 Gorong-gorong diameter 85 cm (*)
Gorong-gorong Buah 105.000
42 Gorong-gorong diameter 90 cm (*)
Gorong-gorong Buah 144.300
43 Kapur Bakar diameter
- 90 cm (*) Kg/Zak 5.950
44 Kapur Pasangan - 5 Kg 6.600
45 Kerikil Saring - m³ 185.258
46 Looster Kaca - Ukuran 20 x 20 Buah 26.800
47 Pasir (levaransir) - m³ 157.500
48 Pasir (quary) - m³ 145.858
49 Paving Blok (K.225) - Tebal 10 Cm Buah 3.570
50 Paving Blok (K.225) - Tebal 6 Cm Buah 2.280
51 Paving Blok (K.225) - Tebal 8 Cm Buah 3.030
52 Paving Blok (K.300) - Tebal 10 Cm Buah 3.900
53 Paving Blok (K.300) - Tebal 6 Cm Buah 2.490
54 Paving Blok (K.300) - Tebal 8 Cm Buah 3.240
55 Paving Blok (K.300) Model Cacing - Tebal 8 Cm Buah 2.233
56 Paving Blok (K.300) Model - Tebal 8 Cm Buah 12.267
57 Gressblock
Paving BlokLS
(K.300) Model Segi - Tebal 8 Cm Buah 2.000
58 Empat
Paving Blok (K.300) Model Segi - Tebal 8 Cm Buah 3.267
59 Enam
Paving Blok (K.300) Model Topi - Tebal 8 Cm Buah 8.900
60 Uskup
Paving Blok (K.350) - Tebal 10 Cm Buah 4.220
61 Paving Blok (K.350) - Tebal 6 Cm Buah 2.810
62 Paving Blok (K.350) - Tebal 8 Cm Buah 3.460
63 Paving Blok (K.400) - Tebal 10 Cm Buah 4.540
64 Paving Blok (K.400) - Tebal 6 Cm Buah 2.920
65 Paving Blok (K.400) - Tebal 8 Cm Buah 3.570
66 Paving Blok (K.450) - Tebal 10 Cm Buah 4.800
67 Paving Blok (K.450) - Tebal 6 Cm Buah 3.200
68 Paving Blok (K.450) - Tebal 8 Cm Buah 3.900
69 Paving Blok (K.500) - Tebal 10 Cm Buah 5.000
70 Paving Blok (K.500) - Tebal 6 Cm Buah 3.200
71 Paving Blok (K.500) - Tebal 8 Cm Buah 4.100
72 Paving Blok Model Berlian - m² 121.700
73 Paving Blok Model Kacang - m² 121.700
74 Sirtu (leveransir) - m³ 68.300
75 Sirtu (quarry) - m³ 72.875
76 Tanah Timbunan (leveransir) - m³ 49.775
77 Tanah Timbunan (quarry) - m³ 45.825
B. SEMEN
1 Semen Semen (Portland Zak 46.867
2 Semen Cement) Bosowa 40
Semen (Portland zak 63.000
3 Semen Cement) Bosowa 50
Semen (Portland Zak 46.867
4 Semen Cement) Tiga Roda
Semen (Portland Zak 66.300
5 Semen Cement) Tiga Roda
Semen (Portland Zak 55.700
Cement) Tonasa 40

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)

No. JENIS BARANG SPESIFIKASI SATUAN HARGA

6 Semen Semen (Portland Zak 62.500


7 Semen Cement) Tonasa
Semen Tegel 50
Warna Kg 20.167
8 Semen AM. 50
Semen Warna Kg 14.700
C. HOLLOW BLOCK
1 Besi Hollow Ukuran 15 x 30 x 0.60 - Buah 18.600
2 mm 20 x 40 x 0.60
Besi Hollow Ukuran - Buah 20.300
3 mm 40 x 40 x 0.80
Besi Hollow Ukuran - Buah 25.800
4 Hollow Block mm 15 x 30 x 0.6 Batang 16.800
5 Hollow Block 20 x 20 x 1.2 Batang 44.600
6 Hollow Block 20 x 20 x 1.5 Batang 44.600
7 Hollow Block 20 x 40 x 0.6 Batang 21.000
8 Hollow Block 20 x 40 x 1.5 Batang 56.950
9 Hollow Block 20 x 40 x 1.8 Batang 99.800
10 Hollow Block 20 x 40 x 2 Batang 88.200
11 Hollow Block 40 x 40 x 0.8 Batang 36.200
D. BAHAN KAYU
1 Bambu Panjang - Batang 33.100
2 Bitao Papan/Balok m³ 3.438.100
3 Bitti (Vitex covasus) Papan/Balok m³ 3.465.000
4 Cempedak (Anthocarpus Papan/Balok m³ 2.572.500
5 Champeden)
Damar (Agathis alba) Papan/Balok m³ 3.967.100
6 Dolken Kayu - Batang 19.800
7 Durian Balok m³ 2.913.800
8 Durian Papan m³ 2.887.500
9 Durian (Durio zibethinus) Papan/Balok m³ 2.843.100
10 Jabon (Anthocephalus cadamba) Papan/Balok m³ 2.314.200
11 Jati Lokal (Tectona grandis) Papan/Balok m³ 2.512.400
12 Jati Putih (Gmelina abrorea) Papan/Balok m³ 2.512.400
13 Kacapi/Ketapi (Sandoricum koecape) Balok m³ 2.625.000
14 Kayu Klas I (Jenis Bayam) Balok m³ 12.231.900
15 Kayu Klas I (Jenis Bayam) Papan m³ 16.529.500
16 Kayu Klas II (Jenis Bitti) Balok m³ 4.231.500
17 Kayu Klas II (Jenis Bitti) Papan m³ 4.231.500
18 Kayu Klas II (Jenis Kalapi) Balok m³ 7.934.100
19 Kayu Klas II (Jenis Kalapi) Papan m³ 8.595.300
20 Kayu Klas III (Jenis Nato, Betao, Balok m³ 3.517.500
21 Kendonio dan
Kayu Klas III Sejenis)
(Jenis Nato, Betao, Papan m³ 3.832.500
Kendonio dan Sejenis)
22 Kayu Mai / Bakesting Balok 2.467.500

23 Kayu Mai / Bakesting Papan m³ 2.520.000
24 Mangga (Mangifera indica) Papan/Balok m³ 2.625.000
25 Matoa (Pometia pinnata) Papan/Balok m³ 3.305.900
26 Meranti (Shorea, sp) Papan/Balok m³ 2.975.400
27 Nyatoh/Nato (Palaqium, sp) Papan/Balok m³ 3.438.100
28 Sawo/Kumea (Manilkara, spp) Papan/Balok m³ 5.055.800
29 Sengon (Paraserianthes Falcataria) Papan/Balok m³ 2.467.500
30 Sinangkala Papan/Balok m³ 3.937.500

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)

No. JENIS BARANG SPESIFIKASI SATUAN HARGA

31 Ulin (Eusideroxylon zwageri) Papan/Balok m³ 5.289.500


32 Uru Papan m³ 4.095.000
33 Uru (Elmerillia ovalis) Papan/Balok m³ 3.834.800
E. BAHAN LANTAI
1 Granit Niro 40 x 40 - Dos 279.650
2 Granit Niro 60 x 60 - Dos 173.300
3 Kuku Tegel Polos 10 cm" Buah 700
4 Kuku Tegel Ulir 10 cm" Buah 700
5 Tegel Keramik Accent Color 25 x 25 Dos 68.300
6 Tegel Keramik Cm
Classy Color 25 x 25 Dos 68.300
7 Tegel Keramik Cm
Fancy Color 25 x 25 Dos 69.300
8 Tegel Keramik Cm
Gelap 40 x 40 Dos 78.800
9 Tegel Keramik Hercules-Gelap 40 x Dos 64.600
10 Tegel Keramik 40
Media Gelap 40 x 40 Dos 68.300
11 Tegel Keramik Cm
Median Color 40 x Dos 78.800
12 Tegel Keramik 40 CmColor 25 x 25
Pure Dos 68.300
13 Tegel Keramik Cm
Pure Color 50 x 50 Dos 78.800
14 Tegel Keramik Cm
Putih 10 x 20 Cm Dos 50.600
15 Tegel Keramik Putih 20 x 20 Cm Dos 71.400
16 Tegel Keramik Putih 20 x 25 Cm Dos 58.800
17 Tegel Keramik Putih 30 x 30 Cm Dos 46.200
18 Tegel Keramik Putih 40 x 40 Cm Dos 52.500
19 Tegel Keramik Supermilan 50 x 50 - Dos 78.800
20 Tegel Keramik Putih
Warna 10 x 20 Cm Dos 63.000
21 Tegel Keramik Warna 20 x 20 Cm Dos 66.200
22 Tegel Keramik Warna 20 x 25 Cm Dos 64.100
23 Tegel Keramik Warna 30 x 30 Cm Dos 67.200
24 Tegel Keramik Warna 40 x 40 Cm Dos 77.200
25 Tegel Keramik Warna Muda 20 x Dos 64.600
26 Tegel Keramik 20 Cm Tua 20 x 20
Warna Dos 66.450
27 Tegel Mozaik 30 x 30 Cm
- Dos 39.700
28 Tegel PC Abu-Abu 20 x 20 cm Dos 68.600
29 Tegel PC 25
PC Biji
Badak 20 x 20 cm Dos 83.700
30 Tegel PC PC Badak 30 x 30 cm Dos 86.600
31 Tegel PC PC Warna 20 x 20 Dos 83.700
F. BAHAN KACA cm
1 Kaca Kaca Bening ( 152,5 Lembar 141.800
2 Kaca xKaca
122Bening
x 3 mm( )152,5 Lembar 175.900
3 Kaca xKaca
122Bening
x 5 mm( )51 x Lembar 36.800
4 Kaca 122
KacaxBening
2 mm )2 mm Lembar 33.100
5 Kaca Kaca Bening 3 mm Lembar 126.800
6 Kaca Kaca Bening 5 mm Lembar 159.900
7 Kaca Kaca Biru ( 152 x Lembar 350.400
8 Kaca 122
KacaxBuram
5 mm )( 213 x Lembar 529.000
9 Kaca 122
KacaxBuram
5 mm )3 mm 246.010

10 Kaca Kaca cermin Lembar 519.270

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)

No. JENIS BARANG SPESIFIKASI SATUAN HARGA

11 Kaca Kaca Cermin 2mm Lembar 73.100


12 Kaca Kaca Rayben ( 152,5 m² 154.900
13 Kaca xKaca
122Rayben
x 3 mm()152,5 182.450

14 Kaca xRangka
122 x 5Nako
mm ) Set 213.500
G. BAHAN BESI lengkap terali +
1 Ayakan Kecil - Meter 36.800
2 Ayakan Pasir (Tebal) - Meter 33.600
3 Ayakan Pasir (Tipis) - Meter 25.200
4 Besi Beton (Ulir) 0 = 10 mm (Sll) Pjg Btg 71.400
5 Besi Beton (Ulir) 12
0 =m12 mm (Sll) Pjg Btg 132.200
6 Besi Beton (Ulir) 12
0 =m13 mm (Sll) Pjg Btg 99.200
7 Besi Beton (Ulir) 12 m
0 = 16 mm (Sll) Pjg Btg 183.200
8 Besi Beton (Ulir) 12
0 =m19 mm (Sll) Pjg Btg 273.500
9 Besi Beton (Ulir) 12 m
0 = 22 mm (Sll) Pjg Btg 356.500
10 Besi Beton (Ulir) 12
0 =m25 mm (Sll) Pjg Btg 470.900
11 Besi Beton (Ulir) 12 m
0 = 32 mm (Sll) Pjg Btg 846.300
12 Besi Plat 12 m = 120 x 240
2 mm Lembar 535.500
13 Besi Plat mm
2,3 mm = 120 x 240 Lembar 598.500
14 Besi Plat mm
3 mm = 120 x 240 Lembar 598.500
15 Besi Plat 1 mm (polos) mm
- Lembar 346.400
16 Besi Plat 1,2 mm (polos) - Lembar 330.200
17 Besi Plat 1,5 mm (polos) - Lembar 309.800
18 Besi Plat 1,6 mm (polos) - Lembar 519.800
19 Besi Plat 2 mm (Polos) - Lembar 504.000
20 Besi Plat 2,3 mm (Kembang) - Lembar 664.100
21 Besi Plat 2,3 mm (Polos) - Lembar 612.200
22 Besi Plat 2,6 mm (Polos) - Lembar 639.500
23 Besi Polos ? 10 pjg 12 Batang 65.350
24 Besi Polos ? 10 pjg 9 Batang 46.200
25 Besi Polos Diameter 12 pjg 12 Batang 98.367
26 Besi Polos Diameter 12 pjg 9 Batang 82.233
27 Besi Polos Diameter 14 pjg 12 Batang 133.900
28 Besi Polos Diameter 15 pjg 12 Batang 118.100
29 Besi Polos Diameter 16 pjg 12 Batang 180.267
30 Besi Polos Diameter 19 pjg 12 Batang 273.500
31 Besi Polos Diameter 22 pjg 12 Batang 397.700
32 Besi Polos Diameter 25 pjg 12 Batang 397.700
33 Besi Polos Diameter 32 pjg 12 Batang 397.700
34 Besi Polos Diameter 4.6 pjg 9 Batang 15.200
35 Besi Polos Diameter 5 pjg 9 Batang 18.650
36 Besi Polos Diameter 6 pjg 12 Batang 26.467
37 Besi Polos Diameter 8 pjg 12 Batang 44.100
38 Besi Polos Diameter 9.5 pjg 12 Batang 52.500
39 Besi Polos Ø 4 mm pjg 9 m Batang 14.700
40 Besi Siku 30.30.3 m Batang 44.100
41 Besi Siku 30.30.3 m (tebal Batang 34.700
4,2)

