LAPORAN PROGGRES MINGGUAN
BLOK / NO. : TYPE ALAMANDA SUDUT BLOK B-11/01 ( 1 UNIT )
PROGRES PEKERJAAN PERIODE : 30/08/17 s/d 04/09/17 MINGGU KE : 1 ( SATU )
C. Pekerjaan Beton
1 Sloof 2.64 - - - - 1.04
5 Slab/Pelat beton: - - - -
- Kanopi 1.42 - - - - 0.45
D. Pekerjaan Dinding - - - -
1 Pasangan Dinding bata 13.13 - - - - 120.94
E. Pekerjaan Atap
1 Pasangan Rangka baja ringan 8.16 - - - - 44.47
TOTAL 4.41 - -
TOTAL 5.00 - -
H. Pekerjaan Plafond
1 Plafond dalam 3.91 - - - - 28.25
TOTAL 5.65 - -
I. Pekerjaan Lantai
1 Pemadatan tanah lantai 0.19 - - - - 31.10
TOTAL 6.77 - -
BLOK B11 N0. 01
BOBOT
NO. KETERANGAN MINGGU LALU MINGGU INI 27 STD
PEK.
PROGRES BOBOT PROGRES BOBOT
J. Pekerjaan Pengecatan
1 Cat dinding dalam 1.84 - - - - 90.38
8 Pasangan Kusen : - - - -
Kusen Alumunium P-1 / P-2 1.28 - - - - 3.00
L. Pekerjaan lain-lain
1 Pembersihan selama proyek 0.23 - - - - 1.00
m 1
15,595.24 0.00 483,452.38 483,452.38 66,264,376.16 0.73 483,452.38
- 3,514,452.38
m 1
44,440.00 14,000.00 1,533,180.00 483,000.00 2,016,180.00 66,264,376.16 3.04 2,016,180.00
m 1
30,637.50 8,750.00 995,718.75 284,375.00 1,280,093.75 66,264,376.16 1.93 1,280,093.75
2,528,898.75 1,096,818.20
5,856,466.49 1,626,177.16
66,264,300.00 66,264,376.16
m2 24,397.00 17,600.00 4,113,090.23 2,967,184.00 7,080,274.23 66,264,376.16 10.68 7,080,274.23 7.48 41,997.00
10,603,945.73 5,902,482.35
m 1
22,500.00 8,800.00 562,950.00 220,176.00 10.01 783,126.00 66,264,376.16 1.18
7,947,587.00 2,124,632.64
HARGA SATUAN TOTAL HARGA 27
SAT.
Material (Rp) Upah (Rp) Material (Rp) Upah (Rp)
m 1
63,157.41 25,925.93 650,521.30 267,037.04 917,558.33 66,264,376.16 1.38
2,053,887.03 866,388.89
m 1
28,500.00 11,400.00 555,750.00 222,300.00 778,050.00 66,264,376.16 1.17 114,000
2,018,836.75 1,296,575.00
2,910,264.00 831,504.00
2,773,913.78 1,714,850.00
HARGA SATUAN TOTAL HARGA 27
SAT.
Material (Rp) Upah (Rp) Material (Rp) Upah (Rp)
m 2
9,300.00 8,500.00 555,396.00 507,620.00 1,063,016.00 66,264,376.16 1.60
m 2
5,500.00 8,000.00 155,375.00 226,000.00 381,375.00 66,264,376.16 0.58
m 1
5,500.00 8,000.00 68,805.00 100,080.00 168,885.00 66,264,376.16 0.25
m 1
6,000.00 8,500.00 150,120.00 212,670.00 362,790.00 66,264,376.16 0.55
1,426,786.00 1,769,410.00
- 66,264,376.16 -
6,930,500.00 320,000.00
150,000.00
###
45,051,085.53 21,213,290.63 73,627,000.00
66,264,376.16 7,362,700.00
66,264,300.00
29,397.90
TIME SCHEDULLE
NEW CITRA BUKIT RAYA TYPE ALAMANDA (27/90)
BLOK B-11 NO. 01
Pekerjaan
L. lain-lain 0.23 0.23
-
100.00
RENCANA PROGRESS MINGGUAN 0.66 8.71 11.82 19.02 23.73 15.94 6.31 7.44 5.49 0.89
AKUMULASI RENCANA PROGRESS MINGGUAN - 0.66 9.38 21.19 40.21 63.94 79.88 86.19 93.62 99.11 100.00
AKUMULASI REALISASI PROGRESS MINGGUAN - 2.29
DEVIASI 1.63
(2.29) - - - - -
TIME SCHEDULLE
BULAN KE I BULAN KE II
NO. URAIAN PEKERJAAN BOBOT KET.
1 2 3 4 5 6 7
A. Pekerjaan Persiapan 4.19 1.64 1.64 0.05 0.05 0.05 0.05 0.05
B. Pekerjaan Tanah Dan Pondasi 7.43 0.38 0.38 1.33 1.33 1.33 1.33
C. Pekerjaan Beton 14.22 1.42 1.42 1.42 1.42 1.42
D. Pekerjaan Dinding 31.99 3.55 3.55 3.55
E. Pekerjaan Atap 6.43
F. Pekerjaan Listrik 0.44
G. Pekerjaan Sanitair & Instalasi Air 5.37
H. Pekerjaan Plafond 11.95
I. Pekerjaan Lantai 7.68 1.54 1.54
J. Pekerjaan Pengecatan 5.26
K. Pekerjaan Kusen, Pintu & Jendela 4.74
L. Pekerjaan lain-lain 0.32
100.00
RENCANA PROGRESS MINGGUAN 1.64 2.01 3.39 4.34 6.36 6.36 6.36
AKUMULASI RENCANA PROGRESS MINGGUAN - 1.64 3.65 7.04 11.38 17.74 24.10 30.46
AKUMULASI REALISASI PROGRESS MINGGUAN
DEVIASI
TIME SCHEDULLE
TYPE ALAMANDA STANDART BLOK 11 NO. 05
(14.79) - - - - -
18,900,000.00
170,100,000.00
4,303,530.00
4,500,000.00
2.65
5.30 5.30 - 0.66 ### ### 4.108 5.30 (1.20)