Caesar Adza M
NRP. 04311540000018
Dosen Pembimbing :
Prof. Ir. Daniel M Rosyid, Ph.D.
KERJA PRAKTEK
MO141335
Laporan kerja praktek (KP) dua bulan langsung (25 Juni s.d 17 Agustus 2018)
di PT.ZEE INDONESIA dengan judul :
ANALISA LIFTING PADA RISER DAN PIPE SPOOL DI LLB PLATFORM MILIK
PERTAMINA PHE ONWJ
Disusun oleh:
Caesar Adza M
NRP.04311540000018
Mengetahui/Menyetujui :
Dr. Ir. Hasan Ikhwani, M. Sc. Prof. Ir. Daniel M Rosyid, Ph.D.
NIP. 19690121 199303 1 002 NIP. 19610702 198803 1 003
i
SUMMARY
In 2018, PERTAMINA PHE ONWJ has a project to repair or replace the pipeline off the
Java Sea coast around 80 - 200 km northeast of Jakarta, namely the LIMA and KLA regions. This
project aims to maintain base production to obtain additional production. This project is primarily
to install a new pipeline and replace the part of the pipeline that has been damaged.
PT. ZEE Indonesia as a consultant in the field of offshore, especially in marine operations
and pipelines participated in the success of the project by doing Lifting Analysis of Riser and Pipe
Spool at LLB & LCOM Platform. But not only at LLB & LCOM Platform, including at KLB &
KLA Platform and LLB & LPRO Platform. From the results of the analysis at LLB Platform
including lifting force on riser and spool 10” configuration has greater value than riser and spool
8” cofiguration, the biggest sling tension on riser and spool 8” configuration is 3.68 ton at sling 2
while the biggest sling tension on riser and spool 10” configuration is 4.41 ton at sling 2 too, and
the rigging design on riser and spool 8” & riser and spool 10” is safe with the value of UC less
than 1.
ii
KATA PENGANTAR
Segala puji syukur penulis panjatkan kepada Tuhan Yang Maha Esa karena atas berkat
rahmat-Nya penulis dapat menyelesaikan kerja praktek di PT. ZEE INDONESIA. Kerja praktek
ini merupakan salah satu mata kuliah wajib bagi seluruh mahasiswa Departemen Teknik Kelautan
untuk bisa lulus studi S1. Dari kerja praktek ini banyak sekali pengalaman dan ilmu yang penulis
dapatkan. Bukan sekedar mengaplikasikan ilmu yang didapat selama belajar di kelas, namun
penulis juga belajar berbagai ilmu yang tidak didapatkan selama berada di kelas. Diantaranya
seperti bagaimana cara berkomuniasi dengan baik dan benar dalam suasana kerja , hubungan
dengan stakeholder yang berada di perusahaan , dan juga cara membangun kerja sama team yang
baik
Laporan ini berisi tentang kinerja di PT. ZEE INDONESIA, selain itu juga terlampir
laporan harian, laporan mingguan yang telah dikerjakan selama kerja praktek berlangsung.
Semoga laporan kerja praktek ini dapat menjelaskan secara lengkap bagaimana kerja praktek yang
telah dilakukan oleh penulis selama 2 bulan di PT. ZEE INDONESIA dan bisa bermanfaat bagi
diri penulis sendiri maupun orang lain yang membacanya.
Penulis
iii
UCAPAN TERIMAKASIH
Pada Laporan Kerja Praktek ini penulis menyampaikan banyak terimakasih kepada semua
pihak yang telah memberikan dukungan moril dan materiil kepada penulis selama menjalani kerja
praktek diantara adalah :
1. Orang tua penulis yang selalu memberikan doa dan dukungan kepada penulis.
2. Bapak Fajar Rachmadiarto, S.T sebagai narahubung antara penulis dengan PT. ZEE
Indonesia untuk menyampaikan permohonan kerja praktek
3. Bapak Sukar selaku HRD PT. ZEE Indonesia yang telah memberikan izin kepada penulis
untuk melakukan kerja praktek
4. Bapak Akhmad Rafiudin, S.T sebagai supervisor penulis yang memberikan banyak
pengetahuan baru dan pengalaman dalam mengerjakan pekerjaan-pekerjaan di bidang
offshore fixed structure dan pipe line
5. Bapak Fikri Imanudin, S.T sebagai mentor penulis yang memberikan banyak pengetahuan
baru mengenai lifting analysis pada riser dan spool .
6. Ibu Yesi, S.T sebagai mentor penulis yang memberikan banyak pengetahuan baru
mengenai riser clamp.
7. Bapak Prof. Ir. Daniel M Rosyid, Ph. D., selaku dosen pembimbing dan dosen wali penulis
yang telah memberikan bimbingan dan saran-saran kepada penulis.
8. Bapak Dr. Eng. Rudi Waluyo P, S.T., M.T., selaku Ketua Departemen Teknik Kelautan
yang telah memberikan perizinan kepada penulis untuk melaksanakan kerja praktek.
9. Bapak Dr. Ir. Hasan Ikhwani, M. Sc, selaku koordinator kerja praktek Departemen Teknik
Kelautan yang telah memberikan saran kepada penulis.
10. Teman-teman Teknik Kelautan angkatan 2015 yang melaksanakan kerja praktek bersama
saya di PT. ZEE Indonesia selama 2 bulan.
iv
DAFTAR ISI
v
BAB IV : ANALISA DAN PEMBAHASAN .................................................... 16
4.1.Data Teknis................................................................................................. 16
4.2.Perhitungan Berat Jenis Gabungan Riser, Neopreane dan Spool .............. 18
4.3.Analisa Permodelan Riser dan Spool ........................................................ 19
4.4.Analisa Tegangan Sling Riser dan Spool .................................................. 21
DAFTAR GAMBAR
vi
DAFTAR TABEL
Tabel 4.1-2. Pipeline & Riser 10” Properties at LLB Platform ........................... 16
Tabel 4.1-3. External Coating Data for Subsea Pipeline and Riser .................... 17
Tabel 4.2-1. Berat Jenis Gabungan Riser, Neoprane, dan Spool 8” .................... 18
Tabel 4.2-2. Berat Jenis Gabungan Riser, Neoprane, dan Spool 10”................... 18
Tabel 4.3-2. Berat dan CoG Spool dan Riser 10” ................................................. 19
Tabel 4.2-1. Berat Jenis Gabungan Riser, Neoprane, dan Spool 8” .................... 28
Tabel 4.2-2. Berat Jenis Gabungan Riser, Neoprane, dan Spool 10”................... 29
vii
BAB I
PENDAHULUAN
Setelah diakuisisi oleh Pertamina sejak 2009 hingga saat ini, Blok Offshore
North West Java (ONWJ) menjadi salah satu backbone produksi minyak dan gas bumi
Pertamina. Meski sebagian aset produksi sudah masuk fase mature, PT Pertamina Hulu
Energi (PHE) ONWJ terus berupaya menjaga kontinyuitas produksi dan menahan laju
natural decline rate dengan berbagai program optimisasi aset. Di tengah situasi harga
crude oil di pasar global yang belum membaik, upaya merawat mature fields dengan
tingkat efisiensi tinggi menuntut kreativitas, inovasi, dan terobosan dalam metode
kerja.
Ketekunan merawat fasilitas-fasilitas produksi serta fasilitas pendukung
lainnya, merupakan bagian dari kesuksesan PHE ONWJ dalam mempertahankan
produksinya. Hal tersebut terlihat pada capaian kinerja produksi PHE ONWJ sampai
dengan triwulan 1/2017. Yakni, produksi minyak sebesar 33,8 ribu barel minyak per
hari (MBOPD) atau 115% dari target rencana kerja anggaran perusahaan (RKAP)
tahun 2017 (28,1 MBOPD). Sedangkan raihan produksi gas adalah 131 juta kaki kubik
gas per hari (MMSCFD), atau 96% dari target RKAP (133.59 MMSCFD)
Pada tahun 2018 ini, PERTAMINA PHE ONWJ mempunyai project perbaikan
atau penggantian pipeline di lepas pantai Barat-Laut Jawa sekitar 80 - 200 km Timur-
Laut Jakarta yaitu wilayah LIMA dan KLA . Project ini bertujuan untuk
mempertahankan base production untuk memperoleh additional production . Project
ini utamanya yaitu untuk pemasangan pipeline baru dan mengganti bagian pipeline
yang telah rusak.
