I. DATA
DATA
Lebar jembatan : m
Lebar jalan : m
Panjang balok : 43.90 m
Panjang bentang 43.10 m
Jarak antara balok : 2.36 m
Jumlah balok : 5 balok
Kelas jalan : I
Tebal aspal : 5 cm
Tinggi genangan air : 5 cm
II. MATERIAL
2.1 Beton
2
- Kondisi akhir : fc' = 0.8318 * 350 = 291.1 Kg/cm
28.6 Mpa
- Tegangan ijin akhir : =
2
Teg tekan = 0.45* f'c = 12.85 Mpa = 131.0 Kg/cm
2
Teg tarikTension = -0.50 * √ f'c = -2.67 Mpa = -27.2 Kg/cm
5
- Modulus elastisitas : Ep = 4700*sqrt(fc') 2.511 * 10 Kg/cm2
Page 1
PROYEK : JALAN TOL BEKASI - CAWANG - KAMPUNG MELAYU
BENTANG : 43.90 m & H = 230 CM > DENGAN COAK UJUNG GIRDER
LOKASI : SEKSI 2A UJUNG OVERPASS P4 - P5 > SEGMENTAL
TANGGAL : 26 January 2021
3.2 Resume
(Satuan dalam cm)
URAIAN AREA Ya Yb Ix Wa Wb
Balok Precast 9,777.50 110.79 119.21 65,242,809 588,904 547,278
Balok Composite (Composite) 13,806.18 99.81 155.19 108,818,728 1,090,244 701,203
(Precast) 74.81 1,454,576
Page 2
PROYEK : JALAN TOL BEKASI - CAWANG - KAMPUNG MELAYU
BENTANG : 43.90 m & H = 230 CM > DENGAN COAK UJUNG GIRDER
LOKASI : SEKSI 2A UJUNG OVERPASS P4 - P5 > SEGMENTAL
TANGGAL : 26 January 2021
IV PEMBEBANAN
b. Plat Lantai = 0.25 * 2.36 * 2.4 = 1.4160 t/m' Tabel 3 RSNI T-02-2005
Beban Steel Deck = 1.32 * 0.0095 = 0.0125 t/m'
Beton dlm Steel Deck = 1.32 * 80% * * 0.05
* * 2.4 = 0.1267 t/m'
Beban Lantai, q2 = = 1.5553 t/m'
c. Beban Aspal : q3 = 0.050 * 2.36 * 2.2 = 0.2596 t/m' Tabel 3 RSNI T-02-2005
Beban air : qw = 0.050 * 2.36 * 0.98 = 0.1156 t/m' Tabel 3 RSNI T-02-2005
Beban aspal dan air q3 = qa + qw = 0.3752 t/m' Tabel 3 RSNI T-02-2005
d. Beban Diafragma : --> p = 1.90 * 2.11 * 0.20 * 2.4 = 1.8556 ton Tabel 3 RSNI T-02-2005
tebal diafragma = 0.20 m
Jumlah diafragma tengah = 5 pcs
Symetris at half 1.5 7.18 14.37 21.55 -
buah pd m pd m pd m pd m
1/8 * q4 * 43^2 = 2 * 1.8556 * 14.4 - 1.8556 ( 14.367 + 7.183 + 0.000 + 0.000 + 0.000 )
q4 = 0.2583 t/m'
Page 3
PROYEK : JALAN TOL BEKASI - CAWANG - KAMPUNG MELAYU
BENTANG : 43.90 m & H = 230 CM > DENGAN COAK UJUNG GIRDER
LOKASI : SEKSI 2A UJUNG OVERPASS P4 - P5 > SEGMENTAL
TANGGAL : 26 January 2021
4.2.2. BEBAN TRUK "T" LIHAT RSNI T-2-2005 PASAL 6.4
Beban hidup pada lantai jembatan berupa beban roda ganda oleh Truk (beban T) yang
besarnya, T= 225 kN RSNI T-02-2005
Faktor beban dinamis untuk pembebanan truk diambil, DLA = 0.40 Pasal 6.4.1
Beban truk "T" : PTT = ( 1 + DLA ) * T = 315.00 kN
a= 5.00 m
b= 5.00 m
Gaya geser dan momen yang terjadi akibat pembebanan lalu-lintas, diambil yg memberikan
pengaruh terbesar terhadap T-Girder di antara beban "D" dan beban "T".
