Anda di halaman 1dari 130

Client:

BALAI TEKNIK PERKERETAAPIAN KELAS 1 JAWA


BAGIAN BARAT
Project Name:

KAJIAN PERKUATAN LERENG JALUR KA ANTARA


BATUTULIS-CIOMAS KM 6+550 S.D KM 6+800
LINTAS BOGOR-SUKABUMI
Document Title / Status:

PENYELIDIKAN TANAH / FINAL

Document Number:

-
Contract Number and Contract Name:

00 Final 24/01/2023 HW PS

00 Draft 18/01/2023 HW PS

00 Draft 08/12/2022 HW PS

Rev Status Date Prep. By Chk. By App. By App-Proj By


Laporan ini disiapkan untuk:

BALAI TEKNIK PERKERETAAPIAN KELAS 1 JAWA BAGIAN BARAT


Jl. Soekarno-Hatta No. 637, Sukapura,
Kec. Kiaracondong, Kota Bandung, Jawa Barat

PENYELIDIKAN TANAH
KAJIAN PERKUATAN LERENG JALUR KA ANTARA
BATUTULIS-CIOMAS KM 6+550 s.d KM 6+800
LINTAS BOGOR-SUKABUMI

Bandung, 24 Januari 2023


PT. Wayan Sengara dan Partners Engineering Consultants

Putu Sumiartha, ST, MT


Direktur
Villa Bukit Mas Estate E1, Bojong Koneng, Bandung, Jawa Barat, 40191
Telp. +62-22-20525518
Rev: Page:
PENYELIDIKAN TANAH KAJIAN PERKUATAN LERENG JALUR KA ANTARA 00 3 of 20
BATUTULIS-CIOMAS KM 6+550 s.d KM 6+800 LINTAS BOGOR-SUKABUMI
Rev. Date: 16-Jan-23

DAFTAR ISI

Daftar Isi ..................................................................................................................................................... 3


Daftar Gambar ........................................................................................................................................... 4
1.0 PENDAHULUAN ............................................................................................................................ 5
1.1 Latar Belakang ........................................................................................................................... 5
1.2 Tujuan ........................................................................................................................................ 5
1.3 Ruang Lingkup Pekerjaan .......................................................................................................... 5
2.0 METODOLOGI PEKERJAAN PENYELIDIKAN TANAH ................................................................ 7
2.1 Pengeboran (Machine Drilling)................................................................................................... 7
2.2 Undisturbed Soil Sampling ......................................................................................................... 7
2.3 Standard Penetration Test ......................................................................................................... 8
2.4 Pengujian di Laboratorium ......................................................................................................... 9
2.4.1 Index Properties ................................................................................................................. 9
2.4.2 Shear Strength ................................................................................................................. 10
3.0 SURVEI GEOTEKNIK .................................................................................................................. 11
3.1 Hasil Machine Drilling ............................................................................................................... 11
3.2 Kondisi Tanah Bawah Permukaan ........................................................................................... 12
3.2.1 Borehole BH-01 ................................................................................................................ 12
3.2.2 Borehole BH-02 ................................................................................................................ 12
3.2.3 Borehole BH-03 ................................................................................................................ 12
3.2.4 Borehole BH-04 ................................................................................................................ 13
3.3 Hasil Uji Laboratorium .............................................................................................................. 15
3.3.1 Index Propereties ............................................................................................................. 15
3.3.2 Atterberg Limit .................................................................................................................. 16
3.3.3 Triaxial UU dan Triaxial CU .............................................................................................. 18

LAMPIRAN A Layout Titik Penyelidikan Tanah


LAMPIRAN B Borlog
LAMPIRAN C Dokumentasi Corebox
LAMPIRAN D Dokumentasi Kegiatan Pengeboran
LAMPIRAN E Hasil Uji Laboratorium
LAMPIRAN F Hasil dan Dokumentasi Georadar
Rev: Page:
PENYELIDIKAN TANAH KAJIAN PERKUATAN LERENG JALUR KA ANTARA 00 4 of 20
BATUTULIS-CIOMAS KM 6+550 s.d KM 6+800 LINTAS BOGOR-SUKABUMI
Rev. Date: 16-Jan-23

DAFTAR GAMBAR

Gambar 1.1 Lokasi pekerjaan penyelidikan tanah ..................................................................................... 5


Gambar 2.1 Contoh Corebox Core-Sample pada kedalaman 0-5 meter BH-01 ....................................... 7
Gambar 2.2 Prosedur Pengujian Standard Penetration Test (SPT) .......................................................... 8
Gambar 3.1 Layout titik penyelidikan tanah ............................................................................................. 11
Gambar 3.2 Soil profile KM 6+625 ........................................................................................................... 13
Gambar 3.3 Soil profile KM 6+675 ........................................................................................................... 14
Gambar 3.4 Soil profile KM 6+725 ........................................................................................................... 14
Gambar 3.5 Hasil uji test Unit Weight moist dan dry ............................................................................... 15
Gambar 3.6 Hasil uji test Specific Gravity dan Moisture Content ............................................................ 16
Gambar 3.7 Hasil uji Atterberg Limit ........................................................................................................ 17
Gambar 3.8 Plasticity Chart ..................................................................................................................... 18
Gambar 3.9 Hasil uji Triaxial UU .............................................................................................................. 19
Gambar 3.10 Hasil uji Triaxial Cu ............................................................................................................ 20

DAFTAR TABEL

Tabel 2-1 Hubungan N-SPT & Kerapatan Relatif Tanah Butir Halus ....................................................... 9
Tabel 2-2 Hubungan N-SPT & Kerapatan Relatif Tanah Butir Kasar ....................................................... 9
Tabel 3-1 Rangkuman titik penyelidikan tanah ....................................................................................... 11
Rev: Page:
PENYELIDIKAN TANAH KAJIAN PERKUATAN LERENG JALUR KA ANTARA 00 5 of 20
BATUTULIS-CIOMAS KM 6+550 s.d KM 6+800 LINTAS BOGOR-SUKABUMI
Rev. Date: 16-Jan-23

1.0 PENDAHULUAN

1.1 Latar Belakang


Balai Teknik Perkeretaapian Kelas 1 Jawa Bagian Barat menugaskan PT. WSP Engineering untuk
melaksanakan survei geoteknik di lokasi kelongsoran lereng jalur KA antara Batutulis-Ciomas lintas Bor.
Pekerjaan survei geoteknik meliputi pengeboran dalam dan pengujian laboratorium. Untuk pekerjaan
pengeboran dalam dilengkapi dengan pengujian Standard Penetration Test (SPT) dan soil sampling.
Lokasi pekerjaan ada pada jalur ganda kereta api Batutulis-Ciomas lintas Bogor-Sukabumi, KM 6+550
sampai KM 6+800. Lokasi pekerjaan ditujukkan pada Gambar 1.1.

Gambar 1.1 Lokasi pekerjaan penyelidikan tanah

1.2 Tujuan
Tujuan dari pekerjaan penyelidikan tanah adalah sebagai berikut:
a. Mendapatkan informasi dan gambaran awal terkait jenis tanah dan stratigrafinya;
b. Mengetahui karakteristik lapisan tanah dan mendapatkan parameter tanah desain yang akan
digunakan dalam melakukan analisis pondasi, timbunan, retaining wall dan fasilitas penunjang
lainnya;
c. Mengetahui kondisi muka air tanah.

1.3 Ruang Lingkup Pekerjaan


Ruang lingkup pekerjaan dalam meliputi:
1. Melakukan penyelidikan tanah lapangan
Pekerjaan penyelidikan tanah lapangan meliputi pekerjaan sebagai berikut:
Rev: Page:
PENYELIDIKAN TANAH KAJIAN PERKUATAN LERENG JALUR KA ANTARA 00 6 of 20
BATUTULIS-CIOMAS KM 6+550 s.d KM 6+800 LINTAS BOGOR-SUKABUMI
Rev. Date: 16-Jan-23

a. Pengeboran dalam (machine drilling) sebanyak 4 (empat) titik, dengan kedalaman masing-masing
titik bervariasi antara 20-30 meter;
b. Melakukan pengambilan sampel tidak terganggu (Undisturbed Sample/UDS) pada semua titik bor
setiap interval kedalaman 3 meter atau setiap perubahan lapisan tanah. Rata-rata 3 UDS untuk
setiap titik bor;
Catatan: untuk lapisan lempung/lanau yang keras, UDS diambil dengan menggunakan Mazier
Sampler;
c. Pengujian SPT (standar penetration test) untuk masing-masing titik bor, dengan interval testing
setiap 2 meter pengeboran;
d. Deskripsi tanah selama pengeboran untuk mengidentifikasi stratigrafi tanah.
2. Melakukan pengujian laboratorium
Uji laboratorium dilakukan untuk semua sampel tidak terganggu (UDS) yang telah diperolah selama
pekerjaan pengeboran. Uji laboratorium yang dilakukan adalah sebagai berikut:
a. Index Properties
Pengujian index properties meliputi:
- Water Content (ASTM D2216-98);
- Specific Gravity (ASTM D854);
- Unit Weight (ASTM D2216-98);
- Atterberg Limit (ASTM D4318-84);
- Grain Size Analysis (ASTM D422).
b. Shear Strength
Pengujian shear strength meliputi:
- Triaxial Unconsolidated Undrained (ASTM D2580-87);
- Triaxial Consolidated Undrained (ASTM D4767-11).
Rev: Page:
PENYELIDIKAN TANAH KAJIAN PERKUATAN LERENG JALUR KA ANTARA 00 7 of 20
BATUTULIS-CIOMAS KM 6+550 s.d KM 6+800 LINTAS BOGOR-SUKABUMI
Rev. Date: 16-Jan-23

2.0 METODOLOGI PEKERJAAN PENYELIDIKAN TANAH

2.1 Pengeboran (Machine Drilling)


Pelaksanaan kegiatan pengeboran inti (Core Machine Drilling) mengacu pada ASTM D2113-83,
“Standard Practice for Rock Core Drilling and Sampling of Rock for Site Investigation”. Hasil core drilling
yang didapatkan selama proses pengeboran ditempatkan di dalam corebox (mengacu pada Gambar
2.1), untuk dideskripsikan secara lithology.

Gambar 2.1 Contoh Corebox Core-Sample pada kedalaman 0-5 meter BH-01

2.2 Undisturbed Soil Sampling


Pengambilan sampel tanah tak-terganggu (Undisturbed Soil Sample/UDS) dilakukan untuk memperoleh
sampel tanah yang representatif untuk tes laboratorium. Sampel yang diambil di lapangan menggunakan
thin-walled tube (shebly tube). Pengambilan sampel dengan thin-walled tube digunakan untuk
memperoleh sampel tak-terganggu untuk tanah kohesif dan tanah lempung. Pengambilan sampel tak-
terganggu dilakukan dengan hati-hati untuk memastikan sampel yang diperoleh tidak mengalami
gangguan. Setelah sampel didapatkan, kedua sisi tabung ditutup dengan parafin untuk melindungi dari
panas, penguapan dan friksi, hal ini dilakukan untuk memastikan struktur dan komposisi tanah masih
dalam kondisi asli. Secara umum pengambilan sampel tak-terganggu mengacu pada ASTM D1587,
“Standard Practice for Thin-Walled Tube Sampling of Soil for Geotechnical Purposes”.
Rev: Page:
PENYELIDIKAN TANAH KAJIAN PERKUATAN LERENG JALUR KA ANTARA 00 8 of 20
BATUTULIS-CIOMAS KM 6+550 s.d KM 6+800 LINTAS BOGOR-SUKABUMI
Rev. Date: 16-Jan-23

2.3 Standard Penetration Test


Standard Penetration Test (SPT) dilakukan untuk mengestimasi nilai kerapatan relatif dari lapisan tanah
yang diuji. Untuk melakukan pengujian SPT dibutuhkan sebuah alat utama yang disebut Standard Split
Barrel Sampler atau tabung belah standar. Alat ini dimasukkan ke dalam Bore Hole setelah dibor terlebih
dahulu dengan alat bor. Alat ini diturunkan bersama-sama pipa bor hingga ujungnya menumpu ke tanah
dasar. Setelah menumpu alat ini kemudian dipukul (dengan alat pemukul yang beratnya 63.5- kg) dengan
tinggi jatuh 76-cm.
Standard Penetration Test (SPT) akan dilakukan dengan menggunakan “Spoon Sampler" atau “Split
Spoon Samplers” dengan panjang 18.0 inches (45.70 cm) untuk yang tanpa “shoe”, atau dengan panjang
70.70 cm untuk yang menggunakan “shoe” dan mempunyai diameter dalam 3/8 inch (35 mm). Test akan
dilakukan berdasarkan ASTM D1586-84 (1984).

Gambar 2.2 Prosedur Pengujian Standard Penetration Test (SPT)

Pada pemukulan pertama alat ini dipukul hingga sedalam 15.24 cm. Kemudian dilanjutkan dengan
pemukulan tahap kedua sedalam 30.48 cm. Pada pukulan kedua inilah muncul nilai "N" yang merupakan
manifestasi jumlah pukulan yang dibutuhkan untuk membuat tabung belah standar mencapai kedalaman
30.48 cm.
Rev: Page:
PENYELIDIKAN TANAH KAJIAN PERKUATAN LERENG JALUR KA ANTARA 00 9 of 20
BATUTULIS-CIOMAS KM 6+550 s.d KM 6+800 LINTAS BOGOR-SUKABUMI
Rev. Date: 16-Jan-23

Hubungan antara nilai “N” dengan kerapatan relatif untuk tanah berbutir halus dan tanah berbutir kasar
ditunjukkan pada Tabel 2-1 dan Tabel 2-2.

Tabel 2-1 Hubungan N-SPT & Kerapatan Tabel 2-2 Hubungan N-SPT &
Relatif Tanah Butir Halus Kerapatan Relatif Tanah Butir Kasar
N-SPT Kerapatan Relatif N-SPT Kerapatan Relatif
<2 Very Soft 0-4 Very Loose
2-8 Soft to Medium 4-10 Loose
8-16 Stiff 10-30 Medium
16-30 Very Stiff 30-50 Dense
>30 Hard >50 Very Dense
Sumber: Princeple of Foundation Engineering Sumber: Soil Mechanic in Engineering Practice
Braja, M.Das 2011 Terzaghi, Peck dan Mesri 1996

2.4 Pengujian di Laboratorium


2.4.1 Index Properties
Pengujian index properties bertujuan untuk mengetahui karakteristik tanah yang meliputi pegujian:
a. Water Content (Wn)
Pengujian ini bertujuan untuk mengetahui kadar air tanah. Kadar air adalah rasio perbandingan antara
berat air dengan berat tanah kering yang dinyatakan dalam persen (%). Pengujian ini mengacu pada
ASTM D2216-98, “Standard Test Method for Laboratory Determination of Water (Moisture) Content of
Soil and Rock by Mass”.
b. Specific Gravity (Gs)
Pengujian ini bertujuan untuk mengetahui berat jenis spesifik (specific gravity) tanah. Specific gravity
adalah rasio perbandingan antara massa (berat) kering butiran tanah dan massa (berat) air suling
(distilled water) pada volume yang sama denga volume butrian tersebut. Pengujian ini mengacu pada
ASTM D854, “Standard Test Method for Specific Gravity of Soil”.

c. Berat Volume ()


Pengujian ini bertujuan untuk mengetahui berat volume tanah. Berat volume adalah rasio
perbandingan antara berat tanah dengan volume tanah. Berat volume yang diperoleh dari pengujian

ini adalah berat volume basah (m) dan berat volume kering (d). Pengujian ini mengacu pada ASTM
D2216-98, “Standard Test Method for Laboratory Determination of Water (Moisture) Cotent of Soil and
Rock by Mass”.
d. Analisis Saringan (Grain Size Analaysis)
Pengujian analisis saringan bertujuan untuk mengetahui penyebaran/distribusi tanah berbutir kasar
yang mempunyai ukuran lebih besar dari 0.075 mm sementara untuk tanah berbutir halus atau
berukuran kurang dari 0.075 mm menggunakan analisa Hydrometer. Pengujian ini mengacu pada
ASTM D422, “Standard Test Method for Particle-Size Analysis of Soils”.
e. Batas Atterberg (Atterberg Limit)
Rev: Page:
PENYELIDIKAN TANAH KAJIAN PERKUATAN LERENG JALUR KA ANTARA 00 10 of 20
BATUTULIS-CIOMAS KM 6+550 s.d KM 6+800 LINTAS BOGOR-SUKABUMI
Rev. Date: 16-Jan-23

Pengujian ini bertujuan untuk mengetahui batas-batas Atterberg, seperti Liquid Limit (LL), Plastic Limit
(PL) dan Plasticity Index (PI). Pengujian ini mengacu pada ASTM D4318-84, “Test Method for Liquid
Limit, Plastic Limit and Plasticity Index of Soil”.

2.4.2 Shear Strength


a. Triaxial UU (Unconsolidated Undrained)
Pengujian ini bertujuan untuk memperoleh parameter kuat geser tanah total. Pengujian ini mengacu
pada ASTM D2850-87, “Standard Test Method for Unconsolidated Undrained Compressive Strength
of Cohesive Soils in Triaxial Compression”.
b. Triaxial CU (Consolidated Undrained)
Pengujian ini bertujuan untuk memperoleh parameter kuat geser tanah total dan efektik. Pengujian ini
mengacu pada ASTM D4767-11, ”Standard Test Method for Consolidated Undrained Triaxial
Compression Test for Cohesive Soils”.
Rev: Page:
PENYELIDIKAN TANAH KAJIAN PERKUATAN LERENG JALUR KA ANTARA 00 11 of 20
BATUTULIS-CIOMAS KM 6+550 s.d KM 6+800 LINTAS BOGOR-SUKABUMI
Rev. Date: 16-Jan-23

3.0 SURVEI GEOTEKNIK

Survei geoteknik meliputi pekerjaan penyelidikan tanah dan survei georadar. Penyelidikan tanah meliputi
pekerjaan pengeboran dalam (machine drilling) yang dilaksanakan di jalur ganda kereta api antara
Batutulis-Ciomas lintas Bogor-Sukabumi pada tanggal 31 Oktober sampai dengan 11 November 2022.
Layout dan rangkuman titik penyelidikan tanah ditunjukkan pada Gambar 3.1 dan Tabel 3-1.

Gambar 3.1 Layout titik penyelidikan tanah

Tabel 3-1 Rangkuman titik penyelidikan tanah


Kedalaman Date UTM (Zone 48)
No Borehole Lokasi
m Started Completed North East
1 BH-01 30 06/11/2022 08/11/2022 700359 9265230 KM 6+625
2 BH-02 30 03/11/2022 05/11/2022 700384 9265169 KM 6+675
3 BH-03 30 31/10/2022 02/11/2022 700368 9265111 KM 6+725
4 BH-04 20 10/11/2022 11/11/2022 700331 9265173 KM 6+675

Survei georadar dilaksanakan pada tanggal 15 Desember 2022, survei ini bertujuan untuk mengetahui
kondisi bawah permukaan dengan mengirimkan sinyal elektromagnetik. Hasil survei serta dokumentasi
pekerjaan ditunjukkan pada LAMPIRAN F.

3.1 Hasil Machine Drilling


Hasil machine drilling berupa borlog, dokumentasi lapangan dan dokumentasi corebox secara berturut-
turut ditunjukkan pada LAMPIRAN B, LAMPIRAN C, dan LAMPIRAN D.
Rev: Page:
PENYELIDIKAN TANAH KAJIAN PERKUATAN LERENG JALUR KA ANTARA 00 12 of 20
BATUTULIS-CIOMAS KM 6+550 s.d KM 6+800 LINTAS BOGOR-SUKABUMI
Rev. Date: 16-Jan-23

3.2 Kondisi Tanah Bawah Permukaan


Berdasarkan hasil pengeboran dalam yang disertai pengujian SPT pada masing-masing lubang bor
diperoleh gambaran awal jenis tanah dan stratigrafinya serta kekuatan dari tanah. Informasi jenis dan
komposisi tanah diperoleh dengan mendeskripiskan langsung saat pengeboran sedangkan informasi
kekuatan tanah dilihat dari besarnya nilai N-SPT lapangan. Stratigrafi tanah berdasarkan masing-masing
titik bor ditunjukkan pada

3.2.1 Borehole BH-01


Berdasarkan data BH-01, kondisi lapisan tanah bawah permukaan pada kedalaman 0-5 meter
merupakan lapisan tanah clayey Silt dengan konsistensi stiff, nilai N-SPT berkisar antara 8-10. Lapisan
kedua pada kedalaman 5-13.8 meter merupakan lapisan tanah Silt dengan konsistensi medium stiff to
stiff, nilai N-SPT berkisar antara 6-8. Lapisan ketiga pada kedalaman 12-13.8 meter merupakan lapisan
clayey Silt dengan konsistensi very stiff, nilai N-SPT 19. Lapisan keempat merupakan lapisan Silt pada
kedalaman 13.8-16.8 meter dengan konsistensi hard, nilai N-SPT berkisar antara 50-56. Lapisan kelima
pada kedalaman 16.8-30 meter merupakan lapisan Breccia, nilai N-SPT berkisar antara 40-60. Muka air
tanah ditemukan pada kedalaman 6.5 meter relatif dari permukaan tanah.
3.2.2 Borehole BH-02
Berdasarkan data BH-02, kondisi lapisan tanah bawah permukaan pada kedalaman 0-3 meter
merupakan lapisan Clay dengan konsistensi medium stiff, nilai N-SPT 5. Lapisan kedua pada kedalaman
3-11 meter merupakan lapisan silty Clay dengan konsistensi stiff, nilai N-SPT berkisar antara 8-10.
Lapisan ketiga pada kedalaman 11-17 meter merupakan lapisan tanah clayey Silt dengan konsistensi
medium stiff to stiff, nilai N-SPT berkisar antara 6-8. Lapisan keempat pada kedalaman 17-20 meter
merupakan lapisan tanah silty Clay dengan konsistensi stiff, nilai N-SPT 13. Lapisan kelima pada
kedalaman 20-26 meter merupakan lapisan tanah Silt dengan konsistensi very stiff, nilai N-SPT berkisar
antara 19-29. Lapisan keenam pada kedalaman 26-30 meter merupakan lapisan tanah Silt dan clayey
Silt dengan konsistensi hard, nilai N-SPT berkisar antara 48-51. Muka air tanah ditemukan pada
kedalaman 9.6 meter relatif dari permukaan tanah.
3.2.3 Borehole BH-03
Berdasarkan data BH-03, kondisi lapisan tanah bawah permukaan pada kedalaman 0-8.6 meter
merupakan lapisan tanah Clay dengan konsistensi stiff, nilai N-SPT berkisar antara 6-10. Lapisan kedua
pada kedalaman 8.6-15 meter merupakan lapisan tanah silty Clay dengan konsistensi stiff, nilai N-SPT
berkisar antara 8-11. Lapisan ketiga pada kedalaman 15-23 meter merupakan lapisan tanah clayey Silt
dengan konsistensi very stiff, nilai N-SPT berkisar antara 17-30. Lapisan keempat pada kedalaman 23-
26.7 meter merupakan lapisan tanah silty Clay dengan konsistensi hard, nilai N-SPT berkisar antara 42-
43. Lapisan kelima pada kedalaman 26.7-30 meter merupakan lapisan tanah Silt dengan konsistensi
hard, nilai N-SPT berkisar antara 53-60. Muka air tanah ditemukan pada kedalaman 16.7 meter relatif
dari permukaan tanah.
Rev: Page:
PENYELIDIKAN TANAH KAJIAN PERKUATAN LERENG JALUR KA ANTARA 00 13 of 20
BATUTULIS-CIOMAS KM 6+550 s.d KM 6+800 LINTAS BOGOR-SUKABUMI
Rev. Date: 16-Jan-23

3.2.4 Borehole BH-04


Berdasarkan data BH-04, kondisi lapisan tanah bawah permukaan pada kedalaman 0-4 meter
merupakan lapisan tanah clayey Silt dengan konsistensi stiff, nilai N-SPT 10. Lapisan kedua pada
kedalaman 4-5.9 meter merupakan lapisan tanah Silt dengan konsistensi very stiff, nilai N-SPT 19.
Lapisan ketiga pada kedalaman 5.9-8 meter merupakan lapisan tanah Silt dengan konsistensi hard, nilai
N-SPT 44. Lapisan keempat pada kedalaman 8-20 meter merupakan lapisan tanah Breccia dengan nilai
N-SPT 60. Muka air tanah ditemukan pada kedalaman 4 meter relatif dari permukaan tanah.

