PEKERJAAN PEMBANGUNAN
T/L 150kV . . . . . . . . . . .
( . . . . kmr; 2 Cct; 2 x ACSR 250-A1/S1B-26/7 dan 2 x ACSR/AS 250-A
No. URAIAN
JUMLAH = Rp.
DIBULATKAN = Rp.
TERBILANG :
SI
NGUNAN
....
an 2 x ACSR/AS 250-A1/SA1A-26/7)
JUMLAH
780,286,578.01
15,715,616,604.55
62,873,534,486.72
2,490,943,109.08
81,860,380,778.35
81,860,380,000.00
8,186,038,000.00
90,046,418,000.00
TYPE-POUWELS max. H = 9m
1. REKAPITULASI
PEKERJAAN PEMBANGU
T/L 150kV . . . . . .
( . . . . . kmr; 2 Cct; 2 x ACSR 250-A1/S1B-26/7 dan
No. URAIAN
JUMLAH
TYPE-POUWELS max. H = 9m
1. REKAPITULASI
PEKERJAAN PEMBANGUNAN
T/L 150kV . . . . . .
2 x ACSR 250-A1/S1B-26/7 dan 2 x ACSR/AS 250-A1/SA1A-26/7)
URAIAN JUMLAH
STIGASI Rp -
JUMLAH Rp 780,286,578
220000
780,286,578.01
1. RENCANA ANGGARAN BIAYA (RAB)
PEKERJAAN RE-CHECK SURVEY DAN SOIL INVES
T/L 150kV . . . .
( . . . kmr; 2 Cct; 2 x ACSR 250-A1/S1B-26/7 dan 2 x ACSR/AS
No. U R A I A N SAT.
HARGA JUMLAH
VOL SATUAN HARGA
( Rp. ) ( Rp. )
50 461,989.96 22,868,502.84
50 168,469.83 8,339,256.56
6 958,566.87 5,272,117.80
50 1,094,652.62 54,185,304.82
6 575,150.91 3,163,329.99
Sub Jumlah 93,828,512.01
20 -
Sub Jumlah -
TOTAL 780,286,578.01
2. RE
PENGADAAN MATERIAL KONDUKTOR, GSW
T/L 150
( . . . kmr; 2 Cct; 2 x ACSR 250-A1/S
No. URAIAN
JUMLAH
2. REKAPITULASI
PENGADAAN MATERIAL KONDUKTOR, GSW, OPGW, INSULATOR, FITTING DAN ACCESS
T/L 150kV . . . . . . . . . . .
( . . . kmr; 2 Cct; 2 x ACSR 250-A1/S1B-26/7 dan 2 x ACSR/AS 250-A1/SA1A-26/7)
URAIAN
JUMLAH
ULASI .
W, INSULATOR, FITTING DAN ACCESSORIES
.......
7 dan 2 x ACSR/AS 250-A1/SA1A-26/7)
JUMLAH
Rp -
Rp -
Rp -
Rp -
2.1 RENCANA ANGGARAN BIAYA (RA
PENGADAAN MATERIAL KONDUKTOR, GSW, OPGW, INSULATOR
T/L 150kV . . . . . . . . . . .
( . . . kmr; 2 Cct; 2 x ACSR 250-A1/S1B-26/7 dan 2 x ACSR
NO. URAIAN
TOTAL
NGGARAN BIAYA (RAB)
W, OPGW, INSULATOR, FITTING DAN ACCESSORIES
kV . . . . . . . . . . .
S1B-26/7 dan 2 x ACSR/AS 250-A1/SA1A-26/7)
HARGA (Rp)
SAT. VOL.
SATUAN JUMLAH
Km 89.73 -
Km 95.65 -
Km 7.22 -
Km 7.37 -
Km 10.00 -
Sub Jumlah -
Set 18.00 -
Set 12.00 -
Set 222.00 -
Set 162.00 -
Set 9.00 -
Set 6.00 -
Set 24.00 -
Set 462.00 -
Set 222.00 -
Set 36.00 -
Sub Jumlah -
Set 60.00 -
Set 1,848.00 -
Set 120.00 -
Set - -
Set 2,068.00 -
Set 684.00 -
Set 60.00 -
Set 1,152.00 -
Set 60.00 -
Set - -
Set 1,242.00 -
Set 384.00 -
Set 5.00 -
Set 95.00 -
Set 5.00 -
Set 5.00 -
Set 33.00 -
Set 5.00 -
Set 154.00 -
Set 10.00 -
Set 5.00 -
Set 57.00 -
Set 10.00 -
Set 294.00 -
Set 10.00 -
Set 90.00 -
Set 9.00 -
Sub Jumlah -
-
0
3. REKAPITULASI
PEKERJAAN PEMBANGUN
T/L 150kV . . . . .
( . . . . . kmr; 2 Cct; 2 x ACSR 250-A1/S1B-26/7 dan 2
No. URAIAN
JUMLAH
3. REKAPITULASI
PEKERJAAN PEMBANGUNAN
T/L 150kV . . . . .
; 2 x ACSR 250-A1/S1B-26/7 dan 2 x ACSR/AS 250-A1/SA1A-26/7)
URAIAN JUMLAH
Rp 13,414,950,900
Rp 1,834,785,705
Rp 465,880,000
Rp 15,715,616,605
3.1 RENCANA ANGGARAN BIAYA (RAB)
PEKERJAAN PENGADAAN TOWER, LEG EXTENSION, DAN ACCESSOR
T/L 150kV . . . . . . . . . . .
( . . . kmr; 2 Cct; 2 x ACSR 250-A1/S1B-26/7 dan 2 x ACSR/AS 250-A1/S
TOTAL
GARAN BIAYA (RAB)
G EXTENSION, DAN ACCESSORIES TOWER
...........
-26/7 dan 2 x ACSR/AS 250-A1/SA1A-26/7)
HARGA JUMLAH
Satuan HARGA
( Rp. ) ( Rp. )
140,853,500.00 -
154,496,200.00 154,496,200.00
167,798,400.00 -
187,365,800.00 374,731,600.00
200,395,600.00 200,395,600.00
222,391,900.00 -
238,259,200.00 -
729,623,400.00
178,558,200.00 1,071,349,200.00
198,329,900.00 793,319,600.00
219,509,000.00 1,317,054,000.00
240,529,200.00 3,607,938,000.00
268,745,300.00 2,687,453,000.00
291,286,400.00 582,572,800.00
340,772,400.00 -
10,059,686,600.00
239,303,400.00 -
264,704,700.00 -
310,626,800.00 -
316,665,000.00 633,330,000.00
346,833,300.00 346,833,300.00
376,434,100.00 -
432,185,300.00 -
980,163,300.00
300,094,000.00 300,094,000.00
331,669,700.00 -
370,713,700.00 -
402,039,700.00 -
448,461,200.00 1,345,383,600.00
480,740,600.00 -
544,550,300.00 -
1,645,477,600.00
369,601,400.00 -
402,357,500.00 -
425,511,500.00 -
462,489,800.00 -
503,478,178.66 -
548,099,171.90 -
596,674,721.89 -
-
13,414,950,900.00
3.2 ANALISA BERAT TOWER
PEKERJAAN PENGADAAN MATERIAL TOWER TER
T/L 150kV . . . . . . . . . . .
( . . . kmr; 2 Cct; 2 x ACSR 250-A1/S1B-26/7 dan 2 x ACSR
VOLUME
No. U R A I A N Set Berat (kg) Total
Tower Per-Set Berat(kg)
1 2 3 4 5=3x4
3.1.a ANALISA MATERIAL TOWER TERMASUK STUB
HARGA (Rp)
Dasar Transport ROK Satuan Satuan
per (kg) per (kg) 0% per (kg) Set
6 7 8=(6+7)xROK 9=6+7+8 10=5x9
22,700
TEMPLATE BOQ
PENGADAAN MATERIAL TOWER
PEKERJAAN SUTT 150
(2 CIRCUITS , CONDUCTOR TWIN ZEBR
NO JENIS TOWER
SATUAN
type ....66
1 2 3
I PENGADAAN TOWER
5,636.96 1. Tower Type AA6
6,237.96 a. Tower Type AA6 + 0 kg
7,392.00 b. Tower Type AA6 + 3 kg
8,254.00 c. Tower Type AA6 + 6 kg
8,828.00 d. Tower Type AA6 + 9 kg
9,797.00 e. Tower Type AA6 + 12 kg
10,496.00 f. Tower Type AA6 + 15 kg
g. Tower Type AA6 + 18 kg
a. Tower Type BB6 + 0 kg
b. Tower Type BB6 + 3 kg
6,992.24 c. Tower Type BB6 + 6 kg
7,863.24 d. Tower Type BB6 + 9 kg
8,796.24 e. Tower Type BB6 + 12 kg
9,722.24 f. Tower Type BB6 + 15 kg
10,965.24 g. Tower Type BB6 + 18 kg
11,958.24
14,138.24 3. Tower Type CC6
c. Tower Type CC6 + 6 kg
d. Tower Type CC6 + 9 kg
9,535.49 e. Tower Type CC6 + 12 kg
10,654.49 f. Tower Type CC6 + 15 kg
12,677.49 g. Tower Type CC6 + 18 kg
12,943.49
14,272.49 4. Tower Type DD6
15,576.49 a. Tower Type DD6 + 0 kg
18,032.49 b. Tower Type DD6 + 3 kg
c. Tower Type DD6 + 6 kg
d. Tower Type DD6 + 9 kg
11,882.36 e. Tower Type DD6 + 12 kg
13,273.36 f. Tower Type DD6 + 15 kg
14,993.36 g. Tower Type DD6 + 18 kg
16,373.36
18,418.36 5. Tower Type DDr6
19,840.36 a. Tower Type DDr6 + 0 kg
22,651.36 b. Tower Type DDr6 + 3 kg
c. Tower Type DDr6 + 6 kg
d. Tower Type DDr6 + 9 kg
14,944.36 e. Tower Type DDr6 + 12 kg
16,387.36 f. Tower Type DDr6 + 15 kg
17,407.36 g. Tower Type DDr6 + 18 kg
19,036.36
20,842.02
22,807.70 II PENGADAAN STUB TOWER
24,947.59 1. Stub Tower Type AA6
a. Stub Tower Type AA6 + 0 kg
b. Stub Tower Type AA6 + 3 kg
c. Stub Tower Type AA6 + 6 kg
d. Stub Tower Type AA6 + 9 kg
e. Stub Tower Type AA6 + 12 kg
f. Stub Tower Type AA6 + 15 kg
g. Stub Tower Type AA6 + 18 kg
2. Type BB6
a. Stub Tower Type BB6 + 0 kg
b. Stub Tower Type BB6 + 3 kg
c. Stub Tower Type BB6 + 6 kg
d. Stub Tower Type BB6 + 9 kg
e. Stub Tower Type BB6 + 12 kg
f. Stub Tower Type BB6 + 15 kg
g. Stub Tower Type BB6 + 18 kg
3. Type CC6
a. Stub Tower Type CC6 + 0 kg
b. Stub Tower Type CC6 + 3 kg
c. Stub Tower Type CC6 + 6 kg
d. Stub Tower Type CC6 + 9 kg
e. Stub Tower Type CC6 + 12 kg
f. Stub Tower Type CC6 + 15 kg
g. Stub Tower Type CC6 + 18 kg
4. Type DD6
a. Stub Tower Type DD6 + 0 kg
b. Stub Tower Type DD6 + 3 kg
c. Stub Tower Type DD6 + 6 kg
d. Stub Tower Type DD6 + 9 kg
e. Stub Tower Type DD6 + 12 kg
f. Stub Tower Type DD6 + 15 kg
g. Stub Tower Type DD6 + 18 kg
5. Type DDR6
a. Stub Tower Type DDR6 + 0 kg
b. Stub Tower Type DDR6 + 3 kg
c. Stub Tower Type DDR6 + 6 kg
d. Stub Tower Type DDR6 + 9 kg
e. Stub Tower Type DDR6 + 12 kg
f. Stub Tower Type DDR6 + 15 kg
g. Stub Tower Type DDR6 + 18 kg
7124.6 1 22,700
8214.56 1 22,700
8829.90 1 22,700
9864.6 1 22,700
10710.64 1 22,700
11710.54 1 22,700
12835.80 1 22,700
9,072 1 22,700
10,532 1 22,700
11,562 1 22,700
13,682 1 22,700
14803.61 1 22,700
17321.51 1 22,700
18267.77 1 22,700
14217.22 1 22,700
16405.30 1 22,700
17843.83 1 22,700
20250.26 1 22,700
21,465.28 1 22,700
15640.65 1 22,700
17175.55 1 22,700
19395.23 1 22,700
20974.48 1 22,700
23742.04 1 22,700
25665.38 1 22,700
27,205.30 1 22,700
16500.75 1 22,700
18035.65 1 22,700
20255.33 1 22,700
21834.58 1 22,700
24602.15 1 22,700
26526.15 1 22,700
28,117.72 1 22,700
568.04 1
568.04 1
568.04 1
568.04 1
568.04 1
568.04 1
568.04 1
873.76 1
873.76 1
873.76 1
873.76 1
873.76 1
873.76 1
873.76 1
1006.51 1
1006.51 1
1006.51 1
1006.51 1
1006.51 1
1006.51 1
1006.51 1
1337.64 1
1337.64 1
1337.64 1
1337.64 1
1337.64 1
1337.64 1
1337.64 1
1337.64 1
1337.64 1
1337.64 1
1337.64 1
1337.64 1
1337.64 1
1337.64 1
59.65 7.00
59.65 7.00
69.84 7.00
69.84 7.00
69.84 7.00
1.00 35.00
1.00 35.00
650.00 35.00
R 150 KV
HARGA SHIPPING HARGA CONSTRUCTION
JUMLAH HARGA JUMLAH HARGA
(Rp) (Rp)
3.2 RENCANA ANGGARAN BIAYA (RAB)
PEKERJAAN PENGADAAN TOWER, LEG EXTENSION, DAN ACCESSORIES TOWER
MATERIAL LEG EXTENSION
T/L 150kV . . . . . . . . . . .