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)

No. JENIS BARANG SPESIFIKASI SATUAN HARGA

42 Besi Siku 40.40.3 - 6 m Batang 66.200


43 Besi Siku 40.40.4 m Batang 72.500
44 Besi Siku 40.40.4 m (tebal Batang 38.900
45 Besi Siku 2,3)
40.40.6 m Batang 75.100
46 Besi Siku 50.50.4 Batang 76.700
47 Besi Siku 50.50.5 m Batang 111.800
48 Besi Siku 50.50.5 m (tebal Batang 62.000
49 Besi Siku 2,5)
50.50.6 m Batang 78.800
50 Besi Siku 60.60.6 m Batang 194.300
51 Besi Siku 60.60.6 m Batang 194.300
52 Besi Siku 70.70.7 Batang 291.900
53 Besi Strep 3 Cm (1 x 4) Batang 37.800
54 Besi Strep 4 Cm Batang 47.800
55 Besi Strep 5 Cm 2" x 5 x 6 Batang 99.200
56 Besi Strip Tebal 1,5 mm Kg 22.350
57 Besi Strip Tebal 2 mm Kg 15.800
58 Besi Strip Tebal 3 mm Batang 31.500
59 Duri - Meter 27.100
60 Duri 10 KG /5 KG Rol 189.000
61 Kawat Ayak - Meter 36.800
62 Kawat Baja (Bindstaal) - Kg 27.633
63 Kawat Beton - Kg 26.800
64 Kawat Bronjong - rol 21.000
65 Kawat Bronjong Manual - Kg 16.800
66 Kawat Bronjong Pabrikan - kg 16.900
67 Kawat Nyamuk - Meter 21.000
68 Kawat Rang Besar - Meter 26.300
69 Kawat Rang Kecil - Meter 21.000
70 Mur/Baut 10 Cm - Buah 3.200
71 Mur/Baut 15 Cm - Buah 4.200
72 Mur/Baut 6 Cm - Buah 3.200
73 Mur/Baut 8 Cm - Buah 3.200
74 Paku Paku Asbes Kg 22.600
75 Paku Paku Biasa 5, 6, 7 Kg 17.133
76 Paku dan
Paku10 Cm berulir
Payung Kg 36.800
77 Paku 75
Pakum Sirap Kg 23.767
78 Paku Paku Skrup 3 1/2 Inc Dos 68.300
79 Paku Paku Skrup 4 Inc Dos 6.300
80 Paku Beton - 10 Cm Dos 15.367
81 Paku Beton - 4 Cm Dos 14.533
82 Paku Beton - 5 Cm Dos 19.067
83 Paku Beton - 7 Cm Dos 32.600
84 Paku Beton 3 Cm Dos 10.167
85 Paku Biasa 10 cm Kg 14.050
86 Paku Biasa 5 cm Kg 14.050
87 Paku Biasa 6 cm Kg 14.050

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)

No. JENIS BARANG SPESIFIKASI SATUAN HARGA

88 Paku Biasa 7 cm Kg 14.050


89 Paku Biasa Uk. 2,5" - 3,5" Kg 21.000
90 Paku Biasa Uk. 4" - 6" Kg 14.200
91 Paku Jembatan - Kg 25.200
92 Paku Sekrup 2 cm Dos 17.900
93 Paku Sekrup 4 cm Dos 33.600
94 Paku Seng - Kg 25.200
95 Paku Seng ( Payung ) RRT - Kg 46.533
96 Paku Tindis - Dos 1.850
97 Paku Tripleks - Kg 22.100
H. BAHAN PIPA
1 Benang - roll 4.700
2 Fauchet Elbow PVC 0=1" Buah 3.867
3 Fauchet Elbow PVC 0 = 1/2 " Buah 2.267
4 Fauchet Elbow PVC 0 = 3/4 " Buah 2.600
5 Fauchet Socket PVC 0=1" Buah 3.450
6 Fauchet Socket PVC 0 = 1/2 " Buah 2.350
7 Fauchet Socket PVC 0 = 3/4 " Buah 2.350
8 Fauchet Tee PVC 0=1" Buah 1.600
9 Fauchet Tee PVC 0 = 1/2 " Buah 4.450
10 Fauchet Tee PVC 0 = 3/4 " Buah 2.850
11 Fitting PVC-Faucet Socket (AW)/Sock 1 1/2" Batang 6.550
12 Drat Dalam
13 Fitting PVC-Faucet Socket (AW)/Sock 1 1/4' Batang 5.800
14 Drat Dalam
Fitting PVC-Faucet Socket (AW)/Sock 1" Batang 3.700
Drat Dalam
15 Fitting PVC-Faucet Socket (AW)/Sock 1" X 1/2" Batang 3.200
16 Drat Dalam
Fitting PVC-Faucet Socket (AW)/Sock 1" X 3/4" Batang 3.200
Drat Dalam
17 Fitting PVC-Faucet Socket (AW)/Sock 1/2" Batang 2.600
18 Drat Dalam
Fitting PVC-Faucet Socket (AW)/Sock 1/2" X 3/4" Batang 1.850
Drat Dalam
19 Fitting PVC-Faucet Socket (AW)/Sock 2' Batang 7.900
20 Drat Dalam
Fitting PVC-Faucet Socket (AW)/Sock 3/4" Batang 17.900
Drat Dalam
21 Fitting PVC-TEE (AW) 1 1/2" Batang 6.300
22 Fitting PVC-TEE (AW) 1 1/2" X 1 1/4' Batang 12.100
23 Fitting PVC-TEE (AW) 1 1/2" X 1" Batang 11.000
24 Fitting PVC-TEE (AW) 1 1/2" X 1/2" Batang 10.500
25 Fitting PVC-TEE (AW) 1 1/2" X 3/4' Batang 10.500
26 Fitting PVC-TEE (AW) 1 1/4'' X 1" Batang 10.000
27 Fitting PVC-TEE (AW) 1 1/4'' X 1/2" Batang 8.400
28 Fitting PVC-TEE (AW) 1 1/4'' X 3/4" Batang 9.500
29 Fitting PVC-TEE (AW) 1 1/4" Batang 3.950
30 Fitting PVC-TEE (AW) 1" Batang 8.400
31 Fitting PVC-TEE (AW) 1" x 1/2" Batang 4.950
32 Fitting PVC-TEE (AW) 1" X 3/4" Batang 4.700
33 Fitting PVC-TEE (AW) 1/2" Batang 3.200
34 Fitting PVC-TEE (AW) 2 1/2" Batang 10.000
35 Fitting PVC-TEE (AW) 2'' X 3/4'' Batang 13.700

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)

No. JENIS BARANG SPESIFIKASI SATUAN HARGA

36 Fitting PVC-TEE (AW) 2" Batang 3.200


37 Fitting PVC-TEE (AW) 2" X 1 " Batang 12.100
38 Fitting PVC-TEE (AW) 2" X 1 1/2" Batang 18.900
39 Fitting PVC-TEE (AW) 2" X 1 1/4' Batang 5.700
40 Fitting PVC-TEE (AW) 2" X 1/2" Batang 13.100
41 Fitting PVC-TEE (AW) 3" Batang 10.500
42 Fitting PVC-TEE (AW) 3" X 2" Batang 19.400
43 Fitting PVC-TEE (AW) 3/4" Batang 3.200
44 Fitting PVC-TEE (AW) 3/4" x 1/2" Batang 7.400
45 Fitting PVC-TEE (AW) 4" Batang 21.000
46 Fitting PVC-TEE (AW) 6" Batang 99.800
47 Fitting PVC-TEE (AW) 8" Batang 205.300
48 Pipa Fitting PVC-CAP (D) 1 1/2" Batang 36.800
49 Pipa Fitting PVC-CAP (D) 1 1/2" Batang 4.250
50 Pipa Fitting PVC-CAP (D) 1 1/4" Batang 26.300
51 Pipa Fitting PVC-CAP (D) 1 1/4" Batang 3.650
52 Pipa Fitting PVC-CAP (D) 1" Batang 42.000
53 Pipa Fitting PVC-CAP (D) 1/2" Batang 2.100
54 Pipa Fitting PVC-CAP (D) 10" Batang 313.400
55 Pipa Fitting PVC-CAP (D) 2 1/2" Batang 8.400
56 Pipa Fitting PVC-CAP (D) 2" Batang 4.667
57 Pipa Fitting PVC-CAP (D) 2" Batang 4.367
58 Pipa Fitting PVC-CAP (D) 3" Batang 6.633
59 Pipa Fitting PVC-CAP (D) 3" Batang 10.700
60 Pipa Fitting PVC-CAP (D) 3/4" Batang 2.850
61 Pipa Fitting PVC-CAP (D) 4" Batang 7.900
62 Pipa Fitting PVC-CAP (D) 4" Batang 19.600
63 Pipa Fitting PVC-CAP (D) 5" Batang 65.700
64 Pipa Fitting PVC-CAP (D) 6" Batang 80.900
65 Pipa Fitting PVC-CAP (D) 8" Batang 165.700
66 Pipa Fitting PVC-Elbow (D-DL)/ Keni 1 1/2" Batang 3.700
67 Pipa Fitting PVC-Elbow (D-DL)/ Keni 1 1/4" Batang 3.200
68 Pipa Fitting PVC-Elbow (D-DL)/ Keni 10" Batang 293.000
69 Pipa Fitting PVC-Elbow (D-DL)/ Keni 12" Batang 443.100
70 Pipa Fitting PVC-Elbow (D-DL)/ Keni 2 1/2" Batang 6.633
71 Pipa Fitting PVC-Elbow (D-DL)/ Keni 2" Batang 4.367
71 Pipa Fitting PVC-Elbow (D-DL)/ Keni 3" Batang 7.900
73 Pipa Fitting PVC-Elbow (D-DL)/ Keni 4" Batang 12.600
74 Pipa Fitting PVC-Elbow (D-DL)/ Keni 5" Batang 27.550
75 Pipa Fitting PVC-Elbow (D-DL)/ Keni 6" Batang 38.900
76 Pipa Fitting PVC-Elbow (D-DL)/ Keni 8" Batang 293.000
77 Pipa Fitting PVC-Increaser (D-IN) 1 1/2" X 1 1/4' Batang 5.300
78 Pipa Fitting PVC-Increaser (D-IN) 2 1/2" X 1 1/2" Batang 6.800
79 Pipa Fitting PVC-Increaser (D-IN) 2 1/2" X 2" Batang 7.900
80 Pipa Fitting PVC-Increaser (D-IN) 2" X 1 1/2" Batang 5.300
81 Pipa Fitting PVC-Increaser (D-IN) 2" X 1 1/4" Batang 5.300

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)

No. JENIS BARANG SPESIFIKASI SATUAN HARGA

82 Pipa Fitting PVC-Increaser (D-IN) 3" X 1 1/2" Batang 9.750


83 Pipa Fitting PVC-Increaser (D-IN) 3" X 2 1/2" Batang 8.567
84 Pipa Fitting PVC-Increaser (D-IN) 3" X 2" Batang 8.067
85 Pipa Fitting PVC-Increaser (D-IN) 4" x 2 1/2" Batang 16.300
86 Pipa Fitting PVC-Increaser (D-IN) 4" X 2" Batang 12.767
87 Pipa Fitting PVC-Increaser (D-IN) 4" X 3" Batang 14.700
88 Pipa Fitting PVC-Increaser (D-IN) 5" X 4" Batang 30.500
89 Pipa Fitting PVC-Increaser (D-IN) 6" X 3" Batang 41.500
90 Pipa Fitting PVC-Increaser (D-IN) 6" X 4" Batang 41.500
91 Pipa Fitting PVC-Increaser (D-IN) 6" X 5" Batang 50.400
92 Pipa Fitting PVC-Increaser (D-IN) 8" X 4" Batang 84.000
93 Pipa Fitting PVC-Increaser (D-IN) 8" X 6" Batang 86.100
94 Pipa Fitting PVC-Socket (AW) 1 1/2" Batang 3.450
95 Pipa Fitting PVC-Socket (AW) 1 1/4" Batang 2.600
96 Pipa Fitting PVC-Socket (AW) 1" Batang 2.600
97 Pipa Fitting PVC-Socket (AW) 1/2" Batang 1.600
98 Pipa Fitting PVC-Socket (AW) 2 1/2" Batang 5.800
99 Pipa Fitting PVC-Socket (AW) 2" Batang 3.700
100 Pipa Fitting PVC-Socket (AW) 3" Batang 7.650
101 Pipa Fitting PVC-Socket (AW) 3/4" Batang 2.100
102 Pipa Fitting PVC-Socket (AW) 4" Batang 12.350
103 Pipa Fitting PVC-Socket (AW) 6" Batang 34.700
104 Pipa Fitting PVC-Socket (AW) 8" Batang 85.100
105 Pipa Fitting PVC-Socket (D-DS)/Sock 1 1/2" Batang 3.900
106 Pipa Fitting PVC-Socket (D-DS)/Sock 1 1/4" Batang 2.767
107 Pipa Fitting PVC-Socket (D-DS)/Sock 2 1/2" Batang 6.700
108 Pipa Fitting PVC-Socket (D-DS)/Sock 2" Batang 4.500
109 Pipa Fitting PVC-Socket (D-DS)/Sock 3" Batang 8.400
110 Pipa Fitting PVC-Socket (D-DS)/Sock 4" Batang 11.333
111 Pipa Fitting PVC-Socket (D-DS)/Sock 5" Batang 26.300
112 Pipa Fitting PVC-Socket (D-DS)/Sock 6" Batang 35.700
113 Pipa Fitting PVC-Socket (D-DS)/Sock 8" Batang 85.100
114 Pipa Fitting PVC-Tee (D-DT) 1 1/2" Batang 4.950
115 Pipa Fitting PVC-Tee (D-DT) 1 1/4" Batang 3.950
116 Pipa Fitting PVC-Tee (D-DT) 2 1/2" Batang 12.600
117 Pipa Fitting PVC-Tee (D-DT) 2" Batang 6.050
118 Pipa Fitting PVC-Tee (D-DT) 3" Batang 14.700
119 Pipa Fitting PVC-Tee (D-DT) 3" X 1 1/2" Batang 17.900
120 Pipa Fitting PVC-Tee (D-DT) 3" X 2 1/2" Batang 20.500
121 Pipa Fitting PVC-Tee (D-DT) 3" x 2" Batang 19.400
122 Pipa Fitting PVC-Tee (D-DT) 4" Batang 25.950
123 Pipa Fitting PVC-Tee (D-DT) 4" x 2" Batang 27.800
124 Pipa Fitting PVC-Tee (D-DT) 4" X 3" Batang 31.500
125 Pipa Fitting PVC-Tee (D-DT) 5" Batang 56.200
126 Pipa Fitting PVC-Tee (D-DT) 6" Batang 99.800
127 Pipa Fitting PVC-Tee (D-DT) 8" Batang 205.300