Gambar 3.2 Soil profile KM 6+625


Rev: Page:
PENYELIDIKAN TANAH KAJIAN PERKUATAN LERENG JALUR KA ANTARA 00 14 of 20
BATUTULIS-CIOMAS KM 6+550 s.d KM 6+800 LINTAS BOGOR-SUKABUMI
Rev. Date: 16-Jan-23

Gambar 3.3 Soil profile KM 6+675

Gambar 3.4 Soil profile KM 6+725


Rev: Page:
PENYELIDIKAN TANAH KAJIAN PERKUATAN LERENG JALUR KA ANTARA 00 15 of 20
BATUTULIS-CIOMAS KM 6+550 s.d KM 6+800 LINTAS BOGOR-SUKABUMI
Rev. Date: 16-Jan-23

3.3 Hasil Uji Laboratorium


Selama pengeboran berlangsung, total 10 (sepuluh) sampel UDS berhasil diperoleh. Pengujian
laboratorium dilakukan untuk seluruh sampel UDS yang berhasil diperoleh. Pengujian laboratorium terdiri
dari pengujian Index Properties (water content, specific gravitiy dan unit weight), Atterberg Limit, Grain
Size, Triaxial UU dan Triaxial CU. Hasil pengujian laboratorium ditunjukkan pada LAMPIRAN E.

3.3.1 Index Propereties


Berdasarkan hasil uji laboratorium nilai unit weight (moist) berkisar antara 13.6-16.2 t/m3 dengan nilai
rata-rata 15.4 t/m3 sementara unit weight (dry) berkisar antara 6.9-10.1 t/m3 dan nilai rata-rata 9.1 t/m3.
Specific gravity berkisar antara 2.58-2.70. Nilai moisture content berkisar antara 59-95%. Hasil uji
tersebut ditunjukkan pada Gambar 3.5 dan Gambar 3.6.

γmoist (kN/m³) γdry (kN/m³)


13.00 14.00 15.00 16.00 17.00 0.00 5.00 10.00 15.00 20.00
345 345

340 340

335 335

330 330
Elevation (m)
Elevation (m)

325 325

320 320

315 315

310 310

305 305
moist WSP (2022) Average dry WSP (2022) Average

Gambar 3.5 Hasil uji test Unit Weight moist dan dry
Rev: Page:
PENYELIDIKAN TANAH KAJIAN PERKUATAN LERENG JALUR KA ANTARA 00 16 of 20
BATUTULIS-CIOMAS KM 6+550 s.d KM 6+800 LINTAS BOGOR-SUKABUMI
Rev. Date: 16-Jan-23

Gs Wn (%)
2.50 2.60 2.70 2.80 2.90 3.00 0 20 40 60 80 100
345 345

340 340

335 335

330 330
Elevation (m)

Elevation (m)
325 325

320 320

315 315

310 310

305 305
Gs Wn (2022)

Gambar 3.6 Hasil uji test Specific Gravity dan Moisture Content

3.3.2 Atterberg Limit


Berdasarkan hasil uji Atterberg Limit, nilai Liquid Limit (LL) berkisar antara 61-107%, nilai Plastic Limit
(PL) berkisar antara 40-56%, dan nilai Index Plasticity berkisar antara 17-54%. Berdasarkan Plasticity
Chart, secara umum tanah yang diuji dapat diklasifikasikan sebagai MH or OH. Hasil uji ditunjukkan pada
Gambar 3.7 dan Gambar 3.8.
Rev: Page:
PENYELIDIKAN TANAH KAJIAN PERKUATAN LERENG JALUR KA ANTARA 00 17 of 20
BATUTULIS-CIOMAS KM 6+550 s.d KM 6+800 LINTAS BOGOR-SUKABUMI
Rev. Date: 16-Jan-23

LL (%) PL (%)
0 50 100 150 0 20 40 60
345 345

340 340

335 335

330 330
Elevation (m)

Elevation (m)
325 325

320 320

315 315

310 310

305 305
LL WSP (2022) PL WSP (2022)

PI (%)
0 20 40 60
345

340

335

330
Elevation (m)

325

320

315

310

305
PI WSP (2022)

Gambar 3.7 Hasil uji Atterberg Limit


Rev: Page:
PENYELIDIKAN TANAH KAJIAN PERKUATAN LERENG JALUR KA ANTARA 00 18 of 20
BATUTULIS-CIOMAS KM 6+550 s.d KM 6+800 LINTAS BOGOR-SUKABUMI
Rev. Date: 16-Jan-23

Gambar 3.8 Plasticity Chart

3.3.3 Triaxial UU dan Triaxial CU


Berdasarkan hasil uji Triaxial UU, diperoleh nilai cu yang berkisar antara 14.2-57.1 kPa dan Øu berkisar
antara 0.8-2.9 deg. Sementara hasil uji Triaxial CU berupa c’ dan Ø’ secara berturut adalah 12.7-35.1
kPa dan 27.1-33 deg. Hasil uji Triaxial UU dan Triaxial CU ditunjukkan pada
Rev: Page:
PENYELIDIKAN TANAH KAJIAN PERKUATAN LERENG JALUR KA ANTARA 00 19 of 20
BATUTULIS-CIOMAS KM 6+550 s.d KM 6+800 LINTAS BOGOR-SUKABUMI
Rev. Date: 16-Jan-23

cu (kN/m²) Øu (deg)
0.00 20.00 40.00 60.00 0.00 1.00 2.00 3.00 4.00
345 345

340 340

335 335

330 330
Elevation (m)

Elevation (m)
325 325

320 320

315 315

310 310

305 305
cu WSP (2022) Øu WSP (2022)

Gambar 3.9 Hasil uji Triaxial UU


Rev: Page:
PENYELIDIKAN TANAH KAJIAN PERKUATAN LERENG JALUR KA ANTARA 00 20 of 20
BATUTULIS-CIOMAS KM 6+550 s.d KM 6+800 LINTAS BOGOR-SUKABUMI
Rev. Date: 16-Jan-23

c' (kN/m²) Ø' (deg)


0.00 10.00 20.00 30.00 40.00 0.00 10.00 20.00 30.00 40.00
345 345

340 340

335 335

330 330
Elevation (m)

Elevation (m)
325 325

320 320

315 315

310 310

305 305
c' WSP (2022) phi' WSP (2022)

Gambar 3.10 Hasil uji Triaxial Cu


APPENDIX A
LAYOUT TITIK PENYELIDIKAN
TANAH
KETERANGAN :
: Row WSP
: Row KA
: As Track Rel KA
: Sheetpile Eksisting Terpasang
: Boreholes 2022

: Boreholes 2021

OWNER :

KEMENTERIAN PERHUBUNGAN
DIREKTORAT JENDERAL PERKERETAAPIAN
Rumah dibongkar MENYETUJUI :

P1
......................................................
BH-02 Rmh Gang
Rmh
(30m) P4 dibongkar KONSULTAN PERENCANA :
x=700346.834
y=9265236.697
x=700350.206 P2
y=9265238.158 P5
BH-03
BH-01
(30m)
(30m)
BH-06
DISETUJUI :
(Eksisting) P6
P3 BH-04
(20m)

P7 P8
BH-05 Putu Sumiartha, ST,. MT
(Eksisting)
DIPERIKSA :

Harry Wiguna, ST.


P9
DIGAMBAR :

Pagar

P10
Andrean Rustiana
NAMA PROYEK :

KAJIAN PERKUATAN LERENG JALUR KA


ANTARA BATU TULIS - CIOMAS
LINTAS BOGOR - SUKABUMI

JUDUL GAMBAR :

LAYOUT SOIL INVESTIGATION


LAYOUT SOIL INVESTIGATION KM 6+550 S/D KM 6+800 1 KM 6+550 S/D KM 6+800

SCALE 1 : 1000 GE 01

NO REVISI TANGGAL PARAF


DEPTH KOORDINAT
NO BOR
(m) E N
Y
01 BH-01 30 700367.00 9265236.00 ONL
ION INFORMATION CONSTRUCTION
02 BH-02 30 700384.00 9265169.00 AT
ORM
03 BH-03 30 700368.00 9265111.00 IN F SKALA NO. GAMBAR JML. LEMBAR
R
FO
FT,
04 BH-04 20 700331.00 9265173.00 A3
R A 1 : 1000 GE-01 131
D
KETERANGAN :
: silty Clay, Clay

: Silt with Breccia

: clayey Silt, Silt

: Breccia

OWNER :

336 Saluran Eksisting


335
ROW
334
333 +332.55 BH-01 KEMENTERIAN PERHUBUNGAN
??? 0 DIREKTORAT JENDERAL PERKERETAAPIAN
332
MENYETUJUI :
331
330 8
329
10 ......................................................
328
GWL
327 -5 -6.50m 1.20 4.27
KONSULTAN PERENCANA :

326 6 5.50
Clayey Silt & Silt, +325.00
325 m.stiff to stiff
324 7 CL CL

4.50
323
322 -10 8 0.86 DISETUJUI :

321 +320.50
???
320 19

11.40
319
Clayey Silt, v.stiff
???

4.50
50 Putu Sumiartha, ST,. MT
318 +317.14 +317.14

6.90
-15 DIPERIKSA :
317 Silt with Breccia, hard
316 ??? 56 ???

2.40
315
Clayey Silt, hard 40
314 ??? ??? Harry Wiguna, ST.
313 DIGAMBAR :
312 -20 60
311
310 60
Andrean Rustiana
309
Breccia with trace of Gravel and Boulder, 60 NAMA PROYEK :
308
Low cemented, very weak to weak -25
307
306 60 KAJIAN PERKUATAN LERENG JALUR KA
ANTARA BATU TULIS - CIOMAS
304 LINTAS BOGOR - SUKABUMI
302 60
300 JUDUL GAMBAR :
??? ??? ??? ??? ???
298 -30 60
KM 6+625 297
DATUM LEVEL :+296
SOIL PROFILE KM. 6+625
28.007 331.671

17.215 324.701

317.285
317.355
317.142
317.245
316.995
316.495

317.282
0.549 317.355
0.000 317.142
-0.585 317.245
-1.495 316.995
-2.350 316.495
316.495
315.895
316.495
316.495
315.400
316.000
316.000

316.495
19.267 325.355
35.584 332.522

25.633 331.000

21.209 326.500
32.117 332.394

12.445 321.000
29.400 332.204

LEVEL

-3.350
-3.720
-4.090
-4.590
6.978
6.037
5.488
4.903
3.992
3.138

1.491
9.320
8.950
8.377

2.348
DISTANCE NO REVISI TANGGAL PARAF

SOIL PROFILE KM 6+625 1 NL


Y
O
SCALE 1 : 200 GE 01 ION INFORMATION CONSTRUCTION
AT
ORM
IN F SKALA NO. GAMBAR JML. LEMBAR
R
FO
FT,
A3
R A 1 : 200 GE-01 131
D
KETERANGAN :
ROW
: silty Clay, Clay

343 BH-02 : Silt with Breccia


342 ??? 0
: clayey Silt, Silt
341
340 5 : Breccia

339
BH-06 OWNER :
338 10 (Eksisting)
337 -5
0
336 8
335
silty Clay & Clay, 5

10 GWL m.stiff to stiff


334 6
-9.60m
333 KEMENTERIAN PERHUBUNGAN
7 GWL DIREKTORAT JENDERAL PERKERETAAPIAN
332 -10 9
??? -5 -6.00m
331 8 MENYETUJUI :
330 6
9
329
328 6 11 5.09 ......................................................
327 -15 Clayey Silt, m.stiff +326.00 5.70
-10 17 KONSULTAN PERENCANA :
326 8 TRACK TRACK
???
325 21 CL CL

4.00
324 13 silty Clay, 22 BH-04
323 stiff to v.stiff +322.00
322 -20 19 16 0
??? -15

9.82
321
19 DISETUJUI :

4.20
320 29 10 GWL
319 22 Silt, v.stiff -4.00m
318 27
Silt, v.stiff 19 +317.81 +317.81
???

6.80
24 -5
317 -25

2.60
??? -20 ??? Putu Sumiartha, ST,. MT
316 48 60 44
DIPERIKSA :
315 Silt with Breccia, hard Silt with Breccia, hard ???
60 60
314
??? 51
313
??? Clayey Silt, hard 60
312 -30 48 -10 60
-25 60 Harry Wiguna, ST.
311
310 60 60 DIGAMBAR :

309
60 60
308
307 -1560
Breccia with trace of Gravel and Boulder, -30 60
Breccia with trace of Gravel Andrean Rustiana
306
Low cemented, very weak to weak 60 and Boulder, Low cemented,
304 NAMA PROYEK :
60
very weak to weak
302 60
300
KAJIAN PERKUATAN LERENG JALUR KA
298 -2060 60 ANTARA BATU TULIS - CIOMAS
-35 LINTAS BOGOR - SUKABUMI
297 60
296
60 JUDUL GAMBAR :
295
294 60
293 ??? ??? ??? ??? ???
-40 60
292 SOIL PROFILE KM. 6+675
KM 6+675 291
DATUM LEVEL : +290
317.200
317.800
317.800

317.948
318.019
317.812
317.912
317.665
317.112
317.112
317.948
318.020
317.812
317.912
317.665
317.112
317.112
316.512
317.112
317.112

318.453

319.013

-12.014 319.241
22.600 330.355

18.037 327.000

14.832 322.429
36.526 339.000
43.262 341.867
51.761 342.450

39.810 340.733

28.329 335.668
49.543 342.372

32.982 338.500

LEVEL
NO REVISI TANGGAL PARAF

-0.584
-1.496
-2.290
-3.290
-3.660
-4.030
-4.830

-6.720

-9.720
9.927
9.557
8.557

7.191
6.250
5.700
5.116
4.204
3.411
2.385
1.490
0.550
0.000
DISTANCE
Y
ONL
SOIL PROFILE KM 6+675 ION INFORMATION CONSTRUCTION
1 AT
SCALE 1 : 225 GE 02 ORM
INF SKALA NO. GAMBAR JML. LEMBAR
R
FO
FT,
A3
R A 1 : 225 GE-02 131
D
KETERANGAN :
: silty Clay, Clay

: Silt with Breccia


346 ROW
BH-03 : clayey Silt, Silt
345
344
0 : Breccia
???
343
6
BH-05 OWNER :
342
(Eksisting)
341
10 0
340
-5 5
339
10
338 6
337
KEMENTERIAN PERHUBUNGAN
9 7 GWL DIREKTORAT JENDERAL PERKERETAAPIAN
336
silty Clay & Clay, -5 -6.00m
335 11 MENYETUJUI :
m.stiff to stiff
334
-10 10
13
333
11
332 14
......................................................
331
8 -10 16 KONSULTAN PERENCANA :
330 ???
-15 GWL
329 -16.70m 15 5.03
328
17
17 +327.00 4.80
327
18 TRACK TRACK
326 10 CL CL
Clayey Silt, v.stiff -15
325

5.00
-20 24 9 DISETUJUI :
324
323 7
30 +322.00
322 ???

11.50
13
321
43 -20 ??? Putu Sumiartha, ST,. MT

4.50
320 15
319
-25 silty Clay, hard +318.49 +318.49 DIPERIKSA :
16

7.50
318 ??? 42 ???
317 20
53

3.00
316 Silt with Breccia, hard
-25 37 Harry Wiguna, ST.
315 ??? ???
-30 60 DIGAMBAR :
314 41
313
50
312
311 41
-30 Andrean Rustiana
310
60
309 NAMA PROYEK :
308 Breccia with trace of Gravel and Boulder, 60
307 Low cemented, very weak to weak
60 KAJIAN PERKUATAN LERENG JALUR KA
306 ANTARA BATU TULIS - CIOMAS
-35 LINTAS BOGOR - SUKABUMI
305 60
304
60 JUDUL GAMBAR :
303
302
60
301 ??? ??? ??? ??? ???
-40 60
KM 6+725 300 SOIL PROFILE KM. 6+725
DATUM LEVEL : +299

320.768

-11.082 320.845
317.900
317.500

317.500
318.641
318.707
318.496
318.593
318.341
317.736
317.736
318.641
0.548 318.707
0.000 318.496
-0.585 318.593
-1.495 318.341
-2.150 317.736

317.736
317.136
317.736
317.736
344.045

337.000

322.486
48.498 344.152

44.105 344.152

342.179

330.655
39.399 344.486

LEVEL

NO REVISI TANGGAL PARAF

-3.350
-3.720
-4.090
-4.590

-9.139
35.576

30.900

22.801

17.679

13.643

9.228
8.858

7.374
6.290
5.349
4.800
4.215
3.305
2.650
2.150
1.490
DISTANCE

Y
ONL
SOIL PROFILE KM 6+725 1 ION INFORMATION CONSTRUCTION
AT
SCALE 1 : 225 GE 03
ORM
IN F SKALA NO. GAMBAR JML. LEMBAR
R
FO
FT,
A3
R A 1 : 225 GE-03 131
D
APPENDIX B
BORLOG
BORING NUMBER BH-01
PAGE 1 OF 1

CLIENT : Balai Teknik Perkeretaapian Kelas 1 Jabar PROJECT NAME : Penyelidikan Tanah KA Batutulis-Ciomas
PROJECT NUMBER : PROJECT LOCATION : KM 6+625
DATE STARTED : 6/11/22 COMPLETED : 8/11/22 DRILLING METHOD : Coring, Thin Walled Shelby Tube
GROUND ELEVATION : 332.2 m COORDINATES : N = 742514 ; E = 9295128
LOGGED BY : Herman GROUND WATER LEVELS : - 6.5 m
EDITED BY : Harry Wiguna DEPTH : 30 m
CHECKED BY : Putu Sumiartha, ST., MT

ATTERBERG LIMITS STRENGTH TEST


GRAPHIC LOG

SAMPLE TYPE

SPT N VALUE
DEPTH (m)

USCS

PL WC LL
MATERIAL DESCRIPTION SPT N VALUE qu
(kPa) Gs
20 40 60 80 TYPE
C  C' 
(kPa) (kPa)
(deg) (deg)
FINES CONTENT (%)

15 30 45 60 20 40 60 80

SPT 8
Clayey SILT, reddish brown to brown, stiff consistency
UD CU 18.4 29.8 2.69

SPT 10
5 5

SPT 6

UD UU 36.6 2.9 2.7

SPT 7
GEOTECH BORLOG - GINT STD US LAB.GDT - 17/1/23 17:25 - D:\1. PROJECT\KA BOGOR\GINT\BORLOG LERENG KA BOGOR.GPJ

SILT, reddish brown, medium stiff to stiff consistency

10
SPT 8

UD CU 29.8 32.2 2.62


12
SPT 19

Clayey SILT, light brown, very stiff consistency


13.8
SPT 50
15
SILT, with weathered breccia, brown, hard consistency
SPT 56
16.8

SPT 40

20
SPT 60

SPT 60

BRECCIA with trace of gravel and boulder, low cemented,


very weak to weak
SPT 60
25

SPT 60

SPT 60

30 30
End of drilling at 30 m depth SPT 60

REMARKS : : Standard Penetration Test (SPT) : Undisturbed Sample (UDS) : Disturb Sample (DS)
BORING NUMBER BH-02
PAGE 1 OF 1

CLIENT : Balai Teknik Perkeretaapian Kelas 1 Jabar PROJECT NAME : Penyelidikan Tanah KA Batutulis-Ciomas
PROJECT NUMBER : PROJECT LOCATION : KM 6+675
DATE STARTED : 3/11/22 COMPLETED : 5/11/22 DRILLING METHOD : Coring, Thin Walled Shelby Tube
GROUND ELEVATION : 342 m COORDINATES : N = 742613 ; E = 9295136
LOGGED BY : Herman GROUND WATER LEVELS : - 9.6 m
EDITED BY : Harry Wiguna DEPTH : 30 m
CHECKED BY : Putu Sumiartha, ST., MT

ATTERBERG LIMITS STRENGTH TEST


GRAPHIC LOG

SAMPLE TYPE

SPT N VALUE
DEPTH (m)

