1.1 Perform Manual Lifting Equipment Service


KOD DAN TAJUK WA 1.2 Perform Rigging And Manual Lifting Activities
1.3 Perform Rigging And Lifting Using Overhead Crane

KOD PA ADTBP-A18-21-24 / RIGGING SLINGING - LE01/PA(2/3)

MASA PENILAIAN TARIKH PENILAIAN

DISEDIAKAN OLEH: DIPERIKSA / DISEMAK OLEH:

……..…………………………………………… ……………………………………………………
( S ROSLI BIN HASSAN,PJK,PBM,PBB, ) ( MARINA BINTI SUKOR )

UNTUK DIPENUHI OLEH PEGAWAI PENILAI

NAMA S ROSLI BIN HASSAN,PJK,PBM,PBB,

TANDATANGAN

TARIKH

TERAMPIL /
MARKAH KEPUTUSAN
BELUM TERAMPIL*
(*potong yang mana tidak berkenaan)
ADTBP-A18-21-24 / RIGGING
NO. KOD / CODE NO. MUKASURAT / PAGE : 2 / 9
SLINGING - LE01/PA(2/3)

Arahan Kepada Calon / Instruction to Candidate:

1.Tuliskan Nama, Nombor Kad Pengenalan dan Nombor Daftar Pelajar pada ruangan
yang disediakan.
2. Calon tidak dibenarkan membuka kertas soalan sehingga dibenarkan.
3. Kertas ini mengandungi dua bahagian iaitu Bahagian A dan Bahagian B. Sila jawab
semua soalan.
4. Dilarang membawa nota dan sebarang bahan rujukan kecuali yang dibenarkan.
5. Dilarang meniru semasa penilaian.
6. Dilarang membawa keluar kertas soalan.

BAHAGIAN A : SOALAN SUBJEKTIF / ISI TEMPAT KOSONG

1.4 TAJUK : PERFORM RIGGING AND MANUAL LIFTING ACTIVITIES

TUJUAN :
Tujuan Kertas Tugasan ini adalah untuk menilai pengetahuan pelajar mengenai kerja-kerja
rigging & slinging. Ia merangkumi pengetahuan dalam servis peralatan pengangkut secara
manual.

ARAHAN : Jawab semua soalan di bawah ini.

SECTION A

Masa : 1 jam 30 minit

1. Why the center of gravity (CG) it so important?


ADTBP-A18-21-24 / RIGGING
NO. KOD / CODE NO. MUKASURAT / PAGE : 3 / 9
SLINGING - LE01/PA(2/3)

(True / False)
Mengapa pusat graviti (CG) begitu penting? (Betul/Salah)

a. To control the load so that stability is achieved. (True/False)


b. Determining the location to achieving load control. (True/False)
c. The point where the load weight is concentrated. (True/False)
d. The balance point for an object. (True/False)

(8 Markah)
2. Bodies that Set Safety Standards except?
Badan yang menetapkan Standard Keselamatan kecuali ?

a. OSHA (The Occupational Safety and Health Act)


Standards set into place which help keep workers healthy and safe.

b. ASME (American Society of Mechanical Engineers)


Organization which promotes advances in engineering, along with professional
development, education, and engineering safety

c. NFPA (National Fire Protection Association)


offers codes and standards, along with research and reports, which help riggers to avoid life-
threatening (and business-threatening) fires that could occur from sparks, electrical mishaps,
and misuse of combustibles and heat sources.

e. Department of Manpower Ministry of Human Resources

(2 Markah)

3. No matter what kind of sling you choose, there are certain common elements you
will need to consider to plan a safe and effective lift ;-
Tidak kira jenis sling yang anda pilih, ada elemen umum tertentu yang perlu
dipertimbangkan semasa merancang bagi keselamatan lif yang berkesan ;

a. Weight of the Load – You will need to know or estimate accurately the weight
of the load to ensure a safe lift. (True/False)
ADTBP-A18-21-24 / RIGGING
NO. KOD / CODE NO. MUKASURAT / PAGE : 4 / 9
SLINGING - LE01/PA(2/3)

