Mutu Bahan
a. MUTU BETON
- Dipakai mutu beton : K-225
b. TULANGAN
Pembebanan
c. Kombinasi Pembebanan
- Beban Tetap : U = 1.2 DL + 1.6 LL
Analisa Struktur
Deskripsi Bangunan
Type Struktur
Perhitungan
Beban mati
B. mati = (orang+mati).Skuda-kuda.Sgording 540
B. gording = (bg.hg).Skuda-kuda.1000 28.8
Ptengah = Bmati + Bgording 568.8
Ppinggir = Ptengah/2 284.4
Beban angin
derajat<=65 = (0,02.sudut-0,4).Skuda-kuda.Sgording.Tangin 27
65<=derajat<=90 = (0,9).Skuda-kuda.Sgording.Tangin 81
Pangintekan 27
txt=Panginkiri.sin(derajat) 15.49
tyt=Panginkiri.cos(derajat) 22.12
Pangintarik=0,4.Skuda-kuda.Sgording.Tangin 36.00
hxt=Panginkiri.sin(derajat) 20.65
hyt=Panginkiri.cos(derajat) 29.49
-568.8 kg -568.8 kg
-568.8 kg -568.8"kg
15
15
GORDING 08/14
E.1 Perhitungan Gording
Data-data Kesimpulan :
- Jarak kuda-kuda max = 300 cm - tegangan OK
- Bentang kuda-kuda = 1500 cm - lendutan :
- Jarak gording = 120 cm OK
- Berat penutup atap = 50 kg/m2
- Berat angin = 25 kg/m2
- Kemiringan kuda-kuda = 35 derajat
Kelas kuat kayu 1/2/3/4 ? = 2
Ukuran gording 08/14 cm kayu kruwing Bj = 0.79
Kontrol Lendutan
L = 300 cm
Beban mati
1. Bs Gording =
0.08x0.14x0.79x1000 x 3 = 26.54 kg
2. Bs. Atap = 1.2 x 50 = 60 kg/m'
3. Bs. Kuda-kuda L = 15 m
15 x 3 = 45 kg/m'
4. Bs. Eternit = 3 x 11 = 33 kg/m'
5. Bs. Penggantung = 3 x 8 = 24 kg/m'
No. Batang P (kg) Lk (cm) b (cm) h (cm) Jml Fbr (cm2) I (cm4) I (cm3) lamda Wtabel tegpakai < tegijin Ket
6 x (4 x 5) 1/12 x 4 x 5^3 0,289 x 5 3/9 2 x 11 / 7
1 2 3 4 5 6 7 8 9 10 11 12 13 14
d = 2.5 cm
d = 2.5 cm
d = 2.5 cm
d = 2.5 cm
d = 2.5 cm
P = 7,401.00 kg
M = 179.41 kg.m
panjang tekuk = 400 cm
b = 30 cm
ht = 15 cm
M 179.41 2.42
eo1 = = = 0.02 = cm
P 7,401.00
1 15
eo2 = ht = = 0.5 cm
30 30
eo 2.92
= = 0.1949 cm
ht 15
C1 = 1 2
e1 = C1 C2 ( lk / 100.ht )2 . ht
2
= 1 7.286 ( 400 / 100 15 ) 15
= 7.772 cm
e2 = 0.15 ht = 2.25 cm
eu = eo + e1 + e2
= 2.92 + 7.772 + 2.25 = 12.95 cm
eau = eu + ( 1/2 ht )
= 12.95 + 7.5
= 20.45 cm
m = fc / (0,85 .fy)
= 240 / (0.85 . 22.5)
= 12.55
2
Rn = M / (f b d )
= 15,131,985/(0.85.150.130,130)
= 7.023
= 0.03862
Dipasang tulangan 8 d - 19
6 D(Aact13= ( Aact = 796 mm2) > 753.07
Pembesian begel :
Dsengkang d8 - 150 mm
S1 = 48x8 = 384 mm
S2 = 16x13 = 208 mm
S3 = 150 mm
Smin 150 mm
PENULANGAN KOLOM K2 (30x20)