USCS

PL WC LL
MATERIAL DESCRIPTION SPT N VALUE qu
(kPa) Gs
20 40 60 80 TYPE
C  C' 
(kPa) (kPa)
(deg) (deg)
FINES CONTENT (%)

15 30 45 60 20 40 60 80

CLAY, brown, medium stiff consistency


SPT 5
3
UD CU 14.8 29.7 2.69

SPT 10
5

SPT 8

Silty CLAY, brown to reddish brown, stiff consistency


UD CU 32.7 27.9 2.7
SPT 10
GEOTECH BORLOG - GINT STD US LAB.GDT - 17/1/23 17:26 - D:\1. PROJECT\KA BOGOR\GINT\BORLOG LERENG KA BOGOR.GPJ

10
SPT 9
11

SPT 6

UD UU 14.2 0.8 2.68


Clayey SILT, brown to light brown, medium stiff to stiff
consistency SPT 6
15

SPT 8
17

SPT 13
Silty CLAY, brown, stiff to very stiff cosistency

20 20
SPT 19

SPT 29

SILT, yellowish brown, very stiff consistency

SPT 27
25

26
SPT 48

SILT with breccia, brown, hard consistency


SPT 51
29

Clayey SILT, brown, hard consistency


30 30
End of drilling at 30 m depth SPT 48

REMARKS : : Standard Penetration Test (SPT) : Undisturbed Sample (UDS) : Disturb Sample (DS)
BORING NUMBER BH-03
PAGE 1 OF 1

CLIENT : Balai Teknik Perkeretaapian Kelas 1 Jabar PROJECT NAME : Penyelidikan Tanah KA Batutulis-Ciomas
PROJECT NUMBER : PROJECT LOCATION : KM 6+725
DATE STARTED : 31/10/22 COMPLETED : 2/11/22 DRILLING METHOD : Coring, Thin Walled Shelby Tube
GROUND ELEVATION : 322.2 m COORDINATES : N = 742517 ; E = 9295078
LOGGED BY : Herman GROUND WATER LEVELS : - 16.7 m
EDITED BY : Harry Wiguna DEPTH : 30 m
CHECKED BY : Putu Sumiartha, ST., MT

ATTERBERG LIMITS STRENGTH TEST


GRAPHIC LOG

SAMPLE TYPE

SPT N VALUE
DEPTH (m)

USCS

PL WC LL
MATERIAL DESCRIPTION SPT N VALUE qu
(kPa) Gs
20 40 60 80 TYPE
C  C' 
(kPa) (kPa)
(deg) (deg)
FINES CONTENT (%)

15 30 45 60 20 40 60 80

SPT 6

UD
CU 12.7 33.0 2.69
CLAY, brown to yellowish brown, medium stiff to stiff SPT 10
5
consistency

SPT 10

UD UU 57.1 2.5 2.69


SPT 9
GEOTECH BORLOG - GINT STD US LAB.GDT - 17/1/23 17:25 - D:\1. PROJECT\KA BOGOR\GINT\BORLOG LERENG KA BOGOR.GPJ

8.6

10
SPT 10

UD CU 35.1 27.1 2.69


Silty CLAY, yellowish brown, stiff consistency
SPT 11

SPT 8
15 15

Clayey SILT, intercalated with breccia, brownish gray, very


stiff consistency SPT 17
16.9

SPT 18

20
Clayey SILT, brown, very stiff consistency SPT 24

SPT 30
23.1
Silty CLAY, intercalated with weathered breccia, gray,
24 hard consistency
SPT 43
25
Silty CLAY, brown, hard consistency
SPT 42
26.7

SPT 53
SILT, with weathered breccia, gray, hard consistency

30 30
End of drilling at 30 m depth SPT 60

REMARKS : : Standard Penetration Test (SPT) : Undisturbed Sample (UDS) : Disturb Sample (DS)
BORING NUMBER BH-04
PAGE 1 OF 1

CLIENT : Balai Teknik Perkeretaapian Kelas 1 Jabar PROJECT NAME : Penyelidikan Tanah KA Batutulis-Ciomas
PROJECT NUMBER : PROJECT LOCATION : KM 6+675
DATE STARTED : 10/11/22 COMPLETED : 11/11/22 DRILLING METHOD : Coring, Thin Walled Shelby Tube
GROUND ELEVATION : 344.4 m COORDINATES : N = 742617 ; E = 9295085
LOGGED BY : Herman GROUND WATER LEVELS : - 4 m
EDITED BY : Harry Wiguna DEPTH : 20 m
CHECKED BY : Putu Sumiartha, ST., MT

ATTERBERG LIMITS STRENGTH TEST


GRAPHIC LOG

SAMPLE TYPE

SPT N VALUE
DEPTH (m)

USCS

PL WC LL
MATERIAL DESCRIPTION SPT N VALUE qu
(kPa) Gs
20 40 60 80 TYPE
C  C' 
(kPa) (kPa)
(deg) (deg)
FINES CONTENT (%)

15 30 45 60 20 40 60 80

Clayey SILT, brown, stiff consistency SPT 10

UD >> CU 21.5 34.5 2.58

4
SPT 19

5 SILT, brown, very stiff consistency


GEOTECH BORLOG - GINT STD US LAB.GDT - 17/1/23 17:26 - D:\1. PROJECT\KA BOGOR\GINT\BORLOG LERENG KA BOGOR.GPJ

5.9
SPT 44

SILT, with weathered breccia, hard consistency

8
SPT 60

10
SPT 60

SPT 60

BRECCIA with trace of gravel and boulder, low cemented,


very weak to weak SPT 60

15

SPT 60

SPT 60

20 20
End of drilling at 20 m depth SPT 60

REMARKS : : Standard Penetration Test (SPT) : Undisturbed Sample (UDS) : Disturb Sample (DS)
APPENDIX C
DOKUMENTASI COREBOX
PHOTOGRAPH

Project Penyelidikan Tanah Lereng Jalur Kereta Api antara Batutulis-Ciomas Lintas Bogor-Sukabumi
Client Kemenhub DJKA Balai Teknik Perkeretaapian Kelas I Wilayah Jawa Bagian Barat
Borehole ID BH-01
Location STA 6+625 SPT Automatic Hammer (AH)
Total Depth (m) 30 Boring Method Coring
GWL (m) 6.5 Sampling Thin Walled (Shelby) Tube
Coordinate E: 700359 ; N: 9265230 Page 1

CORE SAMPLE

1
BH-01 Depth 0-5 m

2
BH-01 Depth 5-10 m
PHOTOGRAPH

Project Penyelidikan Tanah Lereng Jalur Kereta Api antara Batutulis-Ciomas Lintas Bogor-Sukabumi
Client Kemenhub DJKA Balai Teknik Perkeretaapian Kelas I Wilayah Jawa Bagian Barat
Borehole ID BH-01
Location STA 6+625 SPT Automatic Hammer (AH)
Total Depth (m) 30 Boring Method Coring
GWL (m) 6.5 Sampling Thin Walled (Shelby) Tube
Coordinate E: 700359 ; N: 9265230 Page 2

CORE SAMPLE

3
BH-01 Depth 10-15 m

4
BH-01 Depth 15-20 m
PHOTOGRAPH

Project Penyelidikan Tanah Lereng Jalur Kereta Api antara Batutulis-Ciomas Lintas Bogor-Sukabumi
Client Kemenhub DJKA Balai Teknik Perkeretaapian Kelas I Wilayah Jawa Bagian Barat
Borehole ID BH-01
Location STA 6+625 SPT Automatic Hammer (AH)
Total Depth (m) 30 Boring Method Coring
GWL (m) 6.5 Sampling Thin Walled (Shelby) Tube
Coordinate E: 700359 ; N: 9265230 Page 3

CORE SAMPLE

5
BH-01 Depth 20-25 m

6
BH-01 Depth 25-30 m
PHOTOGRAPH

Project Penyelidikan Tanah Lereng Jalur Kereta Api antara Batutulis-Ciomas Lintas Bogor-Sukabumi
Client Kemenhub DJKA Balai Teknik Perkeretaapian Kelas I Wilayah Jawa Bagian Barat
Borehole ID BH-01
Location STA 6+625 SPT Automatic Hammer (AH)
Total Depth (m) 30 Boring Method Coring
GWL (m) 6.5 Sampling Thin Walled (Shelby) Tube
Coordinate E: 700359 ; N: 9265230 Page 1

CORE SAMPLE

1
BH-01 Depth 0-5 m

2
BH-01 Depth 5-10 m
PHOTOGRAPH

Project Penyelidikan Tanah Lereng Jalur Kereta Api antara Batutulis-Ciomas Lintas Bogor-Sukabumi
Client Kemenhub DJKA Balai Teknik Perkeretaapian Kelas I Wilayah Jawa Bagian Barat
Borehole ID BH-01
Location STA 6+625 SPT Automatic Hammer (AH)
Total Depth (m) 30 Boring Method Coring
GWL (m) 6.5 Sampling Thin Walled (Shelby) Tube
Coordinate E: 700359 ; N: 9265230 Page 2

CORE SAMPLE

3
BH-01 Depth 10-15 m

4
BH-01 Depth 15-20 m
PHOTOGRAPH

Project Penyelidikan Tanah Lereng Jalur Kereta Api antara Batutulis-Ciomas Lintas Bogor-Sukabumi
Client Kemenhub DJKA Balai Teknik Perkeretaapian Kelas I Wilayah Jawa Bagian Barat
Borehole ID BH-01
Location STA 6+625 SPT Automatic Hammer (AH)
Total Depth (m) 30 Boring Method Coring
GWL (m) 6.5 Sampling Thin Walled (Shelby) Tube
Coordinate E: 700359 ; N: 9265230 Page 3

CORE SAMPLE

5
BH-01 Depth 20-25 m

6
BH-01 Depth 25-30 m
PHOTOGRAPH

Project Penyelidikan Tanah Lereng Jalur Kereta Api antara Batutulis-Ciomas Lintas Bogor-Sukabumi
Client Kemenhub DJKA Balai Teknik Perkeretaapian Kelas I Wilayah Jawa Bagian Barat
Borehole ID BH-01
Location STA 6+625 SPT Automatic Hammer (AH)
Total Depth (m) 30 Boring Method Coring
GWL (m) 6.5 Sampling Thin Walled (Shelby) Tube
Coordinate E: 700359 ; N: 9265230 Page 1

CORE SAMPLE

1
BH-01 Depth 0-5 m

2
BH-01 Depth 5-10 m
PHOTOGRAPH

Project Penyelidikan Tanah Lereng Jalur Kereta Api antara Batutulis-Ciomas Lintas Bogor-Sukabumi
Client Kemenhub DJKA Balai Teknik Perkeretaapian Kelas I Wilayah Jawa Bagian Barat
Borehole ID BH-01
Location STA 6+625 SPT Automatic Hammer (AH)
Total Depth (m) 30 Boring Method Coring
GWL (m) 6.5 Sampling Thin Walled (Shelby) Tube
Coordinate E: 700359 ; N: 9265230 Page 2

CORE SAMPLE

3
BH-01 Depth 10-15 m

4
BH-01 Depth 15-20 m
PHOTOGRAPH

Project Penyelidikan Tanah Lereng Jalur Kereta Api antara Batutulis-Ciomas Lintas Bogor-Sukabumi
Client Kemenhub DJKA Balai Teknik Perkeretaapian Kelas I Wilayah Jawa Bagian Barat
Borehole ID BH-01
Location STA 6+625 SPT Automatic Hammer (AH)
Total Depth (m) 30 Boring Method Coring
GWL (m) 6.5 Sampling Thin Walled (Shelby) Tube
Coordinate E: 700359 ; N: 9265230 Page 3

CORE SAMPLE

5
BH-01 Depth 20-25 m

6
BH-01 Depth 25-30 m
PHOTOGRAPH

Project Penyelidikan Tanah Lereng Jalur Kereta Api antara Batutulis-Ciomas Lintas Bogor-Sukabumi
Client Kemenhub DJKA Balai Teknik Perkeretaapian Kelas I Wilayah Jawa Bagian Barat
Borehole ID BH-04
Location STA 6+675 SPT Automatic Hammer (AH)
Total Depth (m) 20 Boring Method Coring
GWL (m) 4 Sampling Thin Walled (Shelby) Tube
Coordinate E: 700331 ; N: 9265173 Page 1

CORE SAMPLE

1
BH-04 Depth 0-5 m

2
BH-04 Depth 5-10 m
PHOTOGRAPH

Project Penyelidikan Tanah Lereng Jalur Kereta Api antara Batutulis-Ciomas Lintas Bogor-Sukabumi
Client Kemenhub DJKA Balai Teknik Perkeretaapian Kelas I Wilayah Jawa Bagian Barat
Borehole ID BH-04
Location STA 6+675 SPT Automatic Hammer (AH)
Total Depth (m) 20 Boring Method Coring
GWL (m) 4 Sampling Thin Walled (Shelby) Tube
Coordinate E: 700331 ; N: 9265173 Page 2

CORE SAMPLE

3
BH-04 Depth 10-15 m

4
BH-04 Depth 15-20 m
APPENDIX D
DOKUMENTASI KEGIATAN
PENGEBORAN
PHOTOGRAPH

Project Penyelidikan Tanah Lereng Jalur Kereta Api antara Batutulis-Ciomas Lintas Bogor-Sukabumi
Client Kemenhub DJKA Balai Teknik Perkeretaapian Kelas I Wilayah Jawa Bagian Barat
Borehole ID BH-01
Location STA 6+625 SPT Automatic Hammer (AH)
Total Depth (m) 30 Boring Method Coring
GWL (m) 6.5 Sampling Thin Walled (Shelby) Tube
Coordinate E: 700359 ; N: 9265230 Page 1

DRILLING ACTIVITY

1
Drilling Activity at BH-01

2
Drilling Activity at BH-01
PHOTOGRAPH

Project Penyelidikan Tanah Lereng Jalur Kereta Api antara Batutulis-Ciomas Lintas Bogor-Sukabumi
Client Kemenhub DJKA Balai Teknik Perkeretaapian Kelas I Wilayah Jawa Bagian Barat
Borehole ID BH-02
Location STA 6+675 SPT Automatic Hammer (AH)
Total Depth (m) 30 Boring Method Coring
GWL (m) 9.6 Sampling Thin Walled (Shelby) Tube
Coordinate E: 700384 ; N: 9265169 Page 1

DRILLING ACTIVITY

1
Drilling Activity at BH-02

2
Drilling Activity at BH-02
PHOTOGRAPH

Project Penyelidikan Tanah Lereng Jalur Kereta Api antara Batutulis-Ciomas Lintas Bogor-Sukabumi
Client Kemenhub DJKA Balai Teknik Perkeretaapian Kelas I Wilayah Jawa Bagian Barat
Borehole ID BH-01
Location STA 6+625 SPT Automatic Hammer (AH)
Total Depth (m) 30 Boring Method Coring
GWL (m) 6.5 Sampling Thin Walled (Shelby) Tube
Coordinate E: 700359 ; N: 9265230 Page 1

DRILLING ACTIVITY

1
Drilling Activity at BH-01

2
Drilling Activity at BH-01
PHOTOGRAPH

Project Penyelidikan Tanah Lereng Jalur Kereta Api antara Batutulis-Ciomas Lintas Bogor-Sukabumi
Client Kemenhub DJKA Balai Teknik Perkeretaapian Kelas I Wilayah Jawa Bagian Barat
Borehole ID BH-04
Location STA 6+675 SPT Automatic Hammer (AH)
Total Depth (m) 20 Boring Method Coring
GWL (m) 4 Sampling Thin Walled (Shelby) Tube
Coordinate E: 700331 ; N: 9265173 Page 1

DRILLING ACTIVITY

1
Drilling Activity at BH-04

2
APPENDIX E
HASIL UJI LABORATORIUM
Kajian Perkuatan Lereng Jalur KA Antara Batutulis-Ciomas Lintas Bogor-Sukabumi
PROJECT :
Penyelidikan Tanah
LOCATION : Bogor, Jawa Barat SUMMARY OF LABORATORY TEST RESULTS

INDEX PROPERTIES CLASSIFICATION Shear Strength

Number USCS Determination of Water Content - Spesific Gravity Liquid & plastic Limit GRAIN SIZE Triaxial CU Triaxial
of Volumetric Unit Weight Determination ANALYSIS TEST UU
No Borehole Depth of Sample (m) SOIL
% finer by Total Stress Effective Stress Total Stress
Wn moist dry Porosity Sr LL PL PI GRAVEL SAND SILT CLAY
CLASS. Spesific Wt.
C phi C' phi' Cu Øu
Gravity Passing
no. 200
(%) (kN/m3) (kN/m3) n (%) (%) (%) (%) (%) (%) (%) (%) kN/m2 ° kN/m2 ° kN/m2 °
sieve
1 BH-01 3.0 - 3.5 MH or OH 72 15.70 9.13 0.66 99 2.69 63 40 23 3.00 2.00 26.00 69.00 94.00 35.40 15.70 18.40 29.80 - -
2 BH-01 7.0 - 7.5 MH or OH 72 15.70 9.11 0.66 99 2.70 68 49 18 0.00 2.00 50.00 48.00 98.00 - - - - 36.60 2.90
3 BH-01 11.0 - 11.5 MH or OH 94 14.30 7.36 0.72 97 2.62 84 56 28 0.00 1.00 41.00 58.00 99.00 59.90 12.50 29.80 32.20 - -
5 BH-02 3.0 - 3.5 MH or OH 64 15.90 9.71 0.64 96 2.69 64 40 24 0.00 2.00 35.00 63.00 98.00 22.80 14.20 14.80 29.70 - -
6 BH-02 7.5 - 8.0 MH or OH 59 16.20 10.18 0.62 97 2.70 99 54 45 0.00 1.00 23.00 76.00 99.00 37.40 18.70 32.70 27.90 - -
7 BH-02 13.0 - 13.5 MH or OH 76 15.30 8.68 0.68 98 2.68 67 49 17 0.00 2.00 33.00 65.00 98.00 14.20 0.80
9 BH-03 3.5 - 4.0 MH or OH 61 15.80 9.81 0.64 94 2.69 64 40 23 0.00 2.00 31.00 68.00 98.00 33.00 14.10 12.70 33.00 - -
10 BH-03 7.5 - 8.0 MH or OH 59 15.90 9.99 0.63 94 2.69 61 40 21 0.00 3.00 32.00 65.00 97.00 - - - - 57.10 2.50
11 BH-03 11.0 - 11.5 MH or OH 61 16.20 10.04 0.63 98 2.69 64 41 24 0.00 1.00 31.00 68.00 99.00 38.60 17.80 35.10 27.10 - -
13 BH-04 3.0 - 3.5 MH or OH 95 13.60 6.96 0.73 91 2.58 107 53 54 0.00 1.00 25.00 74.00 99.00 31.30 23.00 21.50 34.50 - -
SOIL MECHANICS LABORATORY Form no. (No. formulir)

FACULTY OF CIVIL AND ENVIRONMENTAL ENGINEERING Issue/Revision (Diterbitkan)

BANDUNG INSTITUTE OF TECHNOLOGY Revision (Revisi)

INDEX PROPERTIES Page 2 of 2

Project : Penyelidikan Tanah Lereng Jalur Kereta Api antara Batutulis-Ciomas Lintas Bogor-Sukabumi
Type of sample : UDS Location : Bogor, Jawa Barat
Sample no. : BH-01 Date
Depth (m) : 3.00-3.50 Sample Accepted : 14 November 2022
Sample Tested : Desember 2022
Test Finished : 05 Desember 2022
RESUME
Water Content (%) = 71.94 Type of soil : lempung
Wet Density (t/m3) = 1.57 Color : cokelat
Dry Density (t/m3) = 0.91
Specific Gravity = 2.69
Void Ratio (e) = 1.96 Volume Udara = 0.65 %
Porosity (n) = 0.66
Saturated deg (%) = 99.02 Volume Air = 65.53 %
Volume Udara

Volume Air

Volume Tanah = 33.82 %


Volume Tanah

Tested by Technician : Sahuri

Date : 05 Desember 2022

Project : Penyelidikan Tanah Lereng Jalur Kereta Api antara Batutulis-Ciomas Lintas Bogor-Sukabumi
Type of sample : UDS Location : Bogor, Jawa Barat
Sample no. : BH-01 Date
Depth (m) : 7.00-7.50 Sample Accepted : 14 November 2022
Sample Tested : Desember 2022
Test Finished : 05 Desember 2022
RESUME
Water Content (%) = 72.29 Type of soil : lempung
Wet Density (t/m3) = 1.57 Color : cokelat
Dry Density (t/m3) = 0.91
Specific Gravity = 2.70
Void Ratio (e) = 1.97 Volume Udara = 0.55 %
Porosity (n) = 0.66
Saturated deg (%) = 99.17 Volume Air = 65.76 %
Volume Udara

Volume Air Volume Tanah = 33.69 %


Volume Tanah

Tested by Technician : Sahuri

Date : 05 Desember 2022


SOIL MECHANICS LABORATORY Form no. (No. formulir)

FACULTY OF CIVIL AND ENVIRONMENTAL ENGINEERING Issue/Revision (Diterbitkan)

BANDUNG INSTITUTE OF TECHNOLOGY Revision (Revisi)

INDEX PROPERTIES Page 1 of 2

Project : Penyelidikan Tanah Lereng Jalur Kereta Api antara Batutulis-Ciomas Lintas Bogor-Sukabumi
Type of sample : UDS Location : Bogor, Jawa Barat
Date
Sample Accepted : 14 November 2022
Sample Tested : Desember 2022
Test Finished : 05 Desember 2022
Sample No. BH-01 BH-01

Depth : m 3.00-3.50 7.00-7.50


Container No.
Weight of container + wet soil w1 gr 51.46 50.77 51.28 50.93
Weight of container + dry soil w2 gr 31.66 31.12 31.10 31.51
Weight of water w3 = w1 - w2 gr 19.80 19.65 20.18 19.42
Weight of container w4 gr 3.98 3.96 3.91 3.91
Weight of dry soil w5 = w2 - w4 gr 27.68 27.16 27.19 27.60
Water content ( w3 / w5 ) x 100 % % 71.53 72.35 74.22 70.36