b. Type of hitch and number of slings or legs – Consider the solad’s size and
shape, load control (balance, slippage), attachment points, and any fittings
that will be needed to connect the sling to the lifting device or the load.
(True/False)
c. Reach and angle of the sling – Available headroom, any obstructions, and
type of hitch are important factors in this determination. The angle at which a
sling is used significantly effects its capacity. Use the longest reach possible
for completing the lift, this will provide the largest angle possible for minimum
stress on the sling.
(True/False)
d. Protect the load and sling from damage – Select the best sling material for the
load and environment. Use softeners such as shims, padding or sling
protectors to prevent damage at corners or projections. Inspect slings before
each use.
(True/False)
e. Protect Personnel – Plan to position and utilize personnel safely during
rigging and lifting. Use a line to stabilize or maneuver the load during the lift.
(True/False)
(12 Markah)
4. Select the following Crane type as shown
Pilih jenis kren berikut seperti yang ditunjukkan dibawah ini

i. Monorail Cranes
ii. Bridge Cranes
iii. Gantry Cranes
iv. Jib Cranes

A._______________________________________ (2 Markah)
ADTBP-A18-21-24 / RIGGING
NO. KOD / CODE NO. MUKASURAT / PAGE : 5 / 9
SLINGING - LE01/PA(2/3)

B.__________________________________________ (2 Markah)

C. _____________________________________________ (2 Markah)

D. ______________________________________________ (2 Markah)
ADTBP-A18-21-24 / RIGGING
NO. KOD / CODE NO. MUKASURAT / PAGE : 6 / 9
SLINGING - LE01/PA(2/3)

5. Five Important Tips for Crane Maintenance and Repair


5 Petua penting untuk penyelenggaraan dan pembaikan kren
i. ___________________________________________________________
ii. ___________________________________________________________
iii. ___________________________________________________________
iv. ___________________________________________________________
v. ___________________________________________________________
(10 Markah)

6. List The following 5 Precaution Shall be taken before performing any maintenance on a
Crane?
Senaraikan 5 Langkah berjaga-jaga berikut yang harus diambil sebelum melakukan
penyelenggaraan di atas kren?
i. ___________________________________________________________
ii. ___________________________________________________________
iii. ___________________________________________________________
iv. ___________________________________________________________
v. ___________________________________________________________
(10 Markah)

7. Preventive Maintenance is maintenance that is conducted before an issue is identified.


This includes, but is not limited to ;
Pelenggaraan Pencegahan adalah penyelenggaraan yang dilakukan sebelum masalah
dikenal pasti. Ini termasuk, tetapi tidak terhad kepada ;
i. _____________________________________________
ii. _____________________________________________
iii. _____________________________________________
iv. _____________________________________________
v. _____________________________________________
(5 Markah)

8. What is the definition of overhead crane?


Apakah definasi Overhead Crane?
________________________________________________________________________
________________________________________________________________________
ADTBP-A18-21-24 / RIGGING
NO. KOD / CODE NO. MUKASURAT / PAGE : 7 / 9
SLINGING - LE01/PA(2/3)

________________________________________________________________________
(2 Markah)

9. What do you know about Crane Operator ?


Apa yang anda tahu mengenai pengendali kren ?
_______________________________________________________________________
_______________________________________________________________________
_______________________________________________________________________
_______________________________________________________________________
(3 Markah)

10. Fill in the blank picture below ;


i. Hoisting Mechanisms
ADTBP-A18-21-24 / RIGGING
NO. KOD / CODE NO. MUKASURAT / PAGE : 8 / 9
SLINGING - LE01/PA(2/3)

(10 Markah)

INSTITUT LATIHAN JABATAN TENAGA MANUSIA

KEMENTERIAN SUMBER MANUSIA MALAYSIA

SKEMA PEMARKAHAN

No Soalan Markah

1 / 8

2 / 2

3 / 12

4 / 8

5 / 10

6 / 10

7 / 5

8 / 2

9 / 3

10 / 10

Jumlah / 70
ADTBP-A18-21-24 / RIGGING
NO. KOD / CODE NO. MUKASURAT / PAGE : 9 / 9
SLINGING - LE01/PA(2/3)

 MARKAH TERAMPIL BAGI PENILAIAN INI ADALAH 50%

Anda mungkin juga menyukai