Final Report Penyelidikan Tanah Kajian Perkuatan Lereng Jalur KA Antara Batutulis-Ciomas KM 6
Final Report Penyelidikan Tanah Kajian Perkuatan Lereng Jalur KA Antara Batutulis-Ciomas KM 6
Document Number:
-
Contract Number and Contract Name:
00 Final 24/01/2023 HW PS
00 Draft 18/01/2023 HW PS
00 Draft 08/12/2022 HW PS
PENYELIDIKAN TANAH
KAJIAN PERKUATAN LERENG JALUR KA ANTARA
BATUTULIS-CIOMAS KM 6+550 s.d KM 6+800
LINTAS BOGOR-SUKABUMI
DAFTAR ISI
DAFTAR GAMBAR
DAFTAR TABEL
Tabel 2-1 Hubungan N-SPT & Kerapatan Relatif Tanah Butir Halus ....................................................... 9
Tabel 2-2 Hubungan N-SPT & Kerapatan Relatif Tanah Butir Kasar ....................................................... 9
Tabel 3-1 Rangkuman titik penyelidikan tanah ....................................................................................... 11
Rev: Page:
PENYELIDIKAN TANAH KAJIAN PERKUATAN LERENG JALUR KA ANTARA 00 5 of 20
BATUTULIS-CIOMAS KM 6+550 s.d KM 6+800 LINTAS BOGOR-SUKABUMI
Rev. Date: 16-Jan-23
1.0 PENDAHULUAN
1.2 Tujuan
Tujuan dari pekerjaan penyelidikan tanah adalah sebagai berikut:
a. Mendapatkan informasi dan gambaran awal terkait jenis tanah dan stratigrafinya;
b. Mengetahui karakteristik lapisan tanah dan mendapatkan parameter tanah desain yang akan
digunakan dalam melakukan analisis pondasi, timbunan, retaining wall dan fasilitas penunjang
lainnya;
c. Mengetahui kondisi muka air tanah.
a. Pengeboran dalam (machine drilling) sebanyak 4 (empat) titik, dengan kedalaman masing-masing
titik bervariasi antara 20-30 meter;
b. Melakukan pengambilan sampel tidak terganggu (Undisturbed Sample/UDS) pada semua titik bor
setiap interval kedalaman 3 meter atau setiap perubahan lapisan tanah. Rata-rata 3 UDS untuk
setiap titik bor;
Catatan: untuk lapisan lempung/lanau yang keras, UDS diambil dengan menggunakan Mazier
Sampler;
c. Pengujian SPT (standar penetration test) untuk masing-masing titik bor, dengan interval testing
setiap 2 meter pengeboran;
d. Deskripsi tanah selama pengeboran untuk mengidentifikasi stratigrafi tanah.
2. Melakukan pengujian laboratorium
Uji laboratorium dilakukan untuk semua sampel tidak terganggu (UDS) yang telah diperolah selama
pekerjaan pengeboran. Uji laboratorium yang dilakukan adalah sebagai berikut:
a. Index Properties
Pengujian index properties meliputi:
- Water Content (ASTM D2216-98);
- Specific Gravity (ASTM D854);
- Unit Weight (ASTM D2216-98);
- Atterberg Limit (ASTM D4318-84);
- Grain Size Analysis (ASTM D422).
b. Shear Strength
Pengujian shear strength meliputi:
- Triaxial Unconsolidated Undrained (ASTM D2580-87);
- Triaxial Consolidated Undrained (ASTM D4767-11).
Rev: Page:
PENYELIDIKAN TANAH KAJIAN PERKUATAN LERENG JALUR KA ANTARA 00 7 of 20
BATUTULIS-CIOMAS KM 6+550 s.d KM 6+800 LINTAS BOGOR-SUKABUMI
Rev. Date: 16-Jan-23
Gambar 2.1 Contoh Corebox Core-Sample pada kedalaman 0-5 meter BH-01
Pada pemukulan pertama alat ini dipukul hingga sedalam 15.24 cm. Kemudian dilanjutkan dengan
pemukulan tahap kedua sedalam 30.48 cm. Pada pukulan kedua inilah muncul nilai "N" yang merupakan
manifestasi jumlah pukulan yang dibutuhkan untuk membuat tabung belah standar mencapai kedalaman
30.48 cm.
Rev: Page:
PENYELIDIKAN TANAH KAJIAN PERKUATAN LERENG JALUR KA ANTARA 00 9 of 20
BATUTULIS-CIOMAS KM 6+550 s.d KM 6+800 LINTAS BOGOR-SUKABUMI
Rev. Date: 16-Jan-23
Hubungan antara nilai “N” dengan kerapatan relatif untuk tanah berbutir halus dan tanah berbutir kasar
ditunjukkan pada Tabel 2-1 dan Tabel 2-2.
Tabel 2-1 Hubungan N-SPT & Kerapatan Tabel 2-2 Hubungan N-SPT &
Relatif Tanah Butir Halus Kerapatan Relatif Tanah Butir Kasar
N-SPT Kerapatan Relatif N-SPT Kerapatan Relatif
<2 Very Soft 0-4 Very Loose
2-8 Soft to Medium 4-10 Loose
8-16 Stiff 10-30 Medium
16-30 Very Stiff 30-50 Dense
>30 Hard >50 Very Dense
Sumber: Princeple of Foundation Engineering Sumber: Soil Mechanic in Engineering Practice
Braja, M.Das 2011 Terzaghi, Peck dan Mesri 1996
ini adalah berat volume basah (m) dan berat volume kering (d). Pengujian ini mengacu pada ASTM
D2216-98, “Standard Test Method for Laboratory Determination of Water (Moisture) Cotent of Soil and
Rock by Mass”.
d. Analisis Saringan (Grain Size Analaysis)
Pengujian analisis saringan bertujuan untuk mengetahui penyebaran/distribusi tanah berbutir kasar
yang mempunyai ukuran lebih besar dari 0.075 mm sementara untuk tanah berbutir halus atau
berukuran kurang dari 0.075 mm menggunakan analisa Hydrometer. Pengujian ini mengacu pada
ASTM D422, “Standard Test Method for Particle-Size Analysis of Soils”.
e. Batas Atterberg (Atterberg Limit)
Rev: Page:
PENYELIDIKAN TANAH KAJIAN PERKUATAN LERENG JALUR KA ANTARA 00 10 of 20
BATUTULIS-CIOMAS KM 6+550 s.d KM 6+800 LINTAS BOGOR-SUKABUMI
Rev. Date: 16-Jan-23
Pengujian ini bertujuan untuk mengetahui batas-batas Atterberg, seperti Liquid Limit (LL), Plastic Limit
(PL) dan Plasticity Index (PI). Pengujian ini mengacu pada ASTM D4318-84, “Test Method for Liquid
Limit, Plastic Limit and Plasticity Index of Soil”.
Survei geoteknik meliputi pekerjaan penyelidikan tanah dan survei georadar. Penyelidikan tanah meliputi
pekerjaan pengeboran dalam (machine drilling) yang dilaksanakan di jalur ganda kereta api antara
Batutulis-Ciomas lintas Bogor-Sukabumi pada tanggal 31 Oktober sampai dengan 11 November 2022.
Layout dan rangkuman titik penyelidikan tanah ditunjukkan pada Gambar 3.1 dan Tabel 3-1.
Survei georadar dilaksanakan pada tanggal 15 Desember 2022, survei ini bertujuan untuk mengetahui
kondisi bawah permukaan dengan mengirimkan sinyal elektromagnetik. Hasil survei serta dokumentasi
pekerjaan ditunjukkan pada LAMPIRAN F.
340 340
335 335
330 330
Elevation (m)
Elevation (m)
325 325
320 320
315 315
310 310
305 305
moist WSP (2022) Average dry WSP (2022) Average
Gambar 3.5 Hasil uji test Unit Weight moist dan dry
Rev: Page:
PENYELIDIKAN TANAH KAJIAN PERKUATAN LERENG JALUR KA ANTARA 00 16 of 20
BATUTULIS-CIOMAS KM 6+550 s.d KM 6+800 LINTAS BOGOR-SUKABUMI
Rev. Date: 16-Jan-23
Gs Wn (%)
2.50 2.60 2.70 2.80 2.90 3.00 0 20 40 60 80 100
345 345
340 340
335 335
330 330
Elevation (m)
Elevation (m)
325 325
320 320
315 315
310 310
305 305
Gs Wn (2022)
Gambar 3.6 Hasil uji test Specific Gravity dan Moisture Content
LL (%) PL (%)
0 50 100 150 0 20 40 60
345 345
340 340
335 335
330 330
Elevation (m)
Elevation (m)
325 325
320 320
315 315
310 310
305 305
LL WSP (2022) PL WSP (2022)
PI (%)
0 20 40 60
345
340
335
330
Elevation (m)
325
320
315
310
305
PI WSP (2022)
cu (kN/m²) Øu (deg)
0.00 20.00 40.00 60.00 0.00 1.00 2.00 3.00 4.00
345 345
340 340
335 335
330 330
Elevation (m)
Elevation (m)
325 325
320 320
315 315
310 310
305 305
cu WSP (2022) Øu WSP (2022)
340 340
335 335
330 330
Elevation (m)
Elevation (m)
325 325
320 320
315 315
310 310
305 305
c' WSP (2022) phi' WSP (2022)
: Boreholes 2021
OWNER :
KEMENTERIAN PERHUBUNGAN
DIREKTORAT JENDERAL PERKERETAAPIAN
Rumah dibongkar MENYETUJUI :
P1
......................................................