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)

No. JENIS BARANG SPESIFIKASI SATUAN HARGA

128 Pipa GIP Dop Uk. Ø 1 '' Buah 7.650


129 Pipa GIP Dop Uk. Ø 1/2 '' Buah 12.433
130 Pipa GIP Dop Uk. Ø 3/4 '' Buah 5.466
131 Pipa GIP Double Neple Uk. Buah 8.400
132 Pipa GIP Ø 1 '' Neple Uk.
Double Buah 6.800
133 Pipa GIP Ø 1/2 ''Neple Uk.
Double Buah 8.233
134 Pipa GIP Ø
Water3/4More
'' Uk. Ø Buah 23.100
135 Pipa GIP 1 ''
Water More Uk. Ø Buah 24.200
136 Pipa GIP 1/2
Water '' More Uk. Ø Buah 25.200
137 Pipa GIP (Biasa) 3/4
Uk. Ø '' 1 '' GIP Batang 113.900
138 Pipa GIP (Biasa) Panjang
Uk. Ø 3/46'' m¹ GIP Batang 116.600
139 Pipa GIP (Biasa) Panjang 6 m¹
Uk. Ø 1/2 '' GIP Batang 99.367
140 Pipa GIP (Medium A) Super Panjang
0 = 1 1/2 6Incm¹- 6 m Batang 220.500
141 Pipa GIP (Medium A) Super 0 = 1 Inc - 6 m Batang 152.300
142 Pipa GIP (Medium A) Super 0 = 1/2 Inc - 6 m Batang 143.300
143 Pipa GIP (Medium A) Super 0 = 2 1/2 Inc - 6 m Batang 619.500
144 Pipa GIP (Medium A) Super 0 = 2 Inc - 6 m Batang 207.400
145 Pipa GIP (Medium A) Super 0 = 3 Inc - 6 m Batang 719.300
146 Pipa GIP (Medium A) Super 0 = 3/4 Inc - 6 m Batang 136.500
147 Pipa GIP (Medium B) 0 = 0,5 Inc - 6 m Batang 57.900
148 Pipa GIP (Medium B) 0 = 0,75 Inc - 6 m Batang 75.800
149 Pipa GIP (Medium B) 0 = 1,5 Inc - 6 m Batang 126.000
150 Pipa GIP (Medium B) 0 = 2,5 Inc - 6 m Batang 367.500
151 Pipa GIP (Medium B) 0 = 3 Inc - 6 m Batang 504.000
152 Pipa Giv Medium A Ø 4 - Buah/6m 892.500
153 Pipa Jenis Batang C untuk Instalasi 0 = 5/8 Inc - 4 m Batang 8.400
154 Listrik
Pipa Medium Galvanis 1 1/2" 3,20 mm 6m 198.500
155 Pipa Medium Galvanis 1 1/2" 3,20 mm 10 m 401.100
156 Pipa Medium Galvanis 1 1/4" 3,20 mm 6m 189.000
157 Pipa Medium Galvanis 1 1/4" 3,20 mm 9m 317.900
158 Pipa Medium Galvanis 1" 3,20 mm 6m 140.950
159 Pipa Medium Galvanis 1" 3,20 mm 8m 269.600
160 Pipa Medium Galvanis 1/2" 2,60 mm 6m 164.300
161 Pipa Medium Galvanis 2 1/2" 3,60 mm 6m 553.400
162 Pipa Medium Galvanis 2 1/2" 3,60 mm 12 m 371.900
163 Pipa Medium Galvanis 2" 3,60 mm 6m 226.800
164 Pipa Medium Galvanis 2" 3,60 mm 11 m 165.700
165 Pipa Medium Galvanis 3" 4,00 mm 6m 663.100
166 Pipa Medium Galvanis 3" 4,00 mm 13 m 711.200
167 Pipa Medium Galvanis 3/4" 2,60 mm 6m 180.100
168 Pipa Medium Galvanis 3/4" 2,60 mm 7m 178.600
169 Pipa Medium Galvanis 4" 4,50 mm 6m 866.300
170 Pipa Medium Galvanis 4" 4,50 mm 14 m 955.000
171 Pipa Plastik (Pralon SNI Class AW) 4 - 0 = 3/4 " Batang 28.900
172 m
Pipa Plastik (Pralon SNI Class AW) 4 -0 = 1 " Batang 39.400
173 m
Pipa Plastik (Pralon SNI Class AW) 4 -0 = 1 1/2 " Batang 56.200
m

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)

No. JENIS BARANG SPESIFIKASI SATUAN HARGA

174 Pipa Plastik (Pralon SNI Class AW) 4 -0 = 1 1/4 " Batang 49.400
175 m
Pipa Plastik (Pralon SNI Class AW) 4 0 = 1/2 " Batang 23.600
176 m
Pipa Plastik (Pralon SNI Class AW) 4 -0 = 2 " Batang 66.700
177 m
Pipa Plastik (Pralon SNI Class AW) 4 -0 = 2 1/2 " Batang 92.900
178 m
Pipa Plastik (Pralon SNI Class AW) 4 -0 = 3 " Batang 123.400
179 m
Pipa Plastik (Pralon SNI Class AW) 4 -0 = 4 " Batang 202.100
180 m
Pipa Plastik (Pralon SNI Class AW) 4 -0 = 5 " Batang 330.600
181 m
Pipa Plastik (Pralon SNI Class AW) 4 -0 = 6 " Batang 476.700
182 m
Pipa Plastik (Pralon SNI Class AW) 4 -0 = 8 " Batang 585.500
183 m
Pipa PVC (paralon) Double Neple Uk. Buah 1.600
184 Pipa PVC (paralon) Ø 1/2 ''Neple Uk.
Double Buah 1.600
185 Pipa PVC (paralon) Ø
Knie3/4
Uk.'' Ø 1/2 '' Buah 1.100
186 Pipa PVC (paralon) Knie Uk. Ø 2 '' Buah 4.200
187 Pipa PVC (paralon) Knie Uk. Ø 3 '' Buah 7.400
188 Pipa PVC (paralon) Knie Uk. Ø 3/4 '' Buah 1.600
189 Pipa PVC (paralon) Knie Uk. Ø 4 '' Buah 14.700
190 Pipa PVC Pralon Class D (4 - 0 = 1/2 " Batang 19.800
191 mtr/Batang)
Pipa PVC Pralon Class D (4 - 0 = 3/4 " Batang 26.400
192 mtr/Batang)
Pipa PVC Pralon Class D (4 -0 = 1 " Batang 46.300
193 mtr/Batang)
Pipa PVC Pralon Class D (4 -0 = 1 1/4 " Batang 46.300
194 mtr/Batang)
Pipa PVC Pralon Class D (4 -0 = 2 " Batang 39.400
195 mtr/Batang)
Pipa PVC Pralon Class D (4 -0 = 2 1/2 " Batang 58.300
196 mtr/Batang)
Pipa PVC Pralon Class D (4 -0 = 3 " Batang 68.300
197 mtr/Batang)
198 Pipa PVC Pralon Class D (4 -0 = 4 " Batang 63.000
199 mtr/Batang)
Pipa PVC Pralon Class D (4 -0 = 5 " Batang 198.500
200 mtr/Batang)
Pipa PVC Pralon Class D (4 -0 = 6 " Batang 246.800
201 mtr/Batang)
Reducer Ø 1/2"- Ø 1" - Buah 2.600
202 Reducer Ø 2"- Ø 2,5" - Buah 8.400
203 Reducer Ø 2,5"- Ø 3" - Buah 9.500
204 Reducer Ø 3"- Ø 4" - Buah 12.600
205 Reducer Ø 4"- Ø 5" - Buah 22.100
206 Sambungan L Ø 1 1/2" - Buah 2.600
207 Sambungan L Ø 1" - Buah 3.200
208 Sambungan L Ø 1/2" - Buah 1.100
209 Sambungan L Ø 2 1/2" - Buah 6.300
210 Sambungan L Ø 2" - Buah 3.700
211 Sambungan L Ø 3" - Buah 7.400
212 Sambungan L Ø 4" - Buah 14.700
213 Sambungan Pipa 0=1" Buah 3.200
214 Sambungan Pipa 0 = 1 1/2 " Buah 4.200
215 Sambungan Pipa 0 = 1/2 " Buah 2.100
216 Sambungan Pipa 0=2" Buah 4.950
217 Sambungan Pipa 0 = 2 1/2 " Buah 5.300
218 Sambungan Pipa 0=3" Buah 6.300
219 Sambungan Pipa 0 = 3/4 " Buah 2.100

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)

No. JENIS BARANG SPESIFIKASI SATUAN HARGA

220 Sambungan Pipa 0=4" Buah 10.700


221 Sambungan T Ø 1 1/2" - Buah 4.200
222 Sambungan T Ø 1" - Buah 7.900
223 Sambungan T Ø 1/2" - Buah 4.033
224 Sambungan T Ø 2 1/2" - Buah 7.900
225 Sambungan T Ø 2" - Buah 5.550
226 Sambungan T Ø 3" - Buah 9.500
227 Sambungan T Ø 4" - Buah 13.950
228 Slang Air Pakai Benang - 0 = 1/2 " 50/ Roll 253.600
229 Slang Air Pakai Benang - 0 = 3/4 " 50/ Roll 412.100
230 Slang Air SH Transparan - 0 = 1/2 " 50/ Roll 107.100
231 Slang Air SH Transparan - 0 = 3/4 " 50/ Roll 172.200
232 Talang Talang 6 " Maspion Batang 90.800
233 Talang Talang 8 " (Biasa) Batang 120.800
234 Talang 1/2 Lingkaran
Talang 8 " (Maspion) Batang 118.100
235 Talang 1/2 Lingkaran
Talang U (4 meter) Batang 82.400
236 TS. Cap/Dop PVC 0=2" Buah 4.250
237 TS. Socket PVC Pralon 0 = 1 1/2" Buah 3.400
238 TS. Socket PVC Pralon 0 = 1 1/4" Buah 3.400
239 TS. Socket PVC Pralon 0=2" Buah 3.950
240 TS. Socket PVC Pralon 0=3" Buah 6.300
241 TS. Socket PVC Pralon 0=4" Buah 11.600
242 TS. Socket PVC Pralon Uk. Ø 1/2 '' Buah 500
243 TS. Socket PVC Pralon Uk. Ø 3/4 Buah 2.100
244 TS. Tee PVC Pralon 0=1" Buah 4.250
245 TS. Tee PVC Pralon 0 = 1 " x 1/2 " Buah 6.633
246 TS. Tee PVC Pralon 0 = 1 " x 3/4 " Buah 4.500
247 TS. Tee PVC Pralon 0 = 1 1/2" Buah 6.600
248 TS. Tee PVC Pralon 0 = 1 1/4" Buah 4.250
250 TS. Tee PVC Pralon 0 = 1/2 " Buah 1.600
251 TS. Tee PVC Pralon 0 = 3/4 " Buah 3.200
252 TS. Tee PVC Pralon 0 = 3/4 " x 1/2 " Buah 2.800
253 TS. Tee PVC Pralon Uk. Ø 2 '' Buah 4.200
254 TS. Tee PVC Pralon Uk. Ø 3 '' Buah 9.500
255 TS. Tee PVC Pralon Uk. Ø 4 '' Buah 16.800
256 Tutup Talang Tutup Talang 1/2 Buah 8.400
257 Tutup Talang Lingkaran
Tutup TalangRr 8U Buah 8.900
258 Valve Socket PVC 0=1" Buah 3.450
259 Valve Socket PVC 0 = 1 1/2" Buah 5.800
260 Valve Socket PVC 0 = 1 1/4" Buah 6.200
261 Valve Socket PVC 0 = 1/2 " Buah 2.350
262 Valve Socket PVC 0=2" Buah 7.900
263 Valve Socket PVC 0 = 2 1/2 " Buah 6.600
264 Valve Socket PVC 0=3" Buah 6.300
265 Valve Socket PVC 0 = 3/4 " Buah 2.350
I. BAHAN ATAP

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)

