Item Pekerjaan : Pek.

bongkaran beton bertulang


Vol. Item Pekerjaan : 17.85 M3

Volume per
NO URAIAN Satuan Satu Satuan JUMLAH/VOLUME Harga Jumlah
Pekerjaan KEBUTUHAN Satuan Harga
(Koefisien)
(1) (2) (3) (4) (5) (6) 7

A TENAGA KERJA :
1 Pekerja HOK 13.334 238.01 92,000.00 21,897,094.80
2 Tukang HOK - - 130,000.00 -
3 Kepala Tukang HOK - - 146,000.00 -
4 Mandor HOK 0.666 - 140,000.00 -

Sub Jumlah 21,897,094.80


B BAHAN/MATERIAL :
1 -
2
3
4
-
C PERALATAN
1 -
2
3
4
Sub Jumlah -
JUMLAH TOTAL 21,897,094.80
Item Pekerjaan : Pek. bongkaran beton tanpa tulangan
Vol. Item Pekerjaan : 42.18 M3

Volume per
NO URAIAN Satuan Satu Satuan JUMLAH/VOLUME Harga Jumlah
Pekerjaan KEBUTUHAN Satuan Harga
(Koefisien)
(1) (2) (3) (4) (5) (6) 7

A TENAGA KERJA :
1 Pekerja HOK 6.667 281.21 92,000.00 25,871,693.52
2 Tukang HOK - - 130,000.00 -
3 Kepala Tukang HOK - - 146,000.00 -
4 Mandor HOK 0.333 - 140,000.00 -

Sub Jumlah 25,871,693.52


B BAHAN/MATERIAL :
1 -
2
3
4
-
C PERALATAN
1 -
2
3
4
Sub Jumlah -
JUMLAH TOTAL 25,871,693.52
Item Pekerjaan : Pek. galian Sedimen sedalam 1 m
Vol. Item Pekerjaan : 60.03 M3

Volume per
NO URAIAN Satuan Satu Satuan JUMLAH/VOLUME Harga Jumlah
Pekerjaan KEBUTUHAN Satuan Harga
(Koefisien)
(1) (2) (3) (4) (5) (6) 7

A TENAGA KERJA :
1 Pekerja HOK 0.750 45.02 92,000.00 4,142,070.00
2 Tukang HOK - - 130,000.00 -
3 Kepala Tukang HOK - - 146,000.00 -
4 Mandor HOK 0.025 - 140,000.00 -

Sub Jumlah 4,142,070.00


B BAHAN/MATERIAL :
1 -
2
3
4
-
C PERALATAN
1 -
2
3
4
Sub Jumlah -
JUMLAH TOTAL 4,142,070.00
Item Pekerjaan : Pek. mengangkut material atau hasil galian dan bongkaran dengan jarak angkut 500 m
Vol. Item Pekerjaan : Err:509 M3

Volume per
NO URAIAN Satuan Satu Satuan JUMLAH/VOLUME Harga Jumlah
Pekerjaan KEBUTUHAN Satuan Harga
(Koefisien)
(1) (2) (3) (4) (5) (6) 7

A TENAGA KERJA :
1 Pekerja HOK 2.302 Err:509 92,000.00 Err:509
2 Tukang HOK - - 130,000.00 -
3 Kepala Tukang HOK - - 146,000.00 -
4 Mandor HOK 0.115 - 140,000.00 -

Sub Jumlah Err:509


B BAHAN/MATERIAL :
1 -
2
3
4
-
C PERALATAN
1 -
2
3
4
Sub Jumlah -
JUMLAH TOTAL Err:509
Item Pekerjaan : Pek. Galian tanah sedalam 1 m
Vol. Item Pekerjaan : Err:509 M3

Volume per
NO URAIAN Satuan Satu Satuan JUMLAH/VOLUME Harga Jumlah
Pekerjaan KEBUTUHAN Satuan Harga
(Koefisien)
(1) (2) (3) (4) (5) (6) 7

A TENAGA KERJA :
1 Pekerja HOK 0.750 Err:509 92,000.00 Err:509
2 Tukang HOK - - 130,000.00 -
3 Kepala Tukang HOK - - 146,000.00 -
4 Mandor HOK 0.025 - 140,000.00 -

Sub Jumlah Err:509


B BAHAN/MATERIAL :
1 -
2
3
4
-
C PERALATAN
1 -
2
3
4
Sub Jumlah -
JUMLAH TOTAL Err:509
Item Pekerjaan : Pek. pasangan Batu Kali camp. 1 PC : 4PP
Vol. Item Pekerjaan : 0.33 M3

Volume per
NO URAIAN Satuan Satu Satuan JUMLAH/VOLUME Harga Jumlah
Pekerjaan KEBUTUHAN Satuan Harga
(Koefisien)
(1) (2) (3) (4) (5) (6) 7

A TENAGA KERJA :
1 Pekerja HOK 1.500 0.50 92,000.00 45,540.00
2 Tukang HOK 0.75 0.25 130,000.00 32,175.00
3 Kepala Tukang HOK 0.08 - 146,000.00 -
4 Mandor HOK 0.08 - 140,000.00 -

Sub Jumlah 77,715.00


B BAHAN/MATERIAL :
1 Batu Kali M3 1.20 0.40 250,000.00 99,000.00
2 Semen ( 50 Kg) Zak 3.26 1.08 62,000.00 66,699.60
3 Pasir Pasang M3 0.52 0.17 150,000.00 25,740.00
4
191,439.60
C PERALATAN
1 -
2
3
4
Sub Jumlah -
JUMLAH TOTAL 269,154.60
Item Pekerjaan : Pek. Beton tumbuk camp. 1PC:3PP:5Kr
Vol. Item Pekerjaan : Err:509 M3

Volume per
NO URAIAN Satuan Satu Satuan JUMLAH/VOLUME Harga Jumlah
Pekerjaan KEBUTUHAN Satuan Harga
(Koefisien)
(1) (2) (3) (4) (5) (6) 7

A TENAGA KERJA :
1 Pekerja HOK 0.13 Err:509 92,000.00 Err:509
2 Tukang HOK 0.10 Err:509 130,000.00 Err:509
3 Kepala Tukang HOK 0.01 - 146,000.00 -
4 Mandor HOK 0.01 - 140,000.00 -

Sub Jumlah Err:509


B BAHAN/MATERIAL :
1 Semen (50 Kg) Zak 0.30 Err:509 62,000.00 Err:509
2 Pasir Beton M3 0.06 Err:509 150,000.00 Err:509
3 Kerikil Beton M3 0.08 Err:509 175,000.00 Err:509
4
Err:509
C PERALATAN
1 -
2
3
4
Sub Jumlah -
JUMLAH TOTAL Err:509
Item Pekerjaan : Pek. plesteran t=1,5 cm campuran 1 PC : 3 PP
Vol. Item Pekerjaan : Err:509 M2

Volume per
NO URAIAN Satuan Satu Satuan JUMLAH/VOLUME Harga Jumlah
Pekerjaan KEBUTUHAN Satuan Harga
(Koefisien)
(1) (2) (3) (4) (5) (6) 7

A TENAGA KERJA :
1 Pekerja HOK 0.300 Err:509 92,000.00 Err:509
2 Tukang HOK 0.15 Err:509 130,000.00 Err:509
3 Kepala Tukang HOK 0.02 - 146,000.00 -
4 Mandor HOK 0.015 - 140,000.00 -

Sub Jumlah Err:509


B BAHAN/MATERIAL :
1 Pasir pasang M3 0.02 Err:509 150,000.00 Err:509
2 Semen ( 50 Kg) Zak 0.16 Err:509 62,000.00 Err:509
3 - -
4
Err:509
C PERALATAN
1 -
2
3
4
Sub Jumlah -
JUMLAH TOTAL Err:509
Item Pekerjaan : Pek. Acian
Vol. Item Pekerjaan : Err:509 M2

Volume per
NO URAIAN Satuan Satu Satuan JUMLAH/VOLUME Harga Jumlah
Pekerjaan KEBUTUHAN Satuan Harga
(Koefisien)
(1) (2) (3) (4) (5) (6) 7