P = 17,256.00 kg
M = 123.00 kg.m
panjang tekuk = 400 cm
b = 30 cm
ht = 20 cm
M 123.00 0.71
eo1 = = = 0.01 = cm
P 17,256.00
1 20
eo2 = ht = = 0.67 cm
30 30
eo 1.38
= = 0.069 cm
ht 20
C1 = 1 2
e1 = C1 C2 ( lk / 100.ht )2 . ht
2
= 1 6.552 ( 400 / 100 20 ) 20
= 5.242 cm
e2 = 0.15 ht = 3.00 cm
eu = eo + e1 + e2
= 1.38 + 5.242 + 3 = 9.62 cm
eau = eu + ( 1/2 ht )
= 9.62 + 10.0
= 19.62 cm
m = fc / (0,85 .fy)
= 240 / (0.85 . 22.5)
= 12.55
2
Rn = M / (f b d )
= 33,858,105/(0.85.200.180,180)
= 6.147
= 0.03206
Dipasang tulangan 8 d - 10
19 D(Aact13= ( Aact = 1327 mm2) > 1,154.28
Pembesian begel :
Dsengkang d8 - 200 mm
S1 = 48x8 = 384 mm
S2 = 16x13 = 208 mm
S3 = 200 mm
Smin 200 mm
PENULANGAN KOLOM K3 (30x15)
P = 2,522.63 kg
M = 28.35 kg.m
panjang tekuk = 400 cm
b = 30 cm
ht = 15 cm
M 28.35 1.12
eo1 = = = 0.01 = cm
P 2,522.63
1 15
eo2 = ht = = 0.5 cm
30 30
eo 1.62
= = 0.1083 cm
ht 15
C1 = 1 2
e1 = C1 C2 ( lk / 100.ht )2 . ht
2
= 1 6.96 ( 400 / 100 15 ) 15
= 7.424 cm
e2 = 0.15 ht = 2.25 cm
eu = eo + e1 + e2
= 1.62 + 7.424 + 2.25 = 11.30 cm
eau = eu + ( 1/2 ht )
= 11.30 + 7.5
= 18.80 cm
m = fc / (0,85 .fy)
= 240 / (0.85 . 22.5)
= 12.55
2
Rn = M / (f b d )
= 4,741,996/(0.85.150.130,130)
= 2.201
= 0.00977
Dipasang tulangan 8 d - 19
4 D(Aact12= ( Aact = 452 mm2) > 190.48
Pembesian begel :
Dsengkang d8 - 150 mm
S1 = 48x8 = 384 mm
S2 = 16x12 = 192 mm
S3 = 150 mm
Smin 150 mm
PERHITUNGAN PENULANGAN SLOOF (SL-1)
Mn = Asakt x fy d - a/2
68.455
= 678.24 x 240 243 -
2
-6
= 33902091.98 x 10
= 33.90209198 KNm
Mt = f Mn
= 0.8 x 33.902
= 27.1217 KNm salah
b. Penulangan Lapangan
1. Menghitung koefisien tahanan balok
K = Mu / f x bw x d2
6
16.600 x 10
K = 2
0.8 x 150 x 280
= 1.764 Mpa
2. Menghitung rasio tulangan perlu
0.85 f,c 2 x k
r perlu = x 1 - 1 -
fy 0.85 f,c
Mn = Asakt x fy x d - a/2
45.637
= 339.12 x 240 261 -
2
-6
= 19385318.13 x 10
= 19.38531813
Mt = f Mn
= 0.8 x 19.385
= 15.5083 KNm salah
Mn = Asakt x fy d - a/2
45.637
= 452.16 x 240 243 -
2
-6
= 23839500.44 x 10
= 23.83950044 KNm
Mt = f Mn
= 0.8 x 23.840
= 19.0716 KNm >> Mu ……….. Oke
b. Penulangan Lapangan
1. Menghitung koefisien tahanan balok
K = Mu / f x bw x d2
6
9.455 x 10
K = 2
0.8 x 150 x 280
= 1.005 Mpa
2. Menghitung rasio tulangan perlu
0.85 f,c 2 x k
r perlu = x 1 - 1 -
fy 0.85 f,c