PT.ZEE Indonesia sebagai konsultan di bidang offshore, khususnya dalam
marine operation and pipeline ikut serta dalam mensukseskan project tersebut dengan
melakukan Lifting Analysis of Riser and Pipe Spool at LLB & LCOM Platform. Namun
tidak hanya di LLB & LCOM Platform saja, termasuk juga di KLB & KLA Platform
dan LLB & LPRO Platform.
1
List of Pipelines for Replacement
Year 2018
Size Length Repair
No. Pipeline Name Service
(Inch) (Km) Strategy
1 KLB- KLA 12" 1 MOL Full
2 LLB-LPRO 10" 7.2 MOL Full
3 LCOM-LLB 8" 7.2 GL Full
2
1.3. Tujuan
Adapun tujuan yang ingin dicapai dalam laporan kerja praktek ini adalah:
1. Mengetahui gaya lifting yang dihasilkan saat melakukan proses lifting pada
riser dan spool
2. Mengatahui tegangan sling yang dihasilkan saat melakukan proses lifting
pada riser dan spool
3. Mengetahui rigging design yang digunakan dalam melakukan proses lifting
pada riser dan spool
3
BAB II
PROFIL PERUSAHAAN
4
2.3. Divisi
Di PT. ZEE Indonesia terdapat tiga divisi engineering yang bertugas untuk
mengerjakan pekerjaan - pekerjaannya, tiga divisi tersebut adalah :
2.3.2. Pipeline
Divisi yang bekerja mengerjakan perhitungan terkait pipeline, mulai dari
analysis stress statis dan dinamis, dsb,. Divisi ini sering menggunakan software
AutoPipe atau Offpipe dalam membantu pekerjaan-pekerjaan bidang tersebut
2.3.3. Structure
Divisi yang bekerja dalam perhitungan analisa kekuatan fixed platform. Dari
mulai analisa in-place , fatigue, serta seismic. Namun tidak sebatas fixed platform saja,
seperti analisa kekuatan bolt pada riser, clamp, skid frame pada suatu bangunan
offshore , ataupun lifting pada riser dan spool. Divisi ini sering menggunakan software
SACS dalam membantu pekerjaan-pekerjaan bidang tersebut
5
2.4.1. Offshore Jackets & Topsides
Bidang Offshore Jackets & Topsides meliputi Detail Engineering, in-place, soil/pile
interaction, dynamics, fatique, earthquake. Full implementation of API RP2A, 20th
edition and LRDF. Loadout, seafastening, transportation stability, launch and
upending. Assesment of new and existing platforms, push over analysis, ultimate
capacity and failure risk analysis
2.4.2 Process
Bidang Process meliputi Process Simulation, petrochemical, chemical PFD’s
MFD’s equipment and line sizing, efficient/drain/flare disposal systems, mass and heat
balance, flow control, depressuring analysis, operating manuals. Multi phase flow, and
pipeline sizing.
2.4.3. Mechanical
Bidang Mechanical meliputi Mechanical equipment design, spec and selection
(eg. Cranes, compressors, pumps, air cables, flare tips, mooring machinery). Civil
design, fire and safety (API and NFPA checks,) maintenance manuals.
6
Software digunakan untuk membuat design awal 2D dari semua pekerjaan yang
akan dilakukan
c. OFFPIPE
Selain ZEE Pipe terdapat OFFPIPE yang juga memiliki fungsi yang sama yaitu
untuk analisa pipeline installation serta perhitungan lainnya yang berhubungan
dengan penggelaran pipa OFFPIPE digunakan oleh divisi pipeline.
d. Ultramarine MOSES
Di PT. ZEE Indonesia MOSES digunakan untuk memodelkan segala bentuk
bangunan apung yang akan digunakan untuk kebutuhan pada proyek. MOSES
dapat menghasilkan data seperti RAO, wave drift, added mass, damping, vessel
properties dan sebagainya yang selanjutnya digunakan untuk input pada Orcaflex
atau OFFPIPE.
e. SACS Structural Software
Software ini merupakan software yang paling sering digunakan oleh divisi
structure karena kemampuannya yang luas. Perhitungan tegangan untuk analisa
statis dan dinamis pada struktur lepas pantai menjadi lebih mudah karena software
ini mampu memodelkan dan menganalisa sekaligus hasil dari model tersebut.
f. Excel Spreadsheets and MathCAD
MathCAD merupakan software yang digunakan oleh semua divisi karena software
ini dibutuhkan untuk melakukan segala perhitungan baik di divisi manapun.
MathCAD dipilih karena lebih mudah dalam melakukan input data dan
perhitungan dibandingkan software lain yang sejenis.
7
2.6. Sistem Operasional
Secara struktural sistem operasional di PT. ZEE Indonesia dapat digambarkan
dengan skema sebagai berikut :
8
2.7. Pengalaman Proyek
Berikut merupakan beberapa pengalaman proyek yang pernah dikerjakan oleh
PT. ZEE Indonesia :
2.7.1 Betara Complex Development
Lima tambahan on-shore fields telah dilakukan dan hasil produksi (gas dan
kondensate) akan diekspor melalui terminal lepas pantai
Projek ini meliputi on-shore Gathering lines, Refining & Fractionating unit
onshore Trunk lines, HDD at shore, 3 Submarine pipelines, 2 offshore Offloading
Terminals including Process platform.
Bangka Field adalah area gas laut dalam yang terletak di lepas pantai
Kalimantan Timur, Indonesia. Hydrocarbon yang terdapat disana yaitu 179.5 BSCF of
gas dan 2,766 MSTBO of condensate.
Di Bangka Field akan dikembangkan dengan dua sumur bawah laut yang
dihubungkan dengan FPU West Seno melalui 9.5” ID Flexible Flow line baru .
Jaringan umbilical baru akan dipasang untuk remote subsea controls dari FPU.
Modifikasi akan dilakukan pada FPU West Seno sebagai bagian dari Bangka Topside
Project for processing and handling of the Bangka gas and condensate
9
Gambar 2.3 FPU West Seno
10
BAB III
DASAR TEORI
F en = [ 1.0 – 0.25 λ2 ] F y
Untuk λ > 2:
1
F en = Fy
λ2
0.5
kL Fy
λ =
r E
11
dengan :
λ = parameter slenderness dari column
E = modulus elastisitas Young
K = faktor panjang efektif , dapat dilihat pada Tabel 2.4
L = panjang column
R = jari-jari girasi
• Local Buckling
a. Elastic Local Bucling
t
F xe = 2 C x E
D
dengan :
F xe = besarnya tegangan elastis buckling lokal
C x = koefisien dari critical buckling
D = diameter luar
t = ketebalan dinding
x = jarak titik dari sumbu longitudinal member
b. Inelastic Local Buckling
D
F xc = Fy untuk < 60
t
1
D 4
F xc = [ 1.64 – 0.23 ] Fy ≤ F xc
t
dengan :
F xc = besarnya tegangan inelastis buckling local
• Bending
f b < Φ F bn
dengan :
M
fb = , tekanan bending dengan faktor beban, M < M p jika M > M y
S
S = modulus elastisitas
12
M = momen bending
My = momen yield elastis
Φb = resistan factor untuk bending, besarnya 0.75
F bn = tegangan bending
Besarnya tegangan bending untuk tubular member diperoleh dari :
Z
F bn = Fy
S
D
Untuk < 10340 / F y (F y dalam MPa)
t
D
Untuk < 1500 / F y (F y dalam ksi)
t
D Z
F bn = [ 0.84 – 1.74 F y t ] Fy
t S
D
Untuk 10340 / F y < < 20680/ F y (F y dalam MPa)
t
D
Untuk 1500 / F y < < 3000 / F y (F y dalam ksi)
t
D Z
F bn = [ 0.72 – 0.58 (F y t) ] F y
E S
D
Untuk 3000 / F y < ≤ 300 (F y dalam MPa)
t
D
Untuk 3000 / F y < ≤ 300 (F y dalam ksi)
t
dengan :
Z = modulus plastis
13
3.2 Lifting Rigging Design
• Sling Design Load
a. Maximum Static Load
Nilai terbesar dari static load yang diperoleh dari gaya yg bekerja
pada sling.
b. 2 Part Sling Factor
Saat sebuah 2-part sling, melingkari atau melalui sebuah shackle,
trunnion, padear atau crane hook, selai pada pada titik penghentian.