BH-02 Rmh Gang
Rmh
(30m) P4 dibongkar KONSULTAN PERENCANA :
x=700346.834
y=9265236.697
x=700350.206 P2
y=9265238.158 P5
BH-03
BH-01
(30m)
(30m)
BH-06
DISETUJUI :
(Eksisting) P6
P3 BH-04
(20m)
P7 P8
BH-05 Putu Sumiartha, ST,. MT
(Eksisting)
DIPERIKSA :
Pagar
P10
Andrean Rustiana
NAMA PROYEK :
JUDUL GAMBAR :
SCALE 1 : 1000 GE 01
: Breccia
OWNER :
326 6 5.50
Clayey Silt & Silt, +325.00
325 m.stiff to stiff
324 7 CL CL
4.50
323
322 -10 8 0.86 DISETUJUI :
321 +320.50
???
320 19
11.40
319
Clayey Silt, v.stiff
???
4.50
50 Putu Sumiartha, ST,. MT
318 +317.14 +317.14
6.90
-15 DIPERIKSA :
317 Silt with Breccia, hard
316 ??? 56 ???
2.40
315
Clayey Silt, hard 40
314 ??? ??? Harry Wiguna, ST.
313 DIGAMBAR :
312 -20 60
311
310 60
Andrean Rustiana
309
Breccia with trace of Gravel and Boulder, 60 NAMA PROYEK :
308
Low cemented, very weak to weak -25
307
306 60 KAJIAN PERKUATAN LERENG JALUR KA
ANTARA BATU TULIS - CIOMAS
304 LINTAS BOGOR - SUKABUMI
302 60
300 JUDUL GAMBAR :
??? ??? ??? ??? ???
298 -30 60
KM 6+625 297
DATUM LEVEL :+296
SOIL PROFILE KM. 6+625
28.007 331.671
17.215 324.701
317.285
317.355
317.142
317.245
316.995
316.495
317.282
0.549 317.355
0.000 317.142
-0.585 317.245
-1.495 316.995
-2.350 316.495
316.495
315.895
316.495
316.495
315.400
316.000
316.000
316.495
19.267 325.355
35.584 332.522
25.633 331.000
21.209 326.500
32.117 332.394
12.445 321.000
29.400 332.204
LEVEL
-3.350
-3.720
-4.090
-4.590
6.978
6.037
5.488
4.903
3.992
3.138
1.491
9.320
8.950
8.377
2.348
DISTANCE NO REVISI TANGGAL PARAF
339
BH-06 OWNER :
338 10 (Eksisting)
337 -5
0
336 8
335
silty Clay & Clay, 5
4.00
324 13 silty Clay, 22 BH-04
323 stiff to v.stiff +322.00
322 -20 19 16 0
??? -15
9.82
321
19 DISETUJUI :
4.20
320 29 10 GWL
319 22 Silt, v.stiff -4.00m
318 27
Silt, v.stiff 19 +317.81 +317.81
???
6.80
24 -5
317 -25
2.60
??? -20 ??? Putu Sumiartha, ST,. MT
316 48 60 44
DIPERIKSA :
315 Silt with Breccia, hard Silt with Breccia, hard ???
60 60
314
??? 51
313
??? Clayey Silt, hard 60
312 -30 48 -10 60
-25 60 Harry Wiguna, ST.
311
310 60 60 DIGAMBAR :
309
60 60
308
307 -1560
Breccia with trace of Gravel and Boulder, -30 60
Breccia with trace of Gravel Andrean Rustiana
306
Low cemented, very weak to weak 60 and Boulder, Low cemented,
304 NAMA PROYEK :
60
very weak to weak
302 60
300
KAJIAN PERKUATAN LERENG JALUR KA
298 -2060 60 ANTARA BATU TULIS - CIOMAS
-35 LINTAS BOGOR - SUKABUMI
297 60
296
60 JUDUL GAMBAR :
295
294 60
293 ??? ??? ??? ??? ???
-40 60
292 SOIL PROFILE KM. 6+675
KM 6+675 291
DATUM LEVEL : +290
317.200
317.800
317.800
317.948
318.019
317.812
317.912
317.665
317.112
317.112
317.948
318.020
317.812
317.912
317.665
317.112
317.112
316.512
317.112
317.112
318.453
319.013
-12.014 319.241
22.600 330.355
18.037 327.000
14.832 322.429
36.526 339.000
43.262 341.867
51.761 342.450
39.810 340.733
28.329 335.668
49.543 342.372
32.982 338.500
LEVEL
NO REVISI TANGGAL PARAF
-0.584
-1.496
-2.290
-3.290
-3.660
-4.030
-4.830
-6.720
-9.720
9.927
9.557
8.557
7.191
6.250
5.700
5.116
4.204
3.411
2.385
1.490
0.550
0.000
DISTANCE
Y
ONL
SOIL PROFILE KM 6+675 ION INFORMATION CONSTRUCTION
1 AT
SCALE 1 : 225 GE 02 ORM
INF SKALA NO. GAMBAR JML. LEMBAR
R
FO
FT,
A3
R A 1 : 225 GE-02 131
D
KETERANGAN :
: silty Clay, Clay
5.00
-20 24 9 DISETUJUI :
324
323 7
30 +322.00
322 ???
11.50
13
321
43 -20 ??? Putu Sumiartha, ST,. MT
4.50
320 15
319
-25 silty Clay, hard +318.49 +318.49 DIPERIKSA :
16
7.50
318 ??? 42 ???
317 20
53
3.00
316 Silt with Breccia, hard
-25 37 Harry Wiguna, ST.
315 ??? ???
-30 60 DIGAMBAR :
314 41
313
50
312
311 41
-30 Andrean Rustiana
310
60
309 NAMA PROYEK :
308 Breccia with trace of Gravel and Boulder, 60
307 Low cemented, very weak to weak
60 KAJIAN PERKUATAN LERENG JALUR KA
306 ANTARA BATU TULIS - CIOMAS
-35 LINTAS BOGOR - SUKABUMI
305 60
304
60 JUDUL GAMBAR :
303
302
60
301 ??? ??? ??? ??? ???
-40 60
KM 6+725 300 SOIL PROFILE KM. 6+725
DATUM LEVEL : +299
320.768
-11.082 320.845
317.900
317.500
317.500
318.641
318.707
318.496
318.593
318.341
317.736
317.736
318.641
0.548 318.707
0.000 318.496
-0.585 318.593
-1.495 318.341
-2.150 317.736
317.736
317.136
317.736
317.736
344.045
337.000
322.486
48.498 344.152
44.105 344.152
342.179
330.655
39.399 344.486
LEVEL
-3.350
-3.720
-4.090
-4.590
-9.139
35.576
30.900
22.801
17.679
13.643
9.228
8.858
7.374
6.290
5.349
4.800
4.215
3.305
2.650
2.150
1.490
DISTANCE
Y
ONL
SOIL PROFILE KM 6+725 1 ION INFORMATION CONSTRUCTION
AT
SCALE 1 : 225 GE 03
ORM
IN F SKALA NO. GAMBAR JML. LEMBAR
R
FO
FT,
A3
R A 1 : 225 GE-03 131
D
APPENDIX B
BORLOG
BORING NUMBER BH-01
PAGE 1 OF 1
CLIENT : Balai Teknik Perkeretaapian Kelas 1 Jabar PROJECT NAME : Penyelidikan Tanah KA Batutulis-Ciomas
PROJECT NUMBER : PROJECT LOCATION : KM 6+625
DATE STARTED : 6/11/22 COMPLETED : 8/11/22 DRILLING METHOD : Coring, Thin Walled Shelby Tube
GROUND ELEVATION : 332.2 m COORDINATES : N = 742514 ; E = 9295128
LOGGED BY : Herman GROUND WATER LEVELS : - 6.5 m
EDITED BY : Harry Wiguna DEPTH : 30 m
CHECKED BY : Putu Sumiartha, ST., MT
SAMPLE TYPE
SPT N VALUE
DEPTH (m)
USCS
PL WC LL
MATERIAL DESCRIPTION SPT N VALUE qu
(kPa) Gs
20 40 60 80 TYPE
C C'
(kPa) (kPa)
(deg) (deg)
FINES CONTENT (%)
15 30 45 60 20 40 60 80
SPT 8
Clayey SILT, reddish brown to brown, stiff consistency
UD CU 18.4 29.8 2.69
SPT 10
5 5
SPT 6
SPT 7
GEOTECH BORLOG - GINT STD US LAB.GDT - 17/1/23 17:25 - D:\1. PROJECT\KA BOGOR\GINT\BORLOG LERENG KA BOGOR.GPJ
10
SPT 8
SPT 40
20
SPT 60
SPT 60
SPT 60
SPT 60
30 30
End of drilling at 30 m depth SPT 60
REMARKS : : Standard Penetration Test (SPT) : Undisturbed Sample (UDS) : Disturb Sample (DS)
BORING NUMBER BH-02
PAGE 1 OF 1
CLIENT : Balai Teknik Perkeretaapian Kelas 1 Jabar PROJECT NAME : Penyelidikan Tanah KA Batutulis-Ciomas
PROJECT NUMBER : PROJECT LOCATION : KM 6+675
DATE STARTED : 3/11/22 COMPLETED : 5/11/22 DRILLING METHOD : Coring, Thin Walled Shelby Tube
GROUND ELEVATION : 342 m COORDINATES : N = 742613 ; E = 9295136
LOGGED BY : Herman GROUND WATER LEVELS : - 9.6 m
EDITED BY : Harry Wiguna DEPTH : 30 m
CHECKED BY : Putu Sumiartha, ST., MT
SAMPLE TYPE
SPT N VALUE
DEPTH (m)
USCS
PL WC LL
MATERIAL DESCRIPTION SPT N VALUE qu
(kPa) Gs
20 40 60 80 TYPE
C C'
(kPa) (kPa)
(deg) (deg)
FINES CONTENT (%)
15 30 45 60 20 40 60 80
SPT 10
5
SPT 8
10
SPT 9
11
SPT 6
SPT 8
17
SPT 13
Silty CLAY, brown, stiff to very stiff cosistency
20 20
SPT 19
SPT 29
SPT 27
25
26
SPT 48
REMARKS : : Standard Penetration Test (SPT) : Undisturbed Sample (UDS) : Disturb Sample (DS)
BORING NUMBER BH-03
PAGE 1 OF 1
CLIENT : Balai Teknik Perkeretaapian Kelas 1 Jabar PROJECT NAME : Penyelidikan Tanah KA Batutulis-Ciomas