Mn = Asakt x fy x d - a/2
45.637
= 339.12 x 240 261 -
2
-6
= 19385318.13 x 10
= 19.38531813
Mt = f Mn
= 0.8 x 19.385
= 15.5083 KNm Mu ……….. Oke
Mn = Asakt x fy d - a/2
91.273
= 1205.76 x 240 239 -
2
-6
= 55811240.73 x 10
= 55.81124073 KNm
Mt = f Mn
= 0.8 x 55.811
= 44.649 KNm salah
b. Penulangan Lapangan
1. Menghitung koefisien tahanan balok
K = Mu / f x bw x d2
6
24.950 x 10
K = 2
0.8 x 200 x 280
= 1.989 Mpa
2. Menghitung rasio tulangan perlu
0.85 f,c 2 x k
r perlu = x 1 - 1 -
fy 0.85 f,c
Mn = Asakt x fy x d - a/2
60.849
= 602.88 x 240 259 -
2
-6
= 33072866.91 x 10
= 33.07286691
Mt = f Mn
= 0.8 x 33.073
= 26.4583 KNm Mu ……….. Oke
Mn = Asakt x fy d - a/2
40.170
= 530.66 x 240 261 -
2
-6
= 30618881.49 x 10
= 30.61888149 KNm
Mt = f Mn
= 0.8 x 30.619
= 24.4951 KNm >> Mu ……….. Oke
b. Penulangan Lapangan
1. Menghitung koefisien tahanan balok
K = Mu / f x bw x d2
6
11.800 x 10
K = 2
0.8 x 200 x 280
= 0.941 Mpa
2. Menghitung rasio tulangan perlu
0.85 f,c 2 x k
r perlu = x 1 - 1 -
fy 0.85 f,c
Mn = Asakt x fy x d - a/2
40.170
= 397.995 x 240 261 -
2
-6
= 22964161.11 x 10
= 22.96416111
Mt = f Mn
= 0.8 x 22.964
= 18.3713 KNm Mu ……….. Oke
Data - data
Beban mati
pelat = 0.1 x 2400 = 240 kg/m2
spesi = 2 x 21 = 42
keramik = 0 x 24 = 0
beban plafond + pengantung + rangka = 0
AC + pipa = 0
DD = 282 kg/m2
Beban hidup
air hujan = 0.1 x 1000 = 100 kg/m2
guna = 100
DL 200 kg/m2
Beban berfaktor
D = 1,2 x 282 + 1,6 x 200 = 658.4 kg/m2
Statika
q 658.4 kg/m2
lx 3.00 m
ly 4.00 m
ly/lx 1.33
Jepit penuh/elastis {1/2] 2
wtx (tabel setelah interpolasi) 51.00
wty (tabel setelah interpolasi) 38.00
Mlx = 0,001x 658.4 x 3.00^2 x 51 = 302.21 kgm
Mly = 0,001x 658.4 x 3.00^2 x 38 = 225.17 kgm
Mtx = 0,001x 658.4 x 3.00^2 x 51 = 302.21 kgm
Mty = 0,001x 658.4 x 3.00^2 x 38 = 225.17 kgm
Penulangan
Data-data
fc' (beton) 18.675 Mpa h 100 mm
fy' (baja) 240 Mpa b 1000 mm
d' (1) 20 mm (dlm ruang)
pmin = = 0.0025
pmaks = = 0.0404
Lapangan x
Mu = 302.2056 *9.8/1000kgm = 2.83 kNm
d = 100 - 20 = 80 mm
Mu = 2.83 = 442.9201
bd2 1 x 0.08^2
Tumpuan x
Mu = 302.2056 *9.8/1000kgm = 2.83 kNm
d = 100 - 20 = 80 mm
Mu = 2.83 = 442.9201
bd2 1 x 0.08^2
Lapangan y
Mu = 225.1728 *9.8/1000kgm = 2.11 kNm
d = 100 - 20 = 80 mm
Mu = 2.11 = 330.0189
bd2 1 x 0.08^2
Mu = 2.11 = 330.0189
bd2 1 x 0.08^2
