Menghitung LHR

Fungsi Jalan = Arteri Kelas I


NO. Jenis Kendaraaan Uraian Kelompok Sumbu Jumlah kendaraan
1 2,3,4 Sedan/Angkot/Pickup(1.1) 2 9090
2 5b Bus Besar (1.2) 2 1590
3 6a.2 Truk 2 Sumbu Ringan (1.2) 2 3090
4 6b2.2 Truk 2 Sumbu Berat (1.2) 2 1090
5 7a2 Truk 3 Sumbu Berat (1.22) 3 900
6 7c2.1 Truk 5 Sumbu Trailer (1.2.22) 5 90
Umur Rencana = 10 Tahun
Angka Pertumbuhan Lalu Lintas = 7%

NO. Uraian Jumlah kendaraan Koef - SMP LHR (SMP)


1 Sedan/Angkot/Pickup(1.1) 9090 1 9090
2 Bus Besar (1.2) 1590 2.5 3975
3 Truk 2 Sumbu Ringan (1.2) 3090 2.4 7416
4 Truk 2 Sumbu Berat (1.2) 1090 2.4 2616
5 Truk 3 Sumbu Berat (1.22) 900 5 4500
6 Truk 5 Sumbu Trailer (1.2.22) 90 5 450
PERHITUNGAN LHR AWAL TOTAL 28047

NO. Uraian Jumlah kendaraan (1+0.07)^10 LHR (SMP)


1 Sedan/Angkot/Pickup(1.1) 9090 1.96715 17881.406
2 Bus Besar (1.2) 1590 1.96715 3127.771
3 Truk 2 Sumbu Ringan (1.2) 3090 1.96715 6078.498
4 Truk 2 Sumbu Berat (1.2) 1090 1.96715 2144.195
5 Truk 3 Sumbu Berat (1.22) 900 1.96715 1770.436
6 Truk 5 Sumbu Trailer (1.2.22) 90 1.96715 177.044
PERHITUNGAN LHR AKHIR TOTAL 31179.349

Menghitung VLHR
VLHR = (LHR Awal + LHR Akhir )/2 = 29613.17

Faktor - K 7%
Faktor - F 1

=
VLHR yang didapat = 29613.1745065198
Berdasarkan VLHR yang didapat dan tabel diatas, maka jalan tersebut
Merupakan jalan Arteri dengan Lebar Jalur 14 m dan Lebar Bahu 2,5 m
Sehingga Lebar Perjalur 7m dan Lebar Jalur 3,5 M
Ket : Jika jalan 2 Jalur dan setiap jalurnya 2 Lajur

FAKTOR K FAKTOR F
VLHR
(%) (%)
> 50.000 4-6 0,9-1
30.000 - 50.000 6-8 0,8-1
10.000 - 30.000 6-8 0,8-1
5.000 - 10.000 8-10 0,6-0,8
1.000 - 5.000 10-12 0,6-0,8
< 1.000 12-16 <0,6
Jumlah kendaraan
9090
1590
3090
1090
900
90

LHR (SMP)
9090
3975
7416
2616
4500
450
28047

LHR (SMP)
17881.406
3127.771
6078.498
2144.195
1770.436
177.044
31179.349

207292.2
Koordinat ΔX (m) ΔY (m)
Titik
X Y Xakhir – Xawal Yakhir – Yawal
A -613.202 261.055
192.126 390.622
P1 -421.076 651.677
311.804 226.607
P2 -109.272 878.284
12.255 211.107
L -97.017 1,089.391

VLHR yang didapat 29613.1745065198


Berdasarkan VLHR yang didapat dan Tabel diatas, maka jalan tersebut
merupakan jalan Arteri dengan Lebar Jalur 7 m dan Lebar Bahu 2 m
Sehingga memiliki Lebar Lajur 3,5 m
ket : jika jalan nya 2 Lajur
PERHITUNGAN GEOMETRI JALAN RAYA AGUSTINA PATULUS E

L (m) ΔX/ΔY Tan-1


kwadran Azimuth (o)
(ΔX2 + ΔY2)0.5 ΔX/ΔY DEGREES(ATAN(ΔX/ΔY))

435.314 0.492 26.190 Kw I 26

385.451 1.376 53.992 Kw I 54

211.462 0.058 3.322 Kw I 3

lan tersebut
ar Bahu 2 m
AGUSTINA PATULUS EXAUDI LUMBAN GAOL (210404074)

KEL
ΔPI ( )o

Titik A ke P1
segmen
1
28 2
3
51 4
5
6
7
8
9
10
11
12
13
Jumlah
Rata-rata
Titik P1 ke P2
segmen
1
2
3
4
5
6
Jumlah
Rata-rata

Titik P2 ke L
segmen
1
2
3
4
5
6
7
Jumlah
Rata-rata
KELANDAIAN

Titik A ke P1
jarak El. Awal El. Akhir Beda K Kelandaian
12.28 34 32 -2 16.29%
29.01 32 34 2 6.89%
13.98 34 36 2 14.31%
15.98 36 38 2 12.52%
17.32 38 38 0 0.00%
32.35 38 36 -2 6.18%
21.36 36 34 -2 9.36%
30.98 34 32 -2 6.46% Kemiringan rata-rata =
54.68 32 32 0 0.00% Berdasarkan perhitungan, didap
21.68 32 34 2 9.23% Dapat kita simpulkan jenis meda
22.42 34 36 2 8.92%
14.88 36 38 2 13.44%
61.95 38 40 2 3.23%
348.87
8.22%

jarak El. Awal El. Akhir Beda K Kelandaian


277.9287 40 40 0 0.00%
73.918 40 42 2 2.71%
61.7199 42 42 0 0.00%
40.4511 42 40 -2 4.94%
25.8962 40 40 0 0.00%
98.2986 40 40 0 0.00%
578.2125
1.27%

jarak El. Awal El. Akhir Beda K Kelandaian


278.374 40 40 0 0.00% Berdasarkan kemiringan yang te
55.9426 40 40 0 0.00% maka VR yang didapatkan untu
59.0627 40 40 0 0.00%
63.8251 40 40 0 0.00%
10.3957 40 42 2 19.24%
14.5162 42 44 2 13.78%
24.9958 44 44 0 0.00%
507.1121
4.72%
Kemiringan rata-rata = 4.74%
Berdasarkan perhitungan, didapat kemiringan dari A-R sebesar 0,0%
Dapat kita simpulkan jenis medannya termasuk DATAR karena <10%

Berdasarkan kemiringan yang telah didapatkan dan fungsi tabel diatas,


maka VR yang didapatkan untuk medan datar 80-120 km/jam
PERENCANAAN TIKUNGAN
Tikungan P1
DAP1 = 435.314 Vr 60 km/jam
DP1P2 = 385.451 R1min 125 m
Sudut Tikungan = 28 14 R2min 200 m
T1max = 435.314 R3min 1490 m
T2max = 180.225

