PELAKSANAAN PEKERJAAN PENGGANTIAN ISOLASI PIPING DI AREA LINE DI AREA

TURBINE DAN BOILER DALAM RANGKA SERIOUS INSPECTION PLTA AIR ANYIR BANGKA UNIT 1 TAHUN 2022
PT. GUNUNG API MULIA
TAHUN 2022
Hari / Tanggal : 04 Agustus 2022
Laporan Harian Bidang : Mekanik
Pekerjaan Yang Telah Dilaksanakan
No Area / Equipment (Work To be Done) Progress Pekerjaan Yang Akan Dilaksanakan (Work To Do) Temuan
Area Turbin Dan Boiler : Pembongkaran Isolasi Lama Eksisting di Area Turbine Dan Boiler : Bongkar Pembongkaran Isolasi Lama Eksisting di Area Turbine Dan Boiler : -
1 Daerator #1 > Line Outlet coalfeeder To Furnace,Line Mainsteam Right 50% > ValveLine Sampling, Valve Feedwater, Line Spray
2 Line Resirkulasi BFP 1A Dan 1B Boiler, ValveLine Sampling, Valve Feedwater, Line Spray Spray MainSteam, Flexible damper SA Fan
3 Line Main Steam Spray MainSteam, Flexible damper SA Fan > Cleaning Area Dan Pembuangan Limbah Hasil Pekerjaan
4 HP / LP Heater > Cleaning Area Dan Pembuangan Limbah Hasil Pekerjaan Ke tempat yang Ketempat yang telah di tentukan Divisi Lingkungan
5 Valve Drain telah di tentukan Divisi Lingkungan PT. PJBS Unit PLTU Air Anyir PT. PJBS Unit PLTU Air Anyir
6 Line Elbow
7 HP Heater 1
8 MOV
9 Line Schedule to Blowdown

Mengetahui Yang Membuat


PT. PJB Services PT.GUNUNG API MULIA

( ANGGA PRAMANA ) ( HARIYONO )


Rendal Project Spv. Project