2
Preparation Risk Evaluation Record Keeping
Hazard
Identificat
ion
Risk
Risk
Evaluati
Control
on
HAZARD IDENTIFICATION
proses untuk mengenali bahaya potensial yang ada dan
menentukan karakteristiknya
Identifikasi potensi bahaya terkait
aktivitas kerja;
Electrical and
Method of Manual material
mechanical
work; handling;
hazards;
Machinery or
Temporary
Chemical plant
structure
hazards; (unguarded
(scaffolds)
machine);
Layout and
Environmental
location
Conditions;
equipment etc
HAZARD IDENTIFICATION TECHNIQUE
• Incident Data
Increasing Level of Effort Required
• Checklist Analysis
• Brainstorming
• Job Safety Analysis
• What if
• Guideword Analysis
• Hazard and Operability Study
• Failure Mode and Effect Analysis (FMEA)
• Task Analysis
• Event Tree
• Fault Tree
• etc
Tipe “Hazard”
Physical Chemical
Biological Ergonomic
Physical Chemical
Physical Hazard
Biological Ergonomic
Noise/Kebisingan
Vibration/getaran
Chemical Hazard
Biological Ergonomic
Type of chemicals:
Route:
Explosives
Flammable
liquids
Inhalation
Corrosives Skin
Oxidizing materials Absorption
Toxic
Ingestion
carcinogenic
mutagenic Injection
teratogenic
substances
water reactive
Physical Chemical
Biological Hazard
Biological Ergonomic
Type
Route :
Biological wastes (blood, fluids, etc)
Airborne
Drugs (antibiotics, marijuana)
Bloodborne
Contact
Genetically-engineered materials
Fecal-oral
Foodborne
Viruses, bacteria Animal-
borne
Fungi, molds
Insect-borne
Parasites, insects
Ergonomic Hazard
Biological Ergonomic
Physical
Environmental
Psycho-Social
Ergonomic Hazards
1. Likelihood memberikan indikator pada seberapa sering potensi risiko bakal muncul
2. Likelihood "selalu" menjadi parameter mengenai kemunculan atas potensi risiko.
3. Likelihood kerapkali diterjemahkan dalam bentuk bahasa lain seperti :
✓ seberapa sering penyimpangan suatu aktifitas/proses terjadi
✓ seberapa sering suatu abnormal peralatan terjadi
✓ seberapa sering "shutdown" suatu sistem terjadi dan lain sebagainya.
Seberapa sering atau seberapa banyak merupakan "ukuran" yang harus dikontrol oleh suatu
aktifitas/sistem yang sesuai sebagai risk controlnya
Penilaian Risiko (2)
Notes :
Risk • Likelihood : used as a general description of
probability or frequency
Formula : R = P(L) x C(S) • Probability : a measure of the chance of
occurrence expressed as a number
between 0 and 1
Consequences/Severity/
Probability/Likelihood (AS/NZS 4360:2004-1.3.6)
Impact/Tingkat
/Kemungkinan
Keparahan
likelihood yang lebih consequences lebih menitikberatkan pada
menitikberatkan pada receptor (penerima) dari risiko ketika sumber
sumber risiko risiko gagal untuk dikontrol.
Satuan yang biasa dipergunakan disini adalah seberapa parah dampak yang diterima
oleh suatu sistem (bisa orang, bisa peralatan, dan bisa juga lingkungan) ketika
sumber risiko "lepas" menjadi risiko.
Sebagai contoh :
1. Seberapa parah dampak yang diterima oleh receptor (orang, aset, atau
lingkungan) ketika overpressure (sumber risiko) berubah (lepas) menjadi
ledakan (risiko)
2. Seberapa besar dampak ketika LFL - Lower Flammability Limit (sumber risiko)
berubah (lepas) menjadi flash fire (risiko).
Penilaian Risiko (3)
Notes :
Risk 1. Likelihood membutuhkan
Formula : R = P(L) x C(S) konsistensi dan fokus
2. consequences membutuhkan
kesiapsiagaan dan response.