Syarat : Tc < Tmax


Full Circle
R > R3 = 2000
TC = R tan (1/2(99°))
TC = 2000 tan (1/2(99°))
TC = 494.982 TIDAK OKE

R2 < R < R3 = 550


TC = R tan (1/2(99°))
TC = 550 tan (1/2(99°))
TC = 136.120 TIDAK OKE

Spiral circle Spiral


R1 < R < R2 = 150
TC = R tan (1/2(99°))
TC = 150 tan (1/2(99°))
TC = 37.124 OK

Spiral spiral
R < R1 = 100
TC = R tan (1/2(99°))
TC = 100 tan (1/2(99°))
TC = 24.749 OK

TITIK Sudut Tikung Tmax1 Tmax2 Tmax TC


P1 28 435.314 180.225 180.225 150
P2 51 298.191 211.462 211.462 150
P3 0 186.4624 Err:509 Err:509 150

Menghitung Ls
Berdasarkan waktu tempuh maksimum (3 detik)
Ls = 50.000 m

Berdasarkan antisipasi gaya sentrifugal, koef C (1-3) diambil 2


Ls = 1.323 m

Berdasarkan perubahan kelandaian

Ls = 40.000 m

Berdasarkan perhitungan diatas dapat disimpulkan,


panjang lengkung peralihan = 50.000 m

Menghitung Elemen Tikungan


1. Menghitung θs
θs = 9.554 °

2. Menghitung θc
θc = 8.693 °

3. Menghitung Lc
Lc = 22.748 m

4. Menghitung Ltotal
Ltot = 326.51
Ltot = 122.748 m

5. Menghitung Yc
Yc = 2.778 m
6. Menghitung Xc
Xc = 49.861 m

7. Menghitung P
P= 0.697 m

8. Menghitung k
k= 24.964 m

9. Menghitung Es
Es = 5.244 m

10. Menghitung Ts

Syarat : 100 < Ts < Tmax


Ts = 62.260

Vr 60 km/jam
R 150 m
ΔE 28 °
θs 9.554 °
Ls 50.00 m
θc 8.693 °
Lc 22.748 m
Ltotal 122.748 m
Yc 4.938 m
Xc 49.861 m
P 0.697 m
k 24.964 m
Es 5.244 m
Ts 62.260 m
Tikungan P2
DP1P2 = 385.451
DP2P3 = 211.462
Sudut Tikungan = 51 25.3
T1max = 298.191
T2max = 211.462

Syarat : Tc < Tmax


Full Circle
R > R3 = 2000
TC = R tan (1/2(108°)) 1
TC = 2500 tan (1/2(108°))
TC = 946.879 TIDAK OKE

R2 < R < R3 = 550


TC = R tan (1/2(108°))
TC = 650 tan (1/2(108°))
TC = 260.392 TIDAK OKE

Spiral circle Spiral


R1 < R < R2 = 150
TC = R tan (1/2(108°))
TC = 250 tan (1/2(108°))
TC = 71.016 OK

Spiral spiral
R < R1 = 100
TC = R tan (1/2(108°))
TC = 180 tan (1/2(108°))
TC = 47.344 OK

TC LS SS SC LC Ltotal Yc
37.12362146 66.67 12.7388535 0 22.7478057 156.0811 4.938272
71.01593066 66.67 12.7388535 0 1.32 134.6563 4.938272
0 66.67 12.7388535 0 0 133.3333 4.938272

Menghitung Ls
Berdasarkan waktu tempuh maksimum (3 detik)
Ls = 50.000 m

Berdasarkan antisipasi gaya sentrifugal, koef C (1-3) diambil 2


Ls = 1.323 m

Berdasarkan perubahan kelandaian

Ls = 40.000 m

Berdasarkan perhitungan diatas dapat disimpulkan,


panjang lengkung peralihan = 50.000 m

Menghitung Elemen Tikungan


1. Menghitung θs
θs = 9.554 °

2. Menghitung θc
θc = 31.561 °

3. Menghitung Lc
Lc = 82.585 m

4. Menghitung Ltotal
Ltot = 215,761 + (2 x 66,667)
Ltot = 82.585 m

5. Menghitung Yc
Yc = 2.778 m
6. Menghitung Xc
Xc = 49.861 m

7. Menghitung P
P= 0.697 m

8. Menghitung k
k= 24.964 m

9. Menghitung Es
Es = 16.733 m

10. Menghitung Ts

Syarat : 100 < Ts < Tmax


Ts = 96.310

Vr 60 km/jam
R 150 m
ΔE 51 °
θs 9.554 °
Ls 50.00 m
θc 31.561 ° 8.366
Lc 82.585 m
Ltotal 82.585 m
Yc 2.778 m
Xc 49.861 m
P 0.697 m
k 24.964 m
Es 16.733 m
Ts 96.310 m
Tikungan P3
DP2P3 = 211.462
DP3R = Err:509
Sudut Tikungan = 0
T1max = 186.462
T2max = Err:509

Syarat : Tc < Tmax


Full Circle
R > R3 = 2000
TC = R tan (1/2(76°))
TC = 2500 tan (1/2(76°))
TC = 0.000 TIDAK OKE

R2 < R < R3 = 550


TC = R tan (1/2(76°))
TC = 650 tan (1/2(76°))
TC = 0.000 TIDAK OKE

Spiral circle Spiral


R1 < R < R2 = 150
TC = R tan (1/2(76°))
TC = 250 tan (1/2(76°))
TC = 0.000 OK

Spiral spiral
R < R1 = 100
TC = R tan (1/2(76°))
TC = 180 tan (1/2(76°))
TC = 0.000 OK

Jenis
Xc P Es k Ts Tikungan Ec Lc
66.3374485596708 1.2461 5.809259 33.2612958 70.69331 SCS 4.525607 72.74781
66.3374485596708 1.2461 17.34028 33.2612958 104.8672 SCS 15.96163 132.5851
66.3374485596708 1.2461 1.246057 33.2612958 33.2613 SCS 0 0

Menghitung Ls
Berdasarkan waktu tempuh maksimum (3 detik)
Ls = 50.000 m

Berdasarkan antisipasi gaya sentrifugal, koef C (1-3) diambil 2


Ls = 1.323 m

Berdasarkan perubahan kelandaian

Ls = 40.00 m

Berdasarkan perhitungan diatas dapat disimpulkan,


panjang lengkung peralihan = 50.000 m

Menghitung Elemen Tikungan


1. Menghitung θs
θs = 9.554 °

2. Menghitung θc
θc = -19.108 °

3. Menghitung Lc
Lc = -50.000 m

4. Menghitung Ltotal
Ltot = 460,382 + (2 x 66,67)
Ltot = 50.000 m

5. Menghitung Yc
Yc = 2.778 m
6. Menghitung Xc
Xc = 49.861 m

7. Menghitung P
P= 0.697 m

8. Menghitung k
k= 24.964 m

9. Menghitung Es
Es = 0.697 m

10. Menghitung Ts

Syarat : 100 < Ts < Tmax


Ts = 24.964

Vr 60 km/jam
R 150 m
ΔE 0 °
θs 9.554 °
Ls 50.00 m
θc -19.108 ° -9.554
Lc -50.000 m
Ltotal 50.000 m
Yc 2.778 m
Xc 49.861 m
P 0.697 m
k 24.964 m
Es 0.697 m
Ts 24.964 m
PELEBARAN TIKUNGAN