( . . . kmr; 2 Cct; 2 x ACSR 250-A1/S1B-26/7 dan 2 x ACSR/AS 250-A1/SA1A-26/7)
TOTAL
(RAB)
AN ACCESSORIES TOWER
CSR/AS 250-A1/SA1A-26/7)
Total
Set
-
-
40,277,064.00
18,218,112.00
11,841,772.80
-
-
70,336,948.80
-
164,206,125.00
648,805,952.00
563,398,110.00
144,101,870.00
-
-
1,520,512,057.00
7,330,353.85
28,588,380.00
65,727,396.00
44,520,375.00
18,078,053.00
-
-
164,244,557.85
-
-
60,145,012.00
19,547,128.90
-
-
-
79,692,140.90
-
-
-
-
-
-
-
-
1,834,785,704.55
3.4 ANALISA BERAT LEG EXTENSION
PEKERJAAN PENGADAAN MATERIAL TOWER
MATERIAL LEG EXTENSION
T/L 150kV . . . . . . . . . . . Transpor jkt - site Harga dasar tower Rp 21,500
( . . . kmr; 2 Cct; 2 x ACSR 250-A1/S1B-26/7 dan 2 x ACSR/AS 250-A1/SA1A-26/7) Rp 1,200 normal (tidak express) (Harga permen perind 15 thn 2016)
1 ACCESSORIESS TOWER
1 Number & Danger Plate tower 99.00
2 Anti Climbing Rangka Besi tower 99.00
3 Counterpoise tower 50.00
4 Baut Anti Maling (Anti Theft Nut)
- Tower Tipe AA2 tower
- Tower Tipe BB2 tower
- Tower Tipe CC2 tower
- Tower Tipe DD2 tower
- Tower Tipe EE2 tower
- Tower Tipe DDR2 tower
HARGA JUMLAH
Satuan HARGA
( Rp. ) ( Rp. )
120,000 11,880,000.00
3,500,000 346,500,000.00
2,150,000 107,500,000.00
TOTAL 465,880,000.00
No. URAIAN
JUMLAH
4. REKAPITULASI
RJAAN PEMBANGUNAN
150kV . . . . . . . . . . .
A1/S1B-26/7 dan 2 x ACSR/AS 250-A1/SA1A-26/7)
IAN JUMLAH
61,996,848,038.72
876,686,448.00
62,873,534,486.72
###
4.1 RENCANA ANGGAR
PEKERJAAN POND
T/L 150kV .
( . . . . kmr; 2 Cct; 2 x ACSR 250-A1/S1B-26/
NO URAIAN PEKERJAAN
(Pekerjaan Pile Cap Pondasi Boredpile dihitung per set, sedangkan untuk
dihitung per meter panjang. Harga satuan penawaran sudah termasuk Bia
Clearing Lokasi, Pengangkutan Material, Gambar Kerja, Pekerjaan Tanah,
Material, Pekerjaan Pengeboran Boredpile +Casing, Pengecoran Borepile
Cap, Setting Stub, Pemasangan Pentanahan, Tes Kubus Beton, dll)
HARGA ( Rp )
URAIAN PEKERJAAN SAT VOL
HARGA REKAP
- Kelas 1 SET - -
- Kelas 2 SET - -
- Kelas 3 SET - -
- Kelas 4a SET - -
- Kelas 4b SET - -
- Kelas 5 SET - -
- Kelas 7 (w) SET
- Kelas 6
- Kelas 6 - Pile Cap 4 Pile SET - 185,320,590.02
- Kelas 6 - Pile Cap 5 Pile SET - 263,758,958.27
- Kelas 6 - Pile Cap 6 Pile SET - 271,907,143.23
- Kelas 6 - Pile Cap 7 Pile SET - 407,260,012.44
- Kelas 6 - Boredpile D=0.4 m M' - 1,969,450.09
- Kelas 6
- Kelas 6 - Pile Cap 5 Pile SET - 265,637,339.27
- Kelas 6 - Pile Cap 6 Pile SET 1 284,191,873.33
- Kelas 6 - Pile Cap 7 Pile SET - 411,760,090.94
- Kelas 6 - Pile Cap 9 Pile SET - 410,923,293.29
- Kelas 6 - Boredpile D=0.4 m M' 225.60 1,969,449.94
- Kelas 6
- Kelas 6 - Pile Cap 5 Pile SET - 279,508,127.29
- Kelas 6 - Pile Cap 6 Pile SET - 289,915,566.08
- Kelas 6 - Pile Cap 7 Pile SET - 427,707,768.70
- Kelas 6 - Pile Cap 9 Pile SET - 427,248,101.05
- Kelas 6 - Boredpile D=0.4 m M' - 1,969,449.94
- Kelas 6
- Kelas 6 - Pile Cap 7 Pile SET - 495,817,499.40
- Kelas 6 - Pile Cap 9 Pile SET - 495,357,831.75
- Kelas 6 - Pile Cap 10 Pile SET - 557,610,274.63
- Kelas 6 - Pile Cap 12 Pile SET - 642,375,921.42
- Kelas 6 - Boredpile D=0.4 m M' - 1,973,964.22
- Kelas 6
- Kelas 6 - Pile Cap 9 Pile SET - 496,084,337.35
- Kelas 6 - Pile Cap 10 Pile SET - 559,709,883.43
- Kelas 6 - Pile Cap 12 Pile SET - 652,000,621.71
- Kelas 6 - Pile Cap 16 Pile SET - 858,703,258.17
- Kelas 6 - Boredpile D=0.4 m M' - 1,973,964.13
- Kelas 6
- Kelas 6 - Pile Cap 9 Pile SET - 524,989,820.23
- Kelas 6 - Pile Cap 10 Pile SET - 592,679,885.66
- Kelas 6 - Pile Cap 12 Pile SET - 680,629,624.82
- Kelas 6 - Pile Cap 16 Pile SET - 909,450,473.52
- Kelas 6 - Boredpile D=0.4 m M' - 1,976,275.24
Sub Jumlah
M3 186.00 4,713,368.00
Sub Jumlah
M2 -
SET -
- Boredpile D=0.4 m M' -
Sub Jumlah
TOTAL
/7)
HARGA ( Rp )
NO
JUMLAH
4.1
-
-
-
4.2
4.2.1
481,594,149.58
-
-
229,181,077.15
-
403,880,044.27
4.2.2
2,466,800,552.68
2,096,229,151.41
-
417,413,955.75
44,828,137,360.30
-
1,275,761,812.75
2,923,566,445.91
4.2.3
683,944,168.18
-
-
-
1,268,884,375.98
-
728,830,332.60
4.2.4
409,161,146.22
-
-
-
-
2,388,836,849.47
4.2.5
-
-
-
-
-
-
666,126,836.44
-
-
-
-
-
4.2.6
-
-
-
-
-
-
284,191,873.33
-
-
444,307,906.70
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
- 4.3
-
-
61,996,848,038.72
4.4
876,686,448.00
876,686,448.00
4.5
-
-
62,873,534,486.72
4.1 RENCANA ANG
PEKERJAAN P
T/L 150
( . . . . kmr; 2 Cct; 2 x ACSR 250-A1/S1B
URAIAN PEKERJAAN
PEKERJAAN PERSIAPAN
1 Mobilisasi dan Demobilisasi Personil & Peralatan
2 Pembuatan Jalan Kerja
(Pekerjaan Pile Cap Pondasi Boredpile dihitung per set, sedangkan untuk boredpile dih
panjang. Harga satuan penawaran sudah termasuk Biaya Land Clearing Lokasi, Penga
Material, Gambar Kerja, Pekerjaan Tanah, Pengadaan Material, Pekerjaan Pengeboran
+Casing, Pengecoran Borepile dan Pile Cap, Setting Stub, Pemasangan Pentanahan,
Beton, dll)
HARGA ( R
PEKERJAAN SAT VOL
HARGA REKAP
- Kelas 6
- Kelas 6 - Pile Cap 4 Pile SET - -
- Kelas 6 - Pile Cap 5 Pile SET - -
- Kelas 6 - Pile Cap 6 Pile SET - -
- Kelas 6 - Pile Cap 7 Pile SET - -
- Kelas 6 - Boredpile D=0.4 m M' - -
- Kelas 6
- Kelas 6 - Pile Cap 5 Pile SET - -
- Kelas 6 - Pile Cap 6 Pile SET 1 -
- Kelas 6 - Pile Cap 7 Pile SET - -
- Kelas 6 - Pile Cap 9 Pile SET - -
- Kelas 6 - Boredpile D=0.4 m M' 225.60 -
- Kelas 6
- Kelas 6 - Pile Cap 5 Pile SET - -
- Kelas 6 - Pile Cap 6 Pile SET - -
- Kelas 6 - Pile Cap 7 Pile SET - -
- Kelas 6 - Pile Cap 9 Pile SET - -
- Kelas 6 - Boredpile D=0.4 m M' - -
- Kelas 6
- Kelas 6 - Pile Cap 7 Pile SET - -
- Kelas 6 - Pile Cap 9 Pile SET - -
- Kelas 6 - Pile Cap 10 Pile SET - -
- Kelas 6 - Pile Cap 12 Pile SET - -
- Kelas 6 - Boredpile D=0.4 m M' - -
- Kelas 6
- Kelas 6 - Pile Cap 9 Pile SET - -
- Kelas 6 - Pile Cap 10 Pile SET - -
- Kelas 6 - Pile Cap 12 Pile SET - -
- Kelas 6 - Pile Cap 16 Pile SET - -
- Kelas 6 - Boredpile D=0.4 m M' - -
Sub Jumlah
M3 186.00 -
Sub Jumlah
M2 -
Pile Cap 9 Pile SET -
Boredpile D=0.4 m M' -
Sub Jumlah
M' -
BH -
Sub Jumlah
TOTAL
S 250-A1/SA1A-26/7)
HARGA ( Rp )
JUMLAH
-
-
-
1,132,304,709.54
-
-
214,105,694.89
-
364,106,288.52
-
5,347,972,248.17
4,710,306,666.04
-
381,916,346.56
164,868,936,853.52
-
5,424,744,186.83
1,745,430,521.43
-
-
-
5,787,503,649.71
-
2,359,767,885.06
1,480,133,956.88
-
-
-
-
-
-
1,689,909,451.95
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
195,507,138,459.11
-
-
195,507,138,459.11
RENCANA ANGGARAN BIAYA ( RA
PEKERJAAN PONDASI TOWER
T/L 150kV . . . . .
