NO URAIAN PEKERJAAN SPESIFIKASI PKS Qty SATUAN HARGA SATUAN JUMLAH HARGA
NO URAIAN PEKERJAAN SPESIFIKASI PKS Qty SATUAN HARGA SATUAN JUMLAH HARGA
B PEKERJAAN SIPIL
1 Pondasi Gedung Utama 1 lot Rp. 2,115,000,000.00 Rp. 2,115,000,000.00
2 Stasiun Penerimaan Buah 1 lot Rp. 2,504,800,000.00 Rp. 2,504,800,000.00
3 Stasiun Rebusan 1 lot Rp. 980,000,000.00 Rp. 980,000,000.00
4 Stasiun Thresser 1 lot Rp. 385,000,000.00 Rp. 385,000,000.00
5 Stasiun Pengempa 1 lot Rp. 475,000,000.00 Rp. 475,000,000.00
6 Stasiun Pemurnian 1 lot Rp. 350,000,000.00 Rp. 350,000,000.00
7 Stasiun Tanki Timbun 1 lot Rp. 750,000,000.00 Rp. 750,000,000.00
8 Stasiun Pemisahan Kernel 1 lot Rp. 615,000,000.00 Rp. 615,000,000.00
9 Steamand Power Plant 1 lot Rp. 60,000,000.00 Rp. 60,000,000.00
10 Stasiun Pemurnian Air 1 lot Rp. 750,000,000.00 Rp. 750,000,000.00
11 Stasiun Umpan Boiler 1 lot Rp. 675,000,000.00 Rp. 675,000,000.00
12 Lantai,Dinding dan Keramik Bangunan Utama 1 lot Rp. 876,000,000.00 Rp. 876,000,000.00
13 Jalur Kabel 1 lot Rp. 280,000,000.00 Rp. 280,000,000.00
Total-B Rp 10,815,800,000.00
NO URAIAN PEKERJAAN SPESIFIKASI PKS Qty SATUAN HARGA SATUAN JUMLAH HARGA
C BANGUNAN SARANA
1 Kantor & Laboratorium (12x20) m2 1 lot Rp. 760,000,000.00 Rp. 760,000,000.00
2 Jembatan Timbang 1 lot Rp. 85,000,000.00 Rp. 85,000,000.00
3 Pos Security (4x4) 5 lot Rp. 66,400,000.00 Rp. 332,000,000.00
4 Mushollah (8x8) 1 lot Rp. 201,600,000.00 Rp. 201,600,000.00
5 Pondasi & Parkir Mobil (6x3) 1 lot Rp. 50,600,000.00 Rp. 50,600,000.00
6 Pondasi & Parkir Motor (4x3) 1 lot Rp. 25,000,000.00 Rp. 25,000,000.00
7 Toilet Karyawan (4x7) 4 lot Rp. 60,000,000.00 Rp. 240,000,000.00
8 Pagar & Pintu Gerbang 1 lot Rp. 3,000,000,000.00 Rp. 3,000,000,000.00
9 Rumah Pompa Sungai (4x5) 2 lot Rp. 65,000,000.00 Rp. 130,000,000.00
10 Rumah Pompa Permurnian (5x4) 1 lot Rp. 65,000,000.00 Rp. 65,000,000.00
11 Oil Despatch Pump House 1 lot Rp. 65,000,000.00 Rp. 65,000,000.00
12 Effluent Ponds Pump House (3x2) 1 lot Rp. 65,000,000.00 Rp. 65,000,000.00
Total-C Rp 5,019,200,000.00
NO URAIAN PEKERJAAN SPESIFIKASI PKS Qty SATUAN HARGA SATUAN JUMLAH HARGA
D STRUKTUR BAJA UNTUK GEDUNG UTAMA, WORKSHOP & GUDANG c/w ATAP & DINDING
1 Gedung Utama 1 lot Rp. 3,500,000,000.00 Rp. 3,500,000,000.00
2 Workshop & Gudang 1 lot Rp. 2,780,000,000.00 Rp. 2,780,000,000.00
Total-D Rp 6,280,000,000.00
