Anda di halaman 1dari 9

LAPORAN

PRAKTIKUM ILMU UKUR TANAH


PENGUKURAN JALAN DENGAN THEODOLITE
Disusun Guna Memenuhi Tugas Mata Kuliah Ilmu Ukur Tanah
Diampu Oleh : Ir. H. Soeharto, M.Eng.

Disusun oleh :
Kelompok 3
(Nama Anggota Terlampir)

TEKNIK SIPIL
FAKULTAS TEKNIK DAN ILMU KOMPUTER (FASTIKOM)
UNIVERSITAS SAINS AL-QUR’AN (UNSIQ)JAWA TENGAH
DI WONOSOBO
2020
FAKULTAS TEKNIK DAN ILMU KOMPUTER (FASTIKOM)
UNIVERSITAS SAINS AL-QUR’AN (UNSIQ) JAWA TENGAH
DI WONOSOBO

Jl.KH.Hasyim Asy’ari Kalibeber KM. 03 Mojotengah, Wonosobo. |Telp.


082227920500, 087736027247 | email : hmtsunsiq01@gmail.com

LEMBAR PENGESAHAN

Laporan Praktikum Ilmu Ukur Tanah


Jurusan Teknik Sipil Universitas Sains Al-Qur’an (UNSIQ) Jawa Tengah
Di Wonosobo

Di Susun Oleh :
1. Anggi Subarkah : Nim. 2019140010
2. Andi Setiawan : Nim. 2019140048
3. Anwar Sadad : Nim. 2019140096
4. Fathul Faizin : Nim. 2019140101
5. Fidiyanto : Nim. 2019140128
6. Muhammad Rafiqul Lubab : Nim. 2019140112
7. Rahadian Daru Arintaka : Nim. 2019140015
8. Ridwan : Nim. 2019140106
9. Rio Gladi Utomo : Nim. 2019140036
10. Ruhan Fawa’id : Nim. 2019140006

ii
Telah di periksa dan di setujui oleh :

Asisten dosen mata kuliah

Joko Adi Wicaksono, S.T Ir. H. Soeharto, M.Eng

Kepala Laboratorium Teknik Sipil Kaprodi Teknik Sipil

Agus Juara, S.T., M.T. Wiji Lestarini, S.T., M.T.


NIDN :06110887203 NPU : 1930905079

iii
KATA PENGANTAR

Puji syukur dipanjatkan ke hadirat Allah SWT, karena atas rahmat dan
hidayah-Nya praktikum ilmu ukur tanah ini dapat diselasaikan. Shalawat serta
salam semoga tetap tercurahkan kepada Baginda Rasulullah Muhammad SAW,
semoga kelak kita di akui sebagai umatnya,

Banyak hambatan yang menimbulkan kesulitan dalam penyelesaian


penulisan laporan ini, namun berkat bantuan dari berbagai pihak akhirnya
kesulitan yang timbul dapat teratasi. Untuk itu atas segala bentuk bantuannya,
disampaikan terima kasih kepada yang terhormat :

1. Dr. KH. Mukhotob Hamzah, M.M. selaku Rektor Universitas Sains Al-
Qur’an (UNSIQ) Jawa Tengah di Wonosobo.
2. Muafani, S.T., M.T. selaku Dekan Fakultas Teknik dan Ilmu Komputer
(FASTIKOM) Universitas Sains Al-Qur’an (UNSIQ) Jawa Tengah di
Wonosobo
3. Wiji Lestarini S.T., M.T. selaku Kaprodi Teknik Sipil Universitas Sains Al-
Qur’an (UNSIQ) Jawa Tengah di Wonosobo
4. Ir. H. Soeharto, M.Eng. sebagai Dosen Pembimbing mata kuliah Teknik Sipil
Universitas Sains Al – Qur’an (UNSIQ) Jawa Tengah di Wonosobo
5. Orangtua tercinta yang tiada hentinya mendoakan kami dan berharap besar
terhadap kesuksesan kami.
6. Kawan-kawan mahasiswa dan mahasiswi Teknik Sipil angkatan 2019.
Penyusun menyadari bahwa eksperimen ini masih jauh dari kesempurnaan,
semoga dengan adanya eksperimen ini bermanfaat bagi perkembangan Ilmu
dalam bidang Teknik Sipil dan bagi seluruh pembaca.

Wonosobo, 14 Agustus 2020

Praktikan

iv
DAFTAR ISI

LEMBAR PENGESAHAN.............................................................................. ii

KATA PENGANTAR ..................................................................................... iii

DAFTAR ISI.................................................................................................... iv

DAFTAR GAMBAR........................................................................................ v

DAFTAR TABEL............................................................................................ vi

BAB I PENDAHULUAN
1.1 Latar belakang.......................................................................................1
2.1 Metode penulisan..................................................................................1
3.1 Tujuan praktikum..................................................................................2

BAB II LANDASAN TEORI


2.1 Pengukuran arak....................................................................................3
2.2 Peralatan ...............................................................................................17
2.3 Cara Pengukuran...................................................................................18

BAB III HASIL DAN PEMBAHASAN


3.1 Pembagian Tugas..................................................................................19
3.2 Hasil Pengukuran..................................................................................19
3.3 Analisa Data..........................................................................................20
3.2.1 Pengukuran elevasi....................................................................20
3.2.2 Pengukuran Koordinat..............................................................25

v
BAB IV PENUTUP
4.1 kesimpulan.................................................................................................. 32
4.2 saran............................................................................................................ 32

LAMPIRAN

vi
DAFTAR GAMBAR

Gambar 2.1. titik masing masing patok............................................................ 4

Gambar 2.2. titik masing masing patok dengan FG......................................... 5

Gambar 2.3. titik masing masing patok dengan AG......................................... 5

Gambar 2.4. titik masing masing patok dengan E dan B.................................. 6

Gambar 2.5. pengukuran jarak optis................................................................. 7

Gambar 2.6. pengukuran elevasi cara sederhana.............................................. 9

Gambar 2.7. pengukuran dengan elevasi cara optis.......................................... 10

Gambar 2.8. pengukuran dengan waterpass..................................................... 10

Gambar 2.9..Pengukuran Elevasi dengan Teodolit.......................................... 11

Gambar 2.10. pengukuran koordinat................................................................ 13

Gambar 2.11. pengukuran sudut arah............................................................... 15

Gambar 2.12. pengukuran arah dan tinggi matahari......................................... 15

Gambar 2.13. pengukuran menggunakan 2 titik ikat........................................ 16

Gambar 2.14. pengukuran titik arah................................................................. 17

Gambar 3.1. Penyetelan theodolit..................................................................... 32

Gambar 3.2. Kegiatan membaca rambu ukur................................................... 32

Gambar 3..3. pencatatan hasil ukur.................................................................. 33

vii
DAFTAR TABEL

Tabel.2.1 Macam cara pengukuran elevasi....................................................... 8

Tabel 2.2 pengukuran elevasi dengan waterpass.............................................. 12

Tabel 3.2.1. hasil pengukuran........................................................................... 19

Tabel 3.2.2. hasil perhitungan pengukuran sudut elevasi ............................... 25