Anda di halaman 1dari 317

Harga Satuan Kegiatan Pekerjaan (HSKP)

Pemerintah Kabupaten Kutai Timur Tahun 2019

DAFTAR ISI

1. BAB I Pendahuluan .........................……………………..............…….…….…… i


2. BAB II Metode Perhitungan HSKP ....................................................................... ix
3. BAB III Penutup .................................................................................................... xxiv
4. Harga Dasar Upah .…………………………………………………….…………. 1
5. Harga Dasar Bahan ……………………………………………………….………. 2
6. Harga Alat Bantu …………………………………………………………………. 24
7. Harga Sewa Alat ………………………………………………………….………. 25
8. Harga Sewa Alat Ukur…………………………………………………………….. 27
9. Laboratorium ........................................................................................................... 28
10. Pengukuran .............................................................................................................. 33
11. Jasa Konsultan ......................................................................................................... 34
12. Rekapitulasi Analisa Harga Satuan Kegiatan dan Pekerjaan Cipta Karya

12.1 Analisa Perhitungan Harga Satuan Pekerjaan Persiapan untuk Kontruksi


Bangunan Gedung dan Perumahan ……………………….………………….…. 38
12.2 Analisa Perhitungan Harga Satuan Pekerjaan Tanah untuk Kontruksi
Bangunan Gedung dan Perumahan ….…………………….……….………….... 45
12.3 Analisa Perhitungan Harga Satuan Pekerjaan Pondasi untuk Kontruksi
Bangunan Gedung dan Perumahan ……………………………….………….…. 50
12.4 Analisa Perhitungan Harga Satuan Pekerjaan Dinding untuk Kontruksi
Bangunan Gedung dan Perumahan ……………………………………………… 56
12.5 Analisa Perhitungan Harga Satuan Pekerjaan Plesteran untuk Kontruksi
Bangunan Gedung dan Perumahan …………………………………………….... 67
12.6 Analisa Perhitungan Harga Satuan Pekerjaan Kayu untuk Kontruksi
Bangunan Gedung dan Perumahan ……………………………………………… 77
12.7 Analisa Perhitungan Harga Satuan Pekerjaan Beton untuk Kontruksi
Bangunan Gedung dan Perumahan ……………………………………………… 88
12.8 Analisa Perhitungan Harga Satuan Pekerjaan Penutup Atap untuk
Kontruksi Bangunan Gedung dan Perumahan ………………………………..…. 103
12.9 Analisa Perhitungan Harga Satuan Pekerjaan Langit-langit untuk Kontruksi
Bangunan Gedung dan Perumahan ………………………………………..…….. 119
12.10 Analisa Perhitungan Harga Satuan Pekerjaan Sanitasi untuk Kontruksi
Bangunan Gedung dan Perumahan ………………………………………….…... 126
12.11 Analisa Perhitungan Harga Satuan Pekerjaan Besi dan Aluminium
untuk Kontruksi Bangunan Gedung dan Perumahan ……………………….…… 139
12.12 Analisa Perhitungan Harga Satuan Pekerjaan Kunci dan Kaca untuk
Kontruksi Bangunan Gedung dan Perumahan ……………………………….…. 148
12.13 Analisa Perhitungan Harga Satuan Pekerjaan Penutup Lantai dan Dinding
untuk Kontruksi Bangunan Gedung dan Perumahan ………………………..….. 159
12.14 Analisa Perhitungan Harga Satuan Pekerjaan Pengecatan untuk Kontruksi
Bangunan Gedung dan Perumahan ………………………………………...…… 184

a
Harga Satuan Kegiatan Pekerjaan (HSKP)
Pemerintah Kabupaten Kutai Timur Tahun 2019

13. Rekap Bidang Bina Marga …………………………………………………...…... 193


14. Rekap Bidang Sumber Daya Air …………………………………………………. 194

14.1 Analisa Bidang Sumber Daya Air ……………………………………………..… 195

15. Rekap Pekerjaan Cetak Sawah …………….………………………………..….… 201

15.1 Analisa Cetak Sawah ………………………………………………….………… 202

16. Harga Bahan Mekanikal Elektrikal ……………………………………………. 213


17. Elektrikal ………………………………………………………………………. 223
18. Pekerjaan Dermaga ……………..……………………………………….…….… 224

18.1 Dermaga Zona 1 …………..........…………………………………….……..…. 225

18.2 Dermaga Zona 2 ………………….........………………………………..…..…. 227

18.3 Dermaga Zona 3 ……………………….........………………………..….….…. 229

18.4 Dermaga Zona 4 ……………………………..........………………….…..……. 231

b
Harga Satuan Kegiatan Pekerjaan (HSKP)
Pemerintah Kabupaten Kutai Timur Tahun 2019

BAB

PENDAHULUAN 1
1.1 PENDAHULUAN
Kondisi geografis dan tersedianya sumber daya suatu daerah dan daerah
lainnya menyebabkan timbulnya perbedaan-perbedaan fisik dan non fisik
dari suatu daerah terhadap daerah lainnya, hal demikian menyebabkan juga
perbedaan besarnya biaya pembangunan .

Faktor-faktor yang mempengaruhi tinggi rendahnya biaya pembangunan


antara lain :

1. Faktor Lokasi
2. Faktor Sumber daya
3. Faktor Transpotasi
4. Faktor Inflasi

 1.1.1. Faktor Lokasi

Kondisi geografis dari suatu lokasi secara langsung akan mempengaruhi


disain bangunan mulai dari pondasi, dinding, lantai maupun atap baik
konstruksi maupun finishingnya. Hal tersebut menyebabkan biaya
pembangunan yang dibutuhkan menjadi tinggi atau rendah.
Makin sederhana desain bangunan yang sesuai dengan kondisi lokasi,
makin rendah biaya pembangunannya, sebaliknya untuk lokasi-lokasi yang
memerlukan desain dengan penyelesaian khusus terhadap kondisi lokasi
akan menyebabkan biaya pembangunan tinggi.

Halaman_ i
Harga Satuan Kegiatan Pekerjaan (HSKP)
Pemerintah Kabupaten Kutai Timur Tahun 2019

 1.1.2. Faktor Sumber Daya

Tersedianya sumber daya yang dibutuhkan dalam pembangunan


bangunan pada suatu daerah baik sumber daya bahan bangunan
maupun tenaga kerja akan menyebabkan tinggi rendahnya biaya
pembangunan.
Suatu daerah yang kaya akan sumber daya bahan bangunan maupun
tenaga kerja akan memberikan kemudahan dibanding dengan daerah
yang kondisinya sulit atau sedikit sumber dayanya. Tingkat kemudahan
tersebut akan mempengaruhi biaya tambahan utuk mendatangkan
sumber daya sehingga akan mempertinggi biaya pembangunan.

 1.1.3. Faktor Transportasi

Faktor tranportasi dipengaruhi langsung oleh sarana dan prasarana


transportasi yang ada baik tranportasi darat, laut, sungai maupun udara.
Makin sulit suatu daerah dijangkau maka biaya pembangunan akan
semakin tinggi.

Sebagai ilustrasi, daerah kepulauan yang mendatangkan bahan


bangunan dan tenaga kerja dari daerah lain akan memerlukan biaya
pembangunan yang lebih tinggi, demikian pula daerah perbukitan,
pegunungan yang belum ada sarana transportasinya diperlukan
angkutan pesawat udara atau kuda.

1.2. PEMBAGIAN ZONA

Kabupaten Kutai Timur merupakan salah satu daerah pemekaran dari


Kabupaten Kutai, dibentuk berdasarkan UU No. 47 Tahun 1999 tentang
Pembentukan Kabupaten Nunukan, Kabupaten Malinau, Kabupaten
Kutai Timur diresmikan pada tanggal 12 Oktober 1999. Sebagai daerah
otonom yang relatif masih baru di Provinsi Kalimantan Timur,

Halaman_ ii
Harga Satuan Kegiatan Pekerjaan (HSKP)
Pemerintah Kabupaten Kutai Timur Tahun 2019

pada awalnya Kabupaten Kutai Timur meliputi 5 wilayah kecamatan


dengan ibukota berada di Sangatta.

Seiring dengan kebijakan pemerintah daerah dalam hal pemerataan


pelayanan dan pembangunan maka 5 kecamatan tersebut dimekarkan
menjadi 11 Kecamatan berdasarkan Peraturan Daerah No. 16 Tahun
1999, selanjutnya berdasarkan Peraturan Daerah No. 16 Tahun 2005
beberapa kecamatan telah dimekarkan kembali sehingga sekarang ini
dalam wilayah Kabupaten Kutai Timur ada 18 kecamatan.

Secara geografis, Kabupaten Kutai Timur terletak pada kedudukan


115° 56’26” BT- 118°58’19”BT & 1°17’1” LS-1°52’39 LU, dengan batas
wilayah administratif sebagai berikut:

 Sebelah Utara : Kecamatan Talisayan dan Kecamatan


Kelay, Kabupaten Berau.
 Sebelah Selatan : Kecamatan Bontang Utara Kota
Bontang dan Kecamatan Marang Kayu, Kabupaten Kutai
Kertanegara.
 Sebelah Timur : Selat Makasar dan Laut Sulawesi.
 Sebelah Barat : Kecamatan Kembang Janggut dan
Kecamatan Tabang, Kabupaten Kutai Kertanegara.

Letak geografis wilayahnya merupakan suatu potensi yang cukup


strategis untuk mendukung interaksi wilayah Kabupaten Kutai Timur
dengan wilayah luar, baik dalam skala regional, nasional maupun
internasional, terutama dengan adanya dukungan fasilitas transportasi
darat, laut dan udara. Secara administratif Kabupaten Kutai Timur
memiliki luas wilayah 35.747 km2 atau 17% dari luas wilayah Propinsi
Kalimantan Timur dan merupakan daerah terluas kedua setelah
Kabupaten Malinau.

Halaman_ iii
Harga Satuan Kegiatan Pekerjaan (HSKP)
Pemerintah Kabupaten Kutai Timur Tahun 2019

Wilayah Kabupaten Kutai Timur terdiri dari 18 Kecamatan, nama


kecamatan dan perkiraan luas wilayah masing-masing kecamatan dapat
dilihat pada tabel 4.1.

Tabel 4.1. Luas Wilayah per Kecamatan di Kabupaten Kutai Timur

No. Kecamatan Luas Wilayah (Km²)


1. Sangatta Utara 1.262,59
2. Sangatta Selatan 1.660,85
3. Teluk Pandan 831,00
4. Rantau Pulung 143,82
5. Bengalon 2.559,84
6. Kaliorang 438,91
7. Kaubun 257,45
8. Sangkulirang 3.203,71
9. Karangan 5.242,17
10.. Sandaran 3.773,40
11. Muara Wahau 4.614,68
12. Muara Ancalong 2.749,87
13. Muara Bengkal 1.622,80
14. Batu Ampar 615,50
15. Kongbeng 581,27
16. Telen 2.805,44
17. Busang 2.878,79
18. Long Mesangat 506,41
Jumlah 35.747,50

Sumber : Kabupaten Kutai Timur Dalam Angka, 2015

Halaman_ iv
Harga Satuan Kegiatan Pekerjaan (HSKP)
Pemerintah Kabupaten Kutai Timur Tahun 2019

Perhitungan inflasi di Kabupaten KUTAI TIMUR mengacu data inflasi


Provinsi Kalimantan Timur. Berikut tabel inflasi bulan januari –
desember.

Tahun Inflasi Bulan Januari - Desember


Samarinda Balikpapan Tarakan Kaltim Nasional
2006 6.52 5.52 - 6.04 6.60
2007 9.18 7.27 - 8.30 6.59
2008 12.69 11.30 19.85 13.06 11.06
2009 4.06 1.60 7.21 4.31 2.78
2010 7.00 7.38 7.92 7.28 6.96 Sumber :
2011 6.23 6.45 6.43 6.34 3.79
Hasil 2012 4.81 6.41 5.99 5.60 4.30 Analisis
BPS - BI 2013 10.06 8.86 9.27 9.50 8.43
2014 6.74 7.43 11.91 7.66 8.36
2015 4.15 4.27 3.91 4.20 4.14
Min 4.06 1.60 3.91 4.20 2.78
Maks 12.69 11.30 19.85 13.06 11.06
Rata-
rata 7.14 6.65 9.06 7.23 6.30

Grafik Inflasi Kaltim - Nasional

Halaman_ v
Harga Satuan Kegiatan Pekerjaan (HSKP)
Pemerintah Kabupaten Kutai Timur Tahun 2019

Dari data inflasi terdapat 3 angka inflasi yaitu : 4,28 %, 7,28 % dan 13,06 %
dari ketiga angka tersebut angka yang paling realistis adalah 7,28 %,
sedangkan kalau 4,28 % maupun 13,06 % merupakan inflasi yang ekstrim.

Pembagian zona harga satuan dilatar belakangi oleh terdapatnya


perbedaan harga antara suatu wilayah dengan wilayah lainnya dalam satu
kecamatan, dengan kondisi geografis yang ada di KUTAI TIMUR berjauhan
dimana transportasi ada yang bisa ditempuh lewat darat, sungai maupun
laut oleh karena itu pembagian zona merupakan faktor yang penting
dilakukan.

2. Tabel 2.1 Pembagian Zona Wilayah Terhadap Harga Di Kabupaten KUTAI TIMUR
Zona I Zona II Zona III Zona IV
- Sengata Selatan - Muara Ancalong - Muara Wahau - Kaliorang
- Sengata Utara - Muara Bengkal - Kongbeng - Sangkurilang
Kecamatan - Teluk Pandan - Long Mesangat - Telen - Kaubun
- Rantau Pulung - Busang - Batu Ampar - Sandaran
- Bengalon - Karangan

Secara umum harga dasar yang dijadikan patokan standar harga


barang/jasa adalah zona I (zona perkotaan) mayoritas item bahan
berasal dari zona perkotaan. Standar harga barang/jasa di zona II, zona
III, dan zona IV dilakukan dengan menambah prosentase tertentu
terhadap harga satuan barang di zona I dengan mempertimbangkan
variable tambahan yang diperlukan atau biaya tambahan agar barang
tersebut sampai di zona II, zona III, dan zona IV

MATRIK PROGRAM PERTRIWULAN

Dalam beberapa tahun terakhir ini, banyak terjadi perubahan dalam


biaya konstruksi bangunan. Perubahan dalam suatu proyek, khususnya
yang disebabkan oleh faktor ekonomi yang paling berpengaruh terhadap
biaya konstruksi adalah inflasi. Oleh sebab itu, inflasi telah menjadi satu

Halaman_ vi
Harga Satuan Kegiatan Pekerjaan (HSKP)
Pemerintah Kabupaten Kutai Timur Tahun 2019

masalah serius yang ber-dampak pada bidang konstruksi sehingga


diperlukan suatu analisa hubungan antara biaya konstruksi bangunan
dengan inflasi.

Kategori elemen-elemen biaya dalam industri konstruksi yang sangat


dipengaruhi oleh inflasi adalah biaya pekerja, biaya bahan, biaya
peralatan, suku bunga, biaya overhead, pajak dan keuntungan.

Sehingga data hasil survey yang telah di rekap akan diolah menurut
kriteria proyeksi waktu 3 (tiga) bulanan dan kriteria pembagian zona
wilayah. Pengolahan data berupa penjumlahan, pengalian, pembagian,
prosentase dsb baik bagi data primier maupun sekunder. Pengolahan
data hasil survei pendataan harga satuan barang dan jasa yang
dituangkan dalam matrik program periode 3 bulanan (Triwulan).

Untuk diketahui BPS Kalimantan Timur baru menerbitkan 3 kota untuk


perhitungan laju inflasi / Indeks Harga Konsumen (IHK) yaitu kota
Balikpapan, Samarinda dan Tarakan, untuk Kabupaten Kutai Timur
khusus Zona I (Sangatta) acuannya adalah Kota Samarinda (±4 Jam
Perjalanan), dimana barometernya adalah Kota Samarinda (hampir 90%
bahan bangunan dipasok lewat kota ini) kecuali bahan pasir, batu
gunung, agregat, kayu, dsb

Dimana :

Halaman_ vii
Harga Satuan Kegiatan Pekerjaan (HSKP)
Pemerintah Kabupaten Kutai Timur Tahun 2019

dimana :
IHKn = Indeks periode ke – n
Pni = Harga jenis barang i, periode ke – (n)
P(n-1)I = Harga jenis barang i, periode ke – (n-1)
P(n-1)i.Q0i = Nilai konsumsi jenis barang i, periode ke – (n-1)
P0i.Q0i = Nilai konsumsi jenis barang i, pada tahun dasar
K = Jumlah jenis barang paket komoditas.

Dengan mempertimbangkan seperti tersebut diatas maka standar harga


barang di zona II, zona III, dan zona IV adalah sebagai berikut :

1. Zona I = Harga tertinggi Zona I + Harga tertinggi Zona I x 5 trip x


(0,44% + Inflasi 7,23%)

2. Zona II = Harga tertinggi Zona II + Harga tertinggi Zona II x 5 trip


(4,76% + Inflasi 7,23%)

3. Zona III = Harga tertinggi Zona III + Harga tertinggi Zona IIIx 5 trip x
(5,72% + Inflasi 7,23%)

4. Zona IV = Harga tertinggi Zona IV + Harga tertinggi Zona IV x 5 trip


x (9,68% + Inflasi 7,23%)

Angka inflasi bersifat fluktuatif, karena itu dalam pengajuan nilai proyek
harus sesuai dengan asumsi inflasi yang disepakati antara pemberi
pekerjaan dan pelaksana pekerjaan.

Khusus untuk zona II berupa wilayah pedalaman Kecamatan Busang dan


Zona IV Kecamatan Sandaran ditambahkan biaya angkut.

Halaman_ viii
Harga Satuan Kegiatan Pekerjaan (HSKP)
Pemerintah Kabupaten Kutai Timur Tahun 2019

BAB

METODE PERHITUNGAN HSKP 2

2.1. Pendahuluan

Berdasarkan Peraturan Presiden Republik Indonesia Nomor 70 Tahun 2012 Tentang


Perubahan Kedua Atas Peraturan Presiden Nomor Tahun 54 Tahun 2010 Tentang
Pengadaan Barang /Jasa pemerintah, bahwa salah satu cara untuk mempercepat
pelaksanaan Pengadaan Barang/Jasa Pemerintah adalah dengan menyiapkan Daftar
Harga Satuan Kegiatan dan Pekerjaan (HSKP). Sehubungan dengan hal tersebut,
pada tahun anggaran 2017 Sekretariat Daerah Bagian Pembangunan Pemerintah
Kabupaten Kutai Timur, kembali menerbitkan HSKP dilingkungan Pemerintah
Kabupaten Kutai Timur, Provinsi Kalimantan Timur.

Penyusunan HSKP ini mengacu pada Peraturan Menteri Pekerjaan Umum


No.28/PRT/M/2016 tentang Analisis Harga Satuan Pekerjaan Bidang Pekerjaan
Umum. Pedoman ini menjelaskan prinsip-prinsip yang menjadi dasar dalam
menganalisis harga satuan upah, alat dan bahan, serta sebagai dasar untuk Analisis
Harga Satuan Pekerjaan (AHSP). Standar lain yang juga dijadikan acuan penyusunan
HSKP ini yaitu Standar Nasional Indonesia yang sudah dibakukan (SNI) 2008.

Dalam membuat Analisa harga satuan setiap satuan pengukuran memerlukan asumsi
metoda pelaksanaan pekerjaan atau cara kerja yang digunakan sehingga rumusan
Analisa harga satuan yang diperoleh mencerminkan harga aktual di lapangan.

Dalam penerapannya, perhitungan harga satuan harus disesuaikan dengan


Spesifikasi Teknis yang digunakan, peraturan-peraturan dan ketentuan-ketentuan
yang berlaku, serta pertimbangan teknis (Engineering judgement) terhadap situasi dan
perkembangan kondisi di lapangan.

Halaman_ ix
Harga Satuan Kegiatan Pekerjaan (HSKP)
Pemerintah Kabupaten Kutai Timur Tahun 2019

3.2 Analisis Harga Satuan Pekerjaan

Analisis harga satuan ini menguraikan suatu perhitungan harga satuan bahan dan
pekerjaan yang secara teknis dirinci secara detail berdasarkan suatu metode kerja dan
asumsi-asumsi yang sesuai dengan yang diuraikan dalam suatu spesifikasi teknik,
gambar disain dan komponen harga satuan bidang fisik yang meliputi bidang fisik
Cipta Karya, Bina Marga, dan Pengairan.

Harga satuan pekerjaan terdiri atas biaya langsung dan biaya tidak langsung.
Komponen biaya langsung terdiri atas upah, bahan dan alat. Komponen biaya tidak
langsung terdiri atas biaya umum atau over head dan keuntungan. Biaya over head
dan keuntungan belum termasuk pajak-pajak yang harus dibayar, besarnya sesuai
dengan ketentuan yang berlaku.

Analisis ini digunakan sebagai suatu konsep dasar perhitungan harga perkiraan sendiri
(HPS) atau owner’s estimate (OE) yang dituangkan sebagai mata pembayaran suatu
pekerjaan. Analisis harga satuan dapat dilakukan menggunakan software atau secara
manual. Dalam Gambar 3.1 diperlihatkan komponen harga satuan pekerjaan.

Gambar 3.1. Struktur Analisis Harga Satuan Pekerjaan

Halaman_ x
Harga Satuan Kegiatan Pekerjaan (HSKP)
Pemerintah Kabupaten Kutai Timur Tahun 2019

3.3 Komponen Harga Satuan Dasar (HSD)

Umum
Harga satuan dasar yang digunakan harus sesuai dengan asumsi
pelaksanaan/penyediaan yang aktual (sesuai dengan kondisi lapangan) dan
mempertimbangkan harga pasar setempat pada waktu penyusunan HPS.

Komponen utama harga satuan pekerjaan terdiri dari 3 (tiga) komponen, yaitu: bahan,
alat dan tenaga kerja.

3.3.1 Bahan

Komponen bahan digunakan dalam mata pembayaran tertentu tergantung pada jenis
pekerjaannya. Faktor yang mempengaruhi harga satuan komponen bahan antara lain
adalah kualitas, kuantitas, dan lokasi asal bahan. Faktor-faktor yang berkaitan dengan
kuantitas dan kualitas bahan harus ditetapkan dengan mengacu kepada Spesifikasi
Umum yang berlaku. Data harga satuan dasar bahan dalam perhitungan analisis
harga satuan, berfungsi untuk kontrol terhadap harga penawaran kontraktor.

Harga satuan dasar bahan dapat dikelompokkan menjadi tiga bagian yaitu :

a. Harga Satuan Dasar Bahan Baku,


Bahan baku biasanya diperhitungkan dari sumber bahan (quarry), tetapi dapat pula
diterima di Base Camp/Gudang setelah memperhitungkan ongkos bongkar-muat
dan pengangkutannya, misalnya : batu, pasir, Semen, besi dan lain-lain

b. Harga Satuan Dasar Bahan Olahan,


Bahan olahan merupakan hasil produksi di plant (pabrik) atau beli dari produsen di
luar proyek, misalnya : agregat kasar dan agregat halus.
Bahan olahan biasanya diberi keterangan tempat bahan tersebut diolah, misalnya
di base camp atau di lokasi khusus. Dalam penetapan harga satuan bahan olahan
di lokasi tertentu, khususnya untuk agregat, ada tiga tahapan yang harus
dilakukan, yaitu: masukan, proses dan luaran. Berikut ini disusun tahap-tahap
analisis perhitungan bahan dasar olahan.

Halaman_ xi
Harga Satuan Kegiatan Pekerjaan (HSKP)
Pemerintah Kabupaten Kutai Timur Tahun 2019

1) Masukan

Masukan yang diperlukan untuk perhitungan HSD bahan olahan antara lain:
a) Jarak Quarry (bila bahan dasar diambil dari quarry)
Jarak yang diperhitungkan sebagai jarak angkut adalah jarak dari sumber
bahan (quarry) ke lokasi di mana alat berada (contoh : pemecah batu).
b) Harga Satuan Bahan Baku atau Bahan Dasar
Yaitu harga satuan dasar (contoh batu kali), berupa data otentik yang
tersedia.
c) Harga Satuan Dasar Alat
Merupakan biaya pemakaian peralatan per satu satuan waktu yang
merupakan luaran dari analisis Harga Satuan Dasar Alat.
d) Harga Satuan Dasar Tenaga Kerja
Yaitu harga satuan dasar tenaga kerja berupa data otentik yang tersedia.
e) Kapasitas Alat
Merupakan kapasitas dari alat yang dipergunakan, misalnya alat pemecah
batu (stone crusher) dalam ton per jam, dan Wheel Loader dalam m3
heaped (kapasitas bucket).
f) Faktor Efisiensi Alat
Merupakan faktor efisiensi kerja dari alat yang dipergunakan, yang meliputi
faktor kondisi operator, faktor kondisi peralatan, faktor kondisi cuaca, faktor
kondisi medan kerja (lapangan) dan faktor kondisi manajemen kerja.
g) Faktor Kehilangan Material
Yaitu faktor untuk memperhitungkan material yang tercecer pada saat
diolah.

2) Proses

Perhitungan bahan olahan dilakukan antara lain meliputi :


a) Biaya kerja alat dalam memproduksi bahan olahan yang bersangkutan,
berdasarkan waktu yang dibutuhkan alat tersebut dan biaya sewa alat.
b) Biaya kebutuhan bahan dasar (batu kali dan pasir) yang diperlukan.
c) Perhitungan tenaga kerja yang diperlukan.
d) Biaya kerja alat dalam proses pencampuran (blending).

Halaman_ xii
Harga Satuan Kegiatan Pekerjaan (HSKP)
Pemerintah Kabupaten Kutai Timur Tahun 2019

3) Luaran (Output)

Proses perhitungan di atas akan menghasilkan harga satuan dasar bahan,


misal : untuk agregat kasar dan agregat halus sebagai luaran. Harga satuan
dasar bahan olahan ini merupakan masukan dalam proses perhitungan analisis
harga satuan pekerjaan

c. Harga Satuan Dasar Bahan Jadi,

Bahan jadi diperhitungkan diterima di Base Camp/Gudang atau di pabrik setelah


memperhitungkan ongkos bongkar-muat dan pengangkutannya serta biaya
pemasangan (tergantung perjanjian transaksi), misal : tiang pancang beton
pracetak, geosintetik dan lain lain.

Masukan/input bahan/material yang dibutuhkan dalam proses perhitungan harga


satuan suatu jenis pekerjaan adalah harga satuan dasar bahan/material, yaitu
harga komponen bahan/material per satu satuan tertentu yang diperlukan dalam
mata pembayaran pekerjaan tersebut. Satuan bahan/material tersebut misalnya
m’, m2, m3, kg, ton, zak, dan sebagainya.

Untuk harga satuan dasar bahan jadi, harus diberi keterangan harga bahan
diterima sampai di lokasi tertentu, misal lokasi pekerjaan, base camp atau bahan
diambil di pabrik/gudang grosir.

3.1.2 Alat

Komponen alat digunakan dalam mata pembayaran tertentu tergantung pada jenis
pekerjaannya. Faktor yang menentukan satuan komponen peralatan antara lain : jenis
peralatan, efisiensi kerja, kondisi cuaca, kondisi medan, jenis material/bahan yang
dikerjakan. Di samping peralatan mekanis, hampir semua nomor mata pembayaran
memerlukan alat bantu manual, seperti: pacul, sekop, gerobak sorong, keranjang,
timba dan lain-lain, namun karena harganya relatif kecil maka untuk memudahkan
analisis, alat bantu manual tidak dianalisis (dalam contoh perhitungan analisis harga
satuan diisi dengan angka nol). Jika beberapa jenis peralatan digunakan dalam mata
pembayaran tertentu, maka produktivitas peralatan ditentukan oleh peralatan utama
yang digunakan dalam mata pembayaran tersebut.

Halaman_ xiii
Harga Satuan Kegiatan Pekerjaan (HSKP)
Pemerintah Kabupaten Kutai Timur Tahun 2019

a. Masukan perhitungan biaya alat


Masukan yang diperlukan dalam perhitungan biaya alat yaitu biaya pemakaian
peralatan per satuan waktu, antara lain :
1) Jenis Alat
Adalah jenis peralatan yang dipergunakan misalnya Wheel Loader, Backhoe-
Excavator, Asphalt Mixing Plant (AMP).
2) Kapasitas Alat
Adalah kapasitas peralatan yang dipergunakan, misalnya AMP 50 ton/jam
(kapasitas produksi per jam), Wheel Loader 1,20 m3 (kapasitas bucket untuk
tanah gembur, kondisi heaped).
3) Umur Ekonomis Alat
Umur ekonomis peralatan antara lain dapat dihitung berdasarkan kondisi
penggunaan dan pemeliharaan yang normal, dengan menggunakan standar
dari pabrik pembuat.
4) Jam Kerja Alat Per Tahun
Adalah jumlah jam kerja peralatan dalam 1 (satu) tahun.
5) Harga Pokok Alat
Harga peralatan yang dipakai dalam perhitungan biaya alat pada analisis
harga satuan pekerjaan.
6) Nilai Sisa Alat
Nilai sisa alat ini banyak tergantung pada kondisi pemakaian dan
pemeliharaan selama waktu pengoperasian. Untuk perhitungan analisis harga
satuan ini maka nilai sisa alat dapat diambil rata-rata10% dari harga pokok
alat, tergantung dari karakteristik (dari pabrik pembuat) dan kemudahan
pemeliharaan alatnya.
7) Tingkat Suku Bunga
Merupakan tingkat suku bunga bank pinjaman investasi yang berlaku pada
waktu pembelian peralatan yang bersangkutan. Perencana teknis / Pengguna
jasa menentukan nilai suku bunga ini dengan mengambil nilai rata-rata dari
beberapa bank komersil terutama di wilayah tempat proyek berada.
8) Asuransi dan Pajak
Besarnya nilai asuransi dan pajak kepemilikan peralatan ini umumnya diambil
rata-rata per tahun sebesar 0,1% untuk asuransi dan 0,1% untuk pajak, atau

Halaman_ xiv
Harga Satuan Kegiatan Pekerjaan (HSKP)
Pemerintah Kabupaten Kutai Timur Tahun 2019

dijumlahkan menjadi sebesar 0,2% dari harga pokok alat, atau 2% dari nilai
sisa alat (apabila nilai sisa alat = 10% dari harga pokok alat).
9) Tenaga Mesin
Merupakan kapasitas tenaga mesin penggerak dalam horsepower (HP).
10) Upah Tenaga
Upah tenaga kerja dalam perhitungan biaya operasi peralatan disini terdiri
dari biaya upah operator/driver dan pembantu operator/driver dalam Rp./jam.
11) Harga Bahan Bakar dan Pelumas
Harga bahan bakar dan miyak pelumas maupun minyak hidrolik dalam
perhitungan biaya operasi peralatan adalah harga bahan bakar dan minyak
pelumas serta minyak hidrolik setempat.

b. Proses perhitungan harga satuan dasar alat


Komponen proses HSD alat, terdiri atas :
1) Biaya Pasti (Owning Cost),
2) Biaya Tidak Pasti atau Biaya Operasi (Operating Cost)

1) Biaya Pasti

Biaya pasti (Owning Cost) adalah biaya pengembalian modal dan bunga
setiap tahun, dihitung sebagai berikut :

Keterangan :

G = Biaya Pasti per jam [Rp.]


B = Harga Pokok Alat Setempat
C = Nilai Sisa Alat
D = Faktor Angsuran / Pengembalian Modal

A = Umur Ekonomis Alat [tahun]


F = Biaya Asuransi dan Pajak dan Lain-lain per tahun
= 0,002 x B atau
= 0,02 x C
i = Tingkat suku bunga pinjaman investasi [% per tahun]
W = jumlah jam kerja alat dalam satu tahun

Halaman_ xv
Harga Satuan Kegiatan Pekerjaan (HSKP)
Pemerintah Kabupaten Kutai Timur Tahun 2019

Catatan :
a) Untuk peralatan yang bertugas berat, dianggap bekerja terus menerus
dalam setahun selama 8 jam/hari dan 250 hari/tahun, maka :
W = 8 x 250 = 2000 jam/tahun.
b) Untuk peralatan yang bertugas tidak terlalu berat atau sedang, dianggap
bekerja selama 200 hari dalam 1 tahun dan 8 jam/hari, maka :
W = 8 x 200 = 1600 jam/tahun.
c) Untuk peralatan yang bertugas ringan, dianggap bekerja selama 150
hari/tahun dan 8 jam/hari, maka :
W = 8 x 150 = 1200 jam/tahun.

2) Biaya tidak pasti atau biaya operasi

a) Perhitungan Biaya Operasi (Cara Teoritis)

Besarnya biaya operasi tiap unit peralatan dihitung sebagai berikut:

1) Biaya Bahan Bakar (H)


Kebutuhan bahan bakar tiap jam dihitung berdasarkan data tenaga
mesin penggerak sesuai yang tercantum dalam manual ditambah
pemakaian bahan bakar yang digunakan untuk proses produksi
(misalnya untuk pengeringan/pemanasan agregat dan pemanasan
aspal pada peralatan AMP, serta pemanasan permukaan perkerasan
pada Hot Recycler).
2) Biaya Minyak Pelumas (I)
Minyak pelumas yang meliputi minyak pelumas mesin, minyak
hidrolik, pelumas transmisi, Tongue Converter, power steering, gemuk
(grease) dan minyak pelumas lainnya, kebutuhan per jam dihitung
berdasarkan kebutuhan jumlah minyak pelumas dibagi tiap berapa
jam minyak pelumas yang bersangkutan harus diganti sesuai manual
pemeliharaan dari pabrik pembuat.
3) Biaya Pemeliharaan / Bengkel (J)
Pemeliharaan peralatan rutin seperti penggantian saringan udara,
saringan bahan bakar, saringan minyak pelumas serta perbaikan
ringan lainnya.

Halaman_ xvi
Harga Satuan Kegiatan Pekerjaan (HSKP)
Pemerintah Kabupaten Kutai Timur Tahun 2019

b) Biaya Perbaikan / Bengkel (K)

Biaya perbaikan ini meliputi :


1) Biaya penggantian ban (untuk peralatan yang memakai roda ban)
2) Biaya penggantian komponen-komponen yang aus (yang
penggantiannya sudah dijadwalkan) seperti swing & fixed jaw pada
jaw crusher, cutting edge pada pisau Bulldozer, saringan (screen)
pada stone crusher dan AMP.
3) Penggantian battery/ accu.
4) Perbaikan undercarriage & attachment.
5) Biaya bengkel.

c) Upah Operator/Driver (M)

Besarnya upah untuk operator/driver dan pembantu operator/driver


diperhitungkan sesuai dengan ”besar perhitungan upah kerja”, tetapi
upah per jam diperhitungkan upah 1 (satu) jam kerja efektif.

d) Perhitungan Biaya Operasi (Cara Pendekatan)

Mengingat banyaknya model/tipe dan jenis peralatan dari berbagai


merk/pabrik, yang dijadikan rujukan, maka estimator yang menyusun
analisis biaya pekerjaan akan mengalami kesulitan dalam menghitung
biaya operasi peralatan apabila menggunakan data-data manual dari
tiap-tiap alat yang bersangkutan.

Untuk memudahkan perhitungan biaya operasi alat dapat dipergunakan


tata cara perhitungan dengan rumus-rumus pendekatan secara rata-rata
yang bisa dipakai untuk seluruh macam peralatan.

Perhitungan cara pendekatan dengan rumus rata-rata untuk biaya tidak


pasti atau biaya operasi adalah sebagai berikut :

1) Biaya Bahan Bakar (H)

Banyaknya bahan bakar per jam yang digunakan oleh mesin


penggerak dan tergantung pada besarnya kapasitas tenaga mesin,
biasanya diukur dengan satuan HP (Horse Power).

Halaman_ xvii
Harga Satuan Kegiatan Pekerjaan (HSKP)
Pemerintah Kabupaten Kutai Timur Tahun 2019

H = (12,00 s/d 15,00)% x HP

Keterangan:
H = banyaknya bahan bakar yang dipergunakan dalam 1 (satu) jam
dengan satuan liter/jam
HP = Horse Power, kapasitas tenaga mesin penggerak
12,00% = untuk alat yang bertugas ringan
15,00% = untuk alat yang bertugas berat

CATATAN 2:
Untuk AMP harus ditambah dengan pemakaian bahan bakar pada
burner agregat dan pada burner aspal. Untuk Hot Recycler harus
ditambah bahan bakar untuk pemanasan permukaan perkerasan.

2) Biaya Minyak Pelumas (I)

Banyaknya minyak pelumas (termasuk pemakaian minyak yang lain


serta grease) yang dipergunakan oleh peralatan yang bersangkutan
dihitung dengan rumus dan berdasarkan kapasitas tenaga mesin.

I = (2,5 s/d 3)% x HP

Keterangan :
I = banyaknya minyak pelumas yang dipakai dalam 1 (satu) jam
dengan satuan liter/jam
HP = kapasitas tenaga mesin (Horse Power)
2,5% = untuk pemakaian ringan
3% = untuk pemakaian berat.

3) Biaya Bengkel (J)

Besarnya biaya bengkel (workshop) tiap jam dihitung sebagai berikut:

Keterangan:
B = Harga pokok alat setempat
W = Jumlah jam kerja alat dalam satu tahun
6,25% = untuk pemakaian ringan

Halaman_ xviii
Harga Satuan Kegiatan Pekerjaan (HSKP)
Pemerintah Kabupaten Kutai Timur Tahun 2019

8,75% = untuk pemakaian berat

4) Biaya Perbaikan (K)

Untuk menghitung biaya perbaikan termasuk penggantian suku


cadang yang aus, dipakai rumus:

Keterangan:
B = Harga pokok alat setempat
W = Jumlah jam kerja alat dalam satu tahun
12,5% = untuk pemakaian ringan
17,5% = untuk pemakaian berat

5) Upah Operator / Driver (M)


Upah Operator dan Pembantu Operator atau Driver,

c. Luaran (Output)

Keluaran harga satuan dasar alat adalah Harga Satuan Dasar Alat yang meliputi
biaya pasti, biaya tidak pasti atau biaya operasi, biaya bengkel dan biaya upah,
biaya perbaikan dan biaya operator.

Keluaran Harga Satuan Dasar Alat ini selanjutnya merupakan masukan (input)
untuk proses analisis harga satuan pekerjaan.

3.1.3 Tenaga Kerja

Komponen tenaga kerja yang digunakan dalam mata pembayaran tertentu tergantung
pada jenis pekerjaannya. Faktor yang menentukan harga satuan komponen tenaga
kerja antara lain: jumlah tenaga kerja dan tingkat keahlian tenaga kerja. Penetapan
jumlah dan keahlian tenaga kerja mengikuti produktivitas peralatan utama.

Halaman_ xix
Harga Satuan Kegiatan Pekerjaan (HSKP)
Pemerintah Kabupaten Kutai Timur Tahun 2019

a) Umum

Biaya tenaga kerja standar dapat dibayar dalam sistem hari orang standar atau
jam orang standar. Besarnya sangat dipengaruhi oleh jenis pekerjaan dan lokasi
pekerjaan.
Untuk pekerjaan bangunan gedung yang dilaksanakan secara manual, indeks
atau koefisien bahan dan tenaga kerja sudah tersedia dalam tabel yang
dipergunakan untuk satu satuan volume pekerjaan atau satu satuan pengukuran
tertentu (Permen PUPR No 28 Tahun 2016 tentang AHSP ).

b) Hari Orang Standar (Standard Man Day)

Yang dimaksud dengan pekerja standar di sini adalah pekerja terampil yang biasa
mengerjakan satu macam pekerjaan seperti pekerja galian, pekerja pengaspalan,
pekerja pasangan batu, pekerja las dan lain sebagainya.

Dalam sistem pengupahan digunakan satu satuan upah berupa orang hari
standar (Standard Man Day) yang disingkat dengan HO atau MD, yaitu sama
dengan upah pekerjaan dalam 1 hari kerja (8 jam kerja termasuk 1 jam istirahat).

c) Jam Orang Standar (Standard Man Hour)

Di dalam standar hari orang yang dimaksud satu hari kerja adalah 8 jam terdiri
atas 7 jam kerja (efektif) dan 1 jam istirahat.

Apabila perhitungan upah dinyatakan dengan jam orang, maka jam orang dihitung
sebagai berikut :

d) Estimasi harga satuan dasar tenaga kerja

Data harga satuan dasar tenaga kerja yang dijadikan rujukan dalam perhitungan
analisis harga satuan adalah sebagai berikut :
• Sumber data harga standar upah berdasarkan UMR (Upah Minimum
Regional) didapat dari ketetapan yang dikeluarkan Menteri Tenaga Kerja
mengenai besarnya Upah Minimum Regional setiap tahun.

Halaman_ xx
Harga Satuan Kegiatan Pekerjaan (HSKP)
Pemerintah Kabupaten Kutai Timur Tahun 2019

• Data lain yang mempunyai legal aspek seperti hasil survey harga upah
setempat.

3.4 Biaya Umum dan Keuntungan (Overhead & Profit)

1) Biaya Umum (Overhead)

Biaya umum adalah biaya yang dikeluarkan untuk mendukung terwujudnya


pekerjaan (proyek) yang bersangkutan, atau biaya yang diperhitungkan
sebagai biaya operasional meliputi pengeluaran untuk :
a) pengeluaran biaya kantor pusat yang bukan dari biaya pengadaan untuk
setiap mata pembayaran,
b) biaya upah pegawai lapangan,
c) biaya manajemen (bunga bank, jaminan bank, tender, dll)
d) biaya akuntansi,
e) biaya pelatihan dan auditing,
f) biaya perijinan dan registrasi,
g) biaya iklan, humas dan promosi,
h) biaya penyusutan peralatan penunjang,
i) biaya kantor, listrik, telephone, dll
j) biaya pengobatan pegawai kantor/lapangan
k) biaya travel, pertemuan/rapat
l) biaya asuransi di luar peralatan
m) dan lain sebagainya.

Biaya umum/overhead ini dihitung berdasarkan persentase dari biaya langsung


yang besarnya tergantung dari lama waktu pelaksanaan pekerjaan, besarnya
tingkat bunga yang berlaku dan lain sebagainya sesuai dengan ketentuan yang
berlaku.

2) Keuntungan (Profit)

Keuntungan ini sudah termasuk biaya resiko pekerjaan.

3) Estimasi biaya umum dan keuntungan

Besarnya Biaya Umum dan Keuntungan ditentukan dengan


mempertimbangkan antara lain tingkat suku bunga pinjaman bank yang

Halaman_ xxi
Harga Satuan Kegiatan Pekerjaan (HSKP)
Pemerintah Kabupaten Kutai Timur Tahun 2019

berlaku, tingkat inflasi, overhead kantor pusat dan lapangan, resiko investasi
yang besarannya maksimum 15%.

Untuk kepentingan estimasi harga melalui AHS ini dapat ditentukan Biaya
Umum dan Keuntungan secara default sebesar 10%, suatu nilai optimum
yang relatif dekat dengan tingkat suku bunga Bank Indonesia.

3.5 Estimasi Biaya

1) Harga Satuan Setiap Mata Pembayaran

Harga satuan setiap mata pembayaran adalah harga suatu jenis pekerjaan
tertentu per satuan tertentu berdasarkan rincian metode pelaksanaan, yang
memuat jenis, kuantitas dan harga satuan dasar dari komponen tenaga kerja,
bahan, dan peralatan yang diperlukan dan di dalamnya sudah termasuk biaya
umum dan keuntungan.

2) Volume Pekerjaan

Volume pekerjaan untuk setiap mata pembayaran disesuaikan dengan


kebutuhan setiap proyek yang dicantumkan dalam Daftar Kuantitas dan Harga
(BOQ/Bill of Quantities). Besarnya volume pekerjaan juga dapat mempengaruhi
besarnya harga satuan setiap pekerjaan itu sendiri.

3) Harga Pekerjaan Setiap Mata Pembayaran

Harga pekerjaan setiap mata pembayaran akan tercantum dalam Daftar


Kuantitas dan Harga (BOQ/Bill Of Quantities) yang merupakan hasil perkalian
volume pekerjaan dengan harga satuan setiap mata pembayaran.

4) Pajak Pertambahan Nilai (PPN)

Pajak Pertambahan Nilai (PPN) besarnya adalah 10 persen dari Harga Total
Seluruh Mata Pembayaran.

5) Perkiraan (Estimasi) Biaya Proyek

Perkiraan biaya proyek merupakan jumlah dari harga total seluruh mata
pembayaran ditambah dengan Pajak Pertambahan Nilai (PPN).

Halaman_ xxii
Harga Satuan Kegiatan Pekerjaan (HSKP)
Pemerintah Kabupaten Kutai Timur Tahun 2018

6) Penerapan Perhitungan Harga Satuan

Dalam penerapan perhitungan analisis harga satuan ini, akan disesuaikan


dengan Spesifikasi, Peraturan-peraturan dan Ketentuan-ketentuan yang
berlaku, serta melakukan pertimbangan teknis (Engineer’s Adjustment)
terhadap situasi dan kondisi lapangan.

7) Penutup

Perlu ditekankan bahwa beberapa angka harga harus disesuaikan dengan


harga terkini setempat, faktor efisiensi peralatan disesuaikan dengan rencana
peralatan yang akan digunakan dan faktor koefisien bahan disesuaikan tipe
bahan yang akan digunakan serta dipengaruhi oleh asumsi dan metode kerja
yang akan dilaksanakan.