TIKUNGAN D
Vr 60 km/jam
R 150 m
A 1.2 m
p 18.9 m
b 3.5 m
n 2m
bo 2.6 m
c 0.9 m

Penambahan lebar perkerasan yang di perlukan (b') Lebar pelebaran yang di perlukan untuk tikungan
= 1.1955

Lebar lintasan kendaraan pada tikungan (b") Pelebaran perkerasan yang di perlukan untuk tikun
= 3.7955 =7

Penambahan akibat kelalaian/kelelahan pengemudi (z) = 3.0612


= 0.5144
Karena B > W maka diperlukan perlebaran pereker
Penambahan lebar akibat adanya tonjolan depan pada tikungan D sebesar 0,9608 m
= 0.15592
TIKUNGAN E
Vr 60 km/jam
R 150 m
A 1.2 m
p 18.9 m
b 3.5 m
n 2 m
bo 2.6 m
c 0.9 m

Penambahan lebar perkerasan yang di perlukan (b')


= 1.1955

ng di perlukan untuk tikungan Lebar lintasan kendaraan pada tikungan (b")


= 10.06124 = 3.7955

an yang di perlukan untuk tikungan Penambahan akibat kelalaian/kelelahan pengemudi (z)


= 0.5144

Penambahan lebar akibat adanya tonjolan depan


= 0.15592
ka diperlukan perlebaran perekerasan
besar 0,9608 m
TIKUNGAN F
Vr 60 km/jam
R 150 m
A 1.2 m
p 18.9 m
b 3.5 m
n 2 m
bo 2.6 m
c 0.9 m

Penambahan lebar perkerasan yang di perlukan (b')

= 1.1955
Lebar lintasan kendaraan pada tikungan (b")

= 3.7955
Penambahan akibat kelalaian/kelelahan pengemudi (z)

= 0.5144
Penambahan lebar akibat adanya tonjolan depan

= 0.15592
Lebar pelebaran yang di perlukan untuk tikungan
= 10.06124

Pelebaran perkerasan yang di perlukan untuk tikungan


=7

= 3.0612

Karena B > W maka diperlukan perlebaran perekerasan


pada tikungan D sebesar 2,3525 m

Lebar pelebaran yang di perlukan untuk tikungan

= 10.06124
Pelebaran yang di perlukan untuk tikungan

= 7

= 3.0612
Karena B > W maka diperlukan perlebaran perekerasan pada
tikungan E sebesar 2,3525 m
Stationing

Titik Stationing Elevasi titik A Elevasi titik B Jarak A ke STA


A 0+000 854 854 0
STA 1 0+050 854 854 0
STA 2 0+100 854 854 0
STA 3 0+150 854 856 39.4601
STA 4 0+200 856 858 37.5443
STA 5 0+250 858 858 17.5066
STA 6 0+300 858 858 0
STA 7 0+350 858 858 0
STA 8 0+400 858 858 0
STA TC 0+408,87 858 858 0
STA 9 0+433,87 858 858 0
STA 10 0+458,87 858 858 0
STA 11 0+483,87 858 858 10.5526
STA 12 0+508,87 858 858 0
STA 13 0+533,87 858 860 0
STA 14 0+558,87 860 862 22.0016
STA 15 0+583,87 862 864 4.0023
STA 16 0+608,87 866 868 3.9476
STA 17 0+633,87 874 876 5.8083
STA 18 0+658,87 878 880 7.032
STA 19 0+683,87 880 882 5.8083
STA 20 0+708,87 884 886 6.4826
STA 21 0+733,87 886 888 14.5651
STA 22 0+758,87 890 892 8.3234
STA CT 0+773,46 894 896 5.7304
STA 23 0+823,46 894 892 12.0892
STA 24 0+873,46 890 890 30.3656
STA 25 0+898,46 890 890 0
STA TS 0+904,22 890 890 0
STA 26 0+929,22 894 892 16.0772
STA SC 0+954,22 892 892 5.1603
STA 27 0+979,22 892 892 0
STA 28 1+004,22 892 892 0
STA 29 1+029,22 892 892 0
STA 30 1+054,22 892 892 0
STA 31 1+079,22 892 892 0
STA 32 1+104,22 892 892 0
STA CS 1+117,04 892 892 0
STA 33 1+142,04 890 890 9.7849
STA SC 1+167,04 890 890 0
STA 34 1+217,04 886 884 12.1421
STA 35 1+267,04 884 882 27.076
STA 36 1+292,04 882 882 9.4873
STA TS 1+304,61 882 880 0
STA 37 1+329,61 880 880 6.958
STA SC 1+354,61 880 880 0
STA 38 1+379,61 878 876 18.1382
STA 39 1+404,61 876 876 0.1419
STA 40 1+429,61 876 876 0
STA CS 1+454,63 876 876 0
STA 41 1+479,63 874 874 24.0483
STA SC 1+504,63 874 874 0
STA 42 1+554,63 870 868 11.5724
STA 43 1+604,63 864 862 2.3057
STA 44 1+654,63 858 856 1.0574
STA 45 1+704,63 852 850 0.2897
STA 46 1+754,63 848 846 9.2393
STA 47 1+804,63 844 842 11.6874
STA 48 1+854,63 838 836 9.7084
STA 49 1+904,63 832 830 5.0185
STA 50 1+954,63 830 828 17.1527
C 2+004,63 828 828 0

Perhitungan penomoran pada Tikungan

TIKUNGAN D (FC) dAD


STA TC = STA Titik A + dAD - Tc dDE
STA TC = 0+000 + 598,25 - 189,38 dEF
STA TC = 408.87 dFC
TIKUNGAN D (FC)
STA CT = STA TC + Lc Vr
STA CT = 408,87 + 364,58 R
STA CT = 773.46 ΔD
Tc
TIKUNGAN E (SCS) Ec
STA TS = STA CT + (dDE - TcD - TsE) Lc
STA TS = 773,46 + (463,23 - 189,38 - 143,09) TIKUNGAN E (SCS)
STA TS = 904.22 Vr
R
STA SC = STA TS + Ls ΔE
STA SC = 904,22 + 50 θs
STA SC = 954.22 Ls
θc
STA CS = STA SC + Lc Lc
STA CS = 954,22 + 162,82 Ltot
STA CS = 1117.04 Yc
Xc
STA ST = STA CS + Ls P
STA SC = 1117,04 + 50 k
STA SC = 1167.04 Es
Ts
TIKUNGAN F (SCS) TIKUNGAN F (SCS)
STA TS = STA SC + (dEF - Vr
STA TS = 1167,04 + (384,62 - 143,09 - 103,96) R
STA TS = 1304.61 ΔE
θs
STA SC = STA TS + Ls Ls
STA SC = 1304,61 + 50 θc
STA SC = 1354.61 Lc
Ltot
STA CS = STA SC + Lc Yc
STA CS = 1354,61 + 100,02 Xc
STA CS = 1454.63 P
k
STA ST = STA CS + Ls Es
STA SC = 1117,04 + 50 Ts
STA SC = 1504.63
Longitudinal Section

