KULIAH LAPANGAN
PERANCANGAN JALAN REL
LRT JAKARTA
KORIDOR 1 (FASE1)
NAMA :
YUSUF WAHYU N (41114120002)
KELAS : SABTU-D408/14.30
DAFTAR ISI
1. PENDAHULUAN .............................................................................................................................................. 2
2. DATA PROJECT .......................................................................................................................................................... 4
3. DOKUMENTASI LAPANGAN.................................................................................................................................. 6
4. PENUTUP ........................................................................................................................................................... 9
1. PENDAHULUAN
Laporan ini menyajikan data hasil kuliah lapangan yang dilakukan di lokasi
proyek LRT Jakarta (Jakpro), Jakarta.
2. DATA PROJECT
Deskripsi Proyek
Pembangunan Prasarana dan Sarana LRTJakarta dalam rangka Asian Games 2018 dengan 6 stasiun
layang dan 1 depo untuk pemeliharaan LRVs(Light Rail Vehicles). Pada tahap awal akan dioperasikan
sebanyak 8 articulated LRVsatau 4 train sets (1 train set = 2 LRVs),dengan headway 10-15 menit.
Berperan Sebagai: Instansi/Perusahaan:
Nama/Calon Mitra Utama 1. Pengawas Pelaksanaan LRTJakarta 1. Dinas Perhubungan UP.Perkeretaapian
2. Feasibility Study Phase 1 Consultant Perkotaan DKI Jakarta
3. Preliminary Design Consultant 2. PT Mott MacDonald Indonesia
4. Tender Assistance Consultant 3. PT Mott MacDonald Indonesia
5. Construction Management and Supervision 4. PT Mott MacDonald Indonesia
Consultant 5. PT Mott MacDonald Indonesia
6. Operation Management Consultant 6. PT Mott MacDonald Indonesia
7. P101 Advance Work Contractor 7. PT Wijaya Karya (Persero)Tbk.
8. P102 Main Work (Civil, M/E, Archi and 8. PT Wijaya Karya (Persero) Tbk.
Railway 9. Hyundai Rotem Company
System) Contractor 10.Korea Rail Network Authority
9. P103 Rolling Stock Supplier 10.Feasibility Study (KRNA) 11.LKPP
Phase 2 Consultant 11.Procurement Advisory 12.(dalam tahap kajian)
Committee 12.Operator LRTJakarta 13.(dalam tahap kajian)
13.Independent Verification & Validation
3. DOKUMENTASI LAPANGAN
Gambar 6. Rel
Gambar 6. Rel
4. PENUTUP
Terima kasih.