Halaman_ xxiii
Harga Satuan Kegiatan Pekerjaan (HSKP)
Pemerintah Kabupaten Kutai Timur Tahun 2019

BAB

PENUTUP 3

3.1 PENUTUP

Pekerjaan yang telah dilaksanakan cukup mengalami kendala, namun dapat diselesaikan
dengan baik, hal ini berkat kerjasama antar internal pihak konsultan berkoordinasi dengan
pihak pengguna jasa. Untuk lebih baiknya dalam penanganan pekerjaan ini di masa yang
akan datang maka perlu adanya saran-saran yang dapat di berikan antara lain :

1. Untuk kegiatan yang akan datang agar format, item pekerjaan yang akan
dilaksanakn telah memiliki format baku yang menjadi standar / acuan dalam
melaksanakan pekerjaan lebih awal dibuat sebelum dimulainya pelaksanaan
pekerjaan.
2. Untuk analisis berdasarkan Standar Nasional Indonesia (SNI) yang terbaru / up to
date pada Pekerjaan Harga Standar Kegiatan Pekerjaan (HSKP) Kabupaten Kutai
Timur Tahun 2018 meliputi Survey di 18 Kecamatan, dimana keluarannya berupa
Harga Satuan (Basic Price), Upah Tenaga Kerja, Alat Bantu, Sewa Alat, Analisa
Pekerjaan, Rekapitulasi Analisa Pekerjaan, Rekap Perhitungan M’ Bangunan,
Perhitungan M’ Bangunan, Perhitungan M’ Pagar, Dermaga, Elektrikal – Mekanikal,
Program Sumber Daya Air, Alat-alat Laboratorium Kontruksi, Survey / Pengukuran /
Alat Survey.
3. Koordinasi antara pengguna jasa / instansi terkait dan penyedia jasa (konsultan
pelaksana) agar lebih di intensifkan lagi lebih awal sebelum tim survey turun ke
lapangan.
4. Permasalahan yang menjadi kendala dalam pelaksanaan pekerjaan hendaknya
dapat dipecahkan secara bersama antara pihak penyedia jasa dan pengguna jasa.
5. Untuk antisipasi adanya kenaikan harga (eskalasi) sebaiknya dilakukan survey
kembali ke lapangan, misalnya pertriwulan atau persemester (6 bulan) agar
mendapatkan hasil yang akurat, valid dan up to date.
6. Antisipasi lain adalah memperhitungkan kenaikan harga barang dengan mencoba
survey kembali namun hanya major item pekerjaan. Misal harga Semen, Besi, Batu.

xxiv
I.1. HARGA BAHAN DASAR & UPAH (BASIC PRICE) PER ZONA
KABUPATEN KUTAI TIMUR PROVINSI KALIMANTAN TIMUR
TAHUN 2019

Satuan Harga di Kabupaten / Kota


No. Uraian Pokok Kegiatan Satuan Kutai Timur Ket.
Zona I Zona II Zona III Zona IV
1 2 3 4 5 6 7 8

I.1 BAHAN - BAHAN BANGUNAN

1. Bahan Dinding Dan Pondasi 1.17 0.17 0.15 0.22


1 Batu Pecah (Palu)
- Batu Pecah 14-15 cm M³ 586,100.00 689,400.00 677,400.00 730,500.00
- Batu Pecah 5-7 cm M³ 703,300.00 823,800.00 809,800.00 864,000.00
- Batu Pecah 3-5 cm M³ 791,200.00 907,400.00 893,900.00 941,200.00
- Batu Pecah 2-3 cm M³ 820,500.00 941,000.00 927,000.00 976,000.00
- Batu Pecah 1-2 cm M³ 820,500.00 941,000.00 927,000.00 976,000.00
- Batu Pecah 0,5 -1 cm M³ 879,200.00 1,008,400.00 993,400.00 1,045,900.00
2 Batu Gunung M³ 586,100.00 663,600.00 654,600.00 686,100.00
3 Batu Padas M³ 410,300.00 470,600.00 463,600.00 488,100.00
4 Batu Kali M³ 761,900.00 873,800.00 860,800.00 906,300.00
5 Timbunan (Lokal) M³ 175,800.00 201,600.00 198,600.00 209,100.00
6 Pasir
- Pasir Pasangan (Lokal) M³ 410,300.00 457,700.00 452,200.00 471,400.00
- Pasir Beton (Palu) M³ 732,600.00 827,300.00 816,300.00 854,800.00
- Pasir Urug (Lokal) M³ 281,300.00 311,400.00 307,900.00 320,200.00
7 Sirtu (Pasir Batu) M³ 542,700.00 622,400.00 613,200.00 645,600.00
8 Kapur Padam M³ 645,900.00 740,800.00 729,800.00 768,300.00
9 Tanah Urug / Timbunan M³ 211,000.00 242,000.00 238,400.00 251,000.00
10 Batu Bata dan Batako
- Bata Merah Bh 1,239.00 2,096.60 2,112.00 2,172.00
- Bata Ringan 60 x 20 x 7,5 cm (Hebel) Bh 20,500.00 23,900.00 23,500.00 25,500.00
- Bata Ringan 60 x 19 x 7,5 cm (Acon) Bh 17,600.00 20,600.00 20,300.00 22,000.00
- Bata Beton 30 x 15 x 8 cm K 175 = 22 m2 Bh 8,800.00 10,400.00 10,200.00 11,000.00
- Bata Beton 30 x 15 x 7 cm K 175 = 22 m2 Bh 8,200.00 9,700.00 9,600.00 10,300.00
Batako
- Batako Lokal 7,5 x 19 x 13,5 Bh 4,100.00 4,700.00 4,600.00 4,900.00
- Batako Lubang 3 - 40 x 20 x 10 cm Bh 3,500.00 4,000.00 4,000.00 4,200.00
- Batako Lubang 2 - 39 x 19 x 9 cm K 225 Bh 8,200.00 9,400.00 9,300.00 9,800.00
11 Kerikil Beton (Palu) M³ 879,200.00 973,900.00 962,900.00 1,001,400.00
12 Beton Cetak (Paving Stone)
- Segi Empat 30 x 30 x 8 cm (full warna) Bh 23,400.00 26,800.00 26,400.00 27,800.00
- Segi Enam 24 x 8 cm (natural) Bh 10,800.00 12,400.00 12,200.00 12,900.00
- Segi Enam 24 x 8 cm (full warna) Bh 12,000.00 13,800.00 13,600.00 14,300.00
13 Grass Block
- Grass Block 14 x 27.5 x 8 cm K 225 = 9/m2 Bh 24,600.00 28,200.00 27,800.00 29,300.00
- Grass Block 14 x 27.5 x 8 cm K 400 = 9/m2 Bh 35,200.00 40,400.00 39,800.00 41,900.00
14 Batu Tempel
- Batu Tempel Palimanan 15 x 30 Bh 287,200.00 312,200.00 309,300.00 319,400.00
- Batu Tempel Paras 15 x 30 Bh 304,800.00 332,400.00 329,200.00 340,400.00
- Batu Tempel Hitam (candi) Bh 246,200.00 265,100.00 262,900.00 270,600.00
- Batu Tempel Alur Andersit Bh 328,200.00 359,200.00 355,600.00 368,200.00
- Batu Tempel Acak/Lempeng Bh 187,600.00 215,200.00 212,000.00 223,200.00
15 Semen
- Semen PC 40 kg kg 1,823.76 1,877.40 2,038.32 2,252.88
- Semen PC 50 kg kg 1,875.52 1,934.13 2,073.96 2,444.40
- Semen Putih 40 kg kg 6,000.00 6,900.00 6,800.00 7,100.00
- Semen Warna kg 5,200.00 6,000.00 5,900.00 6,200.00
16 Beton Ready Mix
- Beton f'c 19,3 Mpa setara K -175 M³ 2,285,800.00 2,621,600.00 2,582,600.00 2,719,100.00
- Beton f'c 14,5 Mpa setara K - 225 M³ 1,775,900.00 2,036,800.00 2,006,500.00 2,112,500.00
- Beton f'c 21,7 Mpa setara K - 250 M³ 3,164,900.00 3,629,800.00 3,575,800.00 3,764,800.00
- Beton f'c 24 Mpa setara K - 275 M³ 3,282,200.00 3,588,700.00 3,553,100.00 3,677,700.00
- Beton f'c 26,4 Mpa setara K - 300 M³ 3,399,400.00 3,898,800.00 3,840,800.00 4,043,800.00
- Beton f'c 31,2 Mpa setara K - 350 M³ 3,516,600.00 4,033,200.00 3,973,200.00 4,183,200.00
- Beton f'c 35,7 Mpa setara K - 400 M³ 3,663,100.00 4,201,200.00 4,138,700.00 4,357,500.00

Halaman 1
I.1. HARGA BAHAN DASAR & UPAH (BASIC PRICE) PER ZONA
KABUPATEN KUTAI TIMUR PROVINSI KALIMANTAN TIMUR
TAHUN 2019

Satuan Harga di Kabupaten / Kota


No. Uraian Pokok Kegiatan Satuan Kutai Timur Ket.
Zona I Zona II Zona III Zona IV
1 2 3 4 5 6 7 8
- Beton f'c 44,6 Mpa setara K - 500 M³ 3,729,900.00 4,277,800.00 4,214,200.00 4,436,900.00
17 Cemical Building
- Sika C (Natural) Kg 34,500.00 39,600.00 39,000.00 41,000.00
- Puzzdith - 100 XR Ltr 269,600.00 309,200.00 304,600.00 320,700.00
- Storox - 100 Kg 175,800.00 201,600.00 198,600.00 209,100.00
- Fosroc PPF M06 0.9 Kg Kg 267,300.00 306,600.00 302,000.00 318,000.00
2. Bahan Atap
-
1 Sirap kayu ulin
- Multi Roof Polos Lbr 111,400.00 127,800.00 125,900.00 132,500.00
- Surya Roof Type Stone Lbr 147,700.00 169,400.00 166,900.00 175,700.00
- Sakura Roof Type Elang Lbr 96,100.00 110,200.00 108,600.00 114,300.00
- Multi Stone (2 Gelombang) Lbr 168,800.00 193,600.00 190,700.00 200,800.00
2 Nok Genteng Metal
- Nok Multi Roof Stone Lbr 64,500.00 74,000.00 72,900.00 76,700.00
- Nok Ratu Lbr 64,500.00 74,000.00 72,900.00 76,700.00
- Nok Putri Lbr 58,600.00 67,200.00 66,200.00 69,700.00
3 Genteng Beton
- Genteng Beton Bh 15,400.00 17,700.00 17,400.00 18,300.00
- Nok Genteng Beton Bh 20,500.00 23,500.00 23,200.00 24,400.00
4 Genteng Keramik
- Genteng Keramik Bh 18,800.00 21,600.00 21,200.00 22,400.00
- Nok Genteng Keramik Bh 25,800.00 29,600.00 29,100.00 30,700.00
- Karpus Genteng keramik Bh 37,500.00 43,000.00 42,400.00 44,600.00
6 Asbes
- Gelombang uk. 2.5 x 92 cm Lbr 70,300.00 80,600.00 79,400.00 83,600.00
- Gelombang uk. 2.25 x 92 cm Lbr 70,900.00 81,300.00 80,100.00 84,300.00
- Gelombang uk. 1.0 x 92 cm Lbr 82,100.00 94,200.00 92,800.00 97,700.00
- Gelombang uk. 85 x 115 cm Lbr 73,800.00 84,600.00 83,400.00 87,800.00
- Gelombang uk. 2.00 x 92 cm x 5 mm Lbr 62,100.00 71,200.00 70,200.00 73,900.00
- Gelombang uk. 1.80 x 92 cm x 5 mm Lbr 45,100.00 51,700.00 51,000.00 53,700.00
- Gelombang uk. 3.00 x 1.05 cm x 4 mm Lbr 152,400.00 174,800.00 172,200.00 181,300.00
- Gelombang uk. 2.70 x 1.05 cm x 4 mm Lbr 135,300.00 155,200.00 152,900.00 160,900.00
- Gelombang uk. 2.40 x 1.05 cm x 4 mm Lbr 117,200.00 134,400.00 132,400.00 139,400.00
- Gelombang uk. 2.10 x 1.05 cm x 4 mm Lbr 107,800.00 123,600.00 121,800.00 128,200.00
- Gelombang uk. 1.50 x 1.05 cm x 4 mm Lbr 87,900.00 100,800.00 99,300.00 104,600.00
- Gelombang uk. 2.70 x 1.08 cm x 6 mm Lbr 52,700.00 60,400.00 59,500.00 62,700.00
- Gelombang uk. 1.80 x 0.8 cm Lbr 58,600.00 67,200.00 66,200.00 69,700.00
- Bubungan Asbes Lbr 64,500.00 74,000.00 72,900.00 76,700.00
- Karpus asbes gelombang besar Lbr 59,800.00 68,600.00 67,600.00 71,100.00
- Karpus asbes gelombang kecil Lbr 72,700.00 83,400.00 82,100.00 86,500.00
5 Atap Bitumen
- Tipe Onduline (95 cm x 200 cm x 0,3 cm x 3,8 cm) Lbr 208,200.00 238,800.00 235,200.00 247,700.00
- Tipe Onduvilla (40 cm x 106 cm x 0,3 cm x 4 cm) Lbr 91,400.00 104,800.00 103,300.00 108,700.00
- Tipe Bitumen CT Lbr 196,900.00 225,800.00 222,500.00 234,200.00
- Tipe Guttrapal Lbr 222,200.00 254,800.00 251,100.00 264,300.00
6 Atap Seng Gelombang
- BJLS 40 KI Lbr 205,700.00 235,900.00 232,400.00 244,700.00
- BJLS 30 KI Lbr 140,700.00 161,400.00 159,000.00 167,400.00
- BJLS 27 KI Lbr 127,200.00 145,900.00 143,700.00 151,300.00
- BJLS 20 KI Lbr 101,200.00 116,100.00 114,300.00 120,400.00
- BJLS 18 KI Lbr 59,800.00 68,600.00 67,600.00 71,100.00
7 Bubungan Seng Gelombang BJLS 30 Lbr 92,400.00 106,000.00 104,400.00 109,900.00
8 Nok
- Nok stel gelombang 1.05 Bh 41,000.00 47,000.00 46,300.00 48,800.00
- Nok stel gelombang 1.08 Bh 51,300.00 58,800.00 58,000.00 61,000.00
- Nok paten 0.92 Bh 44,500.00 51,000.00 50,300.00 52,900.00
- Nok paten 1.05 Bh 62,100.00 71,200.00 70,200.00 73,900.00
- Nok paten 1.08 Bh 42,200.00 48,400.00 47,700.00 50,200.00
- Nok stel rata 0.92 Bh 43,400.00 49,800.00 49,000.00 51,600.00
- Nok stel rata 1.05 Bh 43,400.00 49,800.00 49,000.00 51,600.00
- Nok standar 40 cm, swg 22 Bh 43,400.00 49,800.00 49,000.00 51,600.00
9 Genteng Kaca Bh 25,800.00 29,600.00 29,100.00 30,700.00

Halaman 2
I.1. HARGA BAHAN DASAR & UPAH (BASIC PRICE) PER ZONA
KABUPATEN KUTAI TIMUR PROVINSI KALIMANTAN TIMUR
TAHUN 2019

Satuan Harga di Kabupaten / Kota


No. Uraian Pokok Kegiatan Satuan Kutai Timur Ket.
Zona I Zona II Zona III Zona IV
1 2 3 4 5 6 7 8
10 Roof Light Fiber Glass 180 x 90 m Lbr 112,500.00 129,000.00 127,100.00 133,800.00
11 Seng Plastik Lbr 96,100.00 110,200.00 108,600.00 114,300.00
12 Atap Nipah Lbr 8,200.00 9,400.00 9,300.00 9,800.00
13 Atap Alluminium Gelombang Lbr 72,700.00 83,400.00 82,100.00 86,500.00
14 Ijuk Kg 48,100.00 55,200.00 54,300.00 57,200.00
15 Aluminium Foil
- Aluminium foil 70 m' dobel sheet Glng 1,922,400.00 2,204,800.00 2,172,000.00 2,286,800.00
- Aluminium foil 70 m' single sheet Glng 1,605,900.00 1,841,800.00 1,814,400.00 1,910,300.00
2
- Aluminium foil 70 m' single sheet M 37,500.00 43,000.00 42,400.00 44,600.00
- Aluminium 0.55 mm Lbr 550,900.00 631,800.00 622,400.00 655,300.00
16 Nok Bitumen (100 cm x 50 cm x 0,3 cm) Lbr 133,600.00 153,200.00 151,000.00 158,900.00
17 Nok dan Talang Bitumen Lbr 111,700.00 128,100.00 126,200.00 132,900.00
18 Pekerjaan kuda-kuda baja ringan, spesifikasi bahan Hi-Ten G550
& talang Aluminium 55%, 43,5 zing dan 1,5 silicon termasuk rangka reng
jurai dalam.(profil tebal 0,78mm, C8195 tebal 0,95,r eng tebal 0,50 mm.)
2
19 Kuda - Kuda Bentang s/d 9 m M 410,300.00 470,600.00 463,600.00 488,100.00
2
20 Kuda- Kuda Non Standar M 468,900.00 537,800.00 529,800.00 557,800.00
'
21 Baja ringan C 100 - 100 M 159,500.00 182,900.00 180,200.00 189,700.00
'
22 Baja ringan C 75 - 100 M 94,900.00 108,800.00 107,200.00 112,900.00
'
23 Baja ringan Reng M 33,400.00 38,300.00 37,700.00 39,700.00
24 Dynabolt Bh 9,400.00 10,800.00 10,600.00 11,200.00

3. Bahan Kaca
2
-
1 Kaca Bening 3 mm M 228,600.00 262,200.00 258,300.00 271,900.00
2
2 Kaca Bening 5 mm M 352,800.00 404,600.00 398,600.00 419,700.00
2
3 Kaca Bening 8 mm M 390,300.00 447,600.00 441,000.00 464,300.00
2
4 Kaca Bening 12 mm M 1,113,600.00 1,277,200.00 1,258,200.00 1,324,700.00
2
5 Kaca Ryben 3 mm M 242,600.00 278,200.00 274,100.00 288,600.00
2
6 Kaca Ryben 5 mm M 597,800.00 685,600.00 675,400.00 711,100.00
2
7 Kaca Ryben 8 mm M 583,800.00 669,600.00 659,600.00 694,500.00
2
8 Kaca Ryben 12 mm M 1,357,400.00 1,556,800.00 1,533,600.00 1,614,700.00
9 Kaca Nako 5 mm Buah 370,400.00 424,800.00 418,500.00 440,600.00
2
10 Kaca Cermin 5 mm M 524,000.00 601,000.00 592,000.00 623,300.00
2
11 Kaca Cermin 6 mm M 617,700.00 708,400.00 697,900.00 734,800.00
2
12 Kaca Cermin 8 mm M 726,800.00 833,600.00 821,200.00 864,600.00
2
13 Kaca Stopsol M 792,400.00 908,800.00 895,300.00 942,600.00
2
14 Kaca Nako Antik M 443,100.00 508,200.00 500,600.00 527,100.00
2
15 Kaca Wireglass 5 mm M 1,934,100.00 2,218,200.00 2,185,200.00 2,300,700.00
2
16 Kaca Patri ukir warna 5 mm M 2,168,600.00 2,487,200.00 2,450,200.00 2,579,700.00
17 Profil Kaca Bh 52,700.00 60,400.00 59,500.00 62,700.00
2
18 Kaca S M 133,600.00 153,200.00 151,000.00 158,900.00

4. Bahan Listrik
-
1 Titik Lampu + Instalasi (+Material) Bh 293,100.00 324,100.00 320,500.00 333,100.00
2 Stop Kontak + Instalasi (+Material) Bh 293,100.00 324,100.00 320,500.00 333,100.00
3 Stop Kontak Tunggal (Ex. Brocco) Bh 70,300.00 80,600.00 79,400.00 83,600.00
4 Stop Kontak Double (Ex. Brocco) Bh 79,700.00 91,400.00 90,000.00 94,800.00
5 Stop Kontak Tripel (Ex. Brocco) Bh 119,600.00 137,200.00 135,100.00 142,300.00
6 Sakelar Engkel (Ex. Brocco) Bh 64,500.00 74,000.00 72,900.00 76,700.00
7 Sakelar Double (Ex. Brocco) Bh 70,300.00 80,600.00 79,400.00 83,600.00
D 12 Kabel TM Roll 1,934,100.00 2,218,200.00 2,185,200.00 2,300,700.00
D 13 Kabel Travo Roll 1,934,100.00 2,218,200.00 2,185,200.00 2,300,700.00
14 Kabel Grounding BC 1 x 70 mm M' 139,500.00 160,000.00 157,600.00 165,900.00
15 Kabel Grounding BC 25 mm M' 73,400.00 84,200.00 82,900.00 87,300.00
16 Kabel Grounding NYA 1 x 16 mm2 M' 100,100.00 114,800.00 113,100.00 119,100.00
17 Kabel Grounding NYA 1 x 25 mm2 M' 110,100.00 126,300.00 124,400.00 131,000.00
24 Kabel NYA 1 x1.5 mm2 (Ex. Eterna) M' 2,200.00 2,500.00 2,500.00 2,600.00
25 Kabel NYA 1 × 2.5 mm2 (Ex. Eterna) M' 3,400.00 3,900.00 3,800.00 4,000.00
26 Kabel NYA 1 × 4 mm2 (Ex. Eterna) M' 5,200.00 6,000.00 5,900.00 6,200.00

Halaman 3
I.1. HARGA BAHAN DASAR & UPAH (BASIC PRICE) PER ZONA
KABUPATEN KUTAI TIMUR PROVINSI KALIMANTAN TIMUR
TAHUN 2019

Satuan Harga di Kabupaten / Kota


No. Uraian Pokok Kegiatan Satuan Kutai Timur Ket.
Zona I Zona II Zona III Zona IV
1 2 3 4 5 6 7 8
27 Kabel NYA 1 × 6 mm2 (Ex. Eterna) M' 7,600.00 8,700.00 8,600.00 9,000.00
28 Kabel NYA 1 × 10 mm2 (Ex. Eterna) M' 12,500.00 14,300.00 14,100.00 14,900.00
29 Kabel NYM 3 × 1.5 mm2 (Ex. Eterna) M' 8,500.00 9,800.00 9,600.00 10,100.00
30 Kabel NYM 3 × 2.5 mm2 (Ex. Eterna) M' 12,000.00 13,800.00 13,600.00 14,300.00
31 Kabel NYM 2 × 1.5 mm2 (Ex. Eterna) M' 6,700.00 7,700.00 7,600.00 8,000.00
32 Kabel NYM 2 × 2.5 mm2 (Ex. Eterna) M' 9,500.00 10,900.00 10,700.00 11,300.00
33 Kabel NYM 3 × 4 mm2 (Ex. Eterna) M' 19,600.00 22,500.00 22,100.00 23,300.00
34 Kabel NYM 4 × 2.5 mm2 (Ex. Eterna) M' 15,300.00 17,600.00 17,300.00 18,200.00
35 Kabel NYM 4 × 4 mm2 (Ex. Eterna) M' 25,200.00 28,900.00 28,500.00 30,000.00
36 Kabel NYM 4 × 6 mm2 (Ex. Eterna) M' 35,300.00 40,500.00 39,900.00 42,000.00
37 Kabel NYM 4 × 10 mm2 (Ex. Eterna) M' 57,300.00 65,700.00 64,700.00 68,200.00
38 Kabel NYA 1 × 1.5 mm2 (Ex. Supreme) M' 2,700.00 3,100.00 3,100.00 3,200.00
39 Kabel NYA 1 × 2.5 mm2 (Ex. Supreme) M' 3,600.00 4,100.00 4,100.00 4,300.00
40 Kabel NYM 2 × 1.5 mm2 (Ex. Supreme) M' 8,200.00 9,400.00 9,300.00 9,700.00
41 Kabel NYM 2 × 2.5 mm2 (Ex. Supreme) M' 11,500.00 13,200.00 13,000.00 13,700.00
42 Kabel NYM 3 × 1.5 mm2 (Ex. Supreme) M' 10,400.00 11,900.00 11,800.00 12,400.00
43 Kabel NYM 3 × 2.5 mm2 (Ex. Supreme) M' 14,900.00 17,100.00 16,800.00 17,700.00
44 Kabel NYM 4 × 2.5 mm2 (Ex. Supreme) M' 21,100.00 24,200.00 23,800.00 25,100.00
45 Kabel NYFGBY 4 x 6 mm2 M' 126,200.00 144,700.00 142,600.00 150,100.00
46 Kabel NYFGBY 4 x 35 mm2 M' 280,600.00 321,800.00 317,000.00 333,800.00
47 Kabel NYFGBY 4 x 240 mm2 M' 1,787,400.00 2,050,000.00 2,019,500.00 2,126,200.00
48 Kabel NYY 2 x ( 3 x 16 mm2 ) M' 207,100.00 237,500.00 234,000.00 246,400.00
49 Kabel NYY 4 x 70 mm2 M' 647,100.00 742,200.00 731,100.00 769,800.00
50 Kabel NYY 4 x 35 mm2 M' 317,400.00 364,000.00 358,600.00 377,600.00
51 Kabel NYY 2 x ( 3 x 35 mm2 ) M' 427,600.00 490,400.00 483,100.00 508,700.00
52 Kabel NYY 2 x ( 3 x 25 mm2 ) M' 317,400.00 364,000.00 358,600.00 377,600.00
53 Kabel NYY 2 x ( 3 x 16 mm2 ) M' 207,100.00 237,500.00 234,000.00 246,400.00
54 Kabel NYY 3 x 2,5 mm2 M' 52,700.00 60,400.00 59,500.00 62,700.00
62 Kabel Grounding BC 10 mm2 M' 38,100.00 43,700.00 43,000.00 45,300.00
68 Kabel NYHY 5 x 0.75 MM2 @ 100 m M' 16,900.00 19,400.00 19,100.00 20,100.00
69 Zekering Kas Lokal 1 Group Bh 87,900.00 100,800.00 99,300.00 104,600.00
70 Zekering Kas Lokal 2 Group Bh 146,500.00 168,000.00 165,500.00 174,300.00
71 Zekering Kas Lokal 3 Group Bh 228,600.00 262,200.00 258,300.00 271,900.00
72 Embodus Bh 5,900.00 6,800.00 6,700.00 7,000.00
73 Pipa Conduit Btg 11,700.00 13,400.00 13,200.00 13,900.00
74 Fitting Bh 8,200.00 9,400.00 9,300.00 9,800.00
75 T-Doos / Cabang Bh 4,700.00 5,400.00 5,300.00 5,600.00
76 Klemp Bh 7,000.00 8,000.00 7,900.00 8,300.00
77 Zekering Box 3 Phase Bh 134,800.00 154,600.00 152,300.00 160,400.00
78 Zekering Box 1 Phase Bh 82,100.00 94,200.00 92,800.00 97,700.00
79 Bola Lampu 5 watt Bh 32,800.00 37,600.00 37,100.00 39,000.00
80 Bola Lampu 8 watt Bh 37,500.00 43,000.00 42,400.00 44,600.00
81 Bola Lampu 11 watt Bh 42,200.00 48,400.00 47,700.00 50,200.00
82 Bola Lampu 14 watt Bh 44,500.00 51,000.00 50,300.00 52,900.00
83 Bola Lampu 18 watt Bh 46,900.00 53,800.00 53,000.00 55,800.00
84 Bola Lampu 23 watt Bh 55,100.00 63,200.00 62,300.00 65,500.00

5. Bahan Penggantung
-
1 Engsel 3" Setara (SES) Psg 161,200.00 184,900.00 182,100.00 191,800.00
2 Engsel 4"Setara (DEKSON) Psg 253,200.00 290,400.00 286,100.00 301,200.00
3 Engsel Plastik/Nylon Bh 29,300.00 33,600.00 33,100.00 34,900.00
4 Engsel Pintu Kipas Bh 83,200.00 95,400.00 94,000.00 99,000.00
5 Engsel Angin Bh 98,100.00 112,500.00 110,800.00 116,700.00
6 Hak Angin Bh 33,600.00 38,500.00 38,000.00 40,000.00
7 Kait Angin Bh 37,600.00 43,100.00 42,500.00 44,700.00
8 Espagnolet Lengkap Bh 52,700.00 60,400.00 59,500.00 62,700.00
9 Grendel Lokal Bh 47,000.00 53,900.00 53,100.00 55,900.00
10 Kunci Tanam union 1 x Slash Bh 281,300.00 322,600.00 317,800.00 334,600.00
11 Kunci Tanam union 2 x Slash Bh 457,200.00 524,400.00 516,600.00 543,900.00

Halaman 4
I.1. HARGA BAHAN DASAR & UPAH (BASIC PRICE) PER ZONA
KABUPATEN KUTAI TIMUR PROVINSI KALIMANTAN TIMUR
TAHUN 2019

Satuan Harga di Kabupaten / Kota


No. Uraian Pokok Kegiatan Satuan Kutai Timur Ket.
Zona I Zona II Zona III Zona IV
1 2 3 4 5 6 7 8
12 Kunci Tanam Yale 1 x Slash Bh 123,100.00 141,200.00 139,100.00 146,400.00
13 Kunci Tanam Yale 2 x Slash Bh 146,500.00 168,000.00 165,500.00 174,300.00
14 Kunci Tanam Antik Bh 536,900.00 615,800.00 606,600.00 638,700.00
15 Kunci Tanam Pendek Bh 100,800.00 115,600.00 113,900.00 119,900.00
16 Kunci Tanam Panjang Bh 161,800.00 185,600.00 182,800.00 192,500.00
17 Kunci Tanam Kamar mandi Bh 336,400.00 385,800.00 380,100.00 400,200.00
18 Kunci Silinder Bh 349,300.00 400,600.00 394,700.00 415,500.00
19 Kunci lemari Bh 130,100.00 149,200.00 147,000.00 154,800.00
20 Door Closer Bh 376,300.00 431,600.00 425,200.00 447,600.00
21 Kunci Slot Bh 160,600.00 184,200.00 181,500.00 191,000.00
22 Pegangan Pintu (Door Holder) Bh 174,700.00 200,400.00 197,400.00 207,800.00
23 Door Stop Bh 46,900.00 53,800.00 53,000.00 55,800.00
2
24 Rel Pintu Dorong M 2,227,200.00 2,554,400.00 2,516,400.00 2,649,400.00
2
25 Roling Door Aluminium M 604,900.00 693,800.00 683,400.00 719,600.00
26 Pintu Kaca 5 mm Frame Aluminium Swing (Ex. Alexindo) Unit 2,813,300.00 3,226,600.00 3,178,600.00 3,346,600.00
27 Pintu Folding Gate Besi 0.5 mm Bh 756,100.00 867,200.00 854,300.00 899,400.00
28 Vertikals Blinds Bh 711,500.00 816,000.00 803,900.00 846,400.00
29 Spring Knip Bh 174,700.00 200,400.00 197,400.00 207,800.00

6. Bahan Langit - Langit


1 Plywood
- Plywood 3 mm Lbr 76,200.00 87,400.00 86,100.00 90,600.00
- Plywood 4 mm Lbr 78,500.00 90,000.00 88,700.00 93,400.00
- Plywood 5 mm Lbr 99,600.00 114,200.00 112,500.00 118,500.00
- Plywood 6 mm Lbr 128,900.00 147,800.00 145,600.00 153,300.00
- Plywood 9 mm Lbr 186,400.00 208,800.00 206,200.00 215,300.00
- Plywood 12 mm Lbr 222,700.00 255,400.00 251,600.00 264,900.00
- Plywood 18 mm Lbr 293,100.00 336,200.00 331,200.00 348,700.00
2 Kalsiboard
- Kalsiboard 4 mm Lbr 99,600.00 114,200.00 112,500.00 118,500.00
- Kalsiboard 6 mm Lbr 140,700.00 161,400.00 159,000.00 167,400.00
- Kalsiboard 9 mm Lbr 187,600.00 215,200.00 212,000.00 223,200.00
- Kalsiboard 12 mm Lbr 260,200.00 298,400.00 294,000.00 309,500.00
- Formika 4' x 3' Lbr 345,800.00 396,600.00 390,700.00 411,300.00
3 GRC Board
- GRC 9 mm Lbr 470,600.00 539,700.00 531,700.00 559,800.00
- GRC 6 mm Lbr 672,300.00 771,100.00 759,600.00 799,700.00
4 Acustik Amstrong
- Acustik amstrong 30 x 60 cm Lbr 206,300.00 236,600.00 233,100.00 245,400.00
- Acustik amstrong 60 x 120 cm Lbr 671,700.00 770,400.00 758,900.00 799,000.00
5 Teakwood Lbr 162,900.00 186,800.00 184,100.00 193,800.00
1
6 Profil Aluminium "T" M 118,400.00 135,800.00 133,800.00 140,800.00
7 Ramset (Isi 100 Buah) Box 193,400.00 221,800.00 218,500.00 230,100.00
8 Kawat Seng Polos Kg 43,000.00 49,300.00 48,600.00 51,200.00
9 Seng Rata / Plat
- BJLS 40 KI Lbr 229,200.00 262,900.00 259,000.00 272,600.00
- BJLS 30 KI Lbr 188,700.00 216,400.00 213,200.00 224,500.00
- BJLS 27 KI Lbr 115,600.00 132,600.00 130,600.00 137,500.00
- BJLS 20 KI Lbr 92,700.00 106,300.00 104,700.00 110,300.00
10 Plat Asbes
- Plat asbes tebal 6 mm Lbr 175,800.00 201,600.00 198,600.00 209,100.00
- Plat asbes tebal 5 mm Lbr 147,700.00 169,400.00 166,900.00 175,700.00
- Plat asbes tebal 4 mm Lbr 115,600.00 132,600.00 130,600.00 137,500.00
11 Eternit Asbes Semen 1,00 x 1,00 x 35 mm Lbr 64,500.00 74,000.00 72,900.00 76,700.00
12 Eternit Asbes Semen 1,00 x 1,00 x 40 mm Lbr 68,000.00 78,000.00 76,800.00 80,900.00
13 Eternit Asbes Semen 1,00 x 1,00 x 50 mm Lbr 73,800.00 84,600.00 83,400.00 87,800.00
14 List Shadow Line 10 x 10 M' 14,100.00 16,200.00 15,900.00 16,800.00
7. Bahan Pipa
1 Pipa Besi

Halaman 5
I.1. HARGA BAHAN DASAR & UPAH (BASIC PRICE) PER ZONA
KABUPATEN KUTAI TIMUR PROVINSI KALIMANTAN TIMUR
TAHUN 2019

Satuan Harga di Kabupaten / Kota


No. Uraian Pokok Kegiatan Satuan Kutai Timur Ket.
Zona I Zona II Zona III Zona IV
1 2 3 4 5 6 7 8
- Pipa Besi ½" - 4 m Btg 111,600.00 128,000.00 126,100.00 132,800.00
- Pipa Besi ½" - 6 m Btg 126,400.00 145,000.00 142,800.00 150,400.00
- Pipa Besi ¾" - 4 m Btg 134,500.00 154,300.00 152,000.00 160,000.00
- Pipa Besi 1,5" - 4 m Btg 255,400.00 292,900.00 288,600.00 303,800.00
- Pipa Besi 2" - 4 m Btg 336,200.00 385,600.00 379,900.00 399,900.00
- Pipa Besi 2,5" - 4 m Btg 631,900.00 724,700.00 714,000.00 751,700.00
- Pipa Besi 3" - 4 m Btg 712,600.00 817,300.00 805,100.00 847,700.00
- Pipa Besi 4" - 4 m Btg 712,600.00 817,300.00 805,100.00 847,700.00
Pipa PCV Tekanan 10 Kg/Cm2, Panjang = 4 Meter
1
- Pipa PVC AW Dia 1/2" M 6,800.00 7,900.00 7,700.00 8,300.00
1
- Pipa PVC AW Dia 3/4" M 10,100.00 11,600.00 11,500.00 12,300.00
1
- Pipa PVC AW Dia 1" M 13,500.00 15,500.00 15,400.00 16,300.00
1
- Pipa PVC AW Dia 1,5 " M 26,800.00 31,000.00 30,500.00 32,400.00
1
- Pipa PVC AW Dia 2 " M 30,900.00 35,600.00 35,100.00 37,300.00
1
- Pipa PVC AW Dia 2,5 " M 41,700.00 48,000.00 47,500.00 50,500.00
1
- Pipa PVC AW Dia 3 " M 56,500.00 65,200.00 64,400.00 68,300.00
1
- Pipa PVC AW Dia 4 " M 94,100.00 108,500.00 107,200.00 113,700.00
2 Pipa HDPE
1
- Pipa HDPE Ø 25 mm, SDR 17 (PN 10/PE100) M 12,900.00 14,800.00 14,600.00 15,300.00
1
- Pipa HDPE Ø 32 mm, SDR 17 (PN 10/PE100) M 17,600.00 20,200.00 19,900.00 20,900.00
1
- Pipa HDPE Ø 40 mm, SDR 17 (PN 10/PE100) M 32,300.00 37,000.00 36,500.00 38,400.00
1
- Pipa HDPE Ø 50 mm, SDR 17 (PN 10/PE100) M 50,100.00 57,500.00 56,600.00 59,600.00
1
- Pipa HDPE Ø 63 mm, SDR 17 (PN 10/PE100) M 79,100.00 90,700.00 89,400.00 94,100.00
1
- Pipa HDPE Ø 75 mm, SDR 17 (PN 10/PE100) M 111,400.00 127,800.00 125,900.00 132,500.00
1
` Pipa HDPE Ø 90 mm, SDR 17 (PN 10/PE100) M 160,400.00 184,000.00 181,200.00 190,800.00
1
- Pipa HDPE Ø 110 mm, SDR 17 (PN 10/PE100) M 238,400.00 273,400.00 269,400.00 283,600.00
1
- Pipa HDPE Ø 125 mm, SDR 17 (PN 10/PE100) M 305,300.00 350,100.00 344,900.00 363,200.00
1
- Pipa HDPE Ø 140 mm, SDR 17 (PN 10/PE100) M 383,200.00 439,500.00 433,000.00 455,800.00
1
- Pipa HDPE Ø 160 mm, SDR 17 (PN 10/PE100) M 499,100.00 572,400.00 563,900.00 593,700.00
1
- Pipa HDPE Ø 180 mm, SDR 17 (PN 10/PE100) M 631,700.00 724,500.00 713,700.00 751,400.00
1
- Pipa HDPE Ø 200 mm, SDR 17 (PN 10/PE100) M 779,800.00 894,400.00 881,100.00 927,600.00
1
- Pipa HDPE Ø 225 mm, SDR 17 (PN 10/PE100) M 989,300.00 1,134,600.00 1,117,800.00 1,176,800.00
1
- Pipa HDPE Ø 250 mm, SDR 17 (PN 10/PE100) M 1,212,100.00 1,390,200.00 1,369,500.00 1,441,900.00
1
- Pipa HDPE Ø 280 mm, SDR 17 (PN 10/PE100) M 1,522,900.00 1,746,600.00 1,720,600.00 1,811,600.00
1
- Pipa HDPE Ø 315 mm, SDR 17 (PN 10/PE100) M 1,928,400.00 2,211,700.00 2,178,800.00 2,294,000.00
1
- Pipa HDPE Ø 355 mm, SDR 17 (PN 10/PE100) M 2,454,300.00 2,814,800.00 2,773,000.00 2,919,500.00
1
- Pipa HDPE Ø 400 mm, SDR 17 (PN 10/PE100) M 3,101,500.00 3,557,100.00 3,504,200.00 3,689,400.00
1
- Pipa HDPE Ø 450 mm, SDR 17 (PN 10/PE100) M 3,929,300.00 4,506,500.00 4,439,500.00 4,674,100.00
1
- Pipa HDPE Ø 500 mm, SDR 17 (PN 10/PE100) M 4,840,600.00 5,551,700.00 5,469,100.00 5,758,200.00
1
- Pipa HDPE Ø 560 mm, SDR 17 (PN 10/PE100) M 6,082,800.00 6,976,400.00 6,872,600.00 7,235,800.00
1
- Pipa HDPE Ø 630 mm, SDR 17 (PN 10/PE100) M 7,685,900.00 8,815,000.00 8,683,800.00 9,142,800.00
1
- Pipa HDPE Ø 710 mm, SDR 17 (PN 10/PE100) M 7,967,800.00 9,138,300.00 9,002,300.00 9,478,200.00
1
- Pipa HDPE Ø 800 mm, SDR 17 (PN 10/PE100) M 12,429,600.00 14,255,500.00 14,043,500.00 14,785,700.00
3 Pipa Tanah Dia. 15 cm bh 95,400.00 110,000.00 108,700.00 115,100.00
4 Pipa Tanah Dia. 20 cm bh 147,900.00 170,600.00 168,800.00 178,500.00
5 Pipa Galvanis
- Pipa Galvanis 1/2" - 6 m (medium A) Btg 97,300.00 111,600.00 109,900.00 115,700.00
- Pipa Galvanis 3/4" - 6 m (medium A) Btg 117,200.00 134,400.00 132,400.00 139,400.00
- Pipa Galvanis 1" - 6 m (medium A) Btg 175,800.00 201,600.00 198,600.00 209,100.00
- Pipa Galvanis 1.5" - 6 m (medium A) Btg 255,500.00 293,000.00 288,700.00 303,900.00
- Pipa Galvanis 2" - 6 m (medium A) Btg 482,900.00 553,800.00 545,600.00 574,400.00
- Pipa Galvanis 3" - 6 m (medium A) Btg 739,700.00 848,400.00 835,700.00 879,900.00
- Pipa Galvanis 4" - 6 m (medium A) Btg 941,300.00 1,079,600.00 1,063,500.00 1,119,700.00
6 Waterstop
1
- Waterstop PVC WSF 150 Lebar 150 mm, Tebal 20 mm M 389,900.00 447,200.00 440,500.00 463,800.00
1
- Waterstop PVC WSF 200 Lebar 200 mm, Tebal 20 mm M 403,200.00 462,400.00 455,600.00 479,600.00
1
- Waterstop PVC WSF 250 Lebar 250 mm, Tebal 20 mm M 644,700.00 739,400.00 728,400.00 766,900.00
1
- Waterstop PVC WSH 150 Lebar 150 mm, Tebal 20 mm M 277,200.00 317,900.00 313,200.00 329,800.00
1
- Waterstop PVC WSH 200 Lebar 200 mm, Tebal 20 mm M 296,600.00 340,200.00 335,100.00 352,800.00
1
- Waterstop PVC WSH 250 Lebar 250 mm, Tebal 20 mm M 328,800.00 377,100.00 371,500.00 391,100.00

Halaman 6
I.1. HARGA BAHAN DASAR & UPAH (BASIC PRICE) PER ZONA
KABUPATEN KUTAI TIMUR PROVINSI KALIMANTAN TIMUR
TAHUN 2019

Satuan Harga di Kabupaten / Kota


No. Uraian Pokok Kegiatan Satuan Kutai Timur Ket.
Zona I Zona II Zona III Zona IV
1 2 3 4 5 6 7 8
29 WF 250 x 125 x 6 x 9 Kg 32,400.00 37,200.00 36,600.00 38,500.00
30 WF 150 x 75 x 5 x 7 Kg 32,400.00 37,200.00 36,600.00 38,500.00
31 C 125 x 50 x 20 x 2.3 Kg 32,400.00 37,200.00 36,600.00 38,500.00
32 Trekstang BB dia. 12 mm Kg 32,400.00 37,200.00 36,600.00 38,500.00
33 Plat 12 mm Kg 32,400.00 37,200.00 36,600.00 38,500.00
34 Plat 10 mm Kg 32,400.00 37,200.00 36,600.00 38,500.00
35 Plat 8 mm Kg 32,400.00 37,200.00 36,600.00 38,500.00
36 Plat 6 mm Kg 32,400.00 37,200.00 36,600.00 38,500.00

9. Bahan Lantai
1 Ubin Tegel Polos 20 x 20 cm M² 293,100.00 336,200.00 331,200.00 348,700.00
2 Ubin Tegel Polos 30 x 30 cm M² 152,400.00 174,800.00 172,200.00 181,300.00
3 Ubin Tegel Polos 40 x 40 cm M² 117,200.00 134,400.00 132,400.00 139,400.00
4 Plint Ubin PC Abu-abu 15 x 20 M² 58,600.00 67,200.00 66,200.00 69,700.00
5 Plint Ubin PC Abu-abu 10 x 30 M² 64,500.00 74,000.00 72,900.00 76,700.00
6 Plint Ubin PC Abu-abu 10 x 40 M² 52,700.00 60,400.00 59,500.00 62,700.00
7 Ubin Tegel Warna 20 x 20 cm M² 82,100.00 94,200.00 92,800.00 97,700.00
8 Ubin Tegel Warna 30 x 30 cm M² 87,900.00 100,800.00 99,300.00 104,600.00
9 Ubin Tegel Warna 40 x 40 cm M² 99,600.00 114,200.00 112,500.00 118,500.00
10 Plint Ubin PC Warna 10 x 20 M² 64,500.00 74,000.00 72,900.00 76,700.00
11 Plint Ubin PC Warna 10 x 30 M² 70,300.00 80,600.00 79,400.00 83,600.00
12 Plint Ubin PC Warna 10 x 40 M² 58,600.00 67,200.00 66,200.00 69,700.00
13 Keramik 33 x 33 cm (Ex. Milan) M² 72,800.00 83,500.00 82,300.00 86,600.00
14 Keramik 20 x 20 cm (Ex. Roman) M² 128,900.00 147,800.00 145,600.00 153,300.00
15 Keramik 10 x 33 cm M² 160,000.00 183,500.00 180,800.00 190,300.00
16 Keramik 30 x 30 cm (Ex. Roman) M² 147,200.00 168,800.00 166,300.00 175,100.00
17 Keramik 30 x 30 cm (Ex. Platinum) M² 68,000.00 78,000.00 76,800.00 80,900.00
18 Keramik 40 x 40 cm (Ex. Milan) M² 88,200.00 101,200.00 99,600.00 104,900.00
19 Keramik 40 x 40 cm (Ex. Hercules) M² 79,700.00 91,400.00 90,000.00 94,800.00
20 Keramik Dinding 25 x 45 cm (Ex. Roman) M² 149,600.00 171,600.00 169,000.00 178,000.00
21 Keramik Dinding 30 x 60 cm (Ex. Roman) M² 207,800.00 238,300.00 234,800.00 247,200.00
22 Keramik Lantai 10 x 20 cm (Ex. Roman) M² 833,100.00 955,500.00 941,300.00 991,000.00
23 Keramik Lantai 20 x 20 cm (Ex. Platinum) M² 72,800.00 83,500.00 82,300.00 86,600.00
24 Plint Keramik 5 x 20 M² 42,200.00 48,400.00 47,700.00 50,200.00
25 Plint Keramik 10 x 10 M² 44,500.00 51,000.00 50,300.00 52,900.00
26 Plint Keramik 10 x 20 M² 52,700.00 60,400.00 59,500.00 62,700.00
27 Plint Keramik 10 x 30 M² 61,000.00 70,000.00 68,900.00 72,600.00
28 Plint Keramik 10 x 40 M² 69,200.00 79,400.00 78,200.00 82,300.00
29 Marmer Biasa M² 1,025,700.00 1,176,400.00 1,158,900.00 1,220,100.00
30 Ubin Teralux 30 x 30 cm M² 486,500.00 558,000.00 549,700.00 578,700.00
31 Ubin Teralux 40 x 40 cm M² 52,200.00 59,900.00 59,000.00 62,100.00
32 Plint Teralux 10 x 30 M² 63,300.00 72,600.00 71,500.00 75,300.00
33 Plint Teralux 10 x 40 M² 79,700.00 91,400.00 90,000.00 94,800.00
34 Ubin Teralux marmer 30 x 30 cm M² 539,200.00 618,400.00 609,200.00 641,400.00
35 Ubin Teralux marmer 40 x 40 cm M² 560,300.00 642,600.00 633,100.00 666,500.00
36 Ubin Teralux marmer 60 x 60 cm M² 615,400.00 705,800.00 695,300.00 732,100.00
37 Plint Teralux marmer 10 x 30 M² 13,500.00 15,500.00 15,300.00 16,100.00
38 Plint Teralux marmer 10 x 40 M² 170,000.00 195,000.00 192,100.00 202,200.00
39 Plint Teralux marmer 10 x 60 M² 222,700.00 255,400.00 251,600.00 264,900.00
40 Ubin Porselin Putih Lokal 11 x 11 cm M² 12,700.00 14,600.00 14,300.00 15,100.00
41 Ubin Porselin Putih Lokal 10 x 20 cm M² 92,600.00 106,200.00 104,600.00 110,200.00
42 Ubin Porselin Putih Warna 10 x 20 cm M² 138,300.00 158,600.00 156,300.00 164,500.00
43 Ubin Porselin Putih Lokal 20 x 20 cm M² 140,700.00 161,400.00 159,000.00 167,400.00
44 Ubin Porselin Putih Warna 20 x 20 cm M² 143,000.00 164,000.00 161,600.00 170,100.00
45 Granite tile 30 x 30 M² 466,500.00 535,000.00 527,100.00 554,900.00
46 Homogenius Tile Lantai 60 x 60 (Ex. Niro) M² 291,200.00 334,000.00 329,000.00 346,400.00
47 Homogenius Tile Lantai 60 x 60 (Ex. Indogress) M² 633,000.00 726,000.00 715,200.00 753,000.00
48 Plint Granite 10 x 30 M² 64,500.00 74,000.00 72,900.00 76,700.00
49 Plint Granite 10 x 40 M² 71,500.00 82,000.00 80,800.00 85,100.00

Halaman 8
I.1. HARGA BAHAN DASAR & UPAH (BASIC PRICE) PER ZONA
KABUPATEN KUTAI TIMUR PROVINSI KALIMANTAN TIMUR
TAHUN 2019

Satuan Harga di Kabupaten / Kota


No. Uraian Pokok Kegiatan Satuan Kutai Timur Ket.
Zona I Zona II Zona III Zona IV
1 2 3 4 5 6 7 8
50 Plint Granite 10 x 60 M² 89,200.00 102,300.00 100,800.00 106,100.00
3
51 Hollow Blok M 8,800.00 10,100.00 9,900.00 10,500.00
1
52 Concrete block (CB.20) M 9,400.00 10,800.00 10,600.00 11,200.00
1
53 Concrete block (CB.15) M 9,400.00 10,800.00 10,600.00 11,200.00
1
54 Concrete block (CB.10) M 9,400.00 10,800.00 10,600.00 11,200.00
55 Bondbeam 40 x 20 x 20 cm Bh 10,000.00 11,500.00 11,300.00 11,900.00
56 Roster / Terawang 40 x 40 x 11 Bh 46,900.00 53,800.00 53,000.00 55,800.00
57 Roster / Terawang 12 x 11 x 24 Bh 29,300.00 33,600.00 33,100.00 34,900.00
58 Bathquip Bh 1,523,900.00 1,747,800.00 1,721,800.00 1,812,800.00
59 Karpet M² 175,800.00 201,600.00 198,600.00 209,100.00
60 Underlayer / rubber corrugated M² 257,900.00 295,800.00 291,400.00 306,800.00
61 Parquet M² 257,900.00 295,800.00 291,400.00 306,800.00
62 Gymfloor M² 257,900.00 295,800.00 291,400.00 306,800.00
63 Batu Granite Kg 46,900.00 53,800.00 53,000.00 55,800.00
64 Batu Teraso Kg 37,500.00 43,000.00 42,400.00 44,600.00
66 Vinyl motif kembang ex DN Bh 82,100.00 94,200.00 92,800.00 97,700.00
67 Vinyl wall covering, lebar 50 cm Bh 113,700.00 130,400.00 128,500.00 135,300.00
68 Floor Hardener ferrovax Kg 66,800.00 76,600.00 75,500.00 79,500.00