Jarak antar
Jarak antar Kontur Elevasi Awal Titik Kelandaian
stationing
0 854 A 0
0 854 STA 1 50 0%
0 854 STA 2 50 0%
51.9158 855.52 STA 3 50 -3%
70.0377 857.07 STA 4 50 -3%
0 858 STA 5 50 -2%
0 858 STA 6 50 0%
0 858 STA 7 50 0%
0 858 STA 8 50 0%
0 858 STA TC 8.87 0%
0 858 STA 9 25 0%
0 858 STA 10 25 0%
0 858 STA 11 25 0%
0 858 STA 12 25 0%
0 858 STA 13 25 0%
47.992 860.92 STA 14 25 -12%
12.9475 862.62 STA 15 25 -7%
6.1864 867.28 STA 16 25 -19%
7.2988 875.59 STA 17 25 -33%
16.784 878.84 STA 18 25 -13%
16.852 880.69 STA 19 25 -7%
16.9157 884.77 STA 20 25 -16%
16.4929 887.77 STA 21 25 -12%
8.7241 891.91 STA 22 25 -17%
9.6032 895.19 0.053259 STA CT 14.59 -23%
15.5112 892.44 STA 23 50 6%
0 890 STA 24 50 5%
0 890 STA 25 25 0%
0 890 STA TS 5.76 0%
35.997 893.11 STA 26 25 -12%
0 892 STA SC 25 4%
0 892 STA 27 25 0%
0 892 STA 28 25 0%
0 892 STA 29 25 0%
0 892 STA 30 25 0%
0 892 STA 31 25 0%
0 892 STA 32 25 0%
0 892 STA CS 12.82 0%
0 890 STA 33 25 8%
0 890 STA SC 25 0%
35.0661 885.31 0.022287 STA 34 50 9%
42.5887 882.73 STA 35 50 5%
0 882 STA 36 25 3%
0 882 STA TS 12.57 0%
0 880 STA 37 25 8%
0 880 STA SC 25 0%
42.936 877.16 STA 38 25 11%
0 876 STA 39 25 5%
0 876 STA 40 25 0%
0 876 STA CS 25 0%
0 874 STA 41 25 8%
0 874 STA SC 25 0%
20.0547 868.85 STA 42 50 10%
18.8957 863.76 STA 43 50 10%
16.8815 857.87 STA 44 50 12%
19.595 851.97 STA 45 50 12%
26.6855 847.31 STA 46 50 9%
17.8644 842.69 STA 47 50 9%
18.7372 836.96 STA 48 50 11%
37.8658 831.73 STA 49 50 10%
39.4094 829.13 STA 50 50 5%
0 828 0.072763 C 50 2%
895.19
828

598.25 m
463.23 m
384.62 m
578.21 m
TIKUNGAN D (FC)
60 km/jam
550 m
38 °
189.38 m
31.69 m
364.59 m
TIKUNGAN E (SCS)
60 km/jam
200 m
61 °
7.166 °
50 m
46.669 °
162.822 m
262.822 m
2.083 m
49.922 m
0.521 m
24.974 m
32.723 m
143.090 m
TIKUNGAN F (SCS)
60 km/jam
200 m
43 °
7.166 °
50 m
28.67 °
100.02 m
200.02 m
2.08 m
49.92 m
0.52 m
24.97 m
15.52 m
103.96 m
Elevasi rencana Kelandaian Titik Stationing Elevasi Awal Elevasi Rencana
854 A 0+000 854.00 854.00
856.66 5.33% STA 1 0+050 854.00 856.66
859.33 5.33% STA 2 0+100 854.00 859.33
861.99 5.33% STA 3 0+150 855.52 861.99
864.65 5.33% STA 4 0+200 857.07 864.65
867.31 5.33% STA 5 0+250 858.00 867.31
869.98 5.33% STA 6 0+300 858.00 869.98
872.64 5.33% STA 7 0+350 858.00 872.64
875.30 5.33% STA 8 0+400 858.00 875.30
875.78 5.33% STA TC 0+408,87 858.00 875.78
877.11 5.33% STA 9 0+433,87 858.00 877.11
878.44 5.33% STA 10 0+458,87 858.00 878.44
879.77 5.33% STA 11 0+483,87 858.00 879.77
881.10 5.33% STA 12 0+508,87 858.00 881.10
882.43 5.33% STA 13 0+533,87 858.00 882.43
883.76 5.33% STA 14 0+558,87 860.92 883.76
885.10 5.33% STA 15 0+583,87 862.62 885.10
886.43 5.33% STA 16 0+608,87 867.28 886.43
887.76 5.33% STA 17 0+633,87 875.59 887.76
889.09 5.33% STA 18 0+658,87 878.84 889.09
890.42 5.33% STA 19 0+683,87 880.69 890.42
891.75 5.33% STA 20 0+708,87 884.77 891.75
893.08 5.33% STA 21 0+733,87 887.77 893.08
894.42 5.33% STA 22 0+758,87 891.91 894.42
895.19 5.33% STA CT 0+773,46 895.19 895.19
894.08 -2.23% STA 23 0+823,46 892.44 894.08
892.96 -2.23% STA 24 0+873,46 890.00 892.96
892.41 -2.23% STA 25 0+898,46 890.00 892.41
892.28 -2.23% STA TS 0+904,22 890.00 892.28
891.72 -2.23% STA 26 0+929,22 893.11 891.72
891.16 -2.23% STA SC 0+954,22 892.00 891.16
890.61 -2.23% STA 27 0+979,22 892.00 890.61
890.05 -2.23% STA 28 1+004,22 892.00 890.05
889.49 -2.23% STA 29 1+029,22 892.00 889.49
888.94 -2.23% STA 30 1+054,22 892.00 888.94
888.38 -2.23% STA 31 1+079,22 892.00 888.38
887.82 -2.23% STA 32 1+104,22 892.00 887.82
887.54 -2.23% STA CS 1+117,04 892.00 887.54
886.98 -2.23% STA 33 1+142,04 890.00 886.98
886.42 -2.23% STA SC 1+167,04 890.00 886.42
885.31 -2.23% STA 34 1+217,04 885.31 885.31
881.67 -7.28% STA 35 1+267,04 882.73 881.67
879.85 -7.28% STA 36 1+292,04 882.00 879.85
878.94 -7.28% STA TS 1+304,61 882.00 878.94
877.12 -7.28% STA 37 1+329,61 880.00 877.12
875.30 -7.28% STA SC 1+354,61 880.00 875.30
873.48 -7.28% STA 38 1+379,61 877.16 873.48
871.66 -7.28% STA 39 1+404,61 876.00 871.66
869.84 -7.28% STA 40 1+429,61 876.00 869.84
868.02 -7.28% STA CS 1+454,63 876.00 868.02
866.20 -7.28% STA 41 1+479,63 874.00 866.20
864.38 -7.28% STA SC 1+504,63 874.00 864.38
860.74 -7.28% STA 42 1+554,63 868.85 860.74
857.11 -7.28% STA 43 1+604,63 863.76 857.11
853.47 -7.28% STA 44 1+654,63 857.87 853.47
849.83 -7.28% STA 45 1+704,63 851.97 849.83
846.19 -7.28% STA 46 1+754,63 847.31 846.19
842.55 -7.28% STA 47 1+804,63 842.69 842.55
838.92 -7.28% STA 48 1+854,63 836.96 838.92
835.28 -7.28% STA 49 1+904,63 831.73 835.28
831.64 -7.28% STA 50 1+954,63 829.13 831.64
828.00 -7.28% C 2+004,63 828.00 828.00
Kelandaian

