Nama Paket: Survey Kondisi Jalan PPK: Peningkatan Jalan Dan Jembatan Sumber Dana: DAK TA. 2020
Nama Paket: Survey Kondisi Jalan PPK: Peningkatan Jalan Dan Jembatan Sumber Dana: DAK TA. 2020
TERBILANG : Err:511
1. BIAYA LANGSUNG PERSONIL
A. TENAGA AHLI Panjang Jalan (Km) : 512
Kebutuhan Survey (bulan) : 3.41
Jumlah Tim : 3
Kebutuhan Survey (bulan) : 1.14
: 1
Harga Satuan
No. Posisi / Jabatan SAT. VOLUME JUMLAH (Rp.)
(Rp. )
1 2 3 4 6 10 = 4 X 6
1 2 3 4 6 10 = 4 X 6
1 Kebutuhan Perkantoran
a. Transportasi
B. BIAYA LAPORAN
Harga Satuan
No. Uraian SAT VOLUME JUMLAH (Rp.)
(Rp. )
1 2 3 4 6 9=4x6
1 2 3 4 6 9=4x6
PAKET
SURVEI KONDISI JALAN, LERENG, DAN JEMBATAN
PROVINSI JAWA TIMUR
SATUAN KERJA BALAI BESAR PELAKSANAAN JALAN NASIONAL VIII
SUMBER DANA APBN MURNI TAHUN ANGGARAN 2019
PORTAL ENGINEERING PERKASA, PT. SECON DWITUNGGAL PUTRA, PT. TRIBUANA REKAYASA (KSO)
E. - BIAYA SURVEY INVENTARISASI DAN KONDISI JALAN DAN JEMBATAN 3,324,425,000 3,324,425,000
TERBILANG : Err:511
PORTAL ENGINEERING PERKASA, PT. SECON DWITUNGGAL PUTRA, PT. TRIBUANA REKAYASA (KSO)
1. BIAYA LANGSUNG PERSONIL
A. TENAGA AHLI PENAWARAN AWAL PENAWARAN TERKOREKSI
Harga Harga
Perkiraan Perkiraan
No. Posisi / Jabatan Nama Satuan Satuan JUMLAH (Rp.) Satuan JUMLAH (Rp.)
Kuantitas Kuantitas
(Rp. ) (Rp. )
1 2 3 4 5 6 7=5x6 5 6 7=5x6
1 Sewa Kantor di Surabaya/ Sidoarjo (maks radius 5 Km dari BBPJN VIII) Bulan 11 35,000,000 385,000,000 11
B. PERJALANAN DINAS
Perkiraan Perkiraan
No. Uraian Satuan JUMLAH (Rp.)
Kuantitas Kuantitas
1 2 3 4 6=4x5 4
a. Transportasi
b. Akomodasi
b. Pengguna Jasa
(Min. Thn. 2018 2400cc 3 RowSeat Automatic Transmission (termasuk Sopir, BBM, GPS dan Asuransi)
- Untuk Pengguna Jasa (Monitoring) ( 1 unit ) UB 11 20,000,000 220,000,000 11
4 Konsep Laporan Akhir/ Khusus (Hasil Survey Semester 2) Buku 3 200,000 600,000 3
(Min. Thn. 2017 MPV 2000cc (termasuk Sopir, BBM, GPS dan Asuransi)
3 Survey Kondisi Geometrik, Video (Mobil Survey Jalan Raya), dan Kondisi Perkerasan Jala KM 5607 275,000 1,541,925,000 5607
(Min. Thn. 2017 MPV 2000cc (termasuk Sopir, BBM, GPS dan Asuransi)
(Min. Thn. 2015 Double Kabin 2500cc (termasuk Sopir, BBM, GPS dan Asuransi)
(Min. Thn. 2017 MPV 2000cc (termasuk Sopir, BBM, GPS dan Asuransi)
3 Sewa Alat VIP UH 2400 100,000 240,000,000 2400
Biaya Survei Pencacahan Lalu Lintas (Otomatis)
(Min. Thn. 2017 MPV 2000cc (termasuk Sopir, BBM, GPS dan Asuransi)
3 Sewa Alat Inventarisasi dan Inspeksi Berkala Jembatan ( 2 unit ) Set Hari 120 1,500,000 180,000,000 120
(GPS, Tablet, Distance Meter, Roll Meter, Drone, Perahu Karet, APD)
(Min. Thn. 2017 MPV 2000cc (termasuk Sopir, BBM, GPS dan Asuransi)
3 Sewa Alat Inventarisasi dan Inspeksi Berkala Jembatan ( 1 set ) Set Hari 90 1,500,000 135,000,000 90
(GPS, Tablet, Distance Meter, Roll Meter, Drone, Perahu Karet, APD)
(Min. Thn. 2017 MPV 2000cc (termasuk Sopir, BBM, GPS dan Asuransi)
3 Sewa Alat Inventarisasi dan Inspeksi Berkala Lereng ( 1 set ) Set Hari 120 1,500,000 180,000,000 120
(GPS, Tablet, Distance Meter, Roll Meter, Drone, Clino Meter, kompas geologi, APD)
35,000,000 385,000,000
13,000,000 143,000,000
1,600,000 17,600,000
1,600,000 67,200,000
1,600,000 115,200,000
1,000,000 12,000,000
1,000,000 132,000,000
800,000 8,800,000
600,000 6,600,000
500,000 5,500,000
600,000 6,600,000
6,600,000 72,600,000
4,000,000 44,000,000
1,016,100,000
JUMLAH (Rp.)