A TENAGA KERJA :
1 Pekerja HOK 0.200 Err:509 92,000.00 Err:509
2 Tukang HOK 0.10 Err:509 130,000.00 Err:509
3 Kepala Tukang HOK 0.01 - 146,000.00 -
4 Mandor HOK 0.010 - 140,000.00 -

Sub Jumlah Err:509


B BAHAN/MATERIAL :
1 Semen ( 50 Kg) Zak 0.07 Err:509 62,000.00 Err:509
2
3 - -
4
Err:509
C PERALATAN
1 -
2
3
4
Sub Jumlah -
JUMLAH TOTAL Err:509
Item Pekerjaan : Pek. Pembesian dengan Besi Polos
Vol. Item Pekerjaan : Err:509 Kg

Volume per
NO URAIAN Satuan Satu Satuan JUMLAH/VOLUME Harga Jumlah
Pekerjaan KEBUTUHAN Satuan Harga
(Koefisien)
(1) (2) (3) (4) (5) (6) 7

A TENAGA KERJA :
1 Pekerja HOK 0.007 Err:509 92,000.00 Err:509
2 Tukang HOK 0.007 Err:509 130,000.00 Err:509
3 Kepala Tukang HOK 0.001 - 146,000.00 -
4 Mandor HOK 0.000 - 140,000.00 -

Sub Jumlah Err:509


B BAHAN/MATERIAL :
1 Besi Beton (polos/ulir) Kg 1.05 Err:509 11,600.00 Err:509
2 Kawat Ikat Kg 0.02 Err:509 20,000.00 Err:509
3 - -
4
Err:509
C PERALATAN
1 -
2
3
4
Sub Jumlah -
JUMLAH TOTAL Err:509
Item Pekerjaan : Pek. Bekisting tutup saluran, floordeck T.0,7 mm
Vol. Item Pekerjaan : Err:509 M2

Volume per
NO URAIAN Satuan Satu Satuan JUMLAH/VOLUME Harga Jumlah
Pekerjaan KEBUTUHAN Satuan Harga
(Koefisien)
(1) (2) (3) (4) (5) (6) 7

A TENAGA KERJA :
1 Pekerja HOK 0.120 Err:509 92,000.00 Err:509
2 Tukang HOK 0.060 Err:509 130,000.00 Err:509
3 Kepala Tukang HOK 0.006 - 146,000.00 -
4 Mandor HOK 0.006 - 140,000.00 -

Sub Jumlah Err:509


B BAHAN/MATERIAL :
1 Floordeck Tb.0.7 mm M2 1.10 Err:509 133,400.00 Err:509
2 Sekrup Kg 0.20 - 25,000.00 -
3 - -
4
Err:509
C PERALATAN
1 -
2
3
4
Sub Jumlah -
JUMLAH TOTAL Err:509
Item Pekerjaan : Pek. Beton Site Mix K. 175
Vol. Item Pekerjaan : Err:509 M3

Volume per
NO URAIAN Satuan Satu Satuan JUMLAH/VOLUME Harga Jumlah
Pekerjaan KEBUTUHAN Satuan Harga
(Koefisien)
(1) (2) (3) (4) (5) (6) 7

A TENAGA KERJA :
1 Pekerja HOK 1.650 Err:509 92,000.00 Err:509
2 Tukang HOK 0.275 Err:509 130,000.00 Err:509
3 Kepala Tukang HOK 0.028 - 146,000.00 -
4 Mandor HOK 0.083 - 140,000.00 -

Sub Jumlah Err:509


B BAHAN/MATERIAL :
1 Semen ( 50 Kg) Zak 6.52 Err:509 62,000.00 Err:509
2 Pasir Beton M3 0.54 Err:509 150,000.00 Err:509
3 Kerikil M3 0.76 Err:509 175,000.00 Err:509
4
Err:509
C PERALATAN
1 -
2
3
4
Sub Jumlah -
JUMLAH TOTAL Err:509
Item Pekerjaan : Pek. Galian tanah sedalam 1 m
Vol. Item Pekerjaan : 17.85 M3

Volume per
NO URAIAN Satuan Satu Satuan JUMLAH/VOLUME Harga Jumlah
Pekerjaan KEBUTUHAN Satuan Harga
(Koefisien)
(1) (2) (3) (4) (5) (6) 7

A TENAGA KERJA :
1 Pekerja HOK 0.750 13.39 92,000.00 1,231,650.00
2 Tukang HOK - - 130,000.00 -
3 Kepala Tukang HOK - - 146,000.00 -
4 Mandor HOK 0.025 - 140,000.00 -

Sub Jumlah 1,231,650.00


B BAHAN/MATERIAL :
1 -
2
3
4
-
C PERALATAN
1 -
2
3
4
Sub Jumlah -
JUMLAH TOTAL 1,231,650.00
Item Pekerjaan : Pek. galian Sedimen tanah lumpur 1 m3
Vol. Item Pekerjaan : 42.18 M3

Volume per
NO URAIAN Satuan Satu Satuan JUMLAH/VOLUME Harga Jumlah
Pekerjaan KEBUTUHAN Satuan Harga
(Koefisien)
(1) (2) (3) (4) (5) (6) 7

A TENAGA KERJA :
1 Pekerja HOK 1.200 50.62 92,000.00 4,656,672.00
2 Tukang HOK - - 130,000.00 -
3 Kepala Tukang HOK - - 146,000.00 -
4 Mandor HOK 0.045 - 140,000.00 -

Sub Jumlah 4,656,672.00


B BAHAN/MATERIAL :
1 -
2
3
4
-
C PERALATAN
1 -
2
3
4
Sub Jumlah -
JUMLAH TOTAL 4,656,672.00
Item Pekerjaan : Pek. mengangkut material atau hasil galian dan bongkaran dengan jarak angkut 500 m
Vol. Item Pekerjaan : 60.03 M3

Volume per
NO URAIAN Satuan Satu Satuan JUMLAH/VOLUME Harga Jumlah
Pekerjaan KEBUTUHAN Satuan Harga
(Koefisien)
(1) (2) (3) (4) (5) (6) 7

A TENAGA KERJA :
1 Pekerja HOK 0.356 21.37 92,000.00 1,966,102.56
2 Tukang HOK - - 130,000.00 -
3 Kepala Tukang HOK - - 146,000.00 -
4 Mandor HOK 0.018 - 140,000.00 -

Sub Jumlah 1,966,102.56


B BAHAN/MATERIAL :
1 -
2
3
4
-
C PERALATAN
1 -
2
3
4
Sub Jumlah -
JUMLAH TOTAL 1,966,102.56
Item Pekerjaan : Pek. pasangan Batu Kali camp. 1 PC : 4PP
Vol. Item Pekerjaan : 0.33 M3

Volume per
NO URAIAN Satuan Satu Satuan JUMLAH/VOLUME Harga Jumlah
Pekerjaan KEBUTUHAN Satuan Harga
(Koefisien)
(1) (2) (3) (4) (5) (6) 7

A TENAGA KERJA :
1 Pekerja HOK 1.500 0.50 92,000.00 45,540.00
2 Tukang HOK 0.75 0.25 130,000.00 32,175.00
3 Kepala Tukang HOK 0.08 - 146,000.00 -
4 Mandor HOK 0.08 - 140,000.00 -

Sub Jumlah 77,715.00


B BAHAN/MATERIAL :
1 Batu Kali M3 1.20 0.40 250,000.00 99,000.00
2 Semen ( 50 Kg) Zak 3.26 1.08 62,000.00 66,699.60
3 Pasir Pasang M3 0.52 0.17 150,000.00 25,740.00
4
191,439.60
C PERALATAN
1 -
2
3
4
Sub Jumlah -
JUMLAH TOTAL 269,154.60
Item Pekerjaan : Pek. Pembesian dengan Besi Polos
Vol. Item Pekerjaan : Err:509 Kg