No. JENIS BARANG SPESIFIKASI SATUAN HARGA

1 Genteng Genteng Metal Lembar 91.400


2 Genteng Multi
GentengRoof 0,3 mm
Metal Lembar 35.200
3 Genteng Sakura Roof
Genteng Metal 0,2 mm Lembar 50.400
4 Genteng Surya Roof 0,3 mm
Nok/Bubungan Lembar 32.400
5 Genteng Multi Roof 0,3 mm
Nok/Bubungan Lembar 23.600
6 Genteng Sakura Roof 0,2 mm
Nok/Bubungan Lembar 24.400
7 Karet pelapis genteng surya
- Lebar 1100,3
Roof Cmmm Meter 15.367
8 Karet pelapis genteng - Lebar 50 Cm Meter 8.400
9 Karet pelapis genteng - Lebar 90 Cm Meter 11.600
10 Nok Steel Gelombang - Mini 105 Cm Buah 11.900
11 Rangka Baja Ringan 75x65x6m Batang 78.800
12 Rangka Baja Ringan 75x75x6m Batang 88.033
13 Rangka Baja Ringan 75x80x6m Batang 83.667
14 Seng Gelombang Besar - BWG 32" BJLS 0,30 Kaki 6.950
15 Seng Gelombang Besar mm
- BWG(Gajah Berlian)
32" BJLS 0,30 Kaki 7.400
16 Seng Gelombang Besar mm (Sermani)
- BWG 33" BJLS 0,30 Kaki 7.900
17 Seng Gelombang Besar mm
- BWG(Gajah Berlian)
33" BJLS 0,30 Kaki 8.400
18 Seng Gelombang Kecil mm (Sermani)
- BWG 32" BJLS 0,30 Kaki 7.400
19 Seng Gelombang Kecil mm
- BWG(Gajah Berlian)
32" BJLS 0,30 Kaki 7.900
20 Seng Gelombang Kecil mm (Sermani)
- BWG 33" BJLS 0,30 Kaki 86.500
21 Seng Gelombang Kecil mm
- BWG(Gajah Berlian)
33" BJLS 0,30 Kaki 8.400
22 Seng Plastik Fiber mm
- (Sermani) Kaki 11.600
23 Seng Plastik Laserlite - Kaki 17.900
24 Seng Plat - BWG 33 " BJLS Lembar 63.000
25 Seng Plat 0,20 mm
75x65x6m Batang 78.800
26 Seng Plat 75x75x6m Batang 88.700
J. BAHAN LANGIT-LANGIT
1 Clasiboard (6 mm) - Lembar 137.850
2 Dinabolt 10 Panjang 6cm Batang 1.300
3 Eternit 100 x 100 (Atrisco) - Lembar 43.600
4 Gipsum Board - 240 x 120 x 0,3 Cm Lembar 78.800
5 Gipsum Board 9 mm Lembar 71.067
6 List Profil - 2 x 3 Cm Batang 16.600
7 List Profil - 3 x 3 Cm Batang 10.500
8 List Profil - 4 x 4 Cm Batang 19.350
9 List Profil - 5 x 5 Cm Batang 22.500
10 Reng 30.45 HD Tinggi 30mm, T Batang 34.900
11 Reng 32.45 HD Taso 0.45.
TinggiP32mm,
6m T Batang 37.800
12 Reng 40.45 HD Taso 0.45. P 6m T
Tinggi 40mm, Batang 53.600
13 Teakwood 0.45.
- 122 Px 244
6m x 0,3 Cm Lembar 99.800
14 Teakwood Multipleks 120 x Lembar 119.700
15 Teakwood 240 x 9,0 18 mm
Multipleks Lembar 294.600
16 Teakwood 122 x 224 4 mm
Multipleks Lembar 71.600
17 Teakwood 122 x 224 6 mm
Multipleks Lembar 85.100
18 Teakwood 122 x 224 9 mm
Multipleks Lembar 128.100
19 Tripleks 122
- 120x x224
240 x 3,0 Lembar 49.400
mm

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)

No. JENIS BARANG SPESIFIKASI SATUAN HARGA

20 Tripleks - 120 x 240 x 4,0 Lembar 5.900


21 Tripleks mm
- 122 x 244 x 0,2 Cm Lembar 50.600
22 Tripleks - 122 x 244 x 0,3 Cm Lembar 49.400
23 Tripleks - 122 x 244 x 0,6 Cm Lembar 112.400
24 Tripleks - 122 x 244 x 0,9 Cm Lembar 165.300
25 Tripleks 123 x 244 x 0,6 Cm Lembar 76.700
26 Tripleks 124 x 244 x 0,9 Cm Lembar 113.400
27 Tripleks Tebal 12 mm Lembar 197.700
28 Tripleks Tebal 15 mm Lembar 230.400
29 Tripleks Tebal 3 mm Lembar 52.833
30 Tripleks Tebal 4 mm Lembar 68.300
31 Tripleks Tebal 6 mm Lembar 89.300
32 Tripleks Tebal 9 mm Lembar 131.300
33 Tripleks Melamin - 122 x 244 x 0,2 Cm Lembar 88.200
34 Truss C75.65 SNI ALFA T.0.65 TCT Panjang Batang 80.900
35 Truss C75.75 SNI BMT 6m
T.0.75 TCT Panjang Batang 90.400
36 Truss C75.75 SNI TASO 6m
T.0.75 TCT Panjang Batang 81.900
37 Truss C75.80 SNI TASO 6m
T.0.80TCT Panjang Batang 105.000
K. BAHAN SANITASI 6m
1 Bak Air Fiber Oval Buah 337.100
2 Closed Duduk Standar (Warna) - Buah 787.500
3 Floor Drain - Buah 136.500
4 Klep 0 3/4" PVC Buah 1.400
5 Kloset Duduk KIA Warna Muda Buah 236.300
6 Kloset Duduk KIA Warna Tua Buah 787.500
7 Kloset Duduk TOTO - Buah 2.063.300
8 Kloset Jongkok - Buah 255.700
9 Kloset Jongkok Warna Muda Buah 231.000
10 Kloset Jongkok Warna Tua Buah 152.300
11 Kran Air AMICO 1/2 " - Buah 26.300
12 Kran Urinoir - Buah 297.500
13 Kran Wasthafel - Buah 157.500
14 Pelampung Otomatis 1/2 " Buah 79.800
15 Penutup Closed Duduk - Set 257.300
16 Reservoir Fiber = 0,5 m3 (Exel) - Buah 1.084.300
17 Reservoir Fiber = 1 m3 (Exel) - Buah 1.659.500
18 Roof Drain Metal - Buah 112.400
19 Shower Set TOTO Unit 297.800
20 Shower Spray - Unit 420.700
21 Stop Kran 0 1 " (Besi) - Buah 126.000
22 Stop Kran 0 1/2 " (Besi) - Buah 66.700
23 Stop Kran 0 3/4 " (Besi) - Buah 86.600
24 Stop Kran PVC Ø 4" - Buah 505.600
25 Stop Kran PVC Ø 1,5" (yuta) - Buah 33.100
26 Stop Kran PVC Ø 2" (d'cota ptr) - Buah 95.600
27 Stop Kran PVC Ø 2,5" - Buah 262.000

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)

No. JENIS BARANG SPESIFIKASI SATUAN HARGA

28 Stop Kran PVC Ø 3" - Buah 341.300


29 Tempat Sabun Kramik - Buah 48.300
30 Urinoir TOTO Buah 1.575.000
31 Wasthafel TOTO Buah 1.731.500
32 Wasthafel + Cermin + Siphon - Set 449.400
33 Wasthafel cuci piring logam (1 - Buah 246.800
lubang)
L. BAHAN FINISHING / CAT
1 Amplas / Kertas gosok - Lembar 4.450
2 Cat Anti Bocor No Drop 4 Kg 194.633
3 Cat Atap Nippon Paint 5 Ltr 423.850
4 Cat Atap YOKO 4 Kg 102.400
5 Cat Besi - Kg 58.800
6 Cat Dasar - Kg 32.600
7 Cat Kayu Avian Kg 59.467
8 Cat Kayu Glotex Kg 66.200
9 Cat Kayu I.C.I Kg 33.400
10 Cat Kayu Meni Btl 19.400
11 Cat Kayu Minyak Cat Ltr 32.167
12 Cat Kayu Politur Ltr 63.750
13 Cat Kayu Yoko Kg 44.600
14 Cat Kayu dan besi - Mowilex Kg 105.000
15 Cat Kayu dan besi Avian Kg 59.467
16 Cat Kayu dan besi Brillo Kg 78.800
17 Cat Penutup - Kg 57.800
18 Cat Tembok Aries 5 Kg 51.833
19 Cat Tembok Avitex 5 Kg 110.467
20 Cat Tembok Catilylac 5 Kg 110.300
21 Cat Tembok Catilylac 25 Kg 630.000
22 Cat Tembok Dulux Pentalite 2,5 Ltr 190.100
23 Cat Tembok Standard Colour
Dulux Weather 2,5 Ltr 267.800
24 Cat Tembok Shield
Metrolite 5 Kg 97.700
25 Cat Tembok Mowilex (2,5 Itr) Ltr 152.300
26 Cat Tembok Dalam
Mowilex (2,5 Itr) Ltr 245.200
27 Cat Tembok Luar
Vinilex Nippon paint 5 Kg 126.000
28 Cat Tembok Exterior - Mowilex 2,5 Ltr 275.100
29 Cat Tembok Exterior - Mowilex 20 Ltr 2.028.600
30 Cat Tembok Exterior Catilylac 5 Kg 178.500
31 Cat Tembok Exterior Catilylac 25 Kg 945.000
32 Cat Tembok Exterior Dulux 20 Ltr 1.995.000
33 Cat Tembok Exterior Dulux 2,5 Ltr 267.800
34 Cat Tembok Exterior Metrolite 3 Ltr 97.700
35 Cat Tembok Exterior Metrolite 16 Ltr 472.500
36 Cat Tembok Interior - Mowilex 2,5 Ltr 152.300
37 Cat Tembok Interior - Mowilex 20 Ltr 1.207.500
38 Cat Tembok Interior - Mowilex 1 Ltr 104.000
39 Cat Tembok Interior Metrolite 3 Ltr 97.700

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)

No. JENIS BARANG SPESIFIKASI SATUAN HARGA

40 Cat Tembok Interior Metrolite 16 Ltr 472.500


41 Dempul Kayu - Kg 35.700
42 Dempul Kayu Cap Kucing Kg 33.100
43 Kuas - 1" Buah 4.867
44 Kuas - 1,5" Buah 7.133
45 Kuas - 2" Buah 8.567
46 Kuas - 2,5" Buah 11.000
47 Kuas - 3" Buah 12.600
48 Kuas 4" Buah 17.467
49 Kuas 5" Buah 23.350
50 Kuas Rol - Buah 24.867
51 Kuas Rol Imundex - Buah 28.900
52 Minyak Cat (Tinner Biasa) - Ltr 20.250
53 Minyak Cat (Tinner Super) - Ltr 36.450
54 Mowilex (2,5 Itr) - Mowilex 2,5 Itr Ltr 141.800
55 Mowilex (2,5 Itr) dalam
- Mowilex 2,5 Itr Ltr 216.300
56 Nodrop luar
Roof Sealir 4 Kg 195.300
57 Plamur - 5 Kg 46.200
58 Plamuur - Kg 2.950
59 Politur Vernis Netral - 1 Ltr 54.600
60 Politur Vernis Warna - 1 Ltr 63.750
M. KUNCI
1 Door Clozer - Buah 226.800
2 Engsel Jendela - Buah 22.100
3 Engsel Jendela Uk. 80 x 5 mm Buah 23.100
4 Engsel Kupu-Kupu 4 x 3 - Pasang 32.600
5 Engsel Nilon Ring Pintu Uk. 3 x 2,5 mm Pasang 32.600
6 Engsel Pintu - Buah 31.500
7 Expanyclet - Set 264.500
8 Grendel Besar Buah 36.800
9 Grendel Kecil Buah 10.500
10 Grendel Sedang Buah 15.800
11 Hak Angin ATC Besar Buah 21.000
12 Hak Angin ATC Kecil Buah 15.800
13 Kunci Lemari - Buah 21.000
14 Kunci silinder - Buah 36.800
15 Kunci tanam Royal 1 Slaag Set 23.600
16 Kunci tanam Royal 2 Slaag Set 89.300
17 Kunci tanam Union 1 x slag Buah 78.600
18 Kunci tanam Belucci
Union 12xxslag
slag Buah 204.800
19 Kunci tanam Bertolli
Union 12x xslag
slag Buah 56.200
20 Kunci tanam 808 (Sejenis) Niccole
- 2 x slag Buah 12.600
21 Tarikan Lemari Besar - Buah 15.800
22 Tarikan Lemari Kecil - Buah 3.200
23 Tarikan Lemari Sedang - Buah 3.200
N. BAHAN INSTALASI LISTRIK

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)

No. JENIS BARANG SPESIFIKASI SATUAN HARGA

1 Boks Sekring - Buah 42.250


2 Boks Sekring Kas Kosong DN 1 G Buah 3.700
3 Boks Sekring Kas Kosong DN 2 G Buah 5.300
4 Boks Sekring Kas Kosong DN 3 G Buah 15.800
5 Broco – 1 Way – Engkel - Buah 15.800
6 Broco – 2 Way – Seri - Buah 20.000
7 Broco-1 Way-Engkel - Buah 13.150
8 Broco-2 Way-Seri - Buah 16.900
9 Down light / PLC 13 W - Buah 66.200
10 Eterna NYA 1x1.5 100 m Meter 156.500
11 Eterna NYA 1x10 100 m Meter 16.900
12 Eterna NYA 1x2.5 100 m Meter 327.600
13 Eterna NYA 1x4 100 m Meter 6.400
14 Eterna NYA 1x6 100 m Meter 13.400
15 Eterna NYM 2x1.5 50 m Meter 167.750
16 Eterna NYM 2x2.5 50 m Meter 468.300
17 Eterna NYM 3x1.5 50 m Meter 10.500
18 Eterna NYM 3x2.5 50 m Meter 12.600
19 Eterna NYM 3x4 50 m Meter 472.500
20 Eterna NYM 4x2.5 50 m Meter 17.363
21 Eterna NYM 4x4 50 m Meter 22.995
22 Eterna NYY 2x1.5 50 m Meter 10.015
23 Eterna NYY 2x2.5 50 m Meter 14.363
24 Eterna NYY 3x1.5 50 m Meter 12.753
25 Eterna NYY 3x4 50 m Meter 26.070
26 Eterna NYY 3x6 50 m Meter 29.610
27 Eterna NYY 4x2.5 50 m Meter 17.600
28 Eterna NYY 4x4 50 m Meter 27.150
29 Eterna NYY 4x6 50 m Meter 37.235
30 Fitting Ganda - Buah 16.900
31 Fitting Hias Broco - Buah 14.033
32 Isolator - Buah 32.000
33 Kabel Listrik Type NYY - 2 x 1 1/2 mm Rol/100m 805.400
34 Kabel Listrik Type NYY Eterna
- 2 x 2 1/2 mm Rol/100m 1.053.867
35 Kabel Listrik Type NYY Eterna
- 2 x 4 mm Rol/100m 1.809.200
36 Kabel Listrik Type NYY - 3 x 2 1/2 mm Rol 1.455.800
37 Kabel Telepon 4 x 0,5 mm - Meter 2.200
38 Kabel Tunggal Ny 1,5 (Eternal) - Rol/100m 218.400
39 Kabel Tunggal Ny 1,5 (Mastelindo) - Rol 277.700
40 Lampu Osram TL-D 18 W Buah 16.900
41 Lampu Osram TL-D 36 W Buah 28.100
42 Lampu Pijar - 10 Wat Buah 6.800
43 Lampu Pijar - 100 Wat Buah 8.900
44 Lampu Pijar - 15 Wat Buah 6.300
45 Lampu Pijar - 25 Wat Buah 6.800
46 Lampu Pijar - 40 Wat Buah 6.800

