Parameter Efisiensi
BOD 15-30% Screen 3
TSS 15-30%
Sumber: ASCE, bab 10 halaman 54
Parameter Efisiensi
BOD 0%
N 0%
Sumber : Metcalf and Eddy, (2003), wastewater Enginering Treatment and Reuse. Halaman 385
Bak Ekualisasi
Parameter Efisiensi
Kedalaman (m) 1,5-2
Slope pada Dinding 3:1 -- 2:1
Sumber : Metcalf and Eddy, (2003), wastewater Enginering Treatment and Reuse. Halaman 343
Bangunan Pengendap 1
Parameter Satuan Besaran
Range Tipikal
Rectangular
Kedalaman m 3 – 4,9 4,3
Panjang m 15-90 24 – 40
Lebar m 24-Mar 4,9 – 9,8
Flight speed m/min 0,6-1,2 0,9
Circular
Kedalaman m 3-4,9 4,3
Diameter m 3--60 12 – 45
Slope dasar m/min 1/16 – 1/6 1-/12
Flight speed r/min 0,02 – 0,05 0,03
Sumber : Metcalf and Eddy, (2003), wastewater Enginering Treatment and Reuse. Halaman 398
Parameter efisiensi
TSS 50-70%
BOD 30-40%
Bak Pengendap I
35 35
(BP I)
COD 30-40%
N 8--15%
P 8--12%
Oxydation Ditch
td jam 18-36
Parameter efisiensi
Oxydation
85
Ditch (OD)
COD 80-90%
BOD 75-95%
Sumber Qasim (1985) halaman 310
Activated Sludge
Parameter satuan range tipikal
k per day 02--08 4
kd per day 0.03-0.07 0.05
ks mg/l BOD5 40-120 80
mg/l COD 20-80 40
y VSS/BOD5 0.3-0.7 0.5
VSS/COD 0.2-0.5 0.4
Sumber: Qasim (1985) halaman 308
Parameter efisien
Activated
Sludge
Convention
BOD 80-85% al
COD 80-85%
TSS 80-90%
P 10-25%
N 8-15%
Sumber: Qasim (1985) halaman 53
Trickling Filter
Parameter satuan range
jenis batu
hydraulic loading m3/m2.d 1--4
organik loading kg BOD/m3.d 0,07--0,22
recirculasi 0
kedalaman m 1,8--2,4
Power kW/103m3 2--4
Sumber: Metcalf and Eddy (2003) halaman 893
Parameter Efisiensi
BOD 60-80%
COD 60-80%
TSS 60-85%
P 8-12%
N 8-15%
sumber: Qasim (1985) halaman 53
Sludge Thickener
Parameter Satuan Besaran
Solid Loading kg/m .hari
2
40 – 78
Konsentrasi Solid Lumpur % 2–8
Sludge Volume Ratio Hari 0.5 – 20
Kedalaman Sudge Blanket M 0.6 – 2.4
Slope Bak - 1,4 – 1,6
Sumber Qasim, (1985) halaman Apendix
Sumur
60 10 10 0 0 0 0 0
Pengumpul
Bak
0 0 0 0 0
Equalisasi
Screen 3 3 7 - -
Grit
- - - - -
Chamber
Bak
Pengendap 35 35 60 10 10
I (BP I)
Oxydation
85 85 85 70 -
Ditch (OD)
Activated
Sludge
90 83 85 40 20
Convention
al
Trickling
70 70 75 30 10
Filter (TF)
Secondary
Clarifier 88 73 50 95 75
(SC)
Sludge
Drying Bed 0 0 0 0 0
(SDB)
85 85 70 -
90 83 85 40 20
KARAKTERISTIK AIR BAKU MUTU (pergub 45 thn