Volume per
NO URAIAN Satuan Satu Satuan JUMLAH/VOLUME Harga Jumlah
Pekerjaan KEBUTUHAN Satuan Harga
(Koefisien)
(1) (2) (3) (4) (5) (6) 7

A TENAGA KERJA :
1 Pekerja HOK 0.007 Err:509 92,000.00 Err:509
2 Tukang HOK 0.007 Err:509 130,000.00 Err:509
3 Kepala Tukang HOK 0.001 - 146,000.00 -
4 Mandor HOK 0.000 - 140,000.00 -

Sub Jumlah Err:509


B BAHAN/MATERIAL :
1 Besi Beton (polos/ulir) Kg 1.05 Err:509 11,600.00 Err:509
2 Kawat Ikat Kg 0.02 Err:509 20,000.00 Err:509
3 -
4
Err:509
C PERALATAN
1 -
2
3
4
Sub Jumlah -
JUMLAH TOTAL Err:509
Item Pekerjaan : 1 m² bekisting lantai beton biasa menggunakan papan kayu 3/20 cm (TP)
Vol. Item Pekerjaan : Err:509 M2

Volume per
NO URAIAN Satuan Satu Satuan JUMLAH/VOLUME Harga Jumlah
Pekerjaan KEBUTUHAN Satuan Harga
(Koefisien)
(1) (2) (3) (4) (5) (6) 7

A TENAGA KERJA :
1 Pekerja HOK 0.300 Err:509 92,000.00 Err:509
2 Tukang HOK 0.15 Err:509 130,000.00 Err:509
3 Kepala Tukang HOK 0.015 - 146,000.00 -
4 Mandor HOK 0.030 - 140,000.00 -

Sub Jumlah Err:509


B BAHAN/MATERIAL :
1 Papan 3/20 cm kayu kelas II M3 0.01 Err:509 2,500,000.00 Err:509
2 Kaso
Paku 5/7
5 cmcm
dan 7 cm M3 0.00 Err:509 2,500,000.00 Err:509
3 Kg 0.30 Err:509 18,000.00 Err:509
4 Minyak bekisting Ltr 0.20 Err:509 5,000.00 Err:509
Err:509
C PERALATAN
1 -
2
3
4
Sub Jumlah -
JUMLAH TOTAL Err:509
Item Pekerjaan : Pek. Beton Site Mix K. 175
Vol. Item Pekerjaan : Err:509 M3

Volume per
NO URAIAN Satuan Satu Satuan JUMLAH/VOLUME Harga Jumlah
Pekerjaan KEBUTUHAN Satuan Harga
(Koefisien)
(1) (2) (3) (4) (5) (6) 7

A TENAGA KERJA :
1 Pekerja HOK 1.650 Err:509 92,000.00 Err:509
2 Tukang HOK 0.275 Err:509 130,000.00 Err:509
3 Kepala Tukang HOK 0.028 - 146,000.00 -
4 Mandor HOK 0.083 - 140,000.00 -

Sub Jumlah Err:509


B BAHAN/MATERIAL :
1 Semen ( 50 Kg) Zak 6.52 Err:509 62,000.00 Err:509
2 Pasir Beton M3 0.54 Err:509 150,000.00 Err:509
3 Kerikil M3 0.76 Err:509 175,000.00 Err:509
4
Err:509
C PERALATAN
1 -
2
3
4
Sub Jumlah -
JUMLAH TOTAL Err:509
Item Pekerjaan : Pek. pasangan Batu Kali camp. 1 PC : 4PP
Vol. Item Pekerjaan : Err:509 M3

Volume per
NO URAIAN Satuan Satu Satuan JUMLAH/VOLUME Harga Jumlah
Pekerjaan KEBUTUHAN Satuan Harga
(Koefisien)
(1) (2) (3) (4) (5) (6) 7

A TENAGA KERJA :
1 Pekerja HOK 1.500 Err:509 92,000.00 Err:509
2 Tukang HOK 0.75 Err:509 130,000.00 Err:509
3 Kepala Tukang HOK 0.08 - 146,000.00 -
4 Mandor HOK 0.08 - 140,000.00 -

Sub Jumlah Err:509


B BAHAN/MATERIAL :
1 Batu Kali M3 1.20 Err:509 250,000.00 Err:509
2 Semen ( 50 Kg) Zak 3.26 Err:509 62,000.00 Err:509
3 Pasir Pasang M3 0.52 Err:509 150,000.00 Err:509
4
Err:509
C PERALATAN
1 -
2
3
4
Sub Jumlah -
JUMLAH TOTAL Err:509
Item Pekerjaan : Pek. Pembesian dengan Besi Polos
Vol. Item Pekerjaan : Err:509 Kg

Volume per
NO URAIAN Satuan Satu Satuan JUMLAH/VOLUME Harga Jumlah
Pekerjaan KEBUTUHAN Satuan Harga
(Koefisien)
(1) (2) (3) (4) (5) (6) 7

A TENAGA KERJA :
1 Pekerja HOK 0.007 Err:509 92,000.00 Err:509
2 Tukang HOK 0.007 Err:509 130,000.00 Err:509
3 Kepala Tukang HOK 0.001 - 146,000.00 -
4 Mandor HOK 0.000 - 140,000.00 -

Sub Jumlah Err:509


B BAHAN/MATERIAL :
1 Besi Beton (polos/ulir) Kg 1.05 Err:509 11,600.00 Err:509
2 Kawat Ikat Kg 0.02 Err:509 20,000.00 Err:509
3 -
4
Err:509
C PERALATAN
1 -
2
3
4
Sub Jumlah -
JUMLAH TOTAL Err:509
Item Pekerjaan : 1 m² bekisting lantai beton biasa menggunakan papan kayu 3/20 cm (TP)
Vol. Item Pekerjaan : Err:509 M2

Volume per
NO URAIAN Satuan Satu Satuan JUMLAH/VOLUME Harga Jumlah
Pekerjaan KEBUTUHAN Satuan Harga
(Koefisien)
(1) (2) (3) (4) (5) (6) 7

A TENAGA KERJA :
1 Pekerja HOK 0.300 Err:509 92,000.00 Err:509
2 Tukang HOK 0.15 Err:509 130,000.00 Err:509
3 Kepala Tukang HOK 0.015 - 146,000.00 -
4 Mandor HOK 0.030 - 140,000.00 -

Sub Jumlah Err:509


B BAHAN/MATERIAL :
1 Papan 3/20 cm kayu kelas II M3 0.01 Err:509 2,500,000.00 Err:509
2 Kaso
Paku 5/7
5 cmcm
dan 7 cm M3 0.00 Err:509 2,500,000.00 Err:509
3 Kg 0.30 Err:509 18,000.00 Err:509
4 Minyak bekisting Ltr 0.20 Err:509 5,000.00 Err:509
Err:509
C PERALATAN
1 -
2
3
4
Sub Jumlah -
JUMLAH TOTAL Err:509
Item Pekerjaan : Pek. Beton Site Mix K. 175
Vol. Item Pekerjaan : Err:509 M3

Volume per
NO URAIAN Satuan Satu Satuan JUMLAH/VOLUME Harga Jumlah
Pekerjaan KEBUTUHAN Satuan Harga
(Koefisien)
(1) (2) (3) (4) (5) (6) 7

A TENAGA KERJA :
1 Pekerja HOK 1.650 Err:509 92,000.00 Err:509
2 Tukang HOK 0.275 Err:509 130,000.00 Err:509
3 Kepala Tukang HOK 0.028 - 146,000.00 -
4 Mandor HOK 0.083 - 140,000.00 -

Sub Jumlah Err:509


B BAHAN/MATERIAL :
1 Semen ( 50 Kg) Zak 6.52 Err:509 62,000.00 Err:509
2 Pasir Beton M3 0.54 Err:509 150,000.00 Err:509
3 Kerikil M3 0.76 Err:509 175,000.00 Err:509
4
Err:509
C PERALATAN
1 -
2
3
4
Sub Jumlah -
JUMLAH TOTAL Err:509
Item Pekerjaan : Pek. Beton Site Mix K. 175
Vol. Item Pekerjaan : Err:509 M3