PROJECT NUMBER : PROJECT LOCATION : KM 6+725
DATE STARTED : 31/10/22 COMPLETED : 2/11/22 DRILLING METHOD : Coring, Thin Walled Shelby Tube
GROUND ELEVATION : 322.2 m COORDINATES : N = 742517 ; E = 9295078
LOGGED BY : Herman GROUND WATER LEVELS : - 16.7 m
EDITED BY : Harry Wiguna DEPTH : 30 m
CHECKED BY : Putu Sumiartha, ST., MT
SAMPLE TYPE
SPT N VALUE
DEPTH (m)
USCS
PL WC LL
MATERIAL DESCRIPTION SPT N VALUE qu
(kPa) Gs
20 40 60 80 TYPE
C C'
(kPa) (kPa)
(deg) (deg)
FINES CONTENT (%)
15 30 45 60 20 40 60 80
SPT 6
UD
CU 12.7 33.0 2.69
CLAY, brown to yellowish brown, medium stiff to stiff SPT 10
5
consistency
SPT 10
8.6
10
SPT 10
SPT 8
15 15
SPT 18
20
Clayey SILT, brown, very stiff consistency SPT 24
SPT 30
23.1
Silty CLAY, intercalated with weathered breccia, gray,
24 hard consistency
SPT 43
25
Silty CLAY, brown, hard consistency
SPT 42
26.7
SPT 53
SILT, with weathered breccia, gray, hard consistency
30 30
End of drilling at 30 m depth SPT 60
REMARKS : : Standard Penetration Test (SPT) : Undisturbed Sample (UDS) : Disturb Sample (DS)
BORING NUMBER BH-04
PAGE 1 OF 1
CLIENT : Balai Teknik Perkeretaapian Kelas 1 Jabar PROJECT NAME : Penyelidikan Tanah KA Batutulis-Ciomas
PROJECT NUMBER : PROJECT LOCATION : KM 6+675
DATE STARTED : 10/11/22 COMPLETED : 11/11/22 DRILLING METHOD : Coring, Thin Walled Shelby Tube
GROUND ELEVATION : 344.4 m COORDINATES : N = 742617 ; E = 9295085
LOGGED BY : Herman GROUND WATER LEVELS : - 4 m
EDITED BY : Harry Wiguna DEPTH : 20 m
CHECKED BY : Putu Sumiartha, ST., MT
SAMPLE TYPE
SPT N VALUE
DEPTH (m)
USCS
PL WC LL
MATERIAL DESCRIPTION SPT N VALUE qu
(kPa) Gs
20 40 60 80 TYPE
C C'
(kPa) (kPa)
(deg) (deg)
FINES CONTENT (%)
15 30 45 60 20 40 60 80
4
SPT 19
5.9
SPT 44
8
SPT 60
10
SPT 60
SPT 60
15
SPT 60
SPT 60
20 20
End of drilling at 20 m depth SPT 60
REMARKS : : Standard Penetration Test (SPT) : Undisturbed Sample (UDS) : Disturb Sample (DS)
APPENDIX C
DOKUMENTASI COREBOX
PHOTOGRAPH
Project Penyelidikan Tanah Lereng Jalur Kereta Api antara Batutulis-Ciomas Lintas Bogor-Sukabumi
Client Kemenhub DJKA Balai Teknik Perkeretaapian Kelas I Wilayah Jawa Bagian Barat
Borehole ID BH-01
Location STA 6+625 SPT Automatic Hammer (AH)
Total Depth (m) 30 Boring Method Coring
GWL (m) 6.5 Sampling Thin Walled (Shelby) Tube
Coordinate E: 700359 ; N: 9265230 Page 1
CORE SAMPLE
1
BH-01 Depth 0-5 m
2
BH-01 Depth 5-10 m
PHOTOGRAPH
Project Penyelidikan Tanah Lereng Jalur Kereta Api antara Batutulis-Ciomas Lintas Bogor-Sukabumi
Client Kemenhub DJKA Balai Teknik Perkeretaapian Kelas I Wilayah Jawa Bagian Barat
Borehole ID BH-01
Location STA 6+625 SPT Automatic Hammer (AH)
Total Depth (m) 30 Boring Method Coring
GWL (m) 6.5 Sampling Thin Walled (Shelby) Tube
Coordinate E: 700359 ; N: 9265230 Page 2
CORE SAMPLE
3
BH-01 Depth 10-15 m
4
BH-01 Depth 15-20 m
PHOTOGRAPH
Project Penyelidikan Tanah Lereng Jalur Kereta Api antara Batutulis-Ciomas Lintas Bogor-Sukabumi
Client Kemenhub DJKA Balai Teknik Perkeretaapian Kelas I Wilayah Jawa Bagian Barat
Borehole ID BH-01
Location STA 6+625 SPT Automatic Hammer (AH)
Total Depth (m) 30 Boring Method Coring
GWL (m) 6.5 Sampling Thin Walled (Shelby) Tube
Coordinate E: 700359 ; N: 9265230 Page 3
CORE SAMPLE
5
BH-01 Depth 20-25 m
6
BH-01 Depth 25-30 m
PHOTOGRAPH
Project Penyelidikan Tanah Lereng Jalur Kereta Api antara Batutulis-Ciomas Lintas Bogor-Sukabumi
Client Kemenhub DJKA Balai Teknik Perkeretaapian Kelas I Wilayah Jawa Bagian Barat
Borehole ID BH-01
Location STA 6+625 SPT Automatic Hammer (AH)
Total Depth (m) 30 Boring Method Coring
GWL (m) 6.5 Sampling Thin Walled (Shelby) Tube
Coordinate E: 700359 ; N: 9265230 Page 1
CORE SAMPLE
1
BH-01 Depth 0-5 m
2
BH-01 Depth 5-10 m
PHOTOGRAPH
Project Penyelidikan Tanah Lereng Jalur Kereta Api antara Batutulis-Ciomas Lintas Bogor-Sukabumi
Client Kemenhub DJKA Balai Teknik Perkeretaapian Kelas I Wilayah Jawa Bagian Barat
Borehole ID BH-01
Location STA 6+625 SPT Automatic Hammer (AH)
Total Depth (m) 30 Boring Method Coring
GWL (m) 6.5 Sampling Thin Walled (Shelby) Tube
Coordinate E: 700359 ; N: 9265230 Page 2
CORE SAMPLE
3
BH-01 Depth 10-15 m
4
BH-01 Depth 15-20 m
PHOTOGRAPH
Project Penyelidikan Tanah Lereng Jalur Kereta Api antara Batutulis-Ciomas Lintas Bogor-Sukabumi
Client Kemenhub DJKA Balai Teknik Perkeretaapian Kelas I Wilayah Jawa Bagian Barat
Borehole ID BH-01
Location STA 6+625 SPT Automatic Hammer (AH)
Total Depth (m) 30 Boring Method Coring
GWL (m) 6.5 Sampling Thin Walled (Shelby) Tube
Coordinate E: 700359 ; N: 9265230 Page 3
CORE SAMPLE
5
BH-01 Depth 20-25 m
6
BH-01 Depth 25-30 m
PHOTOGRAPH
Project Penyelidikan Tanah Lereng Jalur Kereta Api antara Batutulis-Ciomas Lintas Bogor-Sukabumi
Client Kemenhub DJKA Balai Teknik Perkeretaapian Kelas I Wilayah Jawa Bagian Barat
Borehole ID BH-01
Location STA 6+625 SPT Automatic Hammer (AH)
Total Depth (m) 30 Boring Method Coring
GWL (m) 6.5 Sampling Thin Walled (Shelby) Tube
Coordinate E: 700359 ; N: 9265230 Page 1
CORE SAMPLE
1
BH-01 Depth 0-5 m
2
BH-01 Depth 5-10 m
PHOTOGRAPH
Project Penyelidikan Tanah Lereng Jalur Kereta Api antara Batutulis-Ciomas Lintas Bogor-Sukabumi
Client Kemenhub DJKA Balai Teknik Perkeretaapian Kelas I Wilayah Jawa Bagian Barat
Borehole ID BH-01
Location STA 6+625 SPT Automatic Hammer (AH)
Total Depth (m) 30 Boring Method Coring
GWL (m) 6.5 Sampling Thin Walled (Shelby) Tube
Coordinate E: 700359 ; N: 9265230 Page 2
CORE SAMPLE
3
BH-01 Depth 10-15 m
4
BH-01 Depth 15-20 m
PHOTOGRAPH
Project Penyelidikan Tanah Lereng Jalur Kereta Api antara Batutulis-Ciomas Lintas Bogor-Sukabumi
Client Kemenhub DJKA Balai Teknik Perkeretaapian Kelas I Wilayah Jawa Bagian Barat
Borehole ID BH-01
Location STA 6+625 SPT Automatic Hammer (AH)
Total Depth (m) 30 Boring Method Coring
GWL (m) 6.5 Sampling Thin Walled (Shelby) Tube
Coordinate E: 700359 ; N: 9265230 Page 3
CORE SAMPLE
5
BH-01 Depth 20-25 m
6
BH-01 Depth 25-30 m
PHOTOGRAPH
Project Penyelidikan Tanah Lereng Jalur Kereta Api antara Batutulis-Ciomas Lintas Bogor-Sukabumi
Client Kemenhub DJKA Balai Teknik Perkeretaapian Kelas I Wilayah Jawa Bagian Barat
Borehole ID BH-04
Location STA 6+675 SPT Automatic Hammer (AH)
Total Depth (m) 20 Boring Method Coring
GWL (m) 4 Sampling Thin Walled (Shelby) Tube
Coordinate E: 700331 ; N: 9265173 Page 1
CORE SAMPLE
1
BH-04 Depth 0-5 m
2
BH-04 Depth 5-10 m
PHOTOGRAPH
Project Penyelidikan Tanah Lereng Jalur Kereta Api antara Batutulis-Ciomas Lintas Bogor-Sukabumi
Client Kemenhub DJKA Balai Teknik Perkeretaapian Kelas I Wilayah Jawa Bagian Barat
Borehole ID BH-04
Location STA 6+675 SPT Automatic Hammer (AH)
Total Depth (m) 20 Boring Method Coring