5.33%
5.33%
5.33%
5.33%
5.33%
5.33%
5.33%
5.33%
5.33%
5.33%
5.33%
5.33%
5.33%
5.33%
5.33%
5.33%
5.33%
5.33%
5.33%
5.33%
5.33%
5.33%
5.33%
5.33%
-2.23%
-2.23%
-2.23%
-2.23%
-2.23%
-2.23%
-2.23%
-2.23%
-2.23%
-2.23%
-2.23%
-2.23%
-2.23%
-2.23%
-2.23%
-2.23%
-7.28%
-7.28%
-7.28%
-7.28%
-7.28%
-7.28%
-7.28%
-7.28%
-7.28%
-7.28%
-7.28%
-7.28%
-7.28%
-7.28%
-7.28%
-7.28%
-7.28%
-7.28%
-7.28%
-7.28%
-7.28%
Alinemen Vertikal

ALINEMEN I
Station PVI = 773.46 Perhitungan Lv
elevasi PVI = 895.19 Syarat keluwesan bentuk Syarat pengurangan go
VR = 60 km/h Lv = 0.6 x VR Lv =
g1 = 5.33 0.0533 = 36 =
g2 = -2.23 -0.0223 Syarat Drainase Jarak Pandang Henti
A = 7.56 Lv = 40 x A Lv =
S = 75 = 302.4 =
Syarat kenyamanan pengemudi Jarak Pandang Henti
Lv = (VR /3.6) x T Lv =
= 50 =

Perhitungan Ev
Berdasarkan perhitungan, panjang
Ev = ( A x S ) /800 lengkung vertikal yang terpanjang sebes
= 0.70875 Lv = 302,4

ALINEMEN II
Station PVI = 1217.04 Perhitungan Lv
elevasi PVI = 885.31 Syarat keluwesan bentuk Syarat pengurangan go
VR = 60 km/h Lv = 0.6 x VR Lv =
g1 = -2.23 -0.0223 = 36 =
g2 = -7.28 -0.0728 Syarat Drainase Jarak Pandang Henti
A = 5.05 Lv = 40 x A Lv =
S = 75 = 202 =
Syarat kenyamanan pengemudi Jarak Pandang Henti
Lv = (VR /3.6) x T Lv =
= 50 =

Perhitungan Ev
Berdasarkan perhitungan, panjang
Ev = ( A x S ) /800 lengkung vertikal yang terpanjang sebes
= 0.473438 Lv = 202

ppv ckung (-)


ppv cmbung (+)
Perhitungan Station Perhitungan Elevasi
Syarat pengurangan goncangan STA PLV = STA PVI - 0.5Lv PLV = Elev PVI - 0,5Lv x g1
(VR2 x A)/360 = 622.26 = 887.13
75.6 STA A = STA PVI - 0.25Lv A= Elev PVI - 0,25Lv x g1
Jarak Pandang Henti (S < L) = 697.86 = 891.16
(A x S2)/405 STA PPV = STA PVI A'= Elev A - (X2/200Lv)
105 = 773.46 = 891.07
Jarak Pandang Henti (S > L) STA B = STA PVI + 0.25Lv PPV= Elev PVI - Ev
2S - (405/A) = 849.06 = 894.48
96.42857 STA PTV = STA PVI + 0.5Lv B= Elev PVI + 0,25Lv x g2
= 924.66 = 893.50
B'= Elev B - (X2/200Lv)
an perhitungan, panjang
vertikal yang terpanjang sebesar = 893.41
4 PTV= Elev PVI + 0,5Lv x g2
= 891.82

Perhitungan Station Perhitungan Elevasi


Syarat pengurangan goncangan STA PLV = STA PVI - 0.5Lv PLV = Elev PVI - 0,5Lv x g1
(VR2 x A)/360 = 1116.04 = 887.56
50.5 STA A = STA PVI - 0.25Lv A= Elev PVI - 0,25Lv x g1
Jarak Pandang Henti (S < L) = 1166.54 = 886.44
(A x S2)/405 STA PPV = STA PVI A'= Elev A - (X2/200Lv)
70.13889 = 1217.04 = 886.37
Jarak Pandang Henti (S > L) STA B = STA PVI + 0.25Lv PPV= Elev PVI + Ev
2S - (405/A) = 1267.54 = 884.84
69.80198 STA PTV = STA PVI + 0.5Lv B= Elev PVI + 0,25Lv x g2
= 1318.04 = 881.63
B'= Elev B - (X2/200Lv)
an perhitungan, panjang
vertikal yang terpanjang sebesar = 881.57
PTV= Elev PVI + 0,5Lv x g2
= 877.96
Elevasi
ev PVI - 0,5Lv x g1

ev PVI - 0,25Lv x g1

ev A - (X2/200Lv)

ev PVI - Ev

ev PVI + 0,25Lv x g2

ev B - (X2/200Lv)

ev PVI + 0,5Lv x g2

ev PVI - 0,5Lv x g1

ev PVI - 0,25Lv x g1

ev A - (X2/200Lv)

ev PVI + Ev
ev PVI + 0,25Lv x g2

ev B - (X2/200Lv)