Volume per
NO URAIAN Satuan Satu Satuan JUMLAH/VOLUME Harga Jumlah
Pekerjaan KEBUTUHAN Satuan Harga
(Koefisien)
(1) (2) (3) (4) (5) (6) 7

A TENAGA KERJA :
1 Pekerja HOK 1.650 Err:509 92,000.00 Err:509
2 Tukang HOK 0.275 Err:509 130,000.00 Err:509
3 Kepala Tukang HOK 0.028 - 146,000.00 -
4 Mandor HOK 0.083 - 140,000.00 -

Sub Jumlah Err:509


B BAHAN/MATERIAL :
1 Semen ( 50 Kg) Zak 6.52 Err:509 62,000.00 Err:509
2 Pasir Beton M3 0.54 Err:509 150,000.00 Err:509
3 Kerikil M3 0.76 Err:509 175,000.00 Err:509
4
Err:509
C PERALATAN
1 -
2
3
4
Sub Jumlah -
JUMLAH TOTAL Err:509

Item Pekerjaan : Pemasangan Pipa PVC 3"


Vol. Item Pekerjaan : Err:509 M

Volume per
NO URAIAN Satuan Satu Satuan JUMLAH/VOLUME Harga Jumlah
Pekerjaan KEBUTUHAN Satuan Harga
(Koefisien)
(1) (2) (3) (4) (5) (6) 7

A TENAGA KERJA :
1 Pekerja HOK 0.081 Err:509 92,000.00 Err:509
2 Tukang HOK 0.135 Err:509 130,000.00 Err:509
3 Kepala Tukang HOK 0.014 - 146,000.00 -
4 Mandor HOK 0.004 - 140,000.00 -

Sub Jumlah Err:509


B BAHAN/MATERIAL :
1 Pipa PVC 3" M 1.20 Err:509 44,250.00 Err:509
2 Perlengkapan % 0.35 -
3 -
4
Err:509
C PERALATAN
1 -
2
3
4
Sub Jumlah -
JUMLAH TOTAL Err:509
Item Pekerjaan : 1 m² bekisting lantai beton biasa menggunakan papan kayu 3/20 cm (TP)
Vol. Item Pekerjaan : Err:509 M2

Volume per
NO URAIAN Satuan Satu Satuan JUMLAH/VOLUME Harga Jumlah
Pekerjaan KEBUTUHAN Satuan Harga
(Koefisien)
(1) (2) (3) (4) (5) (6) 7

A TENAGA KERJA :
1 Pekerja HOK 0.300 Err:509 92,000.00 Err:509
2 Tukang HOK 0.15 Err:509 130,000.00 Err:509
3 Kepala Tukang HOK 0.015 - 146,000.00 -
4 Mandor HOK 0.030 - 140,000.00 -

Sub Jumlah Err:509


B BAHAN/MATERIAL :
1 Papan 3/20 cm kayu kelas II M3 0.01 Err:509 2,500,000.00 Err:509
2 Kaso
Paku 5/7
5 cmcm
dan 7 cm M3 0.00 Err:509 2,500,000.00 Err:509
3 Kg 0.30 Err:509 18,000.00 Err:509
4 Minyak bekisting Ltr 0.20 Err:509 5,000.00 Err:509
Err:509
C PERALATAN
1 -
2
3
4
Sub Jumlah -
JUMLAH TOTAL Err:509
Item Pekerjaan : Pek. Pembesian dengan Besi Polos
Vol. Item Pekerjaan : Err:509 Kg

Volume per
NO URAIAN Satuan Satu Satuan JUMLAH/VOLUME Harga Jumlah
Pekerjaan KEBUTUHAN Satuan Harga
(Koefisien)
(1) (2) (3) (4) (5) (6) 7

A TENAGA KERJA :
1 Pekerja HOK 0.007 Err:509 92,000.00 Err:509
2 Tukang HOK 0.007 Err:509 130,000.00 Err:509
3 Kepala Tukang HOK 0.001 - 146,000.00 -
4 Mandor HOK 0.000 - 140,000.00 -

Sub Jumlah Err:509


B BAHAN/MATERIAL :
1 Besi Beton (polos/ulir) Kg 1.05 Err:509 11,600.00 Err:509
2 Kawat Ikat Kg 0.02 Err:509 20,000.00 Err:509
3 -
4
Err:509
C PERALATAN
1 -
2
3
4
Sub Jumlah -
JUMLAH TOTAL Err:509
Item Pekerjaan : Pek. Beton Site Mix K. 175
Vol. Item Pekerjaan : Err:509 M3

Volume per
NO URAIAN Satuan Satu Satuan JUMLAH/VOLUME Harga Jumlah
Pekerjaan KEBUTUHAN Satuan Harga
(Koefisien)
(1) (2) (3) (4) (5) (6) 7

A TENAGA KERJA :
1 Pekerja HOK 1.650 Err:509 92,000.00 Err:509
2 Tukang HOK 0.275 Err:509 130,000.00 Err:509
3 Kepala Tukang HOK 0.028 - 146,000.00 -
4 Mandor HOK 0.083 - 140,000.00 -

Sub Jumlah Err:509


B BAHAN/MATERIAL :
1 Semen ( 50 Kg) Zak 6.52 Err:509 62,000.00 Err:509
2 Pasir Beton M3 0.54 Err:509 150,000.00 Err:509
3 Kerikil M3 0.76 Err:509 175,000.00 Err:509
4
Err:509
C PERALATAN
1 -
2
3
4
Sub Jumlah -
JUMLAH TOTAL Err:509
Item Pekerjaan : Pengurugan 1 m3 sirtu padat
Vol. Item Pekerjaan : Err:509 M3

Volume per
NO URAIAN Satuan Satu Satuan JUMLAH/VOLUME Harga Jumlah
Pekerjaan KEBUTUHAN Satuan Harga
(Koefisien)
(1) (2) (3) (4) (5) (6) 7

A TENAGA KERJA :
1 Pekerja HOK 0.250 Err:509 92,000.00 Err:509
2 Tukang HOK - Err:509 130,000.00 Err:509
3 Kepala Tukang HOK - Err:509 146,000.00 Err:509
4 Mandor HOK 0.025 - 140,000.00 -

Sub Jumlah Err:509


B BAHAN/MATERIAL :
1 Tanah Urug M3 1.20 Err:509 50,000.00 Err:509
2 -
3 -
4
Err:509
C PERALATAN
1 -
2
3
4
Sub Jumlah -
JUMLAH TOTAL Err:509
Item Pekerjaan : Pek. Beton tumbuk camp. 1PC:3PP:5Kr
Vol. Item Pekerjaan : Err:509 M3

Volume per
NO URAIAN Satuan Satu Satuan JUMLAH/VOLUME Harga Jumlah
Pekerjaan KEBUTUHAN Satuan Harga
(Koefisien)
(1) (2) (3) (4) (5) (6) 7

A TENAGA KERJA :
1 Pekerja HOK 1.32 Err:509 92,000.00 Err:509
2 Tukang HOK 0.22 Err:509 130,000.00 Err:509
3 Kepala Tukang HOK 0.02 - 146,000.00 -
4 Mandor HOK 0.13 - 140,000.00 -

Sub Jumlah Err:509


B BAHAN/MATERIAL :
1 Semen (50 Kg) Zak 4.00 Err:509 62,000.00 Err:509
2 Pasir Beton M3 0.52 Err:509 150,000.00 Err:509
3 Kerikil Beton M3 0.86 Err:509 175,000.00 Err:509
4
Err:509
C PERALATAN
1 -
2
3
4
Sub Jumlah -
JUMLAH TOTAL Err:509
FORMAT BANTU : PERHITUNGAN REKAPITULASI TOTAL KEBUTUHAN
TENAGA KERJA/BAHAN/ALAT