GWL (m) 4 Sampling Thin Walled (Shelby) Tube
Coordinate E: 700331 ; N: 9265173 Page 2
CORE SAMPLE
3
BH-04 Depth 10-15 m
4
BH-04 Depth 15-20 m
APPENDIX D
DOKUMENTASI KEGIATAN
PENGEBORAN
PHOTOGRAPH
Project Penyelidikan Tanah Lereng Jalur Kereta Api antara Batutulis-Ciomas Lintas Bogor-Sukabumi
Client Kemenhub DJKA Balai Teknik Perkeretaapian Kelas I Wilayah Jawa Bagian Barat
Borehole ID BH-01
Location STA 6+625 SPT Automatic Hammer (AH)
Total Depth (m) 30 Boring Method Coring
GWL (m) 6.5 Sampling Thin Walled (Shelby) Tube
Coordinate E: 700359 ; N: 9265230 Page 1
DRILLING ACTIVITY
1
Drilling Activity at BH-01
2
Drilling Activity at BH-01
PHOTOGRAPH
Project Penyelidikan Tanah Lereng Jalur Kereta Api antara Batutulis-Ciomas Lintas Bogor-Sukabumi
Client Kemenhub DJKA Balai Teknik Perkeretaapian Kelas I Wilayah Jawa Bagian Barat
Borehole ID BH-02
Location STA 6+675 SPT Automatic Hammer (AH)
Total Depth (m) 30 Boring Method Coring
GWL (m) 9.6 Sampling Thin Walled (Shelby) Tube
Coordinate E: 700384 ; N: 9265169 Page 1
DRILLING ACTIVITY
1
Drilling Activity at BH-02
2
Drilling Activity at BH-02
PHOTOGRAPH
Project Penyelidikan Tanah Lereng Jalur Kereta Api antara Batutulis-Ciomas Lintas Bogor-Sukabumi
Client Kemenhub DJKA Balai Teknik Perkeretaapian Kelas I Wilayah Jawa Bagian Barat
Borehole ID BH-01
Location STA 6+625 SPT Automatic Hammer (AH)
Total Depth (m) 30 Boring Method Coring
GWL (m) 6.5 Sampling Thin Walled (Shelby) Tube
Coordinate E: 700359 ; N: 9265230 Page 1
DRILLING ACTIVITY
1
Drilling Activity at BH-01
2
Drilling Activity at BH-01
PHOTOGRAPH
Project Penyelidikan Tanah Lereng Jalur Kereta Api antara Batutulis-Ciomas Lintas Bogor-Sukabumi
Client Kemenhub DJKA Balai Teknik Perkeretaapian Kelas I Wilayah Jawa Bagian Barat
Borehole ID BH-04
Location STA 6+675 SPT Automatic Hammer (AH)
Total Depth (m) 20 Boring Method Coring
GWL (m) 4 Sampling Thin Walled (Shelby) Tube
Coordinate E: 700331 ; N: 9265173 Page 1
DRILLING ACTIVITY
1
Drilling Activity at BH-04
2
APPENDIX E
HASIL UJI LABORATORIUM
Kajian Perkuatan Lereng Jalur KA Antara Batutulis-Ciomas Lintas Bogor-Sukabumi
PROJECT :
Penyelidikan Tanah
LOCATION : Bogor, Jawa Barat SUMMARY OF LABORATORY TEST RESULTS
Number USCS Determination of Water Content - Spesific Gravity Liquid & plastic Limit GRAIN SIZE Triaxial CU Triaxial
of Volumetric Unit Weight Determination ANALYSIS TEST UU
No Borehole Depth of Sample (m) SOIL
% finer by Total Stress Effective Stress Total Stress
Wn moist dry Porosity Sr LL PL PI GRAVEL SAND SILT CLAY
CLASS. Spesific Wt.
C phi C' phi' Cu Øu
Gravity Passing
no. 200
(%) (kN/m3) (kN/m3) n (%) (%) (%) (%) (%) (%) (%) (%) kN/m2 ° kN/m2 ° kN/m2 °
sieve
1 BH-01 3.0 - 3.5 MH or OH 72 15.70 9.13 0.66 99 2.69 63 40 23 3.00 2.00 26.00 69.00 94.00 35.40 15.70 18.40 29.80 - -
2 BH-01 7.0 - 7.5 MH or OH 72 15.70 9.11 0.66 99 2.70 68 49 18 0.00 2.00 50.00 48.00 98.00 - - - - 36.60 2.90
3 BH-01 11.0 - 11.5 MH or OH 94 14.30 7.36 0.72 97 2.62 84 56 28 0.00 1.00 41.00 58.00 99.00 59.90 12.50 29.80 32.20 - -
5 BH-02 3.0 - 3.5 MH or OH 64 15.90 9.71 0.64 96 2.69 64 40 24 0.00 2.00 35.00 63.00 98.00 22.80 14.20 14.80 29.70 - -
6 BH-02 7.5 - 8.0 MH or OH 59 16.20 10.18 0.62 97 2.70 99 54 45 0.00 1.00 23.00 76.00 99.00 37.40 18.70 32.70 27.90 - -
7 BH-02 13.0 - 13.5 MH or OH 76 15.30 8.68 0.68 98 2.68 67 49 17 0.00 2.00 33.00 65.00 98.00 14.20 0.80
9 BH-03 3.5 - 4.0 MH or OH 61 15.80 9.81 0.64 94 2.69 64 40 23 0.00 2.00 31.00 68.00 98.00 33.00 14.10 12.70 33.00 - -
10 BH-03 7.5 - 8.0 MH or OH 59 15.90 9.99 0.63 94 2.69 61 40 21 0.00 3.00 32.00 65.00 97.00 - - - - 57.10 2.50
11 BH-03 11.0 - 11.5 MH or OH 61 16.20 10.04 0.63 98 2.69 64 41 24 0.00 1.00 31.00 68.00 99.00 38.60 17.80 35.10 27.10 - -
13 BH-04 3.0 - 3.5 MH or OH 95 13.60 6.96 0.73 91 2.58 107 53 54 0.00 1.00 25.00 74.00 99.00 31.30 23.00 21.50 34.50 - -
SOIL MECHANICS LABORATORY Form no. (No. formulir)
Project : Penyelidikan Tanah Lereng Jalur Kereta Api antara Batutulis-Ciomas Lintas Bogor-Sukabumi
Type of sample : UDS Location : Bogor, Jawa Barat
Sample no. : BH-01 Date
Depth (m) : 3.00-3.50 Sample Accepted : 14 November 2022
Sample Tested : Desember 2022
Test Finished : 05 Desember 2022
RESUME
Water Content (%) = 71.94 Type of soil : lempung
Wet Density (t/m3) = 1.57 Color : cokelat
Dry Density (t/m3) = 0.91
Specific Gravity = 2.69
Void Ratio (e) = 1.96 Volume Udara = 0.65 %
Porosity (n) = 0.66
Saturated deg (%) = 99.02 Volume Air = 65.53 %
Volume Udara
Volume Air
Project : Penyelidikan Tanah Lereng Jalur Kereta Api antara Batutulis-Ciomas Lintas Bogor-Sukabumi
Type of sample : UDS Location : Bogor, Jawa Barat
Sample no. : BH-01 Date
Depth (m) : 7.00-7.50 Sample Accepted : 14 November 2022
Sample Tested : Desember 2022
Test Finished : 05 Desember 2022
RESUME
Water Content (%) = 72.29 Type of soil : lempung
Wet Density (t/m3) = 1.57 Color : cokelat
Dry Density (t/m3) = 0.91
Specific Gravity = 2.70
Void Ratio (e) = 1.97 Volume Udara = 0.55 %
Porosity (n) = 0.66
Saturated deg (%) = 99.17 Volume Air = 65.76 %
Volume Udara
Project : Penyelidikan Tanah Lereng Jalur Kereta Api antara Batutulis-Ciomas Lintas Bogor-Sukabumi
Type of sample : UDS Location : Bogor, Jawa Barat
Date
Sample Accepted : 14 November 2022
Sample Tested : Desember 2022
Test Finished : 05 Desember 2022
Sample No. BH-01 BH-01
Project : Penyelidikan Tanah Lereng Jalur Kereta Api antara Batutulis-Ciomas Lintas Bogor-Sukabumi
Type of sample : UDS Location : Bogor, Jawa Barat
Sample no. : BH-01 Date
Depth (m) : 11.00-11.50 Sample Accepted : 14 November 2022
Sample Tested : Desember 2022
Test Finished : 05 Desember 2022
RESUME
Water Content (%) = 94.26 Type of soil : lempung
Wet Density (t/m3) = 1.43 Color : cokelat
Dry Density (t/m3) = 0.74
Specific Gravity = 2.62
Void Ratio (e) = 2.55 Volume Udara = 2.24 %
Porosity (n) = 0.72
Saturated deg (%) = 96.88 Volume Air = 69.61 %
Volume Udara
Volume Air
Project :
Type of sample : Location :
Sample no. : Date
Depth (m) : Sample Accepted :
Sample Tested :
Test Finished :
RESUME
Water Content (%) = Type of soil :
Wet Density (t/m3) = Color :
Dry Density (t/m3) =
Specific Gravity =
Void Ratio (e) = Volume Udara = %
Porosity (n) =
Saturated deg (%) = Volume Air = %
Volume Tanah = %
Tested by Technician :
Date :
SOIL MECHANICS LABORATORY Form no. (No. formulir)
Project : Penyelidikan Tanah Lereng Jalur Kereta Api antara Batutulis-Ciomas Lintas Bogor-Sukabumi
Type of sample : UDS Location : Bogor, Jawa Barat
Date
Sample Accepted : 14 November 2022
Sample Tested : Desember 2022
Test Finished : 05 Desember 2022
Sample No. BH-01
Depth : m 11.00-11.50
Container No.
