Anda di halaman 1dari 3

Data Hasil Pengukuran Plant Survey Coats Rejo Indonesia Site Tajur Bogor

Lokasi Pengukuran Temperatur Ruangan (⁰F/⁰C) Kelembaban Udara (RH) Intensitas Cahaya (Lux) Kebisingan (dB)
Max Min Avg Max Min Avg Max Min Avg Max Min Avg
Sample Development 84 83.8 84 67.5 67.2 67.3 91 66 67 88.6 79.6 85.5
(Dyeing Area) (28.8‘C) (28.78’C) (28.8’C)
Logistic 89.6 89.4 89.6 62.4 62.1 62,2 376 223 280 71.6 67.5 68.1
(32’C) (31.89’C) (32’C) 100 92 94
COP Winding - - - - - - - - - 87.5 80.5 82.8
Loading /Unloading 89.2 89,2 89.2 66.2 65 65.3 55 46 52 92 79.2 83
(31,78’C) (31.78’C) (31.78’C)
Dyeing Operator - - - 65.8 65.1 65.1 - - - 90.3 79.9 81.5
Chemical - - - 57.1 54.8 55.6 - - - - - -
Drug Store 87 87 87 55.8 55.2 55.6 134 75 86 - - -
(30.56’C) (30.56’C) (30.56’C)
Dryer 87.2 87 87.6 68 67.9 67.8 - - - 81.9 78.8 79.8
(30.67’C) (30.56’C) (30.56’C)
RWB - - - - - - - - - 95.6 90.1 93.4
Finishing 87.4 87.4 87.4 66.2 65.7 66 - - - 98.3 89.2 93.1
(30.78’C) (30.78’C) (30.78’C)
Boiler 87 87 87 66.8 66.8 66.8 64 24 42 83.3 79.1 80.3
(30.56’C) (30.56’C) (30.56’C)
Data Hasil Pengukuran Plant Survey Pabrik Tahu Ibu Sum

Lokasi Pengukuran Temperatur Ruangan (⁰F/⁰C) Kelembaban Udara Intensitas Cahaya (Lux) Kebisingan (dB)
(RH)
Max Min Avg Max Min Avg Max Min Avg Max Min Avg Note
Area Produksi 89.4 ‘F 89.1 ‘F 89.4 ‘F 76 71 72 76 48 54 87 85.5 86.4 Proses penggilingan kedelai
(31,89 ‘C) (31.72 ‘C) (31.89 ‘C) (selama 20 menit)
91.1 87.9 88.2 Proses perebusan kedelai yang
sudah digiling (selama 20 menit)

Data Hasil Pengukuran Plant Survey MWH & LPG Cylinder Manufacturing

Lokasi Pengukuran Temperatur Ruangan (⁰F/⁰C) Kelembaban Udara (RH) Intensitas Cahaya (Lux) Kebisingan (dB)
Max Min Avg Max Min Avg Max Min Avg Max Min Avg
Area Blending 90.3 ‘F 90.3 ‘F 90.3 ‘F 65.9 65.7 65.8 144 45 90 96 79.2 92.3
(32.39 ‘C) (32.39 ‘C) (32.39 ‘C)
Area Circumference Las 89.7 ‘F 89.7 ‘F 89.7 ‘F 67.2 67 67.1 - - - 97.2 89.5 96.2
(32.06 ‘C) (32.06 ‘C) (32.06 ‘C)
Area Anneling 89.9 ‘F 89.9 ‘F 89.9 ‘F 66 65.8 65.8 - - - - - -
(32.17 ‘C) (32.17 ‘C) (32.17 ‘C)
Area Test Pemuaian - - - - - - - - - 97 88.5 93.4
Area Numbering - - - - - - 52 47 48 91.4 89.1 90.7
Area Pemasangan Valve 89.6 ‘F 89.4 ‘F 89.4 ‘F 67.4 67.4 67.3 42 40 41 95.5 86 94
(32 ‘C) (31.89 ‘C) (31.89 ‘C)
Area Painting 89.2 ‘F 89 ‘F 89.2 ‘F 68.2 68.2 68.2 - - - 95.2 87.2 89.3
(31.78 ‘C) (31.78 ‘C) (31.78 ‘C)
Data Hasil Pengukuran Plant Survey RSUD Bekasi

Lokasi Pengukuran Temperatur Ruangan (⁰F/⁰C) Kelembaban Udara (RH) Intensitas Cahaya (Lux) Kebisingan (dB)
Max Min Avg Max Min Avg Max Min Avg Max Min Avg
Laundry - - - - - - - - 46 - - -
Fisioterapi - - - - - - - - - - -
Area Ka. Ruangan 66
Area Admin 80
Instalasi Gizi - - - - - - - - - - -
Area Admin 60
Ruang Tulip - - - - - - - - - - -
Area Nurse Station 83
Area Admin 56
Poli Jantung - - - - - - - - - - -
Area Admin 126
Area Meja Dokter 144

Anda mungkin juga menyukai