Average Water Content % 71.94 72.29

Sample No. BH-01 BH-01

Depth : m 3.00-3.50 7.00-7.50


Ring No. AA BB AA BB
Weight of Ring + Wet Soil w1 gr 80.72 79.01 80.58 79.21
Weight of ring w2 gr 33.62 32.61 33.62 32.61
Weight of Wet Soil w3 = w1 - w2 gr 47.10 46.40 46.96 46.60
Volume of Ring v cm3 29.91 29.79 29.91 29.79
Unit Weight g = w3/v gr/ cm3 1.57 1.56 1.57 1.56

Average Unit Weight gr/cm3 1.57 1.57

Sample No. BH-01 BH-01

Depth m 3.00-3.50 7.00-7.50


Picnometer No. - 3 5
Temperature o 25 25
- C
Weight of picno + sample w1 gr 63.08 70.54
Weight of picnometer w2 gr 47.03 50.21
Weight of sample w3 = w1 - w2 gr 16.05 20.33
Weight of picnometer + water w4 gr 145.44 149.85
Weight of pic + sample + water w5 gr 155.53 162.65
Volume of Sample v = [w4-(w5-w3)] / gw cm3 5.96 7.53

Specific Gravity Gs = w3 / v 2.69 2.70

Tested by Technician : Sahuri

Date : 05 Desember 2022


SOIL MECHANICS LABORATORY Form no. (No. formulir)

FACULTY OF CIVIL AND ENVIRONMENTAL ENGINEERING Issue/Revision (Diterbitkan)

BANDUNG INSTITUTE OF TECHNOLOGY Revision (Revisi)

INDEX PROPERTIES Page 2 of 2

Project : Penyelidikan Tanah Lereng Jalur Kereta Api antara Batutulis-Ciomas Lintas Bogor-Sukabumi
Type of sample : UDS Location : Bogor, Jawa Barat
Sample no. : BH-01 Date
Depth (m) : 11.00-11.50 Sample Accepted : 14 November 2022
Sample Tested : Desember 2022
Test Finished : 05 Desember 2022
RESUME
Water Content (%) = 94.26 Type of soil : lempung
Wet Density (t/m3) = 1.43 Color : cokelat
Dry Density (t/m3) = 0.74
Specific Gravity = 2.62
Void Ratio (e) = 2.55 Volume Udara = 2.24 %
Porosity (n) = 0.72
Saturated deg (%) = 96.88 Volume Air = 69.61 %
Volume Udara

Volume Air

Volume Tanah = 28.14 %


Volume Tanah

Tested by Technician : Sahuri

Date : 05 Desember 2022

Project :
Type of sample : Location :
Sample no. : Date
Depth (m) : Sample Accepted :
Sample Tested :
Test Finished :
RESUME
Water Content (%) = Type of soil :
Wet Density (t/m3) = Color :
Dry Density (t/m3) =
Specific Gravity =
Void Ratio (e) = Volume Udara = %
Porosity (n) =
Saturated deg (%) = Volume Air = %

Volume Tanah = %

Tested by Technician :

Date :
SOIL MECHANICS LABORATORY Form no. (No. formulir)

FACULTY OF CIVIL AND ENVIRONMENTAL ENGINEERING Issue/Revision (Diterbitkan)

BANDUNG INSTITUTE OF TECHNOLOGY Revision (Revisi)

INDEX PROPERTIES Page 1 of 2

Project : Penyelidikan Tanah Lereng Jalur Kereta Api antara Batutulis-Ciomas Lintas Bogor-Sukabumi
Type of sample : UDS Location : Bogor, Jawa Barat
Date
Sample Accepted : 14 November 2022
Sample Tested : Desember 2022
Test Finished : 05 Desember 2022
Sample No. BH-01

Depth : m 11.00-11.50
Container No.
Weight of container + wet soil w1 gr 44.89 47.31
Weight of container + dry soil w2 gr 24.88 26.39
Weight of water w3 = w1 - w2 gr 20.01 20.92
Weight of container w4 gr 3.99 3.83
Weight of dry soil w5 = w2 - w4 gr 20.89 22.56
Water content ( w3 / w5 ) x 100 % % 95.79 92.73

Average Water Content % 94.26

Sample No. BH-01

Depth : m 11.00-11.50
Ring No. AA BB
Weight of Ring + Wet Soil w1 gr 76.21 75.67
Weight of ring w2 gr 33.62 32.61
Weight of Wet Soil w3 = w1 - w2 gr 42.59 43.06
Volume of Ring v cm3 29.91 29.79
Unit Weight g = w3/v gr/ cm3 1.42 1.45

Average Unit Weight gr/cm3 1.43

Sample No. BH-01

Depth m 11.00-11.50
Picnometer No. - 8+12
Temperature o 25
- C
Weight of picno + sample w1 gr 66.79
Weight of picnometer w2 gr 49.18
Weight of sample w3 = w1 - w2 gr 17.61
Weight of picnometer + water w4 gr 150.57
Weight of pic + sample + water w5 gr 161.47
Volume of Sample v = [w4-(w5-w3)] / gw cm3 6.71

Specific Gravity Gs = w3 / v 2.62

Tested by Technician : Sahuri

Date : 05 Desember 2022


SOIL MECHANICS LABORATORY Form no. (No. formulir)

FACULTY OF CIVIL AND ENVIRONMENTAL ENGINEERING Issue/Revision (Diterbitkan)

BANDUNG INSTITUTE OF TECHNOLOGY Revision (Revisi)

INDEX PROPERTIES Page 2 of 2

Project : Penyelidikan Tanah Lereng Jalur Kereta Api antara Batutulis-Ciomas Lintas Bogor-Sukabumi
Type of sample : UDS Location : Bogor, Jawa Barat
Sample no. : BH-02 Date
Depth (m) : 3.00-3.50 Sample Accepted : 14 November 2022
Sample Tested : Desember 2022
Test Finished : 05 Desember 2022
RESUME
Water Content (%) = 63.69 Type of soil : lempung
Wet Density (t/m3) = 1.59 Color : cokelat
Dry Density (t/m3) = 0.97
Specific Gravity = 2.69
Void Ratio (e) = 1.78 Volume Udara = 2.31 %
Porosity (n) = 0.64
Saturated deg (%) = 96.39 Volume Air = 61.71 %
Volume Udara

Volume Air

Volume Tanah = 35.98 %


Volume Tanah

Tested by Technician : Sahuri

Date : 05 Desember 2022

Project : Penyelidikan Tanah Lereng Jalur Kereta Api antara Batutulis-Ciomas Lintas Bogor-Sukabumi
Type of sample : UDS Location : Bogor, Jawa Barat
Sample no. : BH-02 Date
Depth (m) : 7.50-8.00 Sample Accepted : 14 November 2022
Sample Tested : Desember 2022
Test Finished : 05 Desember 2022
RESUME
Water Content (%) = 59.21 Type of soil : lempung
Wet Density (t/m3) = 1.62 Color : cokelat
Dry Density (t/m3) = 1.02
Specific Gravity = 2.70
Void Ratio (e) = 1.65 Volume Udara = 1.88 %
Porosity (n) = 0.62
Saturated deg (%) = 96.97 Volume Air = 60.32 %
Volume Udara

Volume Air Volume Tanah = 37.80 %


Volume Tanah

Tested by Technician : Sahuri

Date : 05 Desember 2022


SOIL MECHANICS LABORATORY Form no. (No. formulir)

FACULTY OF CIVIL AND ENVIRONMENTAL ENGINEERING Issue/Revision (Diterbitkan)

BANDUNG INSTITUTE OF TECHNOLOGY Revision (Revisi)

INDEX PROPERTIES Page 1 of 2

Project : Penyelidikan Tanah Lereng Jalur Kereta Api antara Batutulis-Ciomas Lintas Bogor-Sukabumi
Type of sample : UDS Location : Bogor, Jawa Barat
Date
Sample Accepted : 14 November 2022
Sample Tested : Desember 2022
Test Finished : 05 Desember 2022
Sample No. BH-02 BH-02

Depth : m 3.00-3.50 7.50-8.00


Container No.
Weight of container + wet soil w1 gr 52.69 51.95 52.81 52.79
Weight of container + dry soil w2 gr 33.88 33.18 34.57 34.70
Weight of water w3 = w1 - w2 gr 18.81 18.77 18.24 18.09
Weight of container w4 gr 4.07 3.98 3.85 4.06
Weight of dry soil w5 = w2 - w4 gr 29.81 29.20 30.72 30.64
Water content ( w3 / w5 ) x 100 % % 63.10 64.28 59.38 59.04

Average Water Content % 63.69 59.21

Sample No. BH-02 BH-02

Depth : m 3.00-3.50 7.50-8.00


Ring No. AA BB AA BB
Weight of Ring + Wet Soil w1 gr 80.78 80.14 82.15 80.91
Weight of ring w2 gr 33.62 32.61 33.62 32.61
Weight of Wet Soil w3 = w1 - w2 gr 47.16 47.53 48.53 48.30
Volume of Ring v cm3 29.91 29.79 29.91 29.79
Unit Weight g = w3/v gr/ cm3 1.58 1.60 1.62 1.62

Average Unit Weight gr/cm3 1.59 1.62

Sample No. BH-02 BH-02

Depth m 3.00-3.50 7.50-8.00


Picnometer No. - 13 17
Temperature o 25 25
- C
Weight of picno + sample w1 gr 69.21 69.65
Weight of picnometer w2 gr 49.44 48.60
Weight of sample w3 = w1 - w2 gr 19.77 21.05
Weight of picnometer + water w4 gr 149.51 148.82
Weight of pic + sample + water w5 gr 161.94 162.06
Volume of Sample v = [w4-(w5-w3)] / gw cm3 7.34 7.81

Specific Gravity Gs = w3 / v 2.69 2.70

Tested by Technician : Sahuri

Date : 05 Desember 2022


SOIL MECHANICS LABORATORY Form no. (No. formulir)

FACULTY OF CIVIL AND ENVIRONMENTAL ENGINEERING Issue/Revision (Diterbitkan)

BANDUNG INSTITUTE OF TECHNOLOGY Revision (Revisi)

INDEX PROPERTIES Page 2 of 2

Project : Penyelidikan Tanah Lereng Jalur Kereta Api antara Batutulis-Ciomas Lintas Bogor-Sukabumi
Type of sample : UDS Location : Bogor, Jawa Barat
Sample no. : BH-02 Date
Depth (m) : 13.00-13.50 Sample Accepted : 14 November 2022
Sample Tested : Desember 2022
Test Finished : 05 Desember 2022
RESUME
Water Content (%) = 76.21 Type of soil : lempung
Wet Density (t/m3) = 1.53 Color : cokelat
Dry Density (t/m3) = 0.87
Specific Gravity = 2.68
Void Ratio (e) = 2.09 Volume Udara = 1.65 %
Porosity (n) = 0.68
Saturated deg (%) = 97.56 Volume Air = 66.03 %
Volume Udara

Volume Air

Volume Tanah = 32.32 %


Volume Tanah

Tested by Technician : Sahuri

Date : 05 Desember 2022

Project :
Type of sample : Location :
Sample no. : Date
Depth (m) : Sample Accepted :
Sample Tested :
Test Finished :
RESUME
Water Content (%) = Type of soil :
Wet Density (t/m3) = Color :
Dry Density (t/m3) =
Specific Gravity =
Void Ratio (e) = Volume Udara = %
Porosity (n) =
Saturated deg (%) = Volume Air = %

Volume Tanah = %

Tested by Technician :

Date :
SOIL MECHANICS LABORATORY Form no. (No. formulir)

FACULTY OF CIVIL AND ENVIRONMENTAL ENGINEERING Issue/Revision (Diterbitkan)

BANDUNG INSTITUTE OF TECHNOLOGY Revision (Revisi)

INDEX PROPERTIES Page 1 of 2

Project : Penyelidikan Tanah Lereng Jalur Kereta Api antara Batutulis-Ciomas Lintas Bogor-Sukabumi
Type of sample : UDS Location : Bogor, Jawa Barat
Date
Sample Accepted : 14 November 2022
Sample Tested : Desember 2022
Test Finished : 05 Desember 2022
Sample No. BH-02

Depth : m 13.00-13.50
Container No.
Weight of container + wet soil w1 gr 50.25 49.63
Weight of container + dry soil w2 gr 30.32 29.79
Weight of water w3 = w1 - w2 gr 19.93 19.84
Weight of container w4 gr 3.95 3.97
Weight of dry soil w5 = w2 - w4 gr 26.37 25.82
Water content ( w3 / w5 ) x 100 % % 75.58 76.84

Average Water Content % 76.21

Sample No. BH-02

Depth : m 13.00-13.50
Ring No. AA BB
Weight of Ring + Wet Soil w1 gr 79.50 77.87
Weight of ring w2 gr 33.62 32.61
Weight of Wet Soil w3 = w1 - w2 gr 45.88 45.26
Volume of Ring v cm3 29.91 29.79
Unit Weight g = w3/v gr/ cm3 1.53 1.52

Average Unit Weight gr/cm3 1.53

Sample No. BH-02

Depth m 13.00-13.50
Picnometer No. - 27
Temperature o 25
- C
Weight of picno + sample w1 gr 63.09
Weight of picnometer w2 gr 50.60
Weight of sample w3 = w1 - w2 gr 12.49
Weight of picnometer + water w4 gr 150.38
Weight of pic + sample + water w5 gr 158.21
Volume of Sample v = [w4-(w5-w3)] / gw cm3 4.66

Specific Gravity Gs = w3 / v 2.68

Tested by Technician : Sahuri

Date : 05 Desember 2022


SOIL MECHANICS LABORATORY Form no. (No. formulir)

FACULTY OF CIVIL AND ENVIRONMENTAL ENGINEERING Issue/Revision (Diterbitkan)

BANDUNG INSTITUTE OF TECHNOLOGY Revision (Revisi)

INDEX PROPERTIES Page 2 of 2

Project : Penyelidikan Tanah Lereng Jalur Kereta Api antara Batutulis-Ciomas Lintas Bogor-Sukabumi
Type of sample : UDS Location : Bogor, Jawa Barat
Sample no. : BH-03 Date
Depth (m) : 3.50-4.00 Sample Accepted : 14 November 2022
Sample Tested : Desember 2022
Test Finished : 05 Desember 2022
RESUME
Water Content (%) = 60.99 Type of soil : lempung
Wet Density (t/m3) = 1.58 Color : cokelat
Dry Density (t/m3) = 0.98
Specific Gravity = 2.69
Void Ratio (e) = 1.75 Volume Udara = 3.86 %
Porosity (n) = 0.64
Saturated deg (%) = 93.93 Volume Air = 59.72 %
Volume Udara

Volume Air

Volume Tanah = 36.42 %


Volume Tanah

Tested by Technician : Sahuri

Date : 05 Desember 2022

Project : Penyelidikan Tanah Lereng Jalur Kereta Api antara Batutulis-Ciomas Lintas Bogor-Sukabumi
Type of sample : UDS Location : Bogor, Jawa Barat
Sample no. : BH-03 Date
Depth (m) : 7.50-8.00 Sample Accepted : 14 November 2022
Sample Tested : Desember 2022
Test Finished : 05 Desember 2022
RESUME
Water Content (%) = 59.18 Type of soil : lempung
Wet Density (t/m3) = 1.59 Color : cokelat
Dry Density (t/m3) = 1.00
Specific Gravity = 2.69
Void Ratio (e) = 1.69 Volume Udara = 3.64 %
Porosity (n) = 0.63
Saturated deg (%) = 94.20 Volume Air = 59.14 %
Volume Udara

Volume Air Volume Tanah = 37.22 %


Volume Tanah

Tested by Technician : Sahuri

Date : 05 Desember 2022


SOIL MECHANICS LABORATORY Form no. (No. formulir)

FACULTY OF CIVIL AND ENVIRONMENTAL ENGINEERING Issue/Revision (Diterbitkan)

BANDUNG INSTITUTE OF TECHNOLOGY Revision (Revisi)

INDEX PROPERTIES Page 1 of 2

Project : Penyelidikan Tanah Lereng Jalur Kereta Api antara Batutulis-Ciomas Lintas Bogor-Sukabumi
Type of sample : UDS Location : Bogor, Jawa Barat
Date
Sample Accepted : 14 November 2022
Sample Tested : Desember 2022
Test Finished : 05 Desember 2022
Sample No. BH-03 BH-03

Depth : m 3.50-4.00 7.50-8.00


Container No.
Weight of container + wet soil w1 gr 51.08 51.93 51.98 53.14
Weight of container + dry soil w2 gr 33.22 33.84 34.23 35.26
Weight of water w3 = w1 - w2 gr 17.86 18.09 17.75 17.88
Weight of container w4 gr 4.05 4.06 4.55 4.72
Weight of dry soil w5 = w2 - w4 gr 29.17 29.78 29.68 30.54
Water content ( w3 / w5 ) x 100 % % 61.23 60.75 59.80 58.55

Average Water Content % 60.99 59.18

Sample No. BH-03 BH-03

Depth : m 3.50-4.00 7.50-8.00


Ring No. AA BB AA BB
Weight of Ring + Wet Soil w1 gr 80.23 80.11 81.61 79.60
Weight of ring w2 gr 33.62 32.61 33.62 32.61
Weight of Wet Soil w3 = w1 - w2 gr 46.61 47.50 47.99 46.99
Volume of Ring v cm3 29.91 29.79 29.91 29.79
Unit Weight g = w3/v gr/ cm3 1.56 1.59 1.60 1.58

Average Unit Weight gr/cm3 1.58 1.59

Sample No. BH-03 BH-03

Depth m 3.50-4.00 7.50-8.00


Picnometer No. - 36 192
Temperature o 25 25
- C
Weight of picno + sample w1 gr 67.81 70.91
Weight of picnometer w2 gr 50.04 52.97
Weight of sample w3 = w1 - w2 gr 17.77 17.94
Weight of picnometer + water w4 gr 149.79 151.80
Weight of pic + sample + water w5 gr 160.95 163.06
Volume of Sample v = [w4-(w5-w3)] / gw cm3 6.61 6.68

Specific Gravity Gs = w3 / v 2.69 2.69

Tested by Technician : Sahuri

Date : 05 Desember 2022


SOIL MECHANICS LABORATORY Form no. (No. formulir)

FACULTY OF CIVIL AND ENVIRONMENTAL ENGINEERING Issue/Revision (Diterbitkan)

BANDUNG INSTITUTE OF TECHNOLOGY Revision (Revisi)

INDEX PROPERTIES Page 2 of 2

Project : Penyelidikan Tanah Lereng Jalur Kereta Api antara Batutulis-Ciomas Lintas Bogor-Sukabumi
Type of sample : UDS Location : Bogor, Jawa Barat
Sample no. : BH-03 Date
Depth (m) : 11.00-11.50 Sample Accepted : 14 November 2022
Sample Tested : Desember 2022
Test Finished : 05 Desember 2022
RESUME
Water Content (%) = 61.28 Type of soil : lempung
Wet Density (t/m3) = 1.62 Color : cokelat
Dry Density (t/m3) = 1.00
Specific Gravity = 2.69
Void Ratio (e) = 1.68 Volume Udara = 1.20 %
Porosity (n) = 0.63
Saturated deg (%) = 98.09 Volume Air = 61.46 %
Volume Udara

Volume Air

Volume Tanah = 37.35 %


Volume Tanah

Tested by Technician : Sahuri

Date : 05 Desember 2022

Project :
Type of sample : Location :
Sample no. : Date
Depth (m) : Sample Accepted :
Sample Tested :
Test Finished :
RESUME
Water Content (%) = Type of soil :
Wet Density (t/m3) = Color :
Dry Density (t/m3) =
Specific Gravity =
Void Ratio (e) = Volume Udara = %
Porosity (n) =
Saturated deg (%) = Volume Air = %

Volume Tanah = %

Tested by Technician :

Date :
SOIL MECHANICS LABORATORY Form no. (No. formulir)

FACULTY OF CIVIL AND ENVIRONMENTAL ENGINEERING Issue/Revision (Diterbitkan)

BANDUNG INSTITUTE OF TECHNOLOGY Revision (Revisi)

INDEX PROPERTIES Page 1 of 2

Project : Penyelidikan Tanah Lereng Jalur Kereta Api antara Batutulis-Ciomas Lintas Bogor-Sukabumi
Type of sample : UDS Location : Bogor, Jawa Barat
Date
Sample Accepted : 14 November 2022
Sample Tested : Desember 2022
Test Finished : 05 Desember 2022
Sample No. BH-03

Depth : m 11.00-11.50
Container No.
Weight of container + wet soil w1 gr 54.53 53.57
Weight of container + dry soil w2 gr 36.03 35.06
Weight of water w3 = w1 - w2 gr 18.50 18.51
Weight of container w4 gr 5.51 5.18
Weight of dry soil w5 = w2 - w4 gr 30.52 29.88
Water content ( w3 / w5 ) x 100 % % 60.62 61.95

Average Water Content % 61.28

Sample No. BH-03

Depth : m 11.00-11.50
Ring No. AA BB
Weight of Ring + Wet Soil w1 gr 82.22 80.57
Weight of ring w2 gr 33.62 32.61
Weight of Wet Soil w3 = w1 - w2 gr 48.60 47.96
Volume of Ring v cm3 29.91 29.79
Unit Weight g = w3/v gr/ cm3 1.62 1.61

Average Unit Weight gr/cm3 1.62

Sample No. BH-03

Depth m 11.00-11.50
Picnometer No. - 207
Temperature o 25
- C
Weight of picno + sample w1 gr 72.72
Weight of picnometer w2 gr 56.42
Weight of sample w3 = w1 - w2 gr 16.30
Weight of picnometer + water w4 gr 154.87
Weight of pic + sample + water w5 gr 165.10
Volume of Sample v = [w4-(w5-w3)] / gw cm3 6.07

Specific Gravity Gs = w3 / v 2.69

Tested by Technician : Sahuri

Date : 05 Desember 2022


SOIL MECHANICS LABORATORY Form no. (No. formulir)

FACULTY OF CIVIL AND ENVIRONMENTAL ENGINEERING Issue/Revision (Diterbitkan)

BANDUNG INSTITUTE OF TECHNOLOGY Revision (Revisi)