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)

No. JENIS BARANG SPESIFIKASI SATUAN HARGA

47 Lampu Pijar - 60 Wat Buah 6.800


48 Lampu Pijar (Philips) - 20 Wat Buah 6.800
49 Lampu Pijar (Philips) - 5 Wat Buah 6.300
50 Lampu PL ( Philips ) Type Essential - 14 Wat Buah 36.200
51 Lampu PL ( Philips ) Type Essential - 18 W Buah 38.300
52 Lampu PL ( Philips ) Type Essential - 23 W Buah 38.900
53 Lampu PL ( Philips ) Type Essential -5W Buah 26.300
54 Lampu PL ( Philips ) Type Essential -8W Buah 30.500
55 Lampu Spiral Type Tornado Philips 12 W Buah 43.600
56 Lampu Spiral Type Tornado Philips 15 W Buah 48.300
57 Lampu Spiral Type Tornado Philips 20 W Buah 45.950
58 Lampu Spiral Type Tornado Philips 24 W Buah 54.600
59 Lampu Spiral Type Tornado Philips 5 W Buah 36.800
60 Lampu Spiral Type Tornado Philips 8 W Buah 38.550
61 Lampu Sumpit ( Philips ) Essential - 14 Wat Buah 44.100
62 Lampu Sumpit ( Philips ) Essential - 23 Wat Buah 38.900
63 Lampu Sumpit ( Philips ) Essential - 5 Wat (JNE) Buah 20.000
64 Lampu Sumpit ( Philips ) Essential - 8 Wat Buah 24.200
65 Lampu Sumpit ( Philips ) Tornado - 15 Wat (Cristal) Buah 52.500
66 Lampu Sumpit ( Philips ) Tornado - 20 Wat (Cristal) Buah 43.100
67 Lampu Taman Mercuri - 1 Set 673.400
68 Lampu TL ( Biasa ) 20 Wat Buah 17.900
69 Lampu TL ( Biasa ) 40 Wat Buah 16.800
70 Lampu TL ( Philips ) - 23 Wat Buah 47.100
71 Lampu TL ( Philips ) - 5 Wat (JNE) Buah 29.200
72 Lampu TL ( Philips ) - 8 Wat Buah 31.500
73 Lampu TL ( Philips ) - Ix 20 W Buah 57.600
74 Lampu TL ( Philips ) 1 x 18 W Set 198.500
75 Lampu TL ( Philips ) 1 x 36 W Set 264.500
76 Lampu TL ( Philips ) 2 x 20 W - 18 W Set 264.500
77 Lampu TL ( Philips ) 2 x 40 W Set 330.600
78 Lampu Type Softtone Philips 25 W Buah 12.567
79 Lampu Type Softtone Philips 40 W Buah 16.633
80 Lampu Type Softtone Philips 60 W Buah 12.900
81 Lampu Type Superlux Philips 25 W Buah 9.600
82 Lampu Type Superlux Philips 40 W Buah 10.700
83 Lampu Type Superlux Philips 60 W Buah 11.200
84 MCB - Buah 45.700
85 NCB - Buah 46.600
86 Outlet Telepon - Buah 66.200
87 Outlet TV - Buah 42.100
88 Paralon 5/8 - Buah 8.900
89 Philips LED 3W Putih 3 Buah 34.700
90 Philips Wat
LED 7W Putih-Cool Buah 57.800
91 Philips Daylight
Vision LED7 Wat
4 Wat Buah 34.700
92 Pipa Conduit 1/2" - Batang 28.400

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)

No. JENIS BARANG SPESIFIKASI SATUAN HARGA

93 Pipa Union Untuk Kabel - 5/8 Inc - 4 m Batang 9.000


94 Saklar Phase Double Hitam OB Buah 19.200
95 Saklar Phase Broco
Double Putih CH Buah 19.200
96 Saklar Phase Tunggal Hitam OB Buah 8.000
97 Saklar Phase Broco
Tunggal Putih IB Buah 12.650
98 Saklar Triple Broco
- Buah 68.300
99 Stop Kontak Hitam Buah 14.100
100 Stop Kontak Putih IB Broco Buah 17.900
101 Stop Kontak Steker Broco Buah 15.800
102 Stop Kontak Dinding CP Panasonic Buah 70.800
103 Stop Kontak Dinding CP WBJ1214-3K
Panasonic WEJP- Buah 68.300
O. BAHAN PINTU 11217
1 BAHAN PINTU Pintu Aluminium Set 262.500
2 BAHAN PINTU Biasa
Pintu Aluminium Set 262.500
3 BAHAN PINTU Standar
Pintu PVC Warna Set 241.500
4 BAHAN PINTU Muda
Pintu PVC Warna Set 288.800
P. BAHAN JEMBATAN Tua (Urat Kayu)
1 Angker Bout Besar - Unit 730.000
2 Angker Bout Kecil - Unit 634.800
3 Jarum Keras (Besar) - Warfel (16mm) - Batang 23.100
4 Jarum Keras (Kecil) - Warfel (6mm) - Batang
5 Kaos Kawat 0 1" - Buah 48.400
6 Kuku Macan 1 " - Buah 7.400
7 Kuku Macan fe 1" - Buah 19.500
8 Paku Jembatan - Kg 25.200
9 Pipa Galvanished 3" - m 30.500
10 Pipa Porus/E 2" - m 62.200
11 Pipa Sandaran Diameter 3,00 in - Batang 480.900
12 Medium B
Roller Besar - Buah 54.200
13 Roller Kecil - Buah 44.500
14 Roller Sedang - Buah 60.400
15 Slang 0 1" - Meter 100.200
16 Tali Baja (sling) - 16 mm - m 53.200
17 Tali Baja (sling) - 22 mm - m 68.800
18 Tali Baja (sling) - 25 mm - m 143.200
19 Tali Baja (sling) - 6 mm - m 15.300
20 Tiang Pancang Baja - Kg 43.200
Q. BAHAN JALAN
1 Aspal - Kg 13.200
2 Bensin (Industri) - Ltr 11.000
3 Minyak Pelumas - Ltr 36.000
4 Minyak Solar (Industri) - Ltr 11.800
5 Minyak Tanah (Industri) - Ltr 11.900
R. BAHAN LAIN
1 Elastomer (Bearing Pad) 250 x 250 x - Buah 585.500
2 30
Elastomer (Bearing Pad) 300 x 250 x - Buah 988.600
30

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)

No. JENIS BARANG SPESIFIKASI SATUAN HARGA

3 Expantion Join Type Torma - m 1.824.900


4 Lem Kayu (0,7) - Klg 47.300
5 Lem Kayu (1/2) - Klg 31.500
6 Lem Seng - Meter 8.400
7 Les Aluminium 1,5 - Batang 21.000
8 Tali Nilon - Rol 4.200
UPAH KERJA
A. PEKERJA
1 Pekerja - Org/Hari 90.000
B. TUKANG
2 Tukang Batu - Org/Hari 110.000
3 Tukang Besi - Org/Hari 110.000
4 Tukang Cat - Org/Hari 110.000
5 Tukang Kayu - Org/Hari 110.000
6 Tukang Listrik - Org/Hari 110.000
7 Tukang Pipa - Org/Hari 110.000
C. KEPALA TUKANG
8 Kepala Tukang Batu - Org/Hari 120.000
9 Kepala Tukang Besi - Org/Hari 120.000
10 Kepala Tukang Cat - Org/Hari 120.000
11 Kepala Tukang Kayu - Org/Hari 120.000
12 Kepala Tukang Listrik - Org/Hari 120.000
13 Kepala Tukang Pipa - Org/Hari 120.000
D. MANDOR LAPANGAN
14 Mandor Lapangan - Org/Hari 110.000
E. OPERATOR
15 Operator Kurang terlatih - Org/Hari 90.000
16 Operator Terlatih - Org/Hari 120.000
17 Pembantu Operator - Org/Hari 110.000
F. SOPIR
18 Sopir Pembantu - Org/Hari 110.000
19 Sopir Telatih - Org/Hari 120.000
G. MEKANIK
20 Mekanik - Org/Hari 120.000
21 Mekanik Pembantu - Org/Hari 110.000

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
Dalam Rupiah (Rp)

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
STANDAR HARGA SATUAN BAHAN BANGUNAN DAN UPAH KERJA
PEMERINTAH PROVINSI SULAWESI SELATAN
KABUPATEN LUWU TIMUR
TAHUN 2018

(Dalam Rupiah (R

NO JENIS BAHAN SPESIFIKASI SATUAN

1 2 3 4
I BATA, BATU DAN PASIR
1 Batu Merah uk.5 x 11 x 22 cm Bh
2 Bata Beton Ringan ex Celcom Uk.9 x 19 x 39 cm Bh
3 Batu Kali M³
4 Batu Split Pecah Mesin 1/2 M³
5 Batu Split Pecah Mesin 3/5 M³
6 Batu Kerikil M³
7 Pasir Beton M³
8 Pasir Pasang M³
9 Pasir urug M³
10 Tanah Urug M³

II BAHAN PEREKAT
1 Semen ( 50 Kg ) Semen Indonesia Zak
2 Semen Warna Semen Indonesia Kg

III BAHAN BAJA


1 Besi Beton U-24 KS Kg
2 Besi Beton U-39 KS Kg
3 Besi Plat Rata Rata KS Kg
4 Besi Tempa m²
5 Rangka Atap Baja Ringan Smart truss;Prima truss Zak
6 Kawat Beton Kawat Beton Zak

IV. BAHAN KAYU


1 Kayu Klas 1 Jati M³
2 Kayu Klas II Kamper M³
3 Kayu Klas III Meranti M³
4 Kayu Klas IV Terentang M³
5 Dolken DIA 8 s/d 10 cm p.4 m M³

V. Bahan Aluminium
1 Kusen Aluminium m'
2 Rangka Jendela Aluminium m'
3 Rangka Pintu Aluminium m'
4 Kusen & Pintu PVC Toilet Unit
5 Engsel Bh
6 Handle Pintu Bh

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
(Dalam Rupiah (R

NO JENIS BAHAN SPESIFIKASI SATUAN

1 2 3 4
7 Selinder Bh
8 Door Stoper Bh
9 Door Closer Bh
10 Slot Tanam Bh
11 Kait Angin Bh
12 Grendel Bh
13 Bahan Jalan Bh

VI BAHAN PELAPIS
Triplek t.3 mm Uk.120 x 40 cm
Triplek t.4 mm Uk.120 x 40 cm m
Triplek t.9 mm Uk.120 x 40 cm m

VII BAHAN LANTAI DAN DINDING KERAMIK


1 Keramik 30/30 ex Masterina m²
2 Granite Tile 40/40 ex Granito tile m²
3 Plint Keramik ex Roman bh
4 Plint Granitetetile 10/40 cm ex Granito bh

VIII BAHAN PENUTUP ATAP


1 Genteng Keramik 25 bh/m² ex Jatiwangi bh
2 Genteng Keramik Glazur 15 bh/m² KANMURI bh
3 Nok Genteng Keramik 4 bh/m ex Jatiwangi bh
4 Nok Genteng Keramik Glasur 4 bh/m ex KANMURI bh
5 Seng Plat BJLS 30 L.90 cm m'

IX BAHAN KACA
1 Kaca Polos 3 mm m²
2 Kaca Polos 5 mm m²
3 Kaca Polos 8 mm m²

X BAHAN PAKU DAN MUR BAUT


1 Paku 1 s/d 3 cm kg
2 Paku 5 s/d 10 cm kg
3 Paku 8 sd 12 cm kg
4 Paku Skrup buah

XI BAHAN FINISHING
1 Cat Kayu/Besi ex.SEIV Kg
2 Plamir Kayu Kg
3 Meni Kayu ex.Nippon Kg
4 Wood Filler Impra Kg
5 Thinner ND IMPALA Ltr
6 Amplas Kayu Lbr
7 Kuas Cat Bh

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
(Dalam Rupiah (R

NO JENIS BAHAN SPESIFIKASI SATUAN

1 2 3 4

8 Cat Tembok kw1 ex.Dulux ; Warna Standard Kg

ex.Vinilex ; Warna
9 Cat Tembok kw2 Kg
Standard
10 Plamir Tembok Kg
11 Lem Kayu Kg
12 Seal Tape Bh
13 Minyak Bekisting Ltr