Weight of container + wet soil w1 gr 44.89 47.31
Weight of container + dry soil w2 gr 24.88 26.39
Weight of water w3 = w1 - w2 gr 20.01 20.92
Weight of container w4 gr 3.99 3.83
Weight of dry soil w5 = w2 - w4 gr 20.89 22.56
Water content ( w3 / w5 ) x 100 % % 95.79 92.73
Depth : m 11.00-11.50
Ring No. AA BB
Weight of Ring + Wet Soil w1 gr 76.21 75.67
Weight of ring w2 gr 33.62 32.61
Weight of Wet Soil w3 = w1 - w2 gr 42.59 43.06
Volume of Ring v cm3 29.91 29.79
Unit Weight g = w3/v gr/ cm3 1.42 1.45
Depth m 11.00-11.50
Picnometer No. - 8+12
Temperature o 25
- C
Weight of picno + sample w1 gr 66.79
Weight of picnometer w2 gr 49.18
Weight of sample w3 = w1 - w2 gr 17.61
Weight of picnometer + water w4 gr 150.57
Weight of pic + sample + water w5 gr 161.47
Volume of Sample v = [w4-(w5-w3)] / gw cm3 6.71
Project : Penyelidikan Tanah Lereng Jalur Kereta Api antara Batutulis-Ciomas Lintas Bogor-Sukabumi
Type of sample : UDS Location : Bogor, Jawa Barat
Sample no. : BH-02 Date
Depth (m) : 3.00-3.50 Sample Accepted : 14 November 2022
Sample Tested : Desember 2022
Test Finished : 05 Desember 2022
RESUME
Water Content (%) = 63.69 Type of soil : lempung
Wet Density (t/m3) = 1.59 Color : cokelat
Dry Density (t/m3) = 0.97
Specific Gravity = 2.69
Void Ratio (e) = 1.78 Volume Udara = 2.31 %
Porosity (n) = 0.64
Saturated deg (%) = 96.39 Volume Air = 61.71 %
Volume Udara
Volume Air
Project : Penyelidikan Tanah Lereng Jalur Kereta Api antara Batutulis-Ciomas Lintas Bogor-Sukabumi
Type of sample : UDS Location : Bogor, Jawa Barat
Sample no. : BH-02 Date
Depth (m) : 7.50-8.00 Sample Accepted : 14 November 2022
Sample Tested : Desember 2022
Test Finished : 05 Desember 2022
RESUME
Water Content (%) = 59.21 Type of soil : lempung
Wet Density (t/m3) = 1.62 Color : cokelat
Dry Density (t/m3) = 1.02
Specific Gravity = 2.70
Void Ratio (e) = 1.65 Volume Udara = 1.88 %
Porosity (n) = 0.62
Saturated deg (%) = 96.97 Volume Air = 60.32 %
Volume Udara
Project : Penyelidikan Tanah Lereng Jalur Kereta Api antara Batutulis-Ciomas Lintas Bogor-Sukabumi
Type of sample : UDS Location : Bogor, Jawa Barat
Date
Sample Accepted : 14 November 2022
Sample Tested : Desember 2022
Test Finished : 05 Desember 2022
Sample No. BH-02 BH-02
Project : Penyelidikan Tanah Lereng Jalur Kereta Api antara Batutulis-Ciomas Lintas Bogor-Sukabumi
Type of sample : UDS Location : Bogor, Jawa Barat
Sample no. : BH-02 Date
Depth (m) : 13.00-13.50 Sample Accepted : 14 November 2022
Sample Tested : Desember 2022
Test Finished : 05 Desember 2022
RESUME
Water Content (%) = 76.21 Type of soil : lempung
Wet Density (t/m3) = 1.53 Color : cokelat
Dry Density (t/m3) = 0.87
Specific Gravity = 2.68
Void Ratio (e) = 2.09 Volume Udara = 1.65 %
Porosity (n) = 0.68
Saturated deg (%) = 97.56 Volume Air = 66.03 %
Volume Udara
Volume Air
Project :
Type of sample : Location :
Sample no. : Date
Depth (m) : Sample Accepted :
Sample Tested :
Test Finished :
RESUME
Water Content (%) = Type of soil :
Wet Density (t/m3) = Color :
Dry Density (t/m3) =
Specific Gravity =
Void Ratio (e) = Volume Udara = %
Porosity (n) =
Saturated deg (%) = Volume Air = %
Volume Tanah = %
Tested by Technician :
Date :
SOIL MECHANICS LABORATORY Form no. (No. formulir)
Project : Penyelidikan Tanah Lereng Jalur Kereta Api antara Batutulis-Ciomas Lintas Bogor-Sukabumi
Type of sample : UDS Location : Bogor, Jawa Barat
Date
Sample Accepted : 14 November 2022
Sample Tested : Desember 2022
Test Finished : 05 Desember 2022
Sample No. BH-02
Depth : m 13.00-13.50
Container No.
Weight of container + wet soil w1 gr 50.25 49.63
Weight of container + dry soil w2 gr 30.32 29.79
Weight of water w3 = w1 - w2 gr 19.93 19.84
Weight of container w4 gr 3.95 3.97
Weight of dry soil w5 = w2 - w4 gr 26.37 25.82
Water content ( w3 / w5 ) x 100 % % 75.58 76.84
Depth : m 13.00-13.50
Ring No. AA BB
Weight of Ring + Wet Soil w1 gr 79.50 77.87
Weight of ring w2 gr 33.62 32.61
Weight of Wet Soil w3 = w1 - w2 gr 45.88 45.26
Volume of Ring v cm3 29.91 29.79
Unit Weight g = w3/v gr/ cm3 1.53 1.52
Depth m 13.00-13.50
Picnometer No. - 27
Temperature o 25
- C
Weight of picno + sample w1 gr 63.09
Weight of picnometer w2 gr 50.60
Weight of sample w3 = w1 - w2 gr 12.49
Weight of picnometer + water w4 gr 150.38
Weight of pic + sample + water w5 gr 158.21
Volume of Sample v = [w4-(w5-w3)] / gw cm3 4.66
Project : Penyelidikan Tanah Lereng Jalur Kereta Api antara Batutulis-Ciomas Lintas Bogor-Sukabumi
Type of sample : UDS Location : Bogor, Jawa Barat
Sample no. : BH-03 Date
Depth (m) : 3.50-4.00 Sample Accepted : 14 November 2022
Sample Tested : Desember 2022
Test Finished : 05 Desember 2022
RESUME
Water Content (%) = 60.99 Type of soil : lempung
Wet Density (t/m3) = 1.58 Color : cokelat
Dry Density (t/m3) = 0.98
Specific Gravity = 2.69
Void Ratio (e) = 1.75 Volume Udara = 3.86 %
Porosity (n) = 0.64
Saturated deg (%) = 93.93 Volume Air = 59.72 %
Volume Udara
Volume Air
Project : Penyelidikan Tanah Lereng Jalur Kereta Api antara Batutulis-Ciomas Lintas Bogor-Sukabumi
Type of sample : UDS Location : Bogor, Jawa Barat
Sample no. : BH-03 Date
Depth (m) : 7.50-8.00 Sample Accepted : 14 November 2022
Sample Tested : Desember 2022
Test Finished : 05 Desember 2022
RESUME
Water Content (%) = 59.18 Type of soil : lempung
Wet Density (t/m3) = 1.59 Color : cokelat
Dry Density (t/m3) = 1.00
Specific Gravity = 2.69
Void Ratio (e) = 1.69 Volume Udara = 3.64 %
Porosity (n) = 0.63
Saturated deg (%) = 94.20 Volume Air = 59.14 %
Volume Udara
Project : Penyelidikan Tanah Lereng Jalur Kereta Api antara Batutulis-Ciomas Lintas Bogor-Sukabumi
Type of sample : UDS Location : Bogor, Jawa Barat
Date
Sample Accepted : 14 November 2022
Sample Tested : Desember 2022
Test Finished : 05 Desember 2022
Sample No. BH-03 BH-03
Project : Penyelidikan Tanah Lereng Jalur Kereta Api antara Batutulis-Ciomas Lintas Bogor-Sukabumi
Type of sample : UDS Location : Bogor, Jawa Barat
Sample no. : BH-03 Date
Depth (m) : 11.00-11.50 Sample Accepted : 14 November 2022
Sample Tested : Desember 2022
Test Finished : 05 Desember 2022
RESUME
Water Content (%) = 61.28 Type of soil : lempung
Wet Density (t/m3) = 1.62 Color : cokelat
Dry Density (t/m3) = 1.00
Specific Gravity = 2.69
Void Ratio (e) = 1.68 Volume Udara = 1.20 %
Porosity (n) = 0.63
Saturated deg (%) = 98.09 Volume Air = 61.46 %
Volume Udara
Volume Air
Project :
Type of sample : Location :
Sample no. : Date
Depth (m) : Sample Accepted :
Sample Tested :
Test Finished :
RESUME
Water Content (%) = Type of soil :
Wet Density (t/m3) = Color :
Dry Density (t/m3) =
Specific Gravity =
Void Ratio (e) = Volume Udara = %
Porosity (n) =
Saturated deg (%) = Volume Air = %
Volume Tanah = %
Tested by Technician :
Date :
SOIL MECHANICS LABORATORY Form no. (No. formulir)
Project : Penyelidikan Tanah Lereng Jalur Kereta Api antara Batutulis-Ciomas Lintas Bogor-Sukabumi
Type of sample : UDS Location : Bogor, Jawa Barat
Date
Sample Accepted : 14 November 2022
Sample Tested : Desember 2022
Test Finished : 05 Desember 2022
Sample No. BH-03
Depth : m 11.00-11.50
Container No.
