Perencanaan Struktur
98
99
Fc : 30 MPa
𝑄𝑢.𝐿2 5,4.1,82
𝑀𝑢𝑡𝑢𝑚𝑝𝑢𝑎𝑛 (𝐴, 𝐸) = = = 0,73 kNm
24 24
𝑄𝑢.𝐿2 5,4.1,82
𝑀𝑢𝑡𝑢𝑚𝑝𝑢𝑎𝑛 (𝐵, 𝐷) = = = 1,75 kNm
10 10
𝑄𝑢.𝐿2 5,4.1,82
𝑀𝑢𝑡𝑢𝑚𝑝𝑢𝑎𝑛 (𝑐) = = = 1,6 kNm
11 11
𝑄𝑢.𝐿2 5,4.1,82
𝑀𝑢𝑙𝑎𝑝𝑎𝑛𝑔𝑎𝑛 (𝐵 − 𝐶, 𝐶 − 𝐷) = = = 1,094 kNm
16 16
𝑄𝑢.𝐿2 5,4.1,82
𝑀𝑢𝑙𝑎𝑝𝑎𝑛𝑔𝑎𝑛 (𝐴 − 𝐵, 𝐷 − 𝐸) = = = 1,6 kNm
11 11
857,59. 550
a = 0,85.30.1000 = 18,50 mm
maka;
𝑎
Mn = As . 𝑓𝑦 (deff - 2 )
18,50
Mn = 857,59 . 550 (95 - ) = 40,45 kNm
2
Mu = 1,75 kNm
Tebal efektif pelat = 70 mm
Perkiraan d dengan menggunakan wiremesh Ø7,5 dan selimut beton 20 mm
drenc = tebal efektif pelat – selimut beton – ½ diameter tulangan
= 70-20 – ½ . 7,5
= 71,25 mm ≈ 70 mm
Penentuan rasio tulangan balance berdasarkan rumus
𝑓𝑐′ 600
ρb = 0,85 𝛽1. 𝑓𝑦 . (600+𝑓𝑦)
30 600
= 0,85 . 0,85. 240 . (600+240)
= 0,065
Rasio tulangan maksimum
ρ maks = 0,75 . Pb = 0,75 x 0,065 = 0,0484
Rasio tulangan minimum
1,4
ρ min = = 0,0058
240
Momen tahanan
𝑀𝑢 1,75.106
Rn = Ø. = 0,9. = 0,38 kNm
𝑏. 𝑑2 1000 . 702
103
𝑓𝑦 240
m = 0,85𝑓𝑐′ = 0,85 𝑥 30 = 9,41
1 2𝑚. 𝑅𝑛
ρ = 𝑚 . [ 1 − √1 − ]
240
1 2 . 9,41 . 0,38
= 9,41 . [ 1 − √1 − ]
240
= 0,0016
ρmin 0,0058 > ρ 0,0016 < ρmaks 0,048, maka digunakan ρmin = 0,0058
As perlu = ρ . b . d = 0,0058 x 1000 x 70 = 408,33 mm2
Dari tabel A-5 luas penampang tulangan baja per meter panjang pelat, digunakan
tulangan M7,5 - 100 mm (As = 442 mm2 ).
𝑎
kontrol → 𝑀𝑛 = 𝐴𝑠. 𝑓𝑦 (drenc - 2 )
dimana
𝐴𝑠 . 𝑓𝑦 442 . 240
a = 0,85.𝑓𝑐.𝑏 = 0,85. = 7,4 mm
30 . 1000
maka
7,4
Mn = 442 . 240 . (70 - ) = 7,337554 Nmm = 7,34 kNm
2
Karena hmin (106,71 mm) > deff (95 mm), maka perlu dilakukan
pemeriksaan lendutan.
