PERENCANAAN GORONG-GORONG

Elevasi Hulu BB S1
BB S1 El.Tanggul = + 136
El.MA = + 135
El.MTA = + 134
El.Dasar Sal = + 133

SS D1 Dimensi SS D1
Q = 0,91793 m3/dt
2646 m V = 0,61 m/dt
b = 1,528 m
h = 0,611 m
Gorong - gorong i = 0,0008
7m m = 1,0
n = 2,5
600 m w = 0,5 m
L = 2646 m
BB D1
Elevasi Hilir BB D1
El.Tanggul = + 135,5
El.MA = + 134,5
El.MTA = + 133,5
El.Dasar Sal = + 132,5

Elevasi Pada Gorong - gorong


El.Muka Tanah Asli = + 133,5 + ( x (134 – 133,5))

= + 133,61

El. Dasar Saluran = + 132,5 + ( x (133 – 132,5))

= + 132,61

El. Muka Air = + 132,61 + 0,611


= + 133,221

El. Tanggul = + 133,221 + w


= + 133,221 + 0,5
= + 133,721
Elevasi Pada Belakang Gorong - gorong
El.Muka Tanah Asli = + 133,5 + ( x (134 – 133,5))

= + 133,613

El. Dasar Saluran = + 132,5 + ( x (133 – 132,5))

= + 132,613

El. Muka Air = + 132,613+ 0,611


= + 134,224

El. Tanggul = + 134,224 + w


= + 134,224 + 0,5
= + 134,724

Elevasi Pada Muka Gorong - gorong


El.Muka Tanah Asli = + 133,5 + ( x (134 – 133,5))

= + 133,612
El. Dasar Saluran = + 132,5 + ( x (133 – 132,5))

= + 132,612

El. Muka Air = + 132,612 + 0,611


= + 133,223

El. Tanggul = + 133,223+ w


= + 133,223 + 0,5
= + 133,723

Kelas jalan II dengan lebar lajur ideal 3.5 m sehingga lebar jalan = 7 m
Analisa Perhitungan

1. Kecepatan rencana ditetapkan 1,50 m/dt – 2,00 m/dt


Direncankan Va = 1,5 m/dt
Dimana:
Q = A x Va
A = Q / Va

= 0,611 m2

2. Jika direncanakan bentuk penampang persegi


b =nxh : n = 2,5
= 2,5 h

A =bxh
0,611 m2 = 2,5 h x h
h2 = 0,24
h = 0,489 m

Maka ;
b = 2,5 x 0,489 m
= 1,222 m

3. Kehilangan Energi
Va = 1,5 m/dt
V = 0,61 m/dt

(Va  V ) 2
h masuk = 0,5
2g

= 0,0226 m
(Va  V ) 2
h keluar = 1
2g

= 0,0403 m

h = hm + hk
= 0,0226 + 0,0403
= 0,0629 m
PERENCANAAN SIPHON

BB G1 Elevasi Hulu BB G1
El.Tanggul = + 133,5
El.MA = + 132,5
El.MTA = + 131,5
El.Dasar Sal = + 130,5

Elevasi Hilir BB G2
El.Tanggul = + 133
El.MA = + 132
El.MTA = + 131
2230 m El.Dasar Sal = + 130
10 m
Dimensi
Siphon Q = 0,33753 m3/dt
V = 0,5054 m/dt
1115 b = 0,775 m
m h = 0,576 m
i = 0,0008
m = 1,0
BB G2 n = 1,0
w = 0,5 m

Elevasi Pada Siphon

El.Muka Tanah Asli = + 131 + ( x (131,5 – 131))

= + 131,25

El. Dasar Saluran = + 130 + ( (130,5 – 130))

= + 130,25

El. Muka Air = + 130,25 + 0,576


= + 130,826

El. Tanggul = + 130,826 + W


= + 130,826 + 0,5
= + 131,326
Elevasi Pada Muka Siphon

El.Muka Tanah Asli = + 131 + ( x (131,5 – 131))

= + 131,251

El. Dasar Saluran = + 130 + ( (130,5 – 130))

= + 130,251

El. Muka Air = + 130,251 + 0,576


= + 130,827

El. Tanggul = + 130,827 + W


= + 130,827 + 0,5
= + 131,327

Elevasi Pada Belakang Siphon

El.Muka Tanah Asli = + 131 + ( x (131,5 – 131))