ev PVI + 0,5Lv x g2
Cross Section

elev asli titik 1 titik 2 titik 3 titik 4 titik 5 titik 6 titik 7


0+000 854 A 853.69 853.69 852.69 852.69 853.69 853.86 853.93
0+050 854.00 STA 1 856.35 856.35 855.35 855.35 856.35 856.52 856.59
0+100 854.00 STA 2 859.02 859.02 858.02 858.02 859.02 859.19 859.26
0+150 855.52 STA 3 861.68 861.68 860.68 860.68 861.68 861.85 861.92
0+200 857.07 STA 4 864.34 864.34 863.34 863.34 864.34 864.51 864.58
0+250 858.00 STA 5 867.00 867.00 866.00 866.00 867.00 867.17 867.24
0+300 858.00 STA 6 869.67 869.67 868.67 868.67 869.67 869.84 869.91
0+350 858.00 STA 7 872.33 872.33 871.33 871.33 872.33 872.50 872.57
0+400 858.00 STA 8 874.99 874.99 873.99 873.99 874.99 875.16 875.23
0+408,87 858.00 STA TC 875.41 875.41 874.41 874.41 875.41 875.58 875.65
0+433,87 858.00 STA 9 876.74 876.74 875.74 875.74 876.74 876.91 876.98
0+458,87 858.00 STA 10 878.01 878.01 877.01 877.01 878.01 878.18 878.31
0+483,87 858.00 STA 11 879.34 879.34 878.34 878.34 879.34 879.51 879.64
0+508,87 858.00 STA 12 880.67 880.67 879.67 879.67 880.67 880.84 880.97
0+533,87 858.00 STA 13 882.00 882.00 881.00 881.00 882.00 882.17 882.30
0+558,87 860.92 STA 14 883.34 883.34 882.34 882.34 883.34 883.51 883.64
0+583,87 862.62 STA 15 884.67 884.67 883.67 883.67 884.67 884.84 884.97
0+608,87 867.28 STA 16 886.00 886.00 885.00 885.00 886.00 886.17 886.30
0+633,87 875.59 STA 17 887.33 887.33 886.33 886.33 887.33 887.50 887.63
0+658,87 878.84 STA 18 888.66 888.66 887.66 887.66 888.66 888.83 888.96
0+683,87 880.69 STA 19 889.99 889.99 888.99 888.99 889.99 890.16 890.29
0+708,87 884.77 STA 20 891.32 891.32 890.32 890.32 891.32 891.49 891.62
0+733,87 887.77 STA 21 892.66 892.66 891.66 891.66 892.66 892.83 892.96
0+758,87 891.91 STA 22 893.99 893.99 892.99 892.99 893.99 894.16 894.29
0+773,46 895.19 STA CT 894.76 894.76 893.76 893.76 894.76 894.93 895.06
0+823,46 892.44 STA 23 893.77 893.77 892.77 892.77 893.77 893.94 894.01
0+873,46 890.00 STA 24 892.65 892.65 891.65 891.65 892.65 892.82 892.89
0+898,46 890.00 STA 25 892.10 892.10 891.10 891.10 892.10 892.27 892.34
0+904,22 890.00 STA TS 891.97 891.97 890.97 890.97 891.97 892.14 892.21
0+929,22 893.11 STA 26 891.41 891.41 890.41 890.41 891.41 891.58 891.65
0+954,22 892.00 STA SC 890.43 890.43 889.43 889.43 890.43 890.60 890.88
0+979,22 892.00 STA 27 889.87 889.87 888.87 888.87 889.87 890.04 890.32
1+004,22 892.00 STA 28 889.31 889.31 888.31 888.31 889.31 889.48 889.77
1+029,22 892.00 STA 29 888.76 888.76 887.76 887.76 888.76 888.93 889.21
1+054,22 892.00 STA 30 888.20 888.20 887.20 887.20 888.20 888.37 888.65
1+079,22 892.00 STA 31 887.64 887.64 886.64 886.64 887.64 887.81 888.10
1+104,22 892.00 STA 32 887.08 887.08 886.08 886.08 887.08 887.25 887.54
1+117,04 892.00 STA CS 886.80 886.80 885.80 885.80 886.80 886.97 887.25
1+142,04 890.00 STA 33 887.23 887.23 886.23 886.23 887.23 887.40 887.47
1+167,04 890.00 STA SC 886.67 886.67 885.67 885.67 886.67 886.84 886.91
1+217,04 885.31 STA 34 885.00 885.00 884.00 884.00 885.00 885.17 885.24
1+267,04 882.73 STA 35 881.36 881.36 880.36 880.36 881.36 881.53 881.60
1+292,04 882.00 STA 36 879.54 879.54 878.54 878.54 879.54 879.71 879.78
1+304,61 882.00 STA TS 878.63 878.63 877.63 877.63 878.63 878.80 878.87
1+329,61 880.00 STA 37 876.81 876.81 875.81 875.81 876.81 876.98 877.05
1+354,61 880.00 STA SC 874.56 874.56 873.56 873.56 874.56 874.73 875.01
1+379,61 877.16 STA 38 872.74 872.74 871.74 871.74 872.74 872.91 873.19
1+404,61 876.00 STA 39 870.92 870.92 869.92 869.92 870.92 871.09 871.38
1+429,61 876.00 STA 40 869.10 869.10 868.10 868.10 869.10 869.27 869.56
1+454,63 876.00 STA CS 867.28 867.28 866.28 866.28 867.28 867.45 867.74
1+479,63 874.00 STA 41 867.71 867.71 866.71 866.71 867.71 867.88 867.95
1+504,63 874.00 STA SC 865.89 865.89 864.89 864.89 865.89 866.06 866.13
1+554,63 868.85 STA 42 860.43 860.43 859.43 859.43 860.43 860.60 860.67
1+604,63 863.76 STA 43 856.80 856.80 855.80 855.80 856.80 856.97 857.04
1+654,63 857.87 STA 44 853.16 853.16 852.16 852.16 853.16 853.33 853.40
1+704,63 851.97 STA 45 849.52 849.52 848.52 848.52 849.52 849.69 849.76
1+754,63 847.31 STA 46 845.88 845.88 844.88 844.88 845.88 846.05 846.12
1+804,63 842.69 STA 47 842.24 842.24 841.24 841.24 842.24 842.41 842.48
1+854,63 836.96 STA 48 838.61 838.61 837.61 837.61 838.61 838.78 838.85
1+904,63 831.73 STA 49 834.97 834.97 833.97 833.97 834.97 835.14 835.21