XXI BAHAN SANITARI


1 Washtafel LW 240 CJ ex Toto,Komplit Kran & ACC
2 Kloset Duduk CW600J/SW660 J Komplit ACC
3 Kloset Jongkok Type CE6 ex.Toto Unit
4 Urinoir Type U 57 M ex.Toto Unit
5 Bak Air fibreglass uk.55 x 55 x 60 cm M³
6 Shower Pray type THX 20 NBPIV ex.Toto M³
7 Shower Set type TX 423 SZ ex.Toto M³
8 Floor Drain TX 1B ex.Toto M³
9 Tempat Sabun S 11 N EX.Toto
10 Kran zink T 30 AR13NV7N ex.Toto M³
11 Kitchenzink Hwaco 1L M³
12 Kran Dinding type T23 B13V7N ex. Toto

XIII BAHAN PARTISI DINDING


1 Gypsumboard t.9 mm ex.Jayaboard;uk120x240 c lbr
2 List Profil 5 cm Gypsum m
3 Rangka Metal Furing termasuk paku ripet& acc m²

XIV BAHAN SALURAN AIR


1 PIPA PVC dia 1/2" ex.Wavin; P.4m m'
2 PIPA PVC dia 3/4" ex.Wavin; P.4m m'
3 PIPA PVC dia 1" ex.Wavin; P.4m m'
4 PIPA PVC dia 2" ex.Wavin; P.4m m'
5 PIPA PVC dia 3" ex.Wavin; P.4m m'
6 PIPA PVC dia 4" ex.Wavin; P.4m m'
7 Stop Kran dia 1" ex.Onda bh
8 Klep Diameter3/4" ex.Onda bh
9 Tangki Air 1000 Liter EXEL bh
10 Tangki Air 100 Liter EXEL bh
11 Pelampung Otomats bh
12 Roof Drain Metal bh
13 Mesin Jet Pump Kap.250 Wat Groundfos Unit
14 Mesin Pompa Tekan Kap.150 wat Groundfos Unit

XV PERALATAN ELEKTRIKAL

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
(Dalam Rupiah (R

NO JENIS BAHAN SPESIFIKASI SATUAN

1 2 3 4
1 Box Panel PVC isi 4 MCB Legran Buah
2 MCB 6 A Legran Buah
3 MCB 4 A Legran Buah
4 Kabel NYM 2 X 2,5 mm2 m'
5 Kabel NYM 3 X 2,5 mm2 m'
6 Kabel telephone 4 x 0,5 mm m'
7 Isolasi Buah
8 Saklar Tunggal Broco Buah
9 Saklar Ganda Broco Buah
10 Stop Kontak Broco Buah
11 Outlet TV Broco Buah
12 Outlet Telephone Broco Buah
13 Down Light/ PLC 13 W Buah
14 Fitting Plafond + Lampu SL Panasonic Buah
15 Lampu TL 2 x 18 wat grile Panasonic Buah
16 Lampu TL 2 x 36 wat grile Panasonic Buah

XVI UPAH PEKERJA


1 Tukang Besi Konstruksi Org/Hari
2 Tukang Besi Tulangan Org/Hari
3 Kepala Tukang Besi Org/Hari
(Plafond,Kuda/Gording,R.A
4 Tukang Kayu Kasar Org/Hari
tap)
5 Tukang Kayu Halus Kusen Org/Hari
6 Kepala Tukang Kayu Org/Hari
7 Tukang Batu Kasar Tukang Batu Kasar Org/Hari
Tukang Batu
8 Tukang Batu Halus Halus( Bata,Plester,Acian Org/Hari
list2)
9 Kepala Tukang Batu Org/Hari
10 Tukang Cat Biasa Org/Hari
11 Kepala Tukang Cat Org/Hari
12 Tukang Listrik Org/Hari
13 Kepala Tukang Listrik Org/Hari
14 Pekerja Org/Hari
15 Mandor Org/Hari

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
ATUAN BAHAN BANGUNAN DAN UPAH KERJA
NTAH PROVINSI SULAWESI SELATAN
KABUPATEN LUWU TIMUR
TAHUN 2018

(Dalam Rupiah (Rp)

HARGA

700
Rp 10,000
250,000
375,000
335,000
375,000
190,000
150,000
140,000
140,000

70,000
9,000

13,000
14,000
13,000
275,000
285,000
25,000

9,250,000
4,750,000
3,150,000
2,100,000
17,500

85,000
115,000
196,000
275,000
35,000
375,000

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
(Dalam Rupiah (Rp)

HARGA

5
160,000
45,000
199,000
70,000
16,500
659,375
30,000

65,000
75,000
195,000

82,700
308,700
7,600
22,800

6,100
12,100
14,600
19,100
56,900

132,300
185,400
228,500

25,000
25,000
25,000
1,050

57,600
34,200
44,600.0
48,000
32,100
7,100
17,600

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
(Dalam Rupiah (Rp)

HARGA

60,700

36,400

34,200
35,000
13,500
14,100

696,200
2,311,400
385,900
1,771,800
575,700
256,000
680,700
46,400
42,300
55,000
355,000
35,000

90,000
22,100
55,000

18,000
23,000
30,000
55,000
99,500
170,000
39,900
29,500
1,465,000
950,000
55,000
38,000
1,075,000
575,000

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
(Dalam Rupiah (Rp)

HARGA

120,000
120,000
130,000

120,000

120,000
130,000
120,000

120,000

130,000
120,000
130,000
120,000
130,000
107,323
130,000

Harga Satuan Bahan Bangunan dan Upah Kerja Triwulan IV Tahun 2018
STANDAR HARGA SATUAN BAHAN BANGUNAN DAN UPAH KERJA
PEMERINTAH PROVINSI SULAWESI SELATAN
KABUPATN BARRU
TAHUN 2016
Dalam Rupiah (Rp)
NO BAHAN DASAR SPESIFIKASI SATUAN HARGA
1 2 3 4 5
BAHAN DASAR
1 Batu Gunung / Kali
2 Kerikil Tersaring 2 - 3 cm
3 Batu Belah 10 - 15 cm
4 Batu Belah 7 - 10 cm
5 Batu Belah 5 - 7 cm
6 Batu Belah 3 - 5 cm
7 Batu Belah 2 - 3 cm
8 Batu Belah 1 - 2 cm
9 Batu Belah 0.5 - 1 cm
10 Gorong2 Beton dia. 40 cm
11 Gorong2 Beton dia. 60 cm
12 Gorong2 Beton dia. 80 cm
13 Gorong2 Beton dia. 100 cm
14 Gorong-gorong dia. 30 cm
15 Paving Block
16 Pasir Urug
17 Pasir
18 Timbunan Pilihan
19 Batu Bata
20 Kapur Pasangan
21 Bambu
22 Ijuk
BAHAN SEMEN
1 Portland Cement PC (@ 50kg/zak)
- Merek Tonasa
- Merek Bososwa
2 Portland Cement PC (@ 40kg/zak)
- Merek Tonasa
- Merek Bososwa
3 Semen Putih (@ 50kg/zak)
BAHAN BESI
1 Besi Beton Ø 4
Besi Beton Ø 6
Besi Beton Ø 8
Besi Beton Ø 10
Besi Beton Ø 12

Harga Satuan Bahan Bangunan dan Upah Kerja Semester I Tahun 2016328
Dalam Rupiah (Rp)
NO BAHAN DASAR SPESIFIKASI SATUAN HARGA
1 2 3 4 5
Besi Beton Ø 14
Besi Beton Ø 16
Besi Beton Ø 18
Besi Beton Ø 20
Besi Beton Ø 22
2 Kawat Beton
3 Kawat Ram
4 Kawat Duri
5 Mur/Baut diameter 20 mm
6 Mur/Baut diameter 25 mm
7 Mur/Baut diameter 18 mm
8 Mur/Baut diameter 10 mm
9 Beugel U. 40.40 mm
10 Beugel Strip 40.40 mm
11 Paku Gording panjang . 5 cm
12 Paku Biasa 6-10 Cm
13 Paku Biasa 2-5 Cm
14 Paku Seng Biasa
15 Paku Beton
16 Paku Asbes
17 Paku Les
18 Trali Naco (Besi Batangan)
19 Rangka Naco/Batang
BAHAN LANTAI DAN DINDING
1 Tegel Kramik warna 40x40 cm
2 Tegel Kramik 30x30 cm(Polos)
3 Tegel Kramik 20x20 cm(Alur)
4 Tegel Kramik 20x20 cm(Polos)
5 Tegel ubin warna 20x20 cm
6 Tegel plit 10x30
7 Paving Blok tebal 6 cm
8 Teakwood 120x 240 cm Tebal 3 mm
9 Loster Kramik
BAHAN KAYU
1 Kayu kelas I Jenis Ulin
- Balok
- Papan
2 Kayu kelas I Jenis Bayam
- Balok
- Papan
3 Kayu kelas II Jenis Kapur
- Balok
- Papan

Harga Satuan Bahan Bangunan dan Upah Kerja Semester I Tahun 2016329
Dalam Rupiah (Rp)
NO BAHAN DASAR SPESIFIKASI SATUAN HARGA
1 2 3 4 5
4 Kayu kelas III
- Balok
- Papan
5 Kayu Untuk Perancah
7 Les Kayu Plafond 1 x 4 cm kls II
BAHAN ATAP
1 Seng Gelombang BWG 32" BJLS 0.25 mm
2 Seng BWG 33" BJLS 0.20 mm
3 Bumbungan Seng 90 x 180 cm
4 Seng plat BWG 28"
5 Seng Gelombang BWG 33"
6 Karet Talang
7 Multi Roof
8 Nok Multi Roof
9 Surya Roof
10 Nok Surya Roof
11 Main Trus C 85
12 Reng U Type 41
13 Screw 12-14x20
14 Screw 10 - 16 x 16
15 Baaut Dinabolt
BAHAN KACA
1 Kaca Bening Tebal 3 mm
2 Kaca Bening Tebal 5 mm
3 Kaca Naco Panjang 60 cm
BAHAN KUNCI DAN PENGGANTUNG
1 Kunci Tanam 2x Putar
2 Kunci Merk "Yale" 2X Slag
3 Kunci lemari mutu baik
4 Engsel Pintu ( Kuningan)
5 Engsel Jendela ( Kuningan)
6 Grendel Pintu dan Jendela
7 Hak Angin / Hak Angin Lipat / No.7"
8 Pegangan / Tarikan Jendela + Pintu
9 Kait Jendela Jungkit / Kait Angin
BAHAN CAT
1 Cat Meni Kayu/ Besi "Altex"
2 Minyak Bekisting
3 Cat Kayu Merk "AVIAN"
4 Cat Kilap Merk "Altex"
5 Plamur
6 Politur
7 Dempul

Harga Satuan Bahan Bangunan dan Upah Kerja Semester I Tahun 2016330
Dalam Rupiah (Rp)
NO BAHAN DASAR SPESIFIKASI SATUAN HARGA
1 2 3 4 5
8 Minyak Cat ( Afduner)
9 Kertas Gosok ( Amplas)
10 Cat Tembok "Aries"
11 Cat Tembok "Maritex"
12 Cat Tembok "Avitex"
13 Cat Atap Seng Merk "AGA"
14 Bahan Anti Rayap
BAHAN SANITASI
1 Floor Drain
2 Dol Penguras
3 Closed Jongkok Merek TOTO
4 Closed Duduk Merek TOTO
5 Closed Duduk Merek OHO
6 Urinoir Kramik
7 Waestapel
8 Pipa PVC Type D Diameter 4" merk Wavin btg
9 Pipa PVC Type D Diameter 3" merk Wavin btg
10 Pipa PVC Type D Dia 2" Merek Wavin
11 Pipa PVC Type D Dia. 3/4" Merek Wavin btg
12 Pipa PVC Type D Dia. 1/2" Merek Wavin btg
13 Pipa PVC Type AW Diameter 4"
14 Pipa PVC Type AW Diameter 3"
15 Pipa PVC Type AW Diameter 2"
16 Pipa PVC Type AW Diameter ¾"
17 Pipa PVC Type AW Diameter ½"
18 Kran Air 1/2" Merek Amico
19 Kran Air 3/4" Merek Amico
20 Sambungan T dan L PVC Dia. 2"
21 Sambungan L 4"
22 Sambungan L 3"
23 Pas. Sambungan Elbo 3/4"
24 Pas. Sambungan Elbo 1/2"
25 Pas. Sambungan T 1/2"
26 Pas. Sambungan T 3/4"
27 Sambungan T 4"
28 Sambungan T 3"
29 Pas. Socket 3/4"
30 Pas. Sambungan Lurus 1/2"
31 Pipa GIP Dia 2"
32 Lem Pipa @45 gram
BAHAN LISTRIK
1 Sekring Kas 2 Grup
2 Saklar Tunggal

Harga Satuan Bahan Bangunan dan Upah Kerja Semester I Tahun 2016331
Dalam Rupiah (Rp)
NO BAHAN DASAR SPESIFIKASI SATUAN HARGA
1 2 3 4 5
3 Saklar Ganda
4 Saklar Tiga
5 Stop Kontak
6 Lampu SL 20 Wat
7 Lampu SL 15 Wat
8 Pintting Lampu Pijar
9 Lampu Pijar 18 Wat "Philips"
10 Lampu Pijar 15 Wat "Philips"
11 Lampu Pijar 40 Wat "Philips"
12 Pipa Pengaman Kabel
13 Kabel NYA 2.5 mm
14 Kabel NYA 1.5 mm
BAHAN LANGIT - LANGIT
1 Asbes Semen (Eternit) 1 x 1 Meter 3 mm lbr
2 Triplex (1,20 x 2,40 ) cm t = 3 mm
3 Triplex (1,20 x 2,40 ) cm t = 4 mm
4 Triplex (1,20 x 2,40 ) cm t = 6 mm
5 Triplex (1,20 x 2,40 ) cm t = 9 mm
6 Calsibord
7 Gibsun
BAHAN JALAN
1 Sirtu Royalti
2 Aspal Bitumen
3 As - Buton
4 Minyak Flux
5 Minyak Aspal
6 Minyak Tanah Industri
7 Kayu Bakar
8 Karet Elastomerit
9 Plastik Alas Cor
10 Expansion Joint
11 Berat Girder
12 Guide post
13 Pipa besi untuk Sandaran dia. 2.5".
14 Pipa besi untuk Saluran dia. 2"
15 Minyak Pelumas
16 Kawat Beronjong
17 Baja Tralis
18 Baut Baja
19 Besi Galvanis
20 Baja Profil
BAHAN PIPA
S-10