( . . . . kmr; 2 Cct; 2 x ACSR 250-A1/S1B-26/7 dan 2 x AC
AA2 - Ke
TOTAL JUMLAH AA2 - Kelas 7 (w)
BB2 - Ke
TOTAL JUMLAH BB2 Spesial - Kelas 6 (w)
BB2 Spesial - Ke
TOTAL JUMLAH BB2 - Kelas 7 (w)
NO URAIAN PEKERJAAN SAT
CC2 4.2.3 PONDASI TOWER TIPE CC2
4.2.3.1 PONDASI TOWER TIPE CC2 - Kelas 1
I. PEKERJAAN PERSIAPAN
1. Pembersihan lapangan & Perataan Tanah Ls
2. Pengangkutan material Pondasi ke Lokasi Tower + Stub Ls
3. Pekerjaan Bouwplank. LS
4. Gambar Kerja LS
CC2 Spesial - Ke
TOTAL JUMLAH CC2 Spesial - Kelas 6 (w)
DD2 4.2.4 PONDASI TOWER TIPE DD2
4.2.4.1 PONDASI TOWER TIPE DD2 - Kelas 1
I. PEKERJAAN PERSIAPAN
1. Pembersihan lapangan & Perataan Tanah Ls
2. Pengangkutan material Pondasi ke Lokasi Tower + Stub Ls
3. Pekerjaan Bouwplank. LS
4. Gambar Kerja LS
DD2 - Ke
TOTAL JUMLAH DD2 - Kelas 6 (w)
EE2 - Ke
TOTAL JUMLAH EE2 - Kelas 7 (w)
DDR2 - K
TOTAL JUMLAH DDR2 - Kelas 4b
DDR2 - Ke
TOTAL JUMLAH DDR2 - Kelas 7 (w)
A ANGGARAN BIAYA ( RAB )
JAAN PONDASI TOWER
T/L 150kV . . . . .
-A1/S1B-26/7 dan 2 x ACSR/AS 250-A1/SA1A-26/7)
1.00
1.00 9900
JUMLAH
4.00
4.00
1.00 489,216.00 489,216
1.00 - -
1.00 - -
1.00 380,000.00 380,000 4.00
Sub Jumlah 869,216
AA2 - Kelas 1 JUMLAH 160,531,383
3.00 Set 211,464,416.68
1.00 972,000 972,000
1.00 16,872,327 16,872,327
1.00 3,364,267.20 3,364,267
1.00 -
Sub Jumlah 21,208,594
4.00
4.00
1.00 489,216.00 489,216
1.00 - -
1.00 - -
1.00 380,000.00 380,000 4.00
Sub Jumlah 869,216
AA2 - Kelas 2 JUMLAH 184,342,278
0.00 Set 0.00
4.00
4.00
1.00 489,216.00 489,216
1.00 - -
1.00 - -
1.00 380,000.00 380,000 4.00
Sub Jumlah 869,216
AA2 - Kelas 3 JUMLAH 209,718,117
0.00 Set 0.00
1.00 972,000 972,000
1.00 20,585,087 20,585,087
1.00 3,364,267.20 3,364,267
1.00 -
Sub Jumlah 24,921,354
4.00
4.00
1.00 489,216.00 489,216
1.00 - -
1.00 - -
1.00 380,000.00 380,000 4.00
Sub Jumlah 869,216
AA2 - Kelas 4a JUMLAH 229,181,077
1.00 Set 107,364,426.02
4.00
4.00
1.00 489,216.00 489,216
1.00 - -
1.00 - -
1.00 760,000.00 760,000 8.00
1.00 -
183.04 191,900.00 35,125,376.00
Sub Jumlah 36,374,592.00
AA2 - Kelas 5 JUMLAH 403,880,044.27
1.00 Set 152,556,590.49
4.00
4.00
1.00 489,216.00 489,216.00
1.00 - -
1.00 - -
1.00 380,000.00 380,000.00
1.00 - -
201.60 - -
Sub Jumlah 869,216.00
AA2 - Kelas 7 (w) JUMLAH 439,396,743.39
0.00 Set 0.00
4.00
4.00
1.00 489,216.00 489,216
1.00 - -
1.00 - -
1.00 380,000.00 380,000 4.00
Sub Jumlah 869,216
BB2 - Kelas 1 JUMLAH 308,350,069
7.00 Set 945,418,699.45
4.00
4.00
1.00 489,216.00 489,216
1.00 - -
1.00 - -
1.00 760,000.00 760,000 8.00
Sub Jumlah 1,249,216
BB2 - Kelas 2 JUMLAH 349,371,525
6.00 Set 918,066,817.80
4.00
4.00
1.00 489,216.00 489,216
1.00 - -
1.00 - -
1.00 760,000.00 760,000 8.00
Sub Jumlah 1,249,216
BB2 - Kelas 3 JUMLAH 391,238,305
0.00 Set 0.00
4.00
4.00
1.00 752,169.60 752,170
1.00 - -
1.00 - -
1.00 760,000.00 760,000 8.00
Sub Jumlah 1,512,170
BB2 - Kelas 4a JUMLAH 417,413,956
1.00 Set 196,629,433.58
4.00
4.00
1.00 752,169.60 752,170
1.00 - -
1.00 - -
1.00 1,140,000.00 1,140,000 12.00
1.00 -
292.80 191,900.00 56,188,320.00
Sub Jumlah 58,080,489.60
BB2 - Kelas 5 JUMLAH 669,751,285.84
0.00 Set 0.00
4.00
4.00
1.00 752,169.60 752,170
1.00 - -
1.00 - -
1.00 760,000.00 760,000 8.00
1.00 -
201.60 191,900.00 38,687,040.00
Sub Jumlah 40,199,209.60
BB2 Spesial - Kelas 7 (w) JUMLAH 487,261,074.32
0.00 Set 0.00
VOL HARGA SATUAN JUMLAH HARGA
4.00
4.00
1.00 926,452.80 926,453
1.00 - -
1.00 - -
1.00 760,000.00 760,000 8.00
Sub Jumlah 1,686,453
CC2 - Kelas 1 JUMLAH 341,972,084
2.00 Set 303,721,693.92
4.00
4.00
1.00 926,452.80 926,453
1.00 - -
1.00 - -
1.00 760,000.00 760,000 8.00
Sub Jumlah 1,686,453
CC2 - Kelas 3 JUMLAH 455,064,035
0.00 Set 0.00
4.00
4.00
1.00 926,452.80 926,453
1.00 - -
1.00 - -
1.00 1,140,000.00 1,140,000 12.00
Sub Jumlah 2,066,453
CC2 - Kelas 4a JUMLAH 493,024,254
0.00 Set 0.00
1.00 1,323,000 1,323,000
1.00 141,537,953 141,537,953
1.00 3,924,978.40 3,924,978
1.00 -
Sub Jumlah 146,785,931
4.00
4.00
1.00 1,451,301.60 1,451,302
1.00 - -
1.00 - -
1.00 760,000.00 760,000 8.00
Sub Jumlah 2,211,302
DD2 - Kelas 1 JUMLAH 409,161,146
1.00 Set 180,070,580.60
4.00
4.00
1.00 1,451,301.60 1,451,302
1.00 - -
1.00 - -
1.00 1,140,000.00 1,140,000 12.00
Sub Jumlah 2,591,302
DD2 - Kelas 2 JUMLAH 562,574,438
0.00 Set 0.00
4.00
4.00
1.00 1,451,301.60 1,451,302
1.00 - -
1.00 - -
1.00 1,520,000.00 1,520,000 16.00
Sub Jumlah 2,971,302
DD2 - Kelas 3 JUMLAH 684,512,334
0.00 Set 0.00
1.00 1,518,750 1,518,750
1.00 71,185,247 71,185,247
1.00 4,205,334.00 4,205,334
1.00 -
Sub Jumlah 76,909,331
4.00
4.00
1.00 1,451,301.60 1,451,302
1.00 - -
1.00 - -
1.00 1,900,000.00 1,900,000 20.00
Sub Jumlah 3,351,302
DD2 - Kelas 4a JUMLAH 805,805,512
0.00 Set
4.00
4.00
1.00 1,451,301.60 1,451,302
1.00 - -
1.00 - -
1.00 1,900,000.00 1,900,000 20.00
Sub Jumlah 3,351,302
DD2 - Kelas 4b JUMLAH 797,203,740
0.00 Set 0.00
4.00
4.00
1.00 1,451,301.60 1,451,302
1.00 - -
1.00 - -
1.00 2,660,000.00 2,660,000 28.00
1.00 -
333.60 191,900.00 64,017,840.00
Sub Jumlah 68,129,141.60
DD2 - Kelas 5 JUMLAH 1,194,418,424.74
2.00 Set 1,029,721,822.53
1.00
1.00
1.00
1.00
Sub Jumlah
803.96
17.16
691.69
Sub Jumlah
8.58
45.00
9,282.62
87.51
Sub Jumlah
1.00
1.00
1.00
1.00
1.00
366.80
Sub Jumlah
DD2 - Kelas 6 (w) JUMLAH
0.00 Set 0.00
1.00
1.00
1.00
1.00
Sub Jumlah
258.60
7.06
209.94
Sub Jumlah
3.53
36.16
5,131.75
39.06
Sub Jumlah
4.00
4.00
1.00
1.00
1.00
1.00
Sub Jumlah
EE2 - Kelas 1 JUMLAH
0.00 Set 0.00
1.00
1.00
1.00
1.00
Sub Jumlah
325.33
7.74
272.36
Sub Jumlah
3.87
36.96
5,552.67
42.34
Sub Jumlah
4.00
4.00
1.00
1.00
1.00
1.00
Sub Jumlah
EE2 - Kelas 2 JUMLAH
0.00 Set 0.00
449.72
11.66
373.05
Sub Jumlah
5.83
38.16
8,084.74
60.16
Sub Jumlah
4.00
4.00
1.00
1.00
1.00
1.00
Sub Jumlah
EE2 - Kelas 3 JUMLAH
0.00 Set 0.00
1.00
1.00
1.00
1.00
Sub Jumlah
325.56
11.24
252.18
Sub Jumlah
5.62
36.08
7,499.64
57.51
Sub Jumlah
4.00
4.00
1.00
1.00
1.00
1.00
Sub Jumlah
EE2 - Kelas 4a JUMLAH
0.00 Set 0.00
1.00
1.00
1.00
1.00
Sub Jumlah
50.18
12.54
16.73
Sub Jumlah
200.00
645.45
1.00
58.56
4,403.02
75.98
Sub Jumlah
4.00
4.00
1.00
1.00
1.00
1.00
Sub Jumlah
EE2 - Kelas 4b JUMLAH
0.00 Set 0.00
1.00
1.00
1.00
1.00
Sub Jumlah
782.63
20.45
650.45
Sub Jumlah
10.22
44.60
15,000.75
102.49
Sub Jumlah
4.00
4.00
1.00
1.00
1.00
1.00
1.00
343.20
Sub Jumlah