L beton dan baja
Komponen b h Ai Yi Ai.Yi Ῡ Io Ai.(Ῡ-yi)2
pelat 1000 70 70000 35 2450000 28583333,33 10937500
floordeck 1000 25 25000 82,5 2062500 47,5 1302083,333 170156250
Σ total 95000 4512500 29885416,67 181093750
ΣAi.Yi 4512500
Ῡ = = = 47,5 mm
ΣAi 95000
Itr = Io + Ai.(Ῡ-yi)2
104
= 29885416,67 + 181093750
= 210979167 mm4 = 21,09 x 107 mm4
q = 5,37 kNm
Itr = 21,09 x 107
5 𝑥 𝑞 𝑥 𝐿4
ΔD = 384 𝑥 𝐸 𝑥 𝑙𝑡𝑟
5 𝑥 5,37𝑥 72004
= 384 𝑥 200000 𝑥 21,09 x 107
= 4,46 mm
7200
L/240 = 240
= 30 mm
ΔD = 4,48 mm < L/240 mm = 30 mm (OKE)
105
𝑄𝑢.𝐿2 7,68.1,82
𝑀𝑢𝑡𝑢𝑚𝑝𝑢𝑎𝑛 (𝐵, 𝐷) = = = 2,48 kNm
10 10
𝑄𝑢.𝐿2 7,68.1,82
𝑀𝑢𝑡𝑢𝑚𝑝𝑢𝑎𝑛 (𝑐) = = = 2,26 kNm
11 11
𝑄𝑢.𝐿2 7,68.1,82
𝑀𝑢𝑙𝑎𝑝𝑎𝑛𝑔𝑎𝑛 (𝐵 − 𝐶, 𝐶 − 𝐷) = = = 1,55 kNm
16 16
𝑄𝑢.𝐿2 7,68.1,82
𝑀𝑢𝑙𝑎𝑝𝑎𝑛𝑔𝑎𝑛 (𝐴 − 𝐵, 𝐷 − 𝐸) = = = 2,26 kNm
11 11
maka;
𝑎
Mn = As . 𝑓𝑦 (deff - 2 )
18,50
Mn = 857,59 . 550 (95 - ) = 40,45 kNm
2
= 0,065
Rasio tulangan maksimum
Pmaks = 0,75 . Pb = 0,75 x 0,064 = 0,0484
Rasio tulangan minimum
1,4
Pmin = 240 = 0,0058
Momen tahanan
𝑀𝑢 2,48 .106
Rn = Ø. = 0,9. = 0,54 kNm
𝑏. 𝑑2 1000 . 702
𝑓𝑦 240
m = 0,85𝑓𝑐′ = 0,85 𝑥 30 = 9,41
1 2𝑚. 𝑅𝑛
ρ = 𝑚 . [ 1 − √1 − ]
240
1 2 . 9,41 . 0,54
= 9,41 . [ 1 − √1 − ]
240
= 0,0023
ρmin 0,0058 > ρ 0,0023 < ρmaks 0,048, maka digunakan ρmin = 0,0058
As perlu = ρ . b . d = 0,0058 x 1000 x 70 = 408,33 mm2
108
Dari tabel A-5 luas penampang tulangan baja per meter panjang pelat, digunakan
tulangan M7,5 - 100 mm (As = 442 mm2).
𝑎
kontrol → 𝑀𝑛 = 𝐴𝑠. 𝑓𝑦 (drenc - 2 )
dimana
𝐴𝑠 . 𝑓𝑦 442 . 240
a = 0,85.𝑓𝑐.𝑏 = 0,85. = 4,2 mm
30 . 1000
maka
4,2
Mn = 442 . 240 . (70 - ) = 73375536 Nmm = 7,34 kNm
2
Karena hmin (106,71 mm) > deff (95 mm), maka perlu dilakukan
pemeriksaan lendutan.
L beton dan baja
Komponen b h Ai Yi Ai.Yi Ῡ Io Ai.(Ῡ-yi)2
pelat 1000 70 70000 35 2450000 28583333,33 10937500
floordeck 1000 25 25000 82,5 2062500 47,5 1302083,333 170156250
Σ total 95000 4512500 29885416,67 181093750
Itr = Io + Ai.(Ῡ-yi)2
= 29885416,67 + 181093750
= 210979167 mm4 = 21,09 x 107 mm4
q = 7,68 kNm
5 𝑥 𝑞 𝑥 𝐿4
ΔD = 384 𝑥 𝐸 𝑥 𝑙𝑡𝑟
5 𝑥 7,68𝑥 72004
= 384 𝑥 200000 𝑥 21,09 𝑥 107
= 6,40 mm
7200
L/240 = 240
= 30 mm
ΔD = 6,40 mm < L/240 mm = 30 mm (OKE)
109