Keseluruhan gaya sling bisa didistribuskan ke beberapa bagian
dengan ratio 45:55 yang meyebabkan gesekan hilang melewati
bend.
c. Minimum sling Safety Factor
Safey factor untuk steel slings bernilai >2.25
d. Termination Efficiency Factor
Safety factor dengan hand splices bernilai 0.75
e. Sling Breaking Load
Nilai Sling Breaking Load dapat diperoleh dengan rumus seperti
berikut:
𝑀𝑀𝑀𝑀𝑀𝑀𝑀𝑀𝑀𝑀𝑀𝑀𝑀𝑀 𝑆𝑆𝑆𝑆𝑆𝑆𝑆𝑆𝑆𝑆𝑆𝑆 𝐿𝐿𝐿𝐿𝐿𝐿𝐿𝐿 𝑥𝑥 2 𝑃𝑃𝑃𝑃𝑃𝑃𝑃𝑃 𝑆𝑆𝑆𝑆𝑆𝑆𝑆𝑆𝑆𝑆 𝐹𝐹𝐹𝐹𝐹𝐹𝐹𝐹𝐹𝐹𝐹𝐹 𝑥𝑥 𝑀𝑀𝑀𝑀𝑀𝑀𝑀𝑀𝑀𝑀𝑀𝑀𝑀𝑀 𝑠𝑠𝑠𝑠𝑠𝑠𝑠𝑠𝑠𝑠 𝑆𝑆𝑆𝑆𝑆𝑆𝑆𝑆𝑆𝑆𝑆𝑆 𝐹𝐹𝐹𝐹𝐹𝐹𝐹𝐹𝐹𝐹𝐹𝐹
𝑇𝑇𝑇𝑇𝑇𝑇𝑇𝑇𝑇𝑇𝑇𝑇𝑇𝑇𝑇𝑇𝑇𝑇𝑇𝑇𝑇𝑇 𝐸𝐸𝐸𝐸𝐸𝐸𝐸𝐸𝐸𝐸𝐸𝐸𝐸𝐸𝐸𝐸𝐸𝐸𝐸𝐸 𝐹𝐹𝐹𝐹𝐹𝐹𝐹𝐹𝐹𝐹𝐹𝐹
Dimana nilai minimum breaking load diperoleh dari jenis sling rope
yang digunakan, jadi berbeda setiap jenis sling rope
14
• Webbing Sling
Unity Check Webbing Sling diperoleh dari
𝑀𝑀𝑀𝑀𝑀𝑀𝑀𝑀𝑀𝑀𝑀𝑀𝑀𝑀 𝑆𝑆𝑆𝑆𝑆𝑆𝑆𝑆𝑆𝑆𝑆𝑆 𝐿𝐿𝐿𝐿𝐿𝐿𝐿𝐿
UC =
𝑊𝑊𝑊𝑊𝑊𝑊𝑊𝑊𝑊𝑊𝑊𝑊𝑊𝑊 𝐿𝐿𝐿𝐿𝐿𝐿𝐿𝐿 𝐿𝐿𝐿𝐿𝐿𝐿𝐿𝐿𝐿𝐿
Dimana nilai working load limit diperoleh dari jenis sling rope yang
digunakan, jadi berbeda setiap jenis webbing sling
Dimana nilai working load limit diperoleh dari jenis sling rope yang
digunakan, jadi berbeda setiap jenis chain block
15
BAB IV
ANALISA DAN PEMBAHASAN
Corrosion allowance mm 3
Corrosion allowance mm 3
16
Tabel 4.1-3. External Coating Data for Subsea Pipeline and Riser
Riser mm
Thickness 3.2 (3200)
Corrosion (µm)
Coating Density kg/m3 920
Pipeline mm
Thickness 3.2 (3200)
Corrosion (µm)
Coating Density kg/m3 920
Pipeline Thickness mm 40
Concrete Density kg/m3 3043.5
Weight
Coating Cut Back Length mm 300 ± 10
17
4.2 Perhitungan Berat Jenis Gabungan Riser, Neoprane, dan Spool
Nilai berat jenis gabungan diperoleh dari perhitungan antara berat jenis Riser,
Neoprane, dan Spool itu sendiri dengan berat jenis masing – masing coating
yang melapisinya. Hasil berat jenis gabungan dapat dililhat pada tabel
dibawah ini. Untuk perhitungan selengkapnya dapat dilihat di lampiran.
Tabel 4.2-2. Berat Jenis Gabungan Riser, Neoprane, dan Spool 10”
18
4.3 Analisa Permodelan Riser dan Spool
Dari hasil analisa permodelan riser dan spool menggunakan SACS 5.6
dengan ketentuan yaitu hook point dimodelkan dengan fixed point dan di ujung
permodelan diberikan spring point dengan beban spring mendekati nol untuk
mencegah rotasi yang dapat mengubah CoG dan hook point sehingga diperoleh
hasil sebagai berikut :
ANALYSIS MODEL
WEIGHT CoG**
DESCRIPTION
(MT)* X (m) Y(m) Z(m)
ANALYSIS MODEL
WEIGHT CoG**
DESCRIPTION
(MT)* X (m) Y(m) Z(m)
WEIGHT WEIGHT
LC DESCRIPTION
(MT) (MT)
Riser and Pipe Spool 8” 10”
19
Hook Point
CoG
Origin
0, 0, 0
Hook Point
CoG
Origin
0, 0, 0
20
4.4 Analisa Tegangan Sling Riser dan Spool
Dari hasil analisa permodelan riser dan spool menggunakan SACS 5.6
diperoleh output nilai untuk tegangan sling dan panjang efektif sling . Nilai –
nilai ini diperoleh dari perhitungan yang dilakukan oleh SACS 5.6 dengan
menggunakan rules API RP 2A WSD .
Effective Sling
Sling Length
Description
Identification
(m)
Sling 1 22.229
Sling 2 42.404
Sling 4 42.620
Sling 5 44.686
Sling 1 22.229
Sling 2 42.404
Sling 4 42.620
Sling 5 44.686
21
Tabel 4.4-2. Tegangan sling
Sling
Sling Tension/Unfactored
Description
ID
(Tons)
Sling 1 0.06
Sling 2 3.68
8” Riser &
Sling 3 2.00
Spool
Sling 4 1.94
Sling 5 1.71
Sling 1 0.08
Sling 2 4.41
10” Riser &
Sling 3 2.46
Spool
Sling 4 2.36
Sling 5 2.11
Max. Sling
No Description Tension UC
(MT)
22
Wire Sling Ø60
2 mm 3.68 0.07
SWL 50 MT
Chain Block
3 3.68 0.46
SWL 5 MT
Shackle
4 3.68 0.31
SWL 12 MT
Webbing Sling
5 SWL 8MT @8 m 3.68 0.74
Length
Chain Block
3 4.41 0.88
SWL 5 MT
Shackle
4 4.41 0.37
SWL 12 MT
Webbing Sling
5 SWL 8MT @8 m 4.41 0.55
Length
23
4.6 Member Group UC
Member-member Riser dan Spool yang telah dibuat permodelannya
menggunakan SACS 5.6 kemudian diperiksa nilai UC nya yang berhubungan
dengan kombinasi gaya axial dan bending dengan persamaan yang telah
disediakan oleh AISC. Dari hasil pemeriksaan nilai UC yang diperoleh masih
dibawah nilai batas yaitu 1. Untuk hasil UC dari keseluruhan member dapat
dilihat di lampiran. Untuk nilai UC yang ada ditabel 4.6 ini hanya nilai
terbesar dari setiap member group.