INDEX PROPERTIES Page 2 of 2

Project : Penyelidikan Tanah Lereng Jalur Kereta Api antara Batutulis-Ciomas Lintas Bogor-Sukabumi
Type of sample : UDS Location : Bogor, Jawa Barat
Sample no. : BH-04 Date
Depth (m) : 3.00-3.50 Sample Accepted : 14 November 2022
Sample Tested : Desember 2022
Test Finished : 05 Desember 2022
RESUME
Water Content (%) = 95.38 Type of soil : lempung
Wet Density (t/m3) = 1.36 Color : cokelat
Dry Density (t/m3) = 0.70
Specific Gravity = 2.58
Void Ratio (e) = 2.69 Volume Udara = 6.33 %
Porosity (n) = 0.73
Saturated deg (%) = 91.32 Volume Air = 66.59 %
Volume Udara

Volume Air

Volume Tanah = 27.08 %


Volume Tanah

Tested by Technician : Sahuri

Date : 05 Desember 2022

Project :
Type of sample : Location :
Sample no. : Date
Depth (m) : Sample Accepted :
Sample Tested :
Test Finished :
RESUME
Water Content (%) = Type of soil :
Wet Density (t/m3) = Color :
Dry Density (t/m3) =
Specific Gravity =
Void Ratio (e) = Volume Udara = %
Porosity (n) =
Saturated deg (%) = Volume Air = %

Volume Tanah = %

Tested by Technician :

Date :
SOIL MECHANICS LABORATORY Form no. (No. formulir)

FACULTY OF CIVIL AND ENVIRONMENTAL ENGINEERING Issue/Revision (Diterbitkan)

BANDUNG INSTITUTE OF TECHNOLOGY Revision (Revisi)

INDEX PROPERTIES Page 1 of 2

Project : Penyelidikan Tanah Lereng Jalur Kereta Api antara Batutulis-Ciomas Lintas Bogor-Sukabumi
Type of sample : UDS Location : Bogor, Jawa Barat
Date
Sample Accepted : 14 November 2022
Sample Tested : Desember 2022
Test Finished : 05 Desember 2022
Sample No. BH-04

Depth : m 3.00-3.50
Container No.
Weight of container + wet soil w1 gr 46.93 45.92
Weight of container + dry soil w2 gr 26.56 26.17
Weight of water w3 = w1 - w2 gr 20.37 19.75
Weight of container w4 gr 5.30 5.37
Weight of dry soil w5 = w2 - w4 gr 21.26 20.80
Water content ( w3 / w5 ) x 100 % % 95.81 94.95

Average Water Content % 95.38

Sample No. BH-04

Depth : m 3.00-3.50
Ring No. AA BB
Weight of Ring + Wet Soil w1 gr 74.82 72.85
Weight of ring w2 gr 33.62 32.61
Weight of Wet Soil w3 = w1 - w2 gr 41.20 40.24
Volume of Ring v cm3 29.91 29.79
Unit Weight g = w3/v gr/ cm3 1.38 1.35

Average Unit Weight gr/cm3 1.36

Sample No. BH-04

Depth m 3.00-3.50
Picnometer No. - 238
Temperature o 25
- C
Weight of picno + sample w1 gr 68.19
Weight of picnometer w2 gr 52.23
Weight of sample w3 = w1 - w2 gr 15.96
Weight of picnometer + water w4 gr 149.85
Weight of pic + sample + water w5 gr 159.62
Volume of Sample v = [w4-(w5-w3)] / gw cm3 6.19

Specific Gravity Gs = w3 / v 2.58

Tested by Technician : Sahuri

Date : 05 Desember 2022


SOIL MECHANICS LABORATORY Form No. (No. Formulir)

FACULTY OF CIVIL AND ENVIRONMENTAL ENGINEERING Issue (Diterbitkan)

BANDUNG INSTITUTE OF TECHNOLOGY Revision (Revisi)

ATTERBERG LIMIT (LIQUID LIMIT AND PLASTIC LIMIT) Page 1 of 1

Penyelidikan Tanah Lereng Jalur Kereta Api antara Batutulis-Ciomas Lintas


Project : Location : Bogor, Jawa Barat
Bogor-Sukabumi
Type of sample : UDS Date
No. of sample : BH-01 Sample Accepted : 14 Novembr 2022
Depth (m) : 3.00-3.50 Sample Tested : Desember 2022
Test Finished : 06 Desember 2022

Jenis Test Liquid Limit (Batas Cair) Plastic Limit (Batas plastis)

Test Number
(no uji)
Container Number
(no.cawan)
Number of blows
13 18 23 30 - -
(Jumlah ketukan)
Weight of container + wet soil =W 1 (gr)
40.09 43.28 35.22 44.81 11.78 12.17
(Berat cawan + tanah basah)

Weight of container + dry soil =W 2 (gr)


24.85 27.20 22.67 28.73 9.73 9.95
(Berat cawan + tanah kering)

Weight of water = W 1-W 2 = W 3 (gr)


15.24 16.08 12.55 16.08 2.05 2.22
(Berat Air)

Weight of container = W 4 (gr)


2.77 3.13 3.06 2.66 4.64 4.45
(Berat Cawan)

Weight of dry soil = W 2-W 4 =W 5 (gr)


22.08 24.07 19.61 26.07 5.09 5.50
(Berat Tanah Kering)

Water content = W 3/W 5) x 100 = w %


69.02 66.81 64.00 61.68 40.28 40.36
(Kadar Air)

Average (Rata-rata) 40.32

LIQUID LIMIT = wL
75
RESUME
WATER CONTENT = w (%)

70 Liquid Limit (Batas Cair) = wL 63.40

65 63.40 Plastic Limit (Batas plastis) = wP 40.32

60 Plasticity Index (Indeks Plastis)


23.08
IP = wL -wP
55 Soil Type (Cassagrande)
10 100 MH or OH
NUMBER OF BLOWS
(Klasifiksasi Tanah)

UNIFIED CLASSIFICATION
Liquid Limit %
0 10 20 30 40 50 60 70 80 90 100
60

CLAY OF HIGH PLASTICITY OR ORGANIC CLAY


50 CLAY OF LOW PLASTICITY OR
ORGANIC CLAY CH OR OH
Platicity Index %

40

30
``
SILT OF HIGH PLASTICITY OR ORGANIC SILT

20
CL OR OL MH OR OH
10
CL-ML ML OR OL
0

SILTY CLAY OF LOW PLASTICITY SILT OF LOW PLASTICITY OR ORGANIC SILT

Tested by Technician : Zamzam

Date : 06 Desember 2022


SOIL MECHANICS LABORATORY Form No. (No. Formulir)

FACULTY OF CIVIL AND ENVIRONMENTAL ENGINEERING Issue (Diterbitkan)

BANDUNG INSTITUTE OF TECHNOLOGY Revision (Revisi)

ATTERBERG LIMIT (LIQUID LIMIT AND PLASTIC LIMIT) Page 1 of 1

Penyelidikan Tanah Lereng Jalur Kereta Api antara Batutulis-Ciomas Lintas


Project : Location : Bogor, Jawa Barat
Bogor-Sukabumi
Type of sample : UDS Date
No. of sample : BH-01 Sample Accepted : 14 Novembr 2022
Depth (m) : 7.00-7.50 Sample Tested : Desember 2022
Test Finished : 06 Desember 2022

Jenis Test Liquid Limit (Batas Cair) Plastic Limit (Batas plastis)

Test Number
(no uji)
Container Number
(no.cawan)
Number of blows
14 20 26 32 - -
(Jumlah ketukan)
Weight of container + wet soil =W 1 (gr)
38.64 34.82 36.49 40.07 12.03 12.80
(Berat cawan + tanah basah)

Weight of container + dry soil =W 2 (gr)


23.46 21.52 23.05 25.47 9.08 9.76
(Berat cawan + tanah kering)

Weight of water = W 1-W 2 = W 3 (gr)


15.18 13.30 13.44 14.60 2.95 3.04
(Berat Air)

Weight of container = W 4 (gr)


2.72 2.46 3.15 3.17 3.10 3.63
(Berat Cawan)

Weight of dry soil = W 2-W 4 =W 5 (gr)


20.74 19.06 19.90 22.30 5.98 6.13
(Berat Tanah Kering)

Water content = W 3/W 5) x 100 = w %


73.19 69.78 67.54 65.47 49.33 49.59
(Kadar Air)

Average (Rata-rata) 49.46

LIQUID LIMIT = wL
80
RESUME
WATER CONTENT = w (%)

75 Liquid Limit (Batas Cair) = wL 67.80

70 Plastic Limit (Batas plastis) = wP


67.80 49.46

65 Plasticity Index (Indeks Plastis)


18.34
IP = wL -wP
60 Soil Type (Cassagrande)
10 100 MH or OH
NUMBER OF BLOWS
(Klasifiksasi Tanah)

UNIFIED CLASSIFICATION
Liquid Limit %
0 10 20 30 40 50 60 70 80 90 100
60

CLAY OF HIGH PLASTICITY OR ORGANIC CLAY


50 CLAY OF LOW PLASTICITY OR
ORGANIC CLAY CH OR OH
Platicity Index %

40

30
``
SILT OF HIGH PLASTICITY OR ORGANIC SILT

20
CL OR OL MH OR OH
10
CL-ML ML OR OL
0

SILTY CLAY OF LOW PLASTICITY SILT OF LOW PLASTICITY OR ORGANIC SILT

Tested by Technician : Zamzam

Date : 06 Desember 2022


SOIL MECHANICS LABORATORY Form No. (No. Formulir)

FACULTY OF CIVIL AND ENVIRONMENTAL ENGINEERING Issue (Diterbitkan)

BANDUNG INSTITUTE OF TECHNOLOGY Revision (Revisi)

ATTERBERG LIMIT (LIQUID LIMIT AND PLASTIC LIMIT) Page 1 of 1

Penyelidikan Tanah Lereng Jalur Kereta Api antara Batutulis-Ciomas Lintas


Project : Location : Bogor, Jawa Barat
Bogor-Sukabumi
Type of sample : UDS Date
No. of sample : BH-01 Sample Accepted : 14 Novembr 2022
Depth (m) : 11.00-11.50 Sample Tested : Desember 2022
Test Finished : 06 Desember 2022

Jenis Test Liquid Limit (Batas Cair) Plastic Limit (Batas plastis)

Test Number
(no uji)
Container Number
(no.cawan)
Number of blows
15 20 25 32 - -
(Jumlah ketukan)
Weight of container + wet soil =W 1 (gr)
39.50 39.52 39.13 36.43 11.72 12.47
(Berat cawan + tanah basah)

Weight of container + dry soil =W 2 (gr)


22.47 22.41 22.50 21.20 8.85 9.41
(Berat cawan + tanah kering)

Weight of water = W 1-W 2 = W 3 (gr)


17.03 17.11 16.63 15.23 2.87 3.06
(Berat Air)

Weight of container = W 4 (gr)


3.21 2.43 2.65 2.47 3.67 3.91
(Berat Cawan)

Weight of dry soil = W 2-W 4 =W 5 (gr)


19.26 19.98 19.85 18.73 5.18 5.50
(Berat Tanah Kering)

Water content = W 3/W 5) x 100 = w %


88.42 85.64 83.78 81.31 55.41 55.64
(Kadar Air)

Average (Rata-rata) 55.52

LIQUID LIMIT = wL
95
RESUME
WATER CONTENT = w (%)

90 Liquid Limit (Batas Cair) = wL 83.66

85 83.66 Plastic Limit (Batas plastis) = wP 55.52

80 Plasticity Index (Indeks Plastis)


28.13
IP = wL -wP
75 Soil Type (Cassagrande)
10 100 MH or OH
NUMBER OF BLOWS
(Klasifiksasi Tanah)

UNIFIED CLASSIFICATION
Liquid Limit %
0 10 20 30 40 50 60 70 80 90 100
60

CLAY OF HIGH PLASTICITY OR ORGANIC CLAY


50 CLAY OF LOW PLASTICITY OR
ORGANIC CLAY CH OR OH
Platicity Index %

40

30
``
SILT OF HIGH PLASTICITY OR ORGANIC SILT

20
CL OR OL MH OR OH
10
CL-ML ML OR OL
0

SILTY CLAY OF LOW PLASTICITY SILT OF LOW PLASTICITY OR ORGANIC SILT

Tested by Technician : Zamzam

Date : 06 Desember 2022


SOIL MECHANICS LABORATORY Form No. (No. Formulir)

FACULTY OF CIVIL AND ENVIRONMENTAL ENGINEERING Issue (Diterbitkan)

BANDUNG INSTITUTE OF TECHNOLOGY Revision (Revisi)

ATTERBERG LIMIT (LIQUID LIMIT AND PLASTIC LIMIT) Page 1 of 1

Penyelidikan Tanah Lereng Jalur Kereta Api antara Batutulis-Ciomas Lintas


Project : Location : Bogor, Jawa Barat
Bogor-Sukabumi
Type of sample : UDS Date
No. of sample : BH-02 Sample Accepted : 14 Novembr 2022
Depth (m) : 3.00-3.50 Sample Tested : Desember 2022
Test Finished : 06 Desember 2022

Jenis Test Liquid Limit (Batas Cair) Plastic Limit (Batas plastis)

Test Number
(no uji)
Container Number
(no.cawan)
Number of blows
15 20 27 35 - -
(Jumlah ketukan)
Weight of container + wet soil =W 1 (gr)
39.88 37.95 34.88 36.84 12.24 13.07
(Berat cawan + tanah basah)

Weight of container + dry soil =W 2 (gr)


24.85 23.88 22.28 24.00 10.10 10.57
(Berat cawan + tanah kering)

Weight of water = W 1-W 2 = W 3 (gr)


15.03 14.07 12.60 12.84 2.14 2.50
(Berat Air)

Weight of container = W 4 (gr)


2.75 2.48 2.41 3.15 4.87 4.33
(Berat Cawan)

Weight of dry soil = W 2-W 4 =W 5 (gr)


22.10 21.40 19.87 20.85 5.23 6.24
(Berat Tanah Kering)

Water content = W 3/W 5) x 100 = w %


68.01 65.75 63.41 61.58 40.92 40.06
(Kadar Air)

Average (Rata-rata) 40.49

LIQUID LIMIT = wL
75
RESUME
WATER CONTENT = w (%)

70 Liquid Limit (Batas Cair) = wL 64.08

65 64.08
Plastic Limit (Batas plastis) = wP 40.49

60 Plasticity Index (Indeks Plastis)


23.59
IP = wL -wP
55 Soil Type (Cassagrande)
10 100 MH or OH
NUMBER OF BLOWS
(Klasifiksasi Tanah)

UNIFIED CLASSIFICATION
Liquid Limit %
0 10 20 30 40 50 60 70 80 90 100
60

CLAY OF HIGH PLASTICITY OR ORGANIC CLAY


50 CLAY OF LOW PLASTICITY OR
ORGANIC CLAY CH OR OH
Platicity Index %

40

30 SILT OF HIGH PLASTICITY OR ORGANIC SILT


``

20
CL OR OL MH OR OH
10
CL-ML ML OR OL
0

SILTY CLAY OF LOW PLASTICITY SILT OF LOW PLASTICITY OR ORGANIC SILT

Tested by Technician : Zamzam

Date : 06 Desember 2022


SOIL MECHANICS LABORATORY Form No. (No. Formulir)

FACULTY OF CIVIL AND ENVIRONMENTAL ENGINEERING Issue (Diterbitkan)

BANDUNG INSTITUTE OF TECHNOLOGY Revision (Revisi)

ATTERBERG LIMIT (LIQUID LIMIT AND PLASTIC LIMIT) Page 1 of 1

Penyelidikan Tanah Lereng Jalur Kereta Api antara Batutulis-Ciomas Lintas


Project : Location : Bogor, Jawa Barat
Bogor-Sukabumi
Type of sample : UDS Date
No. of sample : BH-02 Sample Accepted : 14 Novembr 2022
Depth (m) : 7.50-8.00 Sample Tested : Desember 2022
Test Finished : 06 Desember 2022

Jenis Test Liquid Limit (Batas Cair) Plastic Limit (Batas plastis)

Test Number
(no uji)
Container Number
(no.cawan)
Number of blows
15 20 25 31 - -
(Jumlah ketukan)
Weight of container + wet soil =W 1 (gr)
37.15 36.61 37.94 38.55 12.28 12.22
(Berat cawan + tanah basah)

Weight of container + dry soil =W 2 (gr)


19.78 19.53 20.27 20.79 9.16 9.26
(Berat cawan + tanah kering)

Weight of water = W 1-W 2 = W 3 (gr)


17.37 17.08 17.67 17.76 3.12 2.96
(Berat Air)

Weight of container = W 4 (gr)


2.92 2.47 2.42 2.43 3.33 3.73
(Berat Cawan)

Weight of dry soil = W 2-W 4 =W 5 (gr)


16.86 17.06 17.85 18.36 5.83 5.53
(Berat Tanah Kering)

Water content = W 3/W 5) x 100 = w %


103.02 100.12 98.99 96.73 53.52 53.53
(Kadar Air)

Average (Rata-rata) 53.52

LIQUID LIMIT = wL
110
RESUME
WATER CONTENT = w (%)

105 Liquid Limit (Batas Cair) = wL 98.63

100 98.63 Plastic Limit (Batas plastis) = wP 53.52

95 Plasticity Index (Indeks Plastis)


45.11
IP = wL -wP
90 Soil Type (Cassagrande)
10 100 MH or OH
NUMBER OF BLOWS
(Klasifiksasi Tanah)

UNIFIED CLASSIFICATION
Liquid Limit %
0 10 20 30 40 50 60 70 80 90 100
60

CLAY OF HIGH PLASTICITY OR ORGANIC CLAY


50 CLAY OF LOW PLASTICITY OR
ORGANIC CLAY CH OR OH
Platicity Index %

40

30 SILT OF HIGH PLASTICITY OR ORGANIC SILT


``

20
CL OR OL MH OR OH
10
CL-ML ML OR OL
0

SILTY CLAY OF LOW PLASTICITY SILT OF LOW PLASTICITY OR ORGANIC SILT

Tested by Technician : Zamzam

Date : 06 Desember 2022


SOIL MECHANICS LABORATORY Form No. (No. Formulir)

FACULTY OF CIVIL AND ENVIRONMENTAL ENGINEERING Issue (Diterbitkan)

BANDUNG INSTITUTE OF TECHNOLOGY Revision (Revisi)

ATTERBERG LIMIT (LIQUID LIMIT AND PLASTIC LIMIT) Page 1 of 1

Penyelidikan Tanah Lereng Jalur Kereta Api antara Batutulis-Ciomas Lintas


Project : Location : Bogor, Jawa Barat
Bogor-Sukabumi
Type of sample : UDS Date
No. of sample : BH-02 Sample Accepted : 14 Novembr 2022
Depth (m) : 13.00-13.50 Sample Tested : Desember 2022
Test Finished : 06 Desember 2022

Jenis Test Liquid Limit (Batas Cair) Plastic Limit (Batas plastis)

Test Number
(no uji)
Container Number
(no.cawan)
Number of blows
13 18 24 30 - -
(Jumlah ketukan)
Weight of container + wet soil =W 1 (gr)
36.88 36.62 36.66 37.20 12.13 12.53
(Berat cawan + tanah basah)

Weight of container + dry soil =W 2 (gr)


22.62 22.70 22.98 23.50 9.33 9.63
(Berat cawan + tanah kering)

Weight of water = W 1-W 2 = W 3 (gr)


14.26 13.92 13.68 13.70 2.80 2.90
(Berat Air)

Weight of container = W 4 (gr)


2.51 2.43 2.65 2.64 3.65 3.77
(Berat Cawan)

Weight of dry soil = W 2-W 4 =W 5 (gr)


20.11 20.27 20.33 20.86 5.68 5.86
(Berat Tanah Kering)

Water content = W 3/W 5) x 100 = w %


70.91 68.67 67.29 65.68 49.30 49.49
(Kadar Air)

Average (Rata-rata) 49.39

LIQUID LIMIT = wL
75
RESUME
WATER CONTENT = w (%)

Liquid Limit (Batas Cair) = wL 66.85


70

66.85
Plastic Limit (Batas plastis) = wP 49.39
65
Plasticity Index (Indeks Plastis)
17.46
IP = wL -wP
60 Soil Type (Cassagrande)
10 100 MH or OH
NUMBER OF BLOWS
(Klasifiksasi Tanah)

UNIFIED CLASSIFICATION
Liquid Limit %
0 10 20 30 40 50 60 70 80 90 100
60

CLAY OF HIGH PLASTICITY OR ORGANIC CLAY


50 CLAY OF LOW PLASTICITY OR
ORGANIC CLAY CH OR OH
Platicity Index %

40

30 SILT OF HIGH PLASTICITY OR ORGANIC SILT


``

20
CL OR OL MH OR OH
10
CL-ML ML OR OL
0

SILTY CLAY OF LOW PLASTICITY SILT OF LOW PLASTICITY OR ORGANIC SILT

Tested by Technician : Zamzam

Date : 06 Desember 2022


SOIL MECHANICS LABORATORY Form No. (No. Formulir)

FACULTY OF CIVIL AND ENVIRONMENTAL ENGINEERING Issue (Diterbitkan)

BANDUNG INSTITUTE OF TECHNOLOGY Revision (Revisi)

ATTERBERG LIMIT (LIQUID LIMIT AND PLASTIC LIMIT) Page 1 of 1

Penyelidikan Tanah Lereng Jalur Kereta Api antara Batutulis-Ciomas Lintas


Project : Location : Bogor, Jawa Barat
Bogor-Sukabumi
Type of sample : UDS Date
No. of sample : BH-03 Sample Accepted : 14 Novembr 2022
Depth (m) : 3.50-4.00 Sample Tested : Desember 2022
Test Finished : 06 Desember 2022

Jenis Test Liquid Limit (Batas Cair) Plastic Limit (Batas plastis)

Test Number
(no uji)
Container Number
(no.cawan)
Number of blows
13 19 25 32 - -
(Jumlah ketukan)
Weight of container + wet soil =W 1 (gr)
43.99 37.86 36.76 36.50 11.89 12.00
(Berat cawan + tanah basah)

Weight of container + dry soil =W 2 (gr)


26.87 23.71 23.40 23.65 9.88 9.82
(Berat cawan + tanah kering)

Weight of water = W 1-W 2 = W 3 (gr)