10. Bahan Sanitair


1 Klosed Jongkok KIA Bh 363,400.00 416,800.00 410,600.00 432,300.00
2 Klosed Jongkok American Standart Bh 416,100.00 448,000.00 444,300.00 457,200.00
3 Klosed Jongkok (teraso) Bh 199,300.00 228,600.00 225,200.00 237,100.00
4 Klosed Jongkok (Ex. Toto) Bh 498,200.00 933,900.00 883,300.00 1,060,400.00
5 Klosed Duduk (Ex. Serity) Bh 2,110,000.00 2,420,000.00 2,384,000.00 2,510,000.00
6 Klosed Duduk (Ex. Toto) Bh 2,168,600.00 2,642,200.00 2,587,200.00 2,779,700.00
7 Bak Mandi Fibre (besar) Bh 439,600.00 504,200.00 496,700.00 522,900.00
8 Bak Mandi Porselin (besar) Bh 586,100.00 672,200.00 662,200.00 697,200.00
9 Bak Mandi Plastik (besar) Bh 1,289,400.00 1,478,800.00 1,456,800.00 1,533,800.00
10 Bak Mandi (teraso) Bh 527,500.00 605,000.00 596,000.00 627,500.00
11 Urinoir (Ex. Toto) Bh 1,934,100.00 2,218,200.00 2,185,200.00 2,300,700.00
12 Bak Cuci Piring Logam Bh 216,900.00 248,800.00 245,100.00 258,000.00
13 Bak Cuci Piring Stenless Stell Bh 703,300.00 806,600.00 794,600.00 836,600.00
14 Bak Cuci Piring Teraso Bh 363,400.00 416,800.00 410,600.00 432,300.00
15 Pompa Air (Ex. Sanyo 200 watt) Bh 879,200.00 965,300.00 955,300.00 990,300.00
16 Pompa Air (Ex. Shimzu 100 watt semi jet ) Bh 996,400.00 1,086,800.00 1,076,300.00 1,113,100.00
17 Pompa Air (Ex. Panasonic 125 watt) Bh 644,700.00 711,900.00 704,100.00 731,400.00
18 Floor Drain (Ex. Toto) Bh 103,200.00 118,400.00 116,600.00 122,800.00
19 Kran Air (Ex. Toto) Bh 109,600.00 125,700.00 123,800.00 130,400.00
20 Roof Drain 4 In (Stainless) Bh 515,800.00 591,600.00 582,800.00 613,600.00
21 Kran Shower Panas Dan Dingin (Ex. Toto) Bh 1,934,100.00 2,218,200.00 2,185,200.00 2,300,700.00
22 Kran Air Dapur (Ex. Toto) Bh 528,700.00 606,400.00 597,300.00 628,900.00
23 Jet Shower (Ex. Toto) Bh 1,267,500.00 1,453,700.00 1,432,100.00 1,507,800.00
24 Wastafel (Ex. Toto) Bh 3,288,000.00 3,771,000.00 3,714,900.00 3,911,300.00
25 Tandon Air 650 L (Ex. Grand) Bh 937,800.00 1,075,600.00 1,059,600.00 1,115,600.00
26 Tandon Air 1000 L (Ex. Grand) Bh 1,523,900.00 1,747,800.00 1,721,800.00 1,812,800.00

Halaman 9
I.1. HARGA BAHAN DASAR & UPAH (BASIC PRICE) PER ZONA
KABUPATEN KUTAI TIMUR PROVINSI KALIMANTAN TIMUR
TAHUN 2019

Satuan Harga di Kabupaten / Kota


No. Uraian Pokok Kegiatan Satuan Kutai Timur Ket.
Zona I Zona II Zona III Zona IV
1 2 3 4 5 6 7 8
27 Tandon Air 1200 L (Ex. Grand) Bh 1,641,100.00 1,882,200.00 1,854,200.00 1,952,200.00
28 Tissue Holder (Ex. Toto) Bh 457,700.00 524,900.00 517,100.00 544,500.00
29 Roof Tank 2200 Ltr Stainless Stell Bh 8,791,500.00 10,509,200.00 10,309,700.00 11,007,900.00
30 Roof Tank 2000 Ltr Fiber Bh 4,806,000.00 5,512,000.00 5,430,000.00 5,717,000.00
11. Bahan Paku
1 Paku Kayu 0.5" - 1.5" / 1 - 2.5 cm Kg 29,300.00 37,000.00 36,100.00 39,200.00
2 Paku Kayu 2" - 6" / 5 - 7 cm Kg 35,200.00 42,900.00 42,000.00 45,100.00
3 Paku Beton Kg 47,000.00 53,900.00 53,100.00 55,900.00
4 Paku Ulin 1" Kg 52,400.00 60,100.00 59,200.00 62,300.00
5 Paku Ulin 1.5" - 5" Kg 52,400.00 60,100.00 59,200.00 62,300.00
6 Paku Seng Kg 49,500.00 56,800.00 55,900.00 58,900.00
7 Paku Plywood Kg 52,400.00 60,100.00 59,200.00 62,300.00
8 Paku Sekrup Kg 75,300.00 86,400.00 85,100.00 89,600.00
9 Paku Sekrup 1 - 2.5 cm Bh 16,200.00 18,600.00 18,300.00 19,300.00
10 Paku Asbes Kg 57,400.00 65,800.00 64,900.00 68,300.00
11 Paku Sirap Kg 57,400.00 65,800.00 64,900.00 68,300.00
12 Paku Gypsum Kg 61,900.00 71,000.00 69,900.00 73,600.00
13 Paku Kait Bh 2,900.00 3,300.00 3,300.00 3,500.00
14 Paku Sumbet Bh 1,800.00 2,100.00 2,000.00 2,100.00
15 Paku Reng Kg 37,500.00 43,000.00 42,400.00 44,600.00
16 Paku Genteng Metal Kg 52,400.00 60,100.00 59,200.00 62,300.00
17 Paku Pancing 60 x 230 Kg 52,400.00 60,100.00 59,200.00 62,300.00
18 Paku Pancing 50 x 231 Kg 57,800.00 66,300.00 65,300.00 68,800.00
19 Paku Hak Panjang 15 cm Kg 61,900.00 71,000.00 69,900.00 73,600.00
20 Paku 12 cm Kg 58,600.00 67,200.00 66,200.00 69,700.00
21 Paku 10 cm Kg 52,400.00 60,100.00 59,200.00 62,300.00
22 Baut Kg 52,400.00 60,100.00 59,200.00 62,300.00
23 Sekrup Fixer Bh 3,500.00 4,000.00 4,000.00 4,200.00
24 Screew Kg 52,400.00 60,100.00 59,200.00 62,300.00
12. Bahan Gorong-gorong
1 Buis Beton 10 cm x 1 m Bh 72,600.00 83,300.00 82,000.00 86,400.00
2 Buis Beton 15 cm x 1 m Bh 79,400.00 91,100.00 89,700.00 94,400.00
3 Buis Beton 20 cm x 1 m Bh 147,900.00 169,600.00 167,100.00 175,900.00
4 Buis Beton 25 cm x 1 m Bh 174,800.00 200,500.00 197,500.00 207,900.00
5 Buis Beton 50 cm x 1 m Bh 403,400.00 462,700.00 455,800.00 479,900.00
6 Buis Beton 100 cm x 1 m Bh 417,900.00 479,300.00 472,200.00 497,100.00

13. Bahan Kayu


1 Kayu Kelas I (Setara Ulin)
- Balok M³ 6,847,500.00 7,794,600.00 7,684,600.00 8,069,600.00
- Papan M³ 7,470,000.00 8,503,200.00 8,383,200.00 8,803,200.00
- Papan Siring Pagar Kpg 24,856.00 28,256.00 27,856.00 29,256.00
2 Kayu kelas II (Setara Bengkirai/Kamper/Kruing)
- Balok M³ 5,197,840.00 5,916,740.00 5,833,240.00 6,125,540.00
- Papan M³ 6,100,520.00 6,944,320.00 6,846,320.00 7,189,320.00
3 Kayu Kelas III (Setara Meranti) - - -
- Balok M³ 4,980,000.00 5,668,800.00 5,588,800.00 5,868,800.00
- Papan M³ 5,602,500.00 6,446,300.00 6,348,300.00 6,691,300.00
4 Kayu Kelas III (Setara Kapur)
- Balok M³ 4,980,000.00 5,668,800.00 5,588,800.00 5,868,800.00
- Papan M³ 6,100,520.00 6,944,320.00 6,846,320.00 7,189,320.00
5 Kusen Kayu KI. I ( Setara Jati/Ulin) M³ 7,594,480.00 8,644,880.00 8,522,880.00 8,949,880.00
6 Kusen Kayu KI. II (Setara Bengkirai/Kamper/Kruing) M³ 6,536,300.00 7,440,400.00 7,335,400.00 7,702,900.00
7 Papan Kayu KI. I (Setara Jati/Ulin) M³ 8,424,937.60 9,590,237.60 9,454,837.60 9,928,537.60
8 Papan Kayu KI. II (Setara Bengkirai/ Kamper/Kruing) M³ 7,221,040.00 8,219,840.00 8,103,840.00 8,509,840.00
9 Papan Bauwplank Kelas III M³ 3,361,460.00 3,826,360.00 3,772,360.00 3,961,360.00
10 Papan Listplank Kelas III M³ 6,554,892.00 7,461,492.00 7,356,192.00 7,724,792.00
11 Papan Begisting Kelas II M³ 3,361,460.00 3,826,360.00 3,772,360.00 3,961,360.00
12 Kayu Rangka Plafond M³ 5,602,500.00 6,377,400.00 6,287,400.00 6,602,400.00

Halaman 10
I.1. HARGA BAHAN DASAR & UPAH (BASIC PRICE) PER ZONA
KABUPATEN KUTAI TIMUR PROVINSI KALIMANTAN TIMUR
TAHUN 2019

Satuan Harga di Kabupaten / Kota


No. Uraian Pokok Kegiatan Satuan Kutai Timur Ket.
Zona I Zona II Zona III Zona IV
1 2 3 4 5 6 7 8
13 Kayu Rangka Atap M³ 4,980,000.00 5,668,800.00 5,588,800.00 5,868,800.00
14 Kayu Reng 2/3 - 4 m M³ 4,980,000.00 5,668,800.00 5,588,800.00 5,868,800.00
15 Kayu Reng 3/4 - 4 m M³ 5,478,020.00 6,235,720.00 6,147,720.00 6,455,720.00
16 Kayu Gelagar 8/10 - 4 m M³ 6,100,520.00 6,944,320.00 6,846,320.00 7,189,320.00
17 Kayu Begisting M³ 4,606,460.00 5,243,560.00 5,169,560.00 5,428,560.00
18 Kayu Lumbresiring Btg 79,659.20 90,659.20 89,359.20 93,859.20
19 Louvre Unit 1,307,240.00 1,488,040.00 1,467,040.00 1,540,540.00
20 Kayu Kaso 5/7 (meranti) M³ 4,980,000.00 5,668,800.00 5,588,800.00 5,868,800.00
21 Kayu Kaso 5/7 (meranti) Btg 84,650.40 96,350.40 94,950.40 99,750.40
22 Kayu Terentang (meranti) M³ 4,606,460.00 5,243,560.00 5,169,560.00 5,428,560.00
23 Kayu Cetakan M³ 771,936.00 878,736.00 866,336.00 909,736.00
24 List Kayu profil 5/5 M' 82,841.20 94,341.20 92,941.20 97,641.20
25 List Kayu profil 4/4 M' 82,841.20 94,341.20 92,941.20 97,641.20
26 List Kayu profil 2/4 M³ 49,812.00 56,712.00 55,912.00 58,712.00
27 Dolken Kayu Galam Btg 37,384.00 44,284.00 44,184.00 48,484.00
28 Perancah Kayu M³ 3,921,720.00 4,464,120.00 4,401,120.00 4,621,620.00
29 Alang-alang Ikat 62,876.40 71,576.40 70,576.40 74,076.40
30 Bambu Btg 25,492.40 28,992.40 28,592.40 30,092.40
2
31 Bilik Bambu M 271,263.12 308,763.12 304,463.12 319,663.12

14. Bahan Finishing


1 Amplas Kayu Lbr 8,400.00 9,600.00 9,500.00 10,000.00
2 Meni Kayu Kg 78,000.00 89,500.00 88,100.00 92,800.00
3 Meni Besi Kg 79,700.00 91,400.00 90,000.00 94,800.00
4 Dempul Kayu Kg 64,500.00 74,000.00 72,900.00 76,700.00
5 Plamir Tembok Kg 70,300.00 80,600.00 79,400.00 83,600.00
6 Plamir Kayu Kg 73,800.00 84,600.00 83,400.00 87,800.00
7 Tiner A Special Ltr 174,700.00 200,400.00 197,400.00 207,800.00
8 Tiner B Special Ltr 90,300.00 103,600.00 102,000.00 107,400.00
9 Tiner A Biasa Ltr 44,500.00 51,000.00 50,300.00 52,900.00
10 Cat Dasar Tembok Kg 82,100.00 94,200.00 92,800.00 97,700.00
11 Cat Dasar Kayu (Ex. Dulux) Kg 29,300.00 33,600.00 33,100.00 34,900.00
12 Cat Dasar Besi (Ex. Ftalit) Kg 111,400.00 127,800.00 125,900.00 132,500.00
13 Cat Tembok 5 Kg (Ex. Paragon) Klg 127,800.00 146,600.00 144,400.00 152,000.00
14 Cat Tembok Dalam ( Ex. Mowilex) Kg 107,800.00 123,600.00 121,800.00 128,200.00
15 Cat Tembok Luar ( Ex. Mowilex) Kg 349,300.00 400,600.00 394,700.00 415,500.00
16 Undercoat Kg 174,700.00 200,400.00 197,400.00 207,800.00
17 Cat Seng Kg 24,600.00 28,200.00 27,800.00 29,300.00
18 Zincromate Kg 58,000.00 66,500.00 65,500.00 69,000.00
19 Alkali Primer Ltr 86,700.00 99,400.00 98,000.00 103,100.00
20 Alkali Killer Ltr 107,800.00 123,600.00 121,800.00 128,200.00
21 Wood Filler (dempul melamin) Ltr 73,800.00 84,600.00 83,400.00 87,800.00
22 Wood Staind Ltr 111,400.00 127,800.00 125,900.00 132,500.00
23 Sanding Ltr 78,000.00 89,500.00 88,100.00 92,800.00
24 Clear Doop Ltr 111,400.00 127,800.00 125,900.00 132,500.00
25 Flincote Kg 64,500.00 74,000.00 72,900.00 76,700.00
26 Vernis Ltr 94,900.00 108,800.00 107,200.00 112,900.00
27 Teak Oil Ltr 55,100.00 63,200.00 62,300.00 65,500.00
28 Water Profing Kg 92,600.00 106,200.00 104,600.00 110,200.00
29 Lem Kayu Kg 64,500.00 74,000.00 72,900.00 76,700.00
30 Lem Vinyl Kg 64,500.00 74,000.00 72,900.00 76,700.00
31 Lem Aibon Kg 92,600.00 106,200.00 104,600.00 110,200.00
32 Sealent Ltr 55,100.00 63,200.00 62,300.00 65,500.00
33 Formika Ltr 443,700.00 508,900.00 501,300.00 527,800.00
34 Vinyl Karet 30 x 30 kwl Bh 56,300.00 64,600.00 63,600.00 67,000.00
35 Vinyl Karet 15 x 30 kwl Bh 44,500.00 51,000.00 50,300.00 52,900.00
2
36 Wallpaper M 126,600.00 145,200.00 143,000.00 150,600.00
37 Minyak Bekisting Ltr 10,000.00 11,500.00 11,300.00 11,900.00
38 Residu Ltr 46,900.00 53,800.00 53,000.00 55,800.00

Halaman 11
I.1. HARGA BAHAN DASAR & UPAH (BASIC PRICE) PER ZONA
KABUPATEN KUTAI TIMUR PROVINSI KALIMANTAN TIMUR
TAHUN 2019

Satuan Harga di Kabupaten / Kota


No. Uraian Pokok Kegiatan Satuan Kutai Timur Ket.
Zona I Zona II Zona III Zona IV
1 2 3 4 5 6 7 8
39 Aspal Drum 2,051,400.00 2,352,800.00 2,317,800.00 2,440,300.00
40 Soda Api Kg 37,500.00 43,000.00 42,400.00 44,600.00
41 Kapur Tembok Kaleng 28,100.00 32,200.00 31,800.00 33,400.00
42 Pembersih Lantai Ltr 46,900.00 53,800.00 53,000.00 55,800.00
44 Kapur Sirih Kg 48,100.00 55,200.00 54,300.00 57,200.00
45 Kalkarium Kg 107,800.00 123,600.00 121,800.00 128,200.00
46 Tepung Gypsum Kg 16,400.00 18,800.00 18,500.00 19,500.00
47 Politur Ltr 98,500.00 113,000.00 111,300.00 117,200.00
48 Solar Ltr 8,800.00 10,100.00 9,900.00 10,500.00
49 Minyak Pelumas Ltr 82,100.00 94,200.00 92,800.00 97,700.00
50 Tali Ijuk Kg 46,900.00 53,800.00 53,000.00 55,800.00
51 Minyak Tanah Ltr 14,100.00 16,200.00 15,900.00 16,800.00
52 Bensin Ltr 10,500.00 10,500.00 10,400.00 11,000.00
15. Pondasi
1
1 Mini Pile 20 X 20 (Segiempat) f'c 40 Mpa (K - 500), Pijin = 30 ton M 293,100.00 336,200.00 331,200.00 348,700.00
1
2 Mini Pile 25 X 25 (Segiempat) f'c 40 Mpa (K - 500), Pijin = 40 ton M 615,400.00 705,800.00 695,300.00 732,100.00
1
3 Mini Pile 30 X 30 (Segiempat) f'c 40 Mpa (K - 500), Pijin = 40 ton M 791,200.00 907,400.00 893,900.00 941,200.00
1
4 Mini Pile 28 X 28 (Segitiga) f'c 40 Mpa (K - 500), Pijin = 40 ton M 715,000.00 820,000.00 807,800.00 850,500.00
1
5 Mini Pile 32 X 32 (Segitiga) f'c 40 Mpa (K - 500), Pijin = 40 ton M 808,800.00 927,600.00 913,800.00 962,100.00
1
6 Pancang Diameter 30 cm ( bulat ) M 527,500.00 605,000.00 596,000.00 627,500.00
1
7 Pancang Diameter 35 cm ( bulat ) M 697,500.00 800,000.00 788,100.00 829,700.00
1
8 Pancang Diameter 40 cm ( bulat ) M 902,600.00 1,035,200.00 1,019,800.00 1,073,700.00
1
9 Pancang Diameter 45 cm ( bulat ) M 1,406,600.00 1,613,200.00 1,589,200.00 1,673,200.00
1
10 Pancang Diameter 50 cm ( bulat ) M 1,611,800.00 1,848,600.00 1,821,100.00 1,917,300.00
1
11 Pancang Diameter 60 cm ( bulat ) M 1,852,100.00 2,124,200.00 2,092,600.00 2,203,200.00

16 Bahan Lainnya
A. Agregat
3
1 Agregat halus untuk ATB M 504,000.00 578,000.00 569,400.00 599,500.00
3
2 Agregat halus untuk Pondasi M 492,300.00 564,600.00 556,200.00 585,600.00
3
3 Agregat kasar untuk ATB M 504,000.00 578,000.00 569,400.00 599,500.00
3
4 Agregat kasar untuk Pondasi M 492,300.00 564,600.00 556,200.00 585,600.00
3
5 Agregat halus untuk Beton M 498,200.00 571,400.00 562,900.00 592,600.00
3
6 Agregat Kelas A M 820,500.00 902,300.00 892,800.00 926,000.00
3
7 Agregat Kelas B M 703,300.00 779,900.00 771,000.00 802,200.00
3
8 Agregat Kelas C M 586,100.00 654,600.00 646,700.00 674,500.00
3
9 Agregat Kelas S M 70,300.00 80,600.00 79,400.00 83,600.00
B. ACP
2
1 Alumunium Comfosit Panel 1.220x2.240 mm M 914,300.00 1,048,600.00 1,033,000.00 1,087,600.00
2
2 Alucobond M 1,266,000.00 1,452,000.00 1,430,400.00 1,506,000.00
C. HPL
'
1 Taco HPL - enginered veener M 1,055,000.00 1,210,000.00 1,192,000.00 1,255,000.00
'
2 HPL Artform - wood finish M 400,900.00 459,800.00 453,000.00 476,900.00
'
3 Taco HPL - solid brush M 288,400.00 330,800.00 325,800.00 343,100.00
D. Tandon Air / Toren
1 Tandon Air 2200 L (Ex. Penguin) Bh 3,903,400.00 4,476,800.00 4,410,200.00 4,643,300.00
2 Tandon Air 5200 L (Ex. Grand) Bh 5,767,200.00 6,614,400.00 6,516,000.00 6,860,400.00
3 Tandon Air 650 L (Ex. Grand) Bh 937,800.00 1,075,600.00 1,059,600.00 1,115,600.00
4 Tandon Air 1000 L (Ex. Grand) Bh 1,523,900.00 1,747,800.00 1,721,800.00 1,812,800.00
5 Tandon Air 1200 L (Ex. Grand) Bh 1,641,100.00 1,882,200.00 1,854,200.00 1,952,200.00
6 Tissue Holder (Ex. Toto) Bh 457,700.00 524,900.00 517,100.00 544,500.00
E. Amplas
1 Amplas Besi Lbr 7,000.00 8,000.00 7,900.00 8,300.00
F. Plafond
'
1 Plat Gloss White 0,8 mm x 20 cm (Ex. Shunda Plafond) M 34,800.00 39,900.00 39,300.00 41,400.00
'
2 Plat Doff White 0,8 mm x 20 cm (Ex. Shunda Plafond) M 34,800.00 39,900.00 39,300.00 41,400.00
'
3 Drain Gloss Brown Wood Grain 0,8 mm x 20 cm (Ex. Shunda Plafon M 37,100.00 42,600.00 41,900.00 44,100.00
'
4 Plat Gloss White  Bubble 0,8 mm x 20 cm (Ex. Shunda Plafond) M 44,100.00 50,600.00 49,800.00 52,500.00
'
5 Plat Gloss Brown Leaf 0,8 mm x 20 cm (Ex. Shunda Plafond) M 44,100.00 50,600.00 49,800.00 52,500.00
'
6 Plafond Khusus 0,8 mm x 25 cm (Ex. Shunda Plafond) M 36,400.00 41,700.00 41,100.00 43,300.00

Halaman 12
I.1. HARGA BAHAN DASAR & UPAH (BASIC PRICE) PER ZONA
KABUPATEN KUTAI TIMUR PROVINSI KALIMANTAN TIMUR
TAHUN 2019

Satuan Harga di Kabupaten / Kota


No. Uraian Pokok Kegiatan Satuan Kutai Timur Ket.
Zona I Zona II Zona III Zona IV
1 2 3 4 5 6 7 8
'
7 High Quality Plafond 0,8 mm x 30 cm (Ex. Shunda Plafond) M 97,000.00 111,300.00 109,600.00 115,400.00
8 Plafond PVC (Ex. Shunda Plafond) Lbr 240,300.00 275,600.00 271,500.00 285,900.00
9 Lis Plafond PVC (Ex. Shunda Plafond) M' 76,200.00 87,400.00 86,100.00 90,600.00
10 Lis Alumunium Plafond (Ex. Shunda Plafond) M' 23,400.00 26,800.00 26,400.00 27,800.00
G. Cat
1 Cat Tembok setara Dulux 2,5 Liter Liter 295,400.00 338,800.00 333,800.00 351,400.00
2 Cat Tembok setara Catylac 5 Kg Kg 133,600.00 153,200.00 151,000.00 158,900.00
3 Cat Tembok setara Nippon Paint 2,5 Liter Liter 309,500.00 355,000.00 349,700.00 368,200.00
H. Gypsum
1 Gypsum (Ex. Jayaboard 9 mm (1.20×2.40) Lbr 88,200.00 101,200.00 99,700.00 104,900.00
2 Gypsum (Ex. Elephant 9 mm (1.20×2.40) Lbr 85,100.00 97,600.00 96,100.00 101,200.00
3 Gypsum (Ex. Knauf 9 mm (1.20×2.40) Lbr 82,000.00 94,000.00 92,600.00 97,500.00
4 Gypsum (Ex. Star 9 mm (1.20×2.40) Lbr 82,000.00 94,000.00 92,600.00 97,500.00
5 Gypsum (Ex. Aplus 9 mm (1.20×2.40)  Lbr 80,500.00 92,300.00 90,900.00 95,800.00
1
6 List Gipsum (Ex. Jayaboard) M 35,200.00 38,600.00 38,200.00 39,600.00
I. Bata Ringan
1 Bata Ringan 60 x 20 x 7,5 cm (Leicthbric) Bh 94,900.00 108,800.00 107,200.00 112,900.00
2 Bata Ringan 60 x 20 x 7,5 cm (Primacon) Bh 94,900.00 108,800.00 107,200.00 112,900.00
3 Bata Ringan 60 x 20 x 7,5 cm (Power block) Bh 97,500.00 111,800.00 110,200.00 116,000.00
4 Bata Ringan 60 x 20 x 7,5 cm (Hebel) Bh 85,700.00 112,200.00 116,300.00 133,200.00
5 Bata Ringan 60 x 19 x 7,5 cm (Acon) Bh 80,400.00 105,200.00 109,100.00 124,900.00
J. Spandek
'
1 Spandek Ex. Abadi 914 (L 770 / 750 /680/700) 0.30mm M 62,600.00 71,800.00 70,700.00 74,500.00
'
2 Spandek Ex. Abadi 914 (L 770 / 750 /680/700) 0.35mm M 69,600.00 79,800.00 78,600.00 82,800.00
'
3 Spandek Ex. Abadi 914 (L 770 / 750 /680/700) 0.40mm M 76,700.00 88,000.00 86,700.00 91,200.00
'
4 Spandek Ex. Abadi 914 (L 770 / 750 /680/700) 0.45mm M 83,700.00 96,000.00 94,600.00 99,600.00
'
5 Spandek Ex. Abadi 914 (L 770 / 750 /680/700) 0.50mm M 90,700.00 104,000.00 102,500.00 107,900.00
'
6 Spandek Import 914 (770 / 750 /680/700) Warna 0.25mm M 18,600.00 21,300.00 21,000.00 22,100.00
'
7 Spandek Import 914 (770 / 750 /680/700) Warna 0.3 mm M 20,000.00 22,900.00 22,600.00 23,800.00
'
8 Spandek Import 914 (770 / 750 /680/700) Warna 0.35 mm M 21,800.00 25,000.00 24,600.00 25,900.00
'
9 Spandek Import 914 (770 / 750 /680/700) Warna 0.4 mm M 942,400.00 1,080,800.00 1,064,800.00 1,121,000.00
'
10 Spandek Import 914 (770 / 750 /680/700) Warna 0.45mm M 101,300.00 116,200.00 114,500.00 120,500.00
'
11 Spandek Import 914 (770 / 750 /680/700) Warna 0.5 mm M 108,300.00 124,200.00 122,400.00 128,800.00
'
12 Spandek + Peredam 0.25 M 84,400.00 96,800.00 95,400.00 100,400.00
'
13 Spandek + Peredam 0.3 M 22,900.00 26,300.00 25,900.00 27,200.00
'
14 Spandek + Peredam 0.35 M 101,300.00 116,200.00 114,500.00 120,500.00
'
15 Spandek + Peredam 0.4 M 109,700.00 125,800.00 123,900.00 130,500.00
'
16 Spandek Zincalume 1219 0.30mm * M 68,900.00 79,000.00 77,800.00 82,000.00
'
17 Spandek Zincalume 1219 0.35mm M 83,000.00 95,200.00 93,800.00 98,700.00
'
18 Spandek Zincalume 1219 0.45mm M 91,400.00 104,800.00 103,300.00 108,700.00
'
19 Spandek Zincalume 1219 0.50mm M 105,500.00 121,000.00 119,200.00 125,500.00
20 Spandek Zincalume 1219 0.50mm M' 109,700.00 125,800.00 123,900.00 130,500.00
K. Kaca Tempered
2
1 Kaca Tempered 6 mm (Ex. Asahimas) M 366,400.00 420,200.00 414,000.00 435,900.00
2
2 Kaca Tempered 9 mm (Ex. Asahimas) M 562,700.00 645,400.00 635,800.00 669,400.00
2
3 Kaca Tempered 12 mm (Ex. Asahimas) M 640,000.00 734,000.00 723,100.00 761,300.00
2
4 Kaca Tempered 15 mm (Ex. Asahimas) M 2,750,000.00 3,154,000.00 3,107,100.00 3,271,300.00
L. Meubelair
1 1 Biro Desk Grey (Ex Deco) Bh 1,019,800.00 1,169,600.00 1,152,200.00 1,213,100.00
2 Executive Desk Grey (Ex. Deco) Bh 1,351,200.00 1,549,700.00 1,526,600.00 1,607,300.00
3 1 Biro Desk Grey (Ex. Deco) Bh 1,324,100.00 1,518,600.00 1,496,000.00 1,575,100.00
4 1 Biro Desk Beech (Ex. Deco) Bh 1,101,000.00 1,262,700.00 1,244,000.00 1,309,700.00
5 Executive Desk Beech (Ex. Deco) Bh 1,458,300.00 1,672,500.00 1,647,600.00 1,734,700.00
6 1 Biro Desk + Locker Beech (Ex. Deco) Bh 1,430,300.00 1,640,400.00 1,616,000.00 1,701,400.00
7 Lemari Arsip Pintu Sliding Kaca Rendah Type CD-201 Ex. Deco) Bh 2,228,000.00 2,555,300.00 2,517,300.00 2,650,300.00
8 Lemari Arsip Pintu Sliding Rendah Type CD-203 (Ex. Deco) Bh 2,144,600.00 2,459,600.00 2,423,100.00 2,551,100.00
9 Lemari Arsip Pintu Sliding Kaca Tinggi Type-301 (Ex. Deco) Bh 3,195,200.00 3,664,600.00 3,610,100.00 3,800,900.00
10 Lemari Arsip Pintu Swing Tinggi Type CD-302 (Ex. Deco) Bh 2,437,000.00 2,795,000.00 2,753,400.00 2,899,000.00
11 Filling Cabinet 2 Laci (Ex. Deco) Bh 1,548,900.00 1,776,400.00 1,750,000.00 1,842,500.00

Halaman 13
I.1. HARGA BAHAN DASAR & UPAH (BASIC PRICE) PER ZONA
KABUPATEN KUTAI TIMUR PROVINSI KALIMANTAN TIMUR
TAHUN 2019

Satuan Harga di Kabupaten / Kota


No. Uraian Pokok Kegiatan Satuan Kutai Timur Ket.
Zona I Zona II Zona III Zona IV
1 2 3 4 5 6 7 8
12 Filling Cabinet 3 Laci (Ex. Deco) Bh 1,858,600.00 2,131,600.00 2,099,900.00 2,210,900.00
13 Filling Cabinet 4 Laci (Ex. Deco) Bh 2,112,100.00 2,422,400.00 2,386,300.00 2,512,500.00
14 Filling Cabinet B4-2-08DX (Ex. Elite) Bh 1,921,000.00 2,203,200.00 2,170,400.00 2,285,100.00
15 Filling Cabinet B4-3-08DX (Ex. Elite) Bh 2,401,700.00 2,754,500.00 2,713,500.00 2,857,000.00
16 Filling Cabinet B4-4 08 DX (Ex. Elite) Bh 2,906,600.00 3,333,600.00 3,284,000.00 3,457,600.00
17 Filling Cabinet B4-4 C (Ex. Elite) Bh 2,703,000.00 3,100,100.00 3,054,000.00 3,215,400.00
18 Filling Cabinet B4-3 C (Ex. Elite) Bh 2,180,500.00 2,500,800.00 2,463,600.00 2,593,800.00
19 Lemari Arsip 2 Pintu Sliding ½ Tinggi Type EL-431 (Ex. Elite) Bh 2,442,000.00 2,800,700.00 2,759,100.00 2,904,900.00
20 Lemari Arsip 2 Pintu Sliding Kaca ½ Tinggi Type EL-432 (Ex. Elite) Bh 2,582,800.00 2,962,200.00 2,918,100.00 3,072,400.00
21 Lemari Arsip 2 Pintu Swing Tinggi Type EL-436 (Ex. Elite) Bh 3,156,000.00 3,619,600.00 3,565,800.00 3,754,300.00
22 Lemari Arsip 2 Pintu Sliding Kaca Tinggi Type EL-438 (Ex. Elite) Bh 4,061,200.00 4,657,800.00 4,588,500.00 4,831,000.00
23 Locker 8 Pintu (Ex. Elite) Bh 2,178,400.00 2,498,400.00 2,461,300.00 2,591,300.00
24 Locker 6 Pintu (Ex. Elite) Bh 2,071,800.00 2,376,200.00 2,340,800.00 2,464,500.00
25 Locker 1 Pintu (Ex. Elite) Bh 1,367,800.00 1,568,700.00 1,545,400.00 1,627,100.00
26 Meja Tulis EL-421A (Ex. Elite) Bh 4,686,800.00 5,375,300.00 5,295,300.00 5,575,200.00
27 Meja Tulis EL-420A (Ex. Elite) Bh 3,339,100.00 3,829,600.00 3,772,700.00 3,972,100.00
28 Meja Tulis EL-419A (Ex. Elite) Bh 2,100,000.00 2,408,500.00 2,372,700.00 2,498,100.00
29 Meja Tulis EL-425 (Ex. Elite) Bh 5,833,300.00 6,690,200.00 6,590,700.00 6,939,100.00
M. Granite
1 Royal Dream Champagne EPK10W107 60 x 60 (Ex. Eleganza) Bh 896,700.00 1,028,400.00 1,013,100.00 1,066,700.00
2 Royal Dream Golden Brown EPK10Q106 60 x 60 (Ex. Eleganza) Bh 926,600.00 1,062,700.00 1,046,900.00 1,102,200.00
3 VG Crystal Cream 60 x 60 (Ex. Valentine Gress) Bh 706,100.00 809,800.00 797,800.00 840,000.00
4 VG Travertine Medium Cream 60 x 60 (Ex. Valentine Gress) Bh 741,300.00 850,200.00 837,600.00 881,800.00
N. Zat Kimia
2
1 Conplast( Retarder ) M 37,100.00 42,600.00 41,900.00 44,100.00
2 Aluminium Gram 16,500.00 18,900.00 18,600.00 19,600.00
3 Aluminium Hidroksida Gram 5,100.00 5,800.00 5,800.00 6,100.00
4 Aluminium Klorida Heksahidrat Gram 11,800.00 13,500.00 13,300.00 14,000.00
5 Aluminium Nitrat Gram 6,900.00 7,900.00 7,800.00 8,200.00
6 Aluminium Oksida Gram 6,500.00 7,500.00 7,300.00 7,700.00
7 Amonia 25% Ml 3,000.00 3,400.00 3,400.00 3,600.00
8 Amonium Asetat Gram 5,900.00 6,800.00 6,700.00 7,000.00
9 Amonium Besi(II) Sulfat (Garam Mohr) Gram 7,900.00 9,100.00 8,900.00 9,400.00
10 Amonium Bikarbonat Gram 12,000.00 13,800.00 13,600.00 14,300.00
O. Engsel
1 Engsel Casement 16 " (Ex. Doormatic) Set 56,200.00 64,500.00 63,500.00 66,900.00
2 Engsel Casement 12 " (Ex. Doormatic) Set 53,500.00 61,400.00 60,400.00 63,600.00
3 Engsel Casement 12 " (Ex. Doormatic) Set 46,400.00 53,200.00 52,400.00 55,200.00
P. Kaca Sandblasting
'
1 Kaca Grafir (Sandblasting) 3 mm M 787,700.00 903,400.00 890,000.00 937,000.00
'
2 Kaca Grafir (Sandblasting) 5 mm M 1,237,800.00 1,419,600.00 1,398,500.00 1,472,400.00
'
3 Kaca Grafir (Sandblasting) 8 mm M 2,110,000.00 2,420,000.00 2,384,000.00 2,510,000.00
Q. Pipa
1 Pipa PVC Ø 1/2 " AW EX Wavin Btg 48,100.00 55,200.00 54,300.00 57,200.00
2 Pipa PVC Ø 3/4 " AW Ex Wavin Btg 61,000.00 70,000.00 68,900.00 72,600.00
3 Pipa PVC Ø 1 " AW Ex Wavin Btg 113,700.00 130,400.00 128,500.00 135,300.00
4 Pipa PVC Ø 1 ¼" AW Ex Wavin Btg 124,300.00 142,600.00 140,400.00 147,900.00
5 Pipa PVC Ø 1 ½" AW Ex Wavin Btg 139,500.00 160,000.00 157,600.00 165,900.00
6 Pipa PVC Ø 2 " AW Ex Wavin Btg 208,700.00 239,400.00 235,800.00 248,300.00
7 Pipa PVC Ø 3 " AW Ex Wavin Btg 354,000.00 406,000.00 400,000.00 421,100.00
8 Pipa PVC Ø 4 " AW Ex Wavin Btg 499,400.00 572,800.00 564,200.00 594,100.00
9 Pipa PVC Ø 5 " AW Ex Wavin Btg 609,500.00 699,000.00 688,600.00 725,000.00
10 Pipa PVC Ø 1 ¼" D Ex Wavin Btg 72,700.00 83,400.00 82,100.00 86,500.00
11 Pipa PVC Ø 2" D Ex Wavin Btg 125,200.00 143,600.00 141,500.00 148,900.00
12 Pipa PVC Ø 2.5" D Ex Wavin Btg 104,300.00 119,600.00 117,800.00 124,100.00
13 Pipa PVC Ø 3" D Ex Wavin Btg 213,000.00 244,300.00 240,700.00 253,400.00
14 Pipa PVC Ø 4" D Ex Wavin Btg 347,000.00 398,000.00 392,100.00 412,800.00
15 Pipa PVC Ø 5" Ex Wavin Btg 456,000.00 523,000.00 515,200.00 542,400.00
16 Pipa PVC Ø 6" D Ex Wavin Btg 547,400.00 627,800.00 618,500.00 651,200.00

Halaman 14
I.1. HARGA BAHAN DASAR & UPAH (BASIC PRICE) PER ZONA
KABUPATEN KUTAI TIMUR PROVINSI KALIMANTAN TIMUR
TAHUN 2019

Satuan Harga di Kabupaten / Kota


No. Uraian Pokok Kegiatan Satuan Kutai Timur Ket.
Zona I Zona II Zona III Zona IV
1 2 3 4 5 6 7 8
R. Lampu
1 Lampu RM 2 x 18 (Ex.Fatro) Set 351,700.00 403,400.00 397,400.00 418,400.00
2 Lampu RM 2 x 36 (Ex. Fatro) Set 422,000.00 484,000.00 476,800.00 502,000.00
S. Kabel Listrik
1 Harga Kabel NYM Ex. Kabelmetal Indonesia 2×1,5 mm2 M' 9,800.00 11,200.00 11,100.00 11,700.00
2 Harga Kabel NYM Ex. Kabelmetal Indonesia 2×2,5 mm2 M' 14,100.00 16,200.00 15,900.00 16,800.00
3 Harga Kabel NYM Ex. Kabelmetal Indonesia 2×4 mm2 M' 21,100.00 24,200.00 23,800.00 25,100.00
4 Harga Kabel NYM Ex. Kabelmetal Indonesia 2×6 mm2 M' 28,100.00 32,200.00 31,800.00 33,400.00
5 Harga Kabel NYM Ex. Kabelmetal Indonesia 2×10 mm2 M' 46,400.00 53,200.00 52,400.00 55,200.00
6 Harga Kabel NYM Ex. Kabelmetal Indonesia 3×1,5 mm2 M' 12,700.00 14,600.00 14,300.00 15,100.00
7 Harga Kabel NYM Ex. Kabelmetal Indonesia 3×2,5 mm2 M' 18,300.00 21,000.00 20,700.00 21,800.00
8 Harga Kabel NYM Ex. Kabelmetal Indonesia 3×4 mm2 M' 28,100.00 32,200.00 31,800.00 33,400.00
9 Harga Kabel NYM Ex. Kabelmetal Indonesia 3×6 mm2 M' 40,800.00 46,800.00 46,100.00 48,500.00
10 Harga Kabel NYM Ex. Kabelmetal Indonesia 3×10 mm2 M' 67,500.00 77,400.00 76,300.00 80,300.00
11 Harga Kabel NYM Ex. Kabelmetal Indonesia 4×1,5 mm2 M' 15,500.00 17,800.00 17,500.00 18,400.00
12 Harga Kabel NYM Ex. Kabelmetal Indonesia 4×2,5 mm2 M' 23,900.00 27,400.00 27,000.00 28,400.00
13 Harga Kabel NYM Ex.Kabelmetal Indonesia 4×4 mm2 M' 38,000.00 43,600.00 42,900.00 45,200.00
14 Harga Kabel NYM Ex. Kabelmetal Indonesia 4×6 mm2 M' 53,500.00 61,400.00 60,400.00 63,600.00
15 Harga Kabel NYM Ex. Kabelmetal Indonesia 4×10 mm2 M' 88,600.00 101,600.00 100,100.00 105,400.00
16 Harga Kabel NYA Ex. Kabelmetal Indonesia 1×1,5 mm2 M' 3,100.00 3,600.00 3,500.00 3,700.00
17 Harga Kabel NYA Ex. Kabelmetal Indonesia 1×2,5 mm2 M' 4,900.00 5,600.00 5,500.00 5,800.00
18 Harga Kabel NYA Ex. Kabelmetal Indonesia 1×4 mm2 M' 8,000.00 9,200.00 9,000.00 9,500.00
19 Harga Kabel NYA Ex. Kabelmetal Indonesia 1×6 mm2 M' 11,800.00 13,500.00 13,300.00 14,000.00
20 Harga Kabel NYA Ex. Kabelmetal Indonesia 1×10 mm2 M' 19,700.00 22,600.00 22,300.00 23,400.00
21 Harga Kabel NYA Ex. Kabelmetal Indonesia 1×16 mm2 M' 18,300.00 21,000.00 20,700.00 21,800.00
22 Harga Kabel NYA Ex. Kabelmetal Indonesia 1×25 mm2 M' 29,500.00 33,800.00 33,300.00 35,100.00
23 Harga Kabel NYA Ex. Kabelmetal Indonesia 1×35 mm2 M' 39,400.00 45,200.00 44,500.00 46,900.00
24 Harga Kabel NYA Ex. Kabelmetal Indonesia 1×50 mm2 M' 53,500.00 61,400.00 60,400.00 63,600.00
25 Harga Kabel NYA Ex. Kabelmetal Indonesia 1×70 mm2 M' 76,000.00 87,200.00 85,900.00 90,400.00
26 Harga Kabel NYA Ex. Kabelmetal Indonesia 1×95 mm2 M' 105,500.00 121,000.00 119,200.00 125,500.00
27 Harga Kabel NYA Ex. Kabelmetal Indonesia 1×120 mm2 M' 133,600.00 153,200.00 151,000.00 158,900.00
28 Harga Kabel NYA Ex. Kabelmetal Indonesia 1×150 mm2 M' 164,600.00 188,800.00 186,000.00 195,800.00
29 Harga Kabel NYA Ex. Kabelmetal Indonesia 1×185 mm2 M' 204,000.00 234,000.00 230,500.00 242,700.00
30 Harga Kabel NYA Ex. Kabelmetal Indonesia 1×240 mm2 M' 267,300.00 306,600.00 302,000.00 318,000.00
31 Harga Kabel NYA Ex. Kabelmetal Indonesia 1×300 mm2 M' 337,600.00 387,200.00 381,400.00 401,600.00
32 Harga Kabel NYA Ex. Kabelmetal Indonesia 1×400 mm2 M' 422,000.00 484,000.00 476,800.00 502,000.00
33 Harga Kabel NYY Ex. Kabelmetal Indonesia 2×1,5 mm2 M' 17,600.00 20,200.00 19,900.00 20,900.00
34 Harga Kabel NYY Ex. EKabelmetal Indonesia 2×2,5 mm2 M' 20,400.00 23,400.00 23,000.00 24,300.00
35 Harga Kabel NYY Ex. Kabelmetal Indonesia 2×4 mm2 M' 26,000.00 29,800.00 29,400.00 30,900.00
36 Harga Kabel NYY Ex. Kabelmetal Indonesia 2×6 mm2 M' 35,200.00 40,400.00 39,800.00 41,900.00
37 Harga Kabel NYY Ex. Kabelmetal Indonesia 2×10 mm2 M' 46,400.00 53,200.00 52,400.00 55,200.00
38 Harga Kabel NYY Ex. Kabelmetal Indonesia 2×16 mm2 M' 50,200.00 57,600.00 56,700.00 59,700.00
39 Harga Kabel NYY Ex. Kabelmetal Indonesia 2×25 mm2 M' 84,400.00 96,800.00 95,400.00 100,400.00
40 Harga Kabel NYY Ex. Kabelmetal Indonesia 2×35 mm2 M' 105,500.00 121,000.00 119,200.00 125,500.00
41 Harga Kabel NYY Ex. Kabelmetal Indonesia 2×50 mm2 M' 136,400.00 156,400.00 154,100.00 162,300.00
42 Harga Kabel NYY Ex. Kabelmetal Indonesia 4×1,5 mm2 M' 22,500.00 25,800.00 25,400.00 26,800.00
43 Harga Kabel NYY Ex. Kabelmetal Indonesia 4×2,5 mm2 M' 28,100.00 32,200.00 31,800.00 33,400.00
44 Harga Kabel NYY Ex. Kabelmetal Indonesia 4×4 mm2 M' 40,800.00 46,800.00 46,100.00 48,500.00
45 Harga Kabel NYY Ex. Kabelmetal Indonesia 4×6 mm2 M' 50,600.00 58,000.00 57,200.00 60,200.00
46 Harga Kabel NYY Ex. Kabelmetal Indonesia 4×10 mm2 M' 68,900.00 79,000.00 77,800.00 82,000.00
47 Harga Kabel NYY Ex. Kabelmetal Indonesia 4×16 mm2 M' 91,400.00 104,800.00 103,300.00 108,700.00
48 Harga Kabel NYY Ex. Kabelmetal Indonesia 4×25 mm2 M' 133,600.00 153,200.00 151,000.00 158,900.00
49 Harga Kabel NYY Ex. Kabelmetal Indonesia 4×35 mm2 M' 175,800.00 201,600.00 198,600.00 209,100.00
50 Harga Kabel NYY Ex. Kabelmetal Indonesia 4×50 mm2 M' 232,100.00 266,200.00 262,200.00 276,100.00
51 Harga Kabel NYY Ex. Kabelmetal Indonesia 4×70 mm2 M' 316,500.00 363,000.00 357,600.00 376,500.00
52 Harga Kabel NYY Ex. Kabelmetal Indonesia 4×95 mm2 M' 429,000.00 492,000.00 484,700.00 510,300.00
53 Harga Kabel NYY Ex. Kabelmetal Indonesia 4×120 mm2 M' 534,500.00 613,000.00 603,900.00 635,800.00
54 Harga Kabel NYY Ex. Kabelmetal Indonesia 4×150 mm2 M' 654,100.00 750,200.00 739,000.00 778,100.00
55 Harga Kabel NYY Ex. Kabelmetal Indonesia 4×185 mm2 M' 815,900.00 935,800.00 921,800.00 970,600.00

Halaman 15
I.1. HARGA BAHAN DASAR & UPAH (BASIC PRICE) PER ZONA
KABUPATEN KUTAI TIMUR PROVINSI KALIMANTAN TIMUR
TAHUN 2019

