a b a-b

No Item Pekerjaan Panjang (m) Lebar (m) Dalam (m) Jumlah Lapangan Gambar Selisih
Volume (m3) Volume (m3) Volume (m3)
1 Gardu PLN 12.60 8.20 1.65 1 170.48 53.92 116.56
2 Pos Jaga Selatan (type 1) 6.20 4.10 1.50 1 38.13 9.49 28.64
3 Parkir SMA 411.75 345.60
a as 1B-11B 57.20 2.00 1.35 1 154.44
b as A-C 129.00 2.20 1.35 1 383.13
c as D/10B-11B dan as D/1B-2B 2.00 2.20 1.35 2 11.88
d as 2B-10B/D-E 35.00 4.40 1.35 1 207.90
4 Parkir SMP 757.35 411.75 345.60
5 Sumpit+Grease Trap (SMP) 8.20 4.80 1.90 1 74.78 21.67 53.11
6 Sumpit+Tandon Netralisir (SMA) 9.40 5.00 2.10 1 98.70 23.90 74.80
7 Sumpit Type 2 5.50 4.60 1.90 1 48.07 14.26 33.81
8 Sumpit Type 1 4.60 3.80 1.90 1 33.21 7.18 26.03
9 Pagar 587.87 1.80 0.90 1 952.35 499.69 452.66
10 Pos Jaga Utara (type 1) 5.10 4.50 0.95 1 21.80 9.49 12.32
11 Sumpit Tandon Transfer 5.20 5.00 1.85 1 48.10 12.22 35.88
Total = 3000.33 1475.32 1525.01
No. Item Pekerjaan Panjang (m) Lebar (m) Luas (m2) Dalam (m) Jumlah Volume (m3)
1 Gardu PLN 33.70 1.60 1 53.92
2 Pos Jaga Selatan (type 1) 10.54 0.90 1 9.49
3 Parkir SMA 305.00 1.35 1 411.75
4 Parkir SMP 305.00 1.35 1 411.75
5 Sumpit+Grease Trap (SMP) 5.85 2.85 1.30 1 21.67
6 Sumpit+Tandon Netralisir (SMA) 5.65 2.35 1.80 1 23.90
7 Sumpit Type 2 3.85 2.85 1.30 1 14.26
8 Sumpit Type 1 2.35 2.35 1.30 1 7.18
9 Pagar 587.87 1 0.85 1 499.69
10 Pos Jaga Utara 10.54 0.90 1 9.49
11 Sumpit+Tandon Transfer 4 2.35 1.30 1 12.22
Total = 1475.32