NO URAIAN PEKERJAAN SPESIFIKASI PKS Qty SATUAN HARGA SATUAN JUMLAH HARGA
E PEKERJAAN MEKANIK
1 Stasiun Penerimaan Buah
a Jembatan Timbangan 4.000mmx12.000mmx60Ton 2 lot Rp. 630,000,000.00 Rp. 1,260,000,000.00
b Fruit Loading Ramp 20 Bays c/w Power Cylinder 20Bays 1 lot Rp. 2,021,600,000.00 Rp. 2,021,600,000.00
c FFB Conveyor type Scraper Conv No1 T.1161xL.1200xP.27.000mm 1 lot Rp. 1,657,750,000.00 Rp. 1,657,750,000.00
d FFB Conveyor type Scraper Conv No 2 T.1161xL.1200xP.36.000mm 1 unit Rp. 2,557,750,000.00 Rp. 2,557,750,000.00
e FFB Inclined Conveyor type Scraper T.1161xL.1200xP.32.000mm 1 unit Rp. 1,871,250,000.00 Rp. 1,871,250,000.00
f FFB unch Distributing Conveyor type Scraper T.1161xL.1200xP.25.000mm 1 unit Rp. 845,500,000.00 Rp. 845,500,000.00
g FFB Return Conveyor type scraper T.1161xL.900xP.33.000mm 1 unit Rp. 1,271,250,000.00 Rp. 1,271,250,000.00
h Dirty Screw Conveyor ø300x33.000 2 unit Rp. 400,000,000.00 Rp. 800,000,000.00
Total-E1 Rp. 12,285,100,000.00
NO URAIAN PEKERJAAN SPESIFIKASI PKS Qty SATUAN HARGA SATUAN JUMLAH HARGA
2 Stasiun Rebusan
a Struktur & support 1 lot Rp. 2,401,300,000.00 Rp. 2,401,300,000.00
b SFB Auto Feeder Conveyor Type Scraper uk.2.500x1.200x27.000 1 lot Rp. 2,589,450,000.00 Rp. 2,589,450,000.00
c Inclined FFB Conveyor Type Scraper uk.1.200x1.200x27.000 1 lot Rp. 1,989,450,000.00 Rp. 1,989,450,000.00
d Vertical Sterilizer ø3,200 xt = 7,200 Capacity:25TonTBS 4 lot Rp. 2,490,975,000.00 Rp. 9,963,900,000.00
e Blowdown Chamber 1500x9000mm 1 lot Rp. 245,500,000.00 Rp. 245,500,000.00
f Condensate Pit c/w Pump 3000x4000mm 1 unit Rp. 66,900,000.00 Rp. 66,900,000.00
g Vacuum Condensate1,5 m3 4 unit Rp. 60,000,000.00 Rp. 240,000,000.00
h Sterilizer Control Room 4m x 5m 1 unit Rp. 125,000,000.00 Rp. 125,000,000.00
i Automatic Control & Programerfor Sterilizer 1 lot Rp. 1,550,000,000.00 Rp. 1,550,000,000.00
j Oil Recycling Pump 2 lot Rp. 46,900,000.00 Rp. 93,800,000.00
k Sludge Pumpto Effluent 2 lot Rp. 56,350,000.00 Rp. 112,700,000.00
Total-E2 Rp 19,378,000,000.00
NO URAIAN PEKERJAAN SPESIFIKASI PKS Qty SATUAN HARGA SATUAN JUMLAH HARGA
3 Stasiun Thresser
a Thresing Machine & Structure OD.2000x6000mm 3 lot Rp. 524,200,000.00 Rp. 1,572,600,000.00
b Under Thresher Screw Conveyor Ø600x7000mm 4 lot Rp. 180,800,000.00 Rp. 723,200,000.00
c Bottom Cross Conveyor Ø600x33.000mm 1 lot Rp. 262,100,000.00 Rp. 262,100,000.00
d Rethresher Conveyor T.750xL.750xP.12.000mm 1 lot Rp. 594,700,000.00 Rp. 594,700,000.00
e Horizontal Empty Bunch Conveyor Type Scrapper T.750xL.750xP.33.000mm 1 lot Rp. 542,500,000.00 Rp. 542,500,000.00
f Inclined Empty Bunch Conveyor Type Scrapper T.750xL.750xP.33.000mm 1 lot Rp. 740,000,000.00 Rp. 740,000,000.00
g Empty Bunch Press Structure 1 lot Rp. 329,400,000.00 Rp. 329,400,000.00
h Empty Bunch Area 1 lot Rp. 200,000,000.00 Rp. 200,000,000.00
i Empty Bunch press EmptyBunchPressCap.15Ton 2 lot Rp. 1,075,000,000.00 Rp. 2,150,000,000.00
j Vibrating Screen ViratingScreenDoubleDeck 1 lot Rp. 225,750,000.00 Rp. 225,750,000.00
k Sludge Tank 1 lot Rp. 42,900,000.00 Rp. 42,900,000.00
l SludgeTransfer Pump Pump 2 lot Rp. 56,900,000.00 Rp. 113,800,000.00
m Empty Bunch Shredder (cut & press) 2unitcutandpress 1 lot Rp. 1,862,000,000.00 Rp. 1,862,000,000.00
Total-E3 Rp. 9,358,950,000.00
NO URAIAN PEKERJAAN SPESIFIKASI PKS Qty SATUAN HARGA SATUAN JUMLAH HARGA
4 Stasiun Pengempa
a Platformand Structuref or 5 Digesters & Press Station 1 lot Rp. 706,900,000.00 Rp. 706,900,000.00
b Cake Breaker Conveyor no1 Ø900x17.000mm 1 unit Rp. 117,900,000.00 Rp. 117,900,000.00
c Cake Breaker Conveyor no 2 Ø900x19.000mm 1 unit Rp. 615,600,000.00 Rp. 615,600,000.00
d Rethresher Conveyor Ø600x33.000mm 1 unit Rp. 177,900,000.00 Rp. 177,900,000.00
e Digester Capacity:4500ltr 4 unit Rp. 497,400,000.00 Rp. 1,989,600,000.00
f Double Screw Press Capacity:15Ton/jam 4 unit Rp. 575,400,000.00 Rp. 2,301,600,000.00
g Crude Oil Gutter SS Dia.10" 1 unit Rp. 35,000,000.00 Rp. 35,000,000.00
h Sand Trap Tank Cap.30 m3 1 unit Rp. 122,900,000.00 Rp. 122,900,000.00
i Nut Polishing Drum & Roller Ø1.200x6.000mm 1 unit Rp. 350,000,000.00 Rp. 350,000,000.00
j Vibrating Screendia 60" c/w Structure DoubleDeck,dia.60"/Equivalent 3 lot Rp. 248,300,000.00 Rp. 744,900,000.00
k Crude Oil Tank 12 m3 1 unit Rp. 145,800,000.00 Rp. 145,800,000.00
l Crude Oil Pump c/w E. Motor Centrifugal,Mat.:S/S,Head30m 2 set Rp. 48,600,000.00 Rp. 97,200,000.00
m Process Hot Water Tank 1 lot Rp. 80,000,000.00 Rp. 80,000,000.00
n Process Hot Water Pump c/w E. Motor Centrifugal,Mat.:S/S,Head30m 2 set Rp. 37,400,000.00 Rp. 74,800,000.00
Total-E4 Rp. 7,560,100,000.00
NO URAIAN PEKERJAAN SPESIFIKASI PKS Qty SATUAN HARGA SATUAN JUMLAH HARGA
5 Stasiun Pemurnian
a Platformand Structurefor Clarification Station 1 lot Rp. 422,000,000.00 Rp. 422,000,000.00
b Continuous Setting Tank Capacity:180m3 2 lot Rp. 1,121,500,000.00 Rp. 2,243,000,000.00
c Pure Oil Tank Capacity:40m3 2 lot Rp. 279,300,000.00 Rp. 558,600,000.00
d Sludge Tank Capacity:40m3 1 lot Rp. 367,800,000.00 Rp. 367,800,000.00
e Sand Cyclone Merk:PMT/Equivalent 1 lot Rp. 448,200,000.00 Rp. 448,200,000.00
f Vacuum Oil Dryer c/w Pump 1 lot Rp. 313,500,000.00 Rp. 313,500,000.00
g Oil Transfer Pump to Storage Centrifugal,Mat.:S/S,Head30m 2 lot Rp. 275,000,000.00 Rp. 550,000,000.00
h Hot Well Tank 4.5 m3 1 lot Rp. 18,800,000.00 Rp. 18,800,000.00
i Vibrating Screendia 60" c/w Structure 1 lot Rp. 234,000,000.00 Rp. 234,000,000.00
j Sludge Buffer Tank 1 lot Rp. 78,600,000.00 Rp. 78,600,000.00
k Sludge Centrifuge TypeNSC8000 5 lot Rp. 277,600,000.00 Rp. 1,388,000,000.00
l Reclaim Oil Tank 1 lot Rp. 290,000,000.00 Rp. 290,000,000.00
m Fat Fit Cap.250 m3 1 unit Rp. 450,000,000.00 Rp. 450,000,000.00
n Reclaim Oil Pump c/w E.Motor Centrifugal,Mat.:S/S,Head30m 2 lot Rp. 486,000,000.00 Rp. 972,000,000.00
o Sludge Drain Tank 1 lot Rp. 145,000,000.00 Rp. 145,000,000.00
p Oil Flow Meter Merk :Tokicodia.3" 1 lot Rp. 48,000,000.00 Rp. 48,000,000.00
q Oil Pump c/w E. Motor Centrifugal,Mat.:S/S,Head30m 4 lot Rp. 48,600,000.00 Rp. 194,400,000.00
r Float Tank 1 lot Rp. 17,300,000.00 Rp. 17,300,000.00
Total-E5 Rp. 8,739,200,000.00
NO URAIAN PEKERJAAN SPESIFIKASI PKS Qty SATUAN HARGA SATUAN JUMLAH HARGA
NO URAIAN PEKERJAAN SPESIFIKASI PKS Qty SATUAN HARGA SATUAN JUMLAH HARGA
NO URAIAN PEKERJAAN SPESIFIKASI PKS Qty SATUAN HARGA SATUAN JUMLAH HARGA
NO URAIAN PEKERJAAN SPESIFIKASI PKS Qty SATUAN HARGA SATUAN JUMLAH HARGA
NO URAIAN PEKERJAAN SPESIFIKASI PKS Qty SATUAN HARGA SATUAN JUMLAH HARGA
NO URAIAN PEKERJAAN SPESIFIKASI PKS Qty SATUAN HARGA SATUAN JUMLAH HARGA
NO URAIAN PEKERJAAN SPESIFIKASI PKS Qty SATUAN HARGA SATUAN JUMLAH HARGA
NO URAIAN PEKERJAAN SPESIFIKASI PKS Qty SATUAN HARGA SATUAN JUMLAH HARGA
NO URAIAN PEKERJAAN SPESIFIKASI PKS Qty SATUAN HARGA SATUAN JUMLAH HARGA
F PEKERJAAN ELEKTRIK
1 Main Swich Board 1 lot Rp. 1,929,700,000.00 Rp. 1,929,700,000.00
2 Motor Control Centres and Starter Distribution Board 1 lot Rp. 1,613,900,000.00 Rp. 1,613,900,000.00
3 Power Distribution and Control Cables 1 lot Rp. 2,655,300,000.00 Rp. 2,655,300,000.00
4 Factoryand Perimeter Lighting 1 lot Rp. 253,900,000.00 Rp. 253,900,000.00
5 Socket Outlet & Emergency Ligthing 1 lot Rp. 148,400,000.00 Rp. 148,400,000.00
6 Cableto Water Intake 1 lot Rp. 1,040,000,000.00 Rp. 1,040,000,000.00
7 Cableto House 1 lot Rp. 1,085,000,000.00 Rp. 1,085,000,000.00
8 Cableto Effluent 1 lot Rp. 135,000,000.00 Rp. 135,000,000.00
9 Earthing System 1 lot Rp. 187,900,000.00 Rp. 187,900,000.00
10 Lightning Arrester 1 lot Rp. 187,900,000.00 Rp. 187,900,000.00
Total-F Rp. 9,237,000,000.00
NO URAIAN PEKERJAAN SPESIFIKASI PKS Qty SATUAN HARGA SATUAN JUMLAH HARGA
NO URAIAN PEKERJAAN SPESIFIKASI PKS Qty SATUAN HARGA SATUAN JUMLAH HARGA
H LAIN-LAIN
1 Perencanaan dan Pengawasan 1 lot Rp. 5,585,000,000.00 Rp. 5,585,000,000.00
2 Mobilisasi Manpower 1 lot Rp. 1,660,000,000.00 Rp. 1,660,000,000.00
3 Fasilitas Sementara 1 lot Rp. 1,510,000,000.00 Rp. 1,510,000,000.00
4 Transportasi Materialke Lokasi Pabrik 1 lot Rp. 4,450,000,000.00 Rp. 4,450,000,000.00
5 Commissioning Trial Run 1 lot Rp. 2,500,000,000.00 Rp. 2,500,000,000.00
6 Insurance 1 lot Rp. 430,000,000.00 Rp. 430,000,000.00
7 Pembelian alat berat produksi -
a Excavator 2 lot Rp. 1,800,000,000.00 Rp. 3,600,000,000.00
b Whell Loader 2 lot Rp. 1,600,000,000.00 Rp. 3,200,000,000.00
8 Pembelian Alat Transportasi -
a Produksi 5 lot Rp. 650,000,000.00 Rp. 3,250,000,000.00
b Kendaraan Operasional 5 lot Rp. 733,700,000.00 Rp. 3,668,500,000.00
9 Mess Karyawan : -
a Tipe 36 40 lot Rp. 84,100,000.00 Rp. 3,364,000,000.00
b Tipe 45 10 lot Rp. 95,450,000.00 Rp. 954,500,000.00
c Tipe 60 10 lot Rp. 159,100,000.00 Rp. 1,591,000,000.00
d Tipe 90 10 lot Rp. 227,300,000.00 Rp. 2,273,000,000.00
10 Interior dan Furniture Mess Tipe 60 dan 90 -
a Mobiler, AC, dan lain-lain 1 lot Rp. 1,750,000,000.00 Rp. 1,750,000,000.00
11 Kantin 2 lot Rp. 175,000,000.00 Rp. 350,000,000.00
12 Kios 1 lot Rp. 750,000,000.00 Rp. 750,000,000.00
13 Pembangunan Jalan Rabat Beton Menuju Pabrik Sepanjang 1,3 Km 1 lot Rp. 6,000,000,000.00 Rp. 6,000,000,000.00
14 Pembangunan Jembatan Permanen 2 lot Rp. 1,400,000,000.00 Rp. 2,800,000,000.00
15 Pelunasan Lahan seluas 30 Ha 1 lot Rp. 2,050,000,000.00 Rp. 2,050,000,000.00
16 Pelunasan Perijinan, IMB, Amdal, HGB 1 lot Rp. 8,500,000,000.00 Rp. 8,500,000,000.00
Total-H Rp. 60,236,000,000.00