Rekapitulasi
mm2 mm
Lapangan X (tul atas) 200.00 f8 - 200 ( 251 mm2 )
Tumpuan X (tul atas) 200.00 f8 - 200 ( 251 mm2 )
Tumpuan X (tul bagi) 200.00 f8 - 200 ( 251 mm2 )
Lapangan Y (tul atas) 200.00 f8 - 200 ( 251 mm2 )
Tumpuan Y (tul atas) 200.00 f8 - 200 ( 251 mm2 )
Tumpuan Y (tul bagi) 200.00 f8 - 200 ( 251 mm2 )
PENULANGAN PLAT LANTAI 2 (4 X 4 M)
Data - data
Beban mati
pelat = 0.12 x 2400 = 288 kg/m2
spesi = 3 x 21 = 63
keramik = 2 x 24 = 48
Dinding = 0
beban plafond + pengantung + rangka = 18
AC + pipa = 23
DD = 440 kg/m2
Beban hidup
air hujan = 0 kg/m2
guna = 250
DL 250 kg/m2
Beban berfaktor
D = 1,2 x 440 + 1,6 x 250 = 928 kg/m2
Statika
q 928 kg/m2
lx 4.00 m
ly 4.00 m
ly/lx 1.00
Jepit penuh/elastis {1/2] 2
wtx (tabel setelah interpolasi) 36.00
wty (tabel setelah interpolasi) 36.00
Mlx = 0,001x 928 x 4.00^2 x 36 = 534.53 kgm
Mly = 0,001x 928 x 4.00^2 x 36 = 534.53 kgm
Mtx = 0,001x 928 x 4.00^2 x 36 = 534.53 kgm
Mty = 0,001x 928 x 4.00^2 x 36 = 534.53 kgm
Penulangan
Data-data
fc' (beton) 18.675 Mpa h 120 mm
fy' (baja) 240 Mpa b 1000 mm
d' (1) 20 mm (dlm ruang)
pmin = = 0.0058
pmaks = = 0.0404
Lapangan x
Mu = 534.528 *9.8/1000kgm = 5.01 kNm
d = 120 - 20 = 100 mm
Mu = 5.01 = 501.3873
bd2 1 x 0.1^2
p= = 0.0026 < 0.0058
< 0.0404
ppakai = 0.0058
As = 0.0058 x 1000 x 100 = 583.33 mm2
Tumpuan x
Mu = 534.528 *9.8/1000kgm = 5.01 kNm
d = 120 - 20 = 100 mm
Mu = 5.01 = 501.3873
bd2 1 x 0.1^2
Lapangan y
Mu = 534.528 *9.8/1000kgm = 5.01 kNm
d = 120 - 20 = 100 mm
Mu = 5.01 = 501.3873
bd2 1 x 0.1^2
Tumpuan y
Mu = 534.528 *9.8/1000kgm = 5.01 kNm
d = 120 - 20 = 100 mm
Mu = 5.01 = 501.3873
bd2 1 x 0.1^2
Rekapitulasi
mm2 mm
Lapangan X (tul atas) 583.33 f10 - 125 ( 628 mm2 ) M7
Tumpuan X (tul atas) 583.33 f10 - 125 ( 628 mm2 ) M7
Tumpuan X (tul bagi) 240 f8 - 200 ( 251 mm2 ) M6
Lapangan Y (tul atas) 583.33 f10 - 125 ( 628 mm2 ) M7
Tumpuan Y (tul atas) 583.33 f10 - 125 ( 628 mm2 ) M7
Tumpuan Y (tul bagi) 240 f8 - 200 ( 251 mm2 ) M6
PENULANGAN PLAT LANTAI 2 (3 X 4.5 M)
Data - data
Beban mati
pelat = 0.12 x 2400 = 288 kg/m2
spesi = 3 x 21 = 63
keramik = 2 x 24 = 48
Dinding = 0
beban plafond + pengantung + rangka = 18
AC + pipa = 23
DD = 440 kg/m2
Beban hidup
air hujan = 0 kg/m2
guna = 250
DL 250 kg/m2
Beban berfaktor
D = 1,2 x 440 + 1,6 x 250 = 928 kg/m2
