RAW WATER SUPPLY INTAKE FROM LAUSIMEME RESERVOIR IN NORTH SUMATERA PROVINCE, JATIGEDE

STAGE II AND KERTASARI SYSTEM IN WEST JAVA PROVINCE

HIDROLOGI

REVIEW
MEETING

SPAB KERTASARI

ADB Loan 3455-INO - Water Supply System 2070 Jakarta,06 Februari 2023
Pemodelan
Ketersediaan Air

Sistem Penyediaan Air Baku Kertasari 2 2


ALUR PERHITUNGAN
KETERSEDIAAN AIR

Oky Subrata, Modul Pelatihan


Sumber Data
No Type of Data Alternative Source
1 Spatial Data
a) Digital elevation model
(DEM)
Shuttle Radar Topography Mission (SRTM) at 90m
resolution: http://srtm.csi.cgiar.org/ or
DAS Studi
http://hydrosheds.cr.usgs.gov/dataavail.php
DEMNAS 2015
b) Land use Kementerian Lingkungan Hidup dan Kehutanan
c) Soil types Pusat Penelitian Tanah Kementerian Pertanian dan Harmonized
World Soil Database (HWSD) Food and Agriculture Organisation
(FAO). Data HWSD FAO dapat diunduh pada situs
http://www.fao.org/soils-portal/soil-survey/soil-maps-and-
databases/harmonized-world-soil-database-v12/en/
d) Location of Rainfall observation BBWS Citarum
stations Balai Hidrologi dan Kualitas Air
e) Location of AWLR observation BBWS Citarum
stations
Balai Hidrologi dan Kualitas Air
2 Meteorological observation data
a) Precipitation BBWS Citarum
Balai Hidrologi dan Kualitas Air
b) Satellite Data GPM terkoreksi yang dapat diunggah pada link SIHKA dari Subdit
Data dan Pengembangan Sistem Informasi, Kementerian PUPR.
http://103.149.208.16/climatechange
c) Climatological Data BBWS Citarum
3 Hydrological observation data
a) Discharge Data BBWS Citarum
Balai Hidrologi dan Kualitas Air
b) Rating Curve BBWS Citarum
Balai Hidrologi dan Kualitas Air
4 Weir observation data
a) Bendung Wanir Dinas PSDA Jabar
PDAM Tirta Raharja
b) Bendung Wangisagara Dinas PSDA Jabar
PDAM Tirta Raharja
c) Intake Cikoneng PDAM Tirta Raharja
Peta Sebaran Pos Hujan Peta Sebaran Pos Duga Air

Identifikasi Data Hujan Groundstation Identifikasi Data Debit


• Terdapat 2 pos di hulu DAS Bendung Wanir yaitu Cisanti dan • Terdapat 1 pos duga air di hilir bendung Wangisagara yaitu
Cibeureum. Pos hujan lain berada pada bagian hilir adalah AWLR Citarum - Majalaya.
Cipaku Paseh. • Data-data groundstation didapat dari BBWS Citarum,
• Data-data groundstation didapat dari BBWS Citarum, pemeriksaan validitas data diambil dari Subdit Data dan
pemeriksaan validitas data diambil dari Subdit Data dan Pengembangan SISDA, PUPR.
Pengembangan SISDA, PUPR.
STANDAR NASIONAL

SNI 6738-2015 Perhitungan Debit Andalan Sungai dengan Kurva Durasi Debit (Analisa Ket.Air)
PEMERIKSAAN DAN KOREKSI DATA HUJAN POS SITU
Data awal konsultan CISANTI (BBWS CITARUM) DAN SUBDIT SISDA PUPR
Sum of PER-CUM Bulan
Tahun 1 2 3 4 5 6 7 8 9 10 11 12 Hanya ditampilkan untuk internal PUPR
2010 0 347 126 347 234 134 65 165 191 354 284 324
2011 187 198 161 268 315 202 121 177 179 436 186 221
2012 167 215 537 294 51 164 216 231 170 484 241 241
2013 335 96 287 267 153 58 50 86 133 319 399 305
2014 205 204 124 266 159 202 247 268 283 68 363 224
2015 257 225 188 252 215 126 6 596 158 207 320 233
2016 62 291 224 333 224 103 229 201 76 464 481 327
2017 328 502 177 332 263 110 45 233 189 467 350 466
2018 157 68 135 471 188 79 38 244 181 436 466 376
2019 220 82 87 337 204 301 56 209 164 483 352 253
2020 306 235 255 218 306 113 42 32 28 231 125 351 Sisda
2021 219 194 319 55 107 231 42 76 107 170 388 296
Rata-rata 203.6 221.4 218.3 286.7 201.6 151.9 96.4 209.9 154.9 343.3 329.6 301.4

Data Subdit SISDA


Tahun 1 2 3 4 5 6 7 8 9 10 11 12
2010 208 257 304 84 157 108 54 127 168 165 253 123
2011 104 151 153 268 174 150 64 16 10 187 390 312
2012 121 241 164 238 173 53 29 16 36 139 412 423
2013 204 206 236 177 215 150 141 37 63 120 130 309
2014 256 118 312 316 221 118 60 26 0 14 403 489
2015 212 273 366 359 124 28 0 0 2 82 179 480
Karena data ground yang ada hanya 8 tahun (2014-2021), maka
2016 187 417 530 436 244 128 226 96 263 369 345 272 kekurangan data diambil dari data satelit GPM (2010-2013). Data
2017 199 325 285 428 204 88 45 17 50 193 533 279 diambil dari website SISDA dengan nilai yang sudah terkoreksi.
2018 236 327 203 209 133 59 0 27 13 16 264 214
2019 259 284 299 341 33 0 0 0 0 8 83 351
2020 306 235 255 218 306 113 42 32 28 231 125 497
2021 219 194 319 55 107 231 42 76 106.5 170 388 296
Rata-rata 208 258 283 279 180 90 60 36 57 139 283 341
Terdapat perbedaan data pencatatan data hujan yang signifikan antara data yang didapatkan
konsultan dengan data dari SISDA, hal ini didapatkan berawal dari simulasi data debit Wanir
yang polanya berbeda dengan hujan yang diberikan konsultan (garis merah) sehingga dicari
data dari sumber lain. SISDA mengambil data dari buku publikasi data hujan, dan melihat
hasilnya berbeda tapi Ketika di cek lebih baik karena mengikuti pola debit yang dihasilkan di
bendung Wanir, hal ini dibuktikan dengan pengecekan pada saat kalibrasi.
PEMERIKSAAN DAN KOREKSI DATA HUJAN POS CIBEUREUM
(BBWS CITARUM) DAN SUBDIT SISDA PUPR

Data Awal Konsultan


Sum of PER-CUM Bulan
Tahun 1 2 3 4 5 6 7 8 9 10 11 12
2010 77 471 142 233 303 382 259 249 386 472 328 189
2011 189 55 26 163 373 122 288 220 378 485 336 293
2012 163 135 188 215 224 119 154 179 538 275 209 210
2013 247 160 331 179 402 121 191 349 525 459 277 156
2014 317 80 245 51 82 123 136 228 224 265 434 309
2015 296 34 590 105 226 302 179 221 254 546 288 221
2016 57 69 229 343 464 86 247 214 188 304 233 185
2017 365 398 60 186 484 146 179 486 302 156 117 155
2018 52 23 45 156 63 26 13 81 61 146 155 126
2019 73 27 29 112 68 100 19 71 55 161 118 84
2020 204 268 277 262 324 111 39 41 30 178 125 301
2021 221 162 336 51 144 192 38 43 145 242 440 320
Rata-rata 188.4 156.7 208.2 171.3 263.1 152.3 145.1 198.5 257.1 307.4 254.9 212.5