Consequences/Severity/
Probability/Likelihood
Impact/Tingkat
/Kemungkinan
Keparahan
Ukuran Penyebab (3 Factors) Ukuran Akibat (Sasaran & Target)
Unsafe Act, Unsafe Condition PARE ( People, Assest, Reputation &
& Lack of Management Environment)
Controls
• Total Risk = worst case scenario, without considering existing program or reliability
• Residual Risk = Total Risk – Existing program (reliability)
Probability of Failure (PoF) & Probability of Survive (PoS)
• Residual Risk = Reliability/Consequences
Total Risk = Probability of Failure (PoF) x Consequences of Failure (CoF)
HAZARD PROBABILITY MATRIX LEVEL
CLASSIFICATION PROBABILITY
DESCRIPTION LEVEL SPECIFIC INDIVIDUAL ITEM
S E D C B A
PREQUENT A Likely to occur frequent E
V IV 1 1 2 2 2
PROBABLE B Will occur several times
E III 1 2 3 3 3
OCCASIONAL C Likely to occur sometime
R
REMOTE D Unlikely but possible to occur I II 2 2 3 4 4
IMPROBABLE E So unlikely
T
I 3 3 4 4 5
Y
HAZARD SEVERITY MATRIX LEVEL OF RISK
CLASSIFICATION 1 : NEGLIGIBLE DANGER – Corrective action optional
DESCRIPTION CATEGORY MISHAP DEFINITION
2 : MINOR DANGER – Safety devices or Procedural controls
Catastrophic I Death or System Loss required
Preventive maintenance
Design features
Supervision
Engineering and Structural barrier
Testing
Minimizing exposure to sources of risk
Technical control
Separation or relocation of an activity
and resources
Research and development, technological
development
PREDICTIVE HAZARD EVALUATION
SYSTEM
DESCRIPTION
HAZARD
IDENTIFICATION
ACCIDENT ACCIDENT
PROBABILITIES CONSEQUENCES
ESTIMATION ESTIMATION
RISK
DETERMINATION
NO
RISK MODIFY
ACCEPTANCES SYSTEM
YES ACCEPTABLE RISK
OPERATE Risk that has been reduced to a level that can
SYSTEM be tolerated by the organization having regard
to its legal obligations and own OHS policy”
STEPS IN CONDUCTING RISK ASSESSMENT
4
Preparation Risk Evaluation Record Keeping
Risk
Reasonably Practicable
SUBSTITUTION
Level of Protection
ENGINEERING
Reliability
CONTROL
ADMINISTRATIVE
SAFE WORKER
CONTROL
PPE
Lowest Least
HIERARCHY OF RISK CONTROL
Long Most
Term ELIMINATION Preferred
SUBSTITUTION
ENGINEERING
CONTROL
ADMINISTRATIVE
CONTROL
PPE
Short Least
Term Preferred
HIERARCHY OF RISK CONTROL
Most ELIMINATION
Effective If not possible
SUBSTITUTION
If not possible
ENGINEERING
If not possible
ADMINISTRATION
If not possible
Least
PERSONAL PROTECTION
Effective
IMPLEMENTING
THE HIERARCHY OF CONTROL
Process Example
Person
Hazard
(Energy Source)
Energy Path
Example : Noise
•Use bolts instead of rivets •Acoustic hood •Job Rotation
•Or buy a quieter machine •Vibration isolators •Earplugs
•Distance •Earmuffs
ELIMINATION
If not possible
SUBSTITUTION
ADMINISTRATION
If not possible
If not possible
SUBSTITUTION
If not possible
ENGINEERING
If not possible
ADMINISTRATION
If not possible
PERSONAL PROTECTION
ELIMINATION
If not possible
If not possible
( 5S/5R )
SUBSTITUTION
Maintenance
If not possible
Job design
ENGINEERING
Training
If not possible
Safety sign
ADMINISTRATION
Working
PERSONAL PROTECTION Instruction
ELIMINATION
If not possible
SUBSTITUTION
If not possible
ENGINEERING
If not possible
ADMINISTRATION
If not possible
PERSONAL PROTECTION
Selection of Control
Technological options, Legal and
other requirements, Business,
Views of interested parties, risk
Low Cost/Benefit(Risk
reduction) ratio
Risk
Level
Not acceptable