VOLUME JENIS KEBUTUHAN


TENAGA KERJA BAHAN/MATERIAL PERALATAN

Jack Hammer
Kawat Beton

Kaso 5/7 cm

Tanah Urug
Papan 3/20
SATUAN VOLUME

Besi Beton

Paku 5 cm
NO URAIAN PEKERJAAN

dan 7 cm

bekisting
Batu kali
PEKERJAAN PEKERJAAN

cm kayu
Mandor

Cangkul
Pekerja

Minyak
Tukang

Tukang

Semen

kelas II

PVC 3"
Kepala

Kerikil

Sekop

Martil
Pasir
(HOK) (HOK) (HOK) (HOK) (Zak) (M3) (M2) (Kg) (Kg) (M3) (M3) (M3) (Kg) (Ltr) (M3) (M) ( Sewa/Hari ) (Buah) (Buah) (Buah)
1. Pek. galian sedimen pada saluran terbuka (L= 51 M) M3 17.85 - - - 13.39
2. Pek. galian sedimen pada saluran tertutup ( L=120.5 M3 42.18 - - - 50.62
3. Pek. mengangkut material atau hasil galian dan bong M3 60.03 - - - 21.37
4. Pek. Beton Site Mix K. 175 M3 0.33 - - 0.25 0.50 1.08 0.17 0.4
### ### Err:509 Err:509 - - Err:509 Err:509 Err:509 Err:509
### ### Err:509 Err:509 - - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
### ### Err:509 Err:509 - - Err:509 Err:509 Err:509 Err:509 Err:509
### ### Err:509 Err:509 - - Err:509 Err:509 Err:509 Err:509 Err:509
### ### Err:509 Err:509 - - Err:509 Err:509 Err:509 Err:509
### ### Err:509 Err:509 - - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
### ### Err:509 Err:509 - - Err:509 Err:509 Err:509 Err:509 Err:509
### ### Err:509 Err:509 - - Err:509 Err:509 Err:509 Err:509 Err:509
### ### Err:509 Err:509 - - Err:509 Err:509 Err:509
### ### Err:509 Err:509 - - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
### ### Err:509 Err:509 - - Err:509 Err:509 Err:509 Err:509
### ### Err:509 Err:509 - - Err:509 Err:509 Err:509 Err:509 Err:509
### ### Err:509 Err:509 - - Err:509 Err:509 Err:509
### ### Err:509 Err:509 - - Err:509 Err:509 Err:509 Err:509 Err:509
### ### Err:509 Err:509 - -

Total Volume - - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 - - - -
2. BAHAN/MATERIAL
1 Semen Zak 165.00 62,000.00 10,230,000.00
2 Pasir M3 14.50 150,000.00 2,175,000.00
3 Batu kali M3 2.25 250,000.00 562,500.00
4 Besi Beton
Besi 8 Btg 24.00 55,000.00 1,320,000.00
Besi 10 Btg 28.00 86,500.00 2,422,000.00
Besi 12 Btg 6.00 124,000.00 744,000.00
5 Kawat Beton Kg 5.50 20,000.00 110,000.00
6 Kerikil M3 19.25 175,000.00 3,368,750.00
7 Papan 3/20 cm kayu kelas II Lbr 28.0 51,500.00 1,442,000.00
8 Kaso 5/7
Paku 5 cmcm
dan 7 cm Btg 9.0 34,500.00 310,500.00
9 Kg 12.4 18,000.00 222,300.00
10 Minyak bekisting Ltr 8.0 5,000.00 40,000.00
11 Tanah Urug M3 15.50 50,000.00 775,000.00
12 Pipa PVC 3" M3 14.00 44,250.00 619,500.00
24,341,550.00
PPN ( 10%) 2,434,155.00

JUMLAH BIAYA + PPN (10%) 26,775,705.00


RENCANA ANGGARAN BIAYA

Kegiatan : Pemeliharaan Rutin Drainase Dalam Kota


Upah Borongan Galian Sedimen dan Rehab Saluran Drainase di
Pekerjaan :
Jalan Soekarno Hatta
Lokasi : Kelurahan Manggis
Tahun Anggaran : 2019

HARGA
VOLUME
NO URAIAN Satuan SATUAN JUMLAH BIAYA (Rp)
KEBUTUHAN
(Rp)
1. TENAGA KERJA
1 Mandor HOK - 140,000.00 -
2 Kepala Tukang HOK - 146,000.00 -
3 Tukang HOK Err:509 130,000.00 Err:509
4 Pekerja HOK Err:509 92,000.00 Err:509

Err:509 Err:509
2. BAHAN/MATERIAL
1 Semen Zak Err:509 Err:509 Err:509
2 Pasir M3 Err:509 Err:509 Err:509
3 Batu kali M3 Err:509 Err:509 Err:509
4 Besi Beton Kg Err:509 11,600.00 Err:509
5 Kawat Beton Kg Err:509 20,000.00 Err:509
6 Kerikil M3 Err:509 Err:509 Err:509
7 Papan 3/20 cm kayu kelas II M2 Err:509 2,500,000.00 Err:509
8 Kaso 5/7
Paku 5 cmcm
dan 7 cm M3 Err:509 2,500,000.00 Err:509
9 Kg Err:509 18,000.00 Err:509
10 Minyak bekisting Ltr Err:509 5,000.00 Err:509
11 Tanah Urug M3 Err:509 50,000.00 Err:509
12 PVC 3" M Err:509 44,250.00 Err:509
Err:509
3. ALAT
1 Sewa/hari - -
2 Buah

JUMLAH BIAYA (Rp) Err:509

PPN ( 10%) Err:509

JUMLAH BIAYA + PPN (10%) Err:509

JUMLAH BIAYA DIBULATKAN (Rp) Err:509


DAFTAR ANALISA SATUAN PEKERJAAN

Kegiatan: Pemeliharaan Rutin Drainase Dalam Kota


Pekerja : Upah Borongan Galian Sedimen dan Rehab Saluran Drainase di Jalan Soekarno Hatta
Lokasi : Kelurahan Manggis
Tahun A: 2019

Item Pekerjaan : Pek. Galian tanah sedalam 1 m (SNI 2835:2008 - 6.1 )


Vol. Item Pekerjaan : 1.00 M3

Volume per
NO URAIAN Satuan Satu Satuan JUMLAH/VOLUME Harga Jumlah
Pekerjaan KEBUTUHAN Satuan Harga
(Koefisien)
(1) (2) (3) (4) (5) (6) 7

A TENAGA KERJA :
1 Pekerja HOK 0.750 0.75 92,000.00 69,000.00
2 Tukang HOK - - 130,000.00 -
3 Kepala Tukang HOK - - 146,000.00 -
4 Mandor HOK 0.025 - 140,000.00 -

Sub Jumlah 69,000.00


B BAHAN/MATERIAL :
1 -
2
3
4
-
C PERALATAN
1 -
2
3
4
Sub Jumlah -
JUMLAH TOTAL 69,000.00

Item Pekerjaan : Pek. galian Sedimen tanah lumpur 1 m3


Vol. Item Pekerjaan : 1.00 M3

Volume per
NO URAIAN Satuan Satu Satuan JUMLAH/VOLUME Harga Jumlah
Pekerjaan KEBUTUHAN Satuan Harga
(Koefisien)
(1) (2) (3) (4) (5) (6) 7

A TENAGA KERJA :
1 Pekerja HOK 1.200 1.20 92,000.00 110,400.00
2 Tukang HOK - - 130,000.00 -
3 Kepala Tukang HOK - - 146,000.00 -
4 Mandor HOK 0.045 - 140,000.00 -

Sub Jumlah 110,400.00


B BAHAN/MATERIAL :
1 -
2
3
4
-
C PERALATAN
1 -
2
3
4
Sub Jumlah -
DAFTAR ANALISA SATUAN PEKERJAAN

Kegiatan: Pemeliharaan Rutin Drainase Dalam Kota


Pekerja : Upah Borongan Galian Sedimen dan Rehab Saluran Drainase di Jalan Soekarno Hatta
Lokasi : Kelurahan Manggis
Tahun A: 2019