Statika
q 928 kg/m2
lx 3.00 m
ly 4.50 m
ly/lx 1.50
Jepit penuh/elastis {1/2] 2
wtx (tabel setelah interpolasi) 56.00
wty (tabel setelah interpolasi) 37.00
Mlx = 0,001x 928 x 3.00^2 x 56 = 467.71 kgm
Mly = 0,001x 928 x 3.00^2 x 37 = 309.02 kgm
Mtx = 0,001x 928 x 3.00^2 x 56 = 467.71 kgm
Mty = 0,001x 928 x 3.00^2 x 37 = 309.02 kgm
Penulangan
Data-data
fc' (beton) 18.675 Mpa h 120 mm
fy' (baja) 240 Mpa b 1000 mm
d' (1) 20 mm (dlm ruang)
pmin = = 0.0058
pmaks = = 0.0404
Lapangan x
Mu = 467.712 *9.8/1000kgm = 4.39 kNm
d = 120 - 20 = 100 mm
Mu = 4.39 = 438.7139
bd2 1 x 0.1^2
p= = 0.0023 < 0.0058
< 0.0404
ppakai = 0.0058
As = 0.0058 x 1000 x 100 = 583.33 mm2
Tumpuan x
Mu = 467.712 *9.8/1000kgm = 4.39 kNm
d = 120 - 20 = 100 mm
Mu = 4.39 = 438.7139
bd2 1 x 0.1^2
Lapangan y
Mu = 309.024 *9.8/1000kgm = 2.90 kNm
d = 120 - 20 = 100 mm
Mu = 2.90 = 289.8645
bd2 1 x 0.1^2
Tumpuan y
Mu = 309.024 *9.8/1000kgm = 2.90 kNm
d = 120 - 20 = 100 mm
Mu = 2.90 = 289.8645
bd2 1 x 0.1^2
Rekapitulasi
mm2 mm
Lapangan X (tul atas) 583.33 f10 - 125 ( 628 mm2 ) M7
Tumpuan X (tul atas) 583.33 f10 - 125 ( 628 mm2 ) M7
Tumpuan X (tul bagi) 240 f8 - 200 ( 251 mm2 ) M6
Lapangan Y (tul atas) 583.33 f10 - 125 ( 628 mm2 ) M7
Tumpuan Y (tul atas) 583.33 f10 - 125 ( 628 mm2 ) M7
Tumpuan Y (tul bagi) 240 f8 - 200 ( 251 mm2 ) M6
PENULANGAN PLAT LANTAI 2 (4 X 5 M)
Data - data
Beban mati
pelat = 0.12 x 2400 = 288 kg/m2
spesi = 3 x 21 = 63
keramik = 2 x 24 = 48
Dinding = 0
beban plafond + pengantung + rangka = 18
AC + pipa = 23
DD = 440 kg/m2
Beban hidup
air hujan = 0 kg/m2
guna = 250
DL 250 kg/m2
Beban berfaktor
D = 1,2 x 440 + 1,6 x 250 = 928 kg/m2
Statika
q 928 kg/m2
lx 4.00 m
ly 5.00 m
ly/lx 1.25
Jepit penuh/elastis {1/2] 2
wtx (tabel setelah interpolasi) 48.00
wty (tabel setelah interpolasi) 38.00
Mlx = 0,001x 928 x 4.00^2 x 48 = 712.70 kgm
Mly = 0,001x 928 x 4.00^2 x 38 = 564.22 kgm
Mtx = 0,001x 928 x 4.00^2 x 48 = 712.70 kgm
Mty = 0,001x 928 x 4.00^2 x 38 = 564.22 kgm
Penulangan
Data-data
fc' (beton) 18.675 Mpa h 120 mm
fy' (baja) 240 Mpa b 1000 mm
d' (1) 20 mm (dlm ruang)
pmin = = 0.0058
pmaks = = 0.0404
Lapangan x
Mu = 712.704 *9.8/1000kgm = 6.69 kNm
d = 120 - 20 = 100 mm
Mu = 6.69 = 668.5164
bd2 1 x 0.1^2
p= = 0.0035 < 0.0058
< 0.0404
ppakai = 0.0058