Weight of container + wet soil w1 gr 54.53 53.57
Weight of container + dry soil w2 gr 36.03 35.06
Weight of water w3 = w1 - w2 gr 18.50 18.51
Weight of container w4 gr 5.51 5.18
Weight of dry soil w5 = w2 - w4 gr 30.52 29.88
Water content ( w3 / w5 ) x 100 % % 60.62 61.95
Depth : m 11.00-11.50
Ring No. AA BB
Weight of Ring + Wet Soil w1 gr 82.22 80.57
Weight of ring w2 gr 33.62 32.61
Weight of Wet Soil w3 = w1 - w2 gr 48.60 47.96
Volume of Ring v cm3 29.91 29.79
Unit Weight g = w3/v gr/ cm3 1.62 1.61
Depth m 11.00-11.50
Picnometer No. - 207
Temperature o 25
- C
Weight of picno + sample w1 gr 72.72
Weight of picnometer w2 gr 56.42
Weight of sample w3 = w1 - w2 gr 16.30
Weight of picnometer + water w4 gr 154.87
Weight of pic + sample + water w5 gr 165.10
Volume of Sample v = [w4-(w5-w3)] / gw cm3 6.07
Project : Penyelidikan Tanah Lereng Jalur Kereta Api antara Batutulis-Ciomas Lintas Bogor-Sukabumi
Type of sample : UDS Location : Bogor, Jawa Barat
Sample no. : BH-04 Date
Depth (m) : 3.00-3.50 Sample Accepted : 14 November 2022
Sample Tested : Desember 2022
Test Finished : 05 Desember 2022
RESUME
Water Content (%) = 95.38 Type of soil : lempung
Wet Density (t/m3) = 1.36 Color : cokelat
Dry Density (t/m3) = 0.70
Specific Gravity = 2.58
Void Ratio (e) = 2.69 Volume Udara = 6.33 %
Porosity (n) = 0.73
Saturated deg (%) = 91.32 Volume Air = 66.59 %
Volume Udara
Volume Air
Project :
Type of sample : Location :
Sample no. : Date
Depth (m) : Sample Accepted :
Sample Tested :
Test Finished :
RESUME
Water Content (%) = Type of soil :
Wet Density (t/m3) = Color :
Dry Density (t/m3) =
Specific Gravity =
Void Ratio (e) = Volume Udara = %
Porosity (n) =
Saturated deg (%) = Volume Air = %
Volume Tanah = %
Tested by Technician :
Date :
SOIL MECHANICS LABORATORY Form no. (No. formulir)
Project : Penyelidikan Tanah Lereng Jalur Kereta Api antara Batutulis-Ciomas Lintas Bogor-Sukabumi
Type of sample : UDS Location : Bogor, Jawa Barat
Date
Sample Accepted : 14 November 2022
Sample Tested : Desember 2022
Test Finished : 05 Desember 2022
Sample No. BH-04
Depth : m 3.00-3.50
Container No.
Weight of container + wet soil w1 gr 46.93 45.92
Weight of container + dry soil w2 gr 26.56 26.17
Weight of water w3 = w1 - w2 gr 20.37 19.75
Weight of container w4 gr 5.30 5.37
Weight of dry soil w5 = w2 - w4 gr 21.26 20.80
Water content ( w3 / w5 ) x 100 % % 95.81 94.95
Depth : m 3.00-3.50
Ring No. AA BB
Weight of Ring + Wet Soil w1 gr 74.82 72.85
Weight of ring w2 gr 33.62 32.61
Weight of Wet Soil w3 = w1 - w2 gr 41.20 40.24
Volume of Ring v cm3 29.91 29.79
Unit Weight g = w3/v gr/ cm3 1.38 1.35
Depth m 3.00-3.50
Picnometer No. - 238
Temperature o 25
- C
Weight of picno + sample w1 gr 68.19
Weight of picnometer w2 gr 52.23
Weight of sample w3 = w1 - w2 gr 15.96
Weight of picnometer + water w4 gr 149.85
Weight of pic + sample + water w5 gr 159.62
Volume of Sample v = [w4-(w5-w3)] / gw cm3 6.19
Jenis Test Liquid Limit (Batas Cair) Plastic Limit (Batas plastis)
Test Number
(no uji)
Container Number
(no.cawan)
Number of blows
13 18 23 30 - -
(Jumlah ketukan)
Weight of container + wet soil =W 1 (gr)
40.09 43.28 35.22 44.81 11.78 12.17
(Berat cawan + tanah basah)
LIQUID LIMIT = wL
75
RESUME
WATER CONTENT = w (%)
UNIFIED CLASSIFICATION
Liquid Limit %
0 10 20 30 40 50 60 70 80 90 100
60
40
30
``
SILT OF HIGH PLASTICITY OR ORGANIC SILT
20
CL OR OL MH OR OH
10
CL-ML ML OR OL
0
Jenis Test Liquid Limit (Batas Cair) Plastic Limit (Batas plastis)
Test Number
(no uji)
Container Number
(no.cawan)
Number of blows
14 20 26 32 - -
(Jumlah ketukan)
Weight of container + wet soil =W 1 (gr)
38.64 34.82 36.49 40.07 12.03 12.80
(Berat cawan + tanah basah)
LIQUID LIMIT = wL
80
RESUME
WATER CONTENT = w (%)
UNIFIED CLASSIFICATION
Liquid Limit %
0 10 20 30 40 50 60 70 80 90 100
60
40
30
``
SILT OF HIGH PLASTICITY OR ORGANIC SILT
20
CL OR OL MH OR OH
10
CL-ML ML OR OL
0
Jenis Test Liquid Limit (Batas Cair) Plastic Limit (Batas plastis)
Test Number
(no uji)
Container Number
(no.cawan)
Number of blows
15 20 25 32 - -
(Jumlah ketukan)
Weight of container + wet soil =W 1 (gr)
39.50 39.52 39.13 36.43 11.72 12.47
(Berat cawan + tanah basah)
LIQUID LIMIT = wL
95
RESUME
WATER CONTENT = w (%)
UNIFIED CLASSIFICATION
Liquid Limit %
0 10 20 30 40 50 60 70 80 90 100
60
40
30
``
SILT OF HIGH PLASTICITY OR ORGANIC SILT
20
CL OR OL MH OR OH
10
CL-ML ML OR OL
0
Jenis Test Liquid Limit (Batas Cair) Plastic Limit (Batas plastis)
Test Number
(no uji)
Container Number
(no.cawan)
Number of blows
15 20 27 35 - -
(Jumlah ketukan)
Weight of container + wet soil =W 1 (gr)
39.88 37.95 34.88 36.84 12.24 13.07
(Berat cawan + tanah basah)
LIQUID LIMIT = wL
75
RESUME
WATER CONTENT = w (%)
65 64.08
Plastic Limit (Batas plastis) = wP 40.49
UNIFIED CLASSIFICATION
Liquid Limit %
0 10 20 30 40 50 60 70 80 90 100
60
40
20
CL OR OL MH OR OH
10
CL-ML ML OR OL
0
Jenis Test Liquid Limit (Batas Cair) Plastic Limit (Batas plastis)
Test Number
(no uji)
Container Number
(no.cawan)
Number of blows
15 20 25 31 - -
(Jumlah ketukan)
Weight of container + wet soil =W 1 (gr)
37.15 36.61 37.94 38.55 12.28 12.22
(Berat cawan + tanah basah)
LIQUID LIMIT = wL
110
RESUME
WATER CONTENT = w (%)
UNIFIED CLASSIFICATION
Liquid Limit %
0 10 20 30 40 50 60 70 80 90 100
60
40
20
CL OR OL MH OR OH
10
CL-ML ML OR OL
0
Jenis Test Liquid Limit (Batas Cair) Plastic Limit (Batas plastis)
Test Number
(no uji)
Container Number
(no.cawan)
Number of blows
13 18 24 30 - -
(Jumlah ketukan)
Weight of container + wet soil =W 1 (gr)
36.88 36.62 36.66 37.20 12.13 12.53
(Berat cawan + tanah basah)
LIQUID LIMIT = wL
75
RESUME
WATER CONTENT = w (%)
66.85
Plastic Limit (Batas plastis) = wP 49.39
65
Plasticity Index (Indeks Plastis)
17.46
IP = wL -wP
60 Soil Type (Cassagrande)
10 100 MH or OH
NUMBER OF BLOWS
(Klasifiksasi Tanah)
UNIFIED CLASSIFICATION
Liquid Limit %
0 10 20 30 40 50 60 70 80 90 100
60
40
20
CL OR OL MH OR OH
10
CL-ML ML OR OL
0
Jenis Test Liquid Limit (Batas Cair) Plastic Limit (Batas plastis)