EE2 - Kelas 5 JUMLAH
0.00 Set 0.00
1.00
1.00
1.00
1.00
Sub Jumlah
814.80
17.42
700.86
Sub Jumlah
8.71
45.20
11,696.09
88.78
Sub Jumlah
4.00
4.00
1.00
1.00
1.00
1.00
1.00
369.60
Sub Jumlah
EE2 - Kelas 7 (w) JUMLAH
0.00 Set 0.00
4.00
4.00
1.00 1,451,301.60 1,451,302
1.00 - -
1.00 - -
1.00 1,520,000.00 1,520,000 16.00
Sub Jumlah 2,971,302
DDR2 - Kelas 1 JUMLAH 666,126,836
1.00 Set 287,905,097.52
4.00
4.00
1.00 1,451,301.60 1,451,302
1.00 - -
1.00 - -
1.00 1,520,000.00 1,520,000 16.00
Sub Jumlah 2,971,302
DDR2 - Kelas 2 JUMLAH 741,168,528
0.00 Set 0.00
4.00
4.00
1.00 1,451,301.60 1,451,302
1.00 - -
1.00 - -
1.00 2,280,000.00 2,280,000 24.00
Sub Jumlah 3,731,302
DDR2 - Kelas 3 JUMLAH 1,071,421,715
0.00 Set 0.00
4.00
4.00
1.00 1,451,301.60 1,451,302
1.00 - -
1.00 - -
1.00 2,280,000.00 2,280,000 24.00
Sub Jumlah 3,731,302
DDR2 - Kelas 4b JUMLAH 878,287,988
0.00 Set 0.00
4.00
4.00
1.00 1,451,301.60 1,451,302
1.00 - -
1.00 - -
1.00 4,560,000.00 4,560,000 48.00
1.00 -
362.08 191,900.00 69,483,152.00
Sub Jumlah 75,494,453.60
DDR2 - Kelas 5 JUMLAH 1,974,836,912.19
0.00 Set 0.00
1.00
1.00
1.00
1.00
Sub Jumlah
892.74
19.32
766.75
Sub Jumlah
9.66
46.60
14,522.33
97.99
Sub Jumlah
4.00
4.00
1.00
1.00
1.00
1.00
1.00
389.20
Sub Jumlah
DDR2 - Kelas 7 (w) JUMLAH
0.00 Set 0.00
Transpor material pondasi :
Rp 500
BJ
1,400 2,716
2,200 2,332
40 730
1 1,319
2,200 21,912
stub, earthing, grounding material, ala 377
29,386
BJ
1,400 3,220
2,200 2,750
40 762
1 1,446
2,200 25,190
stub, earthing, grounding material, ala 377
33,745
BJ
1,400 3,780
2,200 3,212
40 794
1 1,603
2,200 28,798
stub, earthing, grounding material, ala 377
38,564
BJ
1,400 4,088
2,200 3,454
40 810
1 1,751
2,200 30,690
stub, earthing, grounding material, ala 377
41,170
BJ
1,400 5,382
1,500 64,380
2,200 4,228
40 1,504
1 2,115
2,200 45,100
stub, earthing, grounding material, ala 377
123,086
BJ
1,400 7,252
2,200 6,028
40 954
1 2,378
2,200 51,238
stub, earthing, grounding material, ala 377
68,227
BJ
1,400 4,704
2,200 4,228
40 1,016
1 2,505
2,200 43,318
stub, earthing, grounding material, ala 526
56,298
BJ
1,400 5,740
2,200 4,792
40 1,054
1 2,815
2,200 48,598
stub, earthing, grounding material, ala 526
63,526
BJ
1,400 6,468
2,200 5,390
40 1,093
1 3,051
2,200 54,230
stub, earthing, grounding material, ala 526
70,758
BJ
1,400 6,860
2,200 5,702
40 1,101
1 3,231
2,200 57,024
stub, earthing, grounding material, ala 526
74,445
BJ
1,400 11,340
1,500 157,248
2,200 8,914
40 2,144
1 6,851
2,200 93,940
stub, earthing, grounding material, ala 526
280,964
BJ
1,400 12,908
2,200 10,560
40 1,200
1 4,060
2,200 83,908
stub, earthing, grounding material, ala 526
113,163
BJ
1,400 6,474
2,200 5,086
40 1,072
1 2,223
2,200 52,756
stub, earthing, grounding material, ala 526
68,138
BJ
1,400 9,878
2,200 7,762
40 992
1 2,319
2,200 62,920
stub, earthing, grounding material, ala 526
84,397
BJ
1,400 5,376
2,200 4,506
40 1,102
1 2,989
2,200 46,838
stub, earthing, grounding material, ala 625
61,436
BJ
1,400 6,286
2,200 5,236
40 1,150
1 3,433
2,200 53,713
stub, earthing, grounding material, ala 625
70,443
BJ
1,400 7,252
2,200 6,024
40 1,198
1 3,913
2,200 61,138
stub, earthing, grounding material, ala 625
80,151
BJ
1,400 8,092
2,200 6,692
40 1,158
1 4,174
2,200 66,396
stub, earthing, grounding material, ala 625
87,138
BJ
1,400 11,850
1,500 149,760
2,200 9,310
40 2,317
1 7,380
2,200 101,834
stub, earthing, grounding material, ala 625
283,076
BJ
1,400 15,148
2,200 12,364
40 1,280
1 5,176
2,200 97,944
stub, earthing, grounding material, ala 625
132,538
BJ
1,400 12,370
2,200 9,720
40 1,238
1 4,344
2,200 97,654
stub, earthing, grounding material, ala 625
125,951
BJ
1,400 5,376
2,200 4,796
40 1,296
1 3,727
2,200 56,100
stub, earthing, grounding material, ala 923
72,217
BJ
1,400 7,672
2,200 6,358
40 1,430
1 4,975
2,200 77,000
stub, earthing, grounding material, ala 923
98,358
BJ
1,400 9,408
2,200 7,766
40 1,520
1 5,888
2,200 93,060
stub, earthing, grounding material, ala 923
118,564
BJ
1,400 11,844
2,200 8,272
40 1,440
1 7,032
2,200 112,860
stub, earthing, grounding material, ala 923
142,370
BJ
1,400 14,566
2,200 11,444
40 1,411
1 5,508
2,200 117,718
stub, earthing, grounding material, ala 923
137,004
BJ
1,400 20,160
2,200 16,368
40 1,581
1 8,236
2,200 159,324
stub, earthing, grounding material, ala 923
206,592
BJ
1,400 10,597
2,200 8,326
40 1,470
1 6,190
2,200 91,302
stub, earthing, grounding material, ala 923
118,808
BJ
1,400 11,850
2,200 9,310
40 1,510
1 6,838
2,200 100,707
stub, earthing, grounding material, ala 923
131,138
BJ
1,400 18,194
2,200 14,296
40 1,574
1 9,946
2,200 146,467
stub, earthing, grounding material, ala 923
191,400
BJ
1,400 16,633
2,200 13,069
40 1,467
1 8,798
2,200 133,349
stub, earthing, grounding material, ala 923
174,239
BJ
1,400 16,633
2,200 13,069
40 1,467
1 8,798
2,200 133,349
stub, earthing, grounding material, ala 923
157,983
BJ
1,400 29,842
2,200 23,448
40 2,035
1 14,030
2,200 279,101
stub, earthing, grounding material, ala 923
349,379
Pemasangan grounding Panjang
3.20
3.90
4.10
4.40
4.60
bekisting
balok 5 X 7
triplek
2 Pekerjaan Beton
a Urugan pasir, t = 10 m³ 4 212,936
b Beton 1 : 3 : 5, level m³ 2 741,413
c Beton K 225, pondasm³ 18 1,396,240
d Besi beton kg 1,685 18,249
e Cetakan m² 41 179,756
f Pre-cast block ukurabh 4 42,220
3 Pekerjaan Lain-lain
a Pembuatan dan Pembh 4 117,670
b Transport Material kg ### 250
c Tes Kubus Beton (1 bh 4 65,000
d Penyetelan stub (beskg 252 30,044
2.8 5 14
7.2 1 7.2
21.2
9,252,304
2,447,557
818,524
1,424,995
25,142,334
30,742,652
7,305,269
168,880
470,680
14,036,851
260,000
7,557,909 62.89
850,000
225,000
100,702,957
150 x 150 x 12 mm - 6
M jumlah pondasi wkt pembuatan (hari) total hari skedul (hari)
202 Kg 24
Besi Siku
200 x 200 x 15 mm - 6
M
272 Kg Mob/dem 1 3,400,000 3,400,000
Besi Siku 13 600,000 7,800,000
200 x 200 x 16 mm - 6
M akomodas 14 350,000 1.5 7,350,000
301 Kg 18,550,000
Besi Siku
200 x 200 x 20 mm - 6
M Total regu 40 742,000,000
358 Kg
Besi Siku
200 x 200 x 25 mm - 6
M Molen @ 0,15 m3
442 Kg rerata per pondasi = 20 m3
Besi Siku batch 133.33
250 x 250 x 25 mm - 6
M waktu 3333.33 mnt
562 Kg 55.56 jam
6.94 hari
jml. regu personi/regu tenaga
1 mandor lokal
1 supervisi luar/lokal
14
RENCANA ANGGARAN BIAY
PEKERJAAN PONDASI TO
T/L 150kV . . . . .