24
BAB V
KESIMPULAN
5.1. Kesimpulan
Dari analisa yang telah dilakukan dapat disimpulkan bahwa :
1. Gaya lifting pada konfigurasi riser dan spool 10” memiliki nilai lebih besar
dibandingan dengan konfigurasi riser dan spool 8” dikarenakan berat jenis dari
riser dan spool 10” lebih besar dibandingkan berat jenis riser dan spool 8”
meskipun keduanya memilik konfigurasi pipeline yang sama.
2. Tegangan sling terbesar pada konfigurasi riser dan spool 8” yaitu 3.68 ton pada
sling 2 sedangkan tegangan sling terbesar pada konfigurasi riser dan spool 10” yaitu
4.41 ton pada sling 2 juga.
3. Rigging design pada pada konfigurasi riser dan spool 8” dan konfigurasi riser
dan spool 10” dinyatakan aman dengan nilai UC terbesar yaitu terletak pada chain
block yaitu sebesar 0.74 dan 0.88 pada masing – masing konfigurasi yang dimana
nilai UC tersebut masih kurang dari 1.
25
DAFTAR PUSTAKA
http://www.zee-indonesia.co.id
26
LAMPIRAN
8” RISER & SPOOL
LIFTING
LAMPIRAN
10” RISER & SPOOL
LIFTING
Active Structure
1 .0 0 0 +
0 .9 0 0 - 0 .9 9 9
0 .8 5 0 - 0 .8 9 9
0 .8 0 0 - 0 .8 4 9
0 .0 0 - 0 .7 9 9
SACS INPUT JOINT 0021 -4. 18. 0.-65.759 26.278
JOINT 0022 -4. 18. 0.-73.862 37.851
JOINT 0023 -4. 18. 0.-83.015 48.417
LDOPT OPNF+Z1.0280007.849000 GLOBMN MPT
JOINT 0024 -4. 18. 0.-92.872 57.713
OPTIONS MN SDUCJT 2 1 DC C PTPTPTPTPTPTPTPTPT
JOINT 0025 -5. 18. 0. -3.060 65.608
LCSEL LIFT STAT
JOINT 0026 -5. 18. 0.-13.232 72.097
GRUP
JOINT 0027 -15. 24. 0.-83.560 90.050
GRUP NEO 21.908 1.270 20.007.72236.00 1 1.001.00 0.500 9.7100
JOINT 0028 -17. 25. 20. -1.799 58.315 33.200
GRUP RSB 21.908 1.270 20.007.72236.00 1 1.001.00 0.500 8.1000
JOINT 0029 -10. 21. 0.-48.396 81.074
GRUP RSR 21.908 1.270 20.007.72236.00 1 1.001.00 0.500 8.1000
JOINT 0030 -15. 24. 0.-99.186 99.071 1.197
GRUP SLG 10.000 1.000 20.007.72224.80 9 1.001.00 0.500 1.00-5
JOINT 0031 -16. 25. 0. -8.333 4.352 3.030
GRUP SPB 21.908 1.270 20.007.72236.00 1 1.001.00 0.500 7.8500
JOINT 0032 -16. 25. 0.-18.330 10.124 6.037
GRUP SPL 21.908 1.270 20.007.72236.00 1 1.001.00 0.500N20.430
JOINT 0033 -16. 25. 0.-29.034 16.304 10.501
MEMBER
MEMBER 00280047 NEO L 21.321.3 JOINT 0034 -16. 25. 0.-40.176 22.737 16.669
MEMBER 00470017 NEO L 24.024.0 JOINT 0035 -16. 25. 0.-51.363 29.195 24.678
MEMBER 00270030 RSB L 7.217.21 JOINT 0036 -16. 25. 0.-62.111 35.401 34.483
JOINT 0037 -16. 25. 0.-71.930 41.070 45.821
MEMBER 00300031 RSB L 7.217.21
JOINT 0038 -16. 25. 0.-80.423 45.973 58.231
MEMBER 00310032 RSB L 7.217.21
JOINT 0039 -16. 25. 0.-87.360 49.978 71.149
MEMBER 00320033 RSB L 7.217.21
JOINT 0040 -16. 25. 0.-92.703 53.063 84.015
MEMBER 00330034 RSB L 7.217.21
JOINT 0041 -16. 25. 0.-96.570 55.296 96.376
MEMBER 00340035 RSB L 7.217.21
JOINT 0042 -16. 25. 1.-99.174 56.799 7.921
MEMBER 00350036 RSB L 7.217.21
JOINT 0043 -17. 25. 1. -0.762 57.716 18.484
MEMBER 00360037 RSB L 7.217.21
JOINT 0044 -17. 25. 1. -1.569 58.182 28.013
MEMBER 00370038 RSB L 21.321.3
JOINT 0045 -17. 25. 1. -1.799 58.315 36.530
MEMBER 00380039 RSB L 21.321.3
JOINT 0046 -2. 5. 0. -8.366 5.934
MEMBER 00390040 RSB L 21.321.3
JOINT 0047 -17. 25. 21. -1.799 58.315 83.000
MEMBER 00400041 RSB L 21.321.3
JOINT 0049 -17. 25. 33. -1.799 58.315 83.000
MEMBER 00410042 RSB L 21.321.3
JOINT 1111 -10. 18. 41.-15.439 64.037 80.000 FIXED
MEMBER 00420043 RSB L 21.321.3
LOAD
MEMBER 00430044 RSB L 21.321.3
LOADCN 1
MEMBER 00440045 RSB L 21.321.3
LOADLB 1STRUCTURE MODELLED WEIGHT
MEMBER 00170049 RSR L 24.024.0
DEAD
MEMBER 00450028 RSR L 21.321.3
DEAD -Z M
MEMBER 11110001 SLG 011011011011
LOADCN 2
MEMBER 11110029 SLG 011011011011
LOADLB 2CLAMP WEIGHT
MEMBER 11110037 SLG 011011011011
LOAD 0047 -6.8647 GLOB JOIN CLAMP
MEMBER 11110046 SLG 011011011011
LCOMB
MEMBER 11110047 SLG 011011011011
MEMBER 00000002 SPB L 12.012.0 LCOMB STAT 1 1.10002 1.1000
MEMBER 00020003 SPB L 12.012.0 LCOMB LIFT STAT2.0000
MEMBER 00030004 SPB L 12.012.0 END
MEMBER 00040005 SPB L 12.012.0
MEMBER 00050006 SPB L 12.012.0
MEMBER 00060007 SPB L 12.012.0
MEMBER 00070008 SPB L 12.012.0
MEMBER 00080009 SPB L 12.012.0
MEMBER 00090010 SPB L 12.012.0
MEMBER 00100011 SPB L 12.012.0
MEMBER 00110012 SPB L 12.012.0
MEMBER 00120013 SPB L 12.012.0
MEMBER 00130014 SPB L 12.012.0
MEMBER 00140015 SPB L 12.012.0
MEMBER 00160019 SPB L 11.811.8
MEMBER 00190020 SPB L 11.811.8
MEMBER 00200021 SPB L 11.811.8
MEMBER 00210022 SPB L 11.811.8
MEMBER 00220023 SPB L 11.811.8
MEMBER 00230024 SPB L 11.811.8
MEMBER 00240025 SPB L 11.811.8
MEMBER 00250026 SPB L 11.811.8
MEMBER 00010016 SPL L 11.811.8
MEMBER 00010046 SPL L
MEMBER 00150046 SPL L 12.012.0
MEMBER 00260029 SPL L 11.811.8
MEMBER 00290027 SPL L 7.217.21