Sisda
Data Subdit SISDA
Tahun 1 2 3 4 5 6 7 8 9 10 11 12
2010 881 467 335 137 416 153 42 270 323 386 433 86
2011 167 120 207 595 241 63 0 0 0 138 72 330
2012 345 161 93 194 148 7 0 0 0 252 395 299
2013 291 255 277 255 252 166 138 0 0 128 208 136
2014 227 71 283 207 81 28 0 0 0 0 201 518
2015 379 187 100 0 0 0 0 0 20 84 189 458
2016 174 416 530 458 299 165 224 70 292 382 408 287
2017 170 376 268 463 169 0 27 0 52 178 244 83
2018 231 333 214 202 122 99 0 0 4 44 268 280
2019 194 159 182 187 5 0 0 0 0 43 80 245
2020 204 268 277 262 324 111 39 41 30 178 125 301
2021 221 162 336 51 144 192 38 43 145 242 440 320
Rata-rata 290.2 247.9 258.3 250.8 183.4 81.9 42.3 35.3 72.1 171.1 255.2 278.3
Pengecekan kelayakan data 2 mingguan , ditemukan beberapa hal yaitu: 1) Data Jan- April dibawah 2014 cukup besar,
Pemeriksaan Data Bendung namun tidak dapat dilakukan pengecekan harian karena data dasar sdh per 2 minggu.
2) Terdapat 2 data yang besar (kemungkinan salah pengetikan bulan maret II tahun 2003 (64.646.464) dan Agustus
Wanir Eksisting 2020 sebesar 30.852 3.085 ?
3) Data 2014 dan 2015 memiliki nilai yang sama. 4) data tahun 2020 meragukan, dan setelah dicek dari data hariannya
Pencatatan Data 2 Minggua n memiliki nilai yang berbeda (diketahui pada saat kalibrasi harian)
DEBIT RATA-RATA SETENGAH BULANAN ( M3/Detik)
TAHUN JANUARI PEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOPEMBER DESEMBER
I II I II I II I II I II I II I II I II I II I II I II I II

1998 3.421 4.145 7.629 5.852 4.290 2.690 3.729 5.514 3.597 3.600 2.808 2.945 1.697 1.141 1.995 1.740 1.412 1.173 0.822 0.591 0.801 1.178 2.302 9.294
1999 3.180 4.657 3.524 6.338 5.145 4.318 3.915 4.292 3.105 1.882 1.166 0.829 0.757 0.734 0.699 0.643 0.750 0.581 0.535 0.518 2.435 5.404 7.010 4.324
2000 3.834 6.065 7.825 7.049 6.559 10.404 10.007 5.118 3.159 3.159 2.902 3.079 1.581 1.159 0.976 Diperlukan pengecekan nilai debit Wanir
2.841 2.410 1.221 3.792 3.055 2.672 4.336 4.416 4.120

dengan Rainfall Runoff, dengan data


2001 4.296 7.633 4.095 4.067 2.162 8.613 7.073 5.230 4.402 2.238 2.803 2.119 1.088 1.043 1.501 1.669 0.841 0.657 0.685 1.017 1.273 1.224 4.339 4.782
2002 6.040 8.553 7.495 4.737 5.968 7.659 8.456 5.358 3.513 2.173 1.751 1.327 0.997 0.882 0.643 0.612 0.761 0.621 0.682 0.663 0.887 1.581 1.563 1.781
2003
2004
4.108
4.583
2.595
3.766
5.410
3.555
3.592
5.398
4.479
3.796
6.464
6.053
6.441
6.469
6.349
7.671
5.441
2.767
2.528
2.114
2.130
1.510
4.400
1.394
4.642
1.080
1.885
0.816
1.057
0.931 hujan 2010-2021 maka debit andal
0.796
0.831
1.095
0.873
1.400
0.781
1.013
1.451
2.814
1.597
5.743
3.685
7.526
6.817
6.319
7.703
4.103
2.866
2005
2006
6.040
4.296
8.553
7.633
7.495
4.095
4.737
4.067
5.968
2.162
7.659
8.613
8.456
7.073
5.358
5.230
3.513
4.402
2.173
2.238
1.751
2.803
1.327
2.119
0.997
1.088
0.882
1.043
0.643
1.501
eksisting yang digunakan sebagai
0.612
1.669
0.761
0.841
0.621
0.657
0.682
0.685
0.663
1.017
0.887
1.273
1.581
1.224
1.563
4.339
1.718
4.782
2007
2008
2.222
3.598
2.428
3.088
2.712
2.337
4.639
2.215
4.351
4.484
4.900
9.791
5.394
5.384
8.975
5.333
6.156
2.741
5.080
2.108
2.869
1.610
2.246
1.316
1.667
1.107
1.214
1.026
1.048
1.114
perbandingan pun dari tahun 2010-2021.
0.889
1.245
1.990
1.244
0.687
0.995
0.731
1.267
1.223
2.630
9.927
5.287
14.176
6.255
2.722
6.667
3.374
5.293
2009 3.515 4.742 5.965 4.064 4.551 4.732 3.924 4.251 3.745 3.481 3.473 2.484 2.069 1.777 1.191 1.187 1.283 1.466 2.576 2.418 1.822 6.580 3.045 2.964
2010 0.000 0.000 7.281 9.705 9.993 11.248 9.603 7.690 8.190 9.926 9.944 8.815 8.938 8.203 5.762 6.516 8.593 9.777 5.499 9.808 11.851 9.097 11.142 7.069
2011 5.473 5.405 5.934 5.331 5.478 6.005 6.598 9.290 10.421 7.602 5.924 2.481 3.830 2.388 1.612 1.332 1.365 1.459 2.335 2.436 7.591 6.949 6.482 7.486
2012 7.101 6.123 4.916 7.225 6.282 4.263 6.616 6.237 5.438 3.932 3.053 2.030 1.704 1.409 1.211 1.173 1.085 1.125 1.558 2.561 2.421 6.367 0.000 0.000
2013 5.795 5.543 6.214 6.276 - 7.502 9.551 8.341 0.738 0.817 1.270 - 1.794 2.149 1.832 1.477 1.639 1.518 1.593 2.115 2.315 2.431 3.762 5.123
2014 4.904 4.904 6.811 6.100 4.128 5.226 6.519 7.185 5.591 3.084 2.140 1.193 1.068 0.665 0.105 0.930 0.842 1.006 1.132 0.751 1.426 1.882 0.847 1.081
2015 4.904 4.904 6.811 6.100 4.128 5.226 6.519 7.185 5.591 3.084 2.140 1.193 1.068 0.665 0.105 0.930 0.842 1.006 1.132 0.751 1.426 1.882 0.847 1.081
2016 1.413 2.064 1.882 2.015 2.098 1.541 0.790 0.927 0.891 1.882 2.098 1.221 1.111 1.454 1.701 1.980 2.201 5.596 6.315 5.257 5.754 6.527 5.949 4.045
2017 3.346 4.459 6.130 5.605 5.812 4.918 5.176 5.735 4.307 2.942 3.912 2.292 2.184 1.884 1.609 1.239 1.155 1.277 2.683 1.790 3.313 4.499 4.447 4.165
2018 3.046 3.166 3.989 4.485 6.155 4.671 4.043 3.881 1.978 3.850 2.155 2.503 1.189 1.102 0.964 0.988 0.921 0.820 0.755 1.073 2.415 3.645 4.287 3.539
2019 2.804 3.164 3.870 4.332 4.975 3.596 4.173 4.395 3.964 2.258 1.491 1.120 1.113 0.952 0.901 0.868 0.773 0.665 0.737 0.835 1.414 1.202 1.920 2.090
2020 2.555 1.876 1.876 1.876 1.876 2.194 2.394 2.888 2.888 2.888 2.535 3.288 3.288 3.082 30.852 3.082 3.504 4.399 0.986 2.619 2.258 2.617 5.949 3.793
2021 4.057 4.013 4.064 3.557 3.291 4.653 4.415 2.975 2.065 2.405 2.693 3.605 2.759 1.452 1.290 1.056 0.969 1.608 1.209 2.385 5.450 5.491 4.380 5.878

