KEGIATAN PENYUSUNAN

DAN DEDC
JARINGAN GAS BUMI
RINCIANFEED
PENAWARAN
BIAYA
Bumi
PEKERJAAN PENYUSUNAN DOKUMEN FRONT END ENGINEERING DESIGN (FEED) SISTEM JARINGAN GAS BUMI se-KOTA TAR
DAN DETAIL ENGINEERING DESIGN FOR CONSTRUCTIONS (DEDC) KELURAHAN PAMUSIAN DAN KELURAHAN SELUMIT
TAHUN ANGGARAN 2015
NO
1
I
A

Uraian

Rincian Perhitungan

Vol

Satuan
Biaya
5

2
BIAYA LANGSUNG PERSONEL FEED & DEDC
TENAGA AHLI
1 Ahli Gas Bumi (Team Leader)
2 Ahli Konstruksi Pipa PE
3 Ahli Kimia/Gas
4 Ahli Mesin / Mekanikal
5 Ahli Instrumentasi / Kelistrikan
6 Ahli Lingkungan
7 Ahli Ekonomi
8 Ahli Geodesi
9 Ahli Sipil
10 Ahli Keselamatan dan Kesehatan Kerja

1
1
1
1
1
1
1
1
1
1

Orang
Orang
Orang
Orang
Orang
Orang
Orang
Orang
Orang
Orang

5
5
5
5
5
5
5
5
5
5

Bulan
Bulan
Bulan
Bulan
Bulan
Bulan
Bulan
Bulan
Bulan
Bulan

5
5
5
5
5
5
5
5
5
5

OB
OB
OB
OB
OB
OB
OB
OB
OB
OB

SUB
1
2
3
4
5
6
7
8
9

1
1
1
1
1
1
1
1
1

Orang
Orang
Orang
Orang
Orang
Orang
Orang
Orang
Orang

5
5
5
5
5
5
5
5
5

Bulan
Bulan
Bulan
Bulan
Bulan
Bulan
Bulan
Bulan
Bulan

5
5
5
5
5
5
5
5
5

OB
OB
OB
OB
OB
OB
OB
OB
OB

4
1
8

Orang
Orang
Orang

5
5
5

Bulan
Bulan
Bulan

20
5
40

OB
OB
OB

LS

Kali

40
1
1
1
1
5

OK
LS
LS
LS
LS
Bulan

BUlan
Bulan

5
5
1

UB
UB
LS

5
1

Buku
LS

5
1

Buku
LS

5
1
5
2
5
10

Buku
LS
Buku
Keping
Buku
UB

TENAGA
Ass. Ahli
Ass. Ahli
Ass. Ahli
Ass. Ahli
Ass. Ahli
Ass. Ahli
Ass. Ahli
Ass. Ahli
Ass. Ahli

AHLI
Konstruksi Pipa PE
Kimia/Gas
Mesin / Mekanikal
Instrumentasi / Kelistrikan
Lingkungan
Ekonomi
Geodesi
Sipil
Keselamatan dan Kesehatan Kerja

TENAGA PENDUKUNG
1 CAD Operator
2 Administrator
3 Surveyor

TOTAL BIAYA LANGSUNG PERSONIL


II
A

BIAYA LANGSUNG NON PERSONEL FEED & DEDC


KEGIATAN PERSIAPAN
1 Pengumpulan Data Awal

LS

KEGIATAN PELAKSANAAN SURVEY


1 Transportasi Tenaga Ahli
2 Biaya Survey Topograf
3 Biaya Survey Lingkungan
4 Biaya Pengadaan Peta Digital
5 Biaya Dokumentasi Lapangan (Foto dan Video)
6 Biaya Komunikasi

10
1
1
1
1
5

Orang
LS
LS
LS
LS
Bulan

KEGIATAN PENGOLAHAN DATA, ANALISIS, DESIGN ENGINEERING DAN PELAPORAN


1 Sewa Alat Ujur Theodolite
1
Unit
5
2 Sewa Plotter
1
Unit
5
3 Sewa Software
1
LS
4 Biaya Validasi Data
Biaya Laporan Pendahuluan
- Buku Laporan Pendahuluan
5
Buku
- Presentasi & Pembahasan Awal
1
LS
Biaya Laporan Antara
- Buku Laporan Antara
5
Buku
- Presentasi & Pembahasan Antara
1
LS
Biaya Laporan Akhir
- Buku Laporan Akhir
5
Buku
- Presentasi & Pembahasan Akhir
1
LS
Ringkasan Eksekutif
5
Buku
CD
2
Keping
Gambar Perencanaan
5
Buku
5 Sewa Kendaraan Roda 4 + Operasional
2
Unit
5