JOINT
JOINT 0000 0. 0. 0. 111000
JOINT 0000 0.010 0.010 0.010 ELASTI
JOINT 0001 -3. 13. 0.-65.970 44.197
JOINT 0002 0. 0. 0.-19.932 1.463
JOINT 0003 0. 0. 0.-31.356 3.649
JOINT 0004 0. 0. 0.-43.584 7.143
JOINT 0005 0. 0. 0.-56.346 12.169
JOINT 0006 0. 0. 0.-69.241 18.860
JOINT 0007 0. 0. 0.-81.783 27.204
JOINT 0008 0. 0. 0.-93.466 37.008
JOINT 0009 -1. 0. 0. -3.861 47.910
JOINT 0010 -1. 0. 0.-12.689 59.447
JOINT 0011 -1. 0. 0.-19.854 71.142
JOINT 0012 -1. 0. 0.-25.418 82.577
JOINT 0013 -1. 0. 0.-29.555 93.447
JOINT 0014 -1. 1. 0.-32.489 3.558
JOINT 0015 -1. 1. 0.-34.456 12.821
JOINT 0016 -4. 17. 0.-49.663 89.347
JOINT 0017 -17. 25. 31. -1.799 58.315 45.500
JOINT 0019 -4. 18. 0.-53.597 1.621
JOINT 0020 -4. 18. 0.-58.961 14.063
SACS OUTPUT
Seastate Options
******* SEASTATE OPTIONS *******
FX FY FZ MX MY MZ
(KN) (KN) (KN) (KN-M) (KN-M) (KN-M)
FX FY FZ MX MY MZ
(KN) (KN) (KN) (KN-M) (KN-M) (KN-M)
LOAD *** X-DIRECTION *** *** Y-DIRECTION *** *** Z-DIRECTION ***
CASE JOINT DEFLECTION JOINT DEFLECTION JOINT DEFLECTION
CM CM CM
Spring Forces
SACS-IV SYSTEM SPRING FORCES AND MOMENTS SUMMARY
1111-0001 1111 SLG STAT 18.98 0.00 0.00 0.19 0.00 0.00
LIFT 37.97 0.00 0.00 0.38 0.00 0.00
0001 STAT 18.98 0.00 0.00 0.19 0.00 0.00
LIFT 37.97 0.00 0.00 0.38 0.00 0.00
1111-0029 1111 SLG STAT 19.55 0.00 0.00 -0.15 0.00 0.00
LIFT 39.10 0.00 0.00 -0.29 0.00 0.00
0029 STAT 19.55 0.00 0.00 -0.15 0.00 0.00
LIFT 39.10 0.00 0.00 -0.29 0.00 0.00
1111-0037 1111 SLG STAT 36.05 0.00 0.00 -0.18 0.00 0.00
LIFT 72.10 0.00 0.00 -0.36 0.00 0.00
0037 STAT 36.05 0.00 0.00 -0.18 0.00 0.00
LIFT 72.10 0.00 0.00 -0.36 0.00 0.00
1111-0046 1111 SLG STAT 16.79 0.00 0.00 0.23 0.00 0.00
LIFT 33.57 0.00 0.00 0.46 0.00 0.00
0046 STAT 16.79 0.00 0.00 0.23 0.00 0.00
LIFT 33.57 0.00 0.00 0.46 0.00 0.00
1111-0047 1111 SLG STAT 0.60 0.00 0.00 -0.24 0.00 0.00
LIFT 1.20 0.00 0.00 -0.47 0.00 0.00
0047 STAT 0.60 0.00 0.00 -0.24 0.00 0.00
LIFT 1.20 0.00 0.00 -0.47 0.00 0.00
GROUP II - UNITY CHECKS GREATER THAN 1.00 AND LESS THAN 1.33
GROUP III - UNITY CHECKS GREATER THAN 0.00 AND LESS THAN 0.50
MAXIMUM LOAD DIST AXIAL BENDING STRESS SHEAR FORCE SECOND-HIGHEST THIRD-HIGHEST
MEMBER GROUP COMBINED COND FROM STRESS Y Z FY FZ KLY/RY KLZ/RZ UNITY LOAD UNITY LOAD
ID UNITY CK NO. END N/MM2 N/MM2 N/MM2 KN KN CHECK COND CHECK COND
0028-0047 NEO 0.377 LIFT 0.0 -4.45 -1.03 1.74 -0.37 0.37 291.4 291.4 0.187 STAT 0.000
0047-0017 NEO 0.254 LIFT 0.0 -2.43 0.00 0.00 0.00 0.00 328.3 328.3 0.127 STAT 0.000
0027-0030 RSB 0.057 LIFT 0.0 -1.90 -0.06 10.44 -4.53 -4.34 98.6 98.6 0.028 STAT 0.000
0030-0031 RSB 0.054 LIFT 0.0 -1.83 -2.07 9.54 -4.53 -6.22 98.6 98.6 0.027 STAT 0.000
0031-0032 RSB 0.053 LIFT 0.0 -1.76 -3.75 9.15 -4.53 -7.60 98.6 98.6 0.027 STAT 0.000
0032-0033 RSB 0.058 LIFT 0.1 -1.65 -9.02 7.16 -4.53 -9.23 98.6 98.6 0.029 STAT 0.000
0033-0034 RSB 0.068 LIFT 0.1 -1.52 -12.80 6.40 -4.53 -10.74 98.6 98.6 0.034 STAT 0.000
0034-0035 RSB 0.081 LIFT 0.2 -1.36 -17.39 5.51 -4.53 -12.21 98.6 98.6 0.040 STAT 0.000
0035-0036 RSB 0.097 LIFT 0.2 -1.16 -22.70 4.52 -4.53 -13.57 98.6 98.6 0.048 STAT 0.000
0036-0037 RSB 0.116 LIFT 0.2 -0.94 -28.56 3.45 -4.53 -14.76 98.6 98.6 0.058 STAT 0.000
0017-0049 RSR 0.043 LIFT 0.0 -0.42 0.00 0.00 0.00 0.00 328.3 328.3 0.022 STAT 0.000
0000-0002 SPB 0.000 LIFT 0.2 0.00 -0.07 0.00 -0.01 -0.28 164.1 164.1 0.000 STAT 0.000
0002-0003 SPB 0.001 LIFT 0.1 0.00 -0.17 -0.01 -0.01 -0.44 164.1 164.1 0.000 STAT 0.000
0003-0004 SPB 0.001 LIFT 0.1 0.00 -0.34 -0.01 -0.01 -0.62 164.1 164.1 0.001 STAT 0.000
0004-0005 SPB 0.002 LIFT 0.1 0.00 -0.58 -0.01 -0.01 -0.81 164.1 164.1 0.001 STAT 0.000
0005-0006 SPB 0.003 LIFT 0.1 0.00 -0.90 -0.02 -0.01 -1.01 164.1 164.1 0.002 STAT 0.000
0006-0007 SPB 0.005 LIFT 0.2 0.00 -1.30 -0.02 -0.01 -1.22 164.1 164.1 0.002 STAT 0.000
0007-0008 SPB 0.007 LIFT 0.2 0.00 -1.77 -0.03 -0.01 -1.43 164.1 164.1 0.003 STAT 0.000
0008-0009 SPB 0.009 LIFT 0.2 0.00 -2.30 -0.03 -0.01 -1.64 164.1 164.1 0.004 STAT 0.000
0009-0010 SPB 0.011 LIFT 0.1 0.00 -2.86 -0.04 -0.01 -1.85 164.1 164.1 0.005 STAT 0.000
0010-0011 SPB 0.013 LIFT 0.1 0.00 -3.42 -0.04 -0.01 -2.04 164.1 164.1 0.006 STAT 0.000
0011-0012 SPB 0.015 LIFT 0.1 0.00 -3.98 -0.05 -0.01 -2.22 164.1 164.1 0.007 STAT 0.000
0012-0013 SPB 0.017 LIFT 0.1 0.00 -4.50 -0.05 -0.01 -2.38 164.1 164.1 0.008 STAT 0.000
0013-0014 SPB 0.018 LIFT 0.1 0.00 -4.99 -0.05 -0.01 -2.53 164.1 164.1 0.009 STAT 0.000
0014-0015 SPB 0.020 LIFT 0.1 0.00 -5.43 -0.06 -0.01 -2.66 164.1 164.1 0.010 STAT 0.000
0015-0046 SPL 0.386 LIFT 4.0 0.00 -104.10 -0.17 -0.01 -17.17 164.1 164.1 0.193 STAT 0.000