Dari Data Harian

2018.00 3.046 3.166 3.989 4.485 6.116 4.671 4.043 3.881 1.978 3.850 2.043 2.503 1.189 1.074 0.964 0.988 0.921 0.820 0.755 1.073 2.415 3.645 4.287 3.539

2019.00 2.901 3.164 3.360 4.255 4.955 3.587 4.173 4.395 3.964 2.216 1.481 1.126 1.113 0.952 0.901 0.868 0.773 0.665 0.737 0.835 1.414 1.202 1.920 2.090

2020.00 2.555 2.664 3.388 3.803 4.242 4.214 4.430 3.470 3.589 3.636 3.692 3.258 2.097 1.454 1.133 0.995 0.942 0.999 0.986 2.618 2.258 2.623 3.652 3.793

2021.00 4.057 4.013 4.064 3.557 3.291 4.653 4.415 3.173 2.065 2.405 2.693 3.605 2.737 1.452 1.357 1.056 0.969 1.715 1.209 2.385 5.449 5.857 4.353 5.878
KARAKTERISTIK DAS CITARUM HULU - MAJALAYA
UNTUK KEPERLUAN PEMODELAN HEC HMS

Hydrologic Model Configuration


sampai Wangisagara
7 sub Basin
3 River Reach
2 Diversion
Kalibrasi data debit di Bendung Wanir dan
Wangisagara
Bd. Wanir
Bd. Wangisagara