Satuan Harga di Kabupaten / Kota


No. Uraian Pokok Kegiatan Satuan Kutai Timur Ket.
Zona I Zona II Zona III Zona IV
1 2 3 4 5 6 7 8
56 Harga Kabel NYY Ex. Kabelmetal Indonesia 4×240 mm2 M' 1,062,000.00 1,218,000.00 1,199,900.00 1,263,300.00
57 Harga Kabel NYY Ex. Kabelmetal Indonesia 4×300 mm2 M' 1,315,200.00 1,508,400.00 1,486,000.00 1,564,500.00
58 Harga Kabel Ex. Kabelindo 1×4 mm2 0,6/1 kV M' 7,000.00 8,000.00 7,900.00 8,300.00
59 Harga Kabel Ex. Kabelindo 1×6 mm2 0,6/1 kV M' 9,800.00 11,200.00 11,100.00 11,700.00
60 Harga Kabel Ex. Kabelindo 1×10 mm2 0,6/1 kV M' 15,500.00 17,800.00 17,500.00 18,400.00
61 Harga Kabel Ex. Kabelindo 1×16 mm2 0,6/1 kV M' 21,100.00 24,200.00 23,800.00 25,100.00
62 Harga Kabel Ex. Kabelindo 1×25 mm2 0,6/1 kV M' 32,400.00 37,200.00 36,600.00 38,500.00
63 Harga Kabel Ex. Kabelindo 1×35 mm2 0,6/1 kV M' 42,200.00 48,400.00 47,700.00 50,200.00
64 Harga Kabel Ex. Kabelindo 1×50 mm2 0,6/1 kV M' 56,300.00 64,600.00 63,600.00 67,000.00
65 Harga Kabel Ex. Kabelindo 2×1,5 mm2 0,6/1 kV M' 6,800.00 7,800.00 7,700.00 8,100.00
66 Harga Kabel Ex. Kabelindo 2×2,5 mm2 0,6/1 kV M' 8,900.00 10,200.00 10,100.00 10,600.00
67 Harga Kabel Ex. Kabelindo 2×4 mm2 0,6/1 kV M' 12,700.00 14,600.00 14,300.00 15,100.00
68 Harga Kabel Ex. Kabelindo 2×6 mm2 0,6/1 kV M' 16,600.00 19,000.00 18,800.00 19,700.00
69 Harga Kabel Ex. Kabelindo 2×10 mm2 0,6/1 kV M' 10,100.00 11,600.00 11,400.00 12,000.00
70 Harga Kabel Ex. Kabelindo 4 ×1,5 mm2 0,6/1 kV M' 14,100.00 16,200.00 15,900.00 16,800.00
71 Harga Kabel Ex. Kabelindo 4×2,5 mm2 0,6/1 kV M' 20,800.00 23,900.00 23,500.00 24,700.00
72 Harga Kabel Ex. Kabelindo 4×4 mm2 0,6/1 kV M' 24,500.00 28,100.00 27,700.00 29,100.00
73 Harga Kabel Ex. Kabelindo 4×6 mm2 0,6/1 kV M' 28,000.00 32,100.00 31,600.00 33,300.00
74 Harga Kabel Ex. Kabelindo 4×10 mm2 0,6/1 kV M' 42,900.00 49,200.00 48,500.00 51,000.00
69 Harga Kabel Ex. Kabelindo 5×1,5 mm2 0,6/1 kV M' 16,900.00 19,400.00 19,100.00 20,100.00
70 Harga Kabel Ex. Kabelindo 7×1,5 mm2 0,6/1 kV M' 21,100.00 24,200.00 23,800.00 25,100.00
71 Harga Kabel Ex. Kabelindo 10×1,5 mm2 0,6/1 kV M' 28,100.00 32,200.00 31,800.00 33,400.00
72 Harga Kabel Ex. Kabelindo 12×1,5 mm2 0,6/1 kV M' 32,400.00 37,200.00 36,600.00 38,500.00
73 Harga Kabel Ex. Kabelindo 19×1,5 mm2 0,6/1 kV M' 46,400.00 53,200.00 52,400.00 55,200.00
74 Harga Kabel Ex. Kabelindo 24×1,5 mm2 0,6/1 kV M' 59,100.00 67,800.00 66,800.00 70,300.00
75 Harga Kabel Ex. Kabelindo 30×1,5 mm2 0,6/1 kV M' 70,300.00 80,600.00 79,400.00 83,600.00
70 Harga Kabel NYA Ex. Jembo 1×1,5 mm2 M' 3,100.00 3,600.00 3,500.00 3,700.00
71 Harga Kabel NYA Ex. Jembo 1×2,5 mm2 M' 5,100.00 5,800.00 5,800.00 6,100.00
72 Harga Kabel NYA Ex. Jembo 1×4 mm2 M' 8,000.00 9,200.00 9,000.00 9,500.00
73 Harga Kabel NYA Ex. Jembo 1×6 mm2 M' 11,800.00 13,500.00 13,300.00 14,000.00
74 Harga Kabel NYA Ex. Jembo 1×10 mm2 M' 19,700.00 22,600.00 22,300.00 23,400.00
75 Harga Kabel NYA Ex. Jembo 1×16 mm2 M' 18,300.00 21,000.00 20,700.00 21,800.00
76 Harga Kabel NYA Ex. Jembo 1×25 mm2 M' 29,500.00 33,800.00 33,300.00 35,100.00
77 Harga Kabel NYA Ex. Jembo 1×35 mm2 M' 39,400.00 45,200.00 44,500.00 46,900.00
78 Harga Kabel NYA Ex.Jembo 1×50 mm2 M' 53,500.00 61,400.00 60,400.00 63,600.00
79 Harga Kabel NYM Ex. Jembo 2×1,5 mm2 M' 9,800.00 11,200.00 11,100.00 11,700.00
80 Harga Kabel NYM Ex. Jembo 2×2,5 mm2 M' 14,100.00 16,200.00 15,900.00 16,800.00
81 Harga Kabel NYM Ex. Jembo 2×4 mm2 M' 21,100.00 24,200.00 23,800.00 25,100.00
82 Harga Kabel NYM Ex. Jembo 2×6 mm2 M' 28,100.00 32,200.00 31,800.00 33,400.00
83 Harga Kabel NYM Ex. Jembo 2×10 mm2 M' 46,400.00 53,200.00 52,400.00 55,200.00
84 Harga Kabel NYM Ex. Jembo 3×1,5 mm2 M' 12,700.00 14,600.00 14,300.00 15,100.00
85 Harga Kabel NYM Ex. Jembo 3×2,5 mm2 M' 18,300.00 21,000.00 20,700.00 21,800.00
86 Harga Kabel NYM Ex. Jembo 3×4 mm2 M' 28,100.00 32,200.00 31,800.00 33,400.00
87 Harga Kabel NYY Ex. Jembo 2×1,5 mm2 M' 17,600.00 20,200.00 19,900.00 20,900.00
88 Harga Kabel NYY Ex. Jembo 2×2,5 mm2 M' 20,400.00 23,400.00 23,000.00 24,300.00
89 Harga Kabel NYY Ex. Jembo 2×4 mm2 M' 26,000.00 29,800.00 29,400.00 30,900.00
90 Harga Kabel NYY Ex. Jembo 2×6 mm2 M' 35,200.00 40,400.00 39,800.00 41,900.00
91 Harga Kabel NYY Ex. Jembo 2×10 mm2 M' 46,400.00 53,200.00 52,400.00 55,200.00
92 Harga Kabel NYY Ex. Jembo 2×16 mm2 M' 59,100.00 67,800.00 66,800.00 70,300.00
93 Harga Kabel NYY Ex. Jembo 2×25 mm2 M' 84,400.00 96,800.00 95,400.00 100,400.00
94 Harga Kabel NYY Ex. Jembo 4×150 mm2 M' 654,100.00 750,200.00 739,000.00 778,100.00
95 Harga Kabel NYY Ex. Jembo 4×185 mm2 M' 815,900.00 935,800.00 921,800.00 970,600.00
96 Harga Kabel NYY Ex. Jembo 4×240 mm2 M' 1,062,000.00 1,218,000.00 1,199,900.00 1,263,300.00
97 Harga Kabel NYY Ex. Jembo 4×300 mm2 M' 1,315,200.00 1,508,400.00 1,486,000.00 1,564,500.00
98 Harga Kabel NYA Ex.Tranka 1×50 mm2 (450/700 V) M' 3,100.00 3,600.00 3,500.00 3,700.00
99 Harga Kabel NYA Ex. Tranka 2,5 mm2 (450 / 700 V) M' 5,100.00 5,800.00 5,800.00 6,100.00
100 Harga Kabel NYA Ex. Tranka 4 mm2 (450 / 700 V) M' 8,000.00 9,200.00 9,000.00 9,500.00
101 Harga Kabel NYA Ex. Tranka 6 mm2 (450 / 700 V) M' 11,800.00 13,500.00 13,300.00 14,000.00
102 Harga Kabel NYA Ex. Tranka 10 mm2 (450 / 700) M' 18,300.00 21,000.00 20,700.00 21,800.00

Halaman 16
I.1. HARGA BAHAN DASAR & UPAH (BASIC PRICE) PER ZONA
KABUPATEN KUTAI TIMUR PROVINSI KALIMANTAN TIMUR
TAHUN 2019

Satuan Harga di Kabupaten / Kota


No. Uraian Pokok Kegiatan Satuan Kutai Timur Ket.
Zona I Zona II Zona III Zona IV
1 2 3 4 5 6 7 8
103 Harga Kabel NYA Ex. Tranka 16 mm2 (450 / 700) M' 19,700.00 22,600.00 22,300.00 23,400.00
104 Harga Kabel NYA Ex. Tranka 1× 25 mm2 M' 29,500.00 33,800.00 33,300.00 35,100.00
105 Harga Kabel NYM Ex. Tranka 2× 1,5 mm2 (300 / 500 V) M' 9,800.00 11,200.00 11,100.00 11,700.00
106 Harga Kabel NYM Ex. Tranka 2,5 mm2 (300 / 500 V) M' 14,100.00 16,200.00 15,900.00 16,800.00
107 Harga Kabel NYM Ex. Tranka 4 mm2 (300 / 500 V) M' 21,100.00 24,200.00 23,800.00 25,100.00
108 Harga Kabel NYM Ex. Tranka 6 mm2 (300 / 500 V) M' 28,100.00 32,200.00 31,800.00 33,400.00
109 Harga Kabel NYM Ex. Tranka 10 mm2 (300 / 500 V) M' 46,400.00 53,200.00 52,400.00 55,200.00
110 Harga Kabel NYM Ex. Tranka 3× 1,5 mm2 (300 / 500 V) M' 12,700.00 14,600.00 14,300.00 15,100.00
111 Harga Kabel NYM Ex. Tranka 2,5 mm2 (300 / 500 V) M' 18,300.00 21,000.00 20,700.00 21,800.00
112 Harga Kabel NYM Ex. Tranka 2,5 mm2 (300 / 500 V) M' 28,100.00 32,200.00 31,800.00 33,400.00
113 Harga Kabel NYM Ex. Tranka 4 mm2 (300 / 500 V) M' 102,000.00 117,000.00 115,200.00 121,300.00
114 Harga Kabel NYY Ex. Tranka 1 x 4 mm2 (0,6 / 1 KV) M' 7,000.00 8,000.00 7,900.00 8,300.00
115 Harga Kabel NYY Ex. Tranka 6 mm2 (0,6 / 1 KV) M' 9,800.00 11,200.00 11,100.00 11,700.00
116 Harga Kabel NYY Ex. Tranka 10 mm2 (0,6 / 1 KV) M' 15,500.00 17,800.00 17,500.00 18,400.00
117 Harga Kabel NYY Ex. Tranka 16 mm2 (0,6 / 1 KV) M' 21,100.00 24,200.00 23,800.00 25,100.00
118 Harga Kabel NYY Ex. Tranka 25 mm2 (0,6 / 1 KV) M' 32,400.00 37,200.00 36,600.00 38,500.00
119 Harga Kabel NYY Ex. Tranka 35 mm2 (0,6 / 1 KV) M' 42,200.00 48,400.00 47,700.00 50,200.00
120 Harga Kabel NYY Ex. Tranka 4 x 1,5 mm2 (0,6 / 1 KV) M' 18,300.00 21,000.00 20,700.00 21,800.00
121 Harga Kabel NYY Ex. Tranka 2,5 mm2 (0,6 / 1 KV) M' 28,100.00 32,200.00 31,800.00 33,400.00
122 Harga Kabel NYY Ex. Tranka 4 mm2 (0,6 / 1 KV) M' 42,200.00 48,400.00 47,700.00 50,200.00
Q BAHAN LALU LINTAS
1 Rambu BH 275,000.00 322,400.00 316,900.00 336,100.00
2 Marka M2 450,000.00 527,500.00 518,500.00 550,000.00
3 Cat Median M2 525,000.00 615,400.00 604,900.00 641,700.00
4 Rangka Baja M2 315,000.00 369,200.00 362,900.00 385,000.00
5 Sewa Ponton HARI 9,500,000.00 11,078,500.00 10,895,200.00 11,536,800.00

Halaman 17
I.2. HARGA DASAR UPAH (BASIC PRICE) PER ZONA
KABUPATEN KUTAI TIMUR PROVINSI KALIMANTAN TIMUR
TAHUN 2019

Satuan Harga di Kabupaten / Kota


No. Uraian Pokok Kegiatan Satuan Kutai Timur Ket.
Zona I Zona II Zona III Zona IV
1 2 3 4 5 6 7 8

I.2 UPAH PEKERJA 1.06 1.06 1.06 1.06


1 Pekerja Biasa OH 137,800.00 146,100.00 148,800.00 157,100.00
2 Mandor OH 174,900.00 185,400.00 188,900.00 199,400.00
3 Tukang Kayu OH 159,000.00 168,500.00 171,700.00 181,300.00
4 Kepala Tukang Kayu OH 164,300.00 174,200.00 177,400.00 187,300.00
5 Laden Tukang Hari 100,700.00 108,100.00 111,300.00 116,600.00
6 Tukang Batu OH 159,000.00 168,500.00 171,700.00 181,300.00
7 Kepala Tukang Batu OH 164,300.00 174,200.00 177,400.00 187,300.00
8 Laden Tukang Batu Hari 100,700.00 108,100.00 111,300.00 116,600.00
9 Tukang Cat OH 159,000.00 168,500.00 171,700.00 181,300.00
10 Kepala Tukang Cat OH 164,300.00 174,200.00 177,400.00 187,300.00
11 Laden Tukang Cat Hari 100,700.00 108,100.00 111,300.00 116,600.00
12 Tukang Besi OH 159,000.00 168,500.00 171,700.00 181,300.00
13 Kepala Tukang Besi Hari 164,300.00 174,200.00 177,400.00 187,300.00
14 Laden Tukang Besi Hari 100,700.00 108,100.00 111,300.00 116,600.00
15 Tukang Gali Hari 159,000.00 168,500.00 171,700.00 181,300.00
16 Kepala Tukang Gali Hari 164,300.00 174,200.00 177,400.00 187,300.00
17 Tukang Las Hari 159,000.00 168,500.00 171,700.00 181,300.00
18 Tukang Las Khusus Hari 164,300.00 174,200.00 177,400.00 187,300.00
19 Tukang Aluminium Hari 159,000.00 168,500.00 171,700.00 181,300.00
20 Penjaga Api Hari 87,600.00 90,100.00 89,000.00 95,400.00
21 Masinis Mesin Gilas Hari 118,700.00 127,200.00 121,900.00 132,500.00
22 Penjaga Malam Bln 2,226,000.00 2,650,000.00 2,438,000.00 2,968,000.00
23 Pembantu Juru Ukur OH 159,000.00 190,800.00 185,500.00 212,000.00
24 Juru Ukur OH 174,900.00 307,600.00 302,300.00 313,000.00
25 Kepala Tukang Las Hari 174,900.00 307,600.00 302,300.00 313,000.00
26 Kepala Tukang Alumunium Hari 174,900.00 307,600.00 302,300.00 313,000.00
27 Tukang Bongkar Hari 174,900.00 307,600.00 302,300.00 313,000.00
28 Tukang Listrik OH 168,000.00 184,000.00 181,000.00 187,000.00
29 Tukang Pipa Hari 174,900.00 307,600.00 302,300.00 313,000.00
30 Pembantu Mekanik Hari 159,000.00 190,800.00 185,500.00 212,000.00
31 Mekanik Hari 174,900.00 307,600.00 302,300.00 313,000.00
32 Pembantu Operator Hari 159,000.00 190,800.00 185,500.00 212,000.00
33 Operator Hari 174,900.00 307,600.00 302,300.00 313,000.00
34 Pembantu Sopir Hari 159,000.00 190,800.00 185,500.00 212,000.00
35 Sopir Hari 174,900.00 307,600.00 302,300.00 313,000.00
36 Pembantu Instalator OH 157,000.00 173,000.00 170,000.00 176,000.00

Halaman 18
I.3. HARGA ALAT BANTU (BASIC PRICE) PER ZONA
KABUPATEN KUTAI TIMUR PROVINSI KALIMANTAN TIMUR
TAHUN 2019

Satuan Harga di Kabupaten / Kota


No. Uraian Pokok Kegiatan Satuan Kutai Timur Ket.
Zona I Zona II Zona III Zona IV
1 2 3 4 5 6 7 8

I.3 ALAT BANTU 1.01 0.31 0.30 0.56


1 Batu Asahan Bh 32,700.00 42,800.00 42,500.00 50,900.00
2 Kuas 4" Bh 23,900.00 31,300.00 31,100.00 37,200.00
3 Tang Pemotong Kawat Bh 45,300.00 59,400.00 58,900.00 70,500.00
4 Keranjang Bh 35,300.00 46,300.00 45,900.00 54,900.00
5 Gergaji Bh 111,800.00 146,500.00 145,500.00 174,000.00
6 Gunting Pemotong Bh 65,500.00 85,800.00 85,200.00 101,900.00
7 Palu Bh 66,500.00 87,100.00 86,500.00 103,500.00
8 Kasut Kayu Bh 21,200.00 27,800.00 27,600.00 33,000.00
9 Gerobak / Arco Bh 511,700.00 670,500.00 665,800.00 796,400.00
10 Ember Bh 26,400.00 34,600.00 34,300.00 41,100.00
11 Bodem Bh 202,500.00 265,300.00 263,500.00 315,200.00
12 Kunci Pembengkok Bh 28,200.00 37,000.00 36,700.00 43,900.00
13 Linggis Bh 99,200.00 130,000.00 129,100.00 154,400.00
14 Chain Saw Bh 856,100.00 1,121,700.00 1,113,900.00 1,332,300.00
15 Kotak Adukan Bh 199,400.00 261,300.00 259,400.00 310,300.00
16 Sabun Bh 4,000.00 5,200.00 5,200.00 6,200.00
17 Gunting Besi Jam 45,300.00 59,400.00 58,900.00 70,500.00
18 Mesin Las Jam 98,500.00 129,100.00 128,200.00 153,300.00
19 Solar Ltr 7,600.00 10,000.00 9,900.00 11,800.00
20 Minyak Pelumas Ltr 51,900.00 68,000.00 67,500.00 80,800.00
21 Tali Ijuk Kg 40,300.00 52,800.00 52,400.00 62,700.00
22 Minyak Tanah Ltr 12,100.00 15,900.00 15,700.00 18,800.00
23 Bensin (Premium) Ltr 9,100.00 11,900.00 11,800.00 14,200.00
24 3
Air PDAM/Bersih M 3,500.00 4,600.00 4,600.00 5,400.00

Halaman 19
I.4. HARGA SEWA PERALATAN (BASIC PRICE) PER ZONA
KABUPATEN KUTAI TIMUR PROVINSI KALIMANTAN TIMUR
TAHUN 2019

Satuan Harga di Kabupaten / Kota


No. Uraian Pokok Kegiatan Kode Satuan Kutai Timur Ket.
Zona I Zona II Zona III Zona IV
1 2 3 4 5 6 7 8 9

I.4 HARGA SEWA PERALATAN


1.01 0.17 0.15 0.22
1 Asphalt Mixing Plant 150 HP E01 Jam 10,022,800.00 11,664,600.00 11,465,500.00 12,162,100.00
2 Asphalt Finisher 72 HP E02 Jam 634,800.00 738,730.00 726,130.00 770,230.00
3 Asphalt Sprayer 60 HP E03 Jam 99,700.00 116,000.00 114,100.00 121,000.00
4 Bulldozer 100-150 HP E04 Jam 1,091,700.00 1,270,510.00 1,248,910.00 1,324,710.00
5 Compressor 4000 - 6500 L/M E05 Jam 225,600.00 262,600.00 258,100.00 273,800.00
6 Concrete Mixer 0.3 - 0,6 M3 E06 Jam 115,800.00 134,800.00 132,500.00 140,600.00
7 Crane 10 - 15 Ton E07 Jam 736,300.00 856,900.00 842,300.00 893,400.00
8 Dump Truck 3 - 4 M3 E08 Jam 413,000.00 480,600.00 472,400.00 501,100.00
9 Dump Truck 6 - 8 M3 E09 Jam 448,200.00 521,600.00 512,700.00 543,900.00
10 Excavator 80 - 140 HP E10 Jam 800,700.00 931,900.00 916,000.00 971,600.00
11 Flat Bed Truck 3 - 4 M3 E11 Jam 877,300.00 1,021,000.00 1,003,600.00 1,064,500.00
12 Generator Set E12 Jam 595,300.00 692,800.00 681,000.00 722,300.00
13 Motor Grader > 100 HP E13 Jam 821,900.00 956,500.00 940,200.00 997,300.00
14 Truck Loader 75 - 100 HP E14 Jam 499,600.00 581,400.00 571,500.00 606,200.00
15 Wheel Loader 1.0 - 1.7 M3 E15 Jam 625,500.00 727,900.00 715,500.00 759,000.00
16 Three Whell Roller 6 - 10 T E16 Jam 359,600.00 418,500.00 411,300.00 436,300.00
17 Tandem Roller 6 - 10 T E17 Jam 359,600.00 418,500.00 411,300.00 436,300.00
18 Pneumatic Tire Roller 8-10 T E18 Jam 654,700.00 761,900.00 748,900.00 794,400.00
19 Vibration Roller 5 - 8 T E19 Jam 567,100.00 659,900.00 648,700.00 688,100.00
20 Concrete Vibrator E20 Jam 65,500.00 76,200.00 74,900.00 79,400.00
21 Stone Crusher E21 Jam 1,168,400.00 1,359,800.00 1,336,600.00 1,417,800.00
22 Water Pump 70-100 MM E22 Jam 55,400.00 64,500.00 63,400.00 67,200.00
23 Water Tanker 3000 - 4500 L E23 Jam 590,200.00 686,900.00 675,200.00 716,200.00
24 Pedestrian Roller E24 Jam 93,700.00 109,000.00 107,200.00 113,700.00
25 Tamper E25 Jam 73,500.00 85,600.00 84,100.00 89,200.00
26 Jack Hammer E26 Jam 44,300.00 51,600.00 50,700.00 53,800.00
27 Fulvi Mixer E27 Jam 2,044,700.00 2,379,600.00 2,339,000.00 2,481,100.00
28 Concrete Pump E28 Jam 455,300.00 529,800.00 520,800.00 552,400.00
29 Trailer 20 Ton E29 Jam 711,100.00 827,600.00 813,500.00 862,900.00
30 Pile Driver + Hammer E30 Jam 134,000.00 155,900.00 153,200.00 162,600.00
31 Crane On Track 35 Ton E31 Jam 806,800.00 938,900.00 922,900.00 979,000.00
32 Welding Set E32 Jam 162,200.00 188,700.00 185,500.00 196,800.00
33 Boring Pile Machine E33 Jam 1,414,100.00 1,645,800.00 1,617,700.00 1,716,000.00
34 Asphalt Liquid Mixer E34 Jam 60,400.00 70,300.00 69,100.00 73,300.00
35 Trailler 15 Ton E35 Jam 747,400.00 869,800.00 854,900.00 906,900.00
36 Rock Drill Breaker E36 Jam 101,700.00 118,400.00 116,400.00 123,400.00
37 Cold Milling E37 Jam 2,202,800.00 2,563,600.00 2,519,900.00 2,673,000.00
38 Vibratory Roller 1 Ton E38 Jam 80,600.00 93,800.00 92,200.00 97,800.00
39 Hot Recycler E39 Jam 10,948,500.00 12,741,800.00 12,524,400.00 13,285,300.00
40 Agregat (Chip) Speader E40 Jam 793,700.00 923,700.00 907,900.00 963,100.00
41 Asphalt Distributor E41 Jam 542,900.00 631,800.00 621,000.00 658,800.00
42 Concrete Paver E42 Jam 589,600.00 686,143.97 674,443.97 715,443.97
43 Batching Plant E43 Jam 538,900.00 627,100.00 616,400.00 653,900.00
44 Concrete Breaker E44 Jam 1,237,900.00 1,440,600.00 1,416,100.00 1,502,100.00
45 Asphalt Tanker E45 Jam 821,900.00 956,500.00 940,200.00 997,300.00
46 Cement Tanker E46 Jam 763,500.00 888,500.00 873,400.00 926,400.00
47 Concrete Mixer (350) E47 Jam 115,800.00 134,800.00 132,500.00 140,600.00
48 Vibrating Hammer E48 Jam 67,500.00 78,500.00 77,200.00 81,900.00
48 Truck Mixer (Agitator) E49 Jam 947,800.00 1,103,000.00 1,084,200.00 1,150,100.00
49 Bor Pile Machine E50 Jam 968,900.00 1,127,700.00 1,108,400.00 1,175,800.00
50 Crane On Track 75 - 100 Ton E51 Jam 669,800.00 779,500.00 766,200.00 812,800.00
51 Blending Equipment E52 Jam 423,000.00 492,300.00 483,900.00 513,300.00
52 Asphalt Liquid Mixer E34a Jam 165,200.00 192,200.00 189,000.00 200,400.00
53 Pulvi Mixer Jam 1,223,800.00 1,424,200.00 1,399,900.00 1,485,000.00
54 Screed Paver Jam 415,500.00 483,500.00 475,300.00 504,200.00

Halaman 20
I.5. HARGA SEWA ALAT UKUR (BASIC PRICE) PER ZONA
KABUPATEN KUTAI TIMUR PROVINSI KALIMANTAN TIMUR
TAHUN 2019

Satuan Harga di Kabupaten / Kota


No.
Uraian Pokok Kegiata Satuan Kutai Timur Ket.
Zona I Zona II Zona III Zona IV
1 2 3 4 5 6 7 10
0.01 0.31 0.30 0.56 0.16
-
I.5 ALAT UKUR -
-
-
I Theodolit Perhari/8 Jam 251,800.00 327,600.00 325,300.00 389,100.00 Biaya diluar Operator
II Water Pass Perhari/8 Jam 151,100.00 196,500.00 195,200.00 233,400.00 Biaya diluar Operator
III GPS Geodetic Perhari/8 Jam 2,518,100.00 3,275,500.00 3,252,500.00 3,890,500.00 Biaya diluar Operator
IV GPS Hand Held Perhari/8 Jam 201,400.00 262,000.00 260,200.00 311,200.00 Biaya diluar Operator
V Sewa Drone Perhari/8 Jam 1,007,200.00 1,310,200.00 1,301,000.00 1,556,200.00 Biaya diluar Operator
VI Total Station Perhari/8 Jam 503,600.00 655,100.00 650,500.00 778,100.00 Biaya diluar Operator
-

Halaman 21
HARGA STANDAR KEGIATAN PEKERJAAN (HSKP)
KABUPATEN KUTAI TIMUR
TAHUN 2019

RETRIBUSI TARIF SEWA PENGUJIAN LABORATORIUM

TARIF 2018
NO. JENIS PENGUJIAN SATUAN
(Rp.)
1 2 3 4

I. LABORATORIUM PENGUJIAN TANAH

1. Kadar Air Tanah Per parameter uji 110.000,00

2. Berat Jenis Tanah Per parameter uji 220.000,00

3. Atterberg Limit Per parameter uji 165.000,00

4. Analisa Saringan Per parameter uji 220.000,00

5. Pemadatan laboratorium Standar Per parameter uji 330.000,00

6. Pemadatan Laboratorium Modified Per parameter uji 330.000,00

7. CBR Laboratorium Standar Per parameter uji 330.000,00

8. CBR Laboratorium Modified Per parameter uji 385.000,00

9. Hidrometer Per parameter uji 330.000,00

10. Batas Susut / Shrinkage Limit Per parameter uji 330.000,00

11. Kuat Tekanan Bebas / Unconfined.Comp Strength Per parameter uji 275.000,00

12. Pemampatan / Konsulidasi Per parameter uji 330.000,00

13. Kuat Geser Langsung / Direct Shear Per parameter uji 330.000,00

14. Permiabiliitas Per parameter uji 330.000,00

15. Berat Isi Tanah Per parameter uji 220.000,00

16. Trialxial ( UU ) Per parameter uji 428.000,00

17. Trialxial ( CU ) Per parameter uji 735.000,00

II. PEKERJAAN LAPANGAN

1. Pemboran Tangan Meter 82.500,00

2. Pengambilan Contoh Tanah Asli Per contoh 110.000,00

3. Pengambilan Contoh dengan SPT Per contoh 110.000,00

4. Pemboran Mesin Tanah Basah Meter 165.000,00

5. Penyondiran Ringan Titik 472.500,00

6. Dynamic Cone Penetrometer ( DCP) Titik 165.000,00

7. CBR Lapangaan Titik 165.000,00

8. Kepadatan Lapangan ( Sand Cone ) Titik 165.000,00

9. Kelendutan ( Bengkelmem Beam ) Titik 220.000,00

10. Cone Dril Titik 220.000,00

11. Kuat Tekan Dengan Alat Hammer Test Titik 110.000,00

12. Kadar Air Dengan Speedy Titik 165.000,00

13. Analisa Fisik Pengujian Air 1 x Uji 220.000,00

Halaman 22
HARGA STANDAR KEGIATAN PEKERJAAN (HSKP)
KABUPATEN KUTAI TIMUR
TAHUN 2019

RETRIBUSI TARIF SEWA PENGUJIAN LABORATORIUM

TARIF 2018
NO. JENIS PENGUJIAN SATUAN
(Rp.)
1 2 3 4
14. Pengambilan Sampel Air Titik 110.000,00

Pengambilan Debit Air Perlokasi

15. Sungai Besar Lebar > 20 Meter 1 Lokasi 2.060.000,00

16. Sungai Sedang Lebar 10 - 20 Meter 1 Lokasi 1.545.000,00

17. Sungai Kecil < 10 Meter 1 Lokasi 772.500,00

III. ASPAL ( KERAS, CAIR, CAMPURAN ASPAL )

1. Penetrasi Per parameter uji 165.000,00

2. Titik Lembek Per parameter uji 165.000,00

3. Daktilitas Per parameter uji 165.000,00

4. Kehilangan Berat Per parameter uji 165.000,00

5. Titik Nyala Per parameter uji 165.000,00

6. Berat Jenis Per parameter uji 110.000,00

7. Viscositas Per parameter uji 165.000,00

8. Penyulingan Per parameter uji 220.000,00

9. Exstraction Asphalt Per parameter uji 330.000,00

10. Kelarutan CH CL3 Per parameter uji 165.000,00

11. Penetrasi Setelah Kehilangan Berat Per parameter uji 165.000,00

12. Pengendapan / Kestabilan Per parameter uji 165.000,00

13. Kelekatan terhadap Batuan Kering Per parameter uji 220.000,00

14. Kelekatan terhadap batuan basah Per parameter uji 220.000,00

IV. SEMEN / BETON / CAMPURAN BETON

1. Konsistensi Semen Per parameter uji 110.000,00

2. Pengikatan Awal Semen Per parameter uji 220.000,00

3. Berat Jenis Semen Per parameter uji 165.000,00

4. Kehalusan Semen Per parameter uji 220.000,00

5. Kadar Air Semen Per parameter uji 110.000,00

6. Bobot Isi Per parameter uji 82.500,00

7. Ketepatan Bentuk Per parameter uji 110.000,00

V. AGERIGAT

1. Abrasi Test Per parameter uji 330.000,00

2. Gradasi / Analisa Saringan Per parameter uji 220.000,00

Halaman_ 29
HARGA STANDAR KEGIATAN PEKERJAAN (HSKP)
KABUPATEN KUTAI TIMUR
TAHUN 2019

RETRIBUSI TARIF SEWA PENGUJIAN LABORATORIUM

TARIF 2018
NO. JENIS PENGUJIAN SATUAN
(Rp.)
1 2 3 4
3. Berat Jenis Penyerapan Agregat Kasar Per parameter uji 220.000,00

4. Berat Jenis Dan Penyerapan Agregat Halus Per parameter uji 220.000,00

5. Berat Jenis Per parameter uji 220.000,00

6. Berat Isi Per parameter uji 220.000,00

7. Kadar Lumpur Per parameter uji 275.000,00

8. Organik Per parameter uji 275.000,00

9. Kerekatan Terhadap Aspal Per parameter uji 220.000,00

10. Impact Test Per parameter uji 275.000,00

11. Sand equivalent Per parameter uji 275.000,00

12. Soundness Agregat Kasar Per parameter uji 330.000,00

13. Soundness Agregat Halus Per parameter uji 330.000,00

14. Kepipihan Agregat Per parameter uji 220.000,00

VI. PENGUJIAN BENDA UJI ( KUBUS, CYLINDER, PAVING BLOCK DLL )

1. Kuat Tekan Per benda uji 55.000,00

2. Kuat Tarik Per benda uji 55.000,00

3. Lentur Per benda uji 55.000,00

4. Kuat Tekan Dengan Hammer Test (min 25 titik) Per benda uji 900.000,00

5. Kuat Tekan Mortar Per benda uji 55.000,00

6. Kuat Tekan Stabilitas Marshall Per benda uji 82.500,00

7. Kuat Tekan Kubus, Paving Block Per benda uji 55.000,00

8. Kuat Tekan Silinder, mutu tinggi > K-400 Per benda uji 82.500,00

9. Rudolf Coloum Per benda uji 220.000,00

VII. JOB MIX

1. Job Mix Formula Design Beton (Analisa saringan, kadar air, kadar
Per contoh uji 927.000,00
lumpur, berat jenis & penyerapan, berat isi, zat organik, abrasi)

2. Job Mix Formula Aspal (Analisa saringan, berat jenis &


Per contoh uji 1.030.000,00
penyerapan, abrasi, sand equivalent dan marshall test)

3. Job Mix Formula Design Mortar Per contoh uji 770.000,00

4. Job Mix Semen ( Pemeriksaan Fisika Semen ) Per contoh uji 770.000,00

5. Job Mix Formula Tanah Urugan (berat jenis tanah, pemadatan


Per contoh uji 880.000,00
laboratorium, CBR lapangan, Atterberg limits dan analisa saringan)

6. Job Mix Design Soil Semen (berat jenis tanah, pemadatan


laboratorium,Atterberg limits, analisa saringan dan Unconfined Per persentase mix 927.000,00
compresive strenght)

Halaman 23
HARGA STANDAR KEGIATAN PEKERJAAN (HSKP)
KABUPATEN KUTAI TIMUR
TAHUN 2019

RETRIBUSI TARIF SEWA PENGUJIAN LABORATORIUM

TARIF 2018
NO. JENIS PENGUJIAN SATUAN
(Rp.)
1 2 3 4
7. Job Mix Formula LPA ( Berat Jenis Agregat, Pemadatan
Laboratorium, CBR Laboratorium, Atterberg Limits, Analisa Saringan Per contoh uji 880.000,00
dan Abrasi )
8. Job Mix Formula LPB ( ( Berat Jenis Agregat, Pemadatan
Laboratorium, CBR Laboratorium, Atterberg Limits, Analisa Saringan Per contoh uji 880.000,00
dan Abrasi )

9. Job Mix Formula LPC ( ( Berat Jenis Agregat, Pemadatan


Laboratorium, CBR Laboratorium, Atterberg Limits, Analisa Saringan Per contoh uji 880.000,00
dan Abrasi )

VIII. PENGUJIAN AIR

1. Pemeriksaan Air Untuk Campuran Beton Per contoh uji 370.000,00

2. Pemeriksaan Air Bersih Per contoh uji 525.000,00

3. Pemeriksaan Badan Air Sungai Per contoh uji 945.000,00

4. Pemeriksaan Air Pada Kolam Renang Per contoh uji 370.000,00

5. Pemeriksaan Air Pertanian Per contoh uji 525.000,00

IX. PENGUJIAN FISIKA / KIMIA

1. CO² Per parameter uji 28.000,00

2. Bau Per parameter uji 17.000,00

3. TDS Per parameter uji 22.000,00

4. Kekeruhan Per parameter uji 17.000,00

5. Rasa Per parameter uji 17.000,00

6. Warna Per parameter uji 28.000,00

7. Arsen Per parameter uji 83.000,00

8. Besi Per parameter uji 39.000,00

9. Flourida Per parameter uji 22.000,00

10. Kadrium Per parameter uji 39.000,00

11. Kasadahan ( CaCo³ ) Per parameter uji 28.000,00

12. Klorida Per parameter uji 39.000,00

13. Kromium Per parameter uji 39.000,00

14. Mangan Per parameter uji 39.000,00

15. Nitrat Per parameter uji 28.000,00

16. Nitrit Per parameter uji 22.000,00

17. PH Per parameter uji 17.000,00

18. Selenium Per parameter uji 39.000,00

19. Seng Per parameter uji 39.000,00

20. Sianida Per parameter uji 61.000,00

Halaman 24
HARGA STANDAR KEGIATAN PEKERJAAN (HSKP)
KABUPATEN KUTAI TIMUR
TAHUN 2019

RETRIBUSI TARIF SEWA PENGUJIAN LABORATORIUM

TARIF 2018
NO. JENIS PENGUJIAN SATUAN
(Rp.)
1 2 3 4
21. Sulfat Per parameter uji 17.000,00

22. Timbal Per parameter uji 39.000,00

23. KmnO⁴ ( Permanganat ) Per parameter uji 39.000,00

24. Almunium Per parameter uji 83.000,00

25. Barium Per parameter uji 22.000,00

26. Perak Per parameter uji 39.000,00

27. Supida Per parameter uji 28.000,00

28. Tembaga Per parameter uji 39.000,00

29. Amonia ( NH⁴ ) Per parameter uji 22.000,00

30. Oksigen Terlarut ( DO ) Per parameter uji 22.000,00

31. Kebutuhan Oksigen Iokimia ( BOD ) Per parameter uji 44.000,00

32. Kebutuhan Oksigen Kimia ( COD ) Per parameter uji 28.000,00

33. Senyawa Aktif Biru Metelen Per parameter uji 28.000,00

34. Fend Per parameter uji 28.000,00

35. Minyak dan Lemak Per parameter uji 83.000,00

36. Raksa Per parameter uji 83.000,00

37. TSS Per parameter uji 28.000,00

38. Nikel Per parameter uji 39.000,00

39. Phospat Per parameter uji 28.000,00

40. Phospat Total Per parameter uji 28.000,00

41. Calcium Per parameter uji 22.000,00

42. Magnesium Per parameter uji 22.000,00

43. Detergen Per parameter uji 33.000,00

44. Salinitas Per parameter uji 17.000,00

45. Temperatur Per parameter uji 17.000,00

46. Cobalt Per parameter uji 39.000,00

47. Boron Per parameter uji 17.000,00

48. Chorin Bebas Per parameter uji 39.000,00

49. Total Coil Per parameter uji 88.000,00

50. Fecal Colifrom Per parameter uji 88.000,00

51. Natrium Per parameter uji 39.000,00

KETERANGAN :
Harga Belum ternasuk PPN

Halaman 25
HARGA STANDAR KEGIATAN PEKERJAAN (HSKP)
KABUPATEN KUTAI TIMUR
TAHUN 2019

PEKERJAAN PENGUKURAN/ SURVEYING

HARGA SATUAN
NO. JENIS PENGUKURAN SATUAN 2018
(Rp.)
1 2 3 4

1. Pengukuran luas ( Polygon ) Hektare 371.000,00

2. Pengukuran Memanjang Kilometer 258.000,00

KETERANGAN :
Harga Belum ternasuk PPN

Halaman 26
HARGA STANDAR KEGIATAN PEKERJAAN (HSKP)
KABUPATEN KUTAI TIMUR
TAHUN 2019

JASA KONSULTAN

Tabel 1-17

Biaya Langsung Personil (Remuneration / Billing Rate) Tahun 2017 *


untuk Tenaga Ahli Nasional berpendidikan S1/S2/S3
dengan Undangan Internasional (ICB)
Berdasarkan Pengalaman Profesi yang setara (comparable experiences)

PROVINSI KALIMANTAN TIMUR Indeks = 0,998


RUPIAH PER BULAN
SARJANA DENGAN PENGALAMAN
No
PROFESIONAL (TAHUN)
S1 S2 S3

1 2 3 4 5

1 1 **) 48.902.000 51.896.000


2 2 **) 54.391.000 57.884.000
3 3 35.928.000 60.129.500 63.872.000
4 4 41.666.500 65.618.500 69.610.500
5 5 47.155.500 71.107.500 75.598.500
6 6 52.644.500 76.846.000 81.586.500
7 7 58.383.000 82.335.000 87.325.000
8 8 63.872.000 87.824.000 93.313.000
9 9 69.361.000 93.562.500 99.301.000
10 10 74.850.000 98.802.000 105.289.000
11 11 80.588.500 104.540.500 111.277.000
12 12 85.828.000 110.279.000 117.015.500
13 13 91.566.500 115.768.000 123.003.500
14 14 97.305.000 121.257.000 128.742.000
15 15 102.794.000 127.245.000 134.730.000
16 16 108.283.000 132.484.500 140.718.000
17 17 113.772.000 137.973.500 146.456.500
18 18 119.510.500 143.712.000 152.444.500
19 19 124.999.500 149.201.000 158.432.500
20 20 130.488.500 154.690.000 164.171.000
21 21 136.227.000 160.428.500 170.159.000
22 22 141.466.500 165.917.500 175.897.500
23 23 147.205.000 171.656.000 182.135.000
24 24 152.943.500 176.895.500 187.873.500
25 25 158.682.000 182.634.000 193.861.500

Biaya Langsung Personil Untuk Provinsi Kalimantan Timur Dikalikan Dengan Indeks 0,998

Halaman_ 34
HARGA STANDAR KEGIATAN PEKERJAAN (HSKP)
KABUPATEN KUTAI TIMUR
TAHUN 2019

JASA KONSULTAN

Tabel 2-17
Biaya Langsung Personil (Remuneration / Billing Rate) Tahun 2017 *
untuk Tenaga Ahli Nasional berpendidikan S1/S2/S3
dengan Undangan Internasional (ICB)
Berdasarkan Pengalaman Profesi yang setara (comparable experiences)

PROVINSI KALIMANTAN TIMUR Indeks = 0,998

RUPIAH PER RUPIAH PER RUPIAH PER


KELOMPOK AHLI BULAN BULAN BULAN
TAHUN TAHUN TAHUN
PENGALAMAN PENGALAMAN PENGALAMAN
S1 S2 S3
KUALIFIKASI GOLONGAN
2 3 4 5
1 **)
TENAGA AHLI
2 **)
II - A 3 17.714.500
II - B 4 19.211.500
AHLI MUDA
II - C 5 20.708.500 1 29.191.500
II - D 6 22.205.500 2 30.938.000
III - A 7 23.702.500 3 32.684.500
III - B 8 25.199.500 4 34.680.500 1 41.666.500
AHLI MADYA
III - C 9 26.429.000 5 36.427.000 2 43.662.500
III - D 10 28.193.500 6 38.173.500 3 45.658.500
IV - A 11 29.690.500 7 40.169.500 4 47.654.500
IV - B 12 31.187.500 8 41.916.000 5 49.650.500
IV - C 13 32.684.500 9 43.662.500 6 51.646.500
IV - D 14 34.181.500 10 45.658.500 7 53.642.500
V-A 15 35.678.500 11 47.405.000 8 55.638.500
V-B 16 37.175.500 12 49.151.500 9 57.634.500
V-C 17 38.672.500 13 51.147.500 10 59.630.500
AHLI UTAMA V-D 18 40.169.500 14 52.894.000 11 61.626.500
VI - A 19 41.666.500 15 54.640.500 12 63.622.500
VI - B 20 43.163.500 16 56.636.500 13 65.618.500
VI - C 21 44.660.500 17 58.383.000 14 67.614.500
VI - D 22 46.157.500 18 60.129.500 15 69.610.500
VII - A 23 47.654.500 19 62.125.500 16 71.606.500
VII - B 24 49.151.500 20 63.872.000 17 73.602.500
VII - C 25 50.648.500 21 65.868.000 18 75.598.500

Biaya Langsung Personil Untuk Provinsi Kalimantan Timur Dikalikan Dengan Indeks 0,998

Halaman_ 35
HARGA STANDAR KEGIATAN PEKERJAAN (HSKP)
KABUPATEN KUTAI TIMUR
TAHUN 2019

JASA KONSULTAN
Tabel 3-17

Biaya Langsung Personil (Remuneration / Billing Rate) Tahun 2017


Untuk Tenaga Sub Profesional ** )

PROVINSI KALIMANTAN TIMUR


Indeks = 0,998

PENDIDIKAN &
NO PERSONIL RUPIAH PER BULAN
PENGALAMAN

1 2 3 4

D3/S0 (5-10 Tahun)


1 CAD / CAM Operator S1 (0-3 Tahun) 9.980.000

S2 (0-1 Tahun)
D3/S0 (>3 Tahun)
Software Programmer /
2 S1 (0-3 Tahun) 11.676.600
Implementer
S2 (0-1 Tahun)
D3/S0 (>3 Tahun)
3 Hardware Technician S1 (0-3 Tahun) 9.980.000

S2 (0-1 Tahun)
D3/S0 (>3 Tahun)
4 Fasilitator S1 (0-3 Tahun) 9.980.000

S2 (0-1 Tahun)
D3/S0 (>6Tahun)
5 Senior Assistant Profesional Staff S1 (3-5 Tahun) 12.674.600

S2 (1-3 Tahun)
D3/S0 (3-6Tahun)
6 Assistant Profesional S1 (0-3 Tahun) 11.976.000

S2 (0-1 Tahun)
D3/S0 (>3 Tahun)
7 Special Technician / Inspector S1 (0-3 Tahun) 11.676.600

S2 (0-1 Tahun)
D3/S0 (>3 Tahun)
8 Technician S1 (0-3 Tahun) 9.980.000

S2 (0-1 Tahun)
D3/S0 (>3 Tahun)
9 Inspector S1 (0-3 Tahun) 9.980.000

S2 (0-1 Tahun)
D3/S0 (>3 Tahun)
10 Surveyor S1 (0-3 Tahun) 8.982.000

S2 (0-1 Tahun)

Biaya Langsung Personil Untuk Provinsi Kalimantan Timur Dikalikan Dengan Indeks 0,998

Halaman_ 36
HARGA STANDAR KEGIATAN PEKERJAAN (HSKP)
KABUPATEN KUTAI TIMUR
TAHUN 2019

JASA KONSULTAN
Tabel 4-17

Biaya Langsung Personil (Remuneration / Billing Rate) Tahun 2017


Untuk Tenaga Pendukung ***)

PROVINSI KALIMANTAN TIMUR


Indeks = 0,998

NO PERSONIL RUPIAH PER BULAN

1 2 3

1 Office Manager 10.479.000

2 Site Office Manager / Administrator 9.481.000

3 Bilingual Secretary 10.379.200

4 Secretary 6.387.200

5 Computer Operator / Typist 5.688.600

6 Drafter (Manual) 5.289.400

7 Messenger 3.692.600

8 Office Boy 3.393.200

9 Driver 3.992.000

10 Office Guard / Security Officer 3.642.700

Biaya Langsung Personil Untuk Provinsi Kalimantan Timur Dikalikan Dengan Indeks 0,998

Halaman_ 37
HARGA STANDAR KEGIATAN PEKERJAAN (HSKP)
KABUPATEN KUTAI TIMUR
TAHUN 2019

Tabel 1-18
Biaya Langsung Personil (Remuneration / Billing Rate) Tahun 2018
untuk Tenaga Ahli Nasional berpendidikan S1/S2/S3
dalam rangka Undangan Pelelangan Internasional (ICB)
Berdasarkan Pengalaman Profesi yang setara (comparable experiences) *)

TENAGA AHLI RUPIAH PER BULAN


DAN
S1 / Setara S2 / Setara S3 / Setara
TAHUN PENGALAMAN
1 **) 49.500.000 52.500.000
2 **) 55.000.000 58.500.000
3 36.750.000 60.500.000 64.500.000
4 42.250.000 66.000.000 70.500.000
5 47.750.000 71.750.000 76.500.000
6 53.250.000 77.500.000 82.250.000
7 59.000.000 82.750.000 88.250.000
8 64.500.000 88.500.000 94.250.000
9 70.000.000 94.250.000 100.000.000
10 75.750.000 99.500.000 106.000.000
11 81.250.000 105.250.000 111.750.000
12 86.750.000 111.000.000 117.750.000
13 92.250.000 116.250.000 123.750.000
14 98.000.000 122.000.000 129.500.000
15 103.500.000 127.750.000 135.500.000
16 109.000.000 133.250.000 141.500.000
17 114.750.000 138.750.000 147.250.000
18 120.250.000 144.250.000 153.250.000
19 125.750.000 150.000.000 159.000.000
20 131.250.000 155.500.000 165.000.000
21 137.000.000 161.000.000 171.000.000
22 142.500.000 166.750.000 176.750.000
23 148.250.000 172.250.000 183.000.000
24 153.500.000 177.750.000 189.000.000
25 159.250.000 183.500.000 195.000.000
PROVINSI KALIMANTAN TIMUR Indeks = 0,998

Halamanl 27
HARGA STANDAR KEGIATAN PEKERJAAN (HSKP)
KABUPATEN KUTAI TIMUR
TAHUN 2019

Tabel 2-18
Biaya Langsung Personil (Remuneration / Billing Rate) Tahun 2018
untuk Tenaga Ahli Nasional berpendidikan S1/S2/S3
dalam rangka Undangan Pelelangan Nasional (NCB)
Berdasarkan Pengalaman Profesi yang setara (comparable experiences) *)