NEO 0028-0047 LIFT 0.38 0.0 -4.45 -1.03 1.74 12.13 12.13 270.00 270.00 C>.15A 21.3 21.3 0.85 0.85
RSB 0044-0045 LIFT 0.87 0.1 -7.76 25.93 6.53 12.13 12.13 270.00 270.00 C>.15A 21.3 21.3 0.85 0.85
RSR 0045-0028 LIFT 0.87 0.0 -7.76 -18.66 19.17 12.13 12.13 270.00 270.00 C>.15A 21.3 21.3 0.85 0.85
SPB 0021-0022 LIFT 0.76 0.1 -2.30 11.14 189.71 39.53 39.53 270.00 270.00 C<.15 11.8 11.8 0.85 0.85
SPL 0026-0029 LIFT 0.74 0.0 -2.15 10.88 185.25 39.53 39.53 270.00 270.00 C<.15 11.8 11.8 0.85 0.85
Active Structure
Active Structure
Active Structure
Member Label= Group
Active Structure
Mem Result= Combined UC
1 .0 0 0 +
0 .9 0 0 - 0 .9 9 9
0 .8 5 0 - 0 .8 9 9
0 .8 0 0 - 0 .8 4 9
0 .0 0 - 0 .7 9 9
SACS INPUT JOINT 0020 -4. 18. 0.-58.961 14.063
JOINT 0021 -4. 18. 0.-65.759 26.278
JOINT 0022 -4. 18. 0.-73.862 37.851
LDOPT OPNF+Z1.0280007.849000 GLOBMN MPT
JOINT 0023 -4. 18. 0.-83.015 48.417
OPTIONS MN SDUCJT 2 1 DC C PTPTPTPTPTPTPTPTPT
JOINT 0024 -4. 18. 0.-92.872 57.713
LCSEL LIFT STAT
JOINT 0025 -5. 18. 0. -3.060 65.608
GRUP
JOINT 0026 -5. 18. 0.-13.232 72.097
GRUP BRC 11.430 0.600 20.007.72236.00 1 1.001.00 0.500 19.857
JOINT 0027 -15. 24. 0.-83.560 90.050
GRUP NEO 27.305 1.270 20.007.72236.00 1 1.001.00 0.500 9.6670
JOINT 0028 -17. 25. 20. -1.799 58.315 33.200
GRUP RSB 27.305 1.270 20.007.72236.00 1 1.001.00 0.500 8.1000
JOINT 0029 -10. 21. 0.-48.396 81.074
GRUP RSR 27.305 1.270 20.007.72236.00 1 1.001.00 0.500 8.1000
JOINT 0030 -15. 24. 0.-99.186 99.071 1.197
GRUP SLG 10.000 1.000 20.007.72224.80 9 1.001.00 0.500 1.00-5
JOINT 0031 -16. 25. 0. -8.333 4.352 3.030
GRUP SPB 27.305 1.270 20.007.72236.00 1 1.001.00 0.500 7.8500
JOINT 0032 -16. 25. 0.-18.330 10.124 6.037
GRUP SPL 27.305 1.270 20.007.72236.00 1 1.001.00 0.500 19.857
MEMBER JOINT 0033 -16. 25. 0.-29.034 16.304 10.501
MEMBER 00280047 NEO L 22.022.0 JOINT 0034 -16. 25. 0.-40.176 22.737 16.669
MEMBER 00470017 NEO L 24.024.0 JOINT 0035 -16. 25. 0.-51.363 29.195 24.678
JOINT 0036 -16. 25. 0.-62.111 35.401 34.483
MEMBER 00270030 RSB L 8.008.00
JOINT 0037 -16. 25. 0.-71.930 41.070 45.821
MEMBER 00300031 RSB L 8.008.00
JOINT 0038 -16. 25. 0.-80.423 45.973 58.231
MEMBER 00310032 RSB L 8.008.00
JOINT 0039 -16. 25. 0.-87.360 49.978 71.149
MEMBER 00320033 RSB L 8.008.00
JOINT 0040 -16. 25. 0.-92.703 53.063 84.015
MEMBER 00330034 RSB L 8.008.00
JOINT 0041 -16. 25. 0.-96.570 55.296 96.376
MEMBER 00340035 RSB L 8.008.00
JOINT 0042 -16. 25. 1.-99.174 56.799 7.921
MEMBER 00350036 RSB L 8.008.00
JOINT 0043 -17. 25. 1. -0.762 57.716 18.484
MEMBER 00360037 RSB L 8.008.00
JOINT 0044 -17. 25. 1. -1.569 58.182 28.013
MEMBER 00370038 RSB L 22.022.0
JOINT 0045 -17. 25. 1. -1.799 58.315 36.530
MEMBER 00380039 RSB L 22.022.0
JOINT 0046 -2. 5. 0. -8.366 5.934
MEMBER 00390040 RSB L 22.022.0
JOINT 0047 -17. 25. 21. -1.799 58.315 83.000
MEMBER 00400041 RSB L 22.022.0
JOINT 0049 -17. 25. 33. -1.799 58.315 83.000
MEMBER 00410042 RSB L 22.022.0
JOINT 1111 -10. 18. 41. -9.696 57.985 80.000 FIXED
MEMBER 00420043 RSB L 22.022.0
LOAD
MEMBER 00430044 RSB L 22.022.0
LOADCN 1
MEMBER 00440045 RSB L 22.022.0
DEAD
MEMBER 00170049 RSR L 24.024.0
DEAD -Z M
MEMBER 00450028 RSR L 22.022.0
LOADCN 2
MEMBER 11110001 SLG 011011011011
LOAD 0047 -6.8647 GLOB JOIN CLAMP
MEMBER 11110029 SLG 011011011011
LCOMB
MEMBER 11110037 SLG 011011011011
LCOMB STAT 1 1.10002 1.1000
MEMBER 11110046 SLG 011011011011
MEMBER 11110047 SLG 011011011011 LCOMB LIFT STAT2.0000
MEMBER 00000002 SPB L 12.012.0 END
MEMBER 00020003 SPB L 12.012.0
MEMBER 00030004 SPB L 12.012.0
MEMBER 00040005 SPB L 12.012.0
MEMBER 00050006 SPB L 12.012.0
MEMBER 00060007 SPB L 12.012.0
MEMBER 00070008 SPB L 12.012.0
MEMBER 00080009 SPB L 12.012.0
MEMBER 00090010 SPB L 12.012.0
MEMBER 00100011 SPB L 12.012.0
MEMBER 00110012 SPB L 12.012.0
MEMBER 00120013 SPB L 12.012.0
MEMBER 00130014 SPB L 12.012.0
MEMBER 00140015 SPB L 12.012.0
MEMBER 00160019 SPB L 12.012.0
MEMBER 00190020 SPB L 12.012.0
MEMBER 00200021 SPB L 12.012.0
MEMBER 00210022 SPB L 12.012.0
MEMBER 00220023 SPB L 12.012.0
MEMBER 00230024 SPB L 12.012.0
MEMBER 00240025 SPB L 12.012.0
MEMBER 00250026 SPB L 12.012.0
MEMBER 00010016 SPL L 12.012.0
MEMBER 00010046 SPL L
MEMBER 00150046 SPL L 12.012.0
MEMBER 00260029 SPL L 12.012.0
MEMBER 00290027 SPL L 8.008.00
JOINT
JOINT 0000 0. 0. 0. 111000
JOINT 0000 0.010 0.010 0.010 ELASTI
JOINT 0001 -3. 13. 0.-65.970 44.197
JOINT 0002 0. 0. 0.-19.932 1.463
JOINT 0003 0. 0. 0.-31.356 3.649
JOINT 0004 0. 0. 0.-43.584 7.143
JOINT 0005 0. 0. 0.-56.346 12.169
JOINT 0006 0. 0. 0.-69.241 18.860
JOINT 0007 0. 0. 0.-81.783 27.204
JOINT 0008 0. 0. 0.-93.466 37.008
JOINT 0009 -1. 0. 0. -3.861 47.910