1+954,63 829.13 STA 50 831.33 831.33 830.33 830.33 831.33 831.50 831.57
2+004,63 828.00 C 827.69 827.69 826.69 826.69 827.69 827.86 827.93
titik A titik 8 titik 9 titik 10 titik 11 titik 12 titik 13 titik 14 gmbr
854 853.93 853.86 853.69 852.69 852.69 853.69 853.69 1 udh
856.66 856.59 856.52 856.35 855.35 855.35 856.35 856.35 2 udh
859.33 859.26 859.19 859.02 858.02 858.02 859.02 859.02 3 udh
861.99 861.92 861.85 861.68 860.68 860.68 861.68 861.68 4 udh
864.65 864.58 864.51 864.34 863.34 863.34 864.34 864.34 5 udh
867.31 867.24 867.17 867.00 866.00 866.00 867.00 867.00 6 udh
869.98 869.91 869.84 869.67 868.67 868.67 869.67 869.67 7 udh
872.64 872.57 872.50 872.33 871.33 871.33 872.33 872.33 8 udh
875.30 875.23 875.16 874.99 873.99 873.99 874.99 874.99 9 udh
875.78 875.78 875.78 875.61 874.61 874.61 875.61 875.61 10 udh
877.11 877.24 877.31 877.14 876.14 876.14 877.14 877.14 11 udh
878.44 878.57 878.70 878.53 877.53 877.53 878.53 878.53 12 udh
879.77 879.90 880.03 879.86 878.86 878.86 879.86 879.86 13 udh
881.10 881.23 881.36 881.19 880.19 880.19 881.19 881.19 14 udh
882.43 882.56 882.69 882.52 881.52 881.52 882.52 882.52 15 udh
883.76 883.89 884.02 883.85 882.85 882.85 883.85 883.85 16 udh
885.10 885.23 885.36 885.19 884.19 884.19 885.19 885.19 17 udh
886.43 886.56 886.69 886.52 885.52 885.52 886.52 886.52 18 udh
887.76 887.89 888.02 887.85 886.85 886.85 887.85 887.85 19 udh
889.09 889.22 889.35 889.18 888.18 888.18 889.18 889.18 20 udh
890.42 890.55 890.68 890.51 889.51 889.51 890.51 890.51 21 udh
891.75 891.88 892.01 891.84 890.84 890.84 891.84 891.84 22 udh
893.08 893.21 893.34 893.17 892.17 892.17 893.17 893.17 23 udh
894.42 894.55 894.68 894.51 893.51 893.51 894.51 894.51 24 udh
895.19 895.19 895.19 895.02 894.02 894.02 895.02 895.02 25 udh
894.08 894.01 893.94 893.77 892.77 892.77 893.77 893.77 26 udh
892.96 892.89 892.82 892.65 891.65 891.65 892.65 892.65 27 udh
892.41 892.34 892.27 892.10 891.10 891.10 892.10 892.10 28 udh
892.28 892.28 892.28 892.11 891.11 891.11 892.11 892.11 29 udh
891.72 891.79 891.86 891.69 890.69 890.69 891.69 891.69 30 udh
891.16 891.45 891.73 891.56 890.56 890.56 891.56 891.56 31 udh
890.61 890.89 891.17 891.00 890.00 890.00 891.00 891.00 32 udh
890.05 890.33 890.62 890.45 889.45 889.45 890.45 890.45 33 udh
889.49 889.78 890.06 889.89 888.89 888.89 889.89 889.89 34 udh
888.94 889.22 889.50 889.33 888.33 888.33 889.33 889.33 35 udh
888.38 888.66 888.95 888.78 887.78 887.78 888.78 888.78 36 udh
887.82 888.11 888.39 888.22 887.22 887.22 888.22 888.22 37 udh
887.54 887.82 888.10 887.93 886.93 886.93 887.93 887.93 38 udh
886.98 887.05 887.12 886.95 885.95 885.95 886.95 886.95 39 udh
886.42 886.42 886.42 886.25 885.25 885.25 886.25 886.25 40 udh
885.31 885.24 885.17 885.00 884.00 884.00 885.00 885.00 41 udh
881.67 881.60 881.53 881.36 880.36 880.36 881.36 881.36 42 udh
879.85 879.78 879.71 879.54 878.54 878.54 879.54 879.54 43 udh
878.94 878.94 878.94 878.77 877.77 877.77 878.77 878.77 44 udh
877.12 877.19 877.26 877.09 876.09 876.09 877.09 877.09 45 udh
875.30 875.58 875.86 875.69 874.69 874.69 875.69 875.69 46 udh
873.48 873.76 874.05 873.88 872.88 872.88 873.88 873.88 47 udh
871.66 871.94 872.23 872.06 871.06 871.06 872.06 872.06 48 udh
869.84 870.12 870.41 870.24 869.24 869.24 870.24 870.24 49 udh
868.02 868.30 868.59 868.42 867.42 867.42 868.42 868.42 50 udh
866.20 866.27 866.34 866.17 865.17 865.17 866.17 866.17 51 udh
864.38 864.38 864.38 864.21 863.21 863.21 864.21 864.21 52 udh
860.74 860.67 860.60 860.43 859.43 859.43 860.43 860.43 53 udh
857.11 857.04 856.97 856.80 855.80 855.80 856.80 856.80 54 udh
853.47 853.40 853.33 853.16 852.16 852.16 853.16 853.16 55 udh
849.83 849.76 849.69 849.52 848.52 848.52 849.52 849.52 56 udh
846.19 846.12 846.05 845.88 844.88 844.88 845.88 845.88 57 udh
842.55 842.48 842.41 842.24 841.24 841.24 842.24 842.24 58 udh
838.92 838.85 838.78 838.61 837.61 837.61 838.61 838.61 59 udh
835.28 835.21 835.14 834.97 833.97 833.97 834.97 834.97 60 udh
831.64 831.57 831.50 831.33 830.33 830.33 831.33 831.33 61 udh
828.00 827.93 827.86 827.69 826.69 826.69 827.69 827.69 62 udh
border luas gnt
udh udh
udh udh
udh
udh
udh
udh
udh
udh
udh
udh
udh
udh
udh
udh
udh
udh
udh
udh
udh
udh
udh
udh
udh
udh
udh
udh
udh
udh
udh
udh
udh
udh
udh
udh
udh
udh
udh
udh
udh
udh
udh
udh
udh
udh
udh
udh
udh
udh
udh
udh
udh
udh
udh
udh
udh
udh
udh
udh
udh
udh
udh
udh
PERHITUNGAN VOLUME GALIAN DAN TIMBUNAN