Test Number
(no uji)
Container Number
(no.cawan)
Number of blows
13 19 25 32 - -
(Jumlah ketukan)
Weight of container + wet soil =W 1 (gr)
43.99 37.86 36.76 36.50 11.89 12.00
(Berat cawan + tanah basah)
LIQUID LIMIT = wL
75
RESUME
WATER CONTENT = w (%)
UNIFIED CLASSIFICATION
Liquid Limit %
0 10 20 30 40 50 60 70 80 90 100
60
40
20
CL OR OL MH OR OH
10
CL-ML ML OR OL
0
Jenis Test Liquid Limit (Batas Cair) Plastic Limit (Batas plastis)
Test Number
(no uji)
Container Number
(no.cawan)
Number of blows
13 19 25 33 - -
(Jumlah ketukan)
Weight of container + wet soil =W 1 (gr)
40.23 40.22 38.78 39.36 11.97 12.33
(Berat cawan + tanah basah)
LIQUID LIMIT = wL
70
RESUME
WATER CONTENT = w (%)
UNIFIED CLASSIFICATION
Liquid Limit %
0 10 20 30 40 50 60 70 80 90 100
60
40
20
CL OR OL MH OR OH
10
CL-ML ML OR OL
0
Jenis Test Liquid Limit (Batas Cair) Plastic Limit (Batas plastis)
Test Number
(no uji)
Container Number
(no.cawan)
Number of blows
15 20 26 33 - -
(Jumlah ketukan)
Weight of container + wet soil =W 1 (gr)
33.70 39.89 31.58 33.36 12.87 13.06
(Berat cawan + tanah basah)
LIQUID LIMIT = wL
75
RESUME
WATER CONTENT = w (%)
65
64.40
Plastic Limit (Batas plastis) = wP 40.80
UNIFIED CLASSIFICATION
Liquid Limit %
0 10 20 30 40 50 60 70 80 90 100
60
40
20
CL OR OL MH OR OH
10
CL-ML ML OR OL
0
Jenis Test Liquid Limit (Batas Cair) Plastic Limit (Batas plastis)
Test Number
(no uji)
Container Number
(no.cawan)
Number of blows
14 19 25 33 - -
(Jumlah ketukan)
Weight of container + wet soil =W 1 (gr)
40.85 39.55 36.80 37.61 12.84 12.68
(Berat cawan + tanah basah)
LIQUID LIMIT = wL
125
RESUME
120
WATER CONTENT = w (%)
UNIFIED CLASSIFICATION
Liquid Limit %
0 10 20 30 40 50 60 70 80 90 100
60
40
20
CL OR OL MH OR OH
10
CL-ML ML OR OL
0
Project : Penyelidikan Tanah Lereng Jalur Kereta Api antara Batutulis-Ciomas Lintas Bogor-Sukabumi
Type of sample : UDS Location : Bogor, Jawa Barat
Sample no : BH-01
Depth (m) : 3.00-3.50 Date
Weight of soil : 200 gr Sample Accepted : 14 November 2022
Water Content : 0 % Sample Tested : Desember 2022
Test Finished : 06 Desember 2022
Project : Penyelidikan Tanah Lereng Jalur Kereta Api antara Batutulis-Ciomas Lintas Bogor-Sukabumi
Type of sample : UDS Location : Bogor, Jawa Barat
Sample no. : BH-01
Depth (m) : 3.00-3.50 Result
Gravel (Batu) (%) : 3.22 D10 :
Sand (Pasir) (%) : 2.44 D30 :
Silt (Lanau) (%) : 25.60 D60 : 0.0028
Clay (Lempung) (%) : 68.75 Cu : #DIV/0!
Cz : #DIV/0!
90
80
70
Percent passing (Persen lolos) (%)
60
50
40
30
20
10
0
0.001 0.010 0.100 1.000 10.000 100.000
Diameter of grains (Diameter butir) (mm)
`
SAND
CLAY SILT GRAVEL
FINE MEDIUM COARSE
Project : Penyelidikan Tanah Lereng Jalur Kereta Api antara Batutulis-Ciomas Lintas Bogor-Sukabumi
Type of sample : UDS Location : Bogor, Jawa Barat
Sample no : BH-01
Depth (m) : 7.00-7.50 Date
Weight of soil : 200 gr Sample Accepted : 14 November 2022
Water Content : 0 % Sample Tested : Desember 2022
Test Finished : 06 Desember 2022
Project : Penyelidikan Tanah Lereng Jalur Kereta Api antara Batutulis-Ciomas Lintas Bogor-Sukabumi
Type of sample : UDS Location : Bogor, Jawa Barat
Sample no. : BH-01
Depth (m) : 7.00-7.50 Result
Gravel (Batu) (%) : 0.03 D10 :
Sand (Pasir) (%) : 1.52 D30 :
Silt (Lanau) (%) : 50.01 D60 : 0.0091
Clay (Lempung) (%) : 48.45 Cu : #DIV/0!
Cz : #DIV/0!
90
80
70
Percent passing (Persen lolos) (%)
60
50
40
30
20
10
0
0.001 0.010 0.100 1.000 10.000 100.000
Diameter of grains (Diameter butir) (mm)
`
SAND
CLAY SILT GRAVEL
FINE MEDIUM COARSE
Project : Penyelidikan Tanah Lereng Jalur Kereta Api antara Batutulis-Ciomas Lintas Bogor-Sukabumi
Type of sample : UDS Location : Bogor, Jawa Barat
Sample no : BH-01
Depth (m) : 11.00-11.50 Date
Weight of soil : 200 gr Sample Accepted : 14 November 2022
Water Content : 0 % Sample Tested : Desember 2022
Test Finished : 06 Desember 2022
Project : Penyelidikan Tanah Lereng Jalur Kereta Api antara Batutulis-Ciomas Lintas Bogor-Sukabumi
Type of sample : UDS Location : Bogor, Jawa Barat
Sample no. : BH-01
Depth (m) : 11.00-11.50 Result
Gravel (Batu) (%) : 0.01 D10 :
Sand (Pasir) (%) : 0.73 D30 :
Silt (Lanau) (%) : 41.29 D60 : 0.0058
Clay (Lempung) (%) : 57.98 Cu : #DIV/0!
Cz : #DIV/0!
90
80
70
Percent passing (Persen lolos) (%)
60
50
40
30
20
10
0
0.001 0.010 0.100 1.000 10.000 100.000
Diameter of grains (Diameter butir) (mm)
`
SAND
CLAY SILT GRAVEL
FINE MEDIUM COARSE
Project : Penyelidikan Tanah Lereng Jalur Kereta Api antara Batutulis-Ciomas Lintas Bogor-Sukabumi
Type of sample : UDS Location : Bogor, Jawa Barat
Sample no : BH-02
Depth (m) : 3.00-3.50 Date
Weight of soil : 200 gr Sample Accepted : 14 November 2022
Water Content : 0 % Sample Tested : Desember 2022
Test Finished : 06 Desember 2022
Project : Penyelidikan Tanah Lereng Jalur Kereta Api antara Batutulis-Ciomas Lintas Bogor-Sukabumi
Type of sample : UDS Location : Bogor, Jawa Barat
Sample no. : BH-02
Depth (m) : 3.00-3.50 Result
Gravel (Batu) (%) : 0.02 D10 :
Sand (Pasir) (%) : 2.38 D30 :
Silt (Lanau) (%) : 34.70 D60 : 0.0042
Clay (Lempung) (%) : 62.90 Cu : #DIV/0!
Cz : #DIV/0!
90
80
70
Percent passing (Persen lolos) (%)
60
50
40
30
20
10
0
0.001 0.010 0.100 1.000 10.000 100.000
Diameter of grains (Diameter butir) (mm)
`
SAND
CLAY SILT GRAVEL
FINE MEDIUM COARSE
Project : Penyelidikan Tanah Lereng Jalur Kereta Api antara Batutulis-Ciomas Lintas Bogor-Sukabumi
Type of sample : UDS Location : Bogor, Jawa Barat
Sample no : BH-02
Depth (m) : 7.50-8.00 Date
Weight of soil : 200 gr Sample Accepted : 14 November 2022
Water Content : 0 % Sample Tested : Desember 2022
Test Finished : 06 Desember 2022
Project : Penyelidikan Tanah Lereng Jalur Kereta Api antara Batutulis-Ciomas Lintas Bogor-Sukabumi
Type of sample : UDS Location : Bogor, Jawa Barat
Sample no. : BH-02
Depth (m) : 7.50-8.00 Result
Gravel (Batu) (%) : 0.00 D10 :
Sand (Pasir) (%) : 1.07 D30 :
Silt (Lanau) (%) : 22.63 D60 :
Clay (Lempung) (%) : 76.30 Cu : #DIV/0!
Cz : #DIV/0!