As = 0.0058 x 1000 x 100 = 583.33 mm2
Tumpuan x
Mu = 712.704 *9.8/1000kgm = 6.69 kNm
d = 120 - 20 = 100 mm
Mu = 6.69 = 668.5164
bd2 1 x 0.1^2
Lapangan y
Mu = 564.224 *9.8/1000kgm = 5.29 kNm
d = 120 - 20 = 100 mm
Mu = 5.29 = 529.2421
bd2 1 x 0.1^2
Tumpuan y
Mu = 564.224 *9.8/1000kgm = 5.29 kNm
d = 120 - 20 = 100 mm
Mu = 5.29 = 529.2421
bd2 1 x 0.1^2
Rekapitulasi
mm2 mm
Lapangan X (tul atas) 583.33 f10 - 125 ( 628 mm2 ) M7
Tumpuan X (tul atas) 583.33 f10 - 125 ( 628 mm2 ) M7
Tumpuan X (tul bagi) 240 f8 - 200 ( 251 mm2 ) M6
Lapangan Y (tul atas) 583.33 f10 - 125 ( 628 mm2 ) M7
Tumpuan Y (tul atas) 583.33 f10 - 125 ( 628 mm2 ) M7
Tumpuan Y (tul bagi) 240 f8 - 200 ( 251 mm2 ) M6
PENULANGAN PLAT ATAP /LISPLANK (1 X 4 M)
Data - data
Beban mati
pelat = 0.1 x 2400 = 240 kg/m2
spesi = 2 x 21 = 42
keramik = 0 x 24 = 0
beban plafond + pengantung + rangka = 0
AC + pipa = 0
DD = 282 kg/m2
Beban hidup
air hujan = 0.1 x 1000 = 100 kg/m2
guna = 100
DL 200 kg/m2
Beban berfaktor
D = 1,2 x 282 + 1,6 x 200 = 658.4 kg/m2
Statika
q 658.4 kg/m2
lx 1.00 m
ly 4.00 m
ly/lx 4.00
Jepit penuh/elastis {1/2] 1
wtx (tabel setelah interpolasi) 42.00
wty (tabel setelah interpolasi) 42.00
Mlx = 0,001x 658.4 x 1.00^2 x 63 = 41.48 kgm
Mly = 0,001x 658.4 x 1.00^2 x 8 = 5.27 kgm
Mtx = 0,001x 658.4 x 1.00^2 x 42 = 27.65 kgm
Mty = 0,001x 658.4 x 1.00^2 x 42 = 27.65 kgm
Penulangan
Data-data
fc' (beton) 18.675 Mpa h 100 mm
fy' (baja) 240 Mpa b 1000 mm
d' (1) 20 mm (dlm ruang)
pmin = = 0.0025
pmaks = = 0.0404
Lapangan x
Mu = 41.4792 *9.8/1000kgm = 0.39 kNm
d = 100 - 20 = 80 mm
Mu = 0.39 = 60.7930
bd2 1 x 0.08^2
Tumpuan x
Mu = 27.6528 *9.8/1000kgm = 0.26 kNm
d = 100 - 20 = 80 mm
Mu = 0.26 = 40.5286
bd2 1 x 0.08^2
Lapangan y
Mu = 5.2672 *9.8/1000kgm = 0.05 kNm
d = 100 - 20 = 80 mm
Mu = 0.05 = 7.7197
bd2 1 x 0.08^2
Mu = 0.26 = 40.5286
bd2 1 x 0.08^2
Rekapitulasi
mm2 mm
Lapangan X (tul atas) 200.00 f8 - 200 ( 251 mm2 )
Tumpuan X (tul atas) 200.00 f8 - 200 ( 251 mm2 )
Tumpuan X (tul bagi) 200.00 f8 - 200 ( 251 mm2 )
Lapangan Y (tul atas) 200.00 f8 - 200 ( 251 mm2 )
Tumpuan Y (tul atas) 200.00 f8 - 200 ( 251 mm2 )
Tumpuan Y (tul bagi) 200.00 f8 - 200 ( 251 mm2 )
PENULANGAN TANGGA RADIAL
Data - data
- Balok diambil bentang yang terpanjang
- Tumpuan jepit-jepit