= + 131,248

El. Dasar Saluran = + 130 + ( x (130,5 – 130))

= + 130,248

El. Muka Air = + 130,248 + 0,576


= + 130,824

El. Tanggul = + 130,824 + W


= + 130,824 + 0,5
= + 131,324
Analisa Perhitungan

1. Kecepatan rencana ditetapkan 1,50 m/dt – 2,00 m/dt


Direncankan Va = 1,5 m/dt
Dimana
Q = A x Va
A = Q / Va

=
= 0,22502 m2

2. Jika direncanakan bentuk penampang persegi


b =nxh : n = 1,0
= 1,0 h

A =bxh
0,22502 m2 = 1,0 h x h
h2 = 0,22502
h = 0,474 m

Maka ;
b = 1,0 x 0,474
= 0,474 m

3. Kehilangan Energi
Va = 1,5 m/dt
V = 0,5054 m/dt

(Va  V ) 2
h masuk = m 0,5
2g

=
= 0,0252 m
(Va  V ) 2
h keluar = k 1
2g
=

= 0,05041 m

(Va ) 2 xL
hf =
C 2 xR
dimana :
P = b + 2.h
= 0,576 + (2 x 0,474)
= 1,524 m
A = bxh
= 0,576 x 0,474
= 0,273 m2
R = A/P
= 0,273 / 1,524
= 0,17 m
C = K x R1/6
= 35 x (0,17)1/6
= 26,050
(Va ) 2 xL
hf1 =
C 2 xR

= 0,195 m
(Va ) 2 xL
hf2 =
C 2 xR

=
= 0,072 m
(Va ) 2 xL
hf3 =
C 2 xR

=
= 0,064 m
V2
h saringan = c.
2g

s
c=β[ ]^4/3 . sin δ
b  s = 8 mm Ø jeruji
 b = 5 cm jarak antar jeruji
= 2,4 . sin 30  δ = sudut kemiringan dari
bidang horisontal
= 0,000224 saringan
 β = bentuk jeruji bulat
V2
h saringan = c. = 0.000224 X = (2,4)
2g  Harga Kb dr Kp-4 hal 256
2,9x10 -6 tabel 5.2

Va 2
h belokan = Kb. = 0,14 = 0,0161
2g

h = h saringan +h masuk + hf2 + h belokan + hf1 + h belokan + hf3 + h keluar


= 2,6x10-6 + 0,0252 + 0,072 + 0,0161 + 0,195 + 0,0161 + 0,064 + 0,05041
= 0,438 m = 43,8 cm
BANGUNAN TERJUN

Elevasi Hulu BB G2

BB G2 El.Tanggul = + 133
El.MA = + 132
El.MTA = + 131
El.Dasar Sal = + 130
1004,5 m
Data-data SS G3:
SS G3
Q = 0,18564 m3/dt
V = 0,416 m/dt
b = 0,714 m
h = 0,357 m
B. Terjun 2009 m i = 0,0008
w = 0,5 m
g = 9,81 m
1004,5 p = 2002 m
m

Elevasi Hilir BB G3
BB G3
El.Tanggul = + 132,5
El.MA = + 131,5
El.MTA = + 130,5
El.Dasar Sal = + 129,5

Elevasi pada Muka Tanah Bangunan Terjun


El.Muka Tanah Asli = + 130,5 + ( (131 – 130,5))

= + 130,75

El. Dasar Saluran = + 129,5 + ( (130 – 129,5))

= + 129,75

El. Muka Air = + 129,75 + 0,357


= + 130,107

El. Tanggul = + 130,107 + w


= + 130,107 + 0,5
= + 130,607
Elevasi pada Bangunan Terjun
Perencanaan tinggi terjun 2,00 m
El.Tanggul = + 130,607 + 2,00
= + 132,607

El. Muka Air = + 130,107 + 2,00


= + 132,107

El. Dasar Saluran = + 129,75 + 2,00


= + 131,75

Perhitungan Bangunan Terjun


 Menghitung tinggi energi di muka ambang ( H1 )
2
V1
H1 = h1  H1 = Y1 + P1
2.g

= 0,365 = Y1 + 2,002

= 0,365 m Y1 = 1,823 m
 Menghitung tinggi energi hilir pada kolam olak ( Hd )
Hd = 1,48 x H1
= 1,48 x 0,365
= 0,5402 m
 Menghitung perkiraan awal tinggi bangunan terjun (∆Z )
∆Z = ( ∆H + Hd ) - H1
= ( 0,357 + 0,5402 ) – 0,365
= 0,5322 m
Jadi bangunan terjun ≤ 1,5 → tegak …OK!