17.12 14.15 13.36 12.85 2.01 2.18
(Berat Air)

Weight of container = W 4 (gr)


2.57 2.43 2.47 2.55 4.88 4.44
(Berat Cawan)

Weight of dry soil = W 2-W 4 =W 5 (gr)


24.30 21.28 20.93 21.10 5.00 5.38
(Berat Tanah Kering)

Water content = W 3/W 5) x 100 = w %


70.45 66.49 63.83 60.90 40.20 40.52
(Kadar Air)

Average (Rata-rata) 40.36

LIQUID LIMIT = wL
75
RESUME
WATER CONTENT = w (%)

70 Liquid Limit (Batas Cair) = wL 63.63

65 63.63 Plastic Limit (Batas plastis) = wP 40.36

60 Plasticity Index (Indeks Plastis)


23.27
IP = wL -wP
55 Soil Type (Cassagrande)
10 100 MH or OH
NUMBER OF BLOWS
(Klasifiksasi Tanah)

UNIFIED CLASSIFICATION
Liquid Limit %
0 10 20 30 40 50 60 70 80 90 100
60

CLAY OF HIGH PLASTICITY OR ORGANIC CLAY


50 CLAY OF LOW PLASTICITY OR
ORGANIC CLAY CH OR OH
Platicity Index %

40

30 SILT OF HIGH PLASTICITY OR ORGANIC SILT


``

20
CL OR OL MH OR OH
10
CL-ML ML OR OL
0

SILTY CLAY OF LOW PLASTICITY SILT OF LOW PLASTICITY OR ORGANIC SILT

Tested by Technician : Zamzam

Date : 06 Desember 2022


SOIL MECHANICS LABORATORY Form No. (No. Formulir)

FACULTY OF CIVIL AND ENVIRONMENTAL ENGINEERING Issue (Diterbitkan)

BANDUNG INSTITUTE OF TECHNOLOGY Revision (Revisi)

ATTERBERG LIMIT (LIQUID LIMIT AND PLASTIC LIMIT) Page 1 of 1

Penyelidikan Tanah Lereng Jalur Kereta Api antara Batutulis-Ciomas Lintas


Project : Location : Bogor, Jawa Barat
Bogor-Sukabumi
Type of sample : UDS Date
No. of sample : BH-03 Sample Accepted : 14 Novembr 2022
Depth (m) : 7.50-8.00 Sample Tested : Desember 2022
Test Finished : 06 Desember 2022

Jenis Test Liquid Limit (Batas Cair) Plastic Limit (Batas plastis)

Test Number
(no uji)
Container Number
(no.cawan)
Number of blows
13 19 25 33 - -
(Jumlah ketukan)
Weight of container + wet soil =W 1 (gr)
40.23 40.22 38.78 39.36 11.97 12.33
(Berat cawan + tanah basah)

Weight of container + dry soil =W 2 (gr)


25.28 25.63 25.05 25.50 9.93 9.86
(Berat cawan + tanah kering)

Weight of water = W 1-W 2 = W 3 (gr)


14.95 14.59 13.73 13.86 2.04 2.47
(Berat Air)

Weight of container = W 4 (gr)


2.44 2.36 2.58 2.40 4.88 3.70
(Berat Cawan)

Weight of dry soil = W 2-W 4 =W 5 (gr)


22.84 23.27 22.47 23.10 5.05 6.16
(Berat Tanah Kering)

Water content = W 3/W 5) x 100 = w %


65.46 62.70 61.10 60.00 40.40 40.10
(Kadar Air)

Average (Rata-rata) 40.25

LIQUID LIMIT = wL
70
RESUME
WATER CONTENT = w (%)

Liquid Limit (Batas Cair) = wL 61.35


65

61.35 Plastic Limit (Batas plastis) = wP 40.25


60
Plasticity Index (Indeks Plastis)
21.11
IP = wL -wP
55 Soil Type (Cassagrande)
10 100 MH or OH
NUMBER OF BLOWS
(Klasifiksasi Tanah)

UNIFIED CLASSIFICATION
Liquid Limit %
0 10 20 30 40 50 60 70 80 90 100
60

CLAY OF HIGH PLASTICITY OR ORGANIC CLAY


50 CLAY OF LOW PLASTICITY OR
ORGANIC CLAY CH OR OH
Platicity Index %

40

30 SILT OF HIGH PLASTICITY OR ORGANIC SILT


``

20
CL OR OL MH OR OH
10
CL-ML ML OR OL
0

SILTY CLAY OF LOW PLASTICITY SILT OF LOW PLASTICITY OR ORGANIC SILT

Tested by Technician : Zamzam

Date : 06 Desember 2022


SOIL MECHANICS LABORATORY Form No. (No. Formulir)

FACULTY OF CIVIL AND ENVIRONMENTAL ENGINEERING Issue (Diterbitkan)

BANDUNG INSTITUTE OF TECHNOLOGY Revision (Revisi)

ATTERBERG LIMIT (LIQUID LIMIT AND PLASTIC LIMIT) Page 1 of 1

Penyelidikan Tanah Lereng Jalur Kereta Api antara Batutulis-Ciomas Lintas


Project : Location : Bogor, Jawa Barat
Bogor-Sukabumi
Type of sample : UDS Date
No. of sample : BH-03 Sample Accepted : 14 Novembr 2022
Depth (m) : 11.00-11.50 Sample Tested : Desember 2022
Test Finished : 06 Desember 2022

Jenis Test Liquid Limit (Batas Cair) Plastic Limit (Batas plastis)

Test Number
(no uji)
Container Number
(no.cawan)
Number of blows
15 20 26 33 - -
(Jumlah ketukan)
Weight of container + wet soil =W 1 (gr)
33.70 39.89 31.58 33.36 12.87 13.06
(Berat cawan + tanah basah)

Weight of container + dry soil =W 2 (gr)


21.78 25.47 20.63 22.00 10.23 10.33
(Berat cawan + tanah kering)

Weight of water = W 1-W 2 = W 3 (gr)


11.92 14.42 10.95 11.36 2.64 2.73
(Berat Air)

Weight of container = W 4 (gr)


4.33 3.67 3.55 3.75 3.73 3.67
(Berat Cawan)

Weight of dry soil = W 2-W 4 =W 5 (gr)


17.45 21.80 17.08 18.25 6.50 6.66
(Berat Tanah Kering)

Water content = W 3/W 5) x 100 = w %


68.31 66.15 64.11 62.25 40.62 40.99
(Kadar Air)

Average (Rata-rata) 40.80

LIQUID LIMIT = wL
75
RESUME
WATER CONTENT = w (%)

70 Liquid Limit (Batas Cair) = wL 64.40

65
64.40
Plastic Limit (Batas plastis) = wP 40.80

60 Plasticity Index (Indeks Plastis)


23.60
IP = wL -wP
55 Soil Type (Cassagrande)
10 100 MH or OH
NUMBER OF BLOWS
(Klasifiksasi Tanah)

UNIFIED CLASSIFICATION
Liquid Limit %
0 10 20 30 40 50 60 70 80 90 100
60

CLAY OF HIGH PLASTICITY OR ORGANIC CLAY


50 CLAY OF LOW PLASTICITY OR
ORGANIC CLAY CH OR OH
Platicity Index %

40

30 SILT OF HIGH PLASTICITY OR ORGANIC SILT


``

20
CL OR OL MH OR OH
10
CL-ML ML OR OL
0

SILTY CLAY OF LOW PLASTICITY SILT OF LOW PLASTICITY OR ORGANIC SILT

Tested by Technician : Zamzam

Date : 06 Desember 2022


SOIL MECHANICS LABORATORY Form No. (No. Formulir)

FACULTY OF CIVIL AND ENVIRONMENTAL ENGINEERING Issue (Diterbitkan)

BANDUNG INSTITUTE OF TECHNOLOGY Revision (Revisi)

ATTERBERG LIMIT (LIQUID LIMIT AND PLASTIC LIMIT) Page 1 of 1

Penyelidikan Tanah Lereng Jalur Kereta Api antara Batutulis-Ciomas Lintas


Project : Location : Bogor, Jawa Barat
Bogor-Sukabumi
Type of sample : UDS Date
No. of sample : BH-03 Sample Accepted : 14 Novembr 2022
Depth (m) : 11.00-11.50 Sample Tested : Desember 2022
Test Finished : 06 Desember 2022

Jenis Test Liquid Limit (Batas Cair) Plastic Limit (Batas plastis)

Test Number
(no uji)
Container Number
(no.cawan)
Number of blows
14 19 25 33 - -
(Jumlah ketukan)
Weight of container + wet soil =W 1 (gr)
40.85 39.55 36.80 37.61 12.84 12.68
(Berat cawan + tanah basah)

Weight of container + dry soil =W 2 (gr)


20.18 20.07 19.36 19.75 9.85 10.10
(Berat cawan + tanah kering)

Weight of water = W 1-W 2 = W 3 (gr)


20.67 19.48 17.44 17.86 2.99 2.58
(Berat Air)

Weight of container = W 4 (gr)


2.42 2.54 3.09 2.45 4.21 5.28
(Berat Cawan)

Weight of dry soil = W 2-W 4 =W 5 (gr)


17.76 17.53 16.27 17.30 5.64 4.82
(Berat Tanah Kering)

Water content = W 3/W 5) x 100 = w %


116.39 111.12 107.19 103.24 53.01 53.53
(Kadar Air)

Average (Rata-rata) 53.27

LIQUID LIMIT = wL
125
RESUME
120
WATER CONTENT = w (%)

Liquid Limit (Batas Cair) = wL 107.29


115

110 107.29 Plastic Limit (Batas plastis) = wP 53.27


105
Plasticity Index (Indeks Plastis)
100 54.01
IP = wL -wP
95 Soil Type (Cassagrande)
10 100 MH or OH
NUMBER OF BLOWS
(Klasifiksasi Tanah)

UNIFIED CLASSIFICATION
Liquid Limit %
0 10 20 30 40 50 60 70 80 90 100
60

CLAY OF HIGH PLASTICITY OR ORGANIC CLAY


50 CLAY OF LOW PLASTICITY OR
ORGANIC CLAY CH OR OH
Platicity Index %

40

30 SILT OF HIGH PLASTICITY OR ORGANIC SILT


``

20
CL OR OL MH OR OH
10
CL-ML ML OR OL
0

SILTY CLAY OF LOW PLASTICITY SILT OF LOW PLASTICITY OR ORGANIC SILT

Tested by Technician : Zamzam

Date : 06 Desember 2022


SOIL MECHANICS LABORATORY Form no. (No. formulir)

FACULTY OF CIVIL AND ENVIRONMENTAL ENGINEERING Issue/Revision

BANDUNG INSTITUTE OF TECHNOLOGY Revision (Revisi)

RESULT OF GRAIN SIZE ANALYSIS Page 2 of 2

Project : Penyelidikan Tanah Lereng Jalur Kereta Api antara Batutulis-Ciomas Lintas Bogor-Sukabumi
Type of sample : UDS Location : Bogor, Jawa Barat
Sample no : BH-01
Depth (m) : 3.00-3.50 Date
Weight of soil : 200 gr Sample Accepted : 14 November 2022
Water Content : 0 % Sample Tested : Desember 2022
Test Finished : 06 Desember 2022

Mass Percent Percent Percent


Sieve no. Diameter Retained Retained Cumulative Passing
Remarks
(No. Ayakan) (mm) ( gr ) (%) Retained (%)
(%)
4 4.76 5.11 2.56 2.56 97.45
10 2.00 1.32 0.66 3.22 96.79
18 1.00 1.07 0.53 3.75 96.25
35 0.50 0.87 0.44 4.19 95.82
60 0.25 0.81 0.41 4.59 95.41
100 0.15 1.11 0.56 5.15 94.86
200 0.08 1.02 0.51 5.66 94.35
PAN (%) 94.35

RESULT OF HYDROMETER ANALYSIS

A: 0.992 (lihat tabel) Specific gravity (Berat Jenis) (Gs) : 2.693


k: 0.0128 (lihat tabel) Percent Passing No.200 : 94.35 %
Berat tanah untuk hidrometer : 50 gr

Elapsed R Ra Temp. D N N'


Zr
time 1000 1000 R-Ra Zr
t
(minute) (r-1) (Ra-1) T °C (mm) (%) (%)
0.5 48 -2 25 50.00 8.10 4.025 0.0515 99.20 93.59
1 47 -2 25 49.00 8.30 2.881 0.0369 97.22 91.72
2 46 -2 25 48.00 8.40 2.049 0.0262 95.23 89.85
5 43 -2 25 45.00 8.90 1.334 0.0171 89.28 84.23
15 40 -2 25 42.00 9.40 0.792 0.0101 83.33 78.62
30 38 -2 25 40.00 9.70 0.569 0.0073 79.36 74.87
60 35 -2 25 37.00 10.20 0.412 0.0053 73.41 69.26
250 30 -2 25 32.00 11.10 0.211 0.0027 63.49 59.90
1440 27 -2 25 29.00 11.50 0.089 0.0011 57.54 54.28

Tested by Technician : Zamzam

Date : 06 Desember 2022


SOIL MECHANICS LABORATORY Form no. (No. formulir)

FACULTY OF CIVIL AND ENVIRONMENTAL ENGINEERING Issue/Revision

BANDUNG INSTITUTE OF TECHNOLOGY Revision (Revisi)

RESULT OF GRAIN SIZE ANALYSIS Page 1 of 2

Project : Penyelidikan Tanah Lereng Jalur Kereta Api antara Batutulis-Ciomas Lintas Bogor-Sukabumi
Type of sample : UDS Location : Bogor, Jawa Barat
Sample no. : BH-01
Depth (m) : 3.00-3.50 Result
Gravel (Batu) (%) : 3.22 D10 :
Sand (Pasir) (%) : 2.44 D30 :
Silt (Lanau) (%) : 25.60 D60 : 0.0028
Clay (Lempung) (%) : 68.75 Cu : #DIV/0!
Cz : #DIV/0!

0.005 0.075 0.15 0.25 0.425 0.85 2 4.75 19 75


100

90

80

70
Percent passing (Persen lolos) (%)

60

50

40

30

20

10

0
0.001 0.010 0.100 1.000 10.000 100.000
Diameter of grains (Diameter butir) (mm)
`
SAND
CLAY SILT GRAVEL
FINE MEDIUM COARSE

0.005 mm 0.075 mm 0.425 mm 2.00 mm 4.75 mm

Tested by Technician : Zamzam

Date : 06 Desember 2022


SOIL MECHANICS LABORATORY Form no. (No. formulir)

FACULTY OF CIVIL AND ENVIRONMENTAL ENGINEERING Issue/Revision

BANDUNG INSTITUTE OF TECHNOLOGY Revision (Revisi)

RESULT OF GRAIN SIZE ANALYSIS Page 2 of 2

Project : Penyelidikan Tanah Lereng Jalur Kereta Api antara Batutulis-Ciomas Lintas Bogor-Sukabumi
Type of sample : UDS Location : Bogor, Jawa Barat
Sample no : BH-01
Depth (m) : 7.00-7.50 Date
Weight of soil : 200 gr Sample Accepted : 14 November 2022
Water Content : 0 % Sample Tested : Desember 2022
Test Finished : 06 Desember 2022

Mass Percent Percent Percent


Sieve no. Diameter Retained Retained Cumulative Passing
Remarks
(No. Ayakan) (mm) ( gr ) (%) Retained (%)
(%)
4 4.76 0.00 0.00 0.00 100.00
10 2.00 0.05 0.03 0.03 99.98
18 1.00 0.08 0.04 0.06 99.94
35 0.50 0.26 0.13 0.20 99.81
60 0.25 0.59 0.30 0.49 99.51
100 0.15 1.05 0.53 1.02 98.99
200 0.08 1.06 0.53 1.55 98.46
PAN (%) 98.46

RESULT OF HYDROMETER ANALYSIS

A: 0.989 (lihat tabel) Specific gravity (Berat Jenis) (Gs) : 2.700


k: 0.0127 (lihat tabel) Percent Passing No.200 : 98.46 %
Berat tanah untuk hidrometer : 50 gr

Elapsed R Ra Temp. D N N'


Zr
time 1000 1000 R-Ra Zr
t
(minute) (r-1) (Ra-1) T °C (mm) (%) (%)
0.5 47 -2 25 49.00 8.30 4.074 0.0517 96.92 95.42
1 45 -2 25 47.00 8.60 2.933 0.0372 92.97 91.53
2 42 -2 25 44.00 9.10 2.133 0.0271 87.03 85.69
5 37 -2 25 39.00 9.90 1.407 0.0179 77.14 75.95
15 31 -2 25 33.00 10.90 0.852 0.0108 65.27 64.27
30 27 -2 25 29.00 11.50 0.619 0.0079 57.36 56.48
60 24 -2 25 26.00 12.00 0.447 0.0057 51.43 50.63
250 18 -2 25 20.00 13.00 0.228 0.0029 39.56 38.95
1440 15 -2 25 17.00 13.50 0.097 0.0012 33.63 33.11

Tested by Technician : Zamzam

Date : 06 Desember 2022


SOIL MECHANICS LABORATORY Form no. (No. formulir)

FACULTY OF CIVIL AND ENVIRONMENTAL ENGINEERING Issue/Revision

BANDUNG INSTITUTE OF TECHNOLOGY Revision (Revisi)

RESULT OF GRAIN SIZE ANALYSIS Page 1 of 2

Project : Penyelidikan Tanah Lereng Jalur Kereta Api antara Batutulis-Ciomas Lintas Bogor-Sukabumi
Type of sample : UDS Location : Bogor, Jawa Barat
Sample no. : BH-01
Depth (m) : 7.00-7.50 Result
Gravel (Batu) (%) : 0.03 D10 :
Sand (Pasir) (%) : 1.52 D30 :
Silt (Lanau) (%) : 50.01 D60 : 0.0091
Clay (Lempung) (%) : 48.45 Cu : #DIV/0!
Cz : #DIV/0!

0.005 0.075 0.15 0.25 0.425 0.85 2 4.75 19 75


100

90

80

70
Percent passing (Persen lolos) (%)

60

50

40

30

20

10

0
0.001 0.010 0.100 1.000 10.000 100.000
Diameter of grains (Diameter butir) (mm)
`
SAND
CLAY SILT GRAVEL
FINE MEDIUM COARSE

0.005 mm 0.075 mm 0.425 mm 2.00 mm 4.75 mm

Tested by Technician : Zamzam

Date : 06 Desember 2022


SOIL MECHANICS LABORATORY Form no. (No. formulir)

FACULTY OF CIVIL AND ENVIRONMENTAL ENGINEERING Issue/Revision

BANDUNG INSTITUTE OF TECHNOLOGY Revision (Revisi)

RESULT OF GRAIN SIZE ANALYSIS Page 2 of 2

Project : Penyelidikan Tanah Lereng Jalur Kereta Api antara Batutulis-Ciomas Lintas Bogor-Sukabumi
Type of sample : UDS Location : Bogor, Jawa Barat
Sample no : BH-01
Depth (m) : 11.00-11.50 Date
Weight of soil : 200 gr Sample Accepted : 14 November 2022
Water Content : 0 % Sample Tested : Desember 2022
Test Finished : 06 Desember 2022

Mass Percent Percent Percent


Sieve no. Diameter Retained Retained Cumulative Passing
Remarks
(No. Ayakan) (mm) ( gr ) (%) Retained (%)
(%)
4 4.76 0.00 0.00 0.00 100.00
10 2.00 0.02 0.01 0.01 99.99
18 1.00 0.14 0.07 0.08 99.92
35 0.50 0.22 0.11 0.19 99.81
60 0.25 0.13 0.06 0.25 99.75
100 0.15 0.47 0.24 0.49 99.51
200 0.08 0.49 0.24 0.73 99.27
PAN (%) 99.27

RESULT OF HYDROMETER ANALYSIS

A: 1.006 (lihat tabel) Specific gravity (Berat Jenis) (Gs) : 2.624


k: 0.0131 (lihat tabel) Percent Passing No.200 : 99.27 %
Berat tanah untuk hidrometer : 50 gr

Elapsed R Ra Temp. D N N'


Zr
time 1000 1000 R-Ra Zr
t
(minute) (r-1) (Ra-1) T °C (mm) (%) (%)
0.5 48 -2 25 50.00 8.10 4.025 0.0527 100.60 99.86
1 46 -2 25 48.00 8.40 2.898 0.0380 96.58 95.87
2 44 -2 25 46.00 8.80 2.098 0.0275 92.55 91.87
5 39 -2 25 41.00 9.60 1.386 0.0182 82.49 81.89
15 34 -2 25 36.00 10.40 0.833 0.0109 72.43 71.90
30 31 -2 25 33.00 10.90 0.603 0.0079 66.40 65.91
60 28 -2 25 30.00 11.40 0.436 0.0057 60.36 59.92
250 23 -2 25 25.00 12.20 0.221 0.0029 50.30 49.93
1440 20 -2 25 22.00 12.70 0.094 0.0012 44.26 43.94

Tested by Technician : Zamzam

Date : 06 Desember 2022


SOIL MECHANICS LABORATORY Form no. (No. formulir)

FACULTY OF CIVIL AND ENVIRONMENTAL ENGINEERING Issue/Revision

BANDUNG INSTITUTE OF TECHNOLOGY Revision (Revisi)

RESULT OF GRAIN SIZE ANALYSIS Page 1 of 2

Project : Penyelidikan Tanah Lereng Jalur Kereta Api antara Batutulis-Ciomas Lintas Bogor-Sukabumi
Type of sample : UDS Location : Bogor, Jawa Barat
Sample no. : BH-01
Depth (m) : 11.00-11.50 Result
Gravel (Batu) (%) : 0.01 D10 :
Sand (Pasir) (%) : 0.73 D30 :
Silt (Lanau) (%) : 41.29 D60 : 0.0058
Clay (Lempung) (%) : 57.98 Cu : #DIV/0!
Cz : #DIV/0!

