SUMMARY BULANAN QUALITY CONTROL

PROYEK
PAKET : PRESERVASI RUTIN SP.3 POS BATAS GABUNGAN BTS.NEGARA-SEI.ULAR
KONTRAKTOR : PT. BUMALINDO PRIMA ABADI
NO. KONTRAK :
TANGGAL :
NILAI KONTRAK : 27 FEBRUARI 2018 Bulan : JuLi 20
KONSULTAN : PT. WAHANA MITRA AMERTA

JUMLAH
NO. URAIAN REQUIREMENT
TEST MASUK GAGAL
1. Timbunan Pilihan Density ≥ 100 %
CBR Lapangan
PI
Job Grading Control
2. Aggregat Kelas A Density ≥ 100 %
CBR Lapangan
PI
Job Grading Control

3 AC - WC Asphalt Content

Job Grading Control

Marshall Test

PRD

Density ≥ 98 %

Thickness Check

4 AC - BC Asphalt Content

Job Grading Control

Marshall Test

PRD

Density ≥ 98 %

Thickness Check
ANAN QUALITY CONTROL

Bulan : JuLi 2018

TINDAKAN
KETERANGAN
PERBAIKAN