m
Kapasitas bahan baku tiap jam untuk proses = 5,650 kg/jam
Volume yang dibutuhkan untuk padatan = 2.79408419 m^3
Estimasi awal,
ambil waktu tinggal,t= 30 menit
Ambil L/D = 3
V =phi/4*D^2*L
D= 3.7013320444 m 12.14348 ft
tinggi, Z= 11.1039961333 m
Dt/Di = 3
ZL/Di = 0.4
P = teta*N^3*Di^5*rho/550/gc
= 6.287690115 hp
rho Liq
T
rho Liq
C sulfur
CP sulfur
liq
solid
405 K
DATA K (W/m k) Y= A +BT + CT2 +DT3+ET4
B C K (w/m k) btu/hr ft F
0.000938 -7.37E-07 0.1320 0.076319
323
3.5765398 cp
0.0357654 g/cm/det
C K
132 405
A B n Tc rho (g/ml) rho (kg/m^3)
0.20468 0.1044 0.114 1313 0.028389337 28.38934
A B C D CP
108.05 -2.3743E-01 2.2729E-04 -5.9964E-08 4.5189E+01 Cp (J/mol.K) = A
2.003 1.2002E-01 -1.6202E-04 2.4036E+01 Cp (J/mol.K) =A+B
K
B dv/m v/m rho i mi/rho i
1/K kg/m^3
0.001002 3.0089388E-05 0.001031377 969.57752382 0.011655113
0.000956 9.0253734E-06 0.000953312 1048.9740421 5.375697813
5.387352927
T = T operasi
PERANCANGAN MELTER
kondisi operasi =
P= 1 atm
T= 132 C 405 K
komponenm mol cp x dT Q = m cp dT
S 5650.202 176.5688