( . . . . kmr; 2 Cct; 2 x ACSR 250-A1/S1B-26/7 dan 2
NO URAIAN PEKERJAAN
NO URAIAN PEKERJAAN
NO URAIAN PEKERJAAN
4.2.1.7 PONDASI TOWER TIPE AA6 - Kelas 7
I. PEKERJAAN PERSIAPAN
1. Pembersihan lapangan & Perataan Tanah
2. Pengangkutan material Pondasi ke Lokasi Tower + Stub
3. Pekerjaan Bouwplank.
4. Gambar Kerja
II. PEKERJAAN TANAH
1. Galian tanah
2. Urugan Pasir Bawah Pondasi
3. Timbunan kembali
NO URAIAN PEKERJAAN
4.2.4.7 PONDASI TOWER TIPE DD6 - Kelas 7
I. PEKERJAAN PERSIAPAN
1. Pembersihan lapangan & Perataan Tanah
2. Pengangkutan material Pondasi ke Lokasi Tower + Stub
3. Pekerjaan Bouwplank.
4. Gambar Kerja
NO URAIAN PEKERJAAN
4.2.6.7 PONDASI TOWER TIPE DDR6 - Kelas 7
I. PEKERJAAN PERSIAPAN
1. Pembersihan lapangan & Perataan Tanah
2. Pengangkutan material Pondasi ke Lokasi Tower + Stub
3. Pekerjaan Bouwplank.
4. Gambar Kerja
Ls 1.00
Ls 1.00 9900
JUMLAH
Bh 4.00
Bh 4.00
SET 1.00 489,216.00 489,216
SET 1.00 - -
SET 1.00 - -
Ls 1.00 1,140,000.00 1,140,000 12.00
Sub Jumlah 1,629,216
AA6 - Kelas 1 JUMLAH 377,434,903
Ls 1.00 972,000 972,000
Ls 1.00 38,520,967 38,520,967
LS 1.00 3,364,267.20 3,364,267
LS 1.00 -
Sub Jumlah 42,857,234
Bh 4.00
Bh 4.00
SET 1.00 489,216.00 489,216
SET 1.00 - -
SET 1.00 - -
Ls 1.00 760,000.00 760,000 8.00
Sub Jumlah 1,249,216
AA6 - Kelas 2 JUMLAH 414,589,193
Bh 4.00
Bh 4.00
SET 1.00 489,216.00 489,216
SET 1.00 - -
SET 1.00 - -
Ls 1.00 1,520,000.00 1,520,000 16.00
Sub Jumlah 2,009,216
AA6 - Kelas 3 JUMLAH 615,941,093
Ls 1.00 972,000 972,000
Ls 1.00 18,514,267 18,514,267
LS 1.00 3,364,267.20 3,364,267
LS 1.00 -
Sub Jumlah 22,850,534
Bh 4.00
Bh 4.00
SET 1.00 489,216.00 489,216
SET 1.00 - -
SET 1.00 - -
Ls 1.00 380,000.00 380,000 4.00
Sub Jumlah 869,216
AA6 - Kelas 4 JUMLAH 214,105,695
Bh 4.00
Bh 4.00
SET 1.00 489,216.00 489,216
SET 1.00 - -
SET 1.00 - -
Ls 1.00 760,000.00 760,000 8.00
Ls 1.00 -
M2 183.04 191,900.00 35,125,376.00
Sub Jumlah 36,374,592.00
AA6 - Kelas 6 JUMLAH 364,106,288.52
Bh 4.00
Bh 4.00
SET 1.00 489,216.00 489,216.00
SET 1.00 - -
SET 1.00 - -
Ls 1.00 760,000.00 760,000.00
Ls 1.00 - -
M2 201.60 - -
Sub Jumlah 1,249,216.00
AA6 - Kelas 7 JUMLAH 909,079,497.48
Bh 4.00
Bh 4.00
SET 1.00 489,216.00 489,216
SET 1.00 - -
SET 1.00 - -
Ls 1.00 1,520,000.00 1,520,000 16.00
Ls Sub Jumlah 2,009,216
M2 BB6 - Kelas 1 JUMLAH 668,496,531
Bh 4.00
Bh 4.00
SET 1.00 489,216.00 489,216
SET 1.00 - -
SET 1.00 - -
Ls 1.00 1,900,000.00 1,900,000 20.00
Sub Jumlah 2,389,216
BB6 - Kelas 2 JUMLAH 785,051,111
Ls 1.00 1,140,750 1,140,750
Ls 1.00 114,033,320 114,033,320
LS 1.00 3,364,267.20 3,364,267
LS 1.00 -
Sub Jumlah 118,538,337
Bh 4.00
Bh 4.00
SET 1.00 489,216.00 489,216
SET 1.00 - -
SET 1.00 - -
Ls 1.00 3,040,000.00 3,040,000 32.00
Sub Jumlah 3,529,216
BB6 - Kelas 3 JUMLAH 1,183,089,809
Bh 4.00
Bh 4.00
SET 1.00 752,169.60 752,170
SET 1.00 - -
SET 1.00 - -
Ls 1.00 760,000.00 760,000 8.00
Sub Jumlah 1,512,170
BB6 - Kelas 4 JUMLAH 381,916,347
Bh 4.00
Bh 4.00
SET 1.00 752,169.60 752,170
SET 1.00 - -
SET 1.00 - -
Ls 1.00 760,000.00 760,000 8.00
Ls 1.00 -
M2 292.80 191,900.00 56,188,320.00
Sub Jumlah 57,700,489.60
BB6 - Kelas 6 JUMLAH 408,311,829.33
Bh 4.00
Bh 4.00
SET 1.00 926,452.80 926,453
SET 1.00 - -
SET 1.00 - -
Ls 1.00 1,900,000.00 1,900,000 20.00
Sub Jumlah 2,826,453
CC6 - Kelas 1 JUMLAH 872,715,261
Bh 4.00
Bh 4.00
SET 1.00 926,452.80 926,453
SET 1.00 - -
SET 1.00 - -
Ls 1.00 3,040,000.00 3,040,000 32.00
Sub Jumlah 3,966,453
CC6 - Kelas 3 JUMLAH 1,318,495,860
Bh 4.00
Bh 4.00
SET 1.00 926,452.80 926,453
SET 1.00 - -
SET 1.00 - -
Ls 1.00 1,140,000.00 1,140,000 12.00
Sub Jumlah 2,066,453
CC6 - Kelas 4 JUMLAH 500,220,081
LS 1.00 1,323,000 1,323,000
Ls 1.00 580,253,860 580,253,860
LS 1.00 3,924,978.40 3,924,978
LS 1.00 -
Sub Jumlah 585,501,838
Bh
Bh
SET 1.00 926,452.80 926,453
SET 1.00 - -
SET 1.00 - -
Ls 1.00 5,700,000.00 5,700,000 60.00
Ls 1.00 -
M2 330.40 191,900.00 63,403,760.00
Sub Jumlah 70,030,212.80
CC2 Spesial - Kelas 6 (w) JUMLAH 2,359,767,885.06
1.00 Set 329,672,314.99
Ls 1.00 1,518,750 1,518,750
Ls 1.00 136,110,307 136,110,307
LS 1.00 4,205,334.00 4,205,334
LS 1.00 -
Sub Jumlah 141,834,391
Bh 4.00
Bh 4.00
SET 1.00 1,451,301.60 1,451,302
SET 1.00 - -
SET 1.00 - -
Ls 1.00 3,800,000.00 3,800,000 40.00
Sub Jumlah 5,251,302
DD6 - Kelas 1 JUMLAH 1,480,133,957
Bh 4.00
Bh 4.00
SET 1.00 1,451,301.60 1,451,302
SET 1.00 - -
SET 1.00 - -
Ls 1.00 3,800,000.00 3,800,000 40.00
Sub Jumlah 5,251,302
DD6 - Kelas 2 JUMLAH 1,566,614,370
Bh 4.00
Bh 4.00
SET 1.00 1,451,301.60 1,451,302
SET 1.00 - -
SET 1.00 - -
Ls 1.00 4,940,000.00 4,940,000 52.00
Sub Jumlah 6,391,302
DD6 - Kelas 3 JUMLAH 1,937,466,610
Ls 1.00 1,518,750 1,518,750
Ls 1.00 76,325,927 76,325,927
LS 1.00 4,205,334.00 4,205,334
LS 1.00 -
Sub Jumlah 82,050,011
Bh 4.00
Bh 4.00
SET 1.00 1,451,301.60 1,451,302
SET 1.00 - -
SET 1.00 - -
Ls 1.00 2,280,000.00 2,280,000 24.00
Sub Jumlah 3,731,302
DD6- Kelas 4 JUMLAH 873,948,313
Bh 4.00
Bh 4.00
SET 1.00 1,451,301.60 1,451,302
SET 1.00 - -
SET 1.00 - -
Ls 1.00 3,420,000.00 3,420,000 36.00
Ls 1.00 -
M2 333.60 191,900.00 64,017,840.00
Sub Jumlah 68,889,141.60
DD2 - Kelas 5 JUMLAH 1,413,189,082.87
SAT VOL HARGA SATUAN JUMLAH HARGA
Bh
Bh
SET 1.00 1,451,301.60 1,451,301.60
SET 1.00 - -
SET 1.00 - -
Ls 1.00 9,880,000.00 9,880,000.00 104
Ls 1.00 -
M2 366.80 191,900.00 70,388,920.00
Sub Jumlah 81,720,221.60
DD6 - Kelas 7 JUMLAH 4,083,654,039.97
0.00 Set 0.00
Bh 4.00
Bh 4.00
SET 1.00 1,451,301.60 1,451,302
SET 1.00 - -
SET 1.00 - -
Ls 1.00 4,180,000.00 4,180,000 44.00
Sub Jumlah 5,631,302
DDR6 - Kelas 1 JUMLAH 1,689,909,452
Bh 4.00
Bh 4.00
SET 1.00 1,451,301.60 1,451,302
SET 1.00 - -
SET 1.00 - -
Ls 1.00 4,940,000.00 4,940,000 52.00
Sub Jumlah 6,391,302
DDR6 - Kelas 2 JUMLAH 1,889,554,458
Bh 4.00
Bh 4.00
SET 1.00 1,451,301.60 1,451,302
SET 1.00 - -
SET 1.00 - -
Ls 1.00 5,700,000.00 5,700,000 60.00
Sub Jumlah 7,151,302
DDR6 - Kelas 3 JUMLAH 2,111,673,988
M3 124,800.00 -
M3 11.88 257,580.00 3,060,308
M3 38.94 38,250.00 1,489,455
Sub Jumlah 4,549,763
pasir
M3 6,178,193.00 - beton
M2 15.23 205,514.00 3,129,978 bekisting
Kg 7,606.52 18,356.50 139,629,084 besi
M3 76.07 9,903,958.94 753,394,157 beton
Sub Jumlah 896,153,219 stub, earthing, groun
Bh 4.00
Bh 4.00
SET 1.00 1,451,301.60 1,451,302
SET 1.00 - -
SET 1.00 - -
Ls 1.00 27,360,000.00 27,360,000 288.00
Sub Jumlah 28,811,302
DDR6 - Kelas 5 JUMLAH 10,206,912,813
Bh 4.00
Bh 4.00
SET 1.00 1,451,301.60 1,451,301.60
SET 1.00 - -
SET 1.00 - -
Ls 1.00 11,400,000.00 11,400,000.00 120
Ls 1.00 -
M2 389.20 191,900.00 74,687,480.00
Sub Jumlah 87,538,781.60
DDR6 - Kelas 7 JUMLAH 4,716,964,837.11
0.00 Set 0.00
Transpor material pondasi :
Rp 500
BJ
1,400 6,468
2,200 5,082
40 2,083
1 2,364
2,200 53,460
stub, earthing, grounding mat 377
69,834
BJ
1,400 7,252
2,200 5,698
40 2,141
1 2,570
2,200 59,004
stub, earthing, grounding mat 377
77,042
BJ
1,400 11,844
2,200 9,306
40 2,173
1 3,908
2,200 89,694
stub, earthing, grounding mat 377
117,302
BJ
1,400 -
2,200 -
40 127
1 1,588
2,200 34,936
stub, earthing, grounding mat 377
37,029
BJ
1,400 29,848
1,500 64,380
2,200 46,904
40 1,216
1 15,727
2,200 334,312
stub, earthing, grounding mat 377
492,764
BJ
1,400 8,960
2,200 3,960
40 1,536
1 1,977
2,200 50,688
stub, earthing, grounding mat 377
67,499
BJ
1,400 10,360
2,200 8,140
40 2,765
1 4,893
2,200 96,118
stub, earthing, grounding mat 526
122,803
BJ
1,400 11,844
2,200 9,306
40 2,906
1 5,839
2,200 113,146
stub, earthing, grounding mat 526
143,567
BJ
1,400 20,160
2,200 15,840
40 3,014
1 6,762
2,200 181,764
stub, earthing, grounding mat 526
228,067
BJ
1,400 -
2,200 -
40 229
1 2,858
2,200 62,876
stub, earthing, grounding mat 526
66,490
BJ
1,400 53,732
1,500 157,248
2,200 84,436
40 2,188
1 28,309
2,200 601,766
stub, earthing, grounding mat 526
928,205
BJ
1,400 5,040
2,200 3,960
40 449
1 2,425
2,200 55,198
stub, earthing, grounding mat 526
67,598
BJ
1,400 29,932
2,200 47,036
40 924
1 11,549
2,200 254,078
stub, earthing, grounding mat 526
344,045
BJ
1,400 13,440
2,200 10,560
40 3,190
1 6,409
2,200 126,126
stub, earthing, grounding mat 625
160,351
BJ
1,400 14,560
2,200 11,440
40 3,261
1 6,820
2,200 135,608
stub, earthing, grounding mat 625
172,314
BJ
1,400 22,232
2,200 17,468
40 3,235
1 9,405
2,200 196,306
stub, earthing, grounding mat 625
249,271
BJ
1,400 -
2,200 -
40 300
1 3,748
2,200 82,456
stub, earthing, grounding mat 625
87,129
BJ
1,400 70,448
1,500 149,760
2,200 110,704
40 2,869
1 37,116
2,200 788,986
stub, earthing, grounding mat 625
1,160,508
BJ