JOINT 0010 -1. 0. 0.-12.689 59.447
JOINT 0011 -1. 0. 0.-19.854 71.142
JOINT 0012 -1. 0. 0.-25.418 82.577
JOINT 0013 -1. 0. 0.-29.555 93.447
JOINT 0014 -1. 1. 0.-32.489 3.558
JOINT 0015 -1. 1. 0.-34.456 12.821
JOINT 0016 -4. 17. 0.-49.663 89.347
JOINT 0017 -17. 25. 31. -1.799 58.315 45.500
JOINT 0019 -4. 18. 0.-53.597 1.621
SACS OUTPUT
Seastate Options
******* SEASTATE OPTIONS *******
1 1 DEAD
2 2 USER GENERATED LOADS
1 110.00 DEAD
2 110.00 USER GENERATED LOADS
FX FY FZ MX MY MZ
(KN) (KN) (KN) (KN-M) (KN-M) (KN-M)
FX FY FZ MX MY MZ
(KN) (KN) (KN) (KN-M) (KN-M) (KN-M)
LOAD *** X-DIRECTION *** *** Y-DIRECTION *** *** Z-DIRECTION ***
CASE JOINT DEFLECTION JOINT DEFLECTION JOINT DEFLECTION
CM CM CM
Spring Forces
SACS-IV SYSTEM SPRING FORCES AND MOMENTS SUMMARY
1111-0001 1111 SLG STAT 23.14 0.00 0.00 0.12 0.00 0.00
LIFT 46.29 0.00 0.00 0.24 0.00 0.00
0001 STAT 23.14 0.00 0.00 0.12 0.00 0.00
LIFT 46.29 0.00 0.00 0.24 0.00 0.00
1111-0029 1111 SLG STAT 24.15 0.00 0.00 -0.09 0.00 0.00
LIFT 48.29 0.00 0.00 -0.18 0.00 0.00
0029 STAT 24.15 0.00 0.00 -0.09 0.00 0.00
LIFT 48.29 0.00 0.00 -0.18 0.00 0.00
1111-0037 1111 SLG STAT 43.25 0.00 0.00 -0.11 0.00 0.00
LIFT 86.50 0.00 0.00 -0.22 0.00 0.00
0037 STAT 43.25 0.00 0.00 -0.11 0.00 0.00
LIFT 86.50 0.00 0.00 -0.22 0.00 0.00
1111-0046 1111 SLG STAT 20.71 0.00 0.00 0.14 0.00 0.00
LIFT 41.41 0.00 0.00 0.28 0.00 0.00
0046 STAT 20.71 0.00 0.00 0.14 0.00 0.00
LIFT 41.41 0.00 0.00 0.28 0.00 0.00
1111-0047 1111 SLG STAT 0.75 0.00 0.00 -0.15 0.00 0.00
LIFT 1.51 0.00 0.00 -0.30 0.00 0.00
0047 STAT 0.75 0.00 0.00 -0.15 0.00 0.00
LIFT 1.51 0.00 0.00 -0.30 0.00 0.00
GROUP II - UNITY CHECKS GREATER THAN 1.00 AND LESS THAN 1.33
GROUP III - UNITY CHECKS GREATER THAN 0.00 AND LESS THAN 0.50
MAXIMUM LOAD DIST AXIAL BENDING STRESS SHEAR FORCE SECOND-HIGHEST THIRD-HIGHEST
MEMBER GROUP COMBINED COND FROM STRESS Y Z FY FZ KLY/RY KLZ/RZ UNITY LOAD UNITY LOAD
ID UNITY CK NO. END N/MM2 N/MM2 N/MM2 KN KN CHECK COND CHECK COND
0028-0047 NEO 0.231 LIFT 0.0 -4.06 -0.96 1.23 -0.47 0.47 238.7 238.7 0.115 STAT 0.000
0047-0017 NEO 0.160 LIFT 0.0 -2.42 0.00 0.00 0.00 0.00 260.4 260.4 0.080 STAT 0.000
0027-0030 RSB 0.047 LIFT 0.0 -1.83 1.13 8.61 -5.49 -5.09 86.8 86.8 0.023 STAT 0.000
0030-0031 RSB 0.044 LIFT 0.0 -1.76 -0.34 7.98 -5.49 -7.39 86.8 86.8 0.022 STAT 0.000
0031-0032 RSB 0.043 LIFT 0.0 -1.69 -1.59 7.71 -5.49 -9.07 86.8 86.8 0.021 STAT 0.000
0032-0033 RSB 0.044 LIFT 0.1 -1.59 -5.51 6.24 -5.49 -11.07 86.8 86.8 0.022 STAT 0.000
0033-0034 RSB 0.049 LIFT 0.1 -1.47 -8.33 5.69 -5.49 -12.91 86.8 86.8 0.025 STAT 0.000
0034-0035 RSB 0.058 LIFT 0.2 -1.31 -11.77 5.03 -5.49 -14.71 86.8 86.8 0.029 STAT 0.000
0035-0036 RSB 0.069 LIFT 0.2 -1.12 -15.75 4.28 -5.49 -16.38 86.8 86.8 0.035 STAT 0.000
0036-0037 RSB 0.083 LIFT 0.2 -0.91 -20.15 3.47 -5.49 -17.83 86.8 86.8 0.042 STAT 0.000
0037-0038 RSB 0.427 LIFT 0.0 -5.96 -20.17 4.22 -0.18 48.09 238.7 238.7 0.204 STAT 0.000
0038-0039 RSB 0.402 LIFT 0.0 -6.42 -8.42 4.58 -0.18 40.61 238.7 238.7 0.196 STAT 0.000
0039-0040 RSB 0.423 LIFT 0.1 -6.76 8.41 4.82 -0.18 32.96 238.7 238.7 0.206 STAT 0.000
0040-0041 RSB 0.463 LIFT 0.1 -7.02 13.64 5.04 -0.18 25.67 238.7 238.7 0.223 STAT 0.000
0041-0042 RSB 0.492 LIFT 0.1 -7.20 17.11 5.19 -0.18 18.81 238.7 238.7 0.234 STAT 0.000
0017-0049 RSR 0.027 LIFT 0.0 -0.42 0.00 0.00 0.00 0.00 260.4 260.4 0.014 STAT 0.000
0000-0002 SPB 0.000 LIFT 0.2 0.00 -0.05 0.00 -0.01 -0.35 130.2 130.2 0.000 STAT 0.000
0002-0003 SPB 0.001 LIFT 0.1 0.00 -0.14 0.00 -0.01 -0.56 130.2 130.2 0.000 STAT 0.000
0003-0004 SPB 0.001 LIFT 0.1 0.00 -0.27 0.00 -0.01 -0.78 130.2 130.2 0.001 STAT 0.000
0004-0005 SPB 0.002 LIFT 0.1 0.00 -0.45 -0.01 -0.01 -1.02 130.2 130.2 0.001 STAT 0.000
0005-0006 SPB 0.003 LIFT 0.1 0.00 -0.71 -0.01 -0.01 -1.28 130.2 130.2 0.001 STAT 0.000
0006-0007 SPB 0.004 LIFT 0.2 0.00 -1.02 -0.01 -0.01 -1.54 130.2 130.2 0.002 STAT 0.000
0007-0008 SPB 0.005 LIFT 0.2 0.00 -1.39 -0.01 -0.01 -1.81 130.2 130.2 0.003 STAT 0.000
0008-0009 SPB 0.007 LIFT 0.2 0.00 -1.80 -0.01 -0.01 -2.07 130.2 130.2 0.003 STAT 0.000
0009-0010 SPB 0.008 LIFT 0.1 0.00 -2.24 -0.01 -0.01 -2.33 130.2 130.2 0.004 STAT 0.000
0010-0011 SPB 0.010 LIFT 0.1 0.00 -2.69 -0.02 -0.01 -2.57 130.2 130.2 0.005 STAT 0.000
0011-0012 SPB 0.012 LIFT 0.1 0.00 -3.12 -0.02 -0.01 -2.80 130.2 130.2 0.006 STAT 0.000
0012-0013 SPB 0.013 LIFT 0.1 0.00 -3.53 -0.02 -0.01 -3.00 130.2 130.2 0.007 STAT 0.000
0013-0014 SPB 0.014 LIFT 0.1 0.00 -3.91 -0.02 -0.01 -3.19 130.2 130.2 0.007 STAT 0.000
0014-0015 SPB 0.016 LIFT 0.1 0.00 -4.26 -0.02 -0.01 -3.35 130.2 130.2 0.008 STAT 0.000
0001-0046 SPL 0.448 LIFT 0.0 -1.32 -98.07 -65.24 4.98 20.35 92.6 92.6 0.224 STAT 0.000