JUMLAH TOTAL 110,400.00


DAFTAR ANALISA SATUAN PEKERJAAN

Kegiatan: Pemeliharaan Rutin Drainase Dalam Kota


Pekerja : Upah Borongan Galian Sedimen dan Rehab Saluran Drainase di Jalan Soekarno Hatta
Lokasi : Kelurahan Manggis
Tahun A: 2019

Item Pekerjaan : Pek. mengangkut material atau hasil galian dan bongkaran sejauh 30 M
Vol. Item Pekerjaan : 1.00 M3

Volume per
NO URAIAN Satuan Satu Satuan JUMLAH/VOLUME Harga Jumlah
Pekerjaan KEBUTUHAN Satuan Harga
(Koefisien)
(1) (2) (3) (4) (5) (6) 7

A TENAGA KERJA :
1 Pekerja HOK 0.356 0.36 92,000.00 32,752.00
2 Tukang HOK - - 130,000.00 -
3 Kepala Tukang HOK - - 146,000.00 -
4 Mandor HOK 0.018 - 140,000.00 -

Sub Jumlah 32,752.00


B BAHAN/MATERIAL :
1 -
2
3
4
-
C PERALATAN
1 -
2
3
4
Sub Jumlah -
JUMLAH TOTAL 32,752.00

Item Pekerjaan : Pek. pasangan Batu Kali camp. 1 PC : 4PP


Vol. Item Pekerjaan : 1.00 M3

Volume per
NO URAIAN Satuan Satu Satuan JUMLAH/VOLUME Harga Jumlah
Pekerjaan KEBUTUHAN Satuan Harga
(Koefisien)
(1) (2) (3) (4) (5) (6) 7

A TENAGA KERJA :
1 Pekerja HOK 1.500 1.50 92,000.00 138,000.00
2 Tukang HOK 0.75 0.75 130,000.00 97,500.00
3 Kepala Tukang HOK 0.08 - 146,000.00 -
4 Mandor HOK 0.08 - 140,000.00 -

Sub Jumlah 235,500.00


B BAHAN/MATERIAL :
1 Batu Kali M3 1.20 1.20 250,000.00 300,000.00
2 Semen ( 50 Kg) Zak 3.26 3.26 62,000.00 202,120.00
3 Pasir Pasang M3 0.52 0.52 150,000.00 78,000.00
4
580,120.00
C PERALATAN
1 -
2
3
4
Sub Jumlah -
DAFTAR ANALISA SATUAN PEKERJAAN

Kegiatan: Pemeliharaan Rutin Drainase Dalam Kota


Pekerja : Upah Borongan Galian Sedimen dan Rehab Saluran Drainase di Jalan Soekarno Hatta
Lokasi : Kelurahan Manggis
Tahun A: 2019

JUMLAH TOTAL 815,620.00


RENCANA ANGGARAN BIAYA

Kegiatan : Pemeliharaan Rutin Drainase Dalam Kota


Pekerjaan : Upah Borongan Galian Sedimen dan Rehab Saluran Drainase di Jalan Soekarno Hatta
Lokasi : Kelurahan Manggis
Tahun Anggaran : 2019

HARGA
JUMLAH HARGA
NO URAIAN PEKERJAAN SATUAN VOLUME SATUAN
(Rp) (Rp)
I Pengerukkan Sedimen Saluran Drainase
1. Pek. galian sedimen pada saluran terbuka (L= 51 M) M3 17.85 69,000 1,231,650.00
2. Pek. galian sedimen pada saluran tertutup ( L=120.5 M) M3 42.18 110,400 4,656,120.00
3. Pek. mengangkut material atau hasil galian dan bongkaran M3 60.03 32,752 1,965,938.80
JUMLAH 7,853,708.80
II Rehab Buis Beton (L=2 M)
4. Pek. Beton Site Mix K. 175 M3 0.33 815,620 269,154.60
JUMLAH 269,154.60
JUMLAH TOTAL 8,122,863.40
PPN 10% 812,286.34
JUMLAH TOTAL + PPN 10% 8,935,149.74
DIBULATKAN 8,935,000.00

Terbilang : Delapan Juta Sembilan Ratus Tiga Puluh Lima Ribu Rupiah

Bukittinggi, Juni 2019

Diperiksa Oleh, Dihitung Oleh,


Kasi Drainase Perkotaan Staf Bidang Cipta Karya

ALRISMAN, ST ELFIANA, ST
NIP. 19830120 201001 1 014 NIP. 19861216 201902 2 002

Mengetahui, Diketahui Oleh,


Plt.KEPALA DINAS PEKERJAAN UMUM KEPALA BIDANG CIPTA KARYA
DAN PENATAAN RUANG DPUPR KOTA BUKITTINGGI
KOTA BUKITTINGGI

ISMAIL, SH, MM BAMBANG RIWANTO, ST


NIP. 19620724 198302 1 001 NIP. 19790302 200604 1002
RENCANA ANGGARAN BIAYA

Kegiatan : Pemeliharaan Rutin Drainase Dalam Kota


Pekerjaan : Upah Borongan Galian Sedimen dan Rehab Saluran Drainase di Jalan Soekarno Hatta
Lokasi : Kelurahan Manggis
Tahun Anggaran : 2019

HARGA
JUMLAH HARGA
NO URAIAN PEKERJAAN SATUAN VOLUME SATUAN
(Rp) (Rp)
I Pengerukkan Sedimen Saluran Drainase
1. Pek. galian sedimen pada saluran terbuka (L= 51 M) M3 17.85 69,000 1,231,650.00
2. Pek. galian sedimen pada saluran tertutup ( L=120.5 M) M3 42.18 110,400 4,656,672.00
3. Pek. mengangkut material atau hasil galian dan bongkaran M3 60.03 32,752 1,966,102.56
JUMLAH 7,854,424.56
II Rehab Buis Beton (L=2 M)
4. Pek. Beton Site Mix K. 175 M3 0.33 815,620 269,154.60
JUMLAH 269,154.60
JUMLAH TOTAL 8,123,579.16
PPN 10% 812,357.92
JUMLAH TOTAL + PPN 10% 8,935,937.08
DIBULATKAN 8,935,000.00

Terbilang : Delapan Juta Sembilan Ratus Tiga Puluh Lima Ribu Rupiah

Bukittinggi, Juni 2019

Diperiksa Oleh, Dihitung Oleh,


Kasi Drainase Perkotaan Staf Bidang Cipta Karya

ALRISMAN, ST ELFIANA, ST
NIP. 19830120 201001 1 014 NIP. 19861216 201902 2 002

Mengetahui, Diketahui Oleh,


Plt.KEPALA DINAS PEKERJAAN UMUM KEPALA BIDANG CIPTA KARYA
DAN PENATAAN RUANG DPUPR KOTA BUKITTINGGI
KOTA BUKITTINGGI

ISMAIL, SH, MM BAMBANG RIWANTO, ST


NIP. 19620724 198302 1 001 NIP. 19790302 200604 1002
RENCANA ANGGARAN BIAYA

Kegiatan : Pemeliharaan Rutin Drainase Dalam Kota


Pekerjaan : Upah Borongan Galian Sedimen dan Rehab Saluran Drainase di Jalan Soekarno Hatta
Lokasi : Kelurahan Manggis
Tahun Anggaran : 2019

HARGA
JUMLAH HARGA
NO URAIAN PEKERJAAN SATUAN VOLUME SATUAN
(Rp) (Rp)
I Pengerukkan Sedimen Saluran Drainase
1. Pek. galian sedimen pada saluran terbuka (L= 51 M) M3 17.85 69,000 1,231,650.00
2. Pek. galian sedimen pada saluran tertutup ( L=120.5 M) M3 42.18 110,400 4,656,672.00
3. Pek. mengangkut material atau hasil galian dan bongkaran M3 60.03 32,752 1,966,102.56
JUMLAH 7,854,424.56
II Rehab Buis Beton (L=2 M)
4. Pek. Beton Site Mix K. 175 M3 0.33 815,620 269,154.60
JUMLAH 269,154.60
JUMLAH TOTAL 8,123,579.16
PPN 10% 812,357.92
JUMLAH TOTAL + PPN 10% 8,935,937.08
DIBULATKAN 8,935,000.00