Hasil Kalibrasi: Hasil Kalibrasi


untuk nilai Nash-
Syarat : Case Tahun E RRSE PBIAS
sutclife, RRSE dan
Periode kalibrasi yang Kalibrasi 2018-2021 0.566 0.7 13.54 PBIAS menunjukan
digunakan (2018-2021) Wanir (Good) (Satisfactory) (Good)
parameter yang
untuk bendung Wanir dan Kalibrasi 2018-2021 0.555 0.7 8.07
Wanisagara. (karena data dihasilkan layak
Wangisag (Good) (satisfactory) (Very Good)
yang didapatnya harian) ara untuk digunakan.
Perbandingan Pola Debit Andalan Q80% kondisi Eksisting Bd.
Wanir dan Bd. Wangisagara dengan debit andalan Q80% hasil
simulasi model HMS
Bd. Wanir Bd. Wangisagara
Debit Andal Generating Kertasari
Jan Feb Mar Apr Mei Jun Jul Agst Sep Okt Sep Des
Tahun
1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2
2010 5.24 8.43 8.76 8.03 5.79 6.73 5.34 4.43 5.77 6.31 5.49 4.51 3.41 2.80 4.05 4.21 5.11 5.11 5.31 5.81 5.71 6.83 6.10 3.83
2011 3.19 3.86 3.95 3.71 3.89 4.14 4.85 7.92 9.83 4.56 2.91 2.93 3.72 2.57 2.01 1.64 1.37 1.20 1.21 2.55 3.25 3.09 3.47 5.54
2012 4.78 4.66 4.62 4.40 4.09 3.05 4.34 3.99 3.72 3.96 2.87 1.93 1.61 1.47 1.22 1.03 0.93 0.84 1.71 3.04 3.61 5.77 6.49 5.84
2013 5.63 5.09 5.19 5.62 5.39 5.13 5.90 5.65 5.04 5.35 5.32 4.21 3.81 3.81 2.65 2.06 1.95 1.60 1.42 2.64 3.57 3.42 3.44 3.38
2014 3.82 4.48 2.90 2.49 4.25 4.68 4.88 5.03 3.30 4.05 2.54 2.63 2.01 1.76 1.45 1.17 0.98 0.79 0.65 0.61 1.51 4.05 5.91 7.31
2015 5.84 5.58 6.00 5.08 4.77 4.32 4.21 3.78 3.23 2.28 1.97 1.62 1.32 1.10 0.91 0.74 0.73 0.69 1.63 1.16 1.95 2.84 6.47 6.58
2016 3.81 3.88 4.43 7.46 8.13 8.67 9.43 8.43 8.24 6.81 6.29 5.15 4.95 6.00 4.25 3.64 3.61 6.38 6.60 6.60 7.57 7.27 7.71 6.01
2017 4.52 4.99 6.85 7.43 6.68 6.14 7.44 7.77 6.91 4.45 5.31 3.17 3.08 2.34 2.04 1.65 1.36 1.47 2.72 2.76 4.05 5.79 4.50 3.49
2018 3.45 4.03 4.79 6.35 5.91 4.56 4.79 4.90 3.19 4.19 2.93 2.72 2.77 1.71 1.45 1.24 1.11 0.93 0.74 0.81 3.18 3.38 4.67 3.81
2019 3.47 4.36 3.52 4.25 4.16 4.39 4.32 4.77 3.74 2.19 1.78 1.54 1.34 1.13 0.95 0.78 0.63 0.52 0.57 0.74 1.50 1.04 2.65 3.84
2020 3.31 3.71 4.53 4.66 4.25 4.61 6.12 4.67 4.91 5.95 5.23 4.00 3.46 2.38 2.11 2.26 1.57 1.72 1.72 3.25 3.25 2.69 5.43 5.01
2021 4.40 4.68 4.63 4.02 3.95 5.30 5.25 3.24 2.97 3.08 3.43 4.74 3.39 2.26 2.40 1.85 1.72 3.23 2.15 3.13 8.05 6.13 5.14 6.38
Rata-Rata 4.29 4.81 5.01 5.29 5.11 5.14 5.57 5.38 5.07 4.43 3.84 3.26 2.91 2.44 2.12 1.85 1.76 2.04 2.20 2.76 3.93 4.36 5.16 5.08
Q80 3.45 3.91 4.04 4.07 4.10 4.33 4.43 4.08 3.24 3.25 2.61 2.07 1.69 1.52 1.27 1.05 0.94 0.80 0.83 0.88 2.19 2.89 3.67 3.82
Q90 3.33 3.86 3.56 3.74 3.97 4.16 4.32 3.80 3.20 2.36 2.02 1.65 1.37 1.16 0.97 0.80 0.75 0.70 0.66 0.74 1.55 2.70 3.44 3.53
Q95 3.26 3.79 3.24 3.16 3.93 3.65 4.27 3.54 3.09 2.24 1.88 1.58 1.33 1.11 0.93 0.76 0.68 0.61 0.61 0.68 1.50 1.95 3.09 3.44
Debit Andal Generating Cikoneng
Jan Feb Mar Apr Mei Jun Jul Agst Sep Okt Sep Des
Tahun
1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2
2010 5.31 8.54 8.89 8.15 5.85 6.81 5.39 4.49 5.87 6.41 5.57 4.57 3.44 2.84 4.13 4.26 5.17 5.16 5.39 5.88 5.78 6.93 6.17 3.88
2011 3.23 3.89 3.98 3.73 3.95 4.20 4.90 8.03 9.95 4.64 2.95 2.97 3.77 2.61 2.04 1.66 1.39 1.21 1.22 2.58 3.27 3.10 3.50 5.59
2012 4.82 4.71 4.68 4.46 4.13 3.08 4.40 4.04 3.75 3.99 2.91 1.95 1.62 1.49 1.23 1.03 0.93 0.85 1.73 3.06 3.65 5.83 6.55 5.89
2013 5.67 5.15 5.25 5.68 5.47 5.20 5.94 5.71 5.09 5.41 5.39 4.29 3.83 3.87 2.69 2.08 1.99 1.61 1.43 2.66 3.61 3.44 3.48 3.39
2014 3.86 4.54 2.92 2.54 4.29 4.71 4.93 5.09 3.33 4.08 2.57 2.66 2.01 1.76 1.45 1.18 0.99 0.80 0.65 0.62 1.52 4.09 5.97 7.41
2015 5.87 5.64 6.06 5.11 4.81 4.35 4.23 3.81 3.24 2.29 1.98 1.63 1.33 1.11 0.91 0.75 0.74 0.69 1.65 1.17 1.98 2.88 6.52 6.66
2016 3.87 3.94 4.49 7.54 8.21 8.76 9.53 8.53 8.34 6.89 6.36 5.21 5.04 6.09 4.30 3.66 3.67 6.45 6.67 6.67 7.67 7.33 7.79 6.09
2017 4.60 5.04 6.93 7.52 6.74 6.22 7.53 7.86 6.97 4.49 5.38 3.21 3.12 2.35 2.06 1.67 1.37 1.49 2.75 2.78 4.08 5.87 4.54 3.51
2018 3.45 4.11 4.83 6.42 5.97 4.60 4.85 4.98 3.25 4.25 2.96 2.73 2.80 1.74 1.47 1.26 1.12 0.93 0.75 0.82 3.23 3.41 4.73 3.86
2019 3.50 4.38 3.56 4.30 4.21 4.44 4.35 4.79 3.77 2.21 1.79 1.57 1.35 1.14 0.95 0.78 0.64 0.52 0.57 0.75 1.51 1.06 2.67 3.88
2020 3.35 3.73 4.55 4.73 4.29 4.66 6.19 4.71 4.95 6.03 5.27 4.05 3.49 2.41 2.13 2.29 1.58 1.73 1.74 3.29 3.30 2.72 5.47 5.06
2021 4.44 4.74 4.71 4.02 4.01 5.36 5.29 3.27 2.99 3.11 3.47 4.79 3.44 2.28 2.42 1.88 1.72 3.25 2.18 3.16 8.15 6.19 5.23 6.44
Rata-Rata 4.33 4.87 5.07 5.35 5.16 5.20 5.63 5.44 5.13 4.48 3.88 3.30 2.94 2.47 2.15 1.87 1.78 2.06 2.23 2.79 3.98 4.40 5.22 5.14
Q80 3.46 3.98 4.08 4.08 4.14 4.37 4.49 4.13 3.26 3.28 2.64 2.09 1.70 1.54 1.28 1.06 0.94 0.81 0.84 0.89 2.23 2.92 3.71 3.87
Q90 3.36 3.90 3.60 3.76 4.02 4.22 4.36 3.84 3.24 2.38 2.04 1.66 1.38 1.17 0.98 0.81 0.76 0.70 0.66 0.76 1.57 2.74 3.48 3.55
Q95 3.29 3.82 3.27 3.19 3.98 3.70 4.30 3.57 3.13 2.25 1.90 1.60 1.34 1.12 0.94 0.77 0.70 0.62 0.62 0.69 1.52 1.97 3.12 3.46
Debit Andal Generating Bd. Wanir
Jan Feb Mar Apr Mei Jun Jul Agst Sep Okt Sep Des
Tahun
1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2
2010 5.90 9.54 9.82 8.98 6.43 7.46 5.97 4.93 6.49 7.06 6.15 5.03 3.81 3.12 4.56 4.68 5.71 5.67 5.98 6.47 6.39 7.66 6.73 4.24
2011 3.54 4.29 4.33 4.11 4.31 4.59 5.38 8.87 10.96 5.08 3.23 3.24 4.09 2.83 2.21 1.81 1.50 1.31 1.33 2.81 3.47 3.25 3.78 6.04
2012 5.25 5.17 5.12 4.81 4.41 3.34 4.74 4.42 4.06 4.32 3.13 2.11 1.75 1.59 1.33 1.11 0.99 0.91 1.89 3.38 4.01 6.35 7.07 6.34
2013 6.12 5.63 5.69 6.19 5.99 5.71 6.44 6.21 5.54 5.90 5.86 4.68 4.19 4.23 2.92 2.26 2.12 1.73 1.53 2.88 3.95 3.77 3.73 3.63
2014 4.18 4.91 3.13 2.74 4.67 5.14 5.33 5.48 3.57 4.35 2.75 2.81 2.13 1.86 1.55 1.24 1.05 0.85 0.70 0.65 1.65 4.32 6.47 8.02
2015 6.40 6.17 6.58 5.52 5.19 4.66 4.47 3.99 3.40 2.44 2.09 1.73 1.41 1.17 0.97 0.79 0.78 0.75 1.78 1.27 2.14 3.13 7.11 7.23
2016 4.20 4.28 4.85 8.19 8.93 9.53 10.36 9.26 9.11 7.50 6.93 5.69 5.49 6.61 4.69 3.97 3.97 7.01 7.25 7.27 8.33 8.01 8.49 6.64
2017 4.99 5.48 7.55 8.21 7.34 6.77 8.19 8.58 7.58 4.88 5.81 3.47 3.37 2.56 2.21 1.81 1.48 1.61 2.97 3.01 4.39 6.27 4.85 3.70
2018 3.72 4.42 5.23 6.97 6.48 4.98 5.24 5.41 3.49 4.61 3.20 2.99 3.07 1.89 1.58 1.36 1.21 1.01 0.81 0.91 3.54 3.71 5.16 4.19
2019 3.82 4.73 3.83 4.64 4.51 4.78 4.64 5.17 4.08 2.38 1.93 1.68 1.45 1.23 1.02 0.84 0.69 0.56 0.63 0.82 1.64 1.15 2.87 4.19
2020 3.60 4.02 4.95 5.14 4.65 5.06 6.76 5.15 5.35 6.54 5.77 4.40 3.81 2.62 2.33 2.48 1.73 1.90 1.88 3.54 3.59 2.96 5.86 5.42
2021 4.81 5.15 5.09 4.37 4.35 5.81 5.76 3.56 3.29 3.38 3.76 5.21 3.75 2.48 2.63 2.02 1.88 3.57 2.37 3.46 8.91 6.73 5.69 7.03
Rata-Rata 4.71 5.31 5.52 5.82 5.60 5.65 6.11 5.92 5.58 4.87 4.22 3.59 3.19 2.68 2.33 2.03 1.93 2.24 2.43 3.04 4.33 4.78 5.65 5.55
Q80 3.74 4.32 4.44 4.42 4.43 4.68 4.84 4.52 3.51 3.56 2.83 2.25 1.82 1.64 1.37 1.14 1.00 0.86 0.91 0.98 2.41 3.15 3.99 4.19
Q90 3.61 4.28 3.88 4.13 4.35 4.59 4.65 4.04 3.41 2.53 2.15 1.77 1.48 1.26 1.05 0.87 0.80 0.76 0.71 0.83 1.70 2.98 3.74 3.75
Q95 3.57 4.16 3.51 3.49 4.33 4.03 4.56 3.80 3.35 2.41 2.01 1.71 1.43 1.20 1.00 0.82 0.74 0.66 0.67 0.74 1.64 2.15 3.35 3.67
Debit Andal Generating Bd. Wangisagara
Jan Feb Mar Apr Mei Jun Jul Agst Sep Okt Sep Des
Tahun
1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2
2010 7.82 12.04 13.07 12.14 8.87 10.97 8.69 7.38 8.81 9.93 8.59 7.25 5.55 4.37 6.33 6.54 8.14 8.13 8.16 9.27 9.15 10.52 9.93 6.47
2011 5.07 5.91 5.91 5.42 5.65 6.49 7.35 12.25 14.71 7.14 4.44 4.37 5.56 4.08 3.13 2.49 2.09 1.80 2.03 3.64 5.17 5.64 5.65 9.03
2012 8.09 7.31 7.10 6.92 6.29 4.94 7.01 6.43 6.08 5.84 4.41 3.06 2.49 2.22 1.86 1.56 1.34 1.27 2.63 4.24 5.17 8.70 9.17 9.18
2013 8.49 7.63 7.95 8.77 7.87 8.31 9.85 9.88 7.92 8.69 8.39 6.69 5.91 6.11 4.22 3.21 2.94 2.44 2.39 3.94 5.37 5.50 5.70 5.16
2014 6.01 6.70 4.28 3.80 7.20 8.49 8.00 8.58 5.93 6.43 4.33 4.87 3.43 3.14 2.54 2.14 2.01 1.51 1.23 1.34 2.53 6.86 8.93 12.16
2015 9.69 8.91 9.79 8.36 7.46 8.18 7.72 6.71 6.26 4.09 3.35 2.81 2.34 1.96 1.62 1.33 1.25 1.17 2.27 1.64 2.95 4.83 9.79 9.55
2016 6.07 5.97 6.60 10.81 11.93 12.86 14.02 12.45 11.84 11.09 9.99 7.84 8.09 9.56 6.57 5.57 5.97 10.43 10.57 10.87 13.63 12.21 12.66 9.68
2017 7.18 8.53 10.54 12.15 12.83 11.11 12.51 13.58 11.18 7.11 8.63 5.33 4.99 3.99 3.35 2.73 2.23 2.37 4.75 4.68 6.79 9.11 6.47 4.68
2018 5.34 5.72 6.74 10.92 9.70 7.69 7.57 7.74 4.98 5.97 4.25 4.05 4.15 2.59 2.15 1.94 1.74 1.44 1.13 1.24 5.18 5.27 7.24 5.68
2019 6.23 6.79 5.95 6.80 6.93 7.01 7.47 7.99 6.22 3.70 3.04 2.62 2.25 1.90 1.59 1.30 1.07 0.87 0.93 1.09 2.36 1.75 3.89 5.78
2020 5.23 7.46 7.67 7.59 6.66 7.51 10.39 8.07 7.63 9.01 7.89 5.97 5.10 3.61 3.22 3.37 2.35 2.49 2.47 4.90 4.96 4.40 7.45 6.98
2021 6.77 7.19 6.85 5.92 5.89 7.98 7.77 4.95 4.47 4.81 5.91 7.61 5.05 3.36 3.46 2.69 2.48 4.52 3.21 4.93 11.73 9.37 7.93 9.51
Rata-Rata 6.83 7.51 7.70 8.30 8.11 8.46 9.03 8.83 8.00 6.98 6.10 5.21 4.58 3.91 3.34 2.90 2.80 3.20 3.48 4.32 6.25 7.01 7.90 7.82
Q80 5.47 6.12 6.08 6.09 6.36 7.11 7.49 6.85 5.96 5.01 4.27 3.26 2.68 2.29 1.92 1.63 1.42 1.31 1.39 1.40 3.35 4.92 5.85 5.70
Q90 5.24 5.91 5.92 5.47 5.93 6.55 7.36 6.46 5.08 4.16 3.44 2.84 2.36 1.98 1.64 1.35 1.26 1.18 1.14 1.25 2.58 4.44 5.66 5.21
Q95 5.16 5.82 5.18 4.69 5.78 5.80 7.20 5.77 4.75 3.91 3.21 2.73 2.30 1.93 1.61 1.32 1.17 1.04 1.04 1.18 2.46 3.21 4.86 4.94
Kebutuhan Air