0015-0046 SPL 0.296 LIFT 4.0 0.00 -80.05 -0.07 -0.01 -21.15 130.2 130.2 0.148 STAT 0.000
0029-0027 SPL 0.428 LIFT 0.0 -1.86 -93.80 60.48 -5.49 23.68 86.8 86.8 0.214 STAT 0.000
Member Group Summary
SACS-IV MEMBER UNITY CHECK RANGE SUMMARY
GROUP III - UNITY CHECKS GREATER THAN 0.00 AND LESS THAN 0.50
MAXIMUM LOAD DIST AXIAL BENDING STRESS SHEAR FORCE SECOND-HIGHEST THIRD-HIGHEST
MEMBER GROUP COMBINED COND FROM STRESS Y Z FY FZ KLY/RY KLZ/RZ UNITY LOAD UNITY LOAD
ID UNITY CK NO. END N/MM2 N/MM2 N/MM2 KN KN CHECK COND CHECK COND
0007-0008 SPB 0.005 LIFT 0.2 0.00 -1.39 -0.01 -0.01 -1.81 130.2 130.2 0.003 STAT 0.000
0008-0009 SPB 0.007 LIFT 0.2 0.00 -1.80 -0.01 -0.01 -2.07 130.2 130.2 0.003 STAT 0.000
0009-0010 SPB 0.008 LIFT 0.1 0.00 -2.24 -0.01 -0.01 -2.33 130.2 130.2 0.004 STAT 0.000
0010-0011 SPB 0.010 LIFT 0.1 0.00 -2.69 -0.02 -0.01 -2.57 130.2 130.2 0.005 STAT 0.000
0011-0012 SPB 0.012 LIFT 0.1 0.00 -3.12 -0.02 -0.01 -2.80 130.2 130.2 0.006 STAT 0.000
0012-0013 SPB 0.013 LIFT 0.1 0.00 -3.53 -0.02 -0.01 -3.00 130.2 130.2 0.007 STAT 0.000
0013-0014 SPB 0.014 LIFT 0.1 0.00 -3.91 -0.02 -0.01 -3.19 130.2 130.2 0.007 STAT 0.000
0014-0015 SPB 0.016 LIFT 0.1 0.00 -4.26 -0.02 -0.01 -3.35 130.2 130.2 0.008 STAT 0.000
0001-0046 SPL 0.448 LIFT 0.0 -1.32 -98.07 -65.24 4.98 20.35 92.6 92.6 0.224 STAT 0.000
0015-0046 SPL 0.296 LIFT 4.0 0.00 -80.05 -0.07 -0.01 -21.15 130.2 130.2 0.148 STAT 0.000
0029-0027 SPL 0.428 LIFT 0.0 -1.86 -93.80 60.48 -5.49 23.68 86.8 86.8 0.214 STAT 0.000
OD W.T Density Material Coating Thickness
Item Description
(mm) (mm) 3
(kg/m ) Specification Type (mm)
1 NEO 219.08 12.7 7850 PE 3.2
2 SPL,SPB 219.08 12.7 7850 API 5L - X65 PE 3.2
3 RSB,RSR 219.08 12.7 7850 PE 3.2
RIGGING SUMMARY
1. Design Load
‐ Maximum Static Load (A) = kN
= 3.68 MT
‐ Riser Clamp Static Load (B) = 0.14 kN
= 0.01 MT
2. User Defined Wire Sling Rope
‐ Type =
‐ Sling SWL (SWL1) = 50.00 MT
‐ UC Sling = (A)
(SWL1)
= 0.07 ...OK!
‐ Type =
‐ Sling SWL (SWL2) = 9.00 MT
‐ UC Sling = (B)
(SWL2)
= 0.00 ...OK!
4. User Defined Webbing Sling
‐ Type =
‐ Webing Sling SWL (SWL3) = 8.00 MT
‐ UC Webbing Sling = (A)
(SWL3)
= 0.46 ...OK!
5. User Defined Shackle
‐ Type =
‐ Shackle SWL (SWL4) = 12.00
‐ UC Shackle = (A)
(SWL4)
0.31 ...OK!
6. User Defined Chain Block (Optional Rigging)
‐ Type =
‐ SWL selected (SWL5) = 5.00 MT
‐ UC Chain Block = (A)
(SWL5)
= 0.74 ...OK!
PROJECT : PRRP (LLB 10") SUBJECT : RIGGING CALC. ORIG. : FI
DISCIPLINE : STRUCTURE DATE : August, 2018 CHECK : AR
RIGGING SUMMARY
1. Design Load
‐ Maximum Static Load (A) = 42.51 kN
= 4.33 MT
‐ Riser Clamp Static Load (B) = 0.14 kN
= 0.01 MT
2. User Defined Wire Sling Rope
‐ Type =
‐ Sling SWL (SWL1) = 50.00 MT
‐ UC Sling = (A)
(SWL1)
= 0.09 ...OK!
3. User Defined Main Sling
‐ Type =
‐ Sling SWL (SWL2) = 9.00 MT
‐ UC Sling = (B)
(SWL2)
= 0.00 ...OK!
4. User Defined Webbing Sling
‐ Type =
‐ Webing Sling SWL (SWL3) = 8.00 MT
‐ UC Webbing Sling = (A)
(SWL3)
= 0.54 ...OK!
5. User Defined Shackle
‐ Type =
‐ Shackle SWL (SWL4) = 12.00
‐ UC Shackle = (A)
(SWL4)
0.36 ...OK!
6. User Defined Chain Block (Optional Rigging)
‐ Type =
‐ SWL selected (SWL5) = 5.00 MT
‐ UC Chain Block = (A)
(SWL5)
= 0.87 ...OK!
FAKULTAS TEKNOLOGI
KELAUTAN
EVALUASI KERJA PRAKTEK JURUSAN TEKNIK KELAUTAN
Kampus ITS Sukolilo, Surabaya 60111
FORM KP-06
NAMA : Caesar Adza M
NRP : 04311540000018
Dosen Pembimbing : Prof. Ir. Daniel M. Rosyid, Ph.D.
PEMANTAUAN KEMAJUAN KP
Evaluasi NILAI
Nilai Akhir
Nilai Angka Bobot (%)
Sistematika & Kelengkapan Laporan 50 %
Ujian Lesan/
50 %
Presentasi/ Ujian lain (sebutkan): ......***)
Total Nilai Akhir
Nilai Huruf
Prof. Ir. Daniel M. Rosyid, Ph.D. Dr. Ir. Hasan Ikhwani, M.Sc
NIP. 196107021988031003 NIP. 196901211993031002
Catatan:
1. *) Coret yang tidak perlu
2.**) Nilai Kerja Paktek yang diserahkan ke Koordinator KP lebih 3 bulan sejak berakhir KP, akan
DIBATALKAN, dan mahasisawa wajib mengulangi KP dari awal.
3. ***) Jenis ujian ditentukan sepenuhnya oleh Dosen Pembimbing
CONTACT PERSON FAKULTAS TEKNOLOGI KELAUTAN
DEPARTEMEN TEKNIK KELAUTAN
UNTUK KERJASAMA DENGAN Kampus ITS Sukolilo, Surabaya 60111
Catatan
1. Tuliskan nama- nama contact person di perusahaan tempat Anda melaksanakan Kerja Praktek. Nama-
nama tersebut sangat berguna bagi Jurusan untuk menjalin kerjasama lebih lanjut. Untuk itu, selain
supervisor, tuliskan nama-nama lain yang Anda anggap penting.
2. Apabila lembar ini tidak cukup, dapat dibuat lembar tersendiri.
3. Form KP–07 wajib di buat 2 (dua) rangkap:
- 1 (satu) dilampirkan di Laporan Kerja Praktek,
- 1 (satu) diserahkan ke Kaprodi.