PROVINSI KALIMANTAN TIMUR Indeks = 0,998

KUALIFIKASI TENAGA AHLI RUPIAH PER BULAN


DAN TAHUN PENGALAMAN
S1 / Setara S2 / Setara S3 / Setara
1 **) 22,500,000 29,000,000
TENAGA AHLI (TIDAK PUNYA SKA / SKK) ►
2 **) 24,500,000 31,000,000
1 3 18,000,000 26,250,000 33,000,000
AHLI MUDA ►
2 4 19,500,000 28,000,000 35,000,000
1 3 5 21.000.000 30,000,000 37,000,000
AHLI MADYA ► 2 4 6 22.500.000 31,750,000 39,000,000
3 5 7 24.000.000 33.500.000 41,000,000
1 4 6 8 25.500.000 35,500,000 43.000.000
2 5 7 9 27.000.000 37.250.000 45.000.000
3 6 8 10 28.500.000 39.000.000 47.000.000
4 7 9 11 30.000.000 41.000.000 49.000.000
5 8 10 12 31.500.000 42.750.000 51.000.000
6 9 11 13 33.000.000 44.500.000 53.000.000
7 10 12 14 34.500.000 46.500.000 55.000.000
8 11 13 15 36.000.000 48.250.000 57.000.000
9 12 14 16 37.500.000 50.000.000 59.000.000
AHLI UTAMA ►
10 13 15 17 39.000.000 52.000.000 61.000.000
11 14 16 18 40.500.000 53.750.000 63.000.000
12 15 17 19 42.000.000 55.500.000 65.000.000
13 16 18 20 43.500.000 57.500.000 67.000.000
14 17 19 21 45.000.000 59.250.000 69.000.000
15 18 20 22 46.500.000 61.000.000 71.000.000
16 19 21 23 48.000.000 63.000.000 73.000.000
17 20 22 24 49.500.000 64.750.000 75.000.000
18 21 23 25 51.000.000 66.500.000 77.000.000
Biaya Langsung Personil Untuk Provinsi Kalimantan Timur Dikalikan Dengan Indeks 0,998

Halamanl 28
HARGA STANDAR KEGIATAN PEKERJAAN (HSKP)
KABUPATEN KUTAI TIMUR
TAHUN 2019

Tabel 3-18
Biaya Langsung Personil (Remuneration / Billing Rate) Tahun 2018
Untuk Tenaga Sub Profesional *)
PROVINSI KALIMANTAN TIMUR Indeks = 0,998

NO PERSONIL RUPIAH PER BULAN


1. CAD / CAM OPERATOR 10,350,000
2. SOFTWARE PROGRAMMER / IMPLEMENTER 12,150,000
3. HARDWARE TECHNICIAN 10,350,000
4. FACILITATOR 10,350,000
5. SENIOR ASSISTANT PROFESSIONAL STAFF 13,200,000
6. ASSISTANT PROFESSIONAL STAFF 12,450,000
7. SPECIAL TECHNICIAN / INSPECTOR 12,150,000
8. TECHNICIAN 10,350,000
9. INSPECTOR 10,350,000
10. SURVEYOR 9,300,000

Biaya Langsung Personil Untuk Provinsi Kalimantan Timur Dikalikan Dengan Indeks 0,998

Halamanl 29
HARGA STANDAR KEGIATAN PEKERJAAN (HSKP)
KABUPATEN KUTAI TIMUR
TAHUN 2019

Tabel 4-18
Biaya Langsung Personil (Remuneration / Billing Rate) Tahun 2018
Untuk Tenaga Pendukung (Supporting Staff) *)

PROVINSI KALIMANTAN TIMUR


Indeks = 0,998

NO PERSONIL RUPIAH PER BULAN


1. OFFICE MANAGER 10,850,000
2. SITE OFFICE MANAGER / ADMINISTRATOR 9,850,000
3. BILINGUAL SECRETARY 10,750,000
4. SECRETARY 6,650,000
5. COMPUTER OPERATOR / TYPIST 5,900,000
6. DRAFTER (MANUAL) 5,500,000
7. MESSENGER 4,150,000
8. OFFICE BOY 3,850,000
9. DRIVER 4,450,000
10. OFFICE GUARD / SECURITY OFFICER 4,100,000

Biaya Langsung Personil Untuk Provinsi Kalimantan Timur Dikalikan Dengan Indeks 0,998

Halamanl 30
II. ANALISA HARGA SATUAN KEGIATAN PEKERJAAN (HSKP)
KABUPATEN KUTAI TIMUR PROVINSI KALIMANTAN TIMUR
TAHUN ANGGARAN 2019

II.1 ANALISA PERHITUNGAN HARGA SATUAN PEKERJAAN PERSIAPAN UNTUK KONSTRUKSI BANGUNAN GEDUNG DAN PERUMAHAN

Penetapan Indeks Harga Satuan Pekerjaan Persiapan

1
- Pagar Sementara Dari Kayu Tinggi 2 Meter M
1
- Pagar Sementara Dari Seng Gelombang Tinggi 2 Meter M
1
- Pagar Sementara Dari Kawat Duri Tinggi 1,8 Meter M
1
- Pengukuran Dan Pemasangan Bouwplank M
2
- Pembuatan Kantor Sementara Dgn, Lantai Plesteran M
2
- Pembuatan Gedung Semen Dan Alat-alat M
2
- Pembuatan Rumah Jaga / Konstruksi Kayu M
2
- Membersihkan Lapangan Dan Perataan M
2
- Pembuatan Bedeng Buruh M
2
- Pembuatan Bak Adukan Ukuran (40 x 50 x 20) cm M
3
- Pembuatan Stegger Dari Bambu Ukuran (40 x 50 x 20) cm M
3
- Pembuatan Jalan Sementara M
3
- Bongkaran Beton Bertulang M
3
- Bongkaran Dinding Tembok Bata Merah M

Halaman 22
II. ANALISA HARGA SATUAN KEGIATAN PEKERJAAN (HSKP)
KABUPATEN KUTAI TIMUR PROVINSI KALIMANTAN TIMUR
TAHUN ANGGARAN 2019

II.1 ANALISA PERHITUNGAN HARGA SATUAN PEKERJAAN PERSIAPAN UNTUK KONSTRUKSI BANGUNAN GEDUNG DAN PERUMAHAN

1.12 1.13 1.16


Jenis Pekerjaan : Pagar Sementara Dari Kayu Tinggi 2 Meter (PerMen 28/PRT/M/2016)
Kuantitas Pekerjaan : M1
Produksi Harian / Jam : Harian

Zona I Zona II Zona III Zona IV


No Uraian Satuan Indeks Harga Jumlah Harga Jumlah Harga Jumlah Harga Jumlah
Satuan Harga Satuan Harga Satuan Harga Satuan Harga

I. UPAH
Pekerja OH 0.400 137,800.00 55,120.00 146,100.00 58,440.00 148,800.00 59,520.00 157,100.00 62,840.00
Tukang Kayu OH 0.200 159,000.00 31,800.00 168,500.00 33,700.00 171,700.00 34,340.00 181,300.00 36,260.00
Kepala Tukang OH 0.020 164,300.00 3,286.00 174,200.00 3,484.00 177,400.00 3,548.00 187,300.00 3,746.00
Mandor OH 0.020 174,900.00 3,498.00 185,400.00 3,708.00 188,900.00 3,778.00 199,400.00 3,988.00

II. BAHAN
Dolken Kayu Dia. 8-10/ 400 cm Btg 1.250 37,384.00 46,730.00 44,284.00 55,355.00 44,184.00 55,230.00 48,484.00 60,605.00
Semen portland Kg 5.000 1,875.52 9,377.60 1,934.13 9,670.65 2,073.96 10,369.80 2,444.40 12,222.00
Pasir Beton M3 0.005 732,600.00 3,663.00 827,300.00 4,136.50 816,300.00 4,081.50 854,800.00 4,274.00
Koral Beton M3 0.009 844,000.00 7,596.00 968,000.00 8,712.00 953,600.00 8,582.40 1,004,000.00 9,036.00
Kayu 5/7,meranti M3 0.072 4,980,000.00 358,560.00 5,668,800.00 408,153.60 5,588,800.00 402,393.60 5,868,800.00 422,553.60
Paku Biasa 2" - 5" Kg 0.060 35,200.00 2,112.00 42,900.00 2,574.00 42,000.00 2,520.00 45,100.00 2,706.00
Residu Ltr 0.400 46,900.00 18,760.00 53,800.00 21,520.00 53,000.00 21,200.00 55,800.00 22,320.00

Jumlah Harga Per-Satuan Pekerjaan 540,502.60 609,453.75 605,563.30 640,550.60


Over Head Dan Keuntungan 15 % 81,075.39 91,418.06 90,834.50 96,082.59
Total Harga Per-Satuan Pekerjaan 621,577.99 700,871.81 696,397.80 736,633.19

Jenis Pekerjaan : Pagar Sementara Dari Seng Gelombang Tinggi 2 Meter (PerMen 28/PRT/M/2016)
Kuantitas Pekerjaan : M1
Produksi Harian / Jam : Harian

Zona I Zona II Zona III Zona IV


No Uraian Satuan Indeks Harga Jumlah Harga Jumlah Harga Jumlah Harga Jumlah
Satuan Harga Satuan Harga Satuan Harga Satuan Harga

I. UPAH
Pekerja OH 0.400 137,800.00 55,120.00 146,100.00 58,440.00 148,800.00 59,520.00 157,100.00 62,840.00
Tukang Kayu OH 0.200 159,000.00 31,800.00 168,500.00 33,700.00 171,700.00 34,340.00 181,300.00 36,260.00
Kepala Tukang OH 0.020 164,300.00 3,286.00 174,200.00 3,484.00 177,400.00 3,548.00 187,300.00 3,746.00
Mandor OH 0.020 174,900.00 3,498.00 185,400.00 3,708.00 188,900.00 3,778.00 199,400.00 3,988.00

II. BAHAN
Dolken Kayu Dia. 8 - 400 cm Batang 1.250 37,384.00 46,730.00 44,284.00 55,355.00 44,184.00 55,230.00 48,484.00 60,605.00
Semen portland Kg 2.500 1,875.52 4,688.80 1,934.13 4,835.33 2,073.96 5,184.90 2,444.40 6,111.00
Pasir Beton M3 0.005 732,600.00 3,663.00 827,300.00 4,136.50 816,300.00 4,081.50 854,800.00 4,274.00
Koral Beton M3 0.009 844,000.00 7,596.00 941,000.00 8,469.00 927,000.00 8,343.00 976,000.00 8,784.00
Seng Gelombang 3" - 5" Lembar 1.200 205,700.00 246,840.00 235,900.00 283,080.00 232,400.00 278,880.00 244,700.00 293,640.00
Kayu 5/7,meranti M3 0.072 4,980,000.00 358,560.00 5,668,800.00 408,153.60 5,588,800.00 402,393.60 5,868,800.00 422,553.60
Paku Biasa 2" - 5" Kg 0.060 35,200.00 2,112.00 42,900.00 2,574.00 42,000.00 2,520.00 45,100.00 2,706.00
Meni Besi Kg 0.450 79,700.00 35,865.00 91,400.00 41,130.00 90,000.00 40,500.00 94,800.00 42,660.00

Jumlah Harga Per-Satuan Pekerjaan 799,758.80 907,065.43 898,319.00 948,167.60


Over Head Dan Keuntungan 15 % 119,963.82 136,059.81 134,747.85 142,225.14
Total Harga Per-Satuan Pekerjaan 919,722.62 1,043,125.24 1,033,066.85 1,090,392.74

Halaman 23
II. ANALISA HARGA SATUAN KEGIATAN PEKERJAAN (HSKP)
KABUPATEN KUTAI TIMUR PROVINSI KALIMANTAN TIMUR
TAHUN ANGGARAN 2019

Jenis Pekerjaan : Pagar Sementara Dari Kawat Duri Tinggi 1,8 Meter (PerMen 28/PRT/M/2016)
Kuantitas Pekerjaan : M1
Produksi Harian / Jam : Harian

Zona I Zona II Zona III Zona IV


No Uraian Satuan Indeks Harga Jumlah Harga Jumlah Harga Jumlah Harga Jumlah
Satuan Harga Satuan Harga Satuan Harga Satuan Harga

I. UPAH
Pekerja OH 0.300 137,800.00 41,340.00 146,100.00 43,830.00 148,800.00 44,640.00 157,100.00 47,130.00
Tukang Kayu OH 0.200 159,000.00 31,800.00 168,500.00 33,700.00 171,700.00 34,340.00 181,300.00 36,260.00
Kepala Tukang OH 0.020 164,300.00 3,286.00 174,200.00 3,484.00 177,400.00 3,548.00 187,300.00 3,746.00
Mandor OH 0.020 174,900.00 3,498.00 185,400.00 3,708.00 188,900.00 3,778.00 199,400.00 3,988.00

II. BAHAN
Dolken Kayu Dia. 8 - 400 cm Batang 1.000 37,384.00 37,384.00 44,284.00 44,284.00 44,184.00 44,184.00 48,484.00 48,484.00
Semen portland Kg 2.000 1,875.52 3,751.04 1,934.13 3,868.26 2,073.96 4,147.92 2,444.40 4,888.80
Kawat duri Kg 25.000 32,200.00 805,000.00 36,900.00 922,500.00 36,400.00 910,000.00 38,300.00 957,500.00
Pasir Beton M3 0.005 732,600.00 3,663.00 827,300.00 4,136.50 816,300.00 4,081.50 854,800.00 4,274.00
Koral Beton M3 0.009 820,500.00 7,384.50 941,000.00 8,469.00 927,000.00 8,343.00 976,000.00 8,784.00
Paku Biasa 2" - 5" Kg 0.060 35,200.00 2,112.00 42,900.00 2,574.00 42,000.00 2,520.00 45,100.00 2,706.00

Jumlah Harga Per-Satuan Pekerjaan 939,218.54 1,070,553.76 1,059,582.42 1,117,760.80


Over Head Dan Keuntungan 15 % 140,882.78 160,583.06 158,937.36 167,664.12
Total Harga Per-Satuan Pekerjaan 1,080,101.32 1,231,136.82 1,218,519.78 1,285,424.92

Jenis Pekerjaan : Pengukuran Dan Pemasangan Bouwplank (PerMen 28/PRT/M/2016)


Kuantitas Pekerjaan : M1
Produksi Harian / Jam : Harian

Zona I Zona II Zona III Zona IV


No Uraian Satuan Indeks Harga Jumlah Harga Jumlah Harga Jumlah Harga Jumlah
Satuan Harga Satuan Harga Satuan Harga Satuan Harga

I. UPAH
Pekerja OH 0.100 137,800.00 13,780.00 146,100.00 14,610.00 148,800.00 14,880.00 157,100.00 15,710.00
Tukang Kayu OH 0.100 159,000.00 15,900.00 168,500.00 16,850.00 171,700.00 17,170.00 181,300.00 18,130.00
Kepala Tukang OH 0.010 164,300.00 1,643.00 174,200.00 1,742.00 177,400.00 1,774.00 187,300.00 1,873.00
Mandor OH 0.005 174,900.00 874.50 185,400.00 927.00 188,900.00 944.50 199,400.00 997.00

II. BAHAN
Kayu 5/7,meranti M3 0.012 4,980,000.00 59,760.00 5,668,800.00 68,025.60 5,588,800.00 67,065.60 5,868,800.00 70,425.60
Paku Biasa 2" - 3" Kg 0.020 35,200.00 704.00 42,900.00 858.00 42,000.00 840.00 45,100.00 902.00
Kayu papan 3/20 M3 0.007 3,361,460.00 23,530.22 3,826,360.00 26,784.52 3,772,360.00 26,406.52 3,961,360.00 27,729.52

Jumlah Harga Per-Satuan Pekerjaan 116,191.72 129,797.12 129,080.62 135,767.12


Over Head Dan Keuntungan 15 % 17,428.76 19,469.57 19,362.09 20,365.07
Total Harga Per-Satuan Pekerjaan 133,620.48 149,266.69 148,442.71 156,132.19

Halaman 24
II. ANALISA HARGA SATUAN KEGIATAN PEKERJAAN (HSKP)
KABUPATEN KUTAI TIMUR PROVINSI KALIMANTAN TIMUR
TAHUN ANGGARAN 2019

Jenis Pekerjaan : Pembuatan Kantor Sementara Dgn. Lantai Plesteran (PerMen 28/PRT/M/2016)
Kuantitas Pekerjaan : M2
Produksi Harian / Jam : Harian

Zona I Zona II Zona III Zona IV


No Uraian Satuan Indeks Harga Jumlah Harga Jumlah Harga Jumlah Harga Jumlah
Satuan Harga Satuan Harga Satuan Harga Satuan Harga

I. UPAH
Pekerja OH 2.000 137,800.00 275,600.00 146,100.00 292,200.00 148,800.00 297,600.00 157,100.00 314,200.00
Tukang Kayu OH 2.000 159,000.00 318,000.00 168,500.00 337,000.00 171,700.00 343,400.00 181,300.00 362,600.00
Tukang Batu OH 1.000 164,300.00 164,300.00 168,500.00 168,500.00 171,700.00 171,700.00 181,300.00 181,300.00
Kepala Tukang OH 0.300 164,300.00 49,290.00 174,200.00 52,260.00 177,400.00 53,220.00 187,300.00 56,190.00
Mandor OH 0.050 174,900.00 8,745.00 185,400.00 9,270.00 188,900.00 9,445.00 199,400.00 9,970.00

II. BAHAN
Dolken Kayu Dia. 8 - 400 cm Batang 1.250 37,384.00 46,730.00 44,284.00 55,355.00 44,184.00 55,230.00 48,484.00 60,605.00
Kayu Meranti M3 0.180 5,602,500.00 1,008,450.00 6,446,300.00 1,160,334.00 6,348,300.00 1,142,694.00 5,868,800.00 1,056,384.00
Paku Biasa Kg 0.080 35,200.00 2,816.00 42,900.00 3,432.00 42,000.00 3,360.00 45,100.00 3,608.00
Besi Strip Kg 1.100 28,300.00 31,130.00 32,500.00 35,750.00 32,000.00 35,200.00 33,700.00 37,070.00
Semen Portland Kg 35.000 1,875.52 65,643.20 1,934.13 67,694.55 2,073.96 72,588.60 2,444.40 85,554.00
Pasir Pasang 3 0.150 410,300.00 61,545.00 457,700.00 68,655.00 452,200.00 67,830.00 471,400.00 70,710.00
M
Pasir Beton 3 0.100 732,600.00 73,260.00 827,300.00 82,730.00 816,300.00 81,630.00 854,800.00 85,480.00
M
Koral Beton M3 0.150 820,500.00 123,075.00 941,000.00 141,150.00 927,000.00 139,050.00 976,000.00 146,400.00
Bata merah Buah 30.000 1,239.00 37,170.00 2,096.60 62,898.00 2,112.00 63,360.00 2,172.00 65,160.00
Seng Plat BJLS 20 Lbr 0.250 92,700.00 23,175.00 106,300.00 26,575.00 104,700.00 26,175.00 110,300.00 27,575.00
Jendela Nako Buah 0.200 370,400.00 74,080.00 424,800.00 84,960.00 418,500.00 83,700.00 440,600.00 88,120.00
Kaca Polos M2 0.080 228,600.00 18,288.00 262,200.00 20,976.00 258,300.00 20,664.00 271,900.00 21,752.00
Kunci Tanam Buah 0.150 161,800.00 24,270.00 185,600.00 27,840.00 182,800.00 27,420.00 192,500.00 28,875.00
Plywood 4 mm Lembar 0.060 78,500.00 4,710.00 90,000.00 5,400.00 88,700.00 5,322.00 93,400.00 5,604.00

Jumlah Harga Per-Satuan Pekerjaan 2,410,277.20 2,702,979.55 2,699,588.60 2,707,157.00


Over Head Dan Keuntungan 15 % 361,541.58 405,446.93 404,938.29 406,073.55
Total Harga Per-Satuan Pekerjaan 2,771,818.78 3,108,426.48 3,104,526.89 3,113,230.55

Jenis Pekerjaan : Pembuatan Gudang Semen Dan Peralatan (PerMen 28/PRT/M/2016)


Kuantitas Pekerjaan : M2
Produksi Harian / Jam : Harian

Zona I Zona II Zona III Zona IV


No Uraian Satuan Indeks Harga Jumlah Harga Jumlah Harga Jumlah Harga Jumlah
Satuan Harga Satuan Harga Satuan Harga Satuan Harga

I. UPAH
Pekerja OH 1.000 137,800.00 137,800.00 146,100.00 146,100.00 148,800.00 148,800.00 157,100.00 157,100.00
Tukang Kayu OH 2.000 159,000.00 318,000.00 168,500.00 337,000.00 171,700.00 343,400.00 181,300.00 362,600.00
Kepala Tukang OH 0.200 164,300.00 32,860.00 174,200.00 34,840.00 177,400.00 35,480.00 187,300.00 37,460.00
Mandor OH 0.050 174,900.00 8,745.00 185,400.00 9,270.00 188,900.00 9,445.00 199,400.00 9,970.00

II. BAHAN
Dolken Kayu Dia. 8 - 400 cm Batang 1.700 37,384.00 63,552.80 44,284.00 75,282.80 44,184.00 75,112.80 48,484.00 82,422.80
Kayu meranti M3 0.210 5,602,500.00 1,176,525.00 6,944,320.00 1,458,307.20 6,846,320.00 1,437,727.20 7,189,320.00 1,509,757.20
Paku Biasa Kg 0.300 35,200.00 10,560.00 42,900.00 12,870.00 42,000.00 12,600.00 45,100.00 13,530.00
Semen portland Kg 10.500 1,875.52 19,692.96 1,934.13 20,308.37 2,073.96 21,776.58 2,444.40 25,666.20
Pasir Pasang 3 0.030 410,300.00 12,309.00 457,700.00 13,731.00 452,200.00 13,566.00 471,400.00 14,142.00
M
Koral Beton M3 0.050 820,500.00 41,025.00 941,000.00 47,050.00 927,000.00 46,350.00 976,000.00 48,800.00
Seng Gelombang BJLS 32 Lembar 1.500 140,700.00 211,050.00 161,400.00 242,100.00 159,000.00 238,500.00 167,400.00 251,100.00
Seng Plat Lembar 0.250 188,700.00 47,175.00 216,400.00 54,100.00 213,200.00 53,300.00 224,500.00 56,125.00

Jumlah Harga Per-Satuan Pekerjaan 2,079,294.76 2,450,959.37 2,436,057.58 2,568,673.20


Over Head Dan Keuntungan 15 % 311,894.21 367,643.90 365,408.64 385,300.98
Total Harga Per-Satuan Pekerjaan 2,391,188.97 2,818,603.27 2,801,466.22 2,953,974.18

Halaman 25
II. ANALISA HARGA SATUAN KEGIATAN PEKERJAAN (HSKP)
KABUPATEN KUTAI TIMUR PROVINSI KALIMANTAN TIMUR
TAHUN ANGGARAN 2019

Jenis Pekerjaan : Pembuatan Rumah Jaga/Konstruksi Kayu (PerMen 28/PRT/M/2016)


Kuantitas Pekerjaan : M2
Produksi Harian / Jam : Harian

Zona I Zona II Zona III Zona IV


No Uraian Satuan Indeks Harga Jumlah Harga Jumlah Harga Jumlah Harga Jumlah
Satuan Harga Satuan Harga Satuan Harga Satuan Harga

I. UPAH
Pekerja OH 1.000 137,800.00 137,800.00 146,100.00 146,100.00 148,800.00 148,800.00 157,100.00 157,100.00
Tukang Kayu OH 1.500 159,000.00 238,500.00 168,500.00 252,750.00 171,700.00 257,550.00 181,300.00 271,950.00
Kepala Tukang OH 0.150 164,300.00 24,645.00 174,200.00 26,130.00 177,400.00 26,610.00 187,300.00 28,095.00
Mandor OH 0.050 174,900.00 8,745.00 185,400.00 9,270.00 188,900.00 9,445.00 199,400.00 9,970.00

II. BAHAN
Dolken Kayu Dia. 8 - 400 cm Batang 3.000 37,384.00 112,152.00 44,284.00 132,852.00 44,184.00 132,552.00 48,484.00 145,452.00
Kayu meranti M3 0.276 5,602,500.00 1,546,290.00 6,446,300.00 1,779,178.80 6,348,300.00 1,752,130.80 6,691,300.00 1,846,798.80
Paku Biasa Kg 0.700 35,200.00 24,640.00 42,900.00 30,030.00 42,000.00 29,400.00 45,100.00 31,570.00
Seng Gelombang BJLS 30 Lembar 1.500 140,700.00 211,050.00 161,400.00 242,100.00 159,000.00 238,500.00 167,400.00 251,100.00

Jumlah Harga Per-Satuan Pekerjaan 2,303,822.00 2,618,410.80 2,594,987.80 2,742,035.80


Over Head Dan Keuntungan 15 % 345,573.30 392,761.62 389,248.17 411,305.37
Total Harga Per-Satuan Pekerjaan 2,649,395.30 3,011,172.42 2,984,235.97 3,153,341.17

Jenis Pekerjaan : Membersihkan Lapangan Dan Perataan (PerMen 28/PRT/M/2016)


Kuantitas Pekerjaan : M2
Produksi Harian / Jam : Harian

Zona I Zona II Zona III Zona IV


No Uraian Satuan Indeks Harga Jumlah Harga Jumlah Harga Jumlah Harga Jumlah
Satuan Harga Satuan Harga Satuan Harga Satuan Harga

I. UPAH
Pekerja OH 0.100 137,800.00 13,780.00 146,100.00 14,610.00 148,800.00 14,880.00 157,100.00 15,710.00
Mandor OH 0.050 174,900.00 8,745.00 185,400.00 9,270.00 188,900.00 9,445.00 199,400.00 9,970.00

II. BAHAN

Jumlah Harga Per-Satuan Pekerjaan 22,525.00 23,880.00 24,325.00 25,680.00


Over Head Dan Keuntungan 15 % 3,378.75 3,582.00 3,648.75 3,852.00
Total Harga Per-Satuan Pekerjaan 25,903.75 27,462.00 27,973.75 29,532.00

Halaman 26
II. ANALISA HARGA SATUAN KEGIATAN PEKERJAAN (HSKP)
KABUPATEN KUTAI TIMUR PROVINSI KALIMANTAN TIMUR
TAHUN ANGGARAN 2019

Jenis Pekerjaan : Pembuatan Bedeng Buruh (PerMen 28/PRT/M/2016)


Kuantitas Pekerjaan : M2
Produksi Harian / Jam : Harian

Zona I Zona II Zona III Zona IV


No Uraian Satuan Indeks Harga Jumlah Harga Jumlah Harga Jumlah Harga Jumlah
Satuan Harga Satuan Harga Satuan Harga Satuan Harga

I. UPAH
Pekerja OH 1.000 137,800.00 137,800.00 146,100.00 146,100.00 148,800.00 148,800.00 157,100.00 157,100.00
Tukang Kayu OH 2.000 159,000.00 318,000.00 168,500.00 337,000.00 171,700.00 343,400.00 181,300.00 362,600.00
Kepala Tukang OH 0.200 164,300.00 32,860.00 174,200.00 34,840.00 177,400.00 35,480.00 187,300.00 37,460.00
Mandor OH 0.050 174,900.00 8,745.00 185,400.00 9,270.00 188,900.00 9,445.00 199,400.00 9,970.00

II. BAHAN
Dolken Kayu Dia. 8 - 400 cm Batang 1.250 37,384.00 46,730.00 44,284.00 55,355.00 44,184.00 55,230.00 48,484.00 60,605.00
Kayu meranti M3 0.186 5,602,500.00 1,042,065.00 6,446,300.00 1,199,011.80 6,348,300.00 1,180,783.80 6,691,300.00 1,244,581.80
Paku Biasa Kg 0.300 35,200.00 10,560.00 42,900.00 12,870.00 42,000.00 12,600.00 45,100.00 13,530.00
Semen portland Kg 18.000 1,875.52 33,759.36 1,934.13 34,814.34 2,073.96 37,331.28 2,444.40 43,999.20
Pasir Beton M3 0.030 732,600.00 21,978.00 827,300.00 24,819.00 816,300.00 24,489.00 854,800.00 25,644.00
Koral Beton 3 0.050 820,500.00 41,025.00 941,000.00 47,050.00 927,000.00 46,350.00 976,000.00 48,800.00
M
Seng Gelombang BJLS 32 Lembar 1.500 140,700.00 211,050.00 161,400.00 242,100.00 159,000.00 238,500.00 167,400.00 251,100.00
Plywood 4 mm Lembar 1.350 78,500.00 105,975.00 90,000.00 121,500.00 88,700.00 119,745.00 93,400.00 126,090.00

Jumlah Harga Per-Satuan Pekerjaan 2,010,547.36 2,264,730.14 2,252,154.08 2,381,480.00


Over Head Dan Keuntungan 15 % 301,582.10 339,709.52 337,823.11 357,222.00
Total Harga Per-Satuan Pekerjaan 2,312,129.46 2,604,439.66 2,589,977.19 2,738,702.00

Jenis Pekerjaan : Pembuatan Bak Adukan Ukuran (40 x 50 x 20) cm (PerMen 28/PRT/M/2016)
Kuantitas Pekerjaan : M2
Produksi Harian / Jam : Harian

Zona I Zona II Zona III Zona IV


No Uraian Satuan Indeks Harga Jumlah Harga Jumlah Harga Jumlah Harga Jumlah
Satuan Harga Satuan Harga Satuan Harga Satuan Harga

I. UPAH
Tukang Kayu OH 0.300 159,000.00 47,700.00 168,500.00 50,550.00 171,700.00 51,510.00 181,300.00 54,390.00
Mandor OH 0.030 174,900.00 5,247.00 185,400.00 5,562.00 188,900.00 5,667.00 199,400.00 5,982.00

II. BAHAN
Kayu terentang/meranti M3 0.036 5,602,500.00 201,690.00 6,446,300.00 232,066.80 6,348,300.00 228,538.80 6,691,300.00 240,886.80
Paku biasa Kg 0.080 35,200.00 2,816.00 42,900.00 3,432.00 42,000.00 3,360.00 45,100.00 3,608.00

Jumlah Harga Per-Satuan Pekerjaan 257,453.00 291,610.80 289,075.80 304,866.80


Over Head Dan Keuntungan 15 % 38,617.95 43,741.62 43,361.37 45,730.02
Total Harga Per-Satuan Pekerjaan 296,070.95 335,352.42 332,437.17 350,596.82

Jenis Pekerjaan : Pembuatan Stegger / perancah dari Bambu (PerMen 28/PRT/M/2016)


Kuantitas Pekerjaan : M2
Produksi Harian / Jam : Harian

Zona I Zona II Zona III Zona IV


No Uraian Satuan Indeks Harga Jumlah Harga Jumlah Harga Jumlah Harga Jumlah
Satuan Harga Satuan Harga Satuan Harga Satuan Harga

I. UPAH
Pekerja OH 1.000 137,800.00 137,800.00 146,100.00 146,100.00 148,800.00 148,800.00 157,100.00 157,100.00
Tukang Kayu OH 2.000 159,000.00 318,000.00 168,500.00 337,000.00 171,700.00 343,400.00 181,300.00 362,600.00
Kepala Tukang OH 0.200 164,300.00 32,860.00 174,200.00 34,840.00 177,400.00 35,480.00 187,300.00 37,460.00
Mandor OH 0.050 174,900.00 8,745.00 185,400.00 9,270.00 188,900.00 9,445.00 199,400.00 9,970.00

II. BAHAN
Bambu dia. 6 - 8/600 cm Batang 1.250 25,492.40 31,865.50 28,992.40 36,240.50 28,592.40 35,740.50 30,092.40 37,615.50
Tali ijuk Kg 0.186 48,100.00 8,946.60 55,200.00 10,267.20 54,300.00 10,099.80 57,200.00 10,639.20

Jumlah Harga Per-Satuan Pekerjaan 538,217.10 573,717.70 582,965.30 615,384.70


Over Head Dan Keuntungan 15 % 80,732.57 86,057.66 87,444.80 92,307.71
Total Harga Per-Satuan Pekerjaan 618,949.67 659,775.36 670,410.10 707,692.41

Halaman 27
II. ANALISA HARGA SATUAN KEGIATAN PEKERJAAN (HSKP)
KABUPATEN KUTAI TIMUR PROVINSI KALIMANTAN TIMUR
TAHUN ANGGARAN 2019

II.2 ANALISA PERHITUNGAN HARGA SATUAN PEKERJAAN TANAH UNTUK KONSTRUKSI BANGUNAN GEDUNG DAN PERUMAHAN

Penetapan Indeks Harga Satuan Pekerjaan Tanah

3 3
- Menggali 1 m Tanah Biasa Sedalam 1 Meter M
3 3
- Menggali 1 m Tanah Biasa Sedalam 2 Meter M
3 3
- Menggali 1 m Tanah Biasa Sedalam 3 Meter M
3 3
- Menggali 1 m Tanah Keras Sedalam 1 Meter M
3 3
- Menggali 1 m Tanah Cadas Sedalam 1 Meter M
3 3
- Menggali 1 m Tanah Lumpur Sedalam 1 Meter M
3 3
- Mengerjakan 1 m Stripping Tebing Sedalam 1 Meter M
3 3
- Membuang 1 m Tanah Sejauh 15 Meter M
3 3
- Mengurug Kembali 1 m Galian M
3 3
- Memadatkan 1 m Tanah (per 20 cm) M
3 3
- Mengurug 1 m Pasir Urug M
3 3
- Memasang 1 m Lapisan Pudel Campuran 1KP : 3PP : 7TL M
3 3
- Memasang 1 m Lapisan Pudel Campuran 1KP : 5TL M
2 3
- Memasang 1 m Lapisan Ijuk Tebal 10 cm M
3 3
- Mengurug 1 m Sirtu Padat Untuk Peninggian Lantai Bangu M

Halaman 29
II. ANALISA HARGA SATUAN KEGIATAN PEKERJAAN (HSKP)
KABUPATEN KUTAI TIMUR PROVINSI KALIMANTAN TIMUR
TAHUN ANGGARAN 2019

II.3 ANALISA PERHITUNGAN HARGA SATUAN PEKERJAAN PONDASI UNTUK KONSTRUKSI BANGUNAN GEDUNG DAN PERUMAHAN

Penetapan Indeks Harga Satuan Pekerjaan Pondasi

- Memasang 1 m3 Pondasi Batu Belah, campuran 1 PC : 3 PP M3


3
- Memasang 1 m Pondasi Batu Belah, campuran 1 PC : 4 PP M3
- Memasang 1 m3 Pondasi Batu Belah, campuran 1 PC : 5 PP M3
- Memasang 1 m3 Pondasi Batu Belah, campuran 1 PC : 6 PP M3
- Memasang 1 m3 Pondasi Batu Belah, campuran 1 PC : 8 PP M3
- Memasang 1 m3 Pondasi Batu Belah, campuran 1 KP : 1 SM : 2 PP M3
- Memasang 1 m3 Pondasi Batu Belah, campuran 1 PC : 3 KP : 10 PP M3
3
- Memasang 1 m Pondasi Batu Belah, campuran 1/4 PC : 1 KP : 4 PP M3
3
- Memasang 1 m Batu Kosong (aanstamping) M3
3
- Memasang 1 m Pondasi Siklop 60% Beton Campuran 1 PC : 2 PB : 3 KR M3
3
- Memasang 1 m Pondasi Sumuran diameter 100 cm M3
1
- Pemancangan 1 M Mini Pile 25 x 25 cm Drop Hammer M1
- Pemancangan 1 M1 Mini Pile 25 x 25 cm Jack In Hammer M1
- Joint Sambungan Tiang Pancang Beton Joint
- 1 titik Pecah kepala pancang beton Titik

Halaman 37
II. ANALISA HARGA SATUAN KEGIATAN PEK ERJ AAN (HSKP)
KABUPATEN KUTAI TIMUR PROVINSI KALIMANTAN TIMUR
TAHUN ANGGARAN 2019

II.4 ANALISA PERHITUNGAN HARGA SATUAN PEKERJAAN DINDING UNTUK KONSTRUKSI BANGUNAN GEDUNG DAN PERUMAHAN

Penetapan Indeks Harga Satuan Pekerjaan Dinding

- Memasang 1 m2 Dinding Bata Merah Ukuran (7 x 8,5 x 18) cm Tebal 1 Bata, campuran spesi 1 PC : 2 PP M2
2
- Memasang 1 m Dinding Bata Merah Ukuran (7 x 8,5 x 18) cm Tebal 1 Bata, campuran spesi 1 PC : 3 PP M2
2
- Memasang 1 m Dinding Bata Merah Ukuran (7 x 8,5 x 18) cm Tebal 1 Bata, campuran spesi 1 PC : 4 PP M2
- Memasang 1 m2 Dinding Bata Merah Ukuran (7 x 8,5 x 18) cm Tebal 1 Bata, campuran spesi 1 PC : 5 PP M2
- Memasang 1 m2 Dinding Bata Merah Ukuran (7 x 8,5 x 18)cm Tebal 1 Bata, campuran spesi 1 PC : 6 PP M2
2
- Memasang 1 m Dinding Bata Merah Ukuran (7 x 8,5 x 18) cm Tebal 1 Bata, campuran spesi 1 PC : 3 KP : 10 M2
2
- Memasang 1 m Dinding Bata Merah Ukuran (7 x 8,5 x 18)cm Tebal 1/2 Bata, campuran spesi 1 PC : 2 PP M2
2
- Memasang 1 m Dinding Bata Merah Ukuran (7 x 8,5 x 18) cm Tebal 1/2 Bata, campuran spesi 1 PC : 3 PP M2
2
- Memasang 1 m Dinding Bata Merah Ukuran (7 x 8,5 x 18) cm Tebal 1/2 Bata, campuran spesi 1 PC : 4 PP M2
- Memasang 1 m2 Dinding Bata Merah Ukuran (7 x 8,5 x 18) cm Tebal 1/2 Bata, campuran spesi 1 PC : 5 PP M2
- Memasang 1 m2 Dinding Bata Merah Ukuran (7 x 8,5 x 18) cm Tebal 1/2 Bata, campuran spesi 1 PC : 6 PP M2
2
- Memasang 1 m Dinding Bata Merah Ukuran (7 x 8,5 x 18) cm Tebal 1/2 Bata, campuran spesi 1 PC : 8 PP M2
2
- Memasang 1 m Dinding Bata Merah Ukuran (7 x 8,5 x 18) cm Tebal 1/2 Bata, campuran spesi 1 PC : 3 KP : 1 M2
2
- Memasang 1 m Dinding Bata Merah Ukuran(7 x 8,5 x 18) cm Tebal 1/2 Bata, campuran spesi 1 KP : 1 SM : 1 M2
2
- Memasang 1 m Dinding Bata Merah Ukuran (7 x 8,5 x 18) cm Tebal 1/2 Bata, campuran spesi 1 KP : 1 SM : 2 M2
2
- Memasang 1 m Dinding HB 20, campuran spesi 1 PC : 3 PP M2
- Memasang 1 m2 Dinding HB 20, campuran spesi 1 PC : 4 PP M2
- Memasang 1 m2 Dinding HB 15, campuran spesi 1 PC : 3 PP M2
- Memasang 1 m2 Dinding HB 15, campuran spesi 1 PC : 4 PP M2
2
- Memasang 1 m Dinding HB 10, campuran spesi 1 PC : 3 PP M2
2
- Memasang 1 m Dinding HB 10, campuran spesi 1 PC : 4 PP M2
2
- Memasang 1 m Dinding Terawang (roster) Ukuran (12 x 11 x 24) cm, campuran spesi 1 PC : 3 PP M2
2
- Memasang 1 m Dinding Terawang (roster) Ukuran (12 x 11 x 24) cm, campuran spesi 1 PC : 4 PP M2
- Memasang 1 m2 Dinding Bata Berongga Ekspose Ukuran (5 x 11 x 24) cm, campuran spesi 1 PC : 3 PP M2
- Memasang 1 m2 Dinding Batako 1 PC : 3 pp Ukuran 10 x 20 x 40 cm M2
- Memasang Dinding 1 m2 Partisi Gypsum M2
- Memasang Rangka Hollow Dinding Partisi Gypsum M2
- Memasang Rangka Baja Ringan M2

Halaman 44
II. ANALISA HARGA SATUAN KEGIATAN PEK ERJ AAN (HSKP)
KABUPATEN KUTAI TIMUR PROVINSI KALIMANTAN TIMUR
TAHUN ANGGARAN 2019

II.5 ANALISA PERHITUNGAN HARGA SATUAN PEKERJAAN PLESTERAN UNTUK KONSTRUKSI BANGUNAN GEDUNG DAN PERUMAHAN

Penetapan Indeks Harga Satuan Pekerjaan Plesteran

2 2
- Membuat 1 m Plesteran 1 PC : 1 PP, Tebal 15 mm M
2 2
- Membuat 1 m Plesteran 1 PC : 2 PP, Tebal 15 mm M
2 2
- Membuat 1 m Plesteran 1 PC : 3 PP, Tebal 15 mm M
2 2
- Membuat 1 m Plesteran 1 PC : 4 PP, Tebal 15 mm M
2 2
- Membuat 1 m Plesteran 1 PC : 5 PP, Tebal 15 mm M
2 2
- Membuat 1 m Plesteran 1 PC : 6 PP, Tebal 15 mm M
2 2
- Membuat 1 m Plesteran 1 PC : 7 PP, Tebal 15 mm M
2 2
- Membuat 1 m Plesteran 1 PC : 8 PP, Tebal 15 mm M
2 2
- Membuat 1 m Plesteran 1 PC : 1/2 KP : 3 PP, Tebal 15 mm M
2 2
- Membuat 1 m Plesteran 1 PC : 2 KP : 8 PP, Tebal 15 mm M
2 2
- Membuat 1 m Plesteran 1 SM : 1 KP : 1 PP, Tebal 15 mm M
2 2
- Membuat 1 m Plesteran 1 SM : 1 KP : 2 PP, Tebal 15 mm M
2 2
- Membuat 1 m Plesteran 1 PC : 2 PP, Tebal 20 mm M
2 2
- Membuat 1 m Plesteran 1 PC : 3 PP, Tebal 20 mm M
2 2
- Membuat 1 m Plesteran 1 PC : 4 PP, Tebal 20 mm M
2 2
- Membuat 1 m Plesteran 1 PC : 5 PP, Tebal 20 mm M
2 2
- Membuat 1 m Plesteran 1 PC : 6 PP, Tebal 20 mm M
2 2
- Membuat 1 m Plesteran 1 SM : 1 KP : 2 PP, Tebal 20 mm M
2 2
- Membuat 1 m Berapen 1 PC : 5 PP, Tebal 15 mm M
2 2
- Membuat 1 m Plesteran Skoning 1 PC : 2 PP, Tebal 10 mm M
2 2
- Membuat 1 m Plesteran Granit 1 PC : 2 Granit, Tebal 10 mm M
2 2
- Membuat 1 m Plesteran Teraso 1 PC : 2 Batu Teraso, Tebal 10 mm M
2 2
- Membuat 1 m Plesteran Ciprat 1 PC : 2 PP M
2 2
- Membuat 1 m Finishing Siar Pasangan Dinding Bata Merah (= 20 m') M
2 2
- Membuat 1 m Finishing Siar Pasangan Dinding Conblock Ekspose (= 8 m') M
2 2
- Membuat 1 m Finishing Siar Pasangan Batu Kali Adukan 1 PC : 2 PP M
2 2
- Membuat 1 m Acian M

Halaman 55
II. ANALISA HARGA SATUAN KEGIATAN PEK ERJ AAN (HSKP)
KABUPATEN KUTAI TIMUR PROVINSI KALIMANTAN TIMUR
TAHUN ANGGARAN 2019

II.6 ANALISA PERHITUNGAN HARGA SATUAN PEKERJAAN KAYU UNTUK KONSTRUKSI BANGUNAN GEDUNG DAN PERUMAHAN

Penetapan Indeks Harga Satuan Pekerjaan Kayu

3 3
- Membuat dan Memasang 1 m Kusen Pintu dan Kusen Jendela, Kayu Kelas I M
3 3
- Membuat dan Memasang 1 m Kusen Pintu dan Kusen Jendela, Kayu Kelas II atau III M
2 2
- Membuat dan Memasang 1 m Pintu Klamp Standar, Kayu Kelas II M
2 2
- Membuat dan Memasang 1 m Pintu Klamp Sederhana, Kayu Kelas III M
2 2
- Membuat dan Memasang 1 m Daun Pintu Panel, Kayu Kelas I atau II M
2 2
- Membuat dan Memasang 1 m Pintu dan Jendela Kaca, Kayu Kelas I atau II M
2 2
- Membuat dan Memasang 1 m Pintu dan Jendela Jalusi, Kayu Kelas I atau II M
2 2
- Membuat 1 m Daun Pintu Kayu Lapis (plywood) Rangkap, Rangka Tertutup Kayu Kelas II (lebar sampa M
2 2
- Membuat 1 m Pintu Plywood Rangkap, Rangka Expose Kayu Kelas I atau II M
2 2
- Memasang 1 m Jalusi Kusen, Kayu Kelas I atau II M
2 2
- Memasang 1 m Teakwood Rangkap, Rangka Expose Kayu Kelas I M
2 2
- Memasang 1 m Teakwood Rangkap Lapis Formika, RangkaExspose kayu Kelas II M
3 3
- Memasang 1 m Konstruksi Kuda-kuda Konvensional, Kayu Kelas I, II dan III M
3 3
- Memasang 1 m Konstruksi Kuda-kuda Exspose, Kayu Kelas I M
3 3
- Memasang 1 m Konstruksi Gordeng, kayu Kelas II M
2 2
- Memasang 1 m Rangka Atap Genteng Keramik, Kayu Kelas II M
2 2
- Memasang 1 m Rangka Atap Genteng beton, Kayu Kelas II M
2 2
- Memasang 1 m Rangka Atap Sirap, Kayu Kelas II M
2 2
- Memasang 1 m Rangka Langit-langit (50 x 100) cm, Kayu Kelas II atau III M
2 2
- Memasang 1 m Rangka Langit-langit (60 x 60) cm, Kayu Kelas II atau III M
1 1
- Memasang 1 m Listplank Ukuran (3 x 20) cm, Kayu Kelas I atau Kelas II M
1 1
- Memasang 1 m Listplank Ukuran (3 x 30) cm, Kayu Kelas I atau Kelas II M
2 2
- Memasang 1 m Rangka Dinding Pemisah (60 x 120) cm, Kayu Kelas II atau III M
2 2
- Memasang 1 m Dinding Pemisah Teakwood Rangkap, Rangka Kayu Kelas II M
2 2
- Memasang 1 m Dinding Pemisah Plywood Rangkap, Rangka Kayu Kelas II M
2 2
- Memasang 1 m Dinidng Lambersiring dari Papan Kayu Kelas I M
2 2
- Memasang 1 m Dinidng Lambersiring dari Plywood Ukuran (120 x 240) cm M
2 2
- Memasang 1 m Dinidng Bilik, Rangka Kayu Kelas III atau IV M

Halaman 70
II. ANALISA HARGA SATUAN KEGIATAN PEK ERJ AAN (HSKP)
KABUPATEN KUTAI TIMUR PROVINSI KALIMANTAN TIMUR
TAHUN ANGGARAN 2019

II.7 ANALISA PERHITUNGAN HARGA SATUAN PEKERJAAN BETON UNTUK KONSTRUKSI BANGUNAN GEDUNG DAN PERUMAHAN

Penetapan Indeks Harga Satuan Pekerjaan Beton

- Membuat 1 m3 Beton Mutu fc = 7,4 Mpa (K 100), Slump (12 ± 2) cm, w/c = 0,87 M
3

3 3
- Membuat 1 m Beton Mutu fc = 9,8 Mpa (K 125), Slump (12 ± 2) cm, w/c = 0,78 M
3 3
- Membuat 1 m Beton Mutu fc = 12,2 Mpa (K 150), Slump (12 ± 2) cm, w/c = 0,72 M
- Membuat 1 m3 Lantai Kerja Beton Mutu fc = 7,4 Mpa (K 100), Slump (3 - 6) cm, w/c = 0,87 M
3

3 3
- Membuat 1 m Beton Mutu fc = 14,5 Mpa (K 175), Slump (12 ± 2) cm, w/c = 0,66 M
3 3
- Membuat 1 m Beton Mutu fc = 16,9 Mpa (K 200), Slump (12 ± 2) cm, w/c = 0,61 M
3 3
- Membuat 1 m Beton Mutu fc = 19,3 Mpa (K 225), Slump (12 ± 2) cm, w/c = 0,58 M
3 3
- Membuat 1 m Beton Mutu fc = 21,7 Mpa (K 250), Slump (12 ± 2) cm, w/c = 0,56 M
3 3
- Membuat 1 m Beton Mutu fc = 24,0 Mpa (K 275), Slump (12 ± 2) cm, w/c = 0,53 M
3 3
- Membuat 1 m Beton Mutu fc = 26,4 Mpa (K 300), Slump (12 ± 2) cm, w/c = 0,52 M
- Membuat 1 m3 Beton Mutu fc = 28,8 Mpa (K 325), Slump (12 ± 2) cm, w/c = 0,49 M
3