Sistem Penyediaan Air Baku Kertasari 1717


KEBUTUHAN AIR IRIGASI EKSISTING (WANIR)
RENCANA TATA TANAM GLOBAL DAN NERACA AIR TAHUN 2023
DAERAH IRIGASI : WANIR
Luas Sawah Irigasi : 1880 Ha Dinas : SDA Provinsi Jawa Barat
No. Kode D.I : 32.04.0004 UPTD : PSDA WIL. Sungai Citarum
Periode Masa Tanam : Bulan Oktober 2022 s/d Bulan September 2023
Tahun 2022 Tahun 2023
No. Luas & Kebutuhan Air Okt NOV DES JAN FEB MAR APR MEI JUN JUL AGUS SEP Keterangan
I II I II I II I II I II I II I II I II I II I II I II I II
(1) Gol. Jenis TanamanMT.I MT.II MT.III Sat.Kebutuhan air di
375 Ha
Padi 577.00 577.0 sawah (l/det/ha)
I Palawija 577.00 Padi :
Tebu MH MK
Padi 50.00 50.00 a 1.25 1.125 1 bln
II Palawija 607.00 b 0.725 0.850 3 bln
Tebu c 0.300 0.300 0.5 bln
Padi 1253.00 1253.00
III Palawija 696.00 Palawija : 0.25 l/dt/ha
Tebu 3 bln MH/MK
Padi 100
IV Palawija
Tebu
Jumlah 1880.00 1880.0 1880.00
Bera - - -
Lain-lain - - -
Jumlah Luas DI 1880.00 1880.0 1880.00
(2) Kebut.air di sawah =Gol. I 360.6 721.3 569.8 418.3 418.3 418.3 418.3 418.3 295.7 411.1 649.1 569.7875 490.5 490.5 490.5 490.5 490.5 331.8 86.7 144.3 144.3 144.3 72.1 0.00 Tebu:
Luas x sat. keb.air Gol.II 31.3 62.5 49.4 36.3 36.3 36.3 36.3 36.3 25.6 35.6 56.3 49.4 42.5 42.5 42.5 42.5 42.5 28.8 75.9 151.8 151.8 75.9 0.00 (MH + MK)
(L/det/ha) Gol.III 783.1 1566.3 1237.3 1566.3 1566.3 1566.3 1566.3 1566.3 642.2 188.0 1409.6 1237.3 504.6 504.6 504.6 504.6 504.6 720.5 87.0 174.0 87.0 0.0 p 0.650 2 bln

Gol. IV 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 375.9 0.0 0.0 0.0 q 0.360 4 bln

Jumlah 360.6 752.5 1415.4 2034.0 1691.9 2020.8 2020.8 2020.8 2003.0 2003.0 1326.9 814.0 1949.5 1770.3 1037.6 1037.6 1037.6 878.9 620.0 940.6 383.0 470.0 235.0 0.0 r 0.125 9 bln

(3) Kebutuhan air di pintu tersier = 450.8 940.6 1769.3 2542.4 2114.9 2526.0 2526.0 2526.0 2503.7 2503.7 1658.6 1017.5 2436.8 2212.9 1296.9 1296.9 1296.9 1098.6 62.0 1175.8 478.8 587.5 293.8 0.0
Jumlah(2) x faktor tersier Faktor tersier-->diambil
(4) Kebutuhan air untuk lain-lain 140.0 140.0 140.0 140.0 140.0 140.0 140.0 140.0 140.0 140.0 140.0 140.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 rata-rata sebesar = 1.25