LIMBAH 2002,KELAS II)
Kualitas air Limbah Baku Mutu
Parameter Parameter
(mg/L) (mg/L)
BOD 370 BOD 50
COD - COD 100
TSS 320 TSS 200
N 8 N 20
P 4 P -
Oxydation Ditch
80 - 90 80 - 90 80 - 90 70 -
(OD)
Activated Sludge
80 - 95 80 - 85 80 - 90 15 - 50 10 - 25
Conventional
Trickling Filter
65 - 80 60 - 80 60 - 85 15 - 50 8 - 12
(TF)
Secondary
88 73 50 95 75
Clarifier (SC)
Sludge Drying
- - - - -
Bed (SDB)
Sumber : Qasim, Wastewater Treatment Plants, 1985
TIPIKAL EFISIENSI REMOVAL YANG DIGUNAKAN
Oxydation Ditch
80 85 70 -
(OD)
Activated Sludge
90 82 35 20
Conventional
Trickling Filter
70 70 30 10
(TF)
Secondary
88 50 95 75
Clarifier (SC)
Sludge Drying
- - - -
Bed (SDB)
ALTERNATIF 2 (OD)
UNIT PENGOLAHAN
Konsentrasi Awal Baku Mutu Removal yang
Parameter
(mg/L) (mg/L) Dibutuhkan (%)
Grit Chamber BP I
ALTERNATIF 3 (TRICKLING
FILTER)
UNIT PENGOLAHAN
900 990
1300 1430
1500 1650
2200 2420
GOLAHAN
Oxidation Ditch
Activated Sludge
GOLAHAN
Trickling Filter
Unit Pengolahan
GRIT CHAMBER
Influen
Diketahui :
Q ave = 0.1146 m3/det = 9901.44 m3/hari
BOD = 370 mg/L = 0.37 kg/m3
COD =- mg/L = #VALUE! kg/m3
TSS = 320 mg/L = 0.32 kg/m3
N = 8 mg/L = 0.008 kg/m3
P = 4 mg/L = 0.004 kg/m3
Perhitungan : Influen
M BOD = Q ave x [BOD]
= 8640 m3/hari x 250mg/L
= 3196.8 kg/hari
M COD = Q ave x [COD]
= 8640 m3/hari x 350mg/L
= #VALUE! kg/hari
M TSS = Q ave x [TSS]
= 8640 m3/hari x 200 mg/L
= 2764.8 kg/hari
MN = Q ave x [N]
= 8640 m3/hari x 20 mg/L
= 69.12 kg/hari
MP = Q ave x [P]
= 8640 m3/hari x 1 mg/L
= 34.56 kg/hari
Removal
M BOD = 3% x M BOD
= 3% x 2160 kg/hari
= 95.9 kg/hari
M COD = 3% x M COD
= 3% x 3024 kg/hari
= #VALUE! kg/hari
M TSS = 7% x M TSS
= 7% x 1728 kg/hari
= 193.536 kg/hari
MN = 69.12 kg/hari
MP = 34.56 kg/hari
Effluen
M BOD = M BOD influen - M BOD removal
= 2160 kg/hari - 64.8 kg/hari
= 3100.9 kg/hari
M COD = M COD influen - M COD removal
= 3024 kg/hari - 90.7 kg/hari
= #VALUE! kg/hari
M TSS = M TSS influen - M TSS removal
= 1728 kg/hari - 120.96 kg/hari
= 2571.264 kg/hari
MN = 69.12 kg/hari
MP = 34.56 kg/hari
Sg = 1.06
ρ air = 1 gr/cm3
Debit lumpur = Msolid
Sgx airx 1000
= 120.96kg / hari
1.06 x1x1000
= 3.0 m3/hari
Q effluen = Q ave - Debit lumpur
= 9901.44 m3/hari - 1.9 m3/hari
= 9898.4 m3/hari
BAK PENGENDAP I
Influen
Diketahui :
Q influen = 9898.4 m3/hari
M BOD = 3100.9 kg/hari
