Disusun oleh,
Nama : Restu Chairul Z
NPM 1711112
Jurusan : Teknik Mesin S1
Keterampilan : 5 6 7 8 9 10
Kerajinan : 5 6 7 8 9 10
Etika : 5 6 7 8 9 10
Mengetahui, Menyetujui,
ii
LEMBAR PENGESAHAN LAPORAN KERJA PRAKTIK
SEKOLAH TINGGI TEKNOLOGI MANDALA BANDUNG
NPM : 1711112
Mengetahui,
iii
DAFTAR ISI
LEMBAR PENGESAHAN...........................................................................ii
LEMBAR PENGESAHAN STT MANDALA BANDUNG.......................iii
DAFTAR ISI..................................................................................................iv
DAFTAR GANBAR.....................................................................................vii
KATA PENGANTAR.................................................................................viii
BAB I PENDAHULUAN
1.1 Latar Belakang...................................................................................1
1.2 Maksud dan Tujuan Kerja Praktik..................................................2
a. Maksud Kerja Praktik...............................................................2
b. Tujuan Kerja Praktik.................................................................2
1.3 Lokasi, Waktu, Lama Kerja Praktik...............................................2
1.4 Metode Pengumpulan Data...............................................................3
1.5 Identifikasi Masalah...........................................................................3
1.6 Sistematika Penulisan........................................................................3
BAB II TINJAUAN UMUM PERUSAHAAN
2.1 Profil PT.Mulya Sejahtera Technology............................................6
2.2 Ruang Lingkup PT. Mulya Sejahtera Technology..........................7
2.3 Visi dan Misi PT. Mulya Sejahtera Technology..............................8
a. Visi................................................................................................8
b. Misi...............................................................................................8
2.4 Struktur Organisasi PT. Mulya Sejahtera Technology..................8
2.5 Fasilitas PT. Mulya Sejahtera Technology....................................10
BAB III DATA TEKNIS DARI SISTEM PIVOT HINGE PINS
STABILIZER ELEVATOR BOEING 737-500
3.1 Waktu dan Tempat Pelaksanaan....................................................13
3.2 Langkah Langkah Pelaksanaan......................................................13
3.3 Perawatan Pada Pesawat.................................................................14
Flight Hours...........................................................................15
0Flight Cycle..........................................................................15
Calendar Time........................................................................15
a. Minor maintenance......................................................................15
iv
Transit Check.........................................................................15
Before Departure Check........................................................15
Daily Check (Overnight Check).............................................15
Weekly Check.........................................................................16
b. Aircraft maintenance...................................................................16
A Check..................................................................................16
B Check..................................................................................17
C Check..................................................................................17
D Check..................................................................................17
3.4 Flight Control System......................................................................18
1. Sistem control utama (Primary Control Sysytem)........................19
Ailerons..................................................................................20
Elevator..................................................................................20
Rudder....................................................................................20
2. Sistem kontrol sekunder (secondary control system)....................21
Wing flaps..............................................................................21
Spoiler....................................................................................22
Trim system............................................................................22
Leading edge..........................................................................23
3.5 AirWorthiness Directive..................................................................23
v
d. Proses pengecekan visual............................................................36
e. Proses pemasangan.....................................................................37
f. Dialy Aktivity.............................................................................40
BAB V............................................................................................................41
SIMPULAN DAN SARAN
5.1 Simpulan...........................................................................................41
5.2 Saran..................................................................................................41
DAFTAR PUSTAKA...................................................................................42
vi
DAFTAR GAMBAR
Gambar 2.1 Logo PT. Mulya Sejahtera Technology............................................5
Gambar 2.2 Organisasi Bandung International Aviation.....................................8
Gambar 2.3 Struktur Organisasi Mulya Sejahtera Technology............................9
Gambar 2.4 Lantai Satu Hangar Hall D.............................................................10
Gambar 2.5 Hanggar Hall E...............................................................................10
Gambar 2.6 Lantai Dua Hangar Hall D..............................................................11
Gambar 3.1 Flight Control System.....................................................................17
Gambar 3.2 Elevator, ailerons, rudder................................................................19
Gambar 3.3 Spoiler..............................................................................................22
Gambar 3.4Trim System....................................................................................22
Gambar 3.5 Leading Edge..................................................................................23
Gambar 3.6 Air Worthness Directive.................................................................25
Gambar 4.1 Tail Section/Empenage...................................................................24
Gambar 4.2 Pusat Horizontal Stabilizer.............................................................25
Gambar 4.3 Pivot Hinge Pins.............................................................................25
Gambar 4.4 Iner Hinge pin.................................................................................26
Gambar 4.5 Other hinge pin...............................................................................26
Gambar 4.6 Cotter pin........................................................................................27
Gambar 4.7 Mastinox 6856K.............................................................................27
Gambar 4.8 Speed Handle..................................................................................28
Gambar 4.9 Kunci Ring......................................................................................28
Gambar 4.10 Tang..............................................................................................28
Gambar 4.11 Palu...............................................................................................29
Gambar 4.12 Stik Kuningan...............................................................................29
Gambar 4.13 Rivet Gun......................................................................................30
Gambar 4.14 Rivet Set.......................................................................................30
Gambar 4.15 Penggores......................................................................................31
Gambar 4.16 Kunci Totsi & Kunci Sock...........................................................31
vii
KATA PENGANTAR
Bismillahirrahmaanirrahiim
Assalamu’alaikum wr.wb
Segala puji dan syukur untuk Allah SWT tuhan semesta alam yang telah
mencurahkan berkah dan limpahan rahmatnya sehingga telah mengizinkan penulis
untuk menyelesaikan kewajiban kerja praktek yaitu laporan akhir selama praktek
kerja lapangan berlangsung di PT. Mulya Sejahtera Technology Bandung , dan tak
lupa juga sholawat kepada Nabi Muhammad SAW, beserta keluarga dan
sahabatnya.
Dalam proses penyusunan laporan ini tak lepas dari bantuan , arahan, dan
masukan dari berbagai pihak. Untuk itu penyusun ucapkan terimakasih kepada :
viii
4. Bapak Agus Widodo General Manager Hrd dan Administrasi BIA.
5. Bapak Suyadi Purnomo selaku Maintenance Manager sekaligus sebagai
ketua pembimbing di MS Tech.
6. Bapak Sugiyono Selaku pembimbing lapangan yang selalu mengajari dan
memberi materi laporan tentang struktur pesawat di MS Tech.
7. Terimakasih Kepada Bapak Mechanic dan Engineer MS Tech.
8. Terimakasih Kepada kedua orangtua, Dedi Rusniadi dan Dede Hayati yang
selalu mendukung dan mendoakan saya dimanapun dan kapanpun.
9. Terimakasih rekan rekan STTKD jogja atas sharing ilmu dan pengalaman
seputar dunia penerbangan.
Penulis
ix