3 3
- Membuat 1 m Beton Mutu fc = 31,2 Mpa (K 350), Slump (12 ± 2) cm, w/c = 0,48 M
3 3
- Membuat 1 m Beton Kedap Air dengan Strorox - 100 M
1 1
- Membuat 1 m PVC Waterstop Lebar 150 mm M
1 1
- Membuat 1 m PVC Waterstop Lebar 200 mm M
1 1
- Membuat 1 m PVC Waterstop Lebar 230 mm - 320 mm M
- Pembesian 10 kg dengan Besi Polos atau Besi Ulir Kg
- Memasang 10 kg Kabel Presstressed Polos atau Strands Kg
- Memasang 10 kg Jaring Kawat Baja atau Wiremesh Kg
- Memasang 1 m2 Bekisting untuk Pondasi M
2

2 2
- Memasang 1 m Bekisting untuk Sloof M
2 2
- Memasang 1 m Bekisting untuk Kolom M
2 2
- Memasang 1 m Bekisting untuk Balok M
- Memasang 1 m2 Bekisting untuk Lantai M
2

2 2
- Memasang 1 m Bekisting untuk Dinding M
2 2
- Memasang 1 m Bekisting untuk Tangga M
2 2
- Memasang 1 m Jembatan untuk Pengecoran Beton M
3 3
- Membuat 1 m Pondasi Beton Bertulang (150 kg besi + bekisting) M
3 3
- Membuat 1 m Sloof Beton Bertulang (200 kg besi + bekisting) M
3 3
- Membuat 1 m Kolom Beton Bertulang (300 kg besi + bekisting) M
- Membuat 1 m3 Balok Beton Bertulang (200 kg besi + bekisting) M
3

3 3
- Membuat 1 m Plat Beton Bertulang (150 kg besi + bekisting) M
3 3
- Membuat 1 m Dinding Beton Bertulang (150 kg besi + bekisting) M
3 3
- Membuat 1 m Dinding Beton Bertulang (200 kg besi + bekisting) M
1 1
- Membuat 1 m Kolom Praktis Beton Bertulang (11 x 11) cm M
1 1
- Membuat 1 m Ring Balok Beton Bertulang (10 x 15) cm M

Halaman 83
II. ANALISA HARGA SATUAN KEGIATAN PEK ERJ AAN (HSKP)
KABUPATEN KUTAI TIMUR PROVINSI KALIMANTAN TIMUR
TAHUN ANGGARAN 2019

II.8 ANALISA PERHITUNGAN HARGA SATUAN PEKERJAAN PENUTUP ATAP UNTUK KONSTRUKSI BANGUNAN GEDUNG DAN PERUMAHAN

Penetapan Indeks Harga Satuan Pekerjaan Penutup Atap

2
- Pasang Atap Genteng Pelantong Kecil M
2
- Pasang Atap Genteng Kodok / Glazuur M
2
- Pasang Bubung Genteng Kodok Glazuur M
2
- Pasang Bubung Genteng Palentong Besar M
2
- Pasang Roof Light Fibreglass (180 x 90) cm M
2
- Pasang Atap Asbes Gelombang (2,50 x 0,92 m) x 5 mm M
2
- Pasang Atap Asbes Gelombang (2,25 x 0,92 m) x 5 mm M
2
- Pasang Atap Asbes Gelombang (2,00 x 0,92 m) x 5 mm M
2
- Pasang Atap Asbes Gelombang (1,80 x 0,92 m) x 5 mm M
2
- Pasang Atap Asbes Gelombang (3,00 x 1,05 m) x 4 mm M
2
- Pasang Atap Asbes Gelombang (2,70 x 1,05 m) x 4 mm M
2
- Pasang Atap Asbes Gelombang (2,40 x 1,05 m) x 4 mm M
2
- Pasang Atap Asbes Gelombang (2,10 x 1,05 m) x 4 mm M
2
- Pasang Atap Asbes Gelombang (1,50 x 1,05 m) x 4 mm M
2
- Pasang Atap Asbes Gelombang (3,00 x 1,08 m) x 6 mm M
2
- Pasang Atap Asbes Gelombang (2,70 x 1,08 m) x 6 mm M
2
- Pasang Atap Asbes Gelombang (2,40 x 1,08 m) x 6 mm M
2
- Pasang Atap Asbes Gelombang (2,10 x 1,08 m) x 6 mm M
2
- Pasang Atap Asbes Gelombang (1,80 x 1,08 m) x 6 mm M
1
- Pasang Bubung Stel Gelombang 0,92 m M
1
- Pasang Nok Stel Gelombang 1,05 m M
1
- Pasang Nok Stel Gelombang 1,08 m M
1
- Pasang Nok Paten 0,92 m M
1
- Pasang Nok Paten 1,05 m M
1
- Pasang Nok Paten 1,08 m M
1
- Pasang Nok Stel Rata 0,92 m M
1
- Pasang Nok Stel Rata 1,05 m M
2
- Pasang Atap Genteng Beton M
2
- Pasang Atap Genteng Metal M
2
- Pasang Atap Sirap M
1
- Pasang Nok Genteng Beton M
1
- Pasang Nok Genteng Metal M
2
- Pasang Nok Sirap M
2
- Pasang Atap Seng Gelombang M
2
- Pasang Atap Nok Seng M
2
- Pasang Atap Aluminium M
1
- Pasang Nok Aluminium M
2
- Pasang Aluminium Foill / Sisalation M
2
- Memasang 1 m2 Pasang Kuda-kuda baja ringan + reng untuk atap genteng metal M
2
- 1 m² Pasang Atap Kanopi Polycarbonat M
2
- 1 m² Pasang Rangka Atap Kanopi Hollow M

Halaman 103
II. ANALISA HARGA SATUAN KEGIATAN PEK ERJ AAN (HSKP)
KABUPATEN KUTAI TIMUR PROVINSI KALIMANTAN TIMUR
TAHUN ANGGARAN 2019

II.9 ANALISA PERHITUNGAN HARGA SATUAN PEKERJAAN LANGIT-LANGIT UNTUK KONSTRUKSI BANGUNAN GEDUNG DAN PERUMAHAN

Penetapan Indeks Harga Satuan Pekerjaan Langit-langit

- Memasang 1 m2 Langit-langit Asbes Semen, tebal 4 mm, 5 mm dan 6 mm M


2

2 2
- Memasang 1 m Langit-langit Akustik ukuran (30 x 30) cm M
2 2
- Memasang 1 m Langit-langit Akustik ukuran (30 x 60) cm M
- Memasang 1 m2 Langit-langit Akustik ukuran (60 x 120) cm M
2

2 2
- Memasang 1 m Langit-langit Triplek ukuran (120 x 240) cm, tebal 3 mm, 4mm dan 6 mm M
2 2
- Memasang 1 m Langit-langit Lambersiring Kayu, tebal 9 mm M
2 2
- Memasang 1 m Langit-langit Gypsum Board ukuran (120 x 240 x 9) mm, tebal 9 mm M
1 2
- Memasang 1 m List Plafond Gypsum Profil M
2 2
- Memasang 1 m Langit-langit Akustik ukuran (60 x 120) cm + Rangka Aluminium M
1 2
- Memasang 1 m List Langit-langit Kayu Profil M
2 2
- Memasang 1 m Rangka Plafond Metal M
- Memasang 1 m2 Spandrill M
2

2
- Memasang 1 m2 Rangka Plafond Kalsiboard M
2
- Memasang 1 m2 Plafond PVC Shunda Plafond M
1
- Memasang 1 m’ List Shadow Line M
- Memasang 1 m2 Rangka Metal M
1

2 1
- Memasang 1 m Rangka Kayu M

Halaman 121
II. ANALISA HARGA SATUAN KEGIATAN PEK ERJ AAN (HSKP)
KABUPATEN KUTAI TIMUR PROVINSI KALIMANTAN TIMUR
TAHUN ANGGARAN 2019

II.10 ANALISA PERHITUNGAN HARGA SATUAN PEKERJAAN SANITASI UNTUK KONSTRUKSI BANGUNAN GEDUNG DAN PERUMAHAN

Standar Nasional (SNI) Tentang Tata Cara Perhitungan Harga Satuan Pekerjaan Langit-langit untuk Konstruksi Bangunan Gedung dan Perumahan adalah Revisi dari SNI
Analisa Biaya Konstruksi (ABK) Bangunan Gedung dan Perumahan Pekerjaan Langit-langit

Penetapan Indeks Harga Satuan Pekerjaan Sanitasi

- Memasang Kloset Duduk / Jongkok BH


- Memasang Kloset Jonkok Porselen BH
- Memasang Kloset Jonkok Teraso BH
- Memasang Urinoir BH
- Memasang Wastafel BH
- Memasang Bak Mandi Teraso Volume 0,3 m3 BH
- Memasang Bak Mandi Fibreglass Volume 0,3 m3 BH
- Memasang Bak Mandi Batu Bata Volume 0,3 m3 BH
- Memasang Badkip Porselen BH
- Membuat Bak Beton Volume 1 m3 Air BH
- Memasang Bak Fibreglass Volume 1 m3 Air BH
1
- Memasang Pipa Penyalur Air Limbah Jenis Pipa Tanah, diameter 15 cm M
1
- Memasang Pipa Penyalur Air Limbah Jenis Pipa Tanah, diameter 20 cm M
1
- Memasang Pipa Beton, diameter 15 cm - 20 cm M
1
- Memasang Pipa Beton, diameter 30 cm - 100 cm M
- Memasang Bak Kontrol Pasangan Batu Bata ukuran (30 x 30) cm tinggi 35 BH
- Memasang Bak Kontrol Pasangan Batu Bata ukuran (45 x 45) cm tinggi 50 BH
- Memasang Bak Kontrol Pasangan Batu Bata ukuran (60 x 60) cm tinggi 60 BH
1
- Memasang Pipa Galvanis Diameter 1/2" M
1
- Memasang Pipa Galvanis Diameter 3/4" M
1
- Memasang Pipa Galvanis Diameter 1" M
1
- Memasang Pipa Galvanis Diameter 1 1/2" M
1
- Memasang Pipa Galvanis Diameter 3" M
1
- Memasang Pipa Galvanis Diameter 4" M
1
- Memasang Pipa PVC Type AW Diameter 1/2" M
1
- Memasang Pipa PVC Type AW Diameter 3/4" M
1
- Memasang Pipa PVC Type AW Diameter 1" M
1
- Memasang Pipa PVC Type AW Diameter 1 1/2" M
1
- Memasang Pipa PVC Type AW Diameter 2" M
1
- Memasang Pipa PVC Type AW Diameter 2 1/2" M
1
- Memasang Pipa PVC Type AW Diameter 3" M
1
- Memasang Pipa PVC Type AW Diameter 4" M
- Memasang Bak Cuci Piring Stainless Steel BH
- Memasang Bak Cuci Piring Teraso BH
- Memasang Kran Diameter 3/4" atau 1/2" BH
- Memasang Floor Drain BH

Halaman 130
II. ANALISA HARGA SATUAN KEGIATAN PEK ERJ AAN (HSKP)
KABUPATEN KUTAI TIMUR PROVINSI KALIMANTAN TIMUR
TAHUN ANGGARAN 2019

II.11 ANALISA PERHITUNGAN HARGA SATUAN PEKERJAAN BESI DAN ALUMINIUM UNTUK KONSTRUKSI BANGUNAN GEDUNG DAN PERUMAHAN

Penetapan Indeks Harga Satuan Pekerjaan Besi dan Aluminium

- Memasang 1 kg Besi Profil Kg


- Memasang 1 kg Rangka Kuda-kuda Baja IWF Kg
- Mengerjakan 100 kg Pekerjaan Perakitan Kg
- Membuat 1 m2 Pintu Besi Plat Baja Tebal 2 mm Rangkap, Rangka Baja Siku M2
- Mengerjakan 10 cm Pengelasan dengan Las Listrik M2
- Membuat 1 m2 Rangka Jendela Besi Scuare Tube (25 x 5) cm M2
2
- Memasang 1 m Pintu Rolling Door Besi M2
2
- Memasang 1 m Pintu Lipat (Folding Door) M2
2
- Memasang 1 m Sunscreen Alluminium M2
- Memasang 1 m2 Rolling Door Alluminium M2
- Memasang 1 m1 Kusen Pintu Alluminium M1
2
- Memasang 1 m Pintu Alluminium Strip lebar 8 cm M2
2
- Memasang 1 m Pintu Kaca Rangka Alluminium M2
2
- Memasang 1 m Venetions Blinds dan Vertical Blinds M2
2
- Memasang 1 m Teralis Besi Strip (2 x 3) mm M2
2
- Memasang 1 m Kawat Nyamuk M2
- Memasang 1 m2 Jendela Nako & Tralis M2
- Memasang 1 m1 Talang Datar/Jurai Seng BJLS 28 lebar 90 cm M1
1
- Memasang 1 m Talang 1/2 Lingkaran D-15 cm, Seng Plat BJLS 30 lebar 45 cm M1
- Memasang 1 m2 Aluminium Compiste Panel (ACP) M2
- Memasang 1 m2 Rangka Aluminium Compiste Panel (ACP) M2
- Memasang 1 m2 Rangka GRC M2
- Memasang 1 m2 list Plank M1
- Memasang 1 m2 Rangka GRC M2

Halaman 145
II. ANALISA HARGA SATUAN KEGIATAN PEK ERJ AAN (HSKP)
KABUPATEN KUTAI TIMUR PROVINSI KALIMANTAN TIMUR
TAHUN ANGGARAN 2019

II.12 ANALISA PERHITUNGAN HARGA SATUAN PEKERJAAN KUNCI DAN KACA UNTUK KONSTRUKSI BANGUNAN GEDUNG DAN PERUMAHAN

Standar Nasional (SNI) Tentang Tata Cara Perhitungan Harga Satuan Pekerjaan Besi dan Aluminium untuk Konstruksi Bangunan Gedung dan Perumahan adalah Revisi dari R
Tata Cara Perhitungan Harga Satuan Pekerjaan Besi dan Aluminium

Penetapan Indeks Harga Satuan Pekerjaan Kunci dan Kaca

- Pasang Kunci Tanam Antik BH


- Pasang Kunci Tanam Biasa BH
- Pasang Kunci Tanam Kamar Mandi BH
- Pasang Kunci Silinder BH
- Pasang Engsel Pintu BH
- Pasang Engsel Jendela Kupu-kupu BH
- Pasang Engsel Angin BH
- Pasang Spring Knip BH
- Pasang Kait Angin BH
- Pasang Door Closer BH
- Pasang Kunci Selot BH
- Pasang Pegangan Pintu/Door Holder BH
- Pasang Door Stop BH
- Pasang Rel Pintu Dorong BH
- Pasang Kunci Lemari BH
- Pasang Kaca, tebal 3 mm M2
- Pasang Kaca, tebal 5 mm M2
- Pasang Kaca, tebal 8 mm M2
- Pasang Kaca Buram, tebal 12 mm M2
- Pasang Kaca Cermin, tebal 5 mm M2
- Pasang Kaca Cermin, tebal 6 mm M2
- Pasang Kaca Cermin, tebal 8 mm M2
- Pasang Kaca "Wireglass" tebal 5 mm M2
- Pasang Kaca Patri, tebal 5 mm M2
- Pasang 1 m2 Kaca Stop Sol tebal 5 mm M2
- Pasang 1 m2 Kaca Tempered 12 mm M2
- Pasang 1 m2 Kaca Rayban tebal 5 mm M2
- Pasang 1 m1 Kaca Sand Blast tebal 5 mm M1
- Pasang Engsel Casement Buah

Halaman 155
II. ANALISA HARGA SATUAN KEGIATAN PEK ERJ AAN (HSKP)
KABUPATEN KUTAI TIMUR PROVINSI KALIMANTAN TIMUR
TAHUN ANGGARAN 2019

II.13 ANALISA PERHITUNGAN HARGA SATUAN PEKERJAAN PENUTUP LANTAI DAN DINDING UNTUK KONSTRUKSI BANGUNAN GEDUNG DAN PERUMAHAN

Penetapan Indeks Harga Satuan Pekerjaan Penutup Lantai dan Dinding

2 2
- Memasang 1 m Lantai Ubin PC Abu-abu ukuran (40 x 40) cm M
2 2
- Memasang 1 m Lantai Ubin PC Abu-abu ukuran (30 x 30) cm M
2 2
- Memasang 1 m Lantai Ubin PC Abu-abu ukuran (20 x 20) cm M
2 2
- Memasang 1 m Lantai Ubin Warna ukuran (40 x 40) cm M
2 2
- Memasang 1 m Lantai Ubin Warna ukuran (30 x 30) cm M
2 2
- Memasang 1 m Lantai Ubin Warna ukuran (20 x 20) cm M
2 2
- Memasang 1 m Lantai Ubin Teraso ukuran (40 x 40) cm M
2 2
- Memasang 1 m Lantai Ubin Teraso ukuran (30 x 30) cm M
2 2
- Memasang 1 m Lantai Ubin Granit ukuran (40 x 40) cm M
2 2
- Memasang 1 m Lantai Ubin Granit ukuran (30 x 30) cm M
2 2
- Memasang 1 m Lantai Ubin Teralux ukuran (40 x 40) cm M
2 2
- Memasang 1 m Lantai Ubin Teralux ukuran (30 x 30) cm M
2 2
- Memasang 1 m Lantai Ubin Teralux Marmer ukuran (60 x 60) cm M
2 2
- Memasang 1 m Lantai Ubin Teralux Marmer ukuran (40 x 40) cm M
2 2
- Memasang 1 m Lantai Ubin Teralux Marmer ukuran (30 x 30) cm M
1 1
- Memasang 1 m Plint Ubin PC Abu-abu ukuran (15 x 20) cm M
1 1
- Memasang 1 m Plint Ubin PC Abu-abu ukuran (10 x 30) cm M
1 1
- Memasang 1 m Plint Ubin PC Abu-abu ukuran (10 x 40) cm M
1 1
- Memasang 1 m Plint Ubin PC Warna ukuran (10 x 20) cm M
1 1
- Memasang 1 m Plint Ubin PC Warna ukuran (10 x 30) cm M
1 1
- Memasang 1 m Plint Ubin PC Warna ukuran (10 x 40) cm M
1 1
- Memasang 1 m Plint Ubin Teraso ukuran (10 x 30) cm M
1 1
- Memasang 1 m Plint Ubin Teraso ukuran (10 x 40) cm M
1 1
- Memasang 1 m Plint Ubin Granit ukuran (10 x 40) cm M
1 1
- Memasang 1 m Plint Ubin Granit ukuran (10 x 30) cm M
1 1
- Memasang 1 m Plint Ubin Teralux Kerang ukuran (10 x 40) cm M
1 1
- Memasang 1 m Plint Ubin Teralux Kerang ukuran (10 x 30) cm M
1 1
- Memasang 1 m Plint Ubin Teralux Marmer ukuran (10 x 60) cm M
1 1
- Memasang 1 m Plint Ubin Teralux Marmer ukuran (10 x 40) cm M
1 1
- Memasang 1 m Plint Ubin Teralux Marmer ukuran (10 x 30) cm M
2 2
- Memasang 1 m Lantai Teraso Cor Ditempat, Tebal 3 cm M
2 2
- Memasang 1 m Lantai Keramik Artistik ukuran (10 x 20) cm M
2 2
- Memasang 1 m Lantai Keramik Artistik ukuran (10 x 10) cm atau (5 x 20) cm M
2 2
- Memasang 1 m Lantai Keramik ukuran (33 x 33) cm M
2 2
- Memasang 1 m Lantai Keramik ukuran (30 x 30) cm M
2 2
- Memasang 1 m Lantai Keramik ukuran (20 x 20) cm M
2 2
- Memasang 1 m Lantai Keramik ukuran (10 x 33) cm, Variasi/Border M
2 2
- Memasang 1 m Lantai Mosaik ukuran (30 x 30) cm, campuran spesi 1 PC ; 3 PP M
1 1
- Memasang 1 m Plint Keramik ukuran (10 x 20) cm M
1 1
- Memasang 1 m Plint Keramik ukuran (10 x 10) cm M
1 1
- Memasang 1 m Plint Keramik ukuran (5 x 20) cm M
1 1
- Memasang 1 m Plint Internal Cove Artistik ukuran (5 x 5 x 20) cm M

Halaman 168
II. ANALISA HARGA SATUAN KEGIATAN PEK ERJ AAN (HSKP)
KABUPATEN KUTAI TIMUR PROVINSI KALIMANTAN TIMUR
TAHUN ANGGARAN 2019

2 2
- Memasang 1 m Lantai Marmer ukuran (100 x 100) cm M
2 2
- Memasang 1 m Lantai Karpet M
2 2
- Memasang 1 m Underlayer M
2 2
- Memasang 1 m Lantai Parquet M
2 2
- Memasang 1 m Lantai Kayu (gymfloor) M
2 2
- Memasang 1 m Dinding Porselen ukuran (11 x 11) cm M
2 2
- Memasang 1 m Dinding Porselen ukuran (10 x 20) cm M
2 2
- Memasang 1 m Dinding Porselen ukuran (20 x 20) cm M
2 2
- Memasang 1 m Dinding Keramik Artistik ukuran (10 x 20) cm M
2 2
- Memasang 1 m Dinding Keramik Artistik ukuran (5 x 20) cm M
2 2
- Memasang 1 m Dinding Keramik ukuran (10 x 20) cm M
2 2
- Memasang 1 m Dinding Keramik ukuran (20 x 20) cm M
2 2
- Memasang 1 m Dinding Marmer ukuran (100 x 100) cm M
2 2
- Memasang 1 m Dinding Bata Pelapis ukuran (3 x 7 x 24)cm M
2 2
- Memasang 1 m Dinding Batu Paras M
2 2
- Memasang 1 m Dinding Batu Tempel Hitam M
2 2
- Memasang 1 m Lantai Vinyl ukuran (30 x 30) cm KL I M
2 2
- Memasang 1 m Wallpaper, lebar 50 cm M
2 2
- Memasang 1 m Floor Hardener M
1 1
- Memasang 1 m Plint Vinyl Karet ukuran (15 x 30) cm dengan Perekat M
1 1
- Memasang 1 m Plint Vinyl Kayu Kelas II ukuran (2 x 10) cm M
2 2
- Memasang Lantai 1 m Granite 60 x 60 cm M
2 2
- Memasang Lantai 1 m Granite 100 x 100 cm M
2 2
- Memasang Dinding 1 m Keramik 30 x 60 cm M
2 2
- Memasang Dinding 1 m Keramik 25 x 45 cm M
2
- Memasang Dinding 1 m2 Partisi Gypsum M

Halaman 169
II. ANALISA HARGA SATUAN KEGIATAN PEK ERJ AAN (HSKP)
KABUPATEN KUTAI TIMUR PROVINSI KALIMANTAN TIMUR
TAHUN ANGGARAN 2019

II. 14 ANALISA PERHITUNGAN HARGA SATUAN PEKERJAAN PENGECATAN UNTUK KONSTRUKSI BANGUNAN GEDUNG DAN PERUMAHAN

Standar Nasional (SNI) Tentang Tata Cara Perhitungan Harga Satuan Pekerjaan Penutup Lantai dan Dinding untuk Konstruksi Bangunan Gedung dan Perumahan adala
Tata Cara Perhitungan Harga Satuan Pekerjaan Lantai untuk Bangunan Rumah dan Gedung

Penetapan Indeks Harga Satuan Pekerjaan Pengecetan

2
- Mengikis/Mengerok Permukaan Cat Tembok Lama M
2
- Mencuci Bidang Permukaan Tembok yang Pernah di Cat M
2
- Mengerok Karat Cat Lama Permukaan Baja dengan Cara Manual M
2
- Pengecetan Bidang Kayu Lama M
2
- Pengecetan Bidang Kayu Baru (1 lapis plamir), 1 Lapis Cat Dasar, 2 Lapis Cat Penutup M
2
- Pengecetan Bidang Kayu Baru (1 lapis plamir), 1 Lapis Cat Dasar, 3 Lapis Cat Penutup M
2
- Pelaburan Bidang Kayu dengan Teak Oil M
2
- Pelaburan Bidang Kayu dengan Politur M
2
- Pelaburan Bidang Kayu dengan Cat Residu dan Ter M
2
- Pelaburan Bidang Kayu dengan Vernis M
2
- Pengecetan Tembok Baru (1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup) M
2
- Pengecetan Tembok Lama (1 lapis cat dasar, 2 lapis cat penutup) M
2
- Melabur Tembok dengan Kalkarium M
2
- Melabur Tembok dengan Kapur Sirih M
2
- Melabur Tembok dengan Kapur Sirih (untuk pemeliharaan) M
2
- Pemasangan Wallpaper M
2
- Pengecetan Permukaan Baja dengan Meni Besi M
2
- Pengecetan Permukaan Baja dengan Meni Besi dan Perancah M
2
- Pengecetan Permukaan Baja Lapis Seng (Galbani), Secara Manual Sistem 4 Lapis Cat Konvensional dengan tebal 200 u M
2
- Pengecetan Permukaan Baja Lapis Seng (Galbani), Secara Manual Sistem 3 Lapis Cat Konvensional dengan tebal 200 u M
2
- Pengecetan Permukaan Baja Lapis Seng (Galbani), Secara Manual Sistem 1 Lapis Cat Mutakhir dengan tebal 200 um M
2
- Pengecetan Permukaan Baja Lapis Seng (Galbani) Secara Semprot (airless), Secara Manual Sistem 1 Lapis Cat Mutakhi M

Halaman 199
II. ANALISA HARGA SATUAN KEGIATAN PEK ERJ AAN (HSKP)
KABUPATEN KUTAI TIMUR PROVINSI KALIMANTAN TIMUR
TAHUN ANGGARAN 2019

II. 14 ANALISA PERHITUNGAN HARGA SATUAN PEKERJAAN PENGECATAN UNTUK KONSTRUKSI BANGUNAN GEDUNG DAN PERUMAHAN

Standar Nasional (SNI) Tentang Tata Cara Perhitungan Harga Satuan Pekerjaan Penutup Lantai dan Dinding untuk Konstruksi Bangunan Gedung dan Perumahan adalah Revisi
Tata Cara Perhitungan Harga Satuan Pekerjaan Lantai untuk Bangunan Rumah dan Gedung

Penetapan Indeks Harga Satuan Pekerjaan Pengecetan

- Memasang Instalasi Penerangan & Stop Kontak buah


- Memasang Lampu TL 2 x 36 watt (TKO) buah
- Memasang Lampu Baret 40 watt buah
- Memasang Lampu PL 2 x 9 watt buah
- Memasang Stop Kontak 3(phase) buah
- Memasang Saklat hotel Brocco buah
- Memasang Saklar Tunggal buah
- Pelaburan Bidang Kayu dengan Politur buah
- Memasang Saklar Dobel buah
- Memasang Box Panel Pembagi buah
- Memasang Air Condition Split 1/2 PK buah
- Memasang Air Condition Split 3/4 PK buah
- Memasang Air Condition Split 1 PK buah
- Memasang Air Condition Split 1,5 PK buah

Halaman 209
III. REKAPITULASI ANALISA HARGA SATUAN KEGIATAN PEKERJAAN (HSKP)
BIDANG KONSTRUKSI KEBINA MARGA-AN
TAHUN ANGGARA 2019

HARGA SATUAN KEGIATAN PEKERJAAN


NO JENIS PEKERJAAN SAT.
Zone I Zone II Zone III Zone IV

III.1. HARGA SATUAN PEKERJAAN DRAINASE


- Galian untuk Drainase, Saluran dan Saluran Air M³ 70,599.25 75,541.20 76,247.19 81,189.14
- Pasangan Batu dengan Mortar untuk Saluran M³ 1,862,922.69 1,993,327.28 2,011,956.51 2,142,361.10
- Gorong-gorong Pipa Beton Bertulang, diameter dalam 35 - 45 cm M¹ 1,285,772.68 1,375,776.77 1,388,634.49 1,478,638.58
- Gorong-gorong Pipa Beton Bertulang, diameter 55 - 65 cm M¹ 1,800,248.91 1,926,266.33 1,944,268.82 2,070,286.25
- Gorong-gorong Pipa Beton Bertulang, diameter dalam 75 - 85 cm M¹ 3,629,859.34 3,883,949.49 3,920,248.08 4,174,338.24
- Gorong-gorong Pipa Beton Bertulang, diameter dalam 95 - 105 cm M¹ 4,648,066.57 4,973,431.23 5,019,911.90 5,345,276.56
- Gorong2 Pipa Baja Bergelombang Ton 18,595,542.98 19,897,230.99 20,083,186.42 21,384,874.42
- Gorong-gorong Pipa Beton Tanpa Tulangan diameter dalam 30 cm M¹ 457,497.55 489,522.38 494,097.36 526,122.19
- Timbunan Porous atau Bahan Penyaring (Filter) M³ 667,974.31 714,732.52 721,412.26 768,170.46
- Anyaman Filter Plastik M² 64,262.00 68,760.34 69,402.96 73,901.30
- Pipa Berlubang Banyak (Perforated Pipe) untuk Pekerjaan Drainase Bawah Permukaan M¹ 132,298.90 141,559.83 142,882.81 152,143.74
- - -
III.2. HARGA SATUAN PEKERJAAN TANAH - - -
- Galian Biasa M³ 183,487.11 196,331.21 198,166.08 211,010.18
- Galian batu lunak M³ 284,850.09 304,789.59 307,638.09 327,577.60
- Galian Batu M³ 334,017.88 357,399.14 360,739.32 384,120.57
- Galian Struktur dengan Kedalaman 0 - 2 M M³ 124,681.96 133,409.70 134,656.52 143,384.25
- Galian Struktur dengan Kedalaman 2 - 4 M M³ 612,397.91 655,265.77 661,389.75 704,257.60
- Galian Struktur Kedalaman 4 m - 6 m M³ 535,306.33 572,777.77 578,130.83 615,602.27
- Galian Perkerasan Beraspal dengan Cold Milling Machine M³ 318,462.97 340,755.38 343,940.01 366,232.41
- Galian Perkerasan Beraspal tanpa Cold Milling Machine M³ 1,288,694.65 1,378,903.28 1,391,790.23 1,481,998.85
- Biaya Tambahan untuk jarak angkut bahan galian buangan dengan jarak melebihi 5 Km M³/Km 26,169.75 28,001.63 28,263.32 30,095.21
- Timbunan Biasa Dari Sumber Galian M³ 580,737.08 621,388.67 627,196.05 667,847.64
- Timbunan Biasa Dari Galian M³ 318,461.72 340,754.04 343,938.66 366,230.98
- Timbunan Pilihan (diukur diatas bak truk) M³ 504,731.10 540,062.28 545,109.59 580,440.77
- Timbunan Pilihan (diukur dengan rod dan plate) M³ 354,311.10 379,112.88 382,655.99 407,457.77
- Timbunan Pilihan dari galian M³ 337,885.60 361,537.59 364,916.45 388,568.44
- Penyiapan Badan Jalan M² 940.54 1,006.38 1,015.79 1,081.63
- Galian perkerasan berbutir M³ 231,566.52 247,776.18 250,091.84 266,301.50
- Galian perkerasan beton M³ 268,661.67 287,467.99 290,154.61 308,960.93
- Timbunan biasa dari sumber galian M³ 454,057.29 485,841.30 490,381.87 522,165.88
- Pembersihan dan pengupasan lahan M² 294,120.68 314,709.13 317,650.34 338,238.79
- Pemotongan pohon pilihan diameter 15 - 30 cm Buah 1,032,022.65 1,104,264.24 1,114,584.46 1,186,826.05
- Pemotongan pohon pilihan diameter 30 - 50 cm Buah 1,215,433.41 1,300,513.75 1,312,668.08 1,397,748.42
- Pemotongan pohon pilihan diameter 50 - 75 cm Buah 1,339,615.09 1,433,388.15 1,446,784.30 1,540,557.36
- Pemotongan pohon pilihan diameter > 75 cm Buah 1,671,844.16 1,788,873.25 1,805,591.69 1,922,620.78
- Geotekstil Filler untuk Drainase Bawah Permukaan (Kelas 2) M² 62,543.53 66,921.58 67,547.01 71,925.06
- Geotekstile Separator Kelas 1 M² 91,293.53 97,684.08 98,597.01 104,987.56
- Geotekstile Separator Kelas 2 M² 91,293.53 97,684.08 98,597.01 104,987.56
- Geotekstile Separator Kelas 3 M² 91,293.53 97,684.08 98,597.01 104,987.56
- Geotekstile Stabilisator kelas 1 M² 91,293.53 97,684.08 98,597.01 104,987.56
- - -
III.3. HARGA SATUAN PEKERJAAN PELEBARAN PERKERASAN & BAHU JALAN - - -
- Lapisan Pondasi Agregat Kelas A M³ 1,453,896.63 1,555,669.39 1,570,208.36 1,671,981.12
- Lapisan Pondasi Agregat Kelas B M³ 1,272,283.94 1,361,343.82 1,374,066.66 1,463,126.53
- Semen untuk Pondasi Semen Tanah Ton 2,492,312.87 2,666,774.77 2,691,697.90 2,866,159.80
- Lapis Pondasi Semen Tanah M³ 492,430.25 526,900.37 531,824.68 566,294.79
- Agregat Penutup BURTU M³ 8,543,683.12 9,141,740.94 9,227,177.77 9,825,235.59
- Bahan Aspal untuk Pekerjaan Pelaburan Liter 23,376.51 25,012.87 25,246.63 26,882.99
- Lapis Resap Pengikat Liter 20,578.42 22,018.91 22,224.70 23,665.19
- Lapis Pondasi Agregat kelas S M² 233,764.33 250,127.83 252,465.47 268,828.97
- - -
III.4. HARGA SATUAN PEKERJAAN PERKERASAN BERBUTIR DAN PERKERASAN BETON SEMEN - - -
- Lapisan Pondasi Agregat Kelas A M³ 1,454,804.28 1,556,640.58 1,571,188.63 1,673,024.93
- Lapisan Pondasi Agregat Kelas B M³ 1,272,646.64 1,361,731.91 1,374,458.38 1,463,543.64
- Lapis Permukaan Agregat Tanpa Penutup Aspal M³ 965,241.93 1,032,808.86 1,042,461.28 1,110,028.21
- Lapis Pondasi Semen Tanah M³ 490,955.38 525,322.26 530,231.81 564,598.69
- Semen untuk Pondasi Semen Tanah Ton 2,492,312.87 2,666,774.77 2,691,697.90 2,866,159.80
- Perkerasan Beton Semen dengan Anyaman Tulangan Tunggal M³ 3,309,765.44 3,541,449.02 3,574,546.67 3,806,230.26
- Lapis Pondasi bawah Beton Kurus M³ 1,843,339.80 1,972,373.58 1,990,806.98 2,119,840.77
- Lapis Pondasi Atas Bersemen (Cement Treated Base) (CTB) M³ 1,121,480.15 1,199,983.76 1,211,198.56 1,289,702.17
- Lapis Pondasi Agregat Semen Kelas B (Cement Treated Sub Base) (CTSB) M³ 1,178,272.37 1,260,751.44 1,272,534.16 1,355,013.23
- Lapis Pondasi Agregat Tanpa Penutup Aspal M³ 965,241.93 1,032,808.86 1,042,461.28 1,110,028.21
- Perkerasan Beton Semen M³ 2,837,925.65 3,036,580.44 3,064,959.70 3,263,614.49
- Perkerasan Jalan Beton M³ 2,115,679.03 2,263,776.57 2,284,933.36 2,433,030.89

Halaman 217
III.5. HARGA SATUAN PEKERJAAN PERKERASAN ASPAL - - -
- Lapis Resap Pengikat - Aspal Cair Liter 19,957.20 21,354.20 21,553.78 22,950.78
- Lapis Pengikat - Aspal Cair Liter 21,303.89 22,795.16 23,008.20 24,499.47
- Agregat Penutup BURTU M² 137,055.54 146,649.43 148,019.99 157,613.87
- Agregat Penutup BURDA M² 210,421.19 225,150.67 227,254.88 241,984.37
- Latasir Kelas A (SS-A) Ton 3,037,346.47 3,249,960.72 3,280,334.19 3,492,948.44
- Latasir Kelas B (SS-B) Ton 2,375,031.95 2,541,284.19 2,565,034.51 2,731,286.74
- Lataston Lapis Aus (HRS-WC) Ton 2,679,211.45 2,866,756.25 2,893,548.37 3,081,093.17
- Lataston Lapis Aus Perata (HRS-WCL) Ton 2,679,211.45 2,866,756.25 2,893,548.37 3,081,093.17
- Lataston Lapis Pondasi (HRS-Base) Ton 2,373,124.32 2,539,243.02 2,562,974.26 2,729,092.97
- Laston Lapis Aus (AC-WC) Ton 2,418,714.86 2,588,024.90 2,612,212.05 2,781,522.09
- Laston Lapis Aus Perata (AC-WCL) Ton 2,373,124.32 2,539,243.02 2,562,974.26 2,729,092.97
- Laston Lapis Antara (AC-BC) Ton 2,303,939.83 2,465,215.62 2,488,255.02 2,649,530.80
- Laston Lapis Pondasi (AC-Base) Ton 2,102,545.32 2,249,723.50 2,270,748.95 2,417,927.12
- Campuran Beraspal Dingin untuk Pelapisan M³ 4,863,266.73 5,203,695.40 5,252,328.07 5,592,756.74
- Lapis Permukaan Penetrasi Macadam M³ 3,534,731.23 3,782,162.42 3,817,509.73 4,064,940.91
- Lapis Pondasi/Perata Penetrasi Macadam M³ 3,745,150.94 4,007,311.51 4,044,763.02 4,306,923.58
- Lapis Resap Pengikat - Aspal Emulsi Liter 22,554.00 24,132.78 24,358.32 25,937.10
- - -
III.6. HARGA SATUAN PEKERJAAN STRUKTUR (BETON) - - -
- Beton Mutu Tinggi f’c = 45 Mpa M³ 4,538,184.53 4,855,857.44 4,901,239.29 5,218,912.21
- Beton Mutu Sedang fc’=35 Mpa M³ 4,373,188.89 4,679,312.11 4,723,044.00 5,029,167.22
- Beton Mutu Sedang fc’=30 MPa lantai jembatan M³ 4,280,609.80 4,580,252.49 4,623,058.59 4,922,701.27
- Beton Mutu Sedang fc’= 25 Mpa M³ 3,302,260.93 3,533,419.20 3,566,441.81 3,797,600.07
- Beton Mutu Sedang fc’= 20 MPa M³ 3,226,607.91 3,452,470.46 3,484,736.54 3,710,599.10
- Beton Mutu Rendah fc’= 15 MPa M³ 2,323,176.39 2,485,798.73 2,509,030.50 2,671,652.84
- Beton Siklop fc’=15 Mpa M³ 1,980,022.18 2,118,623.73 2,138,423.95 2,277,025.51
- Beton mutu rendah fc’= 10 Mpa M³ 2,056,139.83 2,200,069.62 2,220,631.02 2,364,560.80
- Baja Tulangan U 24 Polos Kg 34,012.69 36,393.58 36,733.70 39,114.59
- Baja Tulangan U 32 Polos Kg 34,815.68 37,252.77 37,600.93 40,038.03
- Baja Tulangan U 32 Ulir Kg 34,815.68 37,252.77 37,600.93 40,038.03
- Baja Tulangan U 39 Ulir Kg 33,470.18 35,813.09 36,147.79 38,490.70
- Pasangan Batu Batu M³ 2,104,246.34 2,251,543.59 2,272,586.05 2,419,883.30
- Pasangan Batu Kosong Yang Diisi Adukan M³ 1,557,971.35 1,667,029.35 1,682,609.06 1,791,667.06
- Pasangan Batu Kosong M³ 931,123.38 996,302.01 1,005,613.25 1,070,791.88

Halaman 218
IV. REKAPITULASI ANALISA HARGA SATUAN KEGIATAN PEKERJAAN (HSKP)
PEMERINTAH KABUPATEN KUTAI TIMUR UNTUK TAHUN ANGGARAN 2019
BIDANG KONSTRUKSI SUMBER DAYA AIR

HARGA SATUAN KEGIATAN PEKERJAAN


NO JENIS PEKERJAAN SAT.
Zone I Zone II Zone III Zone IV
IV.1. PEKERJAAN TANAH
2
- Pembersihan Dan Stripping/ Kosrekan M 1,530.72 1,637.87 1,653.17 1,760.32
- Tebas Tebang Berupa Memotong Dan Membersihkan 2
M 19,425.59
Lokasi Dari Tanaman / Tumbuhan Diameter < 15 cm 20,785.39 20,979.64 22,339.43

- Cabut 1 Tunggul Pohon Tanaman Keras Diameter > 15 cm 2


M 103,036.68 110,249.25 111,279.62 118,492.18
Dan Membuang Sisa Tunggul Kayu Dan Akar - Akar nya

- Uitset Trase Saluran M¹ 2,344.42 2,508.53 2,531.98 2,696.09


- Pasang 1 m' Profil Melintang Galian Tanah M¹ 309,879.21 331,570.76 334,669.55 356,361.09
- Galian Tanah Biasa Sedalam < 1 m M¹ 81,977.75 87,716.19 88,535.97 94,274.41
- Galian Tanah Biasa Sedalam s.d 2 m M¹ 161,751.91 173,074.55 174,692.07 186,014.70
- Galian Tanah Biasa Sedalam s.d 3 m M¹ 49,674.25 53,151.45 53,648.19 57,125.39

- Galian Tanah Biasa Dengan Kedalaman > 3 m, tambahan


M¹ 83,501.50 89,346.61 90,181.62 96,026.73
Koefisien Untuk Setiap Penambahan Kedalaman 1 m

- Galian Tanah Berbatu Sedalam < 1 m, M¹ 34,466.62 36,879.28 37,223.94 39,636.61


- Galian Tanah Berbatu Sedalam s.d 2 m, M¹ 38,267.89 40,946.65 41,329.32 44,008.08
REKAPITULASI SELANJUTNYA DAPAT DILIHAT PADA
BUKU AHSP 2013

HALAMAN 219
IV.2. PEKERJAAN TANAH SECARA MANUAL

ANALISA HARGA SATUAN PEKERJAAN

JENIS PEKERJAAN : Pembersihan Dan Stripping/ Kosrekan


SATUAN PEMBAYARAN : M2

HARGA JUMLAH
NO KOMPONEN KODE SATUAN KOEFISIEN SATUAN HARGA
(Rp.) (Rp.)

A TENAGA KERJA
1 Pekerja L.01 OH 0.0600 19,685.71 1,181.14
2 Mandor L.04 OH 0.0060 24,985.71 149.91

JUMLAH HARGA TENAGA 1,331.06


B BAHAN

JUMLAH HARGA BAHAN 0.00


C PERALATAN
JUMLAH HARGA PERALATAN 0.00

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 1,331.06


E OVERHEAD & PROFIT 10,00 % x D 199.66
F HARGA SATUAN PEKERJAAN ( D + E ) 1,530.72

ANALISA HARGA SATUAN PEKERJAAN

JENIS PEKERJAAN : Tebas Tebang Berupa Memotong Dan Membersihkan Lokasi Dari Tanaman
Tumbuhan Diameter < 15 cm
SATUAN PEMBAYARAN : M2

HARGA JUMLAH
NO KOMPONEN KODE SATUAN KOEFISIEN SATUAN HARGA
(Rp.) (Rp.)

A TENAGA
1 Pekerja L.01 OH 0.0750 19,685.71 1,476.43
2 Mandor L.04 OH 0.0075 24,985.71 187.39

JUMLAH HARGA TENAGA 1,663.82


B BAHAN
1 Minyak Tanah M.130 L 1.0800 14,100.00 15,228.00

JUMLAH HARGA BAHAN 15,228.00


C PERALATAN

JUMLAH HARGA PERALATAN 0.00

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 16,891.82


E OVERHEAD & PROFIT 15,00 % x D 2,533.77
F HARGA SATUAN PEKERJAAN ( D + E ) 19,425.59

HALAMAN220
ANALISA HARGA SATUAN PEKERJAAN

JENIS PEKERJAAN : Cabut 1 Tunggul Pohon Tanaman Keras Diameter > 15 cm Dan Membuang Sisa
Tunggul Kayu Dan Akar - Akar nya
SATUAN PEMBAYARAN : M2

HARGA JUMLAH
NO KOMPONEN KODE SATUAN KOEFISIEN SATUAN HARGA
(Rp.) (Rp.)

A TENAGA
1 Pekerja L.01 OH 0.2000 19,685.71 3,937.14
2 Mandor L.04 OH 0.0020 24,985.71 49.97

JUMLAH HARGA TENAGA 3,987.11


B BAHAN

JUMLAH HARGA BAHAN 0.00


C PERALATAN
1 Chainsaw E.06 Sewa Hari 0.1000 856,100.00 85,610.00

JUMLAH HARGA PERALATAN 85,610.00

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 89,597.11


E OVERHEAD & PROFIT 15,00 % x D 13,439.57
F HARGA SATUAN PEKERJAAN ( D + E ) 103,036.68

ANALISA HARGA SATUAN PEKERJAAN

JENIS PEKERJAAN : Uitset Trase Saluran


SATUAN PEMBAYARAN : M1

HARGA JUMLAH
NO KOMPONEN KODE SATUAN KOEFISIEN SATUAN HARGA
(Rp.) (Rp.)

A TENAGA
1 Pekerja L.01 OH 0.0120 19,685.71 236.23
2 Pembantu Juru Ukur L.06 OH 0.0040 22,714.29 90.86
3 Juru Ukur L.05 OH 0.0040 24,985.71 99.94

JUMLAH HARGA TENAGA 427.03


B BAHAN

JUMLAH HARGA BAHAN 0.00


C PERALATAN
1 Waterpass E.50 Sewa Hari 0.004 151,100.00 604.40
2 Theodolit E.41 Sewa Hari 0.004 251,800.00 1,007.20

JUMLAH HARGA PERALATAN 1,611.60

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 2,038.63


E OVERHEAD & PROFIT 15,00 % x D 305.79
F HARGA SATUAN PEKERJAAN ( D + E ) 2,344.42

HALAMAN221
ANALISA HARGA SATUAN PEKERJAAN

JENIS PEKERJAAN : Pasang 1 m' Profil Melintang Galian Tanah


SATUAN PEMBAYARAN : M1

HARGA JUMLAH
NO KOMPONEN KODE SATUAN KOEFISIEN SATUAN HARGA
(Rp.) (Rp.)

A TENAGA
1 Pekerja L.01 OH 14.0000 19,685.71 275,600.00
2 Tukang Kayu L.02 OH 1.5000 22,714.29 34,071.43
3 Mandor L.04 OH 1.7500 24,985.71 43,725.00
3 Juru Ukur L.05 OH 1.7500 22,714.29 39,750.00
3 Pembantu Juru Ukur L.06 OH 1.7500 24,985.71 43,725.00

JUMLAH HARGA TENAGA 83,475.00


B BAHAN
1 Kasau 4/6 M.33d M3 0.0206 4,980,000.00 102,687.60
2 Papan 2/20 M.35e M3 0.0227 3,361,460.00 76,232.53
3 Paku M.65b M3 0.2205 29,300.00 6,460.65

JUMLAH HARGA BAHAN 185,380.78


C PERALATAN
1 Waterpass E.50 Sewa Hari 0.004 151,100.00 604.40

JUMLAH HARGA PERALATAN 604.40

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 269,460.18


E OVERHEAD & PROFIT 15,00 % x D 40,419.03
F HARGA SATUAN PEKERJAAN ( D + E ) 309,879.21

ANALISA HARGA SATUAN PEKERJAAN

JENIS PEKERJAAN : Galian Tanah Biasa Sedalam < 1 m


SATUAN PEMBAYARAN : M3

HARGA JUMLAH
NO KOMPONEN KODE SATUAN KOEFISIEN SATUAN HARGA
(Rp.) (Rp.)

A TENAGA
1 Pekerja L.01 OH 1.4000 19,685.71 27,560.00
2 Mandor L.04 OH 1.7500 24,985.71 43,725.00

JUMLAH HARGA TENAGA 71,285.00


B BAHAN

JUMLAH HARGA BAHAN 0.00


C PERALATAN

JUMLAH HARGA PERALATAN 0.00

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 71,285.00


E OVERHEAD & PROFIT 15,00 % x D 10,692.75
F HARGA SATUAN PEKERJAAN ( D + E ) 81,977.75

HALAMAN222
ANALISA HARGA SATUAN PEKERJAAN

JENIS PEKERJAAN : Galian Tanah Biasa Sedalam s.d 2 m


SATUAN PEMBAYARAN : M3

HARGA JUMLAH
NO KOMPONEN KODE SATUAN KOEFISIEN SATUAN HARGA
(Rp.) (Rp.)

A TENAGA
1 Pekerja L.01 OH 6.4615 19,685.71 127,200.03
2 Mandor L.04 OH 0.5385 24,985.71 13,453.81

JUMLAH HARGA TENAGA 140,653.84


B BAHAN

JUMLAH HARGA BAHAN 0.00


C PERALATAN

JUMLAH HARGA PERALATAN 0.00

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 140,653.84


E OVERHEAD & PROFIT 15,00 % x D 21,098.08
F HARGA SATUAN PEKERJAAN ( D + E ) 161,751.91

ANALISA HARGA SATUAN PEKERJAAN

JENIS PEKERJAAN : Galian Tanah Biasa Sedalam s.d 3 m


SATUAN PEMBAYARAN : M3

HARGA JUMLAH
NO KOMPONEN KODE SATUAN KOEFISIEN SATUAN HARGA
(Rp.) (Rp.)

