Anda di halaman 1dari 4

TUGAS MANAJEMEN OPERASIONAL

Nama : Jane Belinda Saranga


Hari Lahir : Kamis (4)
Tanggal Lahir : 29
Bulan Lahir : Juli
Tahun Lahir : 1993
Jumlah Saudara Kandung :3
Nomor Stambuk : C20219026

KURSI
F-305
(1)

KAKI KURSI JOK KURSI SANDARAN TANGAN


S-311 A-315 F-305
(4) (9) (7)

RANGKA JOK BUSA KAIN JOK


S-322 R-424 R-425
(3) (3) (6)

ANALISIS MRP

TABEL 1
DAFTAR KESELURUHAN MATERIAL KURSI

NOMOR NAMA UNIT YANG


LEVEL
IDENTIFIKASI KOMPONEN DIBUTUHKAN
0 F-305 KURSI 1
1 S-311 KAKI KURSI 4
SANDARAN
1 P-313 7
TANGAN
1 A-315 JOK KURSI 9
2 S-322 RANGKA JOK 3
2 R-424 BUSA 3
2 R-425 KAIN JOK 6
TABEL 2
JADWAL INDUK PRODUKSI PALU MANDIRI
WEEK 1 2 3 4 5 6 7 8 9
KURSI 150 170

TABEL 3
DATA KOMPONEN KURSI
PART LEND TIME MAKE (M) OR
LEVEL DESCRIPTION
NUMBER (WEEK) BUY (B)
0 F-305 KURSI 1 M
1 S-311 KAKI KURSI 1 B
SANDARAN
1 P-313 1 B
TANGAN
1 A-315 JOK 2 M
2 S-322 RANGKA JOK 2 B
2 R-424 BUSA 1 B
2 R-425 KAIN JOK 2 B

TABEL 4
PENERIMAAN YANG
DIRENCANAKAN
PART
SCHEDULED DUE
NUMER
(WEEK) DATA
RECEIPT
S-311 50 1
P-313 300 2
300 6
S-322 120 1
R-424 100 1

TABEL 5
DATA PERSEDIAAN
CURRENT
PART ALLOCATED
INVENTORY
NUMBER (UNIT)
(UNIT)
F-305 30 10
S-322 80 0
R-425 50 10
TABEL 6
ANALISIS KEBUTUHAN KOMPONEN
ITEM: KURSI PART N0. F-305
WEEK 0 1 2 3 4 5 6 7 8 9
GR 150 170
SR
OI 20 20 20 20 20 20
NR 130 170
PO 130 170

TABEL 7
ANALISIS KEBUTUHAN KOMPONEN
ITEM: KAKI KURSI PART N0. S-311
WEEK 0 1 2 3 4 5 6 7 8 9
GR TABEL 8 520 680
SR 50
ANALISIS KEBUTUHAN KOMPONEN
OI 50 50 50 50
NR 470 680
PO 470 680

TABEL 8
ANALISIS KEBUTUHAN KOMPONEN
ITEM: SANDARAN TANGAN PART N0. P-313
WEEK 0 1 2 3 4 5 6 7 8 9
GR 910 1190
SR 300 300
OI 300 300 300 300 300
NR
PO 610 890

TABEL 9
ANALISIS KEBUTUHAN KOMPONEN
ITEM: JOK KURSI PART N0. A-315
WEEK 0 1 2 3 4 5 6 7 8 9
GR 1170 1530
SR
OI
NR 1170 1530
PO 1170 1530
TABEL 10
ANALISIS KEBUTUHAN KOMPONEN
ITEM: RANGKA JOK PART N0. S-322
WEEK 0 1 2 3 4 5 6 7 8 9
GR 3510 4590
SR 120
OI 80 200 200
NR 3310 4590
PO 3310 4590

TABEL 11
ANALISIS KEBUTUHAN KOMPONEN
ITEM: BUSA PART N0. A-424
WEEK 0 1 2 3 4 5 6 7 8 9
GR 3510 4590
SR 100
OI 100 100
NR 3410 4590
PO 3410 4590

TABEL 12
ANALISIS KEBUTUHAN KOMPONEN
ITEM: KAIN JOK PART N0. R-425
WEEK 0 1 2 3 4 5 6 7 8 9
GR 7020 9180
SR
OI 40 40 40
NR 6980 9180
PO 6980 9180

RANGKUMAN KEB. MATERIAL RENCANA PRODUKSI PENDEK


& JADWAL PEMESANAN (BUY) (MAKE)
PART NO ITEM WEEK NO AMOUNT PART NO ITEM WEEK NO AMOUNT
S-311 KAKI KURSI 4 470 A-315 JOK 3 1.170
7 680 6 1.530
S-322 RANGKA JOK 1 3.310 F-305 KURSI 5 130
4 4.590 8 170
R-424 BUSA 2 3.410
5 4.590
R-425 KAIN JOK 1 6.980
4 9.180

Anda mungkin juga menyukai