1,400 5,040
2,200 3,960
40 1,792
1 2,475
2,200 59,752
stub, earthing, grounding mat 625
73,644
BJ
1,400 39,256
2,200 61,688
40 1,211
1 15,142
2,200 333,124
stub, earthing, grounding mat 625
451,046
BJ
1,400 20,160
2,200 15,840
40 4,042
1 10,178
2,200 221,078
stub, earthing, grounding mat 923
272,221
BJ
1,400 21,532
2,200 16,918
40 4,125
1 10,719
2,200 234,256
stub, earthing, grounding mat 923
288,472
BJ
1,400 27,440
2,200 21,560
40 4,278
1 12,907
2,200 293,678
stub, earthing, grounding mat 923
360,786
BJ
1,400 -
2,200 -
40 527
1 6,574
2,200 144,628
stub, earthing, grounding mat 923
152,652
BJ
1,400 123,564
2,200 194,172
40 1,216
1 15,727
2,200 1,384,042
stub, earthing, grounding mat 923
1,596,079
BJ
1,400 37,100
2,200 16,390
40 6,359
1 8,187
2,200 209,858
stub, earthing, grounding mat 923
278,817
BJ
1400 68,852.00
2200 108,196.00
40 2,124.80
1 26,562.24
2200 584,364.00
stub, earthing, groundin 923
Rp 791,021.77
BJ
1,400 21,532
2,200 16,918
40 4,518
1 11,290
2,200 256,300
stub, earthing, grounding mat 923
311,482
BJ
1,400 24,388
2,200 19,162
40 4,698
1 12,319
2,200 287,848
stub, earthing, grounding mat 923
349,337
BJ
1,400 29,036
2,200 22,814
40 4,762
1 13,993
2,200 336,556
stub, earthing, grounding mat 923
408,084
BJ
1,400 16,633
2,200 -
40 609
1 7,607
2,200 167,354
stub, earthing, grounding mat 923
193,126
BJ
1,400 142,968
2,200 224,664
40 5,823
1 75,332
2,200 1,601,358
stub, earthing, grounding mat 923
1,908,477
BJ
1,400 42,924
2,200 18,964
40 7,358
1 9,472
2,200 242,792
stub, earthing, grounding mat 923
322,432
BJ
1400 79,674.00
2200 125202
40 2458.4
1 30732.64
2200 676126
stub, earthing, groundin 922.7333333333
Rp 915,116
Pemasangan grounding Panjang
3.20
3.90
4.10
4.40
4.60
bekisting
balok 5 X 7
triplek
2 Pekerjaan Beton
a Urugan pasir, t = 10 m³ 4 212,936
b Beton 1 : 3 : 5, level m³ 2 741,413
c Beton K 225, pondasm³ 18 1,396,240
d Besi beton kg 1,685 18,249
e Cetakan m² 41 179,756
f Pre-cast block ukurabh 4 42,220
3 Pekerjaan Lain-lain
a Pembuatan dan Pembh 4 117,670
b Transport Material kg ### 250
c Tes Kubus Beton (1 bh 4 65,000
d Penyetelan stub (beskg 252 30,044
2.8 5 14
7.2 1 7.2
21.2
9,252,304
2,447,557
818,524
1,424,995
25,142,334
30,742,652
7,305,269
168,880
470,680
14,036,851
260,000
7,557,909 62.89
850,000
225,000
100,702,957
150 x 150 x 12 mm - 6
M jumlah pondasi wkt pembuatan (hari) total hari skedul (hari)
202 Kg 24
Besi Siku
200 x 200 x 15 mm - 6
M
272 Kg Mob/dem 1 3,400,000 3,400,000
Besi Siku 13 600,000 7,800,000
200 x 200 x 16 mm - 6
M akomodas 14 350,000 1.5 7,350,000
301 Kg 18,550,000
Besi Siku
200 x 200 x 20 mm - 6
M Total regu 40 742,000,000
358 Kg
Besi Siku
200 x 200 x 25 mm - 6
M Molen @ 0,15 m3
442 Kg rerata per pondasi = 20 m3
Besi Siku batch 133.33
250 x 250 x 25 mm - 6
M waktu 3333.33 mnt
562 Kg 55.56 jam
6.94 hari
jml. regu personi/regu tenaga
1 mandor lokal
1 supervisi luar/lokal
14
RENCANA ANGGARAN BIAYA ( RAB
PEKERJAAN PONDASI TOWER
T/L 150kV . . . . .
( . . . . kmr; 2 Cct; 2 x ACSR 250-A1/S1B-26/7 dan 2 x ACSR
4.2.7.5 PONDASI TOWER TIPE AA2 - Kelas 6 - Boredpile D=0.6 m per meter
1. Pengangkutan material Pondasi ke Lokasi Tower LS
2. Pengeboran M'
3. Beton K-225 M3
4. Besi Tulangan Bored Pile kg
AA2 - Kelas 6 - Boredpile D=0
4.2.7.10 #REF!
I. PEKERJAAN PERSIAPAN
1. Pembersihan lapangan & Perataan Tanah Ls
2. Pengangkutan material Pondasi ke Lokasi Tower + Stub Ls
3. Pekerjaan Bouwplank LS
4. Gambar Kerja LS
4.2.7.10 PONDASI TOWER TIPE BB2 - Kelas 6 - Boredpile D=0.4 m per meter
1. Pengangkutan material Pondasi ke Lokasi Tower LS
2. Pengeboran M'
3. Beton K-225 M3
4. Besi Tulangan Bored Pile kg
BB2 - Kelas 6 - Boredpile D=0
4.2.7.12 PEKERJAAN TANAH
1. Pengangkutan material Pondasi ke Lokasi Tower LS
2. Pengeboran M'
3. Beton K-225 M3
4. Besi Tulangan Bored Pile kg
4.2.7.15 PONDASI TOWER TIPE CC2 - Kelas 6 - Boredpile D=0.6 m per meter
1. Pengangkutan material Pondasi ke Lokasi Tower LS
2. Pengeboran M'
3. Beton K-225 M3
4. Besi Tulangan Bored Pile kg
CC2 - Kelas 6 - Boredpile D=0
4.2.7.20 PONDASI TOWER TIPE DD2 - Kelas 6 - Boredpile D=0.6 m per meter
1. Pengangkutan material Pondasi ke Lokasi Tower LS
2. Pengeboran M'
3. Beton K-225 M3
4. Besi Tulangan Bored Pile kg
DD2 - Kelas BP - Boredpile D=0
4.2.7.25 PONDASI TOWER TIPE EE2 - Kelas 6 - Boredpile D=0.6 m per meter
1. Pengangkutan material Pondasi ke Lokasi Tower Ls
2. Pengeboran M'
3. Beton K-225 M3
4. Besi Tulangan Bored Pile kg
EE2 - Kelas BP - Boredpile D=0
4.2.7.26 PONDASI TOWER TIPE DDR2 - Kelas 6 - Pile Cap 9 Pile
I. PEKERJAAN PERSIAPAN
1. Pembersihan lapangan & Perataan Tanah LS
2. Pengangkutan material Pondasi ke Lokasi Tower + Stub Ls
3. Pekerjaan Bouwplank LS
4. Gambar Kerja LS
4.2.7.32 #REF!
I. PEKERJAAN PERSIAPAN
1. Pembersihan lapangan & Perataan Tanah LS
2. Pengangkutan material Pondasi ke Lokasi Tower + Stub Ls
3. Pekerjaan Bouwplank LS
4. Gambar Kerja LS
4.2.7.30 PONDASI TOWER TIPE DDR2 - Kelas 6 - Boredpile D=0.6 m per meter
1. Pengangkutan material Pondasi ke Lokasi Tower LS
2. Pengeboran M'
3. Beton K-225 M3
4. Besi Tulangan Bored Pile kg
DDR2 - Kelas BP - Boredpile D=0
4.2.7.34 #REF!
1. Pengangkutan material Pondasi ke Lokasi Tower LS
2. Pengeboran M'
3. Beton K-225 M3
4. Besi Tulangan Bored Pile kg
6 m per meter
1.00 197,621 197,621.07 BJ
1.00 182,500.00 182,500.00 alat 100.00
0.13 9,903,958.94 1,244,571.72 beton 2,200 276.46
18.78 18,356.50 344,757.30 besi 1 18.78
as 6 - Boredpile D=0.6 m JUMLAH 1,969,450.09 395.24
1.00 -
1.00 -
1.00 -
1.00 -
Sub Jumlah -
- -
- -
- -
Sub Jumlah -
- -
- -
- -
- -
Sub Jumlah -
1.00 -
1.00 -
1.00 -
1.00 -
- -
- -
Sub Jumlah -
#REF! JUMLAH 0.00
6 m per meter
1.00 197,621 197,621.07
1.00 182,500.00 182,500.00
0.13 9,903,958.94 1,244,571.72
18.78 18,356.50 344,757.16
as 6 - Boredpile D=0.6 m JUMLAH 1,969,449.94
6 m per meter
1.00 197,621 197,621.07
1.00 182,500.00 182,500.00
0.13 9,903,958.94 1,244,571.72
19.03 18,356.50 349,271.44
Kelas BP - Boredpile D=0.4 m JUMLAH 1,973,964.22
6 m per meter
1.00 197,621 197,621.07
1.00 182,500.00 182,500.00
0.13 9,903,958.94 1,244,571.72
19.03 18,356.50 349,271.34
Kelas BP - Boredpile D=0.4 m JUMLAH 1,973,964.13
1.00 1,728,000 1,728,000.00
1.00 49,460,643 49,460,643.17
1.00 4,485,689.60 4,485,689.60
1.00 -
Sub Jumlah 55,674,332.77
1.00 -
1.00 -
1.00 -
1.00 -
Sub Jumlah -
- -
- -
- -
Sub Jumlah -
- -
- -
- -
- -
Sub Jumlah -
1.00 -
1.00 -
1.00 -
1.00 -
- -
- -
Sub Jumlah -
#REF! JUMLAH 0.00
1.00 -
- -
- -
- -
#REF! JUMLAH 0.00
4.2.7.5 PONDASI TOWER TIPE AA6 - Kelas 6 - Boredpile D=0.6 m per meter
1. Pengangkutan material Pondasi ke Lokasi Tower LS
2. Pengeboran M'
3. Beton K-225 M3
4. Besi Tulangan Bored Pile kg
AA6 - Kelas 6 - Boredpile D=0
4.2.7.10 #REF!
I. PEKERJAAN PERSIAPAN
1. Pembersihan lapangan & Perataan Tanah Ls
2. Pengangkutan material Pondasi ke Lokasi Tower + Stub Ls
3. Pekerjaan Bouwplank LS
4. Gambar Kerja LS
4.2.7.10 PONDASI TOWER TIPE BB6 - Kelas 6 - Boredpile D=0.4 m per meter
1. Pengangkutan material Pondasi ke Lokasi Tower LS
2. Pengeboran M'
3. Beton K-225 M3
4. Besi Tulangan Bored Pile kg
BB6 - Kelas 6 - Boredpile D=0
4.2.7.12 PEKERJAAN TANAH
1. Pengangkutan material Pondasi ke Lokasi Tower LS
2. Pengeboran M'
3. Beton K-225 M3
4. Besi Tulangan Bored Pile kg
4.2.7.15 PONDASI TOWER TIPE CC6 - Kelas 6 - Boredpile D=0.6 m per meter
1. Pengangkutan material Pondasi ke Lokasi Tower LS
2. Pengeboran M'
3. Beton K-225 M3
4. Besi Tulangan Bored Pile kg
CC6 - Kelas 6 - Boredpile D=0
4.2.7.20 PONDASI TOWER TIPE DD2 - Kelas 6 - Boredpile D=0.6 m per meter
1. Pengangkutan material Pondasi ke Lokasi Tower LS
2. Pengeboran M'
3. Beton K-225 M3
4. Besi Tulangan Bored Pile kg
DD2 - Kelas BP - Boredpile D=0
6 m per meter
1.00 197,621 197,621.07 BJ
1.00 182,500.00 182,500.00 alat 100.00
0.13 9,903,958.94 1,244,571.72 beton 2,200 276.46
18.78 18,356.50 344,757.30 besi 1 18.78
as 6 - Boredpile D=0.6 m JUMLAH 1,969,450.09 395.24
1.00 -
1.00 -
1.00 -
1.00 -
Sub Jumlah -
- -
- -
- -
Sub Jumlah -
- -
- -
- -
- -
Sub Jumlah -
1.00 -
1.00 -
1.00 -
1.00 -
- -
- -
Sub Jumlah -
#REF! JUMLAH 0.00
6 m per meter
1.00 197,621 197,621.07
1.00 182,500.00 182,500.00
0.13 9,903,958.94 1,244,571.72
18.78 18,356.50 344,757.16
as 6 - Boredpile D=0.6 m JUMLAH 1,969,449.94
6 m per meter
1.00 197,621 197,621.07
1.00 182,500.00 182,500.00
0.13 9,903,958.94 1,244,571.72
19.03 18,356.50 349,271.44
Kelas BP - Boredpile D=0.4 m JUMLAH 1,973,964.22
5. REKAPITULASI
PEKERJAAN PEMBANGUNAN
T/L 150kV . . . . .