Terbilang : Delapan Juta Sembilan Ratus Tiga Puluh Lima Ribu Rupiah

Bukittinggi, Juni 2019

Diperiksa Oleh, Dihitung Oleh,


Pengawas Pelaksana

INDRA SUSANTO, ST RENAWAFIL


NIP. 19760910 201001 1 003 NIP. 19690718 200801 1 003

Diketahui Oleh,
Pejabat Pembuat Komitmen (PPK)

ALRISMAN, ST
NIP. 19830120 201001 1 014
RENCANA ANGGARAN BIAYA BAHAN

Kegiatan : Pemeliharaan Rutin Drainase Dalam Kota


Pekerjaan : Upah Borongan Galian Sedimen dan Rehab Saluran Drainase di Jalan Soekarno Hatta
Lokasi : Kelurahan Manggis
Tahun Anggaran : 2019

HARGA
JUMLAH HARGA
NO URAIAN PEKERJAAN SATUAN VOLUME SATUAN
(Rp) (Rp)
I Pengerukkan Sedimen Saluran Drainase
1. Pek. galian sedimen pada saluran terbuka (L= 51 M) M3 17.85 - -
2. Pek. galian sedimen pada saluran tertutup ( L=120.5 M) M3 42.18 - -
3. Pek. mengangkut material atau hasil galian dan bongkaran M3 60.03 - -
JUMLAH -
II Rehab Buis Beton (L=2 M)
4. Pek. Beton Site Mix K. 175 M3 0.33 580,120 191,439.60
JUMLAH 191,439.60
JUMLAH TOTAL 191,439.60
PPN 10% 19,143.96
JUMLAH TOTAL + PPN 10% 210,583.56
DIBULATKAN 211,000.00

Terbilang : Dua Ratus Sebelas Ribu Rupiah

Bukittinggi, Juni 2019

Diperiksa Oleh, Dihitung Oleh,


Pengawas Pelaksana

INDRA SUSANTO, ST RENAWAFIL


NIP. 19760910 201001 1 003 NIP. 19690718 200801 1 003

Diketahui Oleh,
Pejabat Pelaksana Teknis Kegiatan

ALRISMAN, ST
NIP. 19830120 201001 1 014
RENCANA ANGGARAN BIAYA UPAH

Kegiatan : Pemeliharaan Rutin Drainase Dalam Kota


Pekerjaan : Upah Borongan Galian Sedimen dan Rehab Saluran Drainase di Jalan Soekarno Hatta
Lokasi : Kelurahan Manggis
Tahun Anggaran : 2019

HARGA
JUMLAH HARGA
NO URAIAN PEKERJAAN SATUAN VOLUME SATUAN
(Rp) (Rp)
I Pengerukkan Sedimen Saluran Drainase
1. Pek. galian sedimen pada saluran terbuka (L= 51 M) M3 17.85 69,000 1,231,650.00
2. Pek. galian sedimen pada saluran tertutup ( L=120.5 M) M3 42.18 110,400 4,656,672.00
3. Pek. mengangkut material atau hasil galian dan bongkaran M3 60.03 32,752 1,966,102.56
JUMLAH 7,854,424.56
II Rehab Buis Beton (L=2 M)
4. Pek. Beton Site Mix K. 175 M3 0.33 235,500 77,715.00
JUMLAH 77,715.00
JUMLAH TOTAL 7,932,139.56
PPN 10% 793,213.96
JUMLAH TOTAL + PPN 10% 8,725,353.52
DIBULATKAN 8,726,000.00

Terbilang : Delapan Juta Tujuh Ratus Dua Puluh Enam Ribu Rupiah

Bukittinggi, Juni 2019

Diperiksa Oleh, Dihitung Oleh,


Pengawas Pelaksana

INDRA SUSANTO, ST RENAWAFIL


NIP. 19760910 201001 1 003 NIP. 19690718 200801 1 003

Diketahui Oleh,
Pejabat Pelaksana Teknis Kegiatan

ALRISMAN, ST
NIP. 19830120 201001 1 014
RENCANA ANGGARAN BIAYA UPAH (TAWARAN UPAH)

Kegiatan : Pemeliharaan Rutin Drainase Dalam Kota


Pekerjaan : Upah Borongan Galian Sedimen dan Rehab Saluran Drainase di Jalan Soekarno Hatta
Lokasi : Kelurahan Manggis
Tahun Anggaran : 2019

HARGA
JUMLAH HARGA
NO URAIAN PEKERJAAN SATUAN VOLUME SATUAN
(Rp) (Rp)
I Pengerukkan Sedimen Saluran Drainase
1. Pek. galian sedimen pada saluran terbuka (L= 51 M) M3 17.85 69,000 1,231,650.00
2. Pek. galian sedimen pada saluran tertutup ( L=120.5 M) M3 42.18 110,000 4,639,800.00
3. Pek. mengangkut material atau hasil galian dan bongkaran M3 60.03 32,000 1,920,960.00
JUMLAH 7,792,410.00
II Rehab Buis Beton (L=2 M)
4. Pek. Beton Site Mix K. 175 M3 0.33 187,000 61,710.00
JUMLAH 61,710.00
JUMLAH TOTAL 7,854,120.00
DIBULATKAN 7,854,000.00

Terbilang : Tujuh Juta Delapan Ratus Lima Puluh Empat Ribu Rupiah

Bukittinggi, Juni 2019

Penawar Upah Borongan,

MAHYUDIN
Kepala Pekerja
RINCIAN KLARIFIKASI DAN NEGOSIASI

Kegiatan : Pemeliharaan Rutin Drainase Dalam Kota


Pekerjaan : Upah Borongan Galian Sedimen dan Rehab Saluran Drainase di Jalan Soekarno Hatta
Lokasi : Kelurahan Manggis
Tahun Anggaran : 2019

HARGA PERKIRAAN SENDIR


HARGA
NO URAIAN PEKERJAAN SATUAN VOLUME
SATUAN
(Rp)
I Pengerukkan Sedimen Saluran Drainase
1. Pek. galian sedimen pada saluran terbuka (L= 51 M) M3 17.85 69,000
2. Pek. galian sedimen pada saluran tertutup ( L=120.5 M) M3 42.18 110,400

3. Pek. mengangkut material atau hasil galian dan bongkaran M3 60.03 32,752

JUMLAH
II Rehab Buis Beton (L=2 M)
4. Pek. Beton Site Mix K. 175 M3 0.33 235,500
JUMLAH
JUMLAH PEKERJAAN
DIBULATKAN

Terbilang : Tujuh Juta Dua Ratus Tiga Puluh Delapan Ribu

PIHAK KEDUA

MAHYUDIN
Kepala Pekerja
AN KLARIFIKASI DAN NEGOSIASI

rainase di Jalan Soekarno Hatta

HARGA PERKIRAAN SENDIRI HARGA PENAWARAN HARGA NEGOISASI


JUMLAH HARGA JUMLAH HARGA JUMLAH
HARGA SATUAN HARGA SATUAN HARGA
(Rp) (Rp) (Rp) (Rp) (Rp)

1,231,650 69,000 1,231,650 65,000 1,160,250


4,656,672 110,000 4,639,800 100,000 4,218,000

1,966,103 32,000 1,920,960 30,000 1,800,900

7,854,425 7,792,410 7,179,150

77,715 187,000 61,710 180,000 59,400


77,715 61,710 59,400
7,932,140 7,854,120 7,238,550
7,932,000 7,854,000 7,238,000

ta Dua Ratus Tiga Puluh Delapan Ribu Rupiah

Bukittinggi, Juni 2019

Dibuat Oleh,
PIHAK PERTAMA

ALRISMAN, ST
NIP. 19830120 201001 1 014
B U K I T T I N G G I

PEMERINTAH KOTA BUKITTINGGI


DINAS PEKERJAAN UMUM DAN
PENATAAN RUANG
Jln. Ombilin Nomor. 169 Belakang Balok, Bukittingi Telp. (0752) 22214