(5) Taksiran kehilangan air di jaringan utama 36.1 94.1 176.9 254.2 211.5 252.6 252.6 252.6 250.4 250.4 132.7 81.4 194.9 177.0 103.8 103.8 103.8 87.9 62.0 94.1 38.3 47.0 23.5 0.0
(6) Total kebut. air di bendung =(3)+(4)+(5) 626.8 1174.7 2086.2 2936.7 2466.4 2918.6 2918.6 2918.6 2 894.1 2894 .1 1931.3 12 38.9 2731.8 2489.9 1500.7 1500.7 150 0.7 1286.5 224 .0 13 69.8 617.1 734.5 417.3 10 0.0 Kehilangan air di jaringan utama
(7) Debit andalan (Q 80%) 953.0 1092.2 1741.8 2321.2 2813.8 3431.8 3559.6 3843.0 3 382.8 3446 .0 3917.4 38 47.8 4019.0 3237.0 1790.0 2367.0 143 8.2 1628.4 1111.8 11 93.0 1185.6 971.6 937.0 96 9.4 rata2 = 10%
(8) Neraca air ----> Q lebih & kurang = (7) - (6) 326.2 -82.5 -344.4 -615.5 347.4 513.2 641.0 924.4 488.7 551.9 1986.1 2608.9 1287.2 747.1 289.3 866.3 -62.5 341.9 887.8 -176.8 568.6 237.1 519.8 869.4
(9) Keandalan ( % ) =(7) : (6) x 100 152.0 93.0 83.5 79.0 114.1 117.6 122.0 131.7 116.9 119.1 202.8 310.6 147.1 130.0 119.3 157.7 95.8 126.6 496.3 87.1 192.1 132.3 224.6 969.4

Kebutuhan air terbesar adalah 2936.7 lps yang terjadi pada bulan November II
Sumber : Komisi Irigasi
Data yang akan digunakan adalah data nomer (6) total kebutuhan air di bendung
Sistem Penyediaan Air Baku Kertasari 18
KEBUTUHAN AIR IRIGASI EKSISTING (WANGISAGARA)

RENCANA TATA TANAM GLOBALDAN NERACA AIR TAHUN 2023


(Penetapan)
DAERAH IRIGASI : Wangisagara
Luas Sawah Irigasi : 1687 Ha Dinas : SDA Provinsi Jawa Barat
No. Kode D.I : 320.417.000.00 Balai : PSDA WIL. Sungai Citarum
Periode Masa Tanam : Bulan Oktober 2022 s/d Bulan September 2023
Tahun 2022 Tahun 2023
No. Luas & Kebutuhan Air Okt Nov Des Jan Feb Mar Apr Mei Jun Jul Ags Sep Okt Keterangan
II I II I II I II I II I II I II I II I II I II I II I II I
(1) Gol. Jenis Tanaman MT.I MT.II MT.III Sat.Kebutuhan air di
542,97 Ha 300 Ha
Padi 542.97 300.00 sawah (l/det/ha)
100 Ha 400 Ha
I Palawija 100.00 400.00 Padi : MT1 MT II
Tebu MH MK
555,08 Ha 250 Ha
Padi 555.08 250.00 0.00 a 1.250 1.125 1.5 bln

DIKERINGKAN
80 Ha 330 Ha
II Palawija 80.00 330.00 b 0.725 0.850 3 bln
Tebu c 0.300 0.300 0.5 bln
588,95 Ha 400 Ha
Padi 588.95 400.00
10 Ha 410 Ha
III Palawija 40.00 410.00 Palawija : 0.3 l/dt/ha
Tebu 0.00 0.00 0.00 3 bln MH/MK
Padi 0.00 0.00 0.00
IV Palawija 0.00 0.00 0.00
Tebu 0.00 0.00 0.00
Jumlah 1687 1170 1140
Bera 517 547
Lain-lain
Jumlah luas DI 1,687 1,687 1,687
(2) Kebut.air di sawah =Gol. I 339.4 678.7 536.2 393.7 393.7 393.7 393.7 393.7 278.3 250.2 337.5 296.3 270.0 285.0 285.0 285.0 285.0 187.5 105.0 120.0 120.0 120.0 60.0 0.0 Tebu:
Luas x sat. keb.air Gol.II 346.9 693.9 548.1 402.4 402.4 402.4 402.4 402.4 284.5 223.9 281.3 246.9 224.5 224.5 224.5 224.5 224.5 155.8 87.0 99.0 99.0 49.5 0.0 (MH + MK)
(L/det/ha) Gol.III 331.3 662.6 581.6 427.0 427.0 427.0 427.0 427.0 338.6 313.3 450.0 395.0 346.0 406.9 406.9 406.9 406.9 236.0 121.5 123.0 61.5 0.0 p 0.650 2 bln
Gol. IV 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 q 0.360 4 bln
Jumlah 339.4 1025.6 1561.3 1604.4 1377.7 1223.1 1223.1 1223.1 1107.7 961.7 900.0 890.8 966.9 904.5 855.5 916.4 916.4 818.9 667.6 443.0 340.5 342.0 171.0 0 r 0.125 9 bln
(3) Kebutuhan air di pintu tersier = 424.2 1282.0 1951.6 2005.5 1722.1 1528.8 1528.8 1528.8 1384.6 1202.1 1125.0 1113.6 1208.6 1130.6 1069.4 1145.4 1145.4 1023.6 834.5 553.8 425.6 427.5 213.8 0
Jumlah(2) x faktor tersier Faktor tersier-->diambil
(4) Kebutuhan air untuk lain-lain 250.0 250.0 250.0 250.0 250.0 250.0 250.0 250.0 250.0 250.0 250.0 150.0 150.0 150.0 150.0 150.0 150.0 150.0 150.0 150.0 150.0 150.0 150.0 150.0 rata-rata sebesar = 1.25
(5) Taksiran kehilangan air di jaringan utama 84.8 256.4 390.3 401.1 344.4 305.8 305.8 305.8 276.9 240.4 225.0 222.7 241.7 226.1 213.9 229.1 229.1 204.7 166.9 110.8 85.1 85.5 42.8 0.0
(6) Total kebut. air di bendung =(3)+(4)+(5) 759.0 1788.5 2592.0 2656.5 2316.5 2084.6 2084.6 2084.6 1911.5 1692.5 1600.0 1486.3 1600.3 1506.8 1433.3 1524.5 1524.5 1378.3 1151.4 814.5 660.8 663.0 406.5 150.0 Kehilangan air di jaringan utama
(7) Debit andalan (Q 80%) 774.4 1942.6 2672.8 4248.8 5082.0 4345.0 4173.8 5587.0 6568.2 5930.2 6158.2 6544.4 5141.2 4978.4 3442.8 2063.8 1846.2 902.6 792.6 779.0 739.2 663.8 685.2 652.8 rata2 = 20%
(8) Neraca air ----> Q lebih & kurang = (7) - (6) 15.4 154.1 80.8 1592.3 2765.5 2260.4 2089.2 3502.4 4656.7 4237.7 4558.2 5058.1 3540.9 3471.7 2009.6 539.3 321.7 -475.7 -358.8 -35.5 78.5 0.8 278.7 502.8
(9) Keandalan ( % ) =(7) : (6) x 100 102.0 108.6 103.1 159.9 219.4 208.4 200.2 268.0 343.6 350.4 384.9 440.3 321.3 330.4 240.2 135.4 121.1 65.5 68.8 95.6 111.9 100.1 168.6 435.2

Kebutuhan air terbesar adalah 2656.5 lps yang terjadi pada bulan Desember I
Sumber : Komisi Irigasi
Data yang akan digunakan adalah data nomer (6) total kebutuhan air di bendung

Sistem Penyediaan Air Baku Kertasari 19


IDENTIFIKASI PERUBAHAN TATA GUNA LAHAN

Pengumpulan Data Daerah Irigasi


1. Peta Lokasi D.I Wanir dan D.I Wangisagara tahun 2015 diperoleh dari UPTD, Dinas Pengelolaan
Sumber Daya Air, Pemerintah Provinsi Jawa Barat dengan keterangan luas D.I Wanir sebesar 1880
Ha dan D.I Wangisagara sebesar 1687 Ha.
2. Data berupa shapefile dari Dinas Pengelolaan Sumber Daya Air (DPSDA), dengan informasi luas
D.I Wanir sebesar 1437.4 Ha dan D.I Wangisagara sebesar 1509.6 Ha.