Elevasi Tanah Tinggi Luas


Stationing
elevasi asli elevasi rencana timbunan galian timbunan
A 0+000 854 854 0.00 0.00 0.00
STA 1 0+050 854.00 856.66 2.66 0.00 55.83
STA 2 0+100 854.00 859.33 5.33 0.00 125.22
STA 3 0+150 855.52 861.99 6.47 0.00 154.89
STA 4 0+200 857.07 864.65 7.58 0.00 167.37
STA 5 0+250 858.00 867.31 9.31 0.00 228.73
STA 6 0+300 858.00 869.98 11.98 0.00 297.65
STA 7 0+350 858.00 872.64 14.64 0.00 367.10
STA 8 0+400 858.00 875.30 17.30 0.00 436.47
STA TC 0+408,87 858.00 875.78 17.78 0.00 449.65
STA 9 0+433,87 858.00 877.11 19.11 0.00 486.08
STA 10 0+458,87 858.00 878.44 20.44 0.00 520.66
STA 11 0+483,87 858.00 879.77 21.77 0.00 555.24
STA 12 0+508,87 858.00 881.10 23.10 0.00 589.56
STA 13 0+533,87 858.00 882.43 24.43 0.00 624.40
STA 14 0+558,87 860.92 883.76 22.85 0.00 583.06
STA 15 0+583,87 862.62 885.10 22.48 0.00 573.70
STA 16 0+608,87 867.28 886.43 19.15 0.00 487.12
STA 17 0+633,87 875.59 887.76 12.17 0.00 305.64
STA 18 0+658,87 878.84 889.09 10.25 0.00 255.72
STA 19 0+683,87 880.69 890.42 9.73 0.00 242.20
STA 20 0+708,87 884.77 891.75 6.99 0.00 170.70
STA 21 0+733,87 887.77 893.08 5.32 0.00 127.28
STA 22 0+758,87 891.91 894.42 2.51 0.00 54.48
STA CT 0+773,46 895.19 895.19 0.00 0.00 0.00
STA 23 0+823,46 892.44 894.08 1.64 0.00 48.03
STA 24 0+873,46 890.00 892.96 2.96 0.00 64.15
STA 25 0+898,46 890.00 892.41 2.41 0.00 49.33
STA TS 0+904,22 890.00 892.28 2.28 0.00 46.96
STA 26 0+929,22 893.11 891.72 0.00 1.38 0.00
STA SC 0+954,22 892.00 891.16 0.00 0.84 0.00
STA 27 0+979,22 892.00 890.61 0.00 1.39 0.00
STA 28 1+004,22 892.00 890.05 0.00 1.95 0.00
STA 29 1+029,22 892.00 889.49 0.00 2.51 0.00
STA 30 1+054,22 892.00 888.94 0.00 3.06 0.00
STA 31 1+079,22 892.00 888.38 0.00 3.62 0.00
STA 32 1+104,22 892.00 887.82 0.00 4.18 0.00
STA CS 1+117,04 892.00 887.54 0.00 4.46 0.00
STA 33 1+142,04 890.00 886.98 0.00 3.02 0.00
STA SC 1+167,04 890.00 886.42 0.00 3.58 0.00
STA 34 1+217,04 885.31 885.31 0.00 0.00 0.00
STA 35 1+267,04 882.73 881.67 0.00 1.06 0.00
STA 36 1+292,04 882.00 879.85 0.00 2.15 0.00
STA TS 1+304,61 882.00 878.94 0.00 3.06 0.00
STA 37 1+329,61 880.00 877.12 0.00 2.88 0.00
STA SC 1+354,61 880.00 875.30 0.00 4.70 0.00
STA 38 1+379,61 877.16 873.48 0.00 3.68 0.00
STA 39 1+404,61 876.00 871.66 0.00 4.34 0.00
STA 40 1+429,61 876.00 869.84 0.00 6.16 0.00
STA CS 1+454,63 876.00 868.02 0.00 7.98 0.00
STA 41 1+479,63 874.00 866.20 0.00 7.80 0.00
STA SC 1+504,63 874.00 864.38 0.00 9.62 0.00
STA 42 1+554,63 868.85 860.74 0.00 8.10 0.00
STA 43 1+604,63 863.76 857.11 0.00 6.65 0.00
STA 44 1+654,63 857.87 853.47 0.00 4.41 0.00
STA 45 1+704,63 851.97 849.83 0.00 2.14 0.00
STA 46 1+754,63 847.31 846.19 0.00 1.12 0.00
STA 47 1+804,63 842.69 842.55 0.00 0.14 0.00
STA 48 1+854,63 836.96 838.92 1.95 0.00 37.63
STA 49 1+904,63 831.73 835.28 3.54 0.00 78.97
STA 50 1+954,63 829.13 831.64 2.51 0.00 51.93
C 2+004,63 828.00 828.00 0.00 0.00 0.00
TOTAL
SELISIH
Luas Volume
Jarak
galian timbunan galian
0.00 0 0.00 0.00 2.66 1
0.00 50 2791.50 0.00 5.33 2
0.00 50 6261.00 0.00 6.47 3
0.00 50 7744.50 0.00 7.58 4
0.00 50 8368.50 0.00 9.31 5
0.00 50 11436.50 0.00 11.98 6
0.00 50 14882.50 0.00 14.64 7
0.00 50 18355.00 0.00 17.30 8
0.00 50 21823.50 0.00 17.78 9
0.00 8.87 3988.40 0.00 19.11 10
0.00 25 12152.00 0.00 20.44 11
0.00 25 13016.50 0.00 21.77 12
0.00 25 13881.00 0.00 23.10 13
0.00 25 14739.00 0.00 24.43 14
0.00 25 15610.00 0.00 22.85 15
0.00 25 14576.50 0.00 22.48 16
0.00 25 14342.50 0.00 19.15 17
0.00 25 12178.00 0.00 12.17 18
0.00 25 7641.00 0.00 10.25 19
0.00 25 6393.00 0.00 9.73 20
0.00 25 6055.00 0.00 6.99 21
0.00 25 4267.50 0.00 5.32 22
0.00 25 3182.00 0.00 2.51 23
0.00 25 1362.00 0.00 0.00 24
0.00 14.59 0.00 0.00 1.64 25
0.00 50 2401.50 0.00 2.96 26
0.00 50 3207.50 0.00 2.41 27
0.00 25 1233.25 0.00 2.28 28
0.00 5.76 270.49 0.00 -1.38 29
42.55 25 0.00 1063.75 -0.84 30
27.41 25 0.00 685.25 -1.39 31
41.74 25 0.00 1043.50 -1.95 32
55.79 25 0.00 1394.75 -2.51 33
70.83 25 0.00 1770.75 -3.06 34
85.13 25 0.00 2128.25 -3.62 35
99.69 25 0.00 2492.25 -4.18 36
114.25 25 0.00 2856.25 -4.46 37
121.53 12.82 0.00 1558.01 -3.02 38
84.94 25 0.00 2123.50 -3.58 39
99.80 25 0.00 2495.00 0.00 40
0.00 50 0.00 0.00 -1.06 41
35.29 50 0.00 1764.50 -2.15 42
63.63 25 0.00 1590.75 -3.06 43
86.28 12.57 0.00 1084.54 -2.88 44
81.34 25 0.00 2033.50 -4.70 45
128.57 25 0.00 3214.25 -3.68 46
101.25 25 0.00 2531.25 -4.34 47
118.41 25 0.00 2960.25 -6.16 48
165.73 25 0.00 4143.25 -7.98 49
213.05 25 0.00 5326.25 -7.80 50
209.22 25 0.00 5230.50 -9.62 51
256.84 25 0.00 6421.00 -8.10 52
218.58 50 0.00 10929.00 -6.65 53
180.63 50 0.00 9031.50 -4.41 54
122.13 50 0.00 6106.50 -2.14 55
63.37 50 0.00 3168.50 -1.12 56
36.88 50 0.00 1844.00 -0.14 57
11.37 50 0.00 568.50 1.95 58
0.00 50 1881.50 0.00 3.54 59
0.00 50 3948.50 0.00 2.51 60
0.00 50 2596.50 0.00 0.00 61
0.00 50 0.00 0.00 0.00 62
250586.64 87559.30
163027.33