SURAT PERINTAH KERJA

Nomor : II.22/PPK-PD/DPUPR-CK/2019
Tanggal : 25 Juni 2109

ANTARA
PEJABAT PEMBUAT KOMITMEN
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
KOTA BUKITTINGGI

DENGAN
PELAKSANA SWAKELOLA

TENTANG

KEGIATAN : Pemeliharaan Rutin Drainase Dalam Kota Tahun


2019

PEKERJAAN : Upah Borongan Pengerukkan Sedimen dan


Perbaikan Buis Beton Saluran Drainase Jalan
Soekarno-Hatta

LOKASI : KOTA BUKITTINGGI

NILAI PEKERJAAN : Rp 7,238,000.00

Tujuh Juta Dua Ratus Tiga Puluh Delapan Ribu Rupiah

WAKTU PELAKSANAA : 10 (sepuluh) hari kalender

MULAI : 25 Juni 2109

SELESAI : 4 Juli 2019


REKAP RENCANA ANGGARAN BIAYA UPAH

Kegiatan : Pemeliharaan Rutin Drainase Dalam Kota


Pekerjaan : Upah Borongan Pengerukkan Sedimen dan Perbaikan Buis Beton Saluran Drainase
Lokasi : Saluran Drainase Jl. Soekarno-Hatta
Tahun Anggaran : 2019

TOTAL JUMLAH
NO URAIAN PEKERJAAN
(Rp)

I Pengerukkan Sedimen Saluran Drainase 7,854,424.56

II Rehab Buis Beton (L=2 M) 77,715

JUMLAH TOTAL 7,932,139.56


DIBULATKAN 7,932,000.00

Terbilang : Tujuh Juta Sembilan Ratus Tiga Puluh Dua Ribu Rupiah

Bukittinggi, Juni 2019

Dibuat Oleh,
Pejabat Pembuat Komitmen

ALRISMAN, ST
NIP. 19830120 201001 1 014
RENCANA ANGGARAN BIAYA UPAH

Kegiatan : Pemeliharaan Rutin Drainase Dalam Kota


Pekerjaan : Upah Borongan Pengerukkan Sedimen dan Perbaikan Buis Beton Saluran Drainase
Lokasi : Saluran Drainase Jl. Soekarno-Hatta
Tahun Anggaran : 2019

HARGA
JUMLAH HARGA
NO URAIAN PEKERJAAN SATUAN VOLUME SATUAN
(Rp) (Rp)
I Pengerukkan Sedimen Saluran Drainase
1. Pek. galian sedimen pada saluran terbuka (L= 51 M) M3 17.85 69,000 1,231,650.00
2. Pek. galian sedimen pada saluran tertutup ( L=120.5 M) M3 42.18 110,400 4,656,672.00
3. Pek. mengangkut material atau hasil galian dan bongkaran M3 60.03 32,752 1,966,102.56
JUMLAH 7,854,424.56
II Rehab Buis Beton (L=2 M)
4. Pek. Beton Site Mix K. 175 M3 0.33 235,500 77,715.00
JUMLAH 77,715.00
JUMLAH TOTAL 7,932,139.56

Bukittinggi, Juni 2019

Dibuat Oleh,
Pejabat Pembuat Komitmen

ALRISMAN, ST
NIP. 19830120 201001 1 014
REKAP RENCANA ANGGARAN BIAYA UPAH (TAWARAN UPAH)

Kegiatan : Pemeliharaan Rutin Drainase Dalam Kota


Pekerjaan : Upah Borongan Pengerukkan Sedimen dan Perbaikan Buis Beton Saluran Drainase
Lokasi : Saluran Drainase Jl. Soekarno-Hatta
Tahun Anggaran : 2019

TOTAL JUMLAH
NO URAIAN PEKERJAAN
(Rp)

I Pengerukkan Sedimen Saluran Drainase 7,792,410.00

II Pekerjaan Pelat Dukker 0.8 M x 4 M 61,710

JUMLAH TOTAL 7,854,120.00


DIBULATKAN 7,854,000.00

Terbilang : Tujuh Juta Delapan Ratus Lima Puluh Empat Ribu Rupiah

Bukittinggi, Juni 2019

Penawar Upah Borongan,

MAHYUDIN
Kepala Pekerja
RENCANA ANGGARAN BIAYA UPAH (TAWARAN UPAH)

Kegiatan : Pemeliharaan Rutin Drainase Dalam Kota


Pekerjaan : Upah Borongan Pengerukkan Sedimen dan Perbaikan Buis Beton Saluran Drainase
Lokasi : Saluran Drainase Jl. Soekarno-Hatta
Tahun Anggaran : 2019

HARGA
JUMLAH HARGA
NO URAIAN PEKERJAAN SATUAN VOLUME SATUAN
(Rp) (Rp)
I Pengerukkan Sedimen Saluran Drainase
1. Pek. galian sedimen pada saluran terbuka (L= 51 M) M3 17.85 69,000 1,231,650.00
2. Pek. galian sedimen pada saluran tertutup ( L=120.5 M) M3 42.18 110,000 4,639,800.00
3. Pek. mengangkut material atau hasil galian dan bongkaran M3 60.03 32,000 1,920,960.00
JUMLAH 7,792,410.00
II Rehab Buis Beton (L=2 M)
4. Pek. Beton Site Mix K. 175 M3 0.33 187,000 61,710.00
JUMLAH 61,710.00
JUMLAH TOTAL 7,854,120.00
DIBULATKAN 7,854,000.00

Bukittinggi, Juni 2019

Untuk dan atas nama Pelaksana Swakelola

MAHYUDIN
Kepala Pekerja
RINCIAN KLARIFIKASI DAN NEGOSIASI

Kegiatan : Pemeliharaan Rutin Drainase Dalam Kota


Pekerjaan : Upah Borongan Pengerukkan Sedimen dan Perbaikan Buis Beton Saluran Drainase
Lokasi : Saluran Drainase Jl. Soekarno-Hatta
Tahun Anggaran : 2019

HARGA PERKIRAAN SENDIRI HARGA PENAWARAN HARGA NEGOISASI


HARGA JUMLAH HARGA JUMLAH HARGA JUMLAH
NO URAIAN PEKERJAAN SATUAN VOLUME
SATUAN HARGA SATUAN HARGA SATUAN HARGA
(Rp) (Rp) (Rp) (Rp) (Rp) (Rp)
I Pengerukkan Sedimen Saluran Drainase
1. Pek. galian sedimen pada saluran terbuka (L= 51 M) M3 17.85 69,000 1,231,650 69,000 1,231,650 65,000 1,160,250
2. Pek. galian sedimen pada saluran tertutup ( L=120.5 M) M3 42.18 110,400 4,656,672 110,000 4,639,800 100,000 4,218,000

3. Pek. mengangkut material atau hasil galian dan bongkaran M3 60.03 32,752 1,966,103 32,000 1,920,960 30,000 1,800,900

JUMLAH 7,854,425 7,792,410 7,179,150


II Rehab Buis Beton (L=2 M)
4. Pek. Beton Site Mix K. 175 M3 0.33 235,500 77,715 187,000 61,710 180,000 59,400
JUMLAH 77,715 61,710 59,400
JUMLAH PEKERJAAN 7,932,140 7,854,120 7,238,550
DIBULATKAN 7,932,000 7,854,000 7,238,000

Terbilang : Tujuh Juta Dua Ratus Tiga Puluh Delapan Ribu Rupiah

Bukittinggi, Juni 2019

Untuk dan atas nama Pelaksana Swakelola Pejabat Pembuat Komitmen

MAHYUDIN ALRISMAN, ST
Kepala Pekerja NIP. 19830120 201001 1 014
JALAN
43.0000

4.0000 9.0000

8Ø8 - 150 Ø10 - 150

0.70

0.20

1.20
JALAN ADINEGORO
43.0000

9.0000 4.3000