0.005 0.075 0.15 0.25 0.425 0.85 2 4.75 19 75


100

90

80

70
Percent passing (Persen lolos) (%)

60

50

40

30

20

10

0
0.001 0.010 0.100 1.000 10.000 100.000
Diameter of grains (Diameter butir) (mm)
`
SAND
CLAY SILT GRAVEL
FINE MEDIUM COARSE

0.005 mm 0.075 mm 0.425 mm 2.00 mm 4.75 mm

Tested by Technician : Zamzam

Date : 06 Desember 2022


SOIL MECHANICS LABORATORY Form no. (No. formulir)

FACULTY OF CIVIL AND ENVIRONMENTAL ENGINEERING Issue/Revision

BANDUNG INSTITUTE OF TECHNOLOGY Revision (Revisi)

RESULT OF GRAIN SIZE ANALYSIS Page 2 of 2

Project : Penyelidikan Tanah Lereng Jalur Kereta Api antara Batutulis-Ciomas Lintas Bogor-Sukabumi
Type of sample : UDS Location : Bogor, Jawa Barat
Sample no : BH-02
Depth (m) : 3.00-3.50 Date
Weight of soil : 200 gr Sample Accepted : 14 November 2022
Water Content : 0 % Sample Tested : Desember 2022
Test Finished : 06 Desember 2022

Mass Percent Percent Percent


Sieve no. Diameter Retained Retained Cumulative Passing
Remarks
(No. Ayakan) (mm) ( gr ) (%) Retained (%)
(%)
4 4.76 0.00 0.00 0.00 100.00
10 2.00 0.04 0.02 0.02 99.98
18 1.00 0.08 0.04 0.06 99.94
35 0.50 0.33 0.17 0.22 99.78
60 0.25 1.16 0.58 0.81 99.20
100 0.15 1.81 0.91 1.71 98.29
200 0.08 1.38 0.69 2.40 97.60
PAN (%) 97.60

RESULT OF HYDROMETER ANALYSIS

A: 0.992 (lihat tabel) Specific gravity (Berat Jenis) (Gs) : 2.694


k: 0.0128 (lihat tabel) Percent Passing No.200 : 97.60 %
Berat tanah untuk hidrometer : 50 gr

Elapsed R Ra Temp. D N N'


Zr
time 1000 1000 R-Ra Zr
t
(minute) (r-1) (Ra-1) T °C (mm) (%) (%)
0.5 47 -2 25 49.00 8.30 4.074 0.0522 97.22 94.88
1 46 -2 25 48.00 8.40 2.898 0.0371 95.23 92.95
2 44 -2 25 46.00 8.80 2.098 0.0268 91.26 89.07
5 40 -2 25 42.00 9.40 1.371 0.0176 83.33 81.33
15 35 -2 25 37.00 10.20 0.825 0.0106 73.41 71.65
30 33 -2 25 35.00 10.60 0.594 0.0076 69.44 67.77
60 31 -2 25 33.00 10.90 0.426 0.0055 65.47 63.90
250 26 -2 25 28.00 11.70 0.216 0.0028 55.55 54.22
1440 23 -2 25 25.00 12.20 0.092 0.0012 49.60 48.41

Tested by Technician : Zamzam

Date : 06 Desember 2022


SOIL MECHANICS LABORATORY Form no. (No. formulir)

FACULTY OF CIVIL AND ENVIRONMENTAL ENGINEERING Issue/Revision

BANDUNG INSTITUTE OF TECHNOLOGY Revision (Revisi)

RESULT OF GRAIN SIZE ANALYSIS Page 1 of 2

Project : Penyelidikan Tanah Lereng Jalur Kereta Api antara Batutulis-Ciomas Lintas Bogor-Sukabumi
Type of sample : UDS Location : Bogor, Jawa Barat
Sample no. : BH-02
Depth (m) : 3.00-3.50 Result
Gravel (Batu) (%) : 0.02 D10 :
Sand (Pasir) (%) : 2.38 D30 :
Silt (Lanau) (%) : 34.70 D60 : 0.0042
Clay (Lempung) (%) : 62.90 Cu : #DIV/0!
Cz : #DIV/0!

0.005 0.075 0.15 0.25 0.425 0.85 2 4.75 19 75


100

90

80

70
Percent passing (Persen lolos) (%)

60

50

40

30

20

10

0
0.001 0.010 0.100 1.000 10.000 100.000
Diameter of grains (Diameter butir) (mm)
`
SAND
CLAY SILT GRAVEL
FINE MEDIUM COARSE

0.005 mm 0.075 mm 0.425 mm 2.00 mm 4.75 mm

Tested by Technician : Zamzam

Date : 06 Desember 2022


SOIL MECHANICS LABORATORY Form no. (No. formulir)

FACULTY OF CIVIL AND ENVIRONMENTAL ENGINEERING Issue/Revision

BANDUNG INSTITUTE OF TECHNOLOGY Revision (Revisi)

RESULT OF GRAIN SIZE ANALYSIS Page 2 of 2

Project : Penyelidikan Tanah Lereng Jalur Kereta Api antara Batutulis-Ciomas Lintas Bogor-Sukabumi
Type of sample : UDS Location : Bogor, Jawa Barat
Sample no : BH-02
Depth (m) : 7.50-8.00 Date
Weight of soil : 200 gr Sample Accepted : 14 November 2022
Water Content : 0 % Sample Tested : Desember 2022
Test Finished : 06 Desember 2022

Mass Percent Percent Percent


Sieve no. Diameter Retained Retained Cumulative Passing
Remarks
(No. Ayakan) (mm) ( gr ) (%) Retained (%)
(%)
4 4.76 0.00 0.00 0.00 100.00
10 2.00 0.00 0.00 0.00 100.00
18 1.00 0.02 0.01 0.01 99.99
35 0.50 0.06 0.03 0.04 99.96
60 0.25 0.25 0.13 0.16 99.84
100 0.15 0.91 0.46 0.62 99.38
200 0.08 0.90 0.45 1.07 98.93
PAN (%) 98.93

RESULT OF HYDROMETER ANALYSIS

A: 0.989 (lihat tabel) Specific gravity (Berat Jenis) (Gs) : 2.695


k: 0.0127 (lihat tabel) Percent Passing No.200 : 98.93 %
Berat tanah untuk hidrometer : 50 gr

Elapsed R Ra Temp. D N N'


Zr
time 1000 1000 R-Ra Zr
t
(minute) (r-1) (Ra-1) T °C (mm) (%) (%)
0.5 48 -2 25 50.00 8.10 4.025 0.0511 98.90 97.84
1 47 -2 25 49.00 8.30 2.881 0.0366 96.92 95.88
2 46 -2 25 48.00 8.40 2.049 0.0260 94.94 93.93
5 43 -2 25 45.00 8.90 1.334 0.0169 89.01 88.06
15 40 -2 25 42.00 9.40 0.792 0.0101 83.08 82.19
30 39 -2 25 41.00 9.60 0.566 0.0072 81.10 80.23
60 37 -2 25 39.00 9.90 0.406 0.0052 77.14 76.32
250 34 -2 25 36.00 10.40 0.204 0.0026 71.21 70.45
1440 30 -2 25 32.00 11.10 0.088 0.0011 63.30 62.62

Tested by Technician : Zamzam

Date : 06 Desember 2022


SOIL MECHANICS LABORATORY Form no. (No. formulir)

FACULTY OF CIVIL AND ENVIRONMENTAL ENGINEERING Issue/Revision

BANDUNG INSTITUTE OF TECHNOLOGY Revision (Revisi)

RESULT OF GRAIN SIZE ANALYSIS Page 1 of 2

Project : Penyelidikan Tanah Lereng Jalur Kereta Api antara Batutulis-Ciomas Lintas Bogor-Sukabumi
Type of sample : UDS Location : Bogor, Jawa Barat
Sample no. : BH-02
Depth (m) : 7.50-8.00 Result
Gravel (Batu) (%) : 0.00 D10 :
Sand (Pasir) (%) : 1.07 D30 :
Silt (Lanau) (%) : 22.63 D60 :
Clay (Lempung) (%) : 76.30 Cu : #DIV/0!
Cz : #DIV/0!

0.005 0.075 0.15 0.25 0.425 0.85 2 4.75 19 75


100

90

80

70
Percent passing (Persen lolos) (%)

60

50

40

30

20

10

0
0.001 0.010 0.100 1.000 10.000 100.000
Diameter of grains (Diameter butir) (mm)
`
SAND
CLAY SILT GRAVEL
FINE MEDIUM COARSE

0.005 mm 0.075 mm 0.425 mm 2.00 mm 4.75 mm

Tested by Technician : Zamzam

Date : 06 Desember 2022


SOIL MECHANICS LABORATORY Form no. (No. formulir)

FACULTY OF CIVIL AND ENVIRONMENTAL ENGINEERING Issue/Revision

BANDUNG INSTITUTE OF TECHNOLOGY Revision (Revisi)

RESULT OF GRAIN SIZE ANALYSIS Page 2 of 2

Project : Penyelidikan Tanah Lereng Jalur Kereta Api antara Batutulis-Ciomas Lintas Bogor-Sukabumi
Type of sample : UDS Location : Bogor, Jawa Barat
Sample no : BH-02
Depth (m) : 7.50-8.00 Date
Weight of soil : 200 gr Sample Accepted : 14 November 2022
Water Content : 0 % Sample Tested : Desember 2022
Test Finished : 06 Desember 2022

Mass Percent Percent Percent


Sieve no. Diameter Retained Retained Cumulative Passing
Remarks
(No. Ayakan) (mm) ( gr ) (%) Retained (%)
(%)
4 4.76 0.00 0.00 0.00 100.00
10 2.00 0.02 0.01 0.01 99.99
18 1.00 0.00 0.00 0.01 99.99
35 0.50 0.07 0.03 0.04 99.96
60 0.25 0.49 0.25 0.29 99.71
100 0.15 1.27 0.63 0.92 99.08
200 0.08 1.23 0.61 1.54 98.46
PAN (%) 98.46

RESULT OF HYDROMETER ANALYSIS

A: 0.994 (lihat tabel) Specific gravity (Berat Jenis) (Gs) : 2.680


k: 0.0128 (lihat tabel) Percent Passing No.200 : 98.46 %
Berat tanah untuk hidrometer : 50 gr

Elapsed R Ra Temp. D N N'


Zr
time 1000 1000 R-Ra Zr
t
(minute) (r-1) (Ra-1) T °C (mm) (%) (%)
0.5 48 -2 25 50.00 8.10 4.025 0.0515 99.40 97.87
1 47 -2 25 49.00 8.30 2.881 0.0369 97.41 95.91
2 45 -2 25 47.00 8.60 2.074 0.0265 93.44 92.00
5 43 -2 25 45.00 8.90 1.334 0.0171 89.46 88.08
15 40 -2 25 42.00 9.40 0.792 0.0101 83.50 82.21
30 37 -2 25 39.00 9.90 0.574 0.0074 77.53 76.34
60 32 -2 25 34.00 10.70 0.422 0.0054 67.59 66.55
250 27 -2 25 29.00 11.50 0.214 0.0027 57.65 56.76
1440 23 -2 25 25.00 12.20 0.092 0.0012 49.70 48.93

Tested by Technician : Zamzam

Date : 06 Desember 2022


SOIL MECHANICS LABORATORY Form no. (No. formulir)

FACULTY OF CIVIL AND ENVIRONMENTAL ENGINEERING Issue/Revision

BANDUNG INSTITUTE OF TECHNOLOGY Revision (Revisi)

RESULT OF GRAIN SIZE ANALYSIS Page 1 of 2

Project : Penyelidikan Tanah Lereng Jalur Kereta Api antara Batutulis-Ciomas Lintas Bogor-Sukabumi
Type of sample : UDS Location : Bogor, Jawa Barat
Sample no. : BH-02
Depth (m) : 7.50-8.00 Result
Gravel (Batu) (%) : 0.01 D10 :
Sand (Pasir) (%) : 1.53 D30 :
Silt (Lanau) (%) : 33.46 D60 : 0.0036
Clay (Lempung) (%) : 65.00 Cu : #DIV/0!
Cz : #DIV/0!

0.005 0.075 0.15 0.25 0.425 0.85 2 4.75 19 75


100

90

80

70
Percent passing (Persen lolos) (%)

60

50

40

30

20

10

0
0.001 0.010 0.100 1.000 10.000 100.000
Diameter of grains (Diameter butir) (mm)
`
SAND
CLAY SILT GRAVEL
FINE MEDIUM COARSE

0.005 mm 0.075 mm 0.425 mm 2.00 mm 4.75 mm

Tested by Technician : Zamzam

Date : 06 Desember 2022


SOIL MECHANICS LABORATORY Form no. (No. formulir)

FACULTY OF CIVIL AND ENVIRONMENTAL ENGINEERING Issue/Revision

BANDUNG INSTITUTE OF TECHNOLOGY Revision (Revisi)

RESULT OF GRAIN SIZE ANALYSIS Page 2 of 2

Project : Penyelidikan Tanah Lereng Jalur Kereta Api antara Batutulis-Ciomas Lintas Bogor-Sukabumi
Type of sample : UDS Location : Bogor, Jawa Barat
Sample no : BH-03
Depth (m) : 3.50-4.00 Date
Weight of soil : 200 gr Sample Accepted : 14 November 2022
Water Content : 0 % Sample Tested : Desember 2022
Test Finished : 06 Desember 2022

Mass Percent Percent Percent


Sieve no. Diameter Retained Retained Cumulative Passing
Remarks
(No. Ayakan) (mm) ( gr ) (%) Retained (%)
(%)
4 4.76 0.00 0.00 0.00 100.00
10 2.00 0.04 0.02 0.02 99.98
18 1.00 0.08 0.04 0.06 99.94
35 0.50 0.26 0.13 0.19 99.81
60 0.25 0.76 0.38 0.57 99.43
100 0.15 1.26 0.63 1.20 98.80
200 0.08 1.10 0.55 1.75 98.25
PAN (%) 98.25

RESULT OF HYDROMETER ANALYSIS

A: 0.992 (lihat tabel) Specific gravity (Berat Jenis) (Gs) : 2.688


k: 0.0128 (lihat tabel) Percent Passing No.200 : 98.25 %
Berat tanah untuk hidrometer : 50 gr

Elapsed R Ra Temp. D N N'


Zr
time 1000 1000 R-Ra Zr
t
(minute) (r-1) (Ra-1) T °C (mm) (%) (%)
0.5 48 -2 25 50.00 8.10 4.025 0.0515 99.20 97.46
1 47 -2 25 49.00 8.30 2.881 0.0369 97.22 95.51
2 45 -2 25 47.00 8.60 2.074 0.0265 93.25 91.62
5 42 -2 25 44.00 9.10 1.349 0.0173 87.30 85.77
15 37 -2 25 39.00 9.90 0.812 0.0104 77.38 76.02
30 35 -2 25 37.00 10.20 0.583 0.0075 73.41 72.12
60 33 -2 25 35.00 10.60 0.420 0.0054 69.44 68.22
250 30 -2 25 32.00 11.10 0.211 0.0027 63.49 62.38
1440 25 -2 25 27.00 11.90 0.091 0.0012 53.57 52.63

Tested by Technician : Zamzam

Date : 06 Desember 2022


SOIL MECHANICS LABORATORY Form no. (No. formulir)

FACULTY OF CIVIL AND ENVIRONMENTAL ENGINEERING Issue/Revision

BANDUNG INSTITUTE OF TECHNOLOGY Revision (Revisi)

RESULT OF GRAIN SIZE ANALYSIS Page 1 of 2

Project : Penyelidikan Tanah Lereng Jalur Kereta Api antara Batutulis-Ciomas Lintas Bogor-Sukabumi
Type of sample : UDS Location : Bogor, Jawa Barat
Sample no. : BH-03
Depth (m) : 3.50-4.00 Result
Gravel (Batu) (%) : 0.02 D10 :
Sand (Pasir) (%) : 1.73 D30 :
Silt (Lanau) (%) : 30.68 D60 : 0.0022
Clay (Lempung) (%) : 67.57 Cu : #DIV/0!
Cz : #DIV/0!

0.005 0.075 0.15 0.25 0.425 0.85 2 4.75 19 75


100

90

80

70
Percent passing (Persen lolos) (%)

60

50

40

30

20

10

0
0.001 0.010 0.100 1.000 10.000 100.000
Diameter of grains (Diameter butir) (mm)
`
SAND
CLAY SILT GRAVEL
FINE MEDIUM COARSE

0.005 mm 0.075 mm 0.425 mm 2.00 mm 4.75 mm

Tested by Technician : Zamzam

Date : 06 Desember 2022


SOIL MECHANICS LABORATORY Form no. (No. formulir)

FACULTY OF CIVIL AND ENVIRONMENTAL ENGINEERING Issue/Revision

BANDUNG INSTITUTE OF TECHNOLOGY Revision (Revisi)

RESULT OF GRAIN SIZE ANALYSIS Page 2 of 2

Project : Penyelidikan Tanah Lereng Jalur Kereta Api antara Batutulis-Ciomas Lintas Bogor-Sukabumi
Type of sample : UDS Location : Bogor, Jawa Barat
Sample no : BH-03
Depth (m) : 7.50-8.00 Date
Weight of soil : 200 gr Sample Accepted : 14 November 2022
Water Content : 0 % Sample Tested : Desember 2022
Test Finished : 06 Desember 2022

Mass Percent Percent Percent


Sieve no. Diameter Retained Retained Cumulative Passing
Remarks
(No. Ayakan) (mm) ( gr ) (%) Retained (%)
(%)
4 4.76 0.00 0.00 0.00 100.00
10 2.00 0.00 0.00 0.00 100.00
18 1.00 4.02 2.01 2.01 97.99
35 0.50 0.04 0.02 2.03 97.97
60 0.25 0.29 0.15 2.18 97.83
100 0.15 0.92 0.46 2.64 97.37
200 0.08 1.09 0.55 3.18 96.82
PAN (%) 96.82

RESULT OF HYDROMETER ANALYSIS

A: 0.992 (lihat tabel) Specific gravity (Berat Jenis) (Gs) : 2.686


k: 0.0127 (lihat tabel) Percent Passing No.200 : 96.82 %
Berat tanah untuk hidrometer : 50 gr

Elapsed R Ra Temp. D N N'


Zr
time 1000 1000 R-Ra Zr
t
(minute) (r-1) (Ra-1) T °C (mm) (%) (%)
0.5 47 -2 25 49.00 8.30 4.074 0.0517 97.22 94.12
1 45 -2 25 47.00 8.60 2.933 0.0372 93.25 90.28
2 43 -2 25 45.00 8.90 2.110 0.0268 89.28 86.44
5 40 -2 25 42.00 9.40 1.371 0.0174 83.33 80.68
15 37 -2 25 39.00 9.90 0.812 0.0103 77.38 74.92
30 35 -2 25 37.00 10.20 0.583 0.0074 73.41 71.07
60 32 -2 25 34.00 10.70 0.422 0.0054 67.46 65.31
250 27 -2 25 29.00 11.50 0.214 0.0027 57.54 55.71
1440 23 -2 25 25.00 12.20 0.092 0.0012 49.60 48.02

Tested by Technician : Zamzam

Date : 06 Desember 2022


SOIL MECHANICS LABORATORY Form no. (No. formulir)

FACULTY OF CIVIL AND ENVIRONMENTAL ENGINEERING Issue/Revision

BANDUNG INSTITUTE OF TECHNOLOGY Revision (Revisi)

RESULT OF GRAIN SIZE ANALYSIS Page 1 of 2

Project : Penyelidikan Tanah Lereng Jalur Kereta Api antara Batutulis-Ciomas Lintas Bogor-Sukabumi
Type of sample : UDS Location : Bogor, Jawa Barat
Sample no. : BH-03
Depth (m) : 7.50-8.00 Result
Gravel (Batu) (%) : 0.00 D10 :
Sand (Pasir) (%) : 3.18 D30 :
Silt (Lanau) (%) : 32.32 D60 : 0.0038
Clay (Lempung) (%) : 64.50 Cu : #DIV/0!
Cz : #DIV/0!

0.005 0.075 0.15 0.25 0.425 0.85 2 4.75 19 75


100

90

80

70
Percent passing (Persen lolos) (%)

60

50

40

30

20

10

0
0.001 0.010 0.100 1.000 10.000 100.000
Diameter of grains (Diameter butir) (mm)
`
SAND
CLAY SILT GRAVEL
FINE MEDIUM COARSE

0.005 mm 0.075 mm 0.425 mm 2.00 mm 4.75 mm

Tested by Technician : Zamzam

Date : 06 Desember 2022


SOIL MECHANICS LABORATORY Form no. (No. formulir)

FACULTY OF CIVIL AND ENVIRONMENTAL ENGINEERING Issue/Revision

BANDUNG INSTITUTE OF TECHNOLOGY Revision (Revisi)

RESULT OF GRAIN SIZE ANALYSIS Page 2 of 2

Project : Penyelidikan Tanah Lereng Jalur Kereta Api antara Batutulis-Ciomas Lintas Bogor-Sukabumi
Type of sample : UDS Location : Bogor, Jawa Barat
Sample no : BH-03
Depth (m) : 11.00-11.50 Date
Weight of soil : 200 gr Sample Accepted : 14 November 2022
Water Content : 0 % Sample Tested : Desember 2022
Test Finished : 06 Desember 2022

Mass Percent Percent Percent


Sieve no. Diameter Retained Retained Cumulative Passing
Remarks
(No. Ayakan) (mm) ( gr ) (%) Retained (%)
(%)
4 4.76 0.00 0.00 0.00 100.00
10 2.00 0.00 0.00 0.00 100.00
18 1.00 0.01 0.01 0.01 100.00
35 0.50 0.11 0.06 0.06 99.94
60 0.25 0.28 0.14 0.20 99.80
100 0.15 0.68 0.34 0.54 99.46
200 0.08 0.75 0.38 0.92 99.09
PAN (%) 99.09

RESULT OF HYDROMETER ANALYSIS

A: 0.992 (lihat tabel) Specific gravity (Berat Jenis) (Gs) : 2.685


k: 0.0128 (lihat tabel) Percent Passing No.200 : 99.09 %
Berat tanah untuk hidrometer : 50 gr

Elapsed R Ra Temp. D N N'


Zr
time 1000 1000 R-Ra Zr
t
(minute) (r-1) (Ra-1) T °C (mm) (%) (%)
0.5 48 -2 25 50.00 8.10 4.025 0.0515 99.20 98.29
1 47 -2 25 49.00 8.30 2.881 0.0369 97.22 96.33
2 46 -2 25 48.00 8.40 2.049 0.0262 95.23 94.36
5 44 -2 25 46.00 8.80 1.327 0.0170 91.26 90.43
15 41 -2 25 43.00 9.20 0.783 0.0100 85.31 84.53
30 37 -2 25 39.00 9.90 0.574 0.0074 77.38 76.67
60 33 -2 25 35.00 10.60 0.420 0.0054 69.44 68.80
250 30 -2 25 32.00 11.10 0.211 0.0027 63.49 62.91
1440 25 -2 25 27.00 11.90 0.091 0.0012 53.57 53.08

Tested by Technician : Zamzam

Date : 06 Desember 2022


SOIL MECHANICS LABORATORY Form no. (No. formulir)

FACULTY OF CIVIL AND ENVIRONMENTAL ENGINEERING Issue/Revision

BANDUNG INSTITUTE OF TECHNOLOGY Revision (Revisi)

RESULT OF GRAIN SIZE ANALYSIS Page 1 of 2

Project : Penyelidikan Tanah Lereng Jalur Kereta Api antara Batutulis-Ciomas Lintas Bogor-Sukabumi
Type of sample : UDS Location : Bogor, Jawa Barat
Sample no. : BH-03
Depth (m) : 11.00-11.50 Result
Gravel (Batu) (%) : 0.00 D10 :
Sand (Pasir) (%) : 0.92 D30 :
Silt (Lanau) (%) : 31.09 D60 : 0.0021
Clay (Lempung) (%) : 68.00 Cu : #DIV/0!
Cz : #DIV/0!