Keunggulan masing-masing data informasi:


• Data dari UPTD memberikan informasi spasial saluran induk dan sekunder
• Data dari DPSDA lebih detail untuk daerah yang terdapat perubahan fungsi lahan (dari/menjadi
area pertanian)

Sistem Penyediaan Air Baku Kertasari 20


INFORMASI SPASIAL D.I WANIR DAN D.I WANGISAGARA

(sumber: UPTD) (sumber: DPSDA)

Sistem Penyediaan Air Baku Kertasari 21


INFORMASI SPASIAL D.I WANIR DAN D.I WANGISAGARA

Pada peta dari UPTD, dilakukan digitasi


menggunakan perangkat lunak GIS untuk
memperoleh luasan daerah irigasi.

Hasil digitasi peta lokasi Daerah Irigasi


diperoleh
• Luas DI Wanir = 1226.98 Ha
• Luas DI Wangisagara = 1364.41 Ha

Sistem Penyediaan Air Baku Kertasari 22


INFORMASI SPASIAL D.I WANIR DAN D.I WANGISAGARA

Penyesuaian terhadap citra (*contoh)

Data awal Data yang diperbarui

Sistem Penyediaan Air Baku Kertasari 23


INFORMASI SPASIAL D.I WANIR DAN D.I WANGISAGARA

Penyesuaian terhadap citra (*contoh)

Data awal Data yang diperbarui

Sistem Penyediaan Air Baku Kertasari 24


KESIMPULAN

Daerah
UPTD (DPSDA) DPSDA
Irigasi
  Luas Luas Luas Luas
(ket peta) (digitasi peta) (shapefile) (penyesuaian
dengan citra
dan Peta
UPTD)

Wanir 1880 Ha 1226.9 Ha 1437.4 Ha 1397.75 Ha


Wangisagara 1687 Ha 1364.4 Ha 1509.6 Ha 1428.78 Ha

Dari hasil analisis yang dilakukan:


• keterangan luas DI Wanir dan DI Wangisagara (1800 Ha dan 1687 Ha)
perlu dicek kembali oleh pihak Komisi Irigasi/ Dinas Pengelolaan
Sumber Daya Air Provinsi Jawa Barat.
• berdasarkan penyesuain dengan citra dan Peta UPTD menggunakan
peranti lunak GIS, diperoleh luas DI Wanir sebesar 1397.75 Ha dan DI
Wangisagara sebesar 1428.78 Ha. Selanjutnya informasi ini akan
digunakan dalam menghitung kebutuhan air untuk masing-masing
daerah irigasi.

Sistem Penyediaan Air Baku Kertasari 25


KEBUTUHAN AIR BAKU U/ AIR MINUM (CIKONENG)

Sumber : PDAM Tirta Raharja


Dari kebutuhan air cikoneng didapat verifikasi bahwa kebutuhan air untuk cikoneng sebesar 450 lps

Sistem Penyediaan Air Baku Kertasari 26


KEBUTUHAN DEBIT PEMELIHARAAN

Hasil Analisa Keandalan wanir


No Prob JAN-1 JAN-2 FEB-1 FEB-2 MAR-1 MAR-2 APR-1 APR-2 MEI-1 MEI-2 JUN-1 JUN-2
Q80 3153.24 3148.90 3496.84 4011.89 4061.60 4306.90 4146.71 4283.80 2761.80 2161.20 1722.80 1297.00
EF (5% Q80) 157.66 157.45 174.84 200.59 203.08 215.35 207.34 214.19 138.09 108.06 86.14 64.85

No Prob JUL-1 JUL-2 AGS-1 AGS-2 SEP-1 SEP-2 OKT-1 OKT-2 NOP-1 NOP-2 DEC-1 DEC-2
Q80 1077.60 882.00 860.33 860.70 841.00 663.40 721.80 751.00 1385.64 1581.00 2225.69 2710.86
EF (5% Q80) 53.88 44.10 43.02 43.04 42.05 33.17 36.09 37.55 69.28 79.05 111.28 135.54

Berdasarkan PP no 38 thn 2011 tentang sungai debit pemeliharaan

Untuk rencana debit pemeliharaan di sepanjang skematik sistem ini digunakan fungsi 5% dari Q80 Wanir tiap

setengah bulanannya. Lalu diambil bulan terkering dijinkankan air melimpah, maka didapatkan keandalan sebesar

33,17 lps

Sistem Penyediaan Air Baku Kertasari 27


Pemodelan Neraca Air

Sistem Penyediaan Air Baku Kertasari 2828


SKEMA SUNGAI CITARUM A

Sistem Penyediaan Air Baku Kertasari 29


SKEMA PEMODELAN
Wangisagara
Citarum 4

Wanir
Citarum 3

Cikoneng
Citarum 2

DEBIT KONTROL
Kertasari KONDISI EKSISTING
Citarum 1

RENCANA PENGAMBILAN
SKENARIO - 1
SKENARIO - 1
No Nama Pemanfaat Air Vol Unit
1 SPAM Cikoneng 450 L/det
2 D.I Wanir 1880 Ha
3 D.I. Wangisagara 1687 Ha
4 D.I. Ancol 41 Ha
5 D.I. Bojong 35.9 Ha
6 D.I. Linger 16.5 Ha
7 D.I. Panganten 16.9 Ha
8 D.I. Sawah Jeruk 12.3 Ha
NERACA AIR SKENARIO - 1
KETERPASOKAN SKENARIO - 1

DARI HASIL PEMODELAN SKENARIO-1 :


• KEANDALAN PASOKAN PDAM = 100%
• KEANDALAN PASOKAN IRIGASI RATA2 > 94%
• KEANDALAN PASOKAN IRIGASI TERJADI PADA BULAN JUL II – NOV II (DIMANA PADA BULAN INI
IRIGASI SEDANG TIDAK BANYAK MEMBUTUHKAN AIR)
• KONDISI INI MASIH MASUK KEDALAM SYARAT PERENCANAAN
SKENARIO - 2
SKENARIO - 2
SKENARIO - 1
No Nama Pemanfaat Air Vol Unit
1 SPAM Cikoneng 450 L/det
2 D.I Wanir 1397.75 Ha
3 D.I. Wangisagara 1428.78 Ha
4 D.I. Ancol 41 Ha
5 D.I. Bojong 35.9 Ha
6 D.I. Linger 16.5 Ha
7 D.I. Panganten 16.9 Ha
8 D.I. Sawah Jeruk 12.3 Ha
NERACA AIR SKENARIO - 2
KETERPASOKAN SKENARIO - 2

DARI HASIL PEMODELAN SKENARIO-1 :