Bulan

TOTAL BIAYA LANGSUNG NON PERSONIL

AN FEED
DAN DEDC
JARINGAN GAS BUMI
CIAN
PENAWARAN
BIAYA
Bumi
ERING DESIGN (FEED) SISTEM JARINGAN GAS BUMI se-KOTA TARAKAN
TIONS (DEDC) KELURAHAN PAMUSIAN DAN KELURAHAN SELUMIT

HUN ANGGARAN 2015


Biaya Satuan

Jumlah

13,000,000
11,000,000
11,000,000
11,000,000
11,000,000
11,000,000
11,000,000
11,000,000
11,000,000
11,000,000

65,000,000
55,000,000
55,000,000
55,000,000
55,000,000
55,000,000
55,000,000
55,000,000
55,000,000
55,000,000
560,000,000

6,000,000
6,000,000
6,000,000
6,000,000
6,000,000
6,000,000
6,000,000
6,000,000
6,000,000

30,000,000
30,000,000
30,000,000
30,000,000
30,000,000
30,000,000
30,000,000
30,000,000
30,000,000
270,000,000

4,000,000
3,500,000
4,000,000

80,000,000
17,500,000
160,000,000
257,500,000
1,087,500,000

5,000,000

5,000,000
5,000,000

300,000
20,000,000
20,000,000
15,000,000
500,000
1,500,000

12,000,000
20,000,000
20,000,000
15,000,000
500,000
7,500,000
75,000,000

2,500,000
1,500,000
1,000,000

12,500,000
7,500,000
1,000,000

3,000,000
5,000,000

15,000,000
5,000,000

500,000
5,000,000

2,500,000
5,000,000

700,000
5,000,000
250,000
25,000
1,000,000
5,500,000

3,500,000
5,000,000
1,250,000
50,000
5,000,000
55,000,000
118,300,000
198,300,000

YA LANGSUNG PERSONIL

LANGSUNG NON PERSONIL

REKAPITULASI PERINCIAN BIAYA


KEGIATAN
PEKERJAAN

:
:

PENYUSUNAN FEED DAN DEDC JARINGAN GAS BUMI

TAHUN ANGGARAN

2015

PENYUSUNAN DOKUMEN FRONT END ENGINEERING DESIGN (FEED) SISTEM JARINGAN GA


ENGINEERING DESIGN FOR CONSTRUCTIONS (DEDC) KELURAHAN PAMUSIAN DAN KELUR

NO

JENIS PEKERJAAN

BIAYA LANGSUNG PERSONIL


A
Tenaga Ahli
B
Sub Tenaga Ahli
C
Tenaga Pendukung
Sub Total I.

II

BIAYA LANGSUNG NON PERSONIL


1
Biaya Pelaksanaan Kegiatan
2
Kegiatan Pelaksanaan Survey
3
Kegiatan Pengolahan Data, Analisis, Design Enjiniring & Pelaporan

Sub Total II.


JUMLAH I + II
PPN 10%
JUMLAH I + II termasuk pajak
DIBULATKAN

Terbilang : Satu Milyar Empat Ratus Empat Belas Juta Tiga Ratus Delapan Puluh Ribu Rupi

REKAPITULASI PERINCIAN BIAYA

N FRONT END ENGINEERING DESIGN (FEED) SISTEM JARINGAN GAS BUMI se-KOTA TARAKAN DAN DETAIL
FOR CONSTRUCTIONS (DEDC) KELURAHAN PAMUSIAN DAN KELURAHAN SELUMIT

JUMLAH (Rp.)

Rp

560,000,000
270,000,000
257,500,000

Rp

1,087,500,000

Rp
Rp
Rp

5,000,000
75,000,000
118,300,000

Rp
Rp
Rp
Rp
Rp

198,300,000
1,285,800,000
128,580,000
1,414,380,000
1,414,380,000

ilyar Empat Ratus Empat Belas Juta Tiga Ratus Delapan Puluh Ribu Rupiah