Gaya geser maksimum akibat beban, T VTT = 381.78 kN
Momen maksimum akibat beban, D MTD = 5926.86 kNm
Page 4
PROYEK : JALAN TOL BEKASI - CAWANG - KAMPUNG MELAYU
BENTANG : 43.90 m & H = 230 CM > DENGAN COAK UJUNG GIRDER
LOKASI : SEKSI 2A UJUNG OVERPASS P4 - P5 > SEGMENTAL
TANGGAL : 26 January 2021
Page 5
PROYEK : JALAN TOL BEKASI - CAWANG - KAMPUNG MELAYU
BENTANG : 43.90 m & H = 230 CM > DENGAN COAK UJUNG GIRDER
LOKASI : SEKSI 2A UJUNG OVERPASS P4 - P5 > SEGMENTAL
TANGGAL : 26 January 2021
V PERHITUNGAN MOMEN
VI PERHITUNGAN LINTANG
(Satuan dalam TON) 0.009281
TYPE KETERANGAN POT 1 POT 2 POT 3 POT 4 POT 5 POT 6 POT 7 0.001856
0.40 1.40 2.40 5.75 12.05 18.55 21.95 0.990719
MS 1. Balok Precast 51.70 49.25 46.81 38.62 23.22 7.33 -0.98
Subtotal MS 51.70 49.25 46.81 38.62 23.22 7.33 -0.98
MA 2. Pelat Lantai & Parapet 32.89 31.34 29.78 24.57 14.77 4.67 -0.62
3. Beban aspal, air 7.94 7.56 7.19 5.93 3.56 1.13 -0.15
4. Beban diafragma 5.46 5.21 4.95 4.08 2.45 0.77 -0.10
Subtotal MA 46.29 44.10 41.92 34.58 20.79 6.57 -0.88
TD 5. Beban Lalu lintas D 38.10 36.29 34.49 28.46 17.11 5.40 -0.72
5. Beban Lalu lintas T 8.09 8.09 8.09 8.09 8.09 8.09 8.09
Subtotal TD 46.19 44.39 42.59 36.55 25.21 13.50 7.37
TB 6. Gaya rem 0.36 0.36 0.36 0.36 0.36 0.36 0.36
Subtotal TB 0.36 0.36 0.36 0.36 0.36 0.36 0.36
ET 7. Temperatur 0.45 0.45 0.45 0.45 0.45 0.45 0.45
Subtotal ET 0.45 0.45 0.45 0.45 0.45 0.45 0.45
EW 8. Beban angin 2.13 2.03 1.93 1.59 0.96 0.30 -0.04
Subtotal EW 2.13 2.03 1.93 1.59 0.96 0.30 -0.04
EQ 9. Beban gempa 29.11 27.73 26.36 21.75 13.07 4.13 -0.55
Subtotal EQ 29.11 27.73 26.36 21.75 13.07 4.13 -0.55
Kombinasi beban 1 (MS+MA+TD+TB) 144.54 138.11 131.67 110.12 69.58 27.76 5.88
Kombinasi beban 2 (MS+MA+TD+TB+ET) 144.99 138.55 132.12 110.56 70.03 28.20 6.33
Kombinasi beban 3 (MS+MA+TD+TB+EW) 146.67 140.14 133.60 111.71 70.54 28.06 5.84
Kombinasi beban 4 (MS+MA+TD+TB+ET+EW) 147.12 140.59 134.05 112.16 70.99 28.51 6.29
Kombinasi beban 5 (MS+MA+EQ) 127.10 121.09 115.08 94.95 57.09 18.03 -2.40
Page 6
PROYEK : JALAN TOL BEKASI - CAWANG - KAMPUNG MELAYU
BENTANG : 43.90 m & H = 230 CM > DENGAN COAK UJUNG GIRDER
LOKASI : SEKSI 2A UJUNG OVERPASS P4 - P5 > SEGMENTAL
TANGGAL : 26 January 2021
51600
7.1 Profile Kabel
n*CreepCoef*Teg cp + SrinkageCoef*Es
Loss creep & shrinkage =
1 + n*Teg cpt/Teg pt*(1+CreepCoef/2)
2
= 1,385.2 Kg/cm
= 122,965 kg
Page 7
PROYEK : JALAN TOL BEKASI - CAWANG - KAMPUNG MELAYU
BENTANG : 43.90 m & H = 230 CM > DENGAN COAK UJUNG GIRDER
LOKASI : SEKSI 2A UJUNG OVERPASS P4 - P5 > SEGMENTAL
TANGGAL : 26 January 2021
Page 8
PROYEK : JALAN TOL BEKASI - CAWANG - KAMPUNG MELAYU
BENTANG : 43.90 m & H = 230 CM > DENGAN COAK UJUNG GIRDER
LOKASI : SEKSI 2A UJUNG OVERPASS P4 - P5 > SEGMENTAL
TANGGAL : 26 January 2021
RESUME
NO URAIAN GIRDER STRESS TEGANGAN KETERANGAN
IJIN
1 KONDISI AWAL Top 13.44 -17.84 OK
Bottom 229.74 299.73 OK
2 KONDISI SERVICE
PEMBEBANAN 1 Top 143.12 280.99 OK
Bottom 10.80 -39.90 OK
Page 9
PROYEK : JALAN TOL BEKASI - CAWANG - KAMPUNG MELAYU
BENTANG : 43.90 m & H = 230 CM > DENGAN COAK UJUNG GIRDER
LOKASI : SEKSI 2A UJUNG OVERPASS P4 - P5 > SEGMENTAL
TANGGAL : 26 January 2021
Diagram Tegangan Saat Tranfer
teg. akibat gaya
prestress awal teg. akibat momen tegangan saat transfer
150 150
117.63 (P/A) -104.19 (M/Wa) 150 13.44
100 100 100
50
Ya 110.7950 50
0 0 0
H 230.00 0 50 100 150+
-200 -100 0 100 = 200 0 50 100 150 200 250
-50 -50 -50
Yb 119.21 -100
-100 -100
PEMBEBANAN 1 (MS+MA+TD+TB)
teg. akibat gaya
prestress eff teg. akibat momen teg. saat servis Pembebanan 1
150 150 150
102.11 (P/A) 41.01 143.12
100 100 100
50 50 50
Ya 110.79
0 0 0
H 230.00 0 50 100 150+-100 -50 0 = 50 0 50 100 150 200
-50 -50 -50
Yb 119.21
-100 -100 -100
PEMBEBANAN 2 (MS+MA+TD+TB+ET)
teg. akibat gaya
prestress eff teg. akibat momen teg. saat servis Pembebanan 2
150 150 150
102.11 41.68 143.80
100 100 100
50 50
Ya 110.79
50
0 0 0
H 230.00 0 50 100 +
-100
150 -50 0= 50 0 50 100 150 200
-50 -50 -50
Yb 119.21
-100 -100 -100
-150
102.11 -92.71
-150
9.40
-150
PEMBEBANAN 3 (MS+MA+TD+TB+EW)
teg. akibat gaya
prestress eff teg. akibat momen teg. saat servis Pembebanan 3
150 150 150
102.11 42.62 144.73
100 100 100
50 50 50
Ya 110.79
0 0 0
H 230.00 0 50 100 +-150
150 -100 -50 = 0 50 0 50 100 150 200
-50 -50 -50
Yb 119.21
-100 -100 -100
PEMBEBANAN 4 (MS+MA+TD+TB+ET+EW)
teg. akibat gaya
prestress eff teg. akibat momen teg. saat servis Pembebanan 4
150 150 150
102.11 43.29 145.41
100 100 100
50
Ya 110.79 50 50
0 0 0
H 230.00 0 50 100 +
150
-150 -100 -50 0 = 50 100 0 50 100 150 200
-50 -50 -50
Yb 119.21
-100 -100 -100
Page 10
PROYEK : JALAN TOL BEKASI - CAWANG - KAMPUNG MELAYU
BENTANG : 43.90 m & H = 230 CM > DENGAN COAK UJUNG GIRDER
LOKASI : SEKSI 2A UJUNG OVERPASS P4 - P5 > SEGMENTAL
TANGGAL : 26 January 2021
PEMBEBANAN 5 (MS+MA+EQ)
teg. akibat gaya
prestress eff teg. akibat momen teg. saat servis Pembebanan 5
150 150
150
102.11 42.62 144.73
100 100 100
50 50 50
Ya 110.79
0 0 0
H 230.00 0 50 100 +
-150
150 -100 -50 =0 50 0 50 100 150 200
-50 -50 -50
GIRDER
DL PT DL+PT ADL TDL+PT
Deflection ( cm ) 4.58 -9.777 -5.20 3.40 -1.80
Span/Deflection 942 -441 -829 1269 -2389
COMPOSITE
ASPAL TDL+LL TL+PT
ADL TDL+PT CREEP LL CREEP
Deflection ( cm ) 0.42 -1.38 -4.15 2.70 -1.45
Span/Deflection 10231 -3117 -1039 1598 -2970
IX MOMEN KAPASITAS
b 1= 0.6500
Note :
b 1 = 0.85 .................…………………..for fc' < 4000 psi
b 1 = 0.85 - 5 x E-5 (fc'-4000) ....for 4000 < fc' < 8000 psi
b 1 = 0.65 .................……………………for fc' > 8000 psi
2
Yield Strength : fpy = 0.9 * 19178.0822 Kg/cm
2
= 17260.274 Kg/cm
g p = 0.28
r p = Aps/(b*dp)
= 0.003579
fps = fpu * [ 1 - ( g p/b 1)* r
p*(fpu/fc')]
2
= 18270.044 Kg/cm (more than fpy)
2
= 17260.274 Kg/cm
T Aps
= * fps
= 88.768 * 17260
= 1532160 kg
C = 1532160 kg
(Position 13.1187 cm from top fibre)
obtained by
a = 26.3056529 cm
2
Area = 6035.78791 cm
f = 0.80
Mu = f * Mn = 2762.562 tm ( Capacity )
Page 11
PROYEK : JALAN TOL BEKASI - CAWANG - KAMPUNG MELAYU
BENTANG : 43.90 m & H = 230 CM > DENGAN COAK UJUNG GIRDER
LOKASI : SEKSI 2A UJUNG OVERPASS P4 - P5 > SEGMENTAL
TANGGAL f : 26 January 2021
X. SHEAR ANALYSIS
(Satuan dalam TON)
TYPE KETERANGAN POT 1 POT 2 POT 3 POT 4 POT 5 POT 6 POT 7
0.40 1.40 2.40 5.75 12.05 18.55 21.95
MS 1. Balok Precast 51.70 49.25 46.81 38.62 23.22 7.33 -0.98
Subtotal MS 51.70 49.25 46.81 38.62 23.22 7.33 -0.98
MA 2. Pelat Lantai & parapet 32.89 31.34 29.78 24.57 14.77 4.67 -0.62
3. Beban aspal dan air 7.94 7.56 7.19 5.93 3.56 1.13 -0.15
4. Beban diafragma 5.46 5.21 4.95 4.08 2.45 0.77 -0.10
Subtotal MA 46.29 44.10 41.92 34.58 20.79 6.57 -0.88
TD 5. Beban Lalu lintas D 38.10 36.29 34.49 28.46 17.11 5.40 -0.72
5. Beban Lalu lintas T 8.09 8.09 8.09 8.09 8.09 8.09 8.09
Subtotal TD 46.19 44.39 42.59 36.55 25.21 13.50 7.37
TB 6. Gaya rem 0.36 0.36 0.36 0.36 0.36 0.36 0.36
Subtotal TB 0.36 0.36 0.36 0.36 0.36 0.36 0.36
ET 7. Temperatur 0.45 0.45 0.45 0.45 0.45 0.45 0.45
Subtotal ET 0.45 0.45 0.45 0.45 0.45 0.45 0.45
EW 8. Beban angin 0.45 0.45 0.45 0.45 0.45 0.45 0.45
Subtotal EW 0.45 0.45 0.45 0.45 0.45 0.45 0.45
EQ 9. Beban gempa 29.11 27.73 26.36 21.75 13.07 4.13 -0.55
Subtotal EQ 29.11 27.73 26.36 21.75 13.07 4.13 -0.55
Ton 239.49 228.93 218.38 183.03 116.54 47.95 12.07
Ultimate Total
kN 2346.98 2243.56 2140.14 1793.68 1142.14 469.91 118.28
Kombinasi (1.2MS + 2MA + 1,8TD + 1,8TB + 1,2ET + 1.2EW)
Page 12
PROYEK : JALAN TOL BEKASI - CAWANG - KAMPUNG MELAYU
BENTANG : 43.90 m & H = 230 CM > DENGAN COAK UJUNG GIRDER
LOKASI : SEKSI 2A UJUNG OVERPASS P4 - P5 > SEGMENTAL
TANGGAL : 26 January 2021
0.8 h = 184 cm
f = 0.70
bw = 25 cm
φVn = Vu
Vn = Vu/φ
Vn = Vc + Vs
Vc tidak boleh melebihi retak geser terlentur (Vci) dan retak geser badan (Vcw)
Vci = (1/20)*sqrt(fc')*bw*d+Vd+(Vi*Mcr/Mmax)
Vd = gaya geser pada penampang akibat beban mati tidak terfaktor (N)
Vi = gaya geser terfaktor pada penampang akibat beban luar (N)
M max = Momen maksimum terfaktor pada penampang akibat kombinasi beban luar (N.mm)
M cr = Z*[0.5*sqrt(fc')+fpe-fd]
Z = I/yt = 652,428,091,348
1,192.13
= 547,278,193 mm3
fpe = 64 x 156,000.00 10.21 N/mm2
977,750
fd = tegangan akibat beban mati tak terfaktor (Mpa)
fc' = 61.24 N/mm2
bw = 650 mm
Ac = 945,250 mm2
d konv = 1,454.23 mm
Page 13