Anda di halaman 1dari 1

ADR/ROD/F-006

PT PAMAPERSADA NUSANTARA KODE DEPARTEMEN


ADARO COAL MINING PROJECT 1.PROD 4. ROAD 7. LOG
2. PHE 5. PCH 8. SHE
GRADER & COMPACTOR TIME SHEET 3. HRGA 6. HAUL
C/N UNIT :1. 2. TANGGAL : KODE LOKASI
NAMA : HM AWAL : 1. 2. (RO) ROAD (RM) ROM
NRP : HM AKHIR : 1. 2.
UNPRODUCTIVE TIME MAINT. (OT) OTHERS (HP) HOPPER
KODE AKTIVITAS

TIDAK ADA OPERATOR


KONDISI BASAH (WET)
(PT) Patching (RS) Resheeting

TDK ADA PEKERJAAN


ISTIRAHAT & MAKAN

WAKTU KERJA
TIDAK DIBUTUHKAN
TUNGGU ALAT LAIN

TUNGGU OPERATOR

JADWAL SERVICE
TUNGGU SURVEY
ISI SOLAR &LUBE

ACTIVITY (MT) Maintenance

DEMO (STRIKE)
CHANGE SHIFT
DEPARTMENT

BREAK DOWN
PINDAH ALAT

HUJAN (RAIN)

DEBU/KABUT
CUCI UNIT
CEK BAN

CATATAN OPERATOR
P2H

SHIFT

KODE KODE
S1 S2 DIISI WAKTU YANG TERJADI (MENIT)
AKTIFITAS
LOKASI
Start Operasi jam:
06.00 18.00

06.30

07.00 19.00

08.00 20.00

09.00 21.00

10.00 22.00

11.00 23.00

12.00 24.00

13.00 01.00

14.00 02.00

15.00 03.00

16.00 04.00

17.00 05.00

Stop operasi jam :


Dibuat oleh Driver Diperiksa oleh foreman Jam Kerja Operator
(Diisi oleh Group Leader)
PRODUKSI :

NON PROD :
(………………) ( …………………)
nama terang nama terang

DISTRIBUSI: PUTIH (Road Maint.Dept.), MERAH (Operator), KUNING (Plant Dept.) Revisi : 0