90
80
70
Percent passing (Persen lolos) (%)
60
50
40
30
20
10
0
0.001 0.010 0.100 1.000 10.000 100.000
Diameter of grains (Diameter butir) (mm)
`
SAND
CLAY SILT GRAVEL
FINE MEDIUM COARSE
Project : Penyelidikan Tanah Lereng Jalur Kereta Api antara Batutulis-Ciomas Lintas Bogor-Sukabumi
Type of sample : UDS Location : Bogor, Jawa Barat
Sample no : BH-02
Depth (m) : 7.50-8.00 Date
Weight of soil : 200 gr Sample Accepted : 14 November 2022
Water Content : 0 % Sample Tested : Desember 2022
Test Finished : 06 Desember 2022
Project : Penyelidikan Tanah Lereng Jalur Kereta Api antara Batutulis-Ciomas Lintas Bogor-Sukabumi
Type of sample : UDS Location : Bogor, Jawa Barat
Sample no. : BH-02
Depth (m) : 7.50-8.00 Result
Gravel (Batu) (%) : 0.01 D10 :
Sand (Pasir) (%) : 1.53 D30 :
Silt (Lanau) (%) : 33.46 D60 : 0.0036
Clay (Lempung) (%) : 65.00 Cu : #DIV/0!
Cz : #DIV/0!
90
80
70
Percent passing (Persen lolos) (%)
60
50
40
30
20
10
0
0.001 0.010 0.100 1.000 10.000 100.000
Diameter of grains (Diameter butir) (mm)
`
SAND
CLAY SILT GRAVEL
FINE MEDIUM COARSE
Project : Penyelidikan Tanah Lereng Jalur Kereta Api antara Batutulis-Ciomas Lintas Bogor-Sukabumi
Type of sample : UDS Location : Bogor, Jawa Barat
Sample no : BH-03
Depth (m) : 3.50-4.00 Date
Weight of soil : 200 gr Sample Accepted : 14 November 2022
Water Content : 0 % Sample Tested : Desember 2022
Test Finished : 06 Desember 2022
Project : Penyelidikan Tanah Lereng Jalur Kereta Api antara Batutulis-Ciomas Lintas Bogor-Sukabumi
Type of sample : UDS Location : Bogor, Jawa Barat
Sample no. : BH-03
Depth (m) : 3.50-4.00 Result
Gravel (Batu) (%) : 0.02 D10 :
Sand (Pasir) (%) : 1.73 D30 :
Silt (Lanau) (%) : 30.68 D60 : 0.0022
Clay (Lempung) (%) : 67.57 Cu : #DIV/0!
Cz : #DIV/0!
90
80
70
Percent passing (Persen lolos) (%)
60
50
40
30
20
10
0
0.001 0.010 0.100 1.000 10.000 100.000
Diameter of grains (Diameter butir) (mm)
`
SAND
CLAY SILT GRAVEL
FINE MEDIUM COARSE
Project : Penyelidikan Tanah Lereng Jalur Kereta Api antara Batutulis-Ciomas Lintas Bogor-Sukabumi
Type of sample : UDS Location : Bogor, Jawa Barat
Sample no : BH-03
Depth (m) : 7.50-8.00 Date
Weight of soil : 200 gr Sample Accepted : 14 November 2022
Water Content : 0 % Sample Tested : Desember 2022
Test Finished : 06 Desember 2022
Project : Penyelidikan Tanah Lereng Jalur Kereta Api antara Batutulis-Ciomas Lintas Bogor-Sukabumi
Type of sample : UDS Location : Bogor, Jawa Barat
Sample no. : BH-03
Depth (m) : 7.50-8.00 Result
Gravel (Batu) (%) : 0.00 D10 :
Sand (Pasir) (%) : 3.18 D30 :
Silt (Lanau) (%) : 32.32 D60 : 0.0038
Clay (Lempung) (%) : 64.50 Cu : #DIV/0!
Cz : #DIV/0!
90
80
70
Percent passing (Persen lolos) (%)
60
50
40
30
20
10
0
0.001 0.010 0.100 1.000 10.000 100.000
Diameter of grains (Diameter butir) (mm)
`
SAND
CLAY SILT GRAVEL
FINE MEDIUM COARSE
Project : Penyelidikan Tanah Lereng Jalur Kereta Api antara Batutulis-Ciomas Lintas Bogor-Sukabumi
Type of sample : UDS Location : Bogor, Jawa Barat
Sample no : BH-03
Depth (m) : 11.00-11.50 Date
Weight of soil : 200 gr Sample Accepted : 14 November 2022
Water Content : 0 % Sample Tested : Desember 2022
Test Finished : 06 Desember 2022
Project : Penyelidikan Tanah Lereng Jalur Kereta Api antara Batutulis-Ciomas Lintas Bogor-Sukabumi
Type of sample : UDS Location : Bogor, Jawa Barat
Sample no. : BH-03
Depth (m) : 11.00-11.50 Result
Gravel (Batu) (%) : 0.00 D10 :
Sand (Pasir) (%) : 0.92 D30 :
Silt (Lanau) (%) : 31.09 D60 : 0.0021
Clay (Lempung) (%) : 68.00 Cu : #DIV/0!
Cz : #DIV/0!
90
80
70
Percent passing (Persen lolos) (%)
60
50
40
30
20
10
0
0.001 0.010 0.100 1.000 10.000 100.000
Diameter of grains (Diameter butir) (mm)
`
SAND
CLAY SILT GRAVEL
FINE MEDIUM COARSE
Project : Penyelidikan Tanah Lereng Jalur Kereta Api antara Batutulis-Ciomas Lintas Bogor-Sukabumi
Type of sample : UDS Location : Bogor, Jawa Barat
Sample no : BH-04
Depth (m) : 3.00-3.50 Date
Weight of soil : 200 gr Sample Accepted : 14 November 2022
Water Content : 0 % Sample Tested : Desember 2022
Test Finished : 06 Desember 2022
Project : Penyelidikan Tanah Lereng Jalur Kereta Api antara Batutulis-Ciomas Lintas Bogor-Sukabumi
Type of sample : UDS Location : Bogor, Jawa Barat
Sample no. : BH-04
Depth (m) : 3.00-3.50 Result
Gravel (Batu) (%) : 0.01 D10 :
Sand (Pasir) (%) : 0.74 D30 :
Silt (Lanau) (%) : 25.25 D60 :
Clay (Lempung) (%) : 74.00 Cu : #DIV/0!
Cz : #DIV/0!
90
80
70
Percent passing (Persen lolos) (%)
60
50
40
30
20
10
0
0.001 0.010 0.100 1.000 10.000 100.000
Diameter of grains (Diameter butir) (mm)
`
SAND
CLAY SILT GRAVEL
FINE MEDIUM COARSE
2
Shear Stress kg/cm2
0
0 1 2 3 4 5 6
Principal Stress kg/cm2
Effective Stress
2
Shear Stress kg/cm2
0
0 1 2 3 4 5 6
Principal Stress kg/cm2
2
Shear Stress kg/cm2
0
0 1 2 3 4 5 6
Principal Stress kg/cm2
Effective Stress
2
Shear Stress kg/cm2
0
0 1 2 3 4 5 6
Principal Stress kg/cm2
2
Shear Stress kg/cm2
0
0 1 2 3 4 5 6
Principal Stress kg/cm2
Effective Stress
2
Shear Stress kg/cm2
0
0 1 2 3 4 5 6
Principal Stress kg/cm2
2
Shear Stress kg/cm2
0
0 1 2 3 4 5 6
Principal Stress kg/cm2
Effective Stress
2
Shear Stress kg/cm2
0
0 1 2 3 4 5 6
Principal Stress kg/cm2
2
Shear Stress kg/cm2
0
0 1 2 3 4 5 6
Principal Stress kg/cm2
Effective Stress
2
Shear Stress kg/cm2
0
0 1 2 3 4 5 6
Principal Stress kg/cm2
2
Shear Stress kg/cm2
0
0 1 2 3 4 5 6
Principal Stress kg/cm2
Effective Stress
2
Shear Stress kg/cm2
0
0 1 2 3 4 5 6
Principal Stress kg/cm2
2
Shear Stress kg/cm2
0
0 1 2 3 4 5 6
Principal Stress kg/cm2
Effective Stress
2
Shear Stress kg/cm2
0
0 1 2 3 4 5 6
Principal Stress kg/cm2
(s1 + s3)
s3 s1'- s3' s3' u s1' s1
2
0.50 0.827 0.50 0.00 1.327 1.33 0.914
1.00 0.885 1.00 0.00 1.885 1.89 1.443
1.50 0.929 1.50 0.00 2.429 2.43 1.965
2
Shear Stress kg/cm2
0
0 1 2 3 4
Principal Stress kg/cm2
(s1 + s3)
s3 s1'- s3' s3' u s1' s1
2
0.50 0.303 0.50 0.00 0.803 0.80 0.652
1.00 0.318 1.00 0.00 1.318 1.32 1.159
1.50 0.333 1.50 0.00 1.833 1.83 1.667
2
Shear Stress kg/cm2
0
0 1 2 3 4
Principal Stress kg/cm2
(s1 + s3)
s3 s1'- s3' s3' u s1' s1
2
0.50 1.239 0.50 0.00 1.739 1.74 1.120
1.00 1.282 1.00 0.00 2.282 2.28 1.641
1.50 1.331 1.50 0.00 2.831 2.83 2.166
2
Shear Stress kg/cm2
0
0 1 2 3 4
Principal Stress kg/cm2
1. Lintasan BGRB-01
2. Lintasan BGRB-02
3. Lintasan BGRB-03
4. Lintasan BGRB-08
5. Lintasan BGRB-09
6. Lintasan BGRB-10
7. Lintasan BGRB-11
8. Lintasan BGRB-16
9. Lintasan BGRB 17
B. Data GPR Bogor KM.6+675