0.005 0.075 0.15 0.25 0.425 0.85 2 4.75 19 75


100

90

80

70
Percent passing (Persen lolos) (%)

60

50

40

30

20

10

0
0.001 0.010 0.100 1.000 10.000 100.000
Diameter of grains (Diameter butir) (mm)
`
SAND
CLAY SILT GRAVEL
FINE MEDIUM COARSE

0.005 mm 0.075 mm 0.425 mm 2.00 mm 4.75 mm

Tested by Technician : Zamzam

Date : 06 Desember 2022


SOIL MECHANICS LABORATORY Form no. (No. formulir)

FACULTY OF CIVIL AND ENVIRONMENTAL ENGINEERING Issue/Revision

BANDUNG INSTITUTE OF TECHNOLOGY Revision (Revisi)

RESULT OF GRAIN SIZE ANALYSIS Page 2 of 2

Project : Penyelidikan Tanah Lereng Jalur Kereta Api antara Batutulis-Ciomas Lintas Bogor-Sukabumi
Type of sample : UDS Location : Bogor, Jawa Barat
Sample no : BH-04
Depth (m) : 3.00-3.50 Date
Weight of soil : 200 gr Sample Accepted : 14 November 2022
Water Content : 0 % Sample Tested : Desember 2022
Test Finished : 06 Desember 2022

Mass Percent Percent Percent


Sieve no. Diameter Retained Retained Cumulative Passing
Remarks
(No. Ayakan) (mm) ( gr ) (%) Retained (%)
(%)
4 4.76 0.00 0.00 0.00 100.00
10 2.00 0.03 0.01 0.01 99.99
18 1.00 0.02 0.01 0.03 99.98
35 0.50 0.11 0.06 0.08 99.92
60 0.25 0.26 0.13 0.21 99.79
100 0.15 0.52 0.26 0.47 99.53
200 0.08 0.57 0.28 0.75 99.25
PAN (%) 99.25

RESULT OF HYDROMETER ANALYSIS

A: 1.014 (lihat tabel) Specific gravity (Berat Jenis) (Gs) : 2.578


k: 0.0132 (lihat tabel) Percent Passing No.200 : 99.25 %
Berat tanah untuk hidrometer : 50 gr

Elapsed R Ra Temp. D N N'


Zr
time 1000 1000 R-Ra Zr
t
(minute) (r-1) (Ra-1) T °C (mm) (%) (%)
0.5 47 -2 25 49.00 8.30 4.074 0.0538 99.37 98.62
1 46 -2 25 48.00 8.40 2.898 0.0383 97.34 96.61
2 45 -2 25 47.00 8.60 2.074 0.0274 95.32 94.60
5 43 -2 25 45.00 8.90 1.334 0.0176 91.26 90.57
15 40 -2 25 42.00 9.40 0.792 0.0104 85.18 84.53
30 37 -2 25 39.00 9.90 0.574 0.0076 79.09 78.49
60 35 -2 25 37.00 10.20 0.412 0.0054 75.04 74.47
250 33 -2 25 35.00 10.60 0.206 0.0027 70.98 70.44
1440 30 -2 25 32.00 11.10 0.088 0.0012 64.90 64.41

Tested by Technician : Zamzam

Date : 06 Desember 2022


SOIL MECHANICS LABORATORY Form no. (No. formulir)

FACULTY OF CIVIL AND ENVIRONMENTAL ENGINEERING Issue/Revision

BANDUNG INSTITUTE OF TECHNOLOGY Revision (Revisi)

RESULT OF GRAIN SIZE ANALYSIS Page 1 of 2

Project : Penyelidikan Tanah Lereng Jalur Kereta Api antara Batutulis-Ciomas Lintas Bogor-Sukabumi
Type of sample : UDS Location : Bogor, Jawa Barat
Sample no. : BH-04
Depth (m) : 3.00-3.50 Result
Gravel (Batu) (%) : 0.01 D10 :
Sand (Pasir) (%) : 0.74 D30 :
Silt (Lanau) (%) : 25.25 D60 :
Clay (Lempung) (%) : 74.00 Cu : #DIV/0!
Cz : #DIV/0!

0.005 0.075 0.15 0.25 0.425 0.85 2 4.75 19 75


100

90

80

70
Percent passing (Persen lolos) (%)

60

50

40

30

20

10

0
0.001 0.010 0.100 1.000 10.000 100.000
Diameter of grains (Diameter butir) (mm)
`
SAND
CLAY SILT GRAVEL
FINE MEDIUM COARSE

0.005 mm 0.075 mm 0.425 mm 2.00 mm 4.75 mm

Tested by Technician : Zamzam

Date : 06 Desember 2022


SOIL MECHANICS LABORATORY Form no.

FACULTY OF CIVIL AND ENVIRONMENTAL ENGINEERING Issue/Revision

BANDUNG INSTITUTE OF TECHNOLOGY Revision

TRIAXIAL COMPRESSION STRESS Page 1 of 1

METODE : CONSOLIDATED UNDRAINED


Project : Penyelidikan Tanah Lereng Jalur Kereta Api antara Batutulis-Ciomas Lintas Bogor-Sukabumi
Borehole : BH-01 Location : Bogor, Jawa Barat
No. Of sample : UDS Date
Depth (m) : 3.00-3.50 Sample Accepted : 14 November 2022
PROVING RING NO. : Sample Tested : Desember 2022
Calibration factor : 0.182 Test Finished : 06 Desember 2022

RESULT Total Stress Effective Stress


2
Cohesion (c) : = 0.354 0.184 kg/cm
o
Angle of Int. Friction : = 15.7 29.8

σ3 σ1' - σ3' σ3' u σ1' σ1 (σ1' + σ3') (σ1 + σ3)


2 2
0.60 1.404 0.280 0.320 1.684 2.004 0.982 1.302
1.10 1.750 0.430 0.670 2.180 2.850 1.305 1.975
1.60 2.174 0.620 0.980 2.794 3.774 1.707 2.687
Total Stress

2
Shear Stress kg/cm2

0
0 1 2 3 4 5 6
Principal Stress kg/cm2

Effective Stress

2
Shear Stress kg/cm2

0
0 1 2 3 4 5 6
Principal Stress kg/cm2

Tested by Technician : Sahuri

Date : 06 Desember 2022


SOIL MECHANICS LABORATORY Form no.

FACULTY OF CIVIL AND ENVIRONMENTAL ENGINEERING Issue/Revision

BANDUNG INSTITUTE OF TECHNOLOGY Revision

TRIAXIAL COMPRESSION STRESS Page 1 of 1

METODE : CONSOLIDATED UNDRAINED


Project : Penyelidikan Tanah Lereng Jalur Kereta Api antara Batutulis-Ciomas Lintas Bogor-Sukabumi
Borehole : BH-01 Location : Bogor, Jawa Barat
No. Of sample : UDS Date
Depth (m) : 11.00-11.50 Sample Accepted : 14 November 2022
PROVING RING NO. : Sample Tested : Desember 2022
Calibration factor : 0.182 Test Finished : 06 Desember 2022

RESULT Total Stress Effective Stress


2
Cohesion (c) : = 0.599 0.298 kg/cm
o
Angle of Int. Friction : = 12.5 32.2

σ3 σ1' - σ3' σ3' u σ1' σ1 (σ1' + σ3') (σ1 + σ3)


2 2
0.60 1.843 0.200 0.400 2.043 2.443 1.122 1.522
1.10 2.115 0.280 0.820 2.395 3.215 1.338 2.158
1.60 2.403 0.400 1.200 2.803 4.003 1.602 2.802
Total Stress

2
Shear Stress kg/cm2

0
0 1 2 3 4 5 6
Principal Stress kg/cm2

Effective Stress

2
Shear Stress kg/cm2

0
0 1 2 3 4 5 6
Principal Stress kg/cm2

Tested by Technician : Sahuri

Date : 06 Desember 2022


SOIL MECHANICS LABORATORY Form no.

FACULTY OF CIVIL AND ENVIRONMENTAL ENGINEERING Issue/Revision

BANDUNG INSTITUTE OF TECHNOLOGY Revision

TRIAXIAL COMPRESSION STRESS Page 1 of 1

METODE : CONSOLIDATED UNDRAINED


Project : Penyelidikan Tanah Lereng Jalur Kereta Api antara Batutulis-Ciomas Lintas Bogor-Sukabumi
Borehole : BH-02 Location : Bogor, Jawa Barat
No. Of sample : UDS Date
Depth (m) : 3.00-3.50 Sample Accepted : 14 November 2022
PROVING RING NO. : Sample Tested : Desember 2022
Calibration factor : 0.182 Test Finished : 08 Desember 2022

RESULT Total Stress Effective Stress


2
Cohesion (c) : = 0.228 0.148 kg/cm
o
Angle of Int. Friction : = 14.2 29.7

σ3 σ1' - σ3' σ3' u σ1' σ1 (σ1' + σ3') (σ1 + σ3)


2 2
0.60 0.991 0.170 0.430 1.161 1.591 0.666 1.096
1.10 1.316 0.300 0.800 1.616 2.416 0.958 1.758
1.60 1.660 0.460 1.140 2.120 3.260 1.290 2.430
Total Stress

2
Shear Stress kg/cm2

0
0 1 2 3 4 5 6
Principal Stress kg/cm2

Effective Stress

2
Shear Stress kg/cm2

0
0 1 2 3 4 5 6
Principal Stress kg/cm2

Tested by Technician : Sahuri

Date : 08 Desember 2022


SOIL MECHANICS LABORATORY Form no.

FACULTY OF CIVIL AND ENVIRONMENTAL ENGINEERING Issue/Revision

BANDUNG INSTITUTE OF TECHNOLOGY Revision

TRIAXIAL COMPRESSION STRESS Page 1 of 1

METODE : CONSOLIDATED UNDRAINED


Project : Penyelidikan Tanah Lereng Jalur Kereta Api antara Batutulis-Ciomas Lintas Bogor-Sukabumi
Borehole : BH-02 Location : Bogor, Jawa Barat
No. Of sample : UDS Date
Depth (m) : 7.50-8.00 Sample Accepted : 14 November 2022
PROVING RING NO. : Sample Tested : Desember 2022
Calibration factor : 0.182 Test Finished : 08 Desember 2022

RESULT Total Stress Effective Stress


2
Cohesion (c) : = 0.374 0.327 kg/cm
o
Angle of Int. Friction : = 18.7 27.9

σ3 σ1' - σ3' σ3' u σ1' σ1 (σ1' + σ3') (σ1 + σ3)


2 2
0.60 1.651 0.240 0.360 1.891 2.251 1.066 1.426
1.10 2.111 0.470 0.630 2.581 3.211 1.526 2.156
1.60 2.645 0.720 0.880 3.365 4.245 2.043 2.923
Total Stress

2
Shear Stress kg/cm2

0
0 1 2 3 4 5 6
Principal Stress kg/cm2

Effective Stress

2
Shear Stress kg/cm2

0
0 1 2 3 4 5 6
Principal Stress kg/cm2

Tested by Technician : Sahuri

Date : 08 Desember 2022


SOIL MECHANICS LABORATORY Form no.

FACULTY OF CIVIL AND ENVIRONMENTAL ENGINEERING Issue/Revision

BANDUNG INSTITUTE OF TECHNOLOGY Revision

TRIAXIAL COMPRESSION STRESS Page 1 of 1

METODE : CONSOLIDATED UNDRAINED


Project : Penyelidikan Tanah Lereng Jalur Kereta Api antara Batutulis-Ciomas Lintas Bogor-Sukabumi
Borehole : BH-03 Location : Bogor, Jawa Barat
No. Of sample : UDS Date
Depth (m) : 3.50-4.00 Sample Accepted : 14 November 2022
PROVING RING NO. : Sample Tested : Desember 2022
Calibration factor : 0.182 Test Finished : 13 Desember 2022

RESULT Total Stress Effective Stress


2
Cohesion (c) : = 0.330 0.127 kg/cm
o
Angle of Int. Friction : = 14.1 33.0

σ3 σ1' - σ3' σ3' u σ1' σ1 (σ1' + σ3') (σ1 + σ3)


2 2
0.60 1.248 0.220 0.380 1.468 1.848 0.844 1.224
1.10 1.537 0.330 0.770 1.867 2.637 1.099 1.869
1.60 1.909 0.440 1.160 2.349 3.509 1.395 2.555
Total Stress

2
Shear Stress kg/cm2

0
0 1 2 3 4 5 6
Principal Stress kg/cm2

Effective Stress

2
Shear Stress kg/cm2

0
0 1 2 3 4 5 6
Principal Stress kg/cm2

Tested by Technician : Sahuri

Date : 13 Desember 2022


SOIL MECHANICS LABORATORY Form no.

FACULTY OF CIVIL AND ENVIRONMENTAL ENGINEERING Issue/Revision

BANDUNG INSTITUTE OF TECHNOLOGY Revision

TRIAXIAL COMPRESSION STRESS Page 1 of 1

METODE : CONSOLIDATED UNDRAINED


Project : Penyelidikan Tanah Lereng Jalur Kereta Api antara Batutulis-Ciomas Lintas Bogor-Sukabumi
Borehole : BH-03 Location : Bogor, Jawa Barat
No. Of sample : UDS Date
Depth (m) : 11.00-11.50 Sample Accepted : 14 November 2022
PROVING RING NO. : Sample Tested : Desember 2022
Calibration factor : 0.182 Test Finished : 13 Desember 2022

RESULT Total Stress Effective Stress


2
Cohesion (c) : = 0.386 0.351 kg/cm
o
Angle of Int. Friction : = 17.8 27.1

σ3 σ1' - σ3' σ3' u σ1' σ1 (σ1' + σ3') (σ1 + σ3)


2 2
0.60 1.626 0.220 0.380 1.846 2.226 1.033 1.413
1.10 2.079 0.440 0.660 2.519 3.179 1.480 2.140
1.60 2.551 0.700 0.900 3.251 4.151 1.976 2.876
Total Stress

2
Shear Stress kg/cm2

0
0 1 2 3 4 5 6
Principal Stress kg/cm2

Effective Stress

2
Shear Stress kg/cm2

0
0 1 2 3 4 5 6
Principal Stress kg/cm2

Tested by Technician : Sahuri

Date : 13 Desember 2022


SOIL MECHANICS LABORATORY Form no.

FACULTY OF CIVIL AND ENVIRONMENTAL ENGINEERING Issue/Revision

BANDUNG INSTITUTE OF TECHNOLOGY Revision

TRIAXIAL COMPRESSION STRESS Page 1 of 1

METODE : CONSOLIDATED UNDRAINED


Project : Penyelidikan Tanah Lereng Jalur Kereta Api antara Batutulis-Ciomas Lintas Bogor-Sukabumi
Borehole : BH-04 Location : Bogor, Jawa Barat
No. Of sample : UDS Date
Depth (m) : 3.00-3.50 Sample Accepted : 14 November 2022
PROVING RING NO. : Sample Tested : Desember 2022
Calibration factor : 0.182 Test Finished : 14 Desember 2022

RESULT Total Stress Effective Stress


2
Cohesion (c) : = 0.313 0.215 kg/cm
o
Angle of Int. Friction : = 23.0 34.5

σ3 σ1' - σ3' σ3' u σ1' σ1 (σ1' + σ3') (σ1 + σ3)


2 2
0.60 1.815 0.240 0.360 2.055 2.415 1.148 1.508
1.10 2.539 0.420 0.680 2.959 3.639 1.690 2.370
1.60 3.234 0.630 0.970 3.864 4.834 2.247 3.217
Total Stress

2
Shear Stress kg/cm2

0
0 1 2 3 4 5 6
Principal Stress kg/cm2

Effective Stress

2
Shear Stress kg/cm2

0
0 1 2 3 4 5 6
Principal Stress kg/cm2

Tested by Technician : Sahuri

Date : 14 Desember 2022


SOIL MECHANICS LABORATORY Form no.

FACULTY OF CIVIL AND ENVIRONMENTAL ENGINEERING Issue/Revision

BANDUNG INSTITUTE OF TECHNOLOGY Revision

TRIAXIAL COMPRESSION STRESS Page 1 of 1

METODE : UNCONSOLIDATED UNDRAINED


Project : Penyelidikan Tanah Lereng Jalur Kereta Api antara Batutulis-Ciomas Lintas Bogor-Sukabumi
Borehole : BH-01 Location : Bogor, Jawa Barat
Type of Sample : UDS
Depth (m) : 7.00-7.50 Date
Sample Accepted : 14 November 2022
PROVING RING NO. : Sample Tested : Desember 2022
Calibration factor : 0.205 Test Finished : 05 Desember 2022
RESULT
Cohesion (c) : 0.366 kg/cm2
o
Angle of Int. Friction : 2.9

(s1 + s3)
s3 s1'- s3' s3' u s1' s1
2
0.50 0.827 0.50 0.00 1.327 1.33 0.914
1.00 0.885 1.00 0.00 1.885 1.89 1.443
1.50 0.929 1.50 0.00 2.429 2.43 1.965

2
Shear Stress kg/cm2

0
0 1 2 3 4
Principal Stress kg/cm2

Tested by Technician : Sahuri

Date : 05 Desember 2022


SOIL MECHANICS LABORATORY Form no.

FACULTY OF CIVIL AND ENVIRONMENTAL ENGINEERING Issue/Revision

BANDUNG INSTITUTE OF TECHNOLOGY Revision

TRIAXIAL COMPRESSION STRESS Page 1 of 1

METODE : UNCONSOLIDATED UNDRAINED


Project : Penyelidikan Tanah Lereng Jalur Kereta Api antara Batutulis-Ciomas Lintas Bogor-Sukabumi
Borehole : BH-02 Location : Bogor, Jawa Barat
Type of Sample : UDS
Depth (m) : 13.00-13.50 Date
Sample Accepted : 14 November 2022
PROVING RING NO. : Sample Tested : Desember 2022
Calibration factor : 0.205 Test Finished : 05 Desember 2022
RESULT
Cohesion (c) : 0.142 kg/cm2
o
Angle of Int. Friction : 0.8

(s1 + s3)
s3 s1'- s3' s3' u s1' s1
2
0.50 0.303 0.50 0.00 0.803 0.80 0.652
1.00 0.318 1.00 0.00 1.318 1.32 1.159
1.50 0.333 1.50 0.00 1.833 1.83 1.667

2
Shear Stress kg/cm2

0
0 1 2 3 4
Principal Stress kg/cm2

Tested by Technician : Sahuri

Date : 05 Desember 2022


SOIL MECHANICS LABORATORY Form no.

FACULTY OF CIVIL AND ENVIRONMENTAL ENGINEERING Issue/Revision

BANDUNG INSTITUTE OF TECHNOLOGY Revision

TRIAXIAL COMPRESSION STRESS Page 1 of 1

METODE : UNCONSOLIDATED UNDRAINED


Project : Penyelidikan Tanah Lereng Jalur Kereta Api antara Batutulis-Ciomas Lintas Bogor-Sukabumi
Borehole : BH-03 Location : Bogor, Jawa Barat
Type of Sample : UDS
Depth (m) : 7.50-8.00 Date
Sample Accepted : 14 November 2022
PROVING RING NO. : Sample Tested : Desember 2022
Calibration factor : 0.205 Test Finished : 05 Desember 2022
RESULT
Cohesion (c) : 0.571 kg/cm2
o
Angle of Int. Friction : 2.5

(s1 + s3)
s3 s1'- s3' s3' u s1' s1
2
0.50 1.239 0.50 0.00 1.739 1.74 1.120
1.00 1.282 1.00 0.00 2.282 2.28 1.641
1.50 1.331 1.50 0.00 2.831 2.83 2.166

2
Shear Stress kg/cm2

0
0 1 2 3 4
Principal Stress kg/cm2

Tested by Technician : Sahuri

Date : 05 Desember 2022


APPENDIX E
HASIL DAN DOKUMENTASI
GEORADAR
A. Data GPR Bogor KM.6+625

1. Lintasan BGRB-01
2. Lintasan BGRB-02
3. Lintasan BGRB-03
4. Lintasan BGRB-08
5. Lintasan BGRB-09
6. Lintasan BGRB-10
7. Lintasan BGRB-11
8. Lintasan BGRB-16
9. Lintasan BGRB 17
B. Data GPR Bogor KM.6+675

10. Lintasan BGRB-04


11. Lintasan BGRB-05
12. Lintasan BGRB-12
13. Lintasan BGRB-13
14. Lintasan BGRB-18
15. Lintasan BGRB-19
C. Data GPR Bogor KM.6+725

16. Lintasan BGRB-06


17. Lintasan BGRB-07
18. Lintasan BGRB-14
19. Lintasan BGRB-15
20. Lintasan BGRB-20
21. Lintasan BGRB-21
LAMPIRAN II
DOKUMENTASI PEKERJAAN LAPANGAN