Anda di halaman 1dari 2

PT.

PLN (Persero)
UIP I

PLTU Pangkalan Susu Unit 3 , 4


Kontraktor

:Guangdong Power
Engineering Corporation
PT NINCEC Multi Dimensi
(Pailit)
PT Bagus Karya

Target
COD

-Unit #3 : 30 Juli 15
-Unit #4 : 30 Juni 15

Kapasitas

: 2x200 MW

Loan
Expired

: IDR 29 Juli 12
USD 14 Agustus 14

Progress
Konstruksi

: 99,76%

BG
Expired

: 15 Desember 15

Contract Price : USD 252,289,550.00


(excl VAT)
IDR 1,053,607,678,822.00

LC Expired : 15 Desember 14 (no.


019310110112)
14 Agustus 14 (no.
019310090059)

Progress
Payment
Uni
(excl
VAT)
t
1

: USD 216,607,227.78
(85,86%)
Status
IDR 937,567,884,346.87
(88,99%)
Unit Stop. Pengujian Load Rejection 100% dan RR selesai. Pengecekan equipment
(generator, pipa reheater, BFP, LP Heater, bearing no 3) dalam rangka persiapan PT,
segera akan dilanjutkan pemasangan instrument performance test.
Unit beroperasi. Pengujian Load Rejection 100% dan RR selesai. Persiapan Performance
Test, Mvar limiter test, PSS test, dan Run Back Test.

PT.PLN (Persero)
UIP I

PLTU Pangkalan Susu

Anda mungkin juga menyukai