A TENAGA
1 Pekerja L.01 OH 1.7500 19,685.71 34,450.00
2 Mandor L.04 OH 0.3500 24,985.71 8,745.00

JUMLAH HARGA TENAGA 43,195.00


B BAHAN

JUMLAH HARGA BAHAN 0.00


C PERALATAN

JUMLAH HARGA PERALATAN 0.00

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 43,195.00


E OVERHEAD & PROFIT 15,00 % x D 6,479.25
F HARGA SATUAN PEKERJAAN ( D + E ) 49,674.25

HALAMAN223
ANALISA HARGA SATUAN PEKERJAAN

JENIS PEKERJAAN : Galian Tanah Biasa Dengan Kedalaman > 3 m, tambahan Koefisien Untuk Setiap
Penambahan Kedalaman 1 m
SATUAN PEMBAYARAN : M3

HARGA JUMLAH
NO KOMPONEN KODE SATUAN KOEFISIEN SATUAN HARGA
(Rp.) (Rp.)

A TENAGA
1 Pekerja L.01 OH 2.8000 19,685.71 55,120.00
2 Mandor L.04 OH 0.7000 24,985.71 17,490.00

JUMLAH HARGA TENAGA 72,610.00


B BAHAN

JUMLAH HARGA BAHAN 0.00


C PERALATAN
JUMLAH HARGA PERALATAN 0.00

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 72,610.00


E OVERHEAD & PROFIT 15,00 % x D 10,891.50
F HARGA SATUAN PEKERJAAN ( D + E ) 83,501.50

ANALISA HARGA SATUAN PEKERJAAN

JENIS PEKERJAAN : Galian Tanah Berbatu Sedalam < 1 m,


SATUAN PEMBAYARAN : M3

HARGA JUMLAH
NO KOMPONEN KODE SATUAN KOEFISIEN SATUAN HARGA
(Rp.) (Rp.)

A TENAGA
1 Pekerja L.01 OH 1.3510 19,685.71 26,595.40
2 Mandor L.04 OH 0.1351 24,985.71 3,375.57

JUMLAH HARGA TENAGA 29,970.97


B BAHAN

JUMLAH HARGA BAHAN 0.00


C PERALATAN
1 Jack Hammer E.26 Sewa Hari 0.1500 44,300.00 6,645.00

JUMLAH HARGA PERALATAN 0.00

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 29,970.97


E OVERHEAD & PROFIT 15,00 % x D 4,495.65
F HARGA SATUAN PEKERJAAN ( D + E ) 34,466.62

HALAMAN224
ANALISA HARGA SATUAN PEKERJAAN

JENIS PEKERJAAN : Galian Tanah Berbatu Sedalam s.d 2 m,


SATUAN PEMBAYARAN : M3

HARGA JUMLAH
NO KOMPONEN KODE SATUAN KOEFISIEN SATUAN HARGA
(Rp.) (Rp.)

A TENAGA
1 Pekerja L.01 OH 1.5000 19,685.71 29,528.57
2 Mandor L.04 OH 0.1500 24,985.71 3,747.86

JUMLAH HARGA TENAGA 33,276.43


B BAHAN

JUMLAH HARGA BAHAN 0.00


C PERALATAN
1 Jack Hammer E.26 Sewa Hari 0.1500 44,300.00 6,645.00

JUMLAH HARGA PERALATAN 0.00

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 33,276.43


E OVERHEAD & PROFIT 15,00 % x D 4,991.46
F HARGA SATUAN PEKERJAAN ( D + E ) 38,267.89

HALAMAN225
III. REKAPITULASI ANALISA HARGA SATUAN KEGIATAN PEKERJAAN (HSKP)
PEMERINTAH KABUPATEN KUTAI TIMUR UNTUK TAHUN ANGGARAN 2019
BIDANG CETAK SAWAH

HARGA SATUAN KEGIATAN PEKERJAAN


N JENIS PEKERJAAN SAT.
Zone I Zone II Zone III Zone IV
O
1 : Galian Biasa M3 183,487.11 196,331.21 198,166.08 211,010.18
2 : Galian batu lunak M3 284,850.09 304,789.59 307,638.09 327,577.60
3 : Galian Batu M3 334,017.88 357,399.14 360,739.32 384,120.57
4 : Pembersihan dan pengupasan lahan/ Land Clearing HA 4,231,683.75 4,527,901.61 4,570,218.45 4,866,436.31
5 : Pembukaan / Penabangan pohon (diameter 15 - 30 cm) Buah 1,032,022.65 1,104,264.24 1,114,584.46 1,186,826.05
6 : Pembukaan / Penabangan pohon diameter 30 - 50 cm Buah 1,215,433.41 1,300,513.75 1,312,668.08 1,397,748.42
7 : Pembukaan / Penabangan pohon diameter 50 - 75 cm Buah 1,339,615.09 1,433,388.15 1,446,784.30 1,540,557.36
8 : Pembukaan / Penabangan pohon diameter > 75 cm Buah 1,671,844.16 1,788,873.25 1,805,591.69 1,922,620.78
9 : Pembuatan Jalan Usaha Tani M2 21,799.09 23,325.03 23,543.02 25,068.95
10 : Pembersihan dan striping/kosrekan Buah 1,530.72 1,637.87 1,653.17 1,760.32
11 : Pembuatan Galengan M 8,617.25 9,220.46 9,306.63 9,909.84

Catatan :
Jenis Pekerjaan mengacu pada buku CETAK SAWAH INDONESIA
Direktorat Perluasan dan Pengelolaan LaHAN,
Direktorat Jenderal Prasarana dan Sarana Pertanian, Kementerian Pertanian
###

Halaman 226
V.1. HARGA SATUAN PEKERJAAN CETAK SAWAH

ANALISA HARGA SATUAN PEKERJAAN

JENIS PEKERJAAN : Galian Biasa


SATUAN PEMBAYARAN : M3
HARGA JUMLAH
NO. KOMPONEN SATUAN PERKIRAAN SATUAN HARGA
KUANTITAS (Rp.) (Rp.)
A TENAGA
1 Pekerja (L01) Jam 0.0511 19,685.71 1,005.95
2 Mandor (L03) Jam 0.0256 24,985.71 147,73
JUMLAH HARGA TENAGA 1,005.95
B BAHAN

JUMLAH HARGA BAHAN 0.00


C PERALATAN
1 Excavator (E10) Jam 0.0256 800,700.00 20,458.07
2 Dump Truck (E08) Jam 0.3344 413,000.00 138,089.99
3 Alat Bantu Ls 1.0000 0.00
JUMLAH HARGA PERALATAN 158,548.06

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 159,554.01


E OVERHEAD & PROFIT 15,00 % x D 23,933.10
F HARGA SATUAN PEKERJAAN ( D + E ) 183,487.11
Note: 1SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
5 Alat Bantu menyesuaikan kebutuhan dan lokasi kegiatan.

Halaman 227
ANALISA HARGA SATUAN PEKERJAAN

JENIS PEKERJAAN : Galian batu lunak


SATUAN PEMBAYARAN : M3
HARGA JUMLAH
NO. KOMPONEN SATUAN PERKIRAAN SATUAN HARGA
KUANTITAS (Rp.) (Rp.)
A TENAGA
1. Pekerja (L01) Jam 0.4462 19,685.71 8,783.77
2. Mandor (L03) Jam 0.0558 24,985.71 1,394.20
JUMLAH HARGA TENAGA 10,177.97
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN
1. Compressor (E05) Jam 0.0558 225,600.00 12,583.67
2. Jack Hammer (E26) Jam 0.0558 44,300.00 2,471.00
3. Wheel Loader (E15) Jam 0.0558 625,500.00 34,889.56
4. Excavator (E10) Jam 0.0558 800,700.00 44,661.98
5 Dump Truck (E08) Jam 0.3460 413,000.00 142,911.56
6 Alat bantu Ls 1.0000 0.00
JUMLAH HARGA PERALATAN 237,517.76
D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 247,695.73
E. OVERHEAD & PROFIT 15,00 % x D 37,154.36
F HARGA SATUAN PEKERJAAN ( D + E ) 284,850.09
Note: 1SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
5 Alat Bantu menyesuaikan kebutuhan dan lokasi kegiatan.

Halaman 228
ANALISA HARGA SATUAN PEKERJAAN
JENIS PEKERJAAN : Galian Batu
SATUAN PEMBAYARAN : M3
HARGA JUMLAH
NO. KOMPONEN SATUAN PERKIRAAN SATUAN HARGA
KUANTITAS (Rp.) (Rp.)
A TENAGA
1 Pekerja (L01) Jam 0.5902 19,685.71 11,618.00
2 Mandor (L03) Jam 0.0738 24,985.71 1,843.24
JUMLAH HARGA TENAGA 13,461.24
B BAHAN

JUMLAH HARGA BAHAN 0.00


C PERALATAN
1 Compressor (E05) Jam 0.0738 225,600.00 16,642.92
2 Jack Hammer (E26) Jam 0.0738 44,300.00 3,268.09
3 Wheel Loader (E15) Jam 0.0738 625,500.00 46,144.25
4 Excavator (E10) Jam 0.0738 800,700.00 59,069.07
5 Dump Truck (E08) Jam 0.3677 413,000.00 151,864.76
6 Alat Bantu Ls 1.0000 0.00
JUMLAH HARGA PERALATAN 276,989.09
D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 290,450.33
E OVERHEAD & PROFIT 15,00 % x D 43,567.55
F HARGA SATUAN PEKERJAAN ( D + E ) 334,017.88
Note: 1SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
5 Alat Bantu menyesuaikan kebutuhan dan lokasi kegiatan.

Halaman 229
ANALISA HARGA SATUAN PEKERJAAN
JENIS PEKERJAAN : Pembersihan dan pengupasan lahan/ Land Clearing
SATUAN PEMBAYARAN : ha
HARGA JUMLAH
NO. KOMPONEN SATUAN PERKIRAAN SATUAN HARGA
KUANTITAS (Rp.) (Rp.)
A TENAGA
1. Pekerja (L01) hari 9.0000 19,685.71 177,171.43
2. Mandor (L03) hari 0.4500 24,985.71 11,243.57
JUMLAH HARGA TENAGA 188,415.00
B BAHAN
Bahan timbunan (M08) M3 1.2000 175,800.00 210,960.00
JUMLAH HARGA BAHAN 210,960.00
C PERALATAN
1 Buldozer hari 3.0000 1,091,700.00 3,275,100.00
2 Alat Bantu Ls 1.0000 5,250.00 5,250.00
JUMLAH HARGA PERALATAN 3,280,350.00

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 3,679,725.00


E. OVERHEAD & PROFIT 15,00 % x D 551,958.75
F. HARGA SATUAN PEKERJAAN ( D + E ) 4,231,683.75
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
5 Alat Bantu menyesuaikan kebutuhan dan lokasi kegiatan.

Halaman 230
ANALISA HARGA SATUAN PEKERJAAN

JENIS PEKERJAAN : Pembukaan / Penabangan pohon (diameter 15 - 30 cm)


SATUAN PEMBAYARAN : Buah
HARGA JUMLAH
NO. KOMPONEN SATUAN PERKIRAAN SATUAN HARGA
KUANTITAS (Rp.) (Rp.)
A TENAGA
1. Pekerja (L01) Jam 3.5000 19,685.71 68,900.00
2. Mandor (L03) Jam 0.3500 24,985.71 8,745.00

JUMLAH HARGA TENAGA 77,645.00


B BAHAN

JUMLAH HARGA BAHAN 0.00


C PERALATAN
1 Dump Truck (E08) Jam 0.1988 413,000.00 82,102.41
2 Chainsaw Jam 1.0000 856,100.00 856,100.00
3 Alat Bantu Ls 1.0000 0.00

JUMLAH HARGA PERALATAN 938,202.41

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 938,202.41


E. OVERHEAD & PROFIT 10,00 % x D 93,820.24
F. HARGA SATUAN PEKERJAAN ( D + E ) 1,032,022.65
Note: 1SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
5 Alat Bantu menyesuaikan kebutuhan dan lokasi kegiatan.

Halaman 231
ANALISA HARGA SATUAN PEKERJAAN

JENIS PEKERJAAN : Pembukaan / Penabangan pohon diameter 30 - 50 cm


SATUAN PEMBAYARAN : Buah
HARGA JUMLAH
NO. KOMPONEN SATUAN PERKIRAAN SATUAN HARGA
KUANTITAS (Rp.) (Rp.)
A TENAGA
1. Pekerja (L01) Jam 3.5000 19,685.71 68,900.00
2. Mandor (L03) Jam 0.3500 24,985.71 8,745.00
JUMLAH HARGA TENAGA 77,645.00
B BAHAN

JUMLAH HARGA BAHAN 0.00


C PERALATAN
1 Dump Truck (E08) Jam 0.2982 413,000.00 123,153.61
2 Chainsaw Jam 1.0000 856,100.00 856,100.00
3 Alat Bantu Ls 1.0000 0.00

JUMLAH HARGA PERALATAN 979,253.61

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 1,056,898.61


E. OVERHEAD & PROFIT 15,00 % x D 158,534.79
F. HARGA SATUAN PEKERJAAN ( D + E ) 1,215,433.41
Note: 1SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
5 Alat Bantu menyesuaikan kebutuhan dan lokasi kegiatan.

Halaman 232
ANALISA HARGA SATUAN PEKERJAAN

JENIS PEKERJAAN : Pembukaan / Penabangan pohon diameter 50 - 75 cm


SATUAN PEMBAYARAN : Buah
HARGA JUMLAH
NO. KOMPONEN SATUAN PERKIRAAN SATUAN HARGA
KUANTITAS (Rp.) (Rp.)
A TENAGA
1. Pekerja (L01) Jam 4.6667 19,685.71 91,866.67
2. Mandor (L03) Jam 0.4667 24,985.71 11,660.00

JUMLAH HARGA TENAGA 103,526.67


B BAHAN

JUMLAH HARGA BAHAN 0.00


C PERALATAN
1 Dump Truck (E08) Jam 0.4970 413,000.00 205,256.02
2 Chainsaw Jam 1.0000 856,100.00 856,100.00
3 Alat Bantu Ls 1.0000 0.00
JUMLAH HARGA PERALATAN 1,061,356.02

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 1,164,882.69


E. OVERHEAD & PROFIT 15,00 % x D 174,732.40
F. HARGA SATUAN PEKERJAAN ( D + E ) 1,339,615.09
Note: 1SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
5 Alat Bantu menyesuaikan kebutuhan dan lokasi kegiatan.

Halaman 233
ANALISA HARGA SATUAN PEKERJAAN

JENIS PEKERJAAN : Pembukaan / Penabangan pohon diameter > 75 cm


SATUAN PEMBAYARAN : Buah

HARGA JUMLAH
NO. KOMPONEN SATUAN PERKIRAAN SATUAN HARGA
KUANTITAS (Rp.) (Rp.)

A TENAGA

1. Pekerja (L01) Jam 3.5000 19,685.71 68,900.00


2. Mandor (L03) Jam 0.3500 24,985.71 8,745.00

JUMLAH HARGA TENAGA 77,645.00


B BAHAN

JUMLAH HARGA BAHAN 0.00


C PERALATAN
1 Dump Truck (E08) Jam 1.0843 413,000.00 447,831.33
2 Chainsaw Jam 1.0843 856,100.00 928,301.20
3 Alat Bantu Ls 1.0000 0.00

JUMLAH HARGA PERALATAN 1,376,132.53

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 1,453,777.53


E. OVERHEAD & PROFIT 15,00 % x D 218,066.63
F. HARGA SATUAN PEKERJAAN ( D + E ) 1,671,844.16
Note: 1SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
5 Alat Bantu menyesuaikan kebutuhan dan lokasi kegiatan.

Halaman 234
ANALISA HARGA SATUAN PEKERJAAN

JENIS PEKERJAAN : Pembuatan Jalan Usaha Tani


SATUAN PEMBAYARAN : M2
HARGA JUMLAH
NO. KOMPONEN SATUAN PERKIRAAN SATUAN HARGA
KUANTITAS (Rp.) (Rp.)

A TENAGA
1 Pekerja (L01) Jam 0.0545 19,685.71 1,072.95
2 Mandor (L03) Jam 0.0036 24,985.71 90.80
JUMLAH HARGA TENAGA 1,163.75
B BAHAN

JUMLAH HARGA BAHAN 0.00


C PERALATAN
1 Stamper Jam 0.0357 73,500.00 2,624.98
2 Bulldozer 100-150 HP Jam 0.0091 1,091,700.00 9,917.00
3 Alat Bantu Ls 1.0000 5,250.00 5,250.00
JUMLAH HARGA PERALATAN 17,791.98

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 18,955.73


E OVERHEAD & PROFIT 15,00 % x D 2,843.36
F HARGA SATUAN PEKERJAAN ( D + E ) 21,799.09
Note: 1SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
5 Alat Bantu menyesuaikan kebutuhan dan lokasi kegiatan.

Halaman 235
ANALISA HARGA SATUAN PEKERJAAN

JENIS PEKERJAAN : Pembersihan dan striping/kosrekan


SATUAN PEMBAYARAN : M2
HARGA JUMLAH
NO. KOMPONEN SATUAN PERKIRAAN SATUAN HARGA
KUANTITAS (Rp.) (Rp.)

A TENAGA
1 Pekerja (L01) hari 0.0600 19,685.71 1,181.14
2 Mandor (L03) hari 0.0060 24,985.71 149.91
JUMLAH HARGA TENAGA 1,331.06
B BAHAN

JUMLAH HARGA BAHAN 0.00


C PERALATAN

JUMLAH HARGA PERALATAN 0.00

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 1,331.06


E OVERHEAD & PROFIT 15,00 % x D 199.66
F HARGA SATUAN PEKERJAAN ( D + E ) 1,530.72
Note: 1SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
5 Alat Bantu menyesuaikan kebutuhan dan lokasi kegiatan.

Halaman 236
ANALISA HARGA SATUAN PEKERJAAN

JENIS PEKERJAAN : Pembuatan Galengan


SATUAN PEMBAYARAN :M

HARGA JUMLAH
NO. KOMPONEN SATUAN PERKIRAAN SATUAN HARGA
KUANTITAS (Rp.) (Rp.)

A TENAGA
1 Pekerja (L01) jam 0.1071 19,685.71 2,108.34
2 Mandor (L03) jam 0.0054 24,985.71 134.92
JUMLAH HARGA TENAGA 2,243.26
B BAHAN

JUMLAH HARGA BAHAN 0.00


C PERALATAN
1 Alat Bantu Ls 1.0000 5,250.00 5,250.00

JUMLAH HARGA PERALATAN 5,250.00

D JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 7,493.26


E OVERHEAD & PROFIT 15,00 % x D 1,123.99
F HARGA SATUAN PEKERJAAN ( D + E ) 8,617.25
Note: 1SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
5 Alat Bantu menyesuaikan kebutuhan dan lokasi kegiatan.

Halaman 237
Kabel NYA, Standar SNI.04-
8 3 x 1,5 mm2 ( @ 100 meter) roll 487,300.00 509,000.00 519,200.00 576,800.00
02698, SPLN 42.2

Kabel NYA, Standar SNI.04-


9 3 x 2,5 mm2 ( @ 100 meter) roll 593,200.00 723,900.00 737,900.00 821,100.00
02698, SPLN 42.2

Kabel NYA, Standar SNI.04-


10 3 x 4 mm2 ( @ 100 meter) roll 1,098,600.00 1,148,500.00 1,170,200.00 1,301,900.00
02698, SPLN 42.2

Kabel NYA, Standar SNI.04-


11 4 x 2,5 mm2 ( @ 100 meter) roll 855,600.00 894,000.00 910,600.00 1,014,200.00
02698, SPLN 42.2

Kabel NYA, Standar SNI.04-


12 4 x 4 mm2 ( @ 100 meter) roll 1,358,200.00 1,410,600.00 1,446,400.00 1,608,900.00
02698, SPLN 42.2

Kabel NYA, Standar SNI.04-


13 4 x 6 mm2 ( @ 100 meter) roll 1,863,400.00 1,947,800.00 1,984,900.00 2,208,700.00
02698, SPLN 42.2

Kabel NYA, Standar SNI.04-


14 4 x 10 mm2 ( @ 100 meter) roll 2,930,000.00 3,061,700.00 3,120,500.00 3,472,200.00
02698, SPLN 42.2

Kabel NYA, Standar SNI.04-


15 2 x 1,5 mm2 ( @ 100 meter) roll 535,900.00 560,200.00 570,400.00 635,600.00
02701, SPLN 43.1

Kabel NYA, Standar SNI.04-


16 2 x 2,5 mm2 ( @ 100 meter) roll 721,300.00 753,300.00 768,600.00 854,300.00
02701, SPLN 43.1

Kabel NYA, Standar SNI.04-


17 3 x 1,5 mm2 ( @ 100 meter) roll 661,200.00 690,600.00 704,700.00 784,000.00
02701, SPLN 43.1

Kabel NYA, Standar SNI.04-


18 3 x 2,5 mm2 ( @ 100 meter) roll 855,600.00 894,000.00 910,600.00 1,014,200.00
02701, SPLN 43.1

Kabel NYA, Standar SNI.04-


19 3 x 4 mm2 ( @ 100 meter) roll 1,273,800.00 1,331,300.00 1,356,900.00 1,509,100.00
02701, SPLN 43.1

Kabel NYA, Standar SNI.04-


20 3 x 6 mm2 ( @ 100 meter) roll 1,646,000.00 1,720,100.00 1,753,400.00 1,950,300.00
02701, SPLN 43.1

Kabel NYA, Standar SNI.04-


21 4 x 2,5 mm2 ( @ 100 meter) roll 969,400.00 1,012,900.00 1,032,100.00 1,148,500.00
02701, SPLN 43.1

Kabel NYA, Standar SNI.04-


22 4 x 4 mm2 ( @ 100 meter) roll 1,511,700.00 1,579,400.00 1,610,100.00 1,791,700.00
02701, SPLN 43.1

Kabel NYA, Standar SNI.04-


23 4 x 6 mm2 ( @ 100 meter) roll 1,927,300.00 2,014,300.00 2,052,600.00 2,284,100.00
02701, SPLN 43.1

Kabel NYA, Standar SNI.04-


24 4 x 10 mm2 ( @ 100 meter) roll 3,123,100.00 3,263,800.00 3,326,400.00 3,701,200.00
02701, SPLN 43.1
25 Kabel AAAC 70 mm (A3C) mtr 14,100.00 14,100.00 15,300.00 16,600.00
26 Kabel AAACS 70 mm (A3CS) mtr 20,500.00 21,700.00 21,700.00 24,300.00
27 Kabel AAAC 100 mm (A3C) mtr 23,000.00 24,300.00 24,300.00 26,900.00
28 Kabel AAACS 100 mm (A3CS) mtr 33,300.00 34,500.00 35,800.00 39,600.00
29 Kabel Twisted 3 x 50 mm + 1 x 25 mm mtr 26,900.00 28,100.00 28,100.00 32,000.00
30 Kabel Twisted 3 x 70 mm + 1 x 25 mm mtr 28,100.00 29,400.00 29,400.00 33,300.00

V. Kapasitor
1 Kapasitor 22uF 250 Volt Buah 35,800.00 37,100.00 38,400.00 42,200.00

VI. Lampu
1 Lampu Hemat Listrik Phillips, Essential 5 watt Buah 36,400.00 39,600.00 40,900.00 46,000.00
2 Lampu Hemat Listrik Phillips, Essential 8 watt Buah 49,900.00 52,400.00 53,700.00 58,800.00
3 Lampu Hemat Listrik Phillips, Essential 11 watt Buah 52,400.00 55,000.00 56,300.00 62,700.00
4 Lampu Hemat Listrik Phillips, Essential 14 watt Buah 62,700.00 65,200.00 66,500.00 74,200.00
5 Lampu Hemat Listrik Phillips, Essential 18 watt Buah 65,200.00 67,800.00 69,100.00 76,700.00
6 Lampu Hemat Listrik Phillips, Essential 23 watt Buah 74,200.00 78,000.00 79,300.00 88,200.00
7 Lampu Hemat Listrik Phillips, Ginie 5 watt Buah 51,200.00 53,700.00 55,000.00 60,100.00
8 Lampu Hemat Listrik Phillips, Ginie 8 watt Buah 55,000.00 57,600.00 58,800.00 65,200.00
9 Lampu Hemat Listrik Phillips, Ginie 11 watt Buah 57,600.00 60,100.00 61,400.00 67,800.00
10 Lampu Hemat Listrik Phillips, Ginie 18 watt Buah 62,700.00 65,200.00 66,500.00 74,200.00
11 Lampu Hemat Listrik Phillips, Tornado 5 watt Buah 62,700.00 65,200.00 66,500.00 74,200.00

Halaman 239
12 Lampu Hemat Listrik Phillips, Tornado 8 watt Buah 62,700.00 65,200.00 66,500.00 74,200.00
13 Lampu Hemat Listrik Phillips, Tornado 12 watt Buah 65,200.00 67,800.00 69,100.00 76,700.00
14 Lampu Hemat Listrik Phillips, Tornado 15 watt Buah 71,600.00 75,500.00 76,700.00 84,400.00
15 Lampu Hemat Listrik Phillips, Tornado 20 watt Buah 7,420.00 78,000.00 79,300.00 88,200.00
16 Lampu Mercury 80 watt/22 Buah 255,800.00 267,300.00 272,400.00 303,100.00
17 Lampu TL TL-D 10-w/54/Cool Daylight Buah 14,100.00 14,100.00 15,300.00 16,600.00
18 Lampu TL TL-D 18-w/54/Cool Daylight Buah 20,500.00 21,700.00 21,700.00 24,300.00
19 Lampu TL TL-D 36-w/54/Cool Daylight Buah 23,000.00 24,300.00 24,300.00 26,900.00
20 Lampu TL TL-D 18w Brightboost 83-84-86 Buah 37,100.00 38,400.00 39,600.00 43,500.00

21 Lampu TL TL-D 36w Brightboost 83-84-86 Buah 42,200.00 43,500.00 44,800.00 49,900.00
22 Lampu TL TL-Ring 22w/CD Buah 51,200.00 53,700.00 55,000.00 60,100.00
23 Lampu TL TL-Ring 32w/CD Buah 56,300.00 58,800.00 60,100.00 66,500.00

VII. MCB
MCB Easy9 1P 4A EZ9F34104
1 MCB Buah 40,900.00 42,200.00 43,500.00 48,600.00
Schneider Electric

MCB Easy9 1P 6A EZ9F34104


2 MCB Buah 40,900.00 42,200.00 43,500.00 48,600.00
Schneider Electric

MCB Easy9 1P 10A EZ9F34104


3 MCB Buah 40,900.00 42,200.00 43,500.00 48,600.00
Schneider Electric

MCB Easy9 1P 16A EZ9F34104


4 MCB Buah 40,900.00 42,200.00 43,500.00 48,600.00
Schneider Electric

VIII. NSFB
1 NSFB Fuji Ea - 100A pak 204,600.00 213,600.00 217,400.00 243,000.00
2 NSFB Fuji Ea - 150A pak 482,100.00 503,900.00 514,100.00 571,700.00

IX. Klem
Imundex no.4 (isi 100 pcs/kotak
1 Klem Kabel pak 14,100.00 14,100.00 15,300.00 16,600.00
+ paku)
Imundex no.5 (isi 100 pcs/kotak
2 Klem Kabel pak 14,100.00 14,100.00 15,300.00 16,600.00
+ paku)
Imundex no.6 (isi 100 pcs/kotak
3 Klem Kabel pak 15,300.00 16,600.00 16,600.00 17,900.00
+ paku)
Imundex no.7 (isi 100 pcs/kotak
4 Klem Kabel pak 15,300.00 16,600.00 16,600.00 17,900.00
+ paku)
Imundex no.8 (isi 100 pcs/kotak
5 Klem Kabel pak 17,900.00 19,200.00 19,200.00 21,700.00
+ paku)
Imundex no.9 (isi 100 pcs/kotak
6 Klem Kabel pak 17,900.00 19,200.00 19,200.00 21,700.00
+ paku)
Imundex no.10 (isi 100
7 Klem Kabel pak 20,500.00 21,700.00 21,700.00 24,300.00
pcs/kotak + paku)
Imundex no.12 (isi 100
8 Klem Kabel pak 26,900.00 28,100.00 28,100.00 32,000.00
pcs/kotak + paku)
Imundex no.14 (isi 100
9 Klem Kabel pak 33,300.00 34,500.00 35,800.00 39,600.00
pcs/kotak + paku)
Imundex no.17 (isi 100
10 Klem Kabel pak 47,300.00 49,900.00 49,900.00 56,300.00
pcs/kotak + paku)
Imundex no.19 (isi 100
11 Klem Kabel pak 63,900.00 66,500.00 67,800.00 75,500.00
pcs/kotak + paku)
Imundex no.22 (isi 100
12 Klem Kabel pak 75,500.00 79,300.00 80,600.00 89,500.00
pcs/kotak + paku)

X. Saklar
Broco Saklar Seri, Double
1 Saklar pak 23,000.00 25,300.00 29,900.00 39,100.00
Switch,250V
Broco Saklar Engkel, Single
2 Saklar pak 17,000.00 18,700.00 22,100.00 28,900.00
Switch,250V
Panasonic Saklar "B" Wide
3 Saklar Saklar Engkel Single Switch, pak 21,700.00 23,000.00 23,000.00 25,800.00
250V
Schneider Electric Vivace KB31
4 Saklar WE G3 10A, 250V, 1 Gang, 2 pak 30,700.00 32,000.00 33,300.00 35,800.00
Way Switvh
Schneider Electric Classic
5 Saklar E31/2 3A WE G3 250V, 10AX, pak 30,700.00 32,000.00 33,300.00 35,800.00
2W, 3 Term, 1G Switch

Halaman 240
Schneider Electric Pieno
6 Saklar E8231L1F WE G3 250V, 1G, pak 39,600.00 40,900.00 42,200.00 47,300.00
1W SW W Fluo Loc
Schneider Electric Vivace
7 Saklar KB32/1 WE G3 10A, 250V, 2 pak 44,800.00 47,300.00 47,300.00 52,400.00
Gang, 1 Way Switvh
Schneider Electric Classic
8 Saklar E32/2 3A WE G3 250V, 10AX, pak 47,300.00 49,900.00 49,900.00 56,300.00
2W, 3 Term, 2G Switch
Schneider Electric Pieno
E8231PRL1F WE G3 10A
9 Saklar pak 47,300.00 49,900.00 49,900.00 56,300.00
250V, 1G Monetary SW W Fluo
Loc
Schneider Electric Classic
10 Saklar E33/1 2AR WE G3 250V, pak 58,800.00 61,400.00 62,700.00 70,300.00
10AX, 1W, 2 Term, 3G Switch
Schneider Electric Pieno
E8232PRL1F WE G3 10A
11 Saklar pak 69,100.00 71,600.00 74,200.00 81,800.00
250V, 2G Monetary SW W Fluo
Loc
Schneider Electric Vivace KB33
12 Saklar WE G3 10A, 250V, 3 Gang, 2 pak 70,300.00 72,900.00 75,500.00 83,100.00
Way Switvh
Schneider Electric Vivace
13 Saklar KB34/1 WE G3 10A, 250V, 4 pak 88,200.00 92,100.00 93,400.00 104,900.00
Gang, 1 Way Switvh
Schneider Electric Pieno
E8233PRL1F WE G3 10A
14 Saklar pak 90,800.00 94,600.00 97,200.00 107,400.00
250V, 3G Monetary SW W Fluo
Loc
Schneider Electric Pieno
E8234PRL1F WE G3
15 Saklar pak 121,500.00 126,600.00 129,200.00 144,500.00
16AX,250V, 4G, 1W SW W
Fluo Loc

XI. Skring Kas


1 Skring Kas 5 Group Biasa Unit 71,600.00 75,500.00 76,700.00 84,400.00

XII. Stater Neon


1 Stater Neon Philips buah 15,300.00 16,600.00 16,600.00 17,900.00
2 Stater Neon Biasa buah 9,000.00 9,000.00 9,000.00 10,200.00

XIII. Terminal
Stop Kontak Arde Uticon 4
1 Stop Kontak buah 26,900.00 28,100.00 28,100.00 32,000.00
Lubang
Stop Kontak Arde Uticon 3
2 Stop Kontak buah 21,700.00 23,000.00 23,000.00 25,600.00
Lubang
Stop Kontak Arde Uticon 2
3 Stop Kontak buah 15,300.00 16,600.00 16,600.00 17,900.00
Lubang
Stop Kontak Arde Uticon 1
4 Stop Kontak buah 10,200.00 10,200.00 11,500.00 11,500.00
Lubang
Uticon Stop Kontak Arde 5
5 Stop Kontak buah 29,400.00 30,700.00 30,700.00 34,500.00
Lubang ST-158
Uticon Stop Kontak Arde 3
6 Stop Kontak buah 38,400.00 39,600.00 40,900.00 46,000.00
Lubang + Saklar
Uticon Stop Kontak Arde 4
7 Stop Kontak buah 42,200.00 43,500.00 44,800.00 49,900.00
Lubang + Saklar
Uticon Stop Kontak Arde 5
8 Stop Kontak buah 47,300.00 49,900.00 49,900.00 56,300.00
Lubang + Saklar
Uticon Stop Kontak Arde 6
9 Stop Kontak buah 51,200.00 53,700.00 55,000.00 60,100.00
Lubang + Saklar
Uticon Stop Kontak 6 Lubang ,
10 Stop Kontak Pengaman, Saklar Tersendiri, buah 186,700.00 195,700.00 198,200.00 221,300.00
Kabel
Uticon Stop Kontak 5 Lubang ,
11 Stop Kontak Pengaman, Saklar Tersendiri, buah 163,700.00 171,400.00 173,900.00 194,400.00
Kabel
Uticon Stop Kontak 6 Lubang ,
12 Stop Kontak buah 106,100.00 111,300.00 112,500.00 125,300.00
Saklar , Kabel

XIV. Steker
1 Steker T Steker Arde Broco buah 29,400.00 30,700.00 30,700.00 34,500.00

Halaman 241
XV. Solder
1 Penyedot Timah buah 42,200.00 43,500.00 44,800.00 49,900.00
2 Soldering Tembak Stanley 100W/220V Flat buah 795,500.00 831,300.00 846,600.00 942,600.00

XVI. Rechargeable Battery


Energizer 2 Baterai NiMH
AA/AAA, Indikator LED, Include
1 Rechargeable Battery pcs 211,000.00 220,000.00 225,100.00 250,700.00
2x Baterai Rechargeable AA
1300mAh
Energizer 2 Batteries AAA
Charge 2 Baterai NiMH
2 Rechargeable Battery pcs 172,700.00 180,300.00 184,200.00 204,600.00
AA/AAA, Indikator LED, Include
2x Baterai Rechargeable AAA
Eneloop Battery - Rechargeable
3 Rechargeable Battery AA Battery 4 PCS Pack 2000 pcs 176,500.00 184,200.00 188,000.00 209,700.00
mAh
PHILIPS Multilife Rechargeable
4 Rechargeable Battery pcs 69,100.00 71,600.00 47,200.00 81,800.00
AAA 800mAh BP2 isi 2pcs
Rechargeable Batteries
5 Rechargeable Battery Energizer Nimh AA 2300mAh pcs 127,900.00 134,300.00 136,800.00 152,200.00
1.2V - 2300 mAh
Baterai Philips Multilife
6 Rechargeable Battery Rechargeable AA 2000mAh (2- pcs 87,000.00 800.00 92,100.00 103,600.00
Pack)
Baterai Philips Multilife
7 Rechargeable Battery Rechargeable AA 2000mAh (4- pcs 159,900.00 167,500.00 170,100.00 189,300.00
Pack)
Baterai Isi Ulang (Rechargeable
8 Rechargeable Battery Batteries) Energizer 2300mAh pcs 87,000.00 90,800.00 92,100.00 103,600.00
Size AA - 2 Pcs

Baterai Isi Ulang (Rechargeable


9 Rechargeable Battery Batteries) Energizer NiMH pcs 159,900.00 167,500.00 170,100.00 189,300.00
175mAh 9V (8.4V)

XVII. Charger Aki


1 Trafo Charger Accu Maxtron CD-730 buah 2,529,700.00 2,643,500.00 2,694,700.00 2,997,800.00
2 Maxtron CB-50 15 AHR buah 1,023,100.00 1,069,200.00 1,089,600.00 1,212,400.00
3 Maxtron CB-10 20 AHR buah 616,400.00 644,600.00 656,100.00 730,300.00

XVIII. Tiang Listrik


Tiang Beton 9 Meter Standar
1 9 Meter mtr 8,440,800.00 8,824,400.00 8,952,300.00 9,975,500.00
PLN
Tiang Beton 13 Meter
2 13 Meter mtr 14,195,800.00 14,835,300.00 15,091,100.00 16,881,500.00
Standar PLN
Tiang Beton 11 Meter
3 11 Meter pc 12,149,600.00 12,661,200.00 12,916,900.00 14,451,600.00
Standar PLN
Tiang Besi 9 Meter Standar
4 9 Meter mtr 6,778,200.00 7,034,000.00 7,161,900.00 8,057,100.00
PLN
Tiang Besi 11 Meter Standar
5 11 Meter pc 7,417,600.00 7,801,300.00 7,929,200.00 8,824,400.00
PLN
Tiang Lampu Jalan Besi
6 Galvanis Single Arm 13 13 Meter mtr 5,755,100.00 6,010,900.00 6,138,700.00 6,778,200.00
Meter
Tiang Lampu Jalan Besi
7 9 Meter pc 6,650,300.00 6,906,100.00 7,034,000.00 7,929,200.00
Galvanis Single Arm 9 Meter
Tiang Lampu Jalan Besi
8 Galvanis Single Arm 11 11 Meter pc 6,522,400.00 6,778,200.00 6,906,100.00 7,673,400.00
Meter
Tiang Lampu Jalan Besi
9 Galvanis Double Arm 9 9 Meter pc 6,138,700.00 6,394,500.00 6,522,400.00 7,289,800.00
Meter
Tiang Lampu Jalan Besi
10 Galvanis Double Arm 11 11 Meter pc 7,801,300.00 8,185,000.00 8,312,900.00 9,208,100.00
Meter

XIX. Travo Distribusi


1 Travo Distribusi 3 Phase 50kVA buah 76,478,500.00 79,931,600.00 81,466,200.00 90,674,400.00
2 Travo Distribusi 3 Phase 100kVA buah 96,813,100.00 101,161,400.00 103,079,700.00 114,717,800.00
3 Travo Distribusi 3 Phase 150kVA buah 123,286,400.00 128,785,700.00 131,343,500.00 146,051,000.00

Halaman 242
4 Travo Distribusi 3 Phase 200kVA buah 141,574,800.00 147,969,300.00 150,782,900.00 167,792,300.00

XX. Solar Sel


1 Panel Solar 10 wp (berat 2kg) set 766,100.00 800,600.00 815,900.00 908,000.00
2 Panel Solar 20 wp (berat 4kg) set 1,385,100.00 1,447,700.00 1,474,600.00 1,640,800.00
30 wp (berat 4kg, 1panel
3 Panel Solar set 2,050,100.00 2,142,200.00 2,183,100.00 2,429,900.00
20wp+10wp diseri)
4 Panel Solar 50 wp (berat 11kg) set 3,080,900.00 3,219,000.00 3,281,700.00 3,651,300.00
5 Solar Charge Controller 20A (berat 1kg) set 1,354,400.00 1,415,700.00 1,442,600.00 1,605,000.00
6 Solar Charge Controller 10A (berat 1kg) set 851,800.00 890,100.00 906,700.00 1,009,100.00
7 Solar Charge Controller 5A (berat 1kg) set 697,000.00 729,000.00 741,800.00 826,200.00
8 Lampu Jalan Tenaga Surya Tanpa tiang lampu set 16,370,000.00 17,137,300.00 17,393,100.00 19,439,400.00

XXI. Kabel Twisted


1 Kabel Twisted 3 x 50 mtr 88,200.00 92,100.00 93,400.00 104,900.00
2 Kabel Twisted 3 x 25 mtr 52,400.00 55,000.00 56,300.00 62,700.00

XXII. Isolator
1 Isolator Tampu 20KV (CA 1-1) buah 887,600.00 927,200.00 945,100.00 1,051,300.00
2 Isolator Tarik 20KV (CA 3) buah 1,264,800.00 1,317,300.00 1,342,900.00 1,496,300.00

XXIII. Lainnya
1 Cross Arm 1800 -uNP10 pc 171,400.00 179,000.00 182,900.00 203,300.00
2 Arm Tie Type 750 Pipe Ø 3/4" pc 223,800.00 234,000.00 237,900.00 264,700.00
3 Ball Clevis pc 276,200.00 289,000.00 294,100.00 327,400.00
HV Band Strap / Cross Arm
4 set 171,400.00 179,000.00 182,900.00 203,300.00
Clevis/ Suso VEE
Socket Eye / Straight Clevis
5 Pc 276,200.00 289,000.00 294,100.00 327,400.00
Eye
Dead End Clamp (Strain
6 set 223,800.00 234,000.00 237,900.00 264,700.00
Clamp)
7 Cut Out Switch 22 KV-100A + Bracket set 2,711,300.00 2,839,200.00 2,890,300.00 3,210,100.00
8 Fuse Link 100 A set 184,200.00 191,800.00 195,700.00 218,700.00
9 Suspension Clamp set 447,600.00 468,100.00 477,000.00 530,700.00
10 Strain Clamp set 223,800.00 234,000.00 237,900.00 264,700.00
Tombak Penangkal Petir
11 set 5,652,800.00 5,908,500.00 6,023,600.00 6,701,500.00
Three Angle
12 Fiting Keramik 125 watt Buah 11,500.00 12,650.00 14,950.00 19,550.00
13 Fiting Keramik 250 watt Buah 4,000.00 4,400.00 5,200.00 6,800.00
14 Pipa Conduit PVC klas D m2 3,200.00 3,520.00 4,160.00 5,440.00
15 Rumah Lampu + Lampu TL 2 x 36 watt (grill) Buah 431,000.00 474,100.00 560,300.00 732,700.00
16 Lampu Baret 40 watt Buah 556,000.00 611,600.00 722,800.00 945,200.00
17 Lampu Downlight isi PL 2 x 9 watt Buah 160,000.00 176,000.00 208,000.00 272,000.00
18 Lampu PL 2 x 9 watt Buah 78,000.00 85,800.00 101,400.00 132,600.00
19 PHB Induk uk. 80 x 60 x 40 Buah 2,175,000.00 2,392,500.00 2,827,500.00 3,697,500.00
20 Kabel Scunt (sepatu kabel) Cu 25, 35 mm Buah 3,000.00 3,300.00 3,900.00 5,100.00
21 Kabel Scunt (sepatu kabel) Cu 50mm Buah 5,000.00 5,500.00 6,500.00 8,500.00
22 Holder Fuse Buah 24,500.00 26,950.00 31,850.00 41,650.00
23 Lampu Indikator set 365,000.00 401,500.00 474,500.00 620,500.00
24 Plat Tembaga 0.5 m set 147,500.00 162,250.00 191,750.00 250,750.00
25 Pas Ground Buah 321,000.00 353,100.00 417,300.00 545,700.00
26 NFB 100 A Buah 3,300,000.00 3,630,000.00 4,290,000.00 5,610,000.00
27 MCB 32 A Buah 46,000.00 50,600.00 59,800.00 78,200.00
28 NH Fuse 50 A Buah 39,000.00 42,900.00 50,700.00 66,300.00
Type ISP Single Ornament
29 Tiang PJU unit 7,972,000.00 8,769,200.00 10,363,600.00 13,552,400.00
Octagonal Type Parabolic, 6 m

Type ISP Single Ornament


30 Tiang PJU unit 8,916,000.00 9,807,600.00 11,590,800.00 15,157,200.00
Octagonal Type Parabolic, 7 m

Type ISP Single Ornament


31 Tiang PJU unit 9,768,000.00 10,777,800.00 12,737,400.00 16,656,600.00
Octagonal Type Parabolic, 8 m
Type ISP Single Ornament
32 Tiang PJU unit 8,392,000.00 9,231,200.00 10,909,600.00 14,266,400.00
Octagonal Type Angle, 6 m
Type ISP Single Ornament
33 Tiang PJU unit 9,650,000.00 10,615,000.00 12,545,000.00 16,405,000.00
Octagonal Type Angle, 7 m
Type ISP Single Ornament
34 Tiang PJU unit 10,910,000.00 12,001,000.00 14,183,000.00 18,547,000.00
Octagonal Type Angle, 8 m

Halaman 243
Box Panel 600 x 500 x 200
35 Box Panel Powder Coating, AMF - ATS unit 6,750,000.00 7,425,000.00 8,775,000.00 11,475,000.00
Satu Phase 10kVA
Box Panel 800 x 600 x 250
36 Box Panel Powder Coating, AMF - ATS unit 15,525,000.00 17,077,500.00 20,182,500.00 26,392,500.00
30kVA
Box Panel 900 x 700 x 250
37 Box Panel Powder Coating, AMF - ATS unit 19,575,000.00 21,532,500.00 25,447,500.00 33,277,500.00
60kVA

Halaman 244
HARGA STANDAR KEGIATAN PEKERJAAN (HSKP)
KABUPATEN KUTAI TIMUR
TAHUN 2019

PEKERJAAN ELEKTRICAL

Jenis Pekerjaan : Memasang Instalasi Penerangan & Stop Kontak


Kuantitas Pekerjaan : 1 Tiik
Produksi Harian/Jam : Harian

Zone I Zone II Zone III Zone IV


No Uraian Satuan Indeks
Harga Jumlah Harga Jumlah Harga Jumlah Harga
Jumlah Harga
Satuan Harga Satuan Harga Satuan Harga Satuan

I UPAH
Pekerja OH 0,3714 136.500 50.696 144.700 53.741 147.400 54.744 155.600 57.789
Mandor OH 173.300 - 183.600 - 187.100 - 197.500 -
Tukang Listrik OH 0,1065 168.000 17.892 184.000 19.596 181.000 19.277 187.000 19.916
Pembantu instalator OH 0,2306 157.000 36.204 173.000 39.894 170.000 39.202 176.000 40.586

II BAHAN
Fiting keramik 125 watt Bh 0 11.500 315 12.650 347 15.525 425 19.550 536
NYM 3 x 2.5 mm2 m¹ 10 11.500 115.000 12.650 126.500 15.525 155.250 19.550 195.500
Klem Bh 1 1.000 1.000 1.100 1.100 1.350 1.350 1.700 1.700
Saklar Bh 0,0041 15.500 64 17.050 70 20.925 86 26.350 108
Pipa Conduit PVC klas D m¹ 5 3.200 16.000 3.520 17.600 4.320 21.600 5.440 27.200
Jumlah Harga Per-satuan Pekerjaan 237.171 258.847 291.934 343.334

Jenis Pekerjaan : Memasang Lampu TL 2 x 36 watt (TKO)


Kuantitas Pekerjaan : 1 Buah
Produksi Harian/Jam : Harian

Zone I Zone II Zone III Zone IV


No Uraian Satuan Indeks
Harga Jumlah Harga Jumlah Harga Jumlah Harga
Jumlah Harga
Satuan Harga Satuan Harga Satuan Harga Satuan

I UPAH
Pekerja OH 0,3123 136.500 42.629 144.700 45.190 147.400 46.033 155.600 48.594
Mandor OH 173.300 - 183.600 - 187.100 - 197.500 -
Tukang Listrik OH 0,1045 168.000 17.556 184.000 19.228 181.000 18.915 187.000 19.542
Pembantu instalator OH 0,2306 157.000 36.204 173.000 39.894 170.000 39.202 176.000 40.586

II BAHAN
Rumah lampu + lampu TL 2 x
Bh 1 431.000 431.000 474.100 474.100 581.850 581.850 732.700 732.700
36 watt ( grill )
Jumlah Harga Per-satuan Pekerjaan 527.389 578.412 686.000 841.421

Halaman_ 245
HARGA STANDAR KEGIATAN PEKERJAAN (HSKP)
KABUPATEN KUTAI TIMUR
TAHUN 2019

PEKERJAAN ELEKTRICAL

Jenis Pekerjaan : Memasang Lampu Baret 40 watt


Kuantitas Pekerjaan : 1 Buah
Produksi Harian/Jam : Harian

Zone I Zone II Zone III Zone IV


No Uraian Satuan Indeks
Harga Jumlah Harga Jumlah Harga Jumlah Harga
Jumlah Harga
Satuan Harga Satuan Harga Satuan Harga Satuan

I UPAH
Pekerja OH 0,1045 136.500 14.264 144.700 15.121 147.400 15.403 155.600 16.260
Mandor OH 173.300 - 183.600 - 187.100 - 197.500 -
Tukang Listrik OH 0,1050 168.000 17.640 184.000 19.320 181.000 19.005 187.000 19.635
Pembantu instalator OH 0,2274 157.000 35.702 173.000 39.340 170.000 38.658 176.000 40.022