 Menghitung kecepatan aliran pada potongan U ( Vu )


Q
Vu = 2 x g x z q = B = 80% x b
b
= = = 0,8 x 0,714

= 3,231 m/det = 0,2599 m2/det = 0,571 m


Q Vu
Yu = FRU =
Vu g x Yu

= =

= 0,08 m = 3,647

Yd =
Yu
2
 1  8Fru^2 1
=

= 0,374

Panjang loncatan (Lj)


Lj = 6 x (Yd - Yu)
= 6 x (0,374 – 0,08)
= 1,764 m
Lp = ∆z . 1,9
= 0,5322 x 1,9
= 1,01118 m
Panjang kolam (LB)
LB = Lp + Lj
= 1,01118 + 1,764
= 2,77518 m
DESAIN BANGUNAN SADAP

SS D2

BB D2

ST Kiri 2 ST Kanan 2

105,5 Ha 100 lt/dt 78,40 Ha 156 lt/dt


SS D3

Gambar Jaringan Irigasi

DATA – DATA SALURAN

Ruas Saluran Sekunder Sungai (SS D2), dan Ruas Saluran Sekunder Sungai (SS D3)
Q = 0,57493 m3 / dt Q = 0,15680 m3 / dt
V = 0,5518 m / dt V = 0,3988 m / dt
h = 0,546 m h = 0,335 m
b = 1,091 m b = 0,670 m
W = 0,5 m W = 0,5 m

Ruas Tersier (SBD Kiri 2), dan Ruas Tersier (SBD Kanan 2)
Q = 0,15778 m3 / dt Q = 0,15092 m3 / dt
V = 0,5828 m / dt V = 0,5764 m / dt
h = 0,368 m h = 0,362 m
b = 0,368 m b = 0,362 m
W = 0,4 m W = 0,4 m
DESAIN HIDROLIK BANGUNAN SADAP
1. Desain Hidrolik pintu sekunder SS D2
Type Slide Gate / Pintu sorong
Direncanakan Lebar = 1,5 m
Q = ( k.µ ).a .b 2.g.h

0,57493 m3 / dt = 0,60 . a . 1,5


0,57493 m3 / dt = 2,929 . a
a=

a = 0,19 m
a = 19 cm
Kontrol 19 cm < 0,63 . h
19 cm < 0,63 . 54 cm
19 cm < 34,02 cm .............................(OK)

2. Desain Hidrolik pintu sekunder SS D3


Type Slide Gate / Pintu sorong
Direncanakan Lebar = 1,5 m
Q = ( k.µ ).a .b 2.g.h

0,15680 m3 / dt = 0,60 . a . 1,5


0,15680 m3 / dt = 2,307 . a
a=

a = 0,06 m
a = 6 cm
Kontrol 6 cm < 0,63 . h
6 cm < 0,63 . 33,5 cm
6 cm < 21,105 cm .............................(OK)

3. Desain Hidrolik Pintu Tersier SBS KANAN 2


Type Slide Gate / Pintu sorong
Direncanakan Lebar = 1,5 m
Q = ( k.µ ).a .b 2.g.h

0,15092 m3 / dt = 0,60 . a . 1,5


0,15092 m3 / dt = 2,398 . a
a=

a = 0,062 m
a = 6,2 cm
Kontrol 6,2 cm < 0,63 . h
6.2 cm < 0,63 . 36,2 cm
6,2 cm < 22,806 cm .............................(OK)

4. Desain Hidrolik Pintu Tersier SBS KIRI 2


Type Slide Gate / Pintu sorong
Direncanakan Lebar = 1,5 m
Q = ( k.µ ).a .b 2.g.h

0,15778 m3 / dt = 0,60 . a . 1,5


0,15778 m3 / dt = 2,418 . a
a=

a = 0,065 m
a = 6,5 cm
Kontrol 6,5 cm < 0,63 . h
6,5 cm < 0,63 . 36,8 cm
6,5 cm < 23,184 cm .............................(OK)