6=4x5
3,500,000 112,000,000
400,000 6,400,000
400,000 6,400,000
500,000 64,000,000
250,000 106,000,000
294,800,000
JUMLAH (Rp.)
6=4x5
12,500,000 137,500,000
12,500,000 150,000,000
20,000,000 220,000,000
2,200,000 48,400,000
555,900,000
JUMLAH (Rp.)
6=4x5
250,000 750,000
120,000 3,960,000
200,000 600,000
200,000 600,000
250,000 750,000
200,000 600,000
1,600,000 19,200,000
2,500,000 2,500,000
28,960,000
Harga
Satuan JUMLAH (Rp.)
(Rp. )
5 6=4x5
250,000 30,000,000
25,000,000 25,000,000
250,000 45,000,000
12,500,000 37,500,000
275,000 1,541,925,000
250,000 45,000,000
12,500,000 37,500,000
250,000 75,000,000
15,000,000 150,000,000
250,000 50,000,000
12,500,000 100,000,000
100,000 240,000,000
10,000,000 110,000,000
250,000 100,000,000
12,500,000 50,000,000
1,500,000 180,000,000
250,000 45,000,000
12,500,000 37,500,000
1,500,000 135,000,000
250,000 60,000,000
12,500,000 50,000,000
1,500,000 180,000,000
3,324,425,000
KEWAJARAN HARGA
1 2 4 5 6 7=5x6 8 9
Harsat Penawaran >=
koef
Rp(Bln) =koef x Rp(bln) KEPMEN PUPR
jatim NO.897/KPTS/M/2017
1 Ketua Tim/ Ahli Teknik Jal OB 11 33,600,000 369,600,000 0.926 37,250,000 34,493,500 TIDAK WAJAR
2 Ahli Teknik Jalan OB 18 20,200,000 363,600,000 0.926 22,500,000 20,835,000 TIDAK WAJAR
3 Ahli Teknik Lalu Lintas OB 10 20,200,000 202,000,000 0.926 22,500,000 20,835,000 TIDAK WAJAR
4 Ahli Teknik Jembatan OB 5 20,200,000 101,000,000 0.926 22,500,000 20,835,000 TIDAK WAJAR
Bab III IKP huruf E.29.4 bahwa "Kewajaran biaya pada Rincian Biaya Langsung Personel didasarkan kepada peraturan
perundang-undangan yang terkait dengan standar remunerasiTenaga Ahli." dan Bab III IKP huruf E. 29.6 bahwa "Apabila
dalam evaluasi penawaran biaya ditemukan bukti harga tidak wajar maka nilai penawaran biaya diberi nilai 0 (nol).
STRUKTUR ORGANISASI
SURVEI KONDISI JALAN, LERENG, DAN JEMBATAN
SATUAN KERJA BALAI BESAR PELAKSANAAN JALAN NASIONAL VIII
TAHUN ANGGARAN 2018
#REF! OB #REF!
#REF!
#REF!
#REF! OB #REF!
#REF!
#REF!
Ofce Team
#REF! #REF!
#REF!
#REF!
#REF! OB #REF! #REF! OB #REF! #REF! OB #REF! #REF! OB #REF! #REF! OB #REF! #REF! OB #REF!
Field Team
#REF! #REF!
#REF! OB #REF! #REF! OB #REF! #REF! OB #REF! #REF! OB #REF! #REF! OB #REF! #REF! OB #REF!