tebal plat 0.15 m fc' (beton) 22.5 Mpa
tebal spesi 2 cm fy' (baja) 320 Mpa
tebal tegel 3 cm d' 20 mm
beban plafond 0 kg/m2 L 1.5 m
beban penggantung 0 kg/m2 optred 0.3 m
beban AC + pipa 0 kg/m2 antrade 0.17 m
tebal air hujan 0 m a 45.0 derajat
beban guna 300 kg/m2
Gambar Rencana
1,472.54 kg/m
1,472.54 kg/m
1.5 m
2m 1.5 m
Pembebanan
Beban terbagi rata
Beban mati
pelat =
[0.15/cosA + 0.17/2] x 2400 = 713.12 kg/m2
spesi = 2 x 21 = 42
keramik = 3 x 24 = 72
plafond = 0
penggantung = 0
AC + pipa = 0
DD = 827.12 kg/m2
Beban hidup
air hujan = 0 kg/m2
guna = 300
DL 300 kg/m2
Beban berfaktor
D = 1,2 x 827.12 + 1,6 x 300 = 1472.5 kg/m2
Statika
- Tumpuan jepit-jepit
- Beban merata
q = 1472.54 kg/m2
L = 1.5 m
- Beban terpusat plat anak tangga tengah 200 x 100 cm (bordes)
P = 1.5 x 0.5 x 2 x 1,472.54 = 2208.81 kg
L = 1.5 - 0.5 x 100 = 1 m
Penulangan bordes
Mu 1325.29 kgm b 1000 mm
fc' (beton) 22.5 Mpa h 150 mm
fy' (baja) 320 Mpa d' 20 mm
Mn = Asakt x fy d - a/2
34.228
= 339.12 x 240 243 -
2
-6
= 18343915.00 x 10
= 18.343915 KNm
Mt = f Mn
= 0.8 x 18.344
= 14.6751 KNm >> Mu ……….. Oke
b. Penulangan Lapangan
1. Menghitung koefisien tahanan balok
K = Mu / f x bw x d2
6
2.250 x 10
K = 2
0.8 x 150 x 280
= 0.239 Mpa
2. Menghitung rasio tulangan perlu
0.85 f,c 2 x k
r perlu = x 1 - 1 -
fy 0.85 f,c
Mn = Asakt x fy x d - a/2
45.637
= 339.12 x 240 261 -
2
-6
= 19385318.13 x 10
= 19.38531813
Mt = f Mn
= 0.8 x 19.385
= 15.5083 KNm Mu ……….. Oke
Pembebanan
Balok sloof = 0,2.0,3.2400 = 144 kg/m'
Tembok = 3.7 .250 = 925 kg/m'
q 1069 kg/m'
Statika L = 5.5 m
Mtum = 1/8 x 1069 x 5.5^2 = 4042.16 kgm
bc = 200 = 1.33333
150
Vu = 269.00 kN
Mu = 40.42 kNm
s tanah = 3 x 100 = 300 kNm2
d = 200 - 30 = 170 mm
bo = 4 x (170 + 150) = 1280 mm
Statika
bc = 200 = 1.33333
150
Vu = 269.00 kN
Mu = 40.42 kNm
s tanah = 3 x 100 = 300 kNm2
d = 200 - 30 = 170 mm
bo = 4 x (170 + 150) = 1280 mm
Penulangan
Penulangan lapangan
Mu 5787.79 kgm b 1000 mm
fc' (beton) 18.65 Mpa h 200 mm
fy' (baja) 320 Mpa d' 30 mm
Penulangan
mm2 mm
Lapangan X (tul atas) 1455.77 D12 - 75 ( 1,508 mm2 ) M10
Tumpuan X (tul atas) 1455.77 D12 - 75 ( 1,508 mm2 ) M10
Tumpuan X (tul bagi) 582.31 D8 - 100 ( 503 mm2 ) M5
DAYA DUKUNG PONDASI DANGKAL
Pondasi lajur / Batu Gunung diletakkan diatas urugan sirtu padat t=90cm
8,400.00
=
80,000