Hasil Telly Tronton9
Hasil Telly Tronton9
Tanggal : 14/03/2021
Depo : Bali
Truk : H 1854 DH
Supplier : Abdi Putra Nuryanto
P.260 cm
20-24 2.5114 Rp. 1,225,000 Rp. 3,076,465
25-29 2.1874 Rp. 1,325,000 Rp. 2,898,305
30-39 1.0183 Rp. 1,425,000 Rp. 1,451,078
40-49 0.5841 Rp. 1,525,000 Rp. 890,753
50-Up 0.2314 Rp. 1,625,000 Rp. 376,025
TOTAL M3 6.5326 Rp. 8,692,626
Jml Btg 65
G.Ttl M3 23.1450 Rp. 24,780,046
AN