( . . . . . kmr; 2 Cct; 2 x ACSR 250-A1/S1B-26/7 dan 2 x ACSR/AS 250
No. URAIAN
JUMLAH
114750
3364267.2
3364267.2
3364267.2
124800
0
3364267.2
189000
TUNGAN SENDIRI
APITULASI
PEMBANGUNAN
0kV . . . . .
B-26/7 dan 2 x ACSR/AS 250-A1/SA1A-26/7)
N JUMLAH
Rp - -
-
Rp 2,459,864,652 2,705,851,117.13
-
Rp 31,078,457 34,186,302.86
-
-
Rp 2,490,943,109 2,740,037,419.98
0
bat 1500 0
0
RENCANA ANGGARAN BIAYA ( RAB )
PEKERJAAN ERECTION TOWER
T/L 150kV . . . . .
( . . . . . kmr; 2 Cct; 2 x ACSR 250-A1/S1B-26/7 dan 2 x ACSR/AS 250-
Catatan : Pekerjaan Pemasangan di atas adalah Pekerjaan Pemasangan Material Tower + Langsir Material.
DDR2 -3 Set
DDR2 +0 Set
3364267.2 Set
DDR2 +6 Set
DDR2 +9 Set
124800 Set
Tower
DDR2 -3 Set
0 Set
3364267.2 Set
DDR2 +6 Set
DDR2 +9 Set
-
Sub Jumlah -
14,048,120.00 -
15,408,784.00 30,817,568.00
16,735,488.00 33,470,976.00
18,687,056.00 37,374,112.00
19,986,592.00 59,959,776.00
22,180,408.00 -
23,762,944.00 -
17,808,624.00 213,703,488.00
19,780,568.00 138,463,976.00
21,892,880.00 218,928,800.00
23,989,344.00 455,797,536.00
26,803,496.00 562,873,416.00
29,051,648.00 232,413,184.00
33,987,168.00 67,974,336.00
23,867,088.00 23,867,088.00
26,400,504.00 -
30,980,576.00 -
31,582,800.00 63,165,600.00
34,591,656.00 69,183,312.00
37,543,912.00 37,543,912.00
43,104,296.00 -
29,930,080.00 29,930,080.00
33,079,304.00 -
36,973,384.00 -
40,097,704.00 -
44,727,584.00 134,182,752.00
47,946,992.00 -
54,311,096.00 -
36,862,448.00 -
40,129,400.00 -
42,438,680.00 -
46,126,736.00 -
50,214,739.93 50,214,739.93
54,665,045.16 -
59,509,760.81 -
Sub Jumlah 2,459,864,651.93
621,569.14 31,078,457.14
Sub Jumlah 31,078,457.14
TOTAL 2,490,943,109.08
0
ANALISA HARGA SATUAN PEMASANGAN TOWER (Erection)
T/L 150kV . . . . .
( . . . . . kmr; 2 Cct; 2 x ACSR 250-A1/S1B-26/7 dan 2 x ACSR/AS 250-A1/SA1
PEMASANGAN TOW
NO JENIS TOWER
SATUAN VOLUME
1 2 3 4
5.1.a PEMASANGAN TOWER
PEMASANGAN TOWER
HARGA SATUAN JUMLAH HARGA
(Rp) (Rp)
5 6=4X5
Rp 2,264 Rp 14,048,120
Rp 2,264 Rp 15,408,784
Rp 2,264 Rp 16,735,488
Rp 2,264 Rp 18,687,056
Rp 2,264 Rp 19,986,592
Rp 2,264 Rp 22,180,408
Rp 2,264 Rp 23,762,944
Rp 2,264 Rp 17,808,624
Rp 2,264 Rp 19,780,568
Rp 2,264 Rp 21,892,880
Rp 2,264 Rp 23,989,344
Rp 2,264 Rp 26,803,496
Rp 2,264 Rp 29,051,648
Rp 2,264 Rp 33,987,168
Rp 2,264 Rp 23,867,088
Rp 2,264 Rp 26,400,504
Rp 2,264 Rp 30,980,576
Rp 2,264 Rp 31,582,800
Rp 2,264 Rp 34,591,656
Rp 2,264 Rp 37,543,912
Rp 2,264 Rp 43,104,296
Rp 2,264 Rp 29,930,080
Rp 2,264 Rp 33,079,304
Rp 2,264 Rp 36,973,384
Rp 2,264 Rp 40,097,704
Rp 2,264 Rp 44,727,584
Rp 2,264 Rp 47,946,992
Rp 2,264 Rp 54,311,096
Rp 2,264 Rp 36,862,448
Rp 2,264 Rp 40,129,400
Rp 2,264 Rp 42,438,680
Rp 2,264 Rp 46,126,736
Rp 2,264 Rp 50,214,740
Rp 2,264 Rp 54,665,045
Rp 2,264 Rp 59,509,761
-
-
-
al tower :
6
PEKER
No. URA
JUMLAH
6. REKAPITULASI
PEKERJAAN PEMBANGUNAN
T/L 150kV . . . . .
( . . . . . kmr; 2 Cct; 2 x ACSR 250-A1/S1B-26/7 dan 2 x ACSR/AS 250-A1/SA1A-26/7)
URAIAN
PEKERJAAN PERSIAPAN
PEMASANGAN FITTING & ASSESORIES UNTUK KONDUKTOR PHASA DAN KAWAT TANAH
JUMLAH
EKAPITULASI
AN PEMBANGUNAN
L 150kV . . . . .
1/S1B-26/7 dan 2 x ACSR/AS 250-A1/SA1A-26/7)
N JUMLAH
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
6.1 RENCANA ANGGARAN BIAYA ( RAB )
PEKERJAAN PENARIKAN KONDUKTOR (STRING
T/L 150kV . . . . . .
( . . . . . kmr; 2 Cct; 2 x ACSR 250-A1/S1B-26/7 dan 2 x ACSR/AS
HARGA ( Rp )
VOLUME
SATUAN JUMLAH
1.00
31.78
1.00
1.00
Sub Jumlah
31.78
31.78
31.78
Sub Jumlah
90.00
9.00
90.00
9.00
90.00
9.00
Sub Jumlah
24.00
36.00
684.00
384.00
45.00
Sub Jumlah
180.00
3,000.00
3,310.00
1,068.00
15.00
249.00
9.00
294.00
Sub Jumlah
99.00
99.00
Sub Jumlah
99.00
99.00
Sub Jumlah
TOTAL
PEKERJAAN PEMBANGUNAN
T/L 150kV . . . . . .
( . . . . . kmr; 2 Cct; 2 x ACSR 250-A1/S1B-26/7 dan 2 x ACSR/AS 250-A1/SA1A-26/7)
II UPAH KERJA
Note:
1 Daftar Isian 2 (Untuk referensi)
S 250-A1/SA1A-26/7)
KETERANGAN
ikat
dus
dus
dus
SIKA CHAPDUR
1220 x 2440 x 6 mm
300 x 2440 x 9 mm
UMK 2017
Stamper
PEKERJAAN PEMBANGUNAN
T/L 150kV . . . . . .
( . . . . . kmr; 2 Cct; 2 x ACSR 250-A1/S1B-26/7 dan 2 x ACSR/AS 250-A1/SA1A-26/7)
1 2 3 4.000
- Material
- Multiplek 12 mm lembar 1.000
- Kayu 6/12 meranti batang 3.000
- Cat Warna kg 2.000
- Paku kg 0.500
- Beton mutu K100 m3 0.065
- Upah
- Tukang Cat orang/hari 1.000
- Pekerja orang/hari 2.000
- Mandor orang/hari 0.100
ROK
TOTAL
- Material
- Dolken Kayu Ø 8 - 10/400 cm batang 1.250
- Kayu 5/7 meranti m3 0.072
- Seng gelombang 3" - 5" lembar 1.200
- Paku kg 0.500
- Cat Meni kg 0.500
- Semen PC kg 2.500
- Pasir Beton m3 0.005
- Batu Koral beton m3 0.009
- Upah
- Tukang kayu orang/hari 0.200
- Pekerja orang/hari 0.400
- Kepala Tukang orang/hari 0.020
- Mandor orang/hari 0.020
ROK
TOTAL
- Material
- Kayu Papan 3/20 meranti m3 0.007
- Kayu 5/7 meranti m3
0.012
- Paku kg 0.020
NAMA KONTRAKTOR :
analisa harga Page 341 of 503
BOQ GARDU INDUK 70 KV TELUK DALAM
TANDA TANGAN :
- Upah
- Tukang kayu orang/hari 0.100
- Pekerja orang/hari 0.100
- Kepala Tukang orang/hari 0.010
- Mandor orang/hari 0.005
ROK
TOTAL
- Material
- Dolken Kayu Ø 8 - 10/ 4 m batang 1.250
- Kayu Kelas III m3 0.180
- Paku Kg 0.850
- Besi Strip Kg 1.100
- Semen Portland Kg 35.000
- Pasir Pasang m3 0.150
- Pasir Beton m3 0.100
- Koral Beton m 3
0.150
- Batu bata merah bh 30.000
NAMA KONTRAKTOR :
analisa harga Page 342 of 503
BOQ GARDU INDUK 70 KV TELUK DALAM
TANDA TANGAN :
- Seng Plat lbr 0.250
- Jendela Nako bh 2.000
- Kaca Polos m2 0.080
- Kunci Tanam bh 0.150
- Engsel pintu bh 0.300
- Plywood 4 mm lbr 0.060
- Upah
- Tukang kayu orang/hari 2.000
- Tukang batu orang/hari 1.000
- Pekerja orang/hari 2.000
- Kepala Tukang orang/hari 0.300
- Mandor orang/hari 0.050
ROK
TOTAL
- Material
- Dolken Kayu Ø 8 - 10/ 4 m btg 1.700
- Kayu Kelas III m3 0.210
- Paku Kg 0.300
- Semen Portland Kg 10.500
- Pasir Beton m3 0.030
- Koral Beton m3 0.050
- Seng Gelombang BJLS 32 lbr 1.500
- Upah
- Tukang kayu orang/hari 2.000
- Pekerja orang/hari 1.000
- Kepala Tukang orang/hari 0.200
- Mandor orang/hari 0.050
ROK
TOTAL
- Upah
- Pekerja orang/hari 0.050
- Mandor orang/hari 0.005
ROK
TOTAL
ROK
TOTAL
NAMA KONTRAKTOR :
analisa harga Page 343 of 503
BOQ GARDU INDUK 70 KV TELUK DALAM
TANDA TANGAN :
- Pekerja orang/hari 1.000
- Mandor orang/hari 0.032
ROK
TOTAL
- Upah
- Pekerja orang/hari 1.500
- Mandor orang/hari 0.060
ROK
TOTAL
NAMA KONTRAKTOR :
analisa harga Page 344 of 503
BOQ GARDU INDUK 70 KV TELUK DALAM
TANDA TANGAN :
10 1 m3 Urugan tanah kembali
ROK
TOTAL
ROK
TOTAL
- Upah
- Pekerja orang/hari 0.330
- Mandor orang/hari 0.010
ROK
TOTAL
- Material
- Tanah m3 1.200
- Upah
- Pekerja orang/hari 0.250
- Mandor orang/hari 0.025
ROK
TOTAL
Material
- Galian tanah biasa (10 org) 50% m3 0.600
- Galian tanah keras (10 org) 50% m 3
0.600
- Pek. Stripping (10 org) 50% m 3
5.000
- Beli Tanah + angkut max 10 km (tanah urug pilihan) m3 1.200
ROK
TOTAL
- Material
- Pasir pasang m3 1.200
NAMA KONTRAKTOR :
analisa harga Page 345 of 503
BOQ GARDU INDUK 70 KV TELUK DALAM
TANDA TANGAN :
- Upah
- Pekerja orang/hari 0.300
- Mandor orang/hari 0.010
ROK
TOTAL
1 m2 Urugan Pasir Dipadatkan (tebal 10 Cm)
- Material
