014-Pppu, Pppa, Plb3 - PT Wahana Citra Nabatirev1
014-Pppu, Pppa, Plb3 - PT Wahana Citra Nabatirev1
Quotation
Nomor
: 014/ TUK-KI/ V/2021/Rev1
penawaran/Quo. No
Tanggal/Date : 14/06/2021
Penanggung Jawab
Operasional Instalasi
IDR 5.550.000
1.5 Pengendalian Pencemaran ✓ ✓ ✓ ✓
Udara (POPU)
Pengoperasian Instalasi
Pengelolaan Limbah B3
1.6 ✓ ✓ ✓ ✓ DR 4.550.000
(OPLB3)
VAT
PPN 10%
Lasaila Arifiani
TUK, Lead oprt. Authorized Signatory
Confirmation Date : ……./……./…..