Harga Satuan Bahan Bangunan dan Upah Kerja Semester I Tahun 2016332
Dalam Rupiah (Rp)
NO BAHAN DASAR SPESIFIKASI SATUAN HARGA
1 2 3 4 5
1 PIPA PVC 1/2"
2 PIPA PVC 3/4"
3 PIPA PVC 1"
4 PIPA PVC 1 1/4"
5 PIPA PVC 1 1/2"
6 PIPA PVC 2"
7 PIPA PVC 2 1/2"
8 PIPA PVC 3"
9 PIPA PVC 4"
10 PIPA PVC 5"
11 PIPA PVC 6"
12 PIPA PVC 8" (OD = 200 mm)
13 PIPA PVC 8" (OD = 225 mm)
14 PIPA PVC 10"
15 PIPA PVC 12"
16 PIPA PVC 14"
17 PIPA PVC 16"
18 PIPA PVC 18"
19 PIPA PVC 20"
20 PIPA PVC 24"
S-12,5
1 PIPA PVC 2"
2 PIPA PVC 2 1/2"
3 PIPA PVC 3"
4 PIPA PVC 4"
5 PIPA PVC 5"
6 PIPA PVC 6"
7 PIPA PVC 8" (OD = 200 mm)
8 PIPA PVC 8" (OD = 225 mm)
9 PIPA PVC 10"
10 PIPA PVC 12"
11 PIPA PVC 14"
12 PIPA PVC 16"
13 PIPA PVC 18"
14 PIPA PVC 20"
15 PIPA PVC 24"
ACCESORIES PVC
1. Valve Socket PVC
1 Valve Socket PVC 1/2"
2 Valve Socket PVC 3/4"
3 Valve Socket PVC 1"
4 Valve Socket PVC 1 1/4"
5 Valve Socket PVC 1 1/2"

Harga Satuan Bahan Bangunan dan Upah Kerja Semester I Tahun 2016333
Dalam Rupiah (Rp)
NO BAHAN DASAR SPESIFIKASI SATUAN HARGA
1 2 3 4 5
6 Valve Socket PVC 2"
7 Valve Socket PVC 2 1/2"
8 Valve Socket PVC 3"
9 Valve Socket PVC 4"
2.TS. Cap/Dop PVC
1 TS. Cap/Dop PVC 1/2"
2 TS. Cap/Dop PVC 3/4"
3 TS. Cap/Dop PVC 1"
4 TS. Cap/Dop PVC 1 1/4"
5 TS. Cap/Dop PVC 1 1/2"
6 TS. Cap/Dop PVC 2"
7 TS. Cap/Dop PVC 2 1/2"
8 TS. Cap/Dop PVC 3"
9 TS. Cap/Dop PVC 4"
10 TS. Cap/Dop PVC 5"
11 TS. Cap/Dop PVC 6"
12 TS. Cap/Dop PVC 8"
13 TS. Cap/Dop PVC 10"
14 TS. Cap/Dop PVC 12"
3. Bell Cap/Dop PVC
1 Bell Cap/Dop PVC 2"
2 Bell Cap/Dop PVC 3"
3 Bell Cap/Dop PVC 4"
4 Bell Cap/Dop PVC 6"
5 Bell Cap/Dop PVC 8"
6 Bell Cap/Dop PVC 10"
7 Bell Cap/Dop PVC 12"
8 Bell Cap/Dop PVC 14"
4. Dressert Join PVC
1 Dressert Join PVC 2"
2 Dressert Join PVC 3"
3 Dressert Join PVC 4"
4 Dressert Join PVC 6"
5 Dressert Join PVC 8"
6 Dressert Join PVC 10"
7 Dressert Join PVC 12"
8 Dressert Join PVC 14"
9 Dressert Join PVC 16"
5. TS. Socket PVC
1 TS. Socket PVC 1/2"
2 TS. Socket PVC 3/4"
3 TS. Socket PVC 1"
4 TS. Socket PVC 1 1/4"

Harga Satuan Bahan Bangunan dan Upah Kerja Semester I Tahun 2016334
Dalam Rupiah (Rp)
NO BAHAN DASAR SPESIFIKASI SATUAN HARGA
1 2 3 4 5
5 TS. Socket PVC 1 1/2"
6 TS. Socket PVC 2"
7 TS. Socket PVC 2 1/2"
8 TS. Socket PVC 3"
9 TS. Socket PVC 4"
10 TS. Socket PVC 5"
11 TS. Socket PVC 6"
12 TS. Socket PVC 8"
13 TS. Socket PVC 10"
14 TS. Socket PVC 12"
6. Bell Socket PVC
1 Bell Socket PVC 2"
2 Bell Socket PVC 3"
3 Bell Socket PVC 4"
4 Bell Socket PVC 6"
5 Bell Socket PVC 8"
6 Bell Socket PVC 10"
7 Bell Socket PVC 12"
8 Bell Socket PVC 14"
9 Bell Socket PVC 16"
10 Bell Socket PVC 20"
11 Bell Socket PVC 24"
7. Bell Reducer PVC
1 Bell Reducer PVC 2 x 1 1/2"
2 Bell Reducer PVC 3 x 2"
3 Bell Reducer PVC 4 x 3"
4 Bell Reducer PVC 5 x 4"
5 Bell Reducer PVC 6 x 4"
6 Bell Reducer PVC 8 x 6"
7 Bell Reducer PVC 10 x 8"
8 Bell Reducer PVC 12 x 4"
9 Bell Reducer PVC 12 x 10"
10 Bell Reducer PVC 14 x 12"
11 Bell Reducer PVC 16 x 14"
8. TS. Reducing Socket PVC
1 TS. Reducing Socket PVC 3/4 x 1/2"
2 TS. Reducing Socket PVC 1 x 1/2"
3 TS. Reducing Socket PVC 1 x 3/4"
4 TS. Reducing Socket PVC 1 1/4 x 1"
5 TS. Reducing Socket PVC 1 1/2 x 1"
6 TS. Reducing Socket PVC 1 1/2 x 1 1/4"
7 TS. Reducing Socket PVC 2 x 1"
8 TS. Reducing Socket PVC 2 x 1 1/4"

Harga Satuan Bahan Bangunan dan Upah Kerja Semester I Tahun 2016335
Dalam Rupiah (Rp)
NO BAHAN DASAR SPESIFIKASI SATUAN HARGA
1 2 3 4 5
9 TS. Reducing Socket PVC 2 x 1 1/2"
10 TS. Reducing Socket PVC 2 1/2 x 2"
11 TS. Reducing Socket PVC 3 x 2"
12 TS. Reducing Socket PVC 3 x 2 1/2"
13 TS. Reducing Socket PVC 4 x 3"
14 TS. Reducing Socket PVC 5 x 4"
15 TS. Reducing Socket PVC 6 x 4"
16 TS. Reducing Socket PVC 6 x 5"
17 TS. Reducing Socket PVC 8 x 6"
18 TS. Reducing Socket PVC 10 x 8"
19 TS. Reducing Socket PVC 12 x 10"
9. TS. Tee PVC
1 TS. Tee PVC 1/2"
2 TS. Tee PVC 3/4 x 1/2"
3 TS. Tee PVC 3/4"
4 TS. Tee PVC 1 x 1/2"
5 TS. Tee PVC 1 x 3/4"
6 TS. Tee PVC 1 x 1"
7 TS. Tee PVC 1 1/4 x 3/4"
8 TS. Tee PVC 1 1/4 x 1"
9 TS. Tee PVC 1 1/4"
10 TS. Tee PVC 1 1/2 x 1"
11 TS. Tee PVC 1 1/2 x 1 1/4"
12 TS. Tee PVC 1 1/2"
13 TS. Tee PVC 2 x 1/2"
14 TS. Tee PVC 2 x 3/4"
15 TS. Tee PVC 2 x 1"
16 TS. Tee PVC 2 x 1 1/2"
17 TS. Tee PVC 2 x 2"
18 TS. Tee PVC 2 1/2 x 1 1/2"
19 TS. Tee PVC 2 1/2 x 2"
20 TS. Tee PVC 2 1/2"
21 TS. Tee PVC 3 x 1"
22 TS. Tee PVC 3 x 1 1/2"
23 TS. Tee PVC 3 x 2"
24 TS. Tee PVC 3 x 2 1/2"
25 TS. Tee PVC 3 x 3"
26 TS. Tee PVC 4 x 2"
27 TS. Tee PVC 4 x 3"
28 TS. Tee PVC 4 x 4"
29 TS. Tee PVC 5 x 5"
30 TS. Tee PVC 6 x 3"
31 TS. Tee PVC 6 x 4"

Harga Satuan Bahan Bangunan dan Upah Kerja Semester I Tahun 2016336
Dalam Rupiah (Rp)
NO BAHAN DASAR SPESIFIKASI SATUAN HARGA
1 2 3 4 5
32 TS. Tee PVC 6 x 6"
10. Bell Tee Bell Branch PVC
1 Bell Tee Bell Branch PVC 2 x 2"
2 Bell Tee Bell Branch PVC 3 x 2"
3 Bell Tee Bell Branch PVC 3 x 3"
4 Bell Tee Bell Branch PVC 4 x 2"
5 Bell Tee Bell Branch PVC 4 x 3"
6 Bell Tee Bell Branch PVC 4 x 4"
7 Bell Tee Bell Branch PVC 5 x 3"
8 Bell Tee Bell Branch PVC 5 x 4"
9 Bell Tee Bell Branch PVC 5 x 5"
10 Bell Tee Bell Branch PVC 6 x 2"
11 Bell Tee Bell Branch PVC 6 x 3"
12 Bell Tee Bell Branch PVC 6 x 4"
13 Bell Tee Bell Branch PVC 6 x 6"
11. Flange Spigot PVC / Flange Socket PVC
1 Flange Spigot PVC / Flange Socket PVC 1 1/2"
2 Flange Spigot PVC / Flange Socket PVC 2"
3 Flange Spigot PVC / Flange Socket PVC 2 1/2"
4 Flange Spigot PVC / Flange Socket PVC 3"
5 Flange Spigot PVC / Flange Socket PVC 4"
6 Flange Spigot PVC / Flange Socket PVC 5"
7 Flange Spigot PVC / Flange Socket PVC 6"
8 Flange Spigot PVC / Flange Socket PVC 8"
9 Flange Spigot PVC / Flange Socket PVC 10"
10 Flange Spigot PVC / Flange Socket PVC 12
11 Flange Spigot PVC / Flange Socket PVC 14"
12 Flange Spigot PVC / Flange Socket PVC 16'
13 Flange Spigot PVC / Flange Socket PVC 20"
12. Flange Bell End PVC
1 Flange Bell End PVC 2"
2 Flange Bell End PVC 2 1/2"
3 Flange Bell End PVC 3"
4 Flange Bell End PVC 4"
5 Flange Bell End PVC 5"
6 Flange Bell End PVC 6"
7 Flange Bell End PVC 8"
8 Flange Bell End PVC 10"
9 Flange Bell End PVC 12"
10 Flange Bell End PVC 14"
11 Flange Bell End PVC 16"
12 Flange Bell End PVC 20"
13. TS. Bend 90' PVC

Harga Satuan Bahan Bangunan dan Upah Kerja Semester I Tahun 2016337
Dalam Rupiah (Rp)
NO BAHAN DASAR SPESIFIKASI SATUAN HARGA
1 2 3 4 5
1 TS. Bend 90' PVC 1/2"
2 TS. Bend 90' PVC 3/4"
3 TS. Bend 90' PVC 1"
4 TS. Bend 90' PVC 1 1/4"
5 TS. Bend 90' PVC 1 1/2"
6 TS. Bend 90' PVC 2"
7 TS. Bend 90' PVC 2 1/2"
8 TS. Bend 90' PVC 3"
9 TS. Bend 90' PVC 4"
10 TS. Bend 90' PVC 5"
11 TS. Bend 90' PVC 6"
12 TS. Bend 90' PVC 8"
13 TS. Bend 90' PVC 10"
14 TS. Bend 90' PVC 12"
14. TS. Bend 45' PVC
1 TS. Bend 45' PVC 1/2"
2 TS. Bend 45' PVC 3/4"
3 TS. Bend 45' PVC 1"
4 TS. Bend 45' PVC 1 1/4"
5 TS. Bend 45' PVC 1 1/2"
6 TS. Bend 45' PVC 2"
7 TS. Bend 45' PVC 2 1/2"
8 TS. Bend 45' PVC 3"
9 TS. Bend 45' PVC 4"
10 TS. Bend 45' PVC 5"
11 TS. Bend 45' PVC 6"
12 TS. Bend 45' PVC 8"
13 TS. Bend 45' PVC 10"
14 TS. Bend 45' PVC 12"
15. TS. Bend 22 1/2' PVC
1 TS. Bend 22 1/2' PVC 1/2"
2 TS. Bend 22 1/2' PVC 3/4"
3 TS. Bend 22 1/2' PVC 1"
4 TS. Bend 22 1/2' PVC 1 1/4"
5 TS. Bend 22 1/2' PVC 1 1/2"
6 TS. Bend 22 1/2' PVC 2"
7 TS. Bend 22 1/2' PVC 2 1/2"
8 TS. Bend 22 1/2' PVC 3"
9 TS. Bend 22 1/2' PVC 4"
10 TS. Bend 22 1/2' PVC 5"
11 TS. Bend 22 1/2' PVC 6"
12 TS. Bend 22 1/2' PVC 8"
14 TS. Bend 22 1/2' PVC 12"

Harga Satuan Bahan Bangunan dan Upah Kerja Semester I Tahun 2016338
Dalam Rupiah (Rp)
NO BAHAN DASAR SPESIFIKASI SATUAN HARGA
1 2 3 4 5
16. TS. Bend 11 1/4' PVC
1 TS. Bend 11 1/4' PVC 1/2"
2 TS. Bend 11 1/4' PVC 3/4"
3 TS. Bend 11 1/4' PVC 1"
4 TS. Bend 11 1/4' PVC 1 1/4"
5 TS. Bend 11 1/4' PVC 1 1/2"
6 TS. Bend 11 1/4' PVC 2"
7 TS. Bend 11 1/4' PVC 2 1/2"
8 TS. Bend 11 1/4' PVC 3"
9 TS. Bend 11 1/4' PVC 4"
10 TS. Bend 11 1/4' PVC 5"
11 TS. Bend 11 1/4' PVC 6"
12 TS. Bend 11 1/4' PVC 8"
13 TS. Bend 11 1/4' PVC 10"
14 TS. Bend 11 1/4' PVC 12"
17. Bell Bend 90' PVC
1 Bell Bend 90' PVC 2"
2 Bell Bend 90' PVC 2 1/2"
3 Bell Bend 90' PVC 3"
4 Bell Bend 90' PVC 4"
5 Bell Bend 90' PVC 5"
6 Bell Bend 90' PVC 6"
7 Bell Bend 90' PVC 8"
8 Bell Bend 90' PVC 10"
9 Bell Bend 90' PVC 12"
10 Bell Bend 90' PVC 14"
11 Bell Bend 90' PVC 16"
12 Bell Bend 90' PVC 20"
13 Bell Bend 90' PVC 24"
18. Bell Bend 45' PVC
1 Bell Bend 45' PVC 2"
2 Bell Bend 45' PVC 2 1/2"
3 Bell Bend 45' PVC 2"
4 Bell Bend 45' PVC 2"
5 Bell Bend 45' PVC 2"
6 Bell Bend 45' PVC 2"
7 Bell Bend 45' PVC 2"
8 Bell Bend 45' PVC 2"
9 Bell Bend 45' PVC 2"
10 Bell Bend 45' PVC 2"
11 Bell Bend 45' PVC 2"
12 Bell Bend 45' PVC 2"
13 Bell Bend 45' PVC 2"

Harga Satuan Bahan Bangunan dan Upah Kerja Semester I Tahun 2016339
Dalam Rupiah (Rp)
NO BAHAN DASAR SPESIFIKASI SATUAN HARGA
1 2 3 4 5
18. Bell Bend 45' PVC
1 Bell Bend 45' PVC 2"
2 Bell Bend 45' PVC 2 1/2"
3 Bell Bend 45' PVC 2"
4 Bell Bend 45' PVC 2"
5 Bell Bend 45' PVC 2"
6 Bell Bend 45' PVC 2"
7 Bell Bend 45' PVC 2"
8 Bell Bend 45' PVC 2"
9 Bell Bend 45' PVC 2"
10 Bell Bend 45' PVC 2"
11 Bell Bend 45' PVC 2"
12 Bell Bend 45' PVC 2"
13 Bell Bend 45' PVC 2"
19. Bell Bend 22 1/2' PVC
1 Bell Bend 22 1/2' PVC 2"
2 Bell Bend 22 1/2' PVC 2 1/2"
3 Bell Bend 22 1/2' PVC 3"
4 Bell Bend 22 1/2' PVC 4"
5 Bell Bend 22 1/2' PVC 5"
6 Bell Bend 22 1/2' PVC 6"
7 Bell Bend 22 1/2' PVC 8"
8 Bell Bend 22 1/2' PVC 10"
9 Bell Bend 22 1/2' PVC 12"
10 Bell Bend 22 1/2' PVC 14"
11 Bell Bend 22 1/2' PVC 16"
12 Bell Bend 22 1/2' PVC 20"
13 Bell Bend 22 1/2' PVC 24"
20. Bell Bend PVC 11 1/4' PVC
1 Bell Bend PVC 11 1/4' PVC 2"
2 Bell Bend PVC 11 1/4' PVC 2 1/2"
3 Bell Bend PVC 11 1/4' PVC 3"
4 Bell Bend PVC 11 1/4' PVC 4"
5 Bell Bend PVC 11 1/4' PVC 5"
6 Bell Bend PVC 11 1/4' PVC 6"
7 Bell Bend PVC 11 1/4' PVC 8"
8 Bell Bend PVC 11 1/4' PVC 10"
9 Bell Bend PVC 11 1/4' PVC 12"
10 Bell Bend PVC 11 1/4' PVC 14"
11 Bell Bend PVC 11 1/4' PVC 16"
12 Bell Bend PVC 11 1/4' PVC 20"
13 Bell Bend PVC 11 1/4' PVC 24"
21. Solvent Cement Pralon (500 gr/klg)

Harga Satuan Bahan Bangunan dan Upah Kerja Semester I Tahun 2016340
Dalam Rupiah (Rp)
NO BAHAN DASAR SPESIFIKASI SATUAN HARGA
1 2 3 4 5
22. Lubricant (1 kg / klg)
PIPA BAJA
1 Pipa Baja 1/2"
2 Pipa Baja 3/4"
3 Pipa Baja 1"
4 Pipa Baja 1 1/4"
5 Pipa Baja 1 1/2"
6 Pipa Baja 2"
7 Pipa Baja 2 1/2"
Rp Pipa Baja 3"
9 Pipa Baja 4"
10 Pipa Baja 5"
11 Pipa Baja 6"
12 Pipa Baja 8"
13 Pipa Baja 10"
14 Pipa Baja 12"
15 Pipa Baja 14"
16 Pipa Baja 16"
ACCESORIES GIP
1. Knie / Elbow 90'
1 Dia. 1/2"
2 Dia. 3/4"
3 Dia. 1"
4 Dia. 1 1/4"
5 Dia. 1 1/2"
6 Dia. 2"
7 Dia. 2 1/2"
8 Dia. 3"
9 Dia. 4"
10 Dia. 5"
11 Dia. 6"
2. Knie / Elbow 45'
1 Dia. 1/2"
2 Dia. 3/4"
3 Dia. 1"
4 Dia. 1 1/4"
5 Dia. 1 1/2"
6 Dia. 2"
7 Dia. 2 1/2"
8 Dia. 3"
9 Dia. 4"
10 Dia. 5"
11 Dia. 6"

Harga Satuan Bahan Bangunan dan Upah Kerja Semester I Tahun 2016341
Dalam Rupiah (Rp)
NO BAHAN DASAR SPESIFIKASI SATUAN HARGA
1 2 3 4 5
3. Tee
1 Dia. 1/2"
2 Dia. 3/4"
3 Dia. 1"
4 Dia. 1 1/4"
5 Dia. 1 1/2"
6 Dia. 2"
7 Dia. 2 1/2"
8 Dia. 3"
9 Dia. 4"
10 Dia. 6"
4. Bend 90' / Boch
1 Dia. 1/2"
2 Dia. 3/4"
3 Dia. 1"
4 Dia. 1 1/4"
5 Dia. 1 1/2"
6 Dia. 2"
7 Dia. 2 1/2"
8 Dia. 3"
9 Dia. 4"
5. Watermuur / Union
1 Dia. 1/2"
2 Dia. 3/4"
3 Dia. 1"
4 Dia. 1 1/4"
5 Dia. 1 1/2"
6 Dia. 2"
7 Dia. 2 1/2"
8 Dia. 3"
9 Dia. 4"
10 Dia. 6"
6. Double Nipple
1 Dia. 1/2"
2 Dia. 3/4"
3 Dia. 1"
4 Dia. 1 1/4"
5 Dia. 1 1/2"
6 Dia. 2"
7 Dia. 2 1/2"
8 Dia. 3"
9 Dia. 4"
10 Dia. 5"

Harga Satuan Bahan Bangunan dan Upah Kerja Semester I Tahun 2016342
Dalam Rupiah (Rp)
NO BAHAN DASAR SPESIFIKASI SATUAN HARGA
1 2 3 4 5
11 Dia. 6"
7. Socket
1 Dia. 1/2"
2 Dia. 3/4"
3 Dia. 1"
4 Dia. 1 1/4"
5 Dia. 1 1/2"
6 Dia. 2"
7 Dia. 2 1/2"
8 Dia. 3"
9 Dia. 4"
10 Dia. 5"
11 Dia. 6"
8. Plug Close End
1 Dia. 1/2"
2 Dia. 3/4"
3 Dia. 1"
4 Dia. 1 1/4"
5 Dia. 1 1/2"
6 Dia. 2"
7 Dia. 2 1/2"
8 Dia. 3"
9 Dia. 4"
10 Dia. 6"
9. Cap / Dop
1 Dia. 1/2"
2 Dia. 3/4"
3 Dia. 1"
4 Dia. 1 1/4"
5 Dia. 1 1/2"
6 Dia. 2"
7 Dia. 2 1/2"
8 Dia. 3"
9 Dia. 4"
10 Dia. 6"
10. Verlop Tee / Reducer
1 Dia. 3/4"
2 Dia. 1"
3 Dia. 1 1/4"
4 Dia. 1 1/2"
5 Dia. 2"
6 Dia. 2 1/2"
7 Dia. 3"

Harga Satuan Bahan Bangunan dan Upah Kerja Semester I Tahun 2016343
Dalam Rupiah (Rp)
NO BAHAN DASAR SPESIFIKASI SATUAN HARGA
1 2 3 4 5
8 Dia. 4"
9 Dia. 6"
11. Verlop Socket / Reducer
1 Dia. 3/4"
2 Dia. 1"
3 Dia. 1 1/4"
4 Dia. 1 1/2"
5 Dia. 2"
6 Dia. 2 1/2"
7 Dia. 3"
8 Dia. 4"
9 Dia. 6"
12. Verlop Ring / Flow Ring
1 Dia. 3/4"
2 Dia. 1"
3 Dia. 1 1/4"
4 Dia. 1 1/2"
5 Dia. 2"
6 Dia. 2 1/2"
7 Dia. 3"
8 Dia. 4"
9 Dia. 6"
13. Verlop Knie / Verlop Elbow
1 Dia. 3/4"
2 Dia. 1"
3 Dia. 1 1/4"
4 Dia. 1 1/2"
5 Dia. 2"
14. Verlop Nipple
1 Dia. 3/4"
2 Dia. 1"
3 Dia. 1 1/4"
4 Dia. 1 1/2"
5 Dia. 2"
15. Gilbout Joint For PVC
1 Dia. 2"
2 Dia. 3"
3 Dia. 4"
4 Dia. 6"
5 Dia. 8"
6 Dia. 10"
16. Gilbout Joint For ACP
1 Dia. 2"

Harga Satuan Bahan Bangunan dan Upah Kerja Semester I Tahun 2016344
Dalam Rupiah (Rp)
NO BAHAN DASAR SPESIFIKASI SATUAN HARGA
1 2 3 4 5
2 Dia. 3"
3 Dia. 4"
4 Dia. 6"
5 Dia. 8"
6 Dia. 10"
7 Dia. 12"
8 Dia. 14"
17. Clamp Saddle
1 Dia. 2 x 1/2"
2 Dia. 2 x 3/4"
3 Dia. 2 x 1"
4 Dia. 3 x 1/2"
5 Dia. 3 x 3/4"
6 Dia. 3 x 1"
7 Dia. 3 x 1 1/2"
8 Dia. 3 x 2"
9 Dia. 4 x 1/2"
10 Dia. 4 x 3/4"
11 Dia. 4 x 1"
12 Dia. 4 x 1 1/2"
13 Dia. 4 x 2"
14 Dia. 6 x 1/2"
15 Dia. 6 x 3/4"
16 Dia. 6 x 1"
17 Dia. 6 x 1 1/2"
18 Dia. 6 x 2"
19 Dia. 6 x 3"
20 Dia. 8 x 1/2"
21 Dia. 8 x 3/4"
22 Dia. 8 x 1"
23 Dia. 8 x 2"
24 Dia. 8 x 3"
18. Street Box / Valve Cover
1 Dia. 2"
2 Dia. 3"
3 Dia. 4"
4 Dia. 6"
5 Dia. 8"
6 Dia. 10"
19. Flange Steel JIS 10K
1 Dia. 2"
2 Dia. 3"
3 Dia. 4"

Harga Satuan Bahan Bangunan dan Upah Kerja Semester I Tahun 2016345
Dalam Rupiah (Rp)
NO BAHAN DASAR SPESIFIKASI SATUAN HARGA
1 2 3 4 5
4 Dia. 6"
5 Dia. 8"
6 Dia. 10"
7 Dia. 12"
20. Lem Pipa PVC
1 @ 600 gram / kaleng
2 @ 45 gram / tube
21. Gate Valve Merk Arrow JIS 10K
1 Dia. 2"
2 Dia. 3"
3 Dia. 4"
4 Dia. 6"
5 Dia. 8"
6 Dia. 10"
7 Dia. 12"
SUB BIDANG HARGA UPAH PEKERJAAN KONSTRUKSI
1 Mandor
2 Mekanik
3 Mekanik Pembantu
4 Tukang Kepala
5 Tukang
6 Operator
7 Operator Tak Terlatih
8 Pembantu Operator
9 Sopir
10 Sopir Personil
11 Pembantu Sopir
12 Buruh Tak Terlatih
13 Buruh Agak Terlatih
14 Buruh Terlatih

Harga Satuan Bahan Bangunan dan Upah Kerja Semester I Tahun 2016346

Anda mungkin juga menyukai