• KEANDALAN PASOKAN PDAM = 100%
• KEANDALAN PASOKAN IRIGASI RATA2 > 98%
• KEANDALAN PASOKAN IRIGASI TERJADI PADA BULAN OKT II – NOV II (DIMANA PADA BULAN INI
IRIGASI SEDANG TIDAK BANYAK MEMBUTUHKAN AIR)
• KONDISI INI MASIH MASUK KEDALAM SYARAT PERENCANAAN
SKENARIO - 3
SKENARIO - 1
No Nama Pemanfaat Air Vol Unit
1 SPAM Cikoneng 450 L/det
2 D.I Wanir 1397.75 Ha
3 D.I. Wangisagara 1428.78 Ha
4 D.I. Ancol 41 Ha
5 D.I. Bojong 35.9 Ha
6 D.I. Linger 16.5 Ha
7 D.I. Panganten 16.9 Ha
8 D.I. Sawah Jeruk 12.3 Ha
9 SPAM Kertasari 550 L/det
NERACA AIR SKENARIO - 3
KETERPASOKAN SKENARIO - 3

DARI HASIL PEMODELAN SKENARIO-1 :


• KEANDALAN PASOKAN PDAM > 97 %
• KEANDALAN PASOKAN IRIGASI RATA2 > 90%
• KEANDALAN PASOKAN IRIGASI TERJADI PADA BULAN JUL II – NOV II (DIMANA PADA BULAN INI
IRIGASI SEDANG TIDAK BANYAK MEMBUTUHKAN AIR)
• KONDISI INI MASIH MASUK KEDALAM SYARAT PERENCANAAN
KETERPASOKA
N SKENARIO - 3

Data Pencatatan Supply Debit IPA Cikoneng Menunjukan Debit Maksimum Adalah 400 L/Det.
Debit Andal Terkecil Di Lokasi Rencana Yang Terjadi Di September II Adalah 800 L/Det
Apabila Rencana IPA Kertasari Dioperasikan Sebesar 400 L/Det Maka Dengan Ditambah Suplai Real Di IPA
Cikoneng, Pasokan Untuk IPA Cikoneng Dan Kertasari Dapat Terpenuhi 100% Sepanjang Tahun
Debit Real Cikoneng Pada Bulan Gagal Pasok SPAM
Jan Feb Mar Apr Mei Jun Jul Agst Sep Okt Sep Des
Tahun
1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2
2010 5.31 8.54 8.89 8.15 5.85 6.81 5.39 4.49 5.87 6.41 5.57 4.57 3.44 2.84 4.13 4.26 5.17 5.16 5.39 5.88 5.78 6.93 6.17 3.88
2011 3.23 3.89 3.98 3.73 3.95 4.20 4.90 8.03 9.95 4.64 2.95 2.97 3.77 2.61 2.04 1.66 1.39 1.21 1.22 2.58 3.27 3.10 3.50 5.59
2012 4.82 4.71 4.68 4.46 4.13 3.08 4.40 4.04 3.75 3.99 2.91 1.95 1.62 1.49 1.23 1.03 0.93 0.85 1.73 3.06 3.65 5.83 6.55 5.89
2013 5.67 5.15 5.25 5.68 5.47 5.20 5.94 5.71 5.09 5.41 5.39 4.29 3.83 3.87 2.69 2.08 1.99 1.61 1.43 2.66 3.61 3.44 3.48 3.39
2014 3.86 4.54 2.92 2.54 4.29 4.71 4.93 5.09 3.33 4.08 2.57 2.66 2.01 1.76 1.45 1.18 0.99 0.80 0.65 0.62 1.52 4.09 5.97 7.41
2015 5.87 5.64 6.06 5.11 4.81 4.35 4.23 3.81 3.24 2.29 1.98 1.63 1.33 1.11 0.91 0.75 0.74 0.69 1.65 1.17 1.98 2.88 6.52 6.66
2016 3.87 3.94 4.49 7.54 8.21 8.76 9.53 8.53 8.34 6.89 6.36 5.21 5.04 6.09 4.30 3.66 3.67 6.45 6.67 6.67 7.67 7.33 7.79 6.09
2017 4.60 5.04 6.93 7.52 6.74 6.22 7.53 7.86 6.97 4.49 5.38 3.21 3.12 2.35 2.06 1.67 1.37 1.49 2.75 2.78 4.08 5.87 4.54 3.51
2018 3.45 4.11 4.83 6.42 5.97 4.60 4.85 4.98 3.25 4.25 2.96 2.73 2.80 1.74 1.47 1.26 1.12 0.93 0.75 0.82 3.23 3.41 4.73 3.86
2019 3.50 4.38 3.56 4.30 4.21 4.44 4.35 4.79 3.77 2.21 1.79 1.57 1.35 1.14 0.95 0.78 0.64 0.52 0.57 0.75 1.51 1.06 2.67 3.88
2020 3.35 3.73 4.55 4.73 4.29 4.66 6.19 4.71 4.95 6.03 5.27 4.05 3.49 2.41 2.13 2.29 1.58 1.73 1.74 3.29 3.30 2.72 5.47 5.06
2021 4.44 4.74 4.71 4.02 4.01 5.36 5.29 3.27 2.99 3.11 3.47 4.79 3.44 2.28 2.42 1.88 1.72 3.25 2.18 3.16 8.15 6.19 5.23 6.44
Rata-Rata 4.33 4.87 5.07 5.35 5.16 5.20 5.63 5.44 5.13 4.48 3.88 3.30 2.94 2.47 2.15 1.87 1.78 2.06 2.23 2.79 3.98 4.40 5.22 5.14
Q80 3.46 3.98 4.08 4.08 4.14 4.37 4.49 4.13 3.26 3.28 2.64 2.09 1.70 1.54 1.28 1.06 0.94 0.81 0.84 0.89 2.23 2.92 3.71 3.87
Q90 3.36 3.90 3.60 3.76 4.02 4.22 4.36 3.84 3.24 2.38 2.04 1.66 1.38 1.17 0.98 0.81 0.76 0.70 0.66 0.76 1.57 2.74 3.48 3.55
Q95 3.29 3.82 3.27 3.19 3.98 3.70 4.30 3.57 3.13 2.25 1.90 1.60 1.34 1.12 0.94 0.77 0.70 0.62 0.62 0.69 1.52 1.97 3.12 3.46

Dari Data Diatas Terlihat


Kegagalan Pasokan SPAM Pada
Hasil Model Neraca Air Tidak
Selalu Terjadi Sepanjang Tahun
Dan Memiliki Peluang Terjadi
Yang Kecil
SKENARIO - 4
SKENARIO - 1
No Nama Pemanfaat Air Vol Unit
1 SPAM Cikoneng 650 L/det
2 D.I Wanir 1397.75 Ha
3 D.I. Wangisagara 1428.78 Ha
4 D.I. Ancol 41 Ha
5 D.I. Bojong 35.9 Ha
6 D.I. Linger 16.5 Ha
7 D.I. Panganten 16.9 Ha
8 D.I. Sawah Jeruk 12.3 Ha
9 SPAM Kertasari 550 L/det
NERACA AIR SKENARIO - 4
KETERPASOKAN SKENARIO - 4
RAW WATER SUPPLY INTAKE FROM LAUSIMEME RESERVOIR IN NORTH SUMATERA PROVINCE, JATIGEDE
STAGE II AND KERTASARI SYSTEM IN WEST JAVA PROVINCE

TERIMAKASIH

ADB Loan 3455-INO - Water Supply System 2070 Jakarta,18 Januari 2023

Anda mungkin juga menyukai