M COD = #VALUE! kg/hari
M TSS = 2571.264 kg/hari
MN = 69.12 kg/hari
MP = 34.56 kg/hari
Removal
M BOD = 35% x M BOD
= 35% x 2095.2 kg/hari
= 1085.3 kg/hari
M COD = 35% x M COD
= 35% x 2933.3 kg/hari
= #VALUE! kg/hari
M TSS = 60% x M TSS
= 60% x 1607.04 kg/hari
= 1542.8 kg/hari
MN = 10% x M N
= 10% x 172.8 kg/hari
= 6.912 kg/hari
MP = 10% x M P
= 10% x 8.64 kg/hari
= 3.5 kg/hari
Effluen
M BOD = M BOD influen - M BOD removal
= 2095.2 kg/hari - 733.3 kg/hari
= 2015.6 kg/hari
M COD = M COD influen - M COD removal
= 2933.3 kg/hari - 1027 kg/hari
= #VALUE! kg/hari
M TSS = M TSS influen - M TSS removal
= 1607.04 kg/hari - 964.2 kg/hari
= 1028.5 kg/hari
MN = M N influen - M N removal
= 172.8 kg/hari - 17.28 kg/hari
= 62.2 kg/hari
MP = M P influen - M P removal
= 8.64 kg/hari - 0.9 kg/hari
= 31.10 kg/hari
Sg = 1.04
ρ air = 1 gr/cm3
Debit lumpur = Msolid
Sgxairx%solidx1000
= 964.2kg / hari
1.06x1x0.06x1000
= 24.7 m3/hari
Q effluen = Q influen - Debit lumpur
= 9899.5 m3/hari - 15.5 m3/hari
= 9873.7 m3/hari
ACTIVATED SLUDGE
& SECONDARY CLARIFIER
Influen
Diketahui :
Q influen = 9873.7 m3/hari
M BOD = 2015.6 kg/hari
M COD = #VALUE! kg/hari
M TSS = 1028.5 kg/hari
MN = 62.2 kg/hari
MP = 31.1 kg/hari
Removal
M BOD = 90% x M BOD
= 90% x 1361.9 kg/hari
= 1713.2 kg/hari
M COD = 83% x M COD
= 83% x 1906.6 kg/hari
= #VALUE! kg/hari
M TSS = 85% x M TSS
= 85% x 642.8 kg/hari
= 874.2 kg/hari
MN = 40% x M N
= 40% x 155.5 kg/hari
= 24.9 kg/hari
MP = 20% x M P
20% x 7.8 kg/hari
6.2 kg/hari
Effluen
M BOD = M BOD influen - M BOD removal
= 1361.9 kg/hari - 1157.6 kg/hari
= 302.3 kg/hari
M COD = M COD influen - M COD removal
= 1906.06 kg/hari - 1582.5 kg/hari
= #VALUE! kg/hari
M TSS = M TSS influen - M TSS removal
= 642.8 kg/hari - 546.4 kg/hari
= 154.3 kg/hari
MN = M N influen - M N removal
= 155.5 kg/hari - 62..2 kg/hari
= 37.3 kg/hari
MP = M P influen - M P removal
7.8 kg/hari - 1.6 kg/hari
24.9 kg/hari
Sg = 1.02
ρ air = 1 gr/cm3
Debit lumpur = Msolid
Sgxairx%solidx1000
= 546.4kg / hari
1.02x1x0.013x1000
= 65.9 m3/hari
Q effluen = Q influen - Debit lumpur
= 9884.1 m3/hari - 8.9 m3/hari
= 9807.7 m3/hari
CHECK BALANCE
Q in = q out
Q in BP I = Q effluen + QR + q + Q effluen BP I
9899.5m3/hari = 9884.1 m3/hari + 30.9 m3/hari +10.3 m3/hari + 15.5 m3/hari
9898.4 = 9898.4 m3/hari
85 40 20
75 30 10
50 95 75
0 0 0