Anda di halaman 1dari 10

LAPORAN

KULIAH LAPANGAN
PERANCANGAN JALAN REL

LRT JAKARTA
KORIDOR 1 (FASE1)

NAMA :
YUSUF WAHYU N (41114120002)
KELAS : SABTU-D408/14.30

UNIVERSITAS MERCU BUANA


PROGRAM STUDI TEKNIK SIPIL
FAKULTAS TEKNIK
2018
UNIVERSITAS MERCUBUANA

DAFTAR ISI

1. PENDAHULUAN .............................................................................................................................................. 2
2. DATA PROJECT .......................................................................................................................................................... 4
3. DOKUMENTASI LAPANGAN.................................................................................................................................. 6
4. PENUTUP ........................................................................................................................................................... 9

PERANCANGAN JALAN REL 1


UNIVERSITAS MERCUBUANA

1. PENDAHULUAN

Laporan ini menyajikan data hasil kuliah lapangan yang dilakukan di lokasi
proyek LRT Jakarta (Jakpro), Jakarta.

Gambar 1. Layout 7 Jaringan Koridor LRT

Gambar di atas menunjukkan layout 7 Jaringan Koridor LRT yang akan


dibangun di Jakarta.

Gambar 2. Layout LRT Koridor 1 Fase 1


PERANCANGAN JALAN REL 2
UNIVERSITAS MERCUBUANA

Gambar di atas menunjukkan layout Jaringan LRT Koridor 1 (Fase1) yang


sedang dibangun di Kelapa Gading – Vlodrome, Jakarta. Dari total
terdapat 7 Koridor yang akan dibangun.

PERANCANGAN JALAN REL 3


UNIVERSITAS MERCUBUANA

2. DATA PROJECT

Berikut merupakan resume detail project LRT Jakarta Kelapa Gading-Velodrome.


Tabel 1. Detail Project

Nama Proyek LRTJakarta Koridor 1 (Fase 1) Kelapa Gading – Velodrome


Lokasi Proyek Jl. Kelapa Nias, Jakarta Utara – Jl. Boulevard Raya, Jakarta Utara – Jl. Velodrome, Jakarta Timur

Deskripsi Proyek
Pembangunan Prasarana dan Sarana LRTJakarta dalam rangka Asian Games 2018 dengan 6 stasiun
layang dan 1 depo untuk pemeliharaan LRVs(Light Rail Vehicles). Pada tahap awal akan dioperasikan
sebanyak 8 articulated LRVsatau 4 train sets (1 train set = 2 LRVs),dengan headway 10-15 menit.
Berperan Sebagai: Instansi/Perusahaan:
Nama/Calon Mitra Utama 1. Pengawas Pelaksanaan LRTJakarta 1. Dinas Perhubungan UP.Perkeretaapian
2. Feasibility Study Phase 1 Consultant Perkotaan DKI Jakarta
3. Preliminary Design Consultant 2. PT Mott MacDonald Indonesia
4. Tender Assistance Consultant 3. PT Mott MacDonald Indonesia
5. Construction Management and Supervision 4. PT Mott MacDonald Indonesia
Consultant 5. PT Mott MacDonald Indonesia
6. Operation Management Consultant 6. PT Mott MacDonald Indonesia
7. P101 Advance Work Contractor 7. PT Wijaya Karya (Persero)Tbk.
8. P102 Main Work (Civil, M/E, Archi and 8. PT Wijaya Karya (Persero) Tbk.
Railway 9. Hyundai Rotem Company
System) Contractor 10.Korea Rail Network Authority
9. P103 Rolling Stock Supplier 10.Feasibility Study (KRNA) 11.LKPP
Phase 2 Consultant 11.Procurement Advisory 12.(dalam tahap kajian)
Committee 12.Operator LRTJakarta 13.(dalam tahap kajian)
13.Independent Verification & Validation

PERANCANGAN JALAN REL 4


UNIVERSITAS MERCUBUANA

Nama Proyek LRTJakarta Koridor 1 (Fase 1) Kelapa Gading – Velodrome


Total Investasi Rp7.345 miliar, dengan rincian sbb.
(sudah termasuk PPN) Kontrak Konsultan PMS(harga kontrak+kontinjensi): Rp247miliar
Kontrak Konsultan AMDAL, Andal Lalin & Soil Investigation (harga kontrak): Rp10 miliar
Independent Validation & Verification (estimasi+kontinjensi): Rp64 miliar
P101 Advanced Works Package (harga kontrak+proposal VO): Rp78 miliar
P102 Main Works Package (harga kontrak+kontinjensi): Rp6.407 miliar
P103 Light Rail Vehicle Supply (harga kontrak+kontinjensi): Rp539 miliar
Proyeksi Kebutuhan Capex
(Rp Miliar) No. Item 2016 2017 2018 & Ret. Total
1 Konsultan PMS 79 106 62 247
2 Konsultan AMDAL, Andal Lalin & SI 8 2 0 10
3 Konsultan IV&V 0 62 2 64
4 P101 Advanced Works Contract Package 58 20 0 78
5 P102 Main Works Contract Package 1.135 3.362 1.910 6.407
Total Prasarana 1.280 3.552 1.974 6.806
6 P103 Purchase of Light Rail Vehicles 0 423 116 539
Total Prasarana dan Sarana 1.280 3.975 2.090 7.345
Pembiayaan/Financing Penyertaan Modal Daerah 100% PMD
Analisa Kelayakan • Jangka Waktu • Asian Games 2018
• Target Revenue • n/a
• NPV • n/a
• IRR • n/a
• PBP • n/a

PERANCANGAN JALAN REL 5


UNIVERSITAS MERCUBUANA

3. DOKUMENTASI LAPANGAN

Gambar 3. Layout LRT Koridor 1 dibagi 5 Section

Gambar 4. Maket Depo LRT JABODETABEK

PERANCANGAN JALAN REL 6


UNIVERSITAS MERCUBUANA

Gambar 5. Kereta LRT di Depo Sementara

Gambar 6. Rel

PERANCANGAN JALAN REL 7


UNIVERSITAS MERCUBUANA

Gambar 6. Rel

Gambar 7. Rel Elektrik

PERANCANGAN JALAN REL 8


UNIVERSITAS MERCUBUANA

4. PENUTUP

Dari hasil kuliah lapangan, terdapat beberapa ilmu baru dalam


pengetahuan dibidang Perancangan Jalan Rel. Diantaranya
kemajuan teknologi dalam bidang konstruksi dan teknologi
perkretaapian Indonesia yang semakin maju.
Demikian kami sampaikan hasil kuliah lapangan pada tanggal 14
Juli 2018 dari Saya. Jika ada hal-hal yang ingin ditanyakan terkait
dengan laporan kuliah lapangan ini, Dapat menghubungi kami.

Terima kasih.

Jakarta, 18 Juli 2018


Hormat Kami,

Yusuf Wahyu Nugroho

PERANCANGAN JALAN REL 9

Anda mungkin juga menyukai