- Sirtu m3 1.200
- Upah
- Pekerja orang/hari 0.250
- Mandor orang/hari 0.025
ROK
TOTAL
- Material
- Batu bata merah bh 70.000
- Portland cement (PC) kg 11.500
- Pasir pasang m3 0.043
NAMA KONTRAKTOR :
analisa harga Page 346 of 503
BOQ GARDU INDUK 70 KV TELUK DALAM
TANDA TANGAN :
- Upah
- Pekerja orang/hari 0.030
- Tukang batu orang/hari 0.100
- Kepala Tukang orang/hari 0.010
- Mandor orang/hari 0.015
ROK
TOTAL
- Material
- Batu bata merah bh 70.000
- Portland cement (PC) kg 18.950
- Pasir pasang m3 0.038
- Upah
- Pekerja orang/hari 0.030
- Tukang batu orang/hari 0.100
- Kepala Tukang orang/hari 0.010
- Mandor orang/hari 0.015
ROK
TOTAL
18 1 m2 plasteran 1 pc : 4 ps tebal 15 mm
- Material
- Portland cement (PC) kg 6.240
- Pasir pasang m3 0.024
- Upah
- Pekerja orang/hari 0.300
- Tukang batu orang/hari 0.150
- Kepala Tukang orang/hari 0.015
- Mandor orang/hari 0.015
ROK
TOTAL
19 1 m2 plasteran 1 pc : 2 ps tebal 15 mm
- Material
- Portland cement (PC) kg 10.224
- Pasir pasang m3 0.020
- Upah
- Pekerja orang/hari 0.300
- Tukang batu orang/hari 0.150
- Kepala Tukang orang/hari 0.015
- Mandor orang/hari 0.015
ROK
TOTAL
NAMA KONTRAKTOR :
analisa harga Page 347 of 503
BOQ GARDU INDUK 70 KV TELUK DALAM
TANDA TANGAN :
20 1 m2 Brafen 1 pc : 5 psr tebal 15 mm
- Material
- Portland cement (PC) kg 5.184
- Pasir pasang m3 0.026
- Upah
- Pekerja orang/hari 0.150
- Tukang batu orang/hari 0.075
- Kepala Tukang orang/hari 0.008
- Mandor orang/hari 0.008
ROK
TOTAL
NAMA KONTRAKTOR :
analisa harga Page 348 of 503
BOQ GARDU INDUK 70 KV TELUK DALAM
TANDA TANGAN :
21 1 m2 Acian
- Material
- Portland cement (PC) kg 3.250
- Upah
- Pekerja orang/hari 0.200
- Tukang batu orang/hari 0.100
- Kepala Tukang orang/hari 0.010
- Mandor orang/hari 0.010
ROK
TOTAL
22 1 m3 Beton Tumbuk 1 PC : 3 PB : 5 KR
- Material
- Portland cement (PC) kg 218.000
- Pasir beton m3 0.520
- Batu koral beton kali m3 0.870
- Upah
- Pekerja orang/hari 1.650
- Tukang batu orang/hari 0.250
- Kepala Tukang orang/hari 0.025
- Mandor orang/hari 0.080
- Upah Pengecoran,perawatan,tes kubus beton,dll LS 1.000
ROK
TOTAL
23 1 m3 Lantai Kerja Beton mutu f'c = 7,4 Mpa (K100), slump (3-6) cm, w/c = 0,87
- Material
- Portland cement (PC) kg 230.000
- Pasir beton kg 893.000
- Split Pecah Mesin 2/3 kg 1,027.000
- Air liter 200.000
- Upah
- Pekerja orang/hari 1.200
- Tukang batu orang/hari 0.200
- Kepala Tukang orang/hari 0.020
- Mandor orang/hari 0.060
- Upah Pengecoran,perawatan,tes kubus beton,dll LS 1.000
ROK
TOTAL
- Material
- Portland cement (PC) kg 326.000
- Pasir beton kg 760.000
NAMA KONTRAKTOR :
analisa harga Page 349 of 503
BOQ GARDU INDUK 70 KV TELUK DALAM
TANDA TANGAN :
- Split Pecah Mesin 2/3 kg 1,029.000
- Air liter 215.000
- Upah
- Pekerja orang/hari 1.650
- Tukang batu orang/hari 0.275
- Kepala Tukang orang/hari 0.028
- Mandor orang/hari 0.083
- Upah Pengecoran,perawatan,tes kubus beton,dll LS 1.000
ROK
TOTAL
- Material
- Portland cement (PC) kg 371.000
NAMA KONTRAKTOR :
analisa harga Page 350 of 503
BOQ GARDU INDUK 70 KV TELUK DALAM
TANDA TANGAN :
- Pasir beton kg 698.000
- Split Pecah Mesin 2/3 kg 1,047.000
- Air liter 215.000
- Upah
- Pekerja orang/hari 1.650
- Tukang batu orang/hari 0.275
- Kepala Tukang orang/hari 0.028
- Mandor orang/hari 0.083
- Upah Pengecoran,perawatan,tes kubus beton,dll LS 1.000
ROK
TOTAL
- Material
- Portland cement (PC) kg 448.000
- Pasir beton kg 667.000
- Split Pecah Mesin 2/3 kg 1,000.000
- Air liter 215.000
- Upah
- Pekerja orang/hari 2.100
- Tukang batu orang/hari 0.350
- Kepala Tukang orang/hari 0.035
- Mandor orang/hari 0.105
- Upah Pengecoran,perawatan,tes kubus beton,dll LS 1.000
ROK
TOTAL
- Material
- Batu belah 15/20 cm m3 1.200
- Portland cement (PC) kg 163.000
- Pasir pasang m3 0.520
- Upah
- Pekerja orang/hari 1.500
- Tukang batu orang/hari 0.750
- Kepala Tukang orang/hari 0.075
- Mandor orang/hari 0.075
ROK
TOTAL
- Material
- Batu belah 15/20 cm m3 1.200
- Portland cement (PC) kg 202.000
- Pasir pasang m3 0.485
NAMA KONTRAKTOR :
analisa harga Page 351 of 503
BOQ GARDU INDUK 70 KV TELUK DALAM
TANDA TANGAN :
- Upah
- Pekerja orang/hari 1.500
- Tukang batu orang/hari 0.750
- Kepala Tukang orang/hari 0.075
- Mandor orang/hari 0.075
ROK
TOTAL
- Material
- Batu belah 15/20 cm m3 1.200
- Pasir urug/pasang m 3
0.432
- Upah
- Pekerja orang/hari 0.780
- Tukang batu orang/hari 0.390
- Kepala Tukang orang/hari 0.039
- Mandor orang/hari 0.039
ROK
TOTAL
NAMA KONTRAKTOR :
analisa harga Page 352 of 503
BOQ GARDU INDUK 70 KV TELUK DALAM
TANDA TANGAN :
- Material
- Besi beton (polos atau ulir) kg 10.500
- Kawat beton kg 0.150
- Upah
- Pekerja orang/hari 0.070
- Tukang batu orang/hari 0.070
- Kepala Tukang orang/hari 0.007
- Mandor orang/hari 0.004
ROK
TOTAL
Per kg
- Material
- Kayu Kelas III m3 0.200
- Paku 5 cm -12 cm kg 1.500
- Minyak bekisting liter 0.400
- Besi beton (polos atau ulir) kg 157.500
- Kawat beton kg 2.250
- Portland cement (PC) kg 336.000
- Pasir beton m3 0.540
- Split Pecah Mesin 2/3 m3 0.810
- Upah
- Pekerja orang/hari 5.300
- Tukang batu orang/hari 0.275
- Tukang kayu orang/hari 1.300
- Tukang besi orang/hari 1.050
- Kepala Tukang orang/hari 0.262
- Mandor orang/hari 0.265
ROK
TOTAL
- Material
- Kayu Kelas III m3 0.270
- Paku 5 cm -12 cm kg 2.000
- Minyak bekisting liter 0.600
- Besi beton (polos atau ulir) kg 210.000
- Kawat beton kg 3.000
- Portland cement (PC) kg 336.000
- Pasir beton m3 0.540
- Split Pecah Mesin 2/3 m3 0.810
- Upah
- Pekerja orang/hari 5.650
- Tukang batu orang/hari 0.275
- Tukang kayu orang/hari 1.560
NAMA KONTRAKTOR :
analisa harga Page 353 of 503
BOQ GARDU INDUK 70 KV TELUK DALAM
TANDA TANGAN :
- Tukang besi orang/hari 1.400
- Kepala Tukang orang/hari 0.323
- Mandor orang/hari 0.283
ROK
TOTAL
- Material
- Kayu Kelas III m3 0.400
- Paku 5 cm -12 cm kg 4.000
NAMA KONTRAKTOR :
analisa harga Page 354 of 503
BOQ GARDU INDUK 70 KV TELUK DALAM
TANDA TANGAN :
- Minyak bekisting liter 2.000
- Besi beton (polos atau ulir) kg 315.000
- Kawat beton kg 4.500
- Portland cement (PC) kg 336.000
- Pasir beton m3 0.540
- Split Pecah Mesin 2/3 m 3
0.810
- Kayu Kelas II balok m 3
0.150
- Plywood 9 mm lembar 3.500
- Kayu Dolken batang 20.000
- Upah
- Pekerja orang/hari 5.650
- Tukang batu orang/hari 0.275
- Tukang kayu orang/hari 1.560
- Tukang besi orang/hari 1.400
- Kepala Tukang orang/hari 0.323
- Mandor orang/hari 0.283
ROK
TOTAL
- Material
- Kayu Kelas III m3 0.320
- Paku 5 cm -12 cm kg 3.200
- Minyak bekisting liter 1.600
- Besi beton (polos atau ulir) kg 210.000
- Kawat beton kg 3.000
- Portland cement (PC) kg 336.000
- Pasir beton m3 0.540
- Split Pecah Mesin 2/3 m3 0.810
- Kayu Kelas II balok m 3
0.140
- Plywood 9 mm lembar 2.800
- Kayu Dolken batang 16.000
- Upah
- Pekerja orang/hari 6.350
- Tukang batu orang/hari 0.275
- Tukang kayu orang/hari 1.650
- Tukang besi orang/hari 1.400
- Kepala Tukang orang/hari 0.330
- Mandor orang/hari 0.318
ROK
TOTAL
- Material
- Kayu Kelas III m3 0.320
- Paku 5 cm -12 cm kg 3.200
- Minyak bekisting liter 1.600
NAMA KONTRAKTOR :
analisa harga Page 355 of 503
BOQ GARDU INDUK 70 KV TELUK DALAM
TANDