Anda di halaman 1dari 3

KTI SPK 8

No. Lokasi Perlatan Nama Peralatan OD (Inch)


1 Bunyu GS 2 - MGS 6
2 Bunyu GS 3 -MGS 6
3 Bunyu MGS - Loading Terminal 6
4 Bunyu GCS Bunyu - Gate Valve Emplacement I 8
5 Bunyu GCS Bunyu - Gate Valve Emplacement II 8
6 Bunyu GCS Bunyu - Gate Valve Emplacement III 8
7 Bunyu EPF - PLN Bunyu 4
Total

KTI SPK 7
No. Lokasi Perlatan Nama Peralatan OD (Inch)
1 Sangasanga SP Nonny - SPU F 6
2 Sangasanga SP Nonny - Boiler Sangasanga 4
3 Sangasanga SPU F - PPP Sangasanga 6
4 Anggana SP NKL - SP site B 8
5 Anggana Gas Plant - Binangat 8
Total

KTI SPK 4
No. Lokasi Perlatan Nama Peralatan OD (Inch)
1 Tanjung Jalur Pipa Utara PPU-BPP 16
2 Tanjung Jalur Pipa Selatan PPU-BPP 16
Total

KTI SPK 9
No. Lokasi Perlatan Nama Peralatan OD (Inch)
1 Sangatta L. Terminal - Tl. Lombok 12
2 Sangatta MGS - L. Terminal 6
3 Sangatta MGS - L. Terminal 4
4 Sangatta SP-2 ke SP-1 6
5 Sangatta SP-3 ke SP-1 4
6 Sangatta SP-4 ke SP-1 3&4
7 Sangatta SP-5 ke SP-1 4
8 Sangatta SP-6 ke SP-1 6
9 Sangatta SP-6 ke SP-1 5
Total
Panjang (m) Panjang (m) Actual Service Fluida
850 796 Crude
1,470 1,087 Crude
2,000 2,097 Crude
4,100 3,389 Gas
5,000 4,164 Gas
1,500 1,316 Gas
1,315 1,251 Gas
16,235 14,100

Panjang (m) Panjang (m) Service Fluida


4,680 4,950 Crude
8,180 8,355 Gas
3,210 3,247 Crude
5,000 4,922 Crude
11,088 11,210 Gas
32,158 32,684

Panjang (m) Panjang (m) Actual Service Fluida


4,000 - Crude
4,000 - Crude
8,000

Panjang (m) Panjang (m) Actual Service Fluida


3,950 3,775 OIL
11,050 11,067 OIL
11,050 11,223 GAS
4,167 4,316 OIL
2,370 2,395 OIL
1,676 1,674 OIL
2,680 2,633 OIL
4,619 4,697 OIL
4,619 4,673 GAS
46,181 46,453
Keterangan

Keterangan

Extra Job

Keterangan

Keterangan

Anda mungkin juga menyukai