II BAHAN
Lampu baret 40 watt Bh 1 556.000 556.000 611.600 611.600 750.600 750.600 945.200 945.200
Jumlah Harga Per-satuan Pekerjaan 623.606 685.381 823.666 1.021.118

Jenis Pekerjaan : Memasang Lampu Down Light isi PL 2 x 9 watt


Kuantitas Pekerjaan : 1 Buah
Produksi Harian/Jam : Harian

Zone I Zone II Zone III Zone IV


No Uraian Satuan Indeks
Harga Jumlah Harga Jumlah Harga Jumlah Harga
Jumlah Harga
Satuan Harga Satuan Harga Satuan Harga Satuan

I UPAH
Pekerja OH 0,1045 136.500 14.264 144.700 15.121 147.400 15.403 155.600 16.260
Mandor OH 173.300 - 183.600 - 187.100 - 197.500 -
Tukang Listrik OH 0,1050 168.000 17.640 184.000 19.320 181.000 19.005 187.000 19.635
Pembantu instalator OH 0,2321 157.000 36.440 173.000 40.153 170.000 39.457 176.000 40.850

II BAHAN
Lampu down light isi PL 2 x 9 wat Bh 1 160.000 160.000 176.000 176.000 216.000 216.000 272.000 272.000
Jumlah Harga Per-satuan Pekerjaan 228.344 250.594 289.865 348.745

Halaman_ 246
HARGA STANDAR KEGIATAN PEKERJAAN (HSKP)
KABUPATEN KUTAI TIMUR
TAHUN 2018

PEKERJAAN ELEKTRICAL

Jenis Pekerjaan : Memasang Lampu PL 2 x 9 watt


Kuantitas Pekerjaan : 1 Buah
Produksi Harian/Jam : Harian

Zone I Zone II Zone III Zone IV


No Uraian Satuan Indeks
Harga Jumlah Harga Jumlah Harga Jumlah Harga
Jumlah Harga
Satuan Harga Satuan Harga Satuan Harga Satuan

I UPAH
Pekerja OH 0,1045 136.500 14.264 144.700 15.121 147.400 15.403 155.600 16.260
Mandor OH 173.300 - 183.600 - 187.100 - 197.500 -
Tukang Listrik OH 0,1050 168.000 17.640 184.000 19.320 181.000 19.005 187.000 19.635
Pembantu instalator OH 0,2321 157.000 36.440 173.000 40.153 170.000 39.457 176.000 40.850

II BAHAN
Lampu PL 2 x 9 watt Bh 1 78.000 78.000 85.800 85.800 105.300 105.300 132.600 132.600
Jumlah Harga Per-satuan Pekerjaan 146.344 160.394 179.165 209.345

Jenis Pekerjaan : Memasang Stop kontak 3 (phase)


Kuantitas Pekerjaan : 1 Buah
Produksi Harian/Jam : Harian

Zone I Zone II Zone III Zone IV


No Uraian Satuan Indeks
Harga Jumlah Harga Jumlah Harga Jumlah Harga
Jumlah Harga
Satuan Harga Satuan Harga Satuan Harga Satuan

I UPAH
Pekerja OH 0,1052 136.500 14.360 144.700 15.222 147.400 15.506 155.600 16.369
Mandor OH 173.300 - 183.600 - 187.100 - 197.500 -
Tukang Listrik OH 0,1055 168.000 17.724 184.000 19.412 181.000 19.096 187.000 19.729
Pembantu instalator OH 0,2326 157.000 36.518 173.000 40.240 170.000 39.542 176.000 40.938

II BAHAN
Stop kontak 25A, 3 phase
Bh 1 197.000 197.000 216.700 216.700 265.950 265.950 334.900 334.900
Brocco
Jumlah Harga Per-satuan Pekerjaan 265.602 291.574 340.094 411.935

Halaman_ 247
HARGA STANDAR KEGIATAN PEKERJAAN (HSKP)
KABUPATEN KUTAI TIMUR
TAHUN 2019

PEKERJAAN ELEKTRICAL

Jenis Pekerjaan : Memasang Saklar hotel Brocco


Kuantitas Pekerjaan : 1 Buah
Produksi Harian/Jam : Harian

Zone I Zone II Zone III Zone IV


No Uraian Satuan Indeks
Harga Jumlah Harga Jumlah Harga Jumlah Harga
Jumlah Harga
Satuan Harga Satuan Harga Satuan Harga Satuan

I UPAH
Pekerja OH 0,1052 136.500 14.360 144.700 15.222 147.400 15.506 155.600 16.369
Mandor OH 173.300 - 183.600 - 187.100 - 197.500 -
Tukang Listrik OH 0,1055 168.000 17.724 184.000 19.412 181.000 19.096 187.000 19.729
Pembantu instalator OH 0,2326 157.000 36.518 173.000 40.240 170.000 39.542 176.000 40.938

II BAHAN
Saklar hotel Bh 1 35.000 35.000 38.500 38.500 47.250 47.250 59.500 59.500
Jumlah Harga Per-satuan Pekerjaan 103.602 113.374 121.394 136.535

Jenis Pekerjaan : Memasang Saklar tunggal


Kuantitas Pekerjaan : 1 Buah
Produksi Harian/Jam : Harian

Zone I Zone II Zone III Zone IV


No Uraian Satuan Indeks
Harga Jumlah Harga Jumlah Harga Jumlah Harga
Jumlah Harga
Satuan Harga Satuan Harga Satuan Harga Satuan

I UPAH
Pekerja OH 0,1052 136.500 14.360 144.700 15.222 147.400 15.506 155.600 16.369
Mandor OH 173.300 - 183.600 - 187.100 - 197.500 -
Tukang Listrik OH 0,1055 168.000 17.724 184.000 19.412 181.000 19.096 187.000 19.729
Pembantu instalator OH 0,2336 157.000 36.675 173.000 40.413 170.000 39.712 176.000 41.114

II BAHAN
Saklar tunggal Brocco Bh 1 17.000 17.000 18.700 18.700 22.950 22.950 28.900 28.900
Jumlah Harga Per-satuan Pekerjaan 85.759 93.747 97.264 106.111

Halaman_ 216
HARGA STANDAR KEGIATAN PEKERJAAN (HSKP)
KABUPATEN KUTAI TIMUR
TAHUN 2019

PEKERJAAN ELEKTRICAL

Jenis Pekerjaan : Memasang Saklar dobel


Kuantitas Pekerjaan : 1 Buah
Produksi Harian/Jam : Harian

Zone I Zone II Zone III Zone IV


No Uraian Satuan Indeks
Harga Jumlah Harga Jumlah Harga Jumlah Harga
Jumlah Harga
Satuan Harga Satuan Harga Satuan Harga Satuan

I UPAH
Pekerja OH 0,1052 136.500 14.360 144.700 15.222 147.400 15.506 155.600 16.369
Mandor OH 173.300 - 183.600 - 187.100 - 197.500 -
Tukang Listrik OH 0,1055 168.000 17.724 184.000 19.412 181.000 19.096 187.000 19.729
Pembantu instalator OH 0,2336 157.000 36.675 173.000 40.413 170.000 39.712 176.000 41.114

II BAHAN
Saklar double Brocco Bh 1 35.000 35.000 38.500 38.500 47.250 47.250 59.500 59.500
Jumlah Harga Per-satuan Pekerjaan 103.759 113.547 121.564 136.711

Jenis Pekerjaan : Memasang Box Panel pembagi


Kuantitas Pekerjaan : 1 Buah
Produksi Harian/Jam : Harian

Zone I Zone II Zone III Zone IV


No Uraian Satuan Indeks
Harga Jumlah Harga Jumlah Harga Jumlah Harga
Jumlah Harga
Satuan Harga Satuan Harga Satuan Harga Satuan

I UPAH
Pekerja OH 0,5000 136.500 68.250 144.700 72.350 147.400 73.700 155.600 77.800
Mandor OH 0,0500 173.300 8.665 183.600 9.180 187.100 9.355 197.500 9.875
Tukang Listrik OH 0,0500 168.000 8.400 184.000 9.200 181.000 9.350 187.000 9.350

II BAHAN
PHB induk uk. 80 x 60 x 40 bh 1,0 2.175.000 2.175.000 2.392.500 2.392.500 2.936.250 2.936.250 3.697.500 3.697.500
NFB 100 A bh 1,0 3.300.000 3.300.000 3.630.000 3.630.000 4.455.000 4.455.000 5.610.000 5.610.000
Kabel scunt (sepatu kabel) Cu 25 bh 4,0 3.000 12.000 3.300 13.200 4.050 16.200 5.100 20.400
Kabel scunt (sepatu kabel) Cu 50 bh 8,0 5.000 40.000 5.500 44.000 6.750 54.000 8.500 68.000
MCB 32 A bh 1,0 46.000 46.000 50.600 50.600 62.100 62.100 78.200 78.200
NH Fuse 50 A bb 6,0 39.000 234.000 42.900 257.400 52.650 315.900 66.300 397.800
Holder fuse bh 6,0 24.500 147.000 26.950 161.700 33.075 198.450 41.650 249.900
Fiting keramik 250 watt bh 1,0 4.000 4.000 4.400 4.400 5.400 5.400 6.800 6.800
Saklar bh 1,0 23.000 23.000 25.300 25.300 31.050 31.050 39.100 39.100
Kabel 10 m m¹ 4,0 173.000 692.000 190.300 761.200 233.550 934.200 294.100 1.176.400
Lampu indikator set 1,0 365.000 365.000 401.500 401.500 492.750 492.750 620.500 620.500
Plat tembaga 0.5 m set 1,0 147.500 147.500 162.250 162.250 199.125 199.125 250.750 250.750
Pas. Ground bh 1,0 321.000 321.000 353.100 353.100 433.350 433.350 545.700 545.700
Jumlah Harga Per-satuan Pekerjaan 7.591.815 8.347.880 10.226.180 12.858.075

Halaman_ 217
HARGA STANDAR KEGIATAN PEKERJAAN (HSKP)
KABUPATEN KUTAI TIMUR
TAHUN 2019

PEKERJAAN ELEKTRICAL

Jenis Pekerjaan : Memasang Air Condition Split 1/2 PK


Kuantitas Pekerjaan : 1 Buah
Produksi Harian/Jam : Harian

Zone I Zone II Zone III Zone IV


No Uraian Satuan Indeks
Harga Jumlah Harga Jumlah Harga Jumlah Harga
Jumlah Harga
Satuan Harga Satuan Harga Satuan Harga Satuan

I UPAH
Pekerja OH 0,5000 136.500 68.250 144.700 72.350 147.400 73.700 155.600 77.800
Mandor OH 0,0500 173.300 8.665 183.600 9.180 187.100 9.355 197.500 9.875
Tukang Listrik OH 0,0500 168.000 8.400 184.000 9.200 181.000 9.050 187.000 9.350

II BAHAN
AC Split 1/2 PK (Lengkap) bh 1,0 3.000.000 3.000.000 3.300.000 3.300.000 4.050.000 4.050.000 5.100.000 5.100.000
Bahan Penunjang Set 1,0 250.000 250.000 275.000 275.000 337.500 337.500 425.000 425.000
Jumlah Harga Per-satuan Pekerjaan 3.335.315 3.665.730 4.479.605 5.622.025

Jenis Pekerjaan : Memasang Air Condition Split 3/4 PK


Kuantitas Pekerjaan : 1 Buah
Produksi Harian/Jam : Harian

Zone I Zone II Zone III Zone IV


No Uraian Satuan Indeks
Harga Jumlah Harga Jumlah Harga Jumlah Harga
Jumlah Harga
Satuan Harga Satuan Harga Satuan Harga Satuan

I UPAH
Pekerja OH 0,5000 136.500 68.250 144.700 72.350 147.400 73.700 155.600 77.800
Mandor OH 0,0500 173.300 8.665 183.600 9.180 187.100 9.355 197.500 9.875
Tukang Listrik OH 0,0500 168.000 8.400 184.000 9.200 181.000 9.050 187.000 9.350

II BAHAN
AC Split 3/4 PK (Lengkap) bh 1,0 3.250.000 3.250.000 3.575.000 3.575.000 4.387.500 4.387.500 5.525.000 5.525.000
Bahan Penunjang Set 1,0 250.000 250.000 275.000 275.000 337.500 337.500 425.000 425.000
Jumlah Harga Per-satuan Pekerjaan 3.585.315 3.940.730 4.817.105 6.047.025

Halaman_ 218
HARGA STANDAR KEGIATAN PEKERJAAN (HSKP)
KABUPATEN KUTAI TIMUR
TAHUN 2019

PEKERJAAN ELEKTRICAL

Jenis Pekerjaan : Memasang Air Condition Split 1 PK


Kuantitas Pekerjaan : 1 Buah
Produksi Harian/Jam : Harian

Zone I Zone II Zone III Zone IV


No Uraian Satuan Indeks
Harga Jumlah Harga Jumlah Harga Jumlah Harga
Jumlah Harga
Satuan Harga Satuan Harga Satuan Harga Satuan

I UPAH
Pekerja OH 0,5000 136.500 68.250 144.700 72.350 147.400 73.700 155.600 77.800
Mandor OH 0,0500 173.300 8.665 183.600 9.180 187.100 9.355 197.500 9.875
Tukang Listrik OH 0,0500 168.000 8.400 184.000 9.200 181.000 9.050 187.000 9.350

II BAHAN
AC Split 1 PK (Lengkap) bh 1,0 3.500.000 3.500.000 3.850.000 3.850.000 4.725.000 4.725.000 5.950.000 5.950.000
Bahan Penunjang Set 1,0 250.000 250.000 275.000 275.000 337.500 337.500 425.000 425.000
Jumlah Harga Per-satuan Pekerjaan 3.835.315 4.215.730 5.154.605 6.472.025

Jenis Pekerjaan : Memasang Air Condition Split 1,5 PK


Kuantitas Pekerjaan : 1 Buah
Produksi Harian/Jam : Harian

Zone I Zone II Zone III Zone IV


No Uraian Satuan Indeks
Harga Jumlah Harga Jumlah Harga Jumlah Harga
Jumlah Harga
Satuan Harga Satuan Harga Satuan Harga Satuan

I UPAH
Pekerja OH 0,5000 136.500 68.250 144.700 72.350 147.400 73.700 155.600 77.800
Mandor OH 0,0500 173.300 8.665 183.600 9.180 187.100 9.355 197.500 9.875
Tukang Listrik OH 0,0500 168.000 8.400 184.000 9.200 181.000 9.050 187.000 9.350

II BAHAN
AC Split 1,5 PK (Lengkap) bh 1,0 3.750.000 3.750.000 4.125.000 4.125.000 5.062.500 5.062.500 6.375.000 6.375.000
Bahan Penunjang Set 1,0 250.000 250.000 275.000 275.000 337.500 337.500 425.000 425.000
Jumlah Harga Per-satuan Pekerjaan 4.085.315 4.490.730 5.492.105 6.897.025

Halaman_ 219
HARGA STANDAR KEGIATAN PEKERJAAN (HSKP)
KABUPATEN KUTAI TIMUR
TAHUN 2019

PEKERJAAN INSTALASI AIR BERSIH & PEMBUANGAN

Jenis Pekerjaan : Memasang Instalasi Pipa PVC type AW dia. 1/2 "
Kuantitas Pekerjaan : 1 Meter
Produksi Harian/Jam : Harian

Zone I Zone II Zone III Zone IV


No Uraian Satuan Indeks
Harga Jumlah Harga Jumlah Harga Jumlah Harga Jumlah
Satuan Harga Satuan Harga Satuan Harga Satuan Harga

I UPAH
Pekerja OH 0,0360 136.500 5.652 144.700 6.228 147.400 6.120 155.600 6.336
Mandor OH 0,0018 173.300 329 183.600 364 187.100 356 197.500 369
Tukang pasang pipa OH 0,0600 168.000 10.080 184.000 11.040 181.000 10.860 187.000 11.220
Kepala tukang pipa OH 0,0060 173.000 1.038 191.000 1.146 186.000 1.116 194.000 1.164

II BAHAN
Pipa PVC m¹ 1,2000 5.750 6.900 6.325 7.590 7.763 9.315 9.775 11.730
Perlengkapan 35 % harga pipa - 0,3500 2.415 - 2.657 - 3.260 - 4.106
Jumlah Harga Per-satuan Pekerjaan 26.414 29.024 31.028 34.925

Jenis Pekerjaan : Memasang Instalasi Pipa PVC type AW dia. 3/4 "
Kuantitas Pekerjaan : 1 Meter
Produksi Harian/Jam : Harian

Zone I Zone II Zone III Zone IV


No Uraian Satuan Indeks
Harga Jumlah Harga Jumlah Harga Jumlah Harga Jumlah
Satuan Harga Satuan Harga Satuan Harga Satuan Harga

I UPAH
Pekerja OH 0,0360 136.500 5.652 144.700 6.228 147.400 6.120 155.600 6.336
Mandor OH 0,0018 173.300 329 183.600 364 187.100 356 197.500 369
Tukang pasang pipa OH 0,0600 168.000 10.080 184.000 11.040 181.000 10.860 187.000 11.220
Kepala tukang pipa OH 0,0060 173.000 1.038 191.000 1.146 186.000 1.116 194.000 1.164

II BAHAN
Pipa PVC m¹ 1,2000 8.375 10.050 9.213 11.055 11.306 13.568 14.238 17.085
Perlengkapan 35 % harga pipa - 0,3500 3.518 - 3.869 - 4.749 - 5.980
Jumlah Harga Per-satuan Pekerjaan 30.667 33.702 36.769 42.154

Halaman_ 220
HARGA STANDAR KEGIATAN PEKERJAAN (HSKP)
KABUPATEN KUTAI TIMUR
TAHUN 2019

PEKERJAAN INSTALASI AIR BERSIH & PEMBUANGAN

Jenis Pekerjaan : Memasang Instalasi Pipa PVC type AW dia. 1 "


Kuantitas Pekerjaan : 1 Meter
Produksi Harian/Jam : Harian

Zone I Zone II Zone III Zone IV


No Uraian Satuan Indeks
Harga Jumlah Harga Jumlah Harga Jumlah Harga Jumlah
Satuan Harga Satuan Harga Satuan Harga Satuan Harga

I UPAH
Pekerja OH 0,0360 136.500 5.652 144.700 6.228 147.400 6.120 155.600 6.336
Mandor OH 0,0018 173.300 329 183.600 364 187.100 356 197.500 369
Tukang pasang pipa OH 0,0600 168.000 10.080 184.000 11.040 181.000 10.860 187.000 11.220
Kepala tukang pipa OH 0,0060 173.000 1.038 191.000 1.146 186.000 1.116 194.000 1.164

II BAHAN
Pipa PVC m¹ 1,2000 10.575 12.690 11.633 13.959 14.276 17.132 17.978 21.573
Perlengkapan 35 % harga pipa - 0,3500 4.442 - 4.886 - 5.996 - 7.551
Jumlah Harga Per-satuan Pekerjaan 34.231 37.622 41.580 48.213

Jenis Pekerjaan : Memasang Instalasi Pipa PVC type AW dia. 1 1/2 "
Kuantitas Pekerjaan : 1 Meter
Produksi Harian/Jam : Harian

Zone I Zone II Zone III Zone IV


No Uraian Satuan Indeks
Harga Jumlah Harga Jumlah Harga Jumlah Harga Jumlah
Satuan Harga Satuan Harga Satuan Harga Satuan Harga

I UPAH
Pekerja OH 0,0360 136.500 5.652 144.700 6.228 147.400 6.120 155.600 6.336
Mandor OH 0,0018 173.300 329 183.600 364 187.100 356 197.500 369
Tukang pasang pipa OH 0,0600 168.000 10.080 184.000 11.040 181.000 10.860 187.000 11.220
Kepala tukang pipa OH 0,0060 173.000 1.038 191.000 1.146 186.000 1.116 194.000 1.164

II BAHAN
Pipa PVC m¹ 1,2000 22.000 26.400 24.200 29.040 29.700 35.640 37.400 44.880
Perlengkapan 35 % harga pipa - 0,3500 9.240 - 10.164 - 12.474 - 15.708
Jumlah Harga Per-satuan Pekerjaan 52.739 57.982 66.566 79.677

Halaman_ 248
HARGA STANDAR KEGIATAN PEKERJAAN (HSKP)
KABUPATEN KUTAI TIMUR
TAHUN 2019

PEKERJAAN INSTALASI AIR BERSIH & PEMBUANGAN

Jenis Pekerjaan : Memasang Instalasi Pipa PVC type AW dia. 2 "


Kuantitas Pekerjaan : 1 Meter
Produksi Harian/Jam : Harian

Zone I Zone II Zone III Zone IV


No Uraian Satuan Indeks
Harga Jumlah Harga Jumlah Harga Jumlah Harga Jumlah
Satuan Harga Satuan Harga Satuan Harga Satuan Harga

I UPAH
Pekerja OH 0,0540 136.500 8.478 144.700 9.342 147.400 9.180 155.600 9.504
Mandor OH 0,0027 173.300 494 183.600 545 187.100 535 197.500 554
Tukang pasang pipa OH 0,0900 168.000 15.120 184.000 16.560 181.000 16.290 187.000 16.830
Kepala tukang pipa OH 0,0090 173.000 1.557 191.000 1.719 186.000 1.674 194.000 1.746

II BAHAN
Pipa PVC m¹ 1,2000 25.000 30.000 27.500 33.000 33.750 40.500 42.500 51.000
Perlengkapan 35 % harga pipa - 0,3500 10.500 - 11.550 - 14.175 - 17.850
Jumlah Harga Per-satuan Pekerjaan 66.149 72.716 82.354 97.484

Jenis Pekerjaan : Memasang Instalasi Pipa PVC type AW dia. 2 1/2 "
Kuantitas Pekerjaan : 1 Meter
Produksi Harian/Jam : Harian

Zone I Zone II Zone III Zone IV


No Uraian Satuan Indeks
Harga Jumlah Harga Jumlah Harga Jumlah Harga Jumlah
Satuan Harga Satuan Harga Satuan Harga Satuan Harga

I UPAH
Pekerja OH 0,0540 136.500 8.478 144.700 9.342 147.400 9.180 155.600 9.504
Mandor OH 0,0027 173.300 494 183.600 545 187.100 535 197.500 554
Tukang pasang pipa OH 0,0900 168.000 15.120 184.000 16.560 181.000 16.290 187.000 16.830
Kepala tukang pipa OH 0,0090 173.000 1.557 191.000 1.719 186.000 1.674 194.000 1.746

II BAHAN
Pipa PVC m¹ 1,2000 34.750 41.700 38.225 45.870 46.913 56.295 59.075 70.890
Perlengkapan 35 % harga pipa - 0,3500 14.595 - 16.055 - 19.703 - 24.812
Jumlah Harga Per-satuan Pekerjaan 81.944 90.091 103.677 124.335

Halaman_ 249
HARGA STANDAR KEGIATAN PEKERJAAN (HSKP)
KABUPATEN KUTAI TIMUR
TAHUN 2019

PEKERJAAN INSTALASI AIR BERSIH & PEMBUANGAN

Jenis Pekerjaan : Memasang Instalasi Pipa PVC type AW dia. 3 "


Kuantitas Pekerjaan : 1 Meter
Produksi Harian/Jam : Harian

Zone I Zone II Zone III Zone IV


No Uraian Satuan Indeks
Harga Jumlah Harga Jumlah Harga Jumlah Harga Jumlah
Satuan Harga Satuan Harga Satuan Harga Satuan Harga

I UPAH
Pekerja OH 0,0810 136.500 12.717 144.700 14.013 147.400 13.770 155.600 14.256
Mandor OH 0,0041 173.300 750 183.600 828 187.100 812 197.500 841
Tukang pasang pipa OH 0,1350 168.000 22.680 184.000 24.840 181.000 24.435 187.000 25.245
Kepala tukang pipa OH 0,0135 173.000 2.336 191.000 2.579 186.000 2.511 194.000 2.619

II BAHAN
Pipa PVC m¹ 1,2000 46.875 56.250 51.563 61.875 63.281 75.938 79.688 95.625
Perlengkapan 35 % harga pipa - 0,3500 19.688 - 21.656 - 26.578 - 33.469
Jumlah Harga Per-satuan Pekerjaan 114.420 125.791 144.043 172.054

Jenis Pekerjaan : Memasang Instalasi Pipa PVC type AW dia. 4 "


Kuantitas Pekerjaan : 1 Meter
Produksi Harian/Jam : Harian

Zone I Zone II Zone III Zone IV


No Uraian Satuan Indeks
Harga Jumlah Harga Jumlah Harga Jumlah Harga Jumlah
Satuan Harga Satuan Harga Satuan Harga Satuan Harga

I UPAH
Pekerja OH 0,0810 136.500 12.717 144.700 14.013 147.400 13.770 155.600 14.256
Mandor OH 0,0041 173.300 750 183.600 828 187.100 812 197.500 841
Tukang pasang pipa OH 0,1350 168.000 22.680 184.000 24.840 181.000 24.435 187.000 25.245
Kepala tukang pipa OH 0,0135 173.000 2.336 191.000 2.579 186.000 2.511 194.000 2.619

II BAHAN
Pipa PVC m¹ 1,2000 78.000 93.600 85.800 102.960 105.300 126.360 132.600 159.120
Perlengkapan 35 % harga pipa - 0,3500 32.760 - 36.036 - 44.226 - 55.692
Jumlah Harga Per-satuan Pekerjaan 164.843 181.256 212.114 257.773

Jenis Pekerjaan : Memasang Instalasi Pipa PVC type AW dia. 6 "


Kuantitas Pekerjaan : 1 Meter
Produksi Harian/Jam : Harian

Zone I Zone II Zone III Zone IV


No Uraian Satuan Indeks
Harga Jumlah Harga Jumlah Harga Jumlah Harga Jumlah
Satuan Harga Satuan Harga Satuan Harga Satuan Harga

I UPAH
Pekerja OH 0,0810 136.500 12.717 144.700 14.013 147.400 13.770 155.600 14.256
Mandor OH 0,0041 173.300 750 183.600 828 187.100 812 197.500 841
Tukang pasang pipa OH 0,1350 168.000 22.680 184.000 24.840 181.000 24.435 187.000 25.245
Kepala tukang pipa OH 0,0135 173.000 2.336 191.000 2.579 186.000 2.511 194.000 2.619

II BAHAN
Pipa PVC m¹ 1,2000 181.000 217.200 199.100 238.920 244.350 293.220 307.700 369.240
Perlengkapan 35 % harga pipa - 0,3500 76.020 - 83.622 - 102.627 - 129.234
Jumlah Harga Per-satuan Pekerjaan 331.703 364.802 437.375 541.435

Halaman_ 250
HARGA STANDAR SATUAN BANGUNAN DERMAGA
PEMERINTAH KABUPATEN KUTAI TIMUR
TAHUN 2019
2
PERHITUNGAN HARGA SATUAN TERTINGGI BANGUNAN DERMAGA PER M

DERMAGA TRESTEL
NO ZONA
(Rp) (Rp)

1 Zone 1 : Sengata Utara; Sengata Selatan; Teluk Pandan; Rantau Pulung; Bengalon 10,151,000.00 10,111,000.00

2 Zone 2 : Muara Bengkal; Muara Ancalong; Long Mesangat; Busang 10,603,000.00 10,563,000.00

3 Zone 3 : Muara Wahau; Kongbeng; Telen; Batu Ampar 10,802,000.00 10,764,000.00

4 Zone 4 : Kaliorang; Sangkulirang; Kaubun; Sandaran; Karangan 11,840,000.00 11,870,000.00

PERHITUNGAN HARGA SATUAN TERTINGGI TALUD DERMAGA PER M1

TALUD
NO ZONA
(Rp)

1 Zone 1 : Sengata Utara; Sengata Selatan; Teluk Pandan; Rantau Pulung; Bengalon 13,164,000.00

2 Zone 2 : Muara Bengkal; Muara Ancalong; Long Mesangat; Busang 13,898,000.00

3 Zone 3 : Muara Wahau; Kongbeng; Telen; Batu Ampar 14,181,000.00

4 Zone 4 : Kaliorang; Sangkulirang; Kaubun; Sandaran; Karangan 14,626,000.00

Halaman 251
2
HARGA SATUAN TERTINGGI BANGUNAN DERMAGA PER M
PEMERINTAH KABUPATEN KUTAI TIMUR
TAHUN 2019

Zone 1

DERMAGA TRESTEL TALUD


NO KEBUTUHAN SATUAN HARGA
VOLUME JUMLAH VOLUME JUMLAH VOLUME JUMLAH

I. BAHAN

I.1 BAHAN KAYU


3
Balok Ulin (Gelagar dll) m 6,005,670.00 0.08 468,742.54 0.09 508,492.40
Papan Kayu KI. I (Jati/Ulin.dll), Papan 3
m 7,470,000.00 1.00 7,470,000.00 1.00 6,021,800.00
lantai
3
Papan Kayu KI. II (Kamper/Kruing.dll) m 6,100,520.00 - -
3
Papan Kayu KI. III m 5,602,500.00 - -
Tiang pancang kayu ukuran 15 x 15 cm
M1 127,748.25 - 0.50 63,874.13
(kayu kelas I)
Tiang pancang kayu ukuran 20 x 20 cm
M1 218,388.00 0.45 98,274.60 -
(Kayu kelas I)
Plywood 3 mm Lbr 76,200.00 - -

Plywood 4 mm Lbr 78,500.00 - -

I.2 BAHAN PASANGAN -


3
Batu Pecah 15-20 cm m 586,100.00 - 0.45 293,613.17
3
Batu Pasang (Bulat) m 443,200.00 - 0.14 61,541.49
3
Batu kali m 761,900.00 - 0.33 147,433.65
3
Pasir Pasangan (Lokal) m 410,300.00 - 0.70 255,123.95
3
Pasir Urug (Lokal) m 281,300.00 - 0.02 9,662.14
3
Pasir Beton / Cor m 732,600.00 - 0.02 7,263.29
3
Sirtu m 542,700.00 - 0.09 37,165.71

Semen PC 50 kg Zak 93,776.00 - 25.87 2,447,639.86

I.3 BAHAN SAMBUNGAN -

Paku Ulin 1,5" - 5" Kg 52,400.00 1.10 57,640.00 1.10 49,170.00

Baut Kg 52,400.00 4.15 217,460.00 4.50 201,150.00

Sekrup Fixer Bh 3,500.00 -

I.4 BAHAN PENUTUP (Seng Gelombang) -

BJLS 27 KI Lbr 127,200.00 -

BJLS 20 KI Lbr 101,200.00 - 70.00 6,104,000.00

BJLS 18 KI Lbr 59,800.00 -

I.5 BAHAN LAIN-LAIN -

Minyak Bekisting Ltr 4,600.00 - - 4.00 -

Minyak Pelumas Ltr 74,600.00 6.00 447,600.00 6.00 447,600.00

SUB TOTAL BIAYA BAHAN BANGUNAN 7,228,479.19 7,292,086.52 9,363,443.26

II. UPAH KERJA

Pekerja Biasa Org / Hari 137,800.00 0.15 21,017.95 0.16 3,374.96 0.42 57,403.54

Mandor Org / Hari 174,900.00 0.01 1,329.24 0.01 10.63 0.03 4,684.82

Tukang Kayu Org / Hari 159,000.00 0.20 31,315.05 0.20 6,179.24 -

Halaman 252
2
HARGA SATUAN TERTINGGI BANGUNAN DERMAGA PER M
PEMERINTAH KABUPATEN KUTAI TIMUR
TAHUN 2019

Zone 1

DERMAGA TRESTEL TALUD


NO KEBUTUHAN SATUAN HARGA
VOLUME JUMLAH VOLUME JUMLAH VOLUME JUMLAH

Kepala Tukang Kayu Org / Hari 164,300.00 0.02 3,236.71 0.02 63.84 -

Tukang Batu Org / Hari 159,000.00 - - 0.12 19,647.86

Kepala Tukang Batu Org / Hari 164,300.00 - - 0.01 2,030.28

SUB TOTAL BIAYA UPAH 56,898.95 9,628.68 83,766.50

III. BIAYA KONSTRUKSI (K)

- Sub Total Biaya Bahan Bangunan 7,285,378.13 7,301,715.20 9,447,209.76

- Sub Total Biaya Upah Kerja 56,898.95 9,628.68 83,766.50


- Sub Total Biaya Peralatan Kerja (10% dr
5,689.89 962.87 8,376.65
Upah Kerja)
A. BIAYA NYATA BANGUNAN 7,347,966.97 7,312,306.74 9,539,352.91

B. JASA KONTRAKTOR + OVERHEAD 10% 734,796.70 731,230.67 953,935.29

BIAYA PERENCANAAN 7% 514,357.69 511,861.47 667,754.70

BIAYA PENGAWASAN 4% 293,918.68 292,492.27 381,574.12

C. PAJAK-PAJAK 881,756.04 877,476.81 1,144,722.35

- PPh Pasal 21/23 2% 146,959.34 146,246.13 190,787.06

- PPN 10% 734,796.70 731,230.67 953,935.29

D. SUB TOTAL (A+B+C) 9,772,796.07 9,725,367.97 12,687,339.37

E. ASURANSI 279,222.74 277,867.66 362,495.41

- All Risk 3% 220,439.01 219,369.20 286,180.59

- Tenaga Kerja 0.50% 36,739.83 36,561.53 47,696.76

- Pihak Ketiga 0.30% 22,043.90 21,936.92 28,618.06

F. PERIJINAN 36,739.83 36,561.53 47,696.76

- Sertifikat Laik Fungsi 0.7% 36,739.83 36,561.53 47,696.76

G. KESELAMATAN DAN KESEHATAN KERJA 1% 72,853.78 73,017.15 94,472.10

H. SUB TOTAL BIAYA KONSTRUKSI FISIK 10,161,612.43 10,112,814.31 13,192,003.64

2
IV. BIAYA KONSTRUKSI FISIK BANGUNAN DERMAGA PER M 10,151,000.00 10,111,000.00 13,164,000.00

Halaman 253
2
HARGA SATUAN TERTINGGI BANGUNAN DERMAGA PER M
PEMERINTAH KABUPATEN KUTAI TIMUR
TAHUN 2019

Zone 2

DERMAGA TRESTEL TALUD


NO KEBUTUHAN SATUAN HARGA
VOLUME JUMLAH VOLUME JUMLAH VOLUME JUMLAH

I. BAHAN

I.1 BAHAN KAYU


3
Balok Ulin (Gelagar dll) m 6,005,670.00 0.08 468,742.54 0.09 531,357.19
3
Papan Kayu KI. I (Jati/Ulin.dll), Papan lantai m 7,470,000.00 1.00 7,470,000.00 1.00 6,292,400.00
3
Papan Kayu KI. II (Kamper/Kruing.dll) m 6,100,520.00 - -
3
Papan Kayu KI. III m 5,602,500.00 - -
Tiang pancang kayu ukuran 15 x 15 cm
M1 127,748.25 - 0.50 64,183.50
(kayu kelas I)
Tiang pancang kayu ukuran 20 x 20 cm
M1 218,388.00 0.45 98,274.60 -
(Kayu kelas I)
Plywood 3 mm Lbr 76,200.00 - -

Plywood 4 mm Lbr 78,500.00 - -

I.2 BAHAN PASANGAN -


3
Batu Pecah 15-20 cm m 586,100.00 - 0.45 309,061.77
3
Batu Pasang (Bulat) m 443,200.00 - 0.14 64,346.40
3
Batu kali m 761,900.00 - 0.33 154,153.32
3
Pasir Pasangan (Lokal) m 410,300.00 - 0.70 266,384.60
3
Pasir Urug (Lokal) m 281,300.00 - 0.02 10,087.97
3
Pasir Beton / Cor m 732,600.00 - 0.02 7,582.71
3
Sirtu m 542,700.00 - 0.09 38,837.14

Semen PC 50 kg Zak 93,776.00 - 25.87 2,701,200.86

I.3 BAHAN SAMBUNGAN -

Paku Ulin 1,5" - 5" Kg 52,400.00 1.10 57,640.00 1.10 51,700.00

Baut Kg 52,400.00 4.15 217,460.00 4.50 211,500.00

Sekrup Fixer Bh 3,500.00 -

I.4 BAHAN PENUTUP (Seng Gelombang) -

BJLS 27 KI Lbr 127,200.00 -

BJLS 20 KI Lbr 101,200.00 - 70.00 6,342,000.00

BJLS 18 KI Lbr 59,800.00 -

I.5 BAHAN LAIN-LAIN -

Minyak Bekisting Ltr 4,600.00 - - 4.00 -

Minyak Pelumas Ltr 74,600.00 6.00 447,600.00 6.00 468,000.00

SUB TOTAL BIAYA BAHAN BANGUNAN 7,555,134.46 7,619,140.69 9,893,654.77

UPAH KERJA

Pekerja Biasa Org / Hari 137,800.00 0.15 21,017.95 0.16 3,374.96 0.42 57,403.54

Mandor Org / Hari 174,900.00 0.01 1,329.24 0.01 10.63 0.03 4,684.82

Tukang Kayu Org / Hari 159,000.00 0.20 31,315.05 0.20 6,179.24 -

Halaman 254
2
HARGA SATUAN TERTINGGI BANGUNAN DERMAGA PER M
PEMERINTAH KABUPATEN KUTAI TIMUR
TAHUN 2019

Zone 2

DERMAGA TRESTEL TALUD


NO KEBUTUHAN SATUAN HARGA
VOLUME JUMLAH VOLUME JUMLAH VOLUME JUMLAH

Kepala Tukang Kayu Org / Hari 164,300.00 0.02 3,236.71 0.02 63.84 -

Tukang Batu Org / Hari 159,000.00 - - 0.12 19,647.86

Kepala Tukang Batu Org / Hari 164,300.00 - - 0.01 2,030.28

SUB TOTAL BIAYA UPAH 56,898.95 9,628.68 83,766.50

III. BIAYA KONSTRUKSI (K)

- Sub Total Biaya Bahan Bangunan 7,612,033.41 7,628,769.36 9,977,421.27

- Sub Total Biaya Upah Kerja 56,898.95 9,628.68 83,766.50


- Sub Total Biaya Peralatan Kerja (10% dr
5,689.89 962.87 8,376.65
Upah Kerja)
A. BIAYA NYATA BANGUNAN 7,674,622.24 7,639,360.91 10,069,564.42

B. JASA KONTRAKTOR + OVERHEAD 10% 767,462.22 763,936.09 1,006,956.44

BIAYA PERENCANAAN 7% 537,223.56 534,755.26 704,869.51

BIAYA PENGAWASAN 4% 306,984.89 305,574.44 402,782.58

C. PAJAK-PAJAK 920,954.67 916,723.31 1,208,347.73

- PPh Pasal 21/23 2% 153,492.44 152,787.22 201,391.29

- PPN 10% 767,462.22 763,936.09 1,006,956.44

D. SUB TOTAL (A+B+C) 10,207,247.59 10,160,350.01 13,392,520.68

E. ASURANSI 291,635.65 290,295.71 382,643.45

- All Risk 3% 230,238.67 229,180.83 302,086.93

- Tenaga Kerja 0.50% 38,373.11 38,196.80 50,347.82

- Pihak Ketiga 0.30% 23,023.87 22,918.08 30,208.69

F. PERIJINAN 38,373.11 38,196.80 50,347.82

- Sertifikat Laik Fungsi 0.7% 38,373.11 38,196.80 50,347.82

G. KESELAMATAN DAN KESEHATAN KERJA 1% 76,120.33 76,287.69 99,774.21

H. SUB TOTAL BIAYA KONSTRUKSI FISIK 10,613,376.68 10,565,130.22 13,925,286.17


2
IV. BIAYA KONSTRUKSI FISIK BANGUNAN DERMAGA PER M 10,603,000.00 10,563,000.00 13,898,000.00

Halaman 255
2
HARGA SATUAN TERTINGGI BANGUNAN DERMAGA PER M
PEMERINTAH KABUPATEN KUTAI TIMUR
TAHUN 2019

Zone 3

DERMAGA TRESTEL TALUD


NO KEBUTUHAN SATUAN HARGA
VOLUME JUMLAH VOLUME JUMLAH VOLUME JUMLAH

I. BAHAN

I.1 BAHAN KAYU


3
Balok Ulin (Gelagar dll) m 6,005,670.00 0.08 468,742.54 0.09 541,499.65
3
Papan Kayu KI. I (Jati/Ulin.dll), Papan lantai m 7,470,000.00 1.00 7,470,000.00 1.00 6,412,900.00
3
Papan Kayu KI. II (Kamper/Kruing.dll) m 6,100,520.00 - -
3
Papan Kayu KI. III m 5,602,500.00 - -
Tiang pancang kayu ukuran 15 x 15 cm
M1 127,748.25 - 0.50 65,408.63
(kayu kelas I)
Tiang pancang kayu ukuran 20 x 20 cm
M1 218,388.00 0.45 98,274.60 -
(Kayu kelas I)
Plywood 3 mm Lbr 76,200.00 - -

Plywood 4 mm Lbr 78,500.00 - -

I.2 BAHAN PASANGAN -


3
Batu Pecah 15-20 cm m 586,100.00 - 0.45 314,226.27
3
Batu Pasang (Bulat) m 443,200.00 - 0.14 65,457.26
3
Batu kali m 761,900.00 - 0.33 156,814.58
3
Pasir Pasangan (Lokal) m 410,300.00 - 0.70 272,014.92
3
Pasir Urug (Lokal) m 281,300.00 - 0.02 10,298.57
3
Pasir Beton / Cor m 732,600.00 - 0.02 7,733.14
3
Sirtu m 542,700.00 - 0.09 39,617.14

Semen PC 50 kg Zak 93,776.00 - 25.87 2,729,661.79

I.3 BAHAN SAMBUNGAN -

Paku Ulin 1,5" - 5" Kg 52,400.00 1.10 57,640.00 1.10 53,020.00

Baut Kg 52,400.00 4.15 217,460.00 4.50 216,900.00

Sekrup Fixer Bh 3,500.00 -

I.4 BAHAN PENUTUP (Seng Gelombang) -

BJLS 27 KI Lbr 127,200.00 -

BJLS 20 KI Lbr 101,200.00 - 70.00 6,503,000.00

BJLS 18 KI Lbr 59,800.00 -

I.5 BAHAN LAIN-LAIN -

Minyak Bekisting Ltr 4,600.00 - - 4.00 -

Minyak Pelumas Ltr 74,600.00 6.00 447,600.00 6.00 474,600.00

SUB TOTAL BIAYA BAHAN BANGUNAN 7,698,994.31 7,764,328.28 10,098,823.67

II. UPAH KERJA

Pekerja Biasa Org / Hari 137,800.00 0.15 21,017.95 0.16 3,374.96 0.42 57,403.54

Mandor Org / Hari 174,900.00 0.01 1,329.24 0.01 10.63 0.03 4,684.82

Tukang Kayu Org / Hari 159,000.00 0.20 31,315.05 0.20 6,179.24 -

Kepala Tukang Kayu Org / Hari 164,300.00 0.02 3,236.71 0.02 63.84 -

Halaman 256
2
HARGA SATUAN TERTINGGI BANGUNAN DERMAGA PER M
PEMERINTAH KABUPATEN KUTAI TIMUR
TAHUN 2019

Zone 3

DERMAGA TRESTEL TALUD


NO KEBUTUHAN SATUAN HARGA
VOLUME JUMLAH VOLUME JUMLAH VOLUME JUMLAH

Tukang Batu Org / Hari 159,000.00 - - 0.12 19,647.86

Kepala Tukang Batu Org / Hari 164,300.00 - - 0.01 2,030.28

SUB TOTAL BIAYA UPAH 56,898.95 9,628.68 83,766.50

III. BIAYA KONSTRUKSI (K)

- Sub Total Biaya Bahan Bangunan 7,755,893.25 7,773,956.95 10,182,590.17

- Sub Total Biaya Upah Kerja 56,898.95 9,628.68 83,766.50


- Sub Total Biaya Peralatan Kerja (10% dr
5,689.89 962.87 8,376.65
Upah Kerja)
A. BIAYA NYATA BANGUNAN 7,818,482.09 7,784,548.50 10,274,733.32

B. JASA KONTRAKTOR + OVERHEAD 10% 781,848.21 778,454.85 1,027,473.33

BIAYA PERENCANAAN 7% 547,293.75 544,918.39 719,231.33

BIAYA PENGAWASAN 4% 312,739.28 311,381.94 410,989.33

C. PAJAK-PAJAK 938,217.85 934,145.82 1,232,968.00

- PPh Pasal 21/23 2% 156,369.64 155,690.97 205,494.67

- PPN 10% 781,848.21 778,454.85 1,027,473.33

D. SUB TOTAL (A+B+C) 10,398,581.18 10,353,449.50 13,665,395.31

E. ASURANSI 297,102.32 295,812.84 390,439.87

- All Risk 3% 234,554.46 233,536.45 308,242.00

- Tenaga Kerja 0.50% 39,092.41 38,922.74 51,373.67

- Pihak Ketiga 0.30% 23,455.45 23,353.65 30,824.20

F. PERIJINAN 39,092.41 38,922.74 51,373.67

- Sertifikat Laik Fungsi 0.7% 39,092.41 38,922.74 51,373.67


KESELAMATAN DAN KESEHATAN
G. 0.01 77,558.93 77,739.57 101,825.90
KERJA
H. SUB TOTAL BIAYA KONSTRUKSI FISIK 10,812,334.84 10,765,924.66 14,209,034.75
2
IV. BIAYA KONSTRUKSI FISIK BANGUNAN DERMAGA PER M 10,802,000.00 10,764,000.00 14,181,000.00

Halaman 257
2
HARGA SATUAN TERTINGGI BANGUNAN DERMAGA PER M
PEMERINTAH KABUPATEN KUTAI TIMUR
TAHUN 2019

Zone 4

DERMAGA TRESTEL TALUD


NO KEBUTUHAN SATUAN HARGA
VOLUME JUMLAH VOLUME JUMLAH VOLUME JUMLAH

I. BAHAN

I.1 BAHAN KAYU


3
Balok Ulin (Gelagar dll) m 6,005,670.00 0.08 468,742.54 0.09 602,605.92
3
Papan Kayu KI. I (Jati/Ulin.dll), Papan lantai m 7,470,000.00 1.00 7,470,000.00 1.00 7,135,500.00
3
Papan Kayu KI. II (Kamper/Kruing.dll) m 6,100,520.00 - -
3
Papan Kayu KI. III m 5,602,500.00 - -
Tiang pancang kayu ukuran 15 x 15 cm
M1 127,748.25 - 0.50 72,789.75
(kayu kelas I)
Tiang pancang kayu ukuran 20 x 20 cm
M1 218,388.00 0.45 98,274.60 -
(Kayu kelas I)
Plywood 3 mm Lbr 76,200.00 - -

Plywood 4 mm Lbr 78,500.00 - -

I.2 BAHAN PASANGAN -


3
Batu Pecah 15-20 cm m 586,100.00 - 0.45 319,345.87
3
Batu Pasang (Bulat) m 443,200.00 - 0.14 72,941.66
3
Batu kali m 761,900.00 - 0.33 174,744.80
3
Pasir Pasangan (Lokal) m 410,300.00 - 0.70 301,926.00
3
Pasir Urug (Lokal) m 281,300.00 - 0.02 11,441.83
3
Pasir Beton / Cor m 732,600.00 - 0.02 8,606.00
3
Sirtu m 542,700.00 - 0.09 44,048.57

Semen PC 50 kg Zak 93,776.00 - 25.87 2,908,189.43

I.3 BAHAN SAMBUNGAN -

Paku Ulin 1,5" - 5" Kg 52,400.00 1.10 57,640.00 1.10 53,570.00

Baut Kg 52,400.00 4.15 217,460.00 4.50 219,150.00

Sekrup Fixer Bh 3,500.00 -

I.4 BAHAN PENUTUP (Seng Gelombang) -

BJLS 27 KI Lbr 127,200.00 -

BJLS 20 KI Lbr 101,200.00 - 70.00 6,650,000.00

BJLS 18 KI Lbr 59,800.00 -

I.5 BAHAN LAIN-LAIN -

Minyak Bekisting Ltr 4,600.00 - - 4.00 -

Minyak Pelumas Ltr 74,600.00 6.00 447,600.00 6.00 488,400.00

SUB TOTAL BIAYA BAHAN BANGUNAN 8,501,037.71 8,572,015.67 10,491,244.15

II. UPAH KERJA

Pekerja Biasa Org / Hari 137,800.00 0.15 21,017.95 0.16 3,374.96 0.42 57,403.54

Mandor Org / Hari 174,900.00 0.01 1,329.24 0.01 10.63 0.03 4,684.82

Tukang Kayu Org / Hari 159,000.00 0.20 31,315.05 0.20 6,179.24 -

Kepala Tukang Kayu Org / Hari 164,300.00 0.02 3,236.71 0.02 63.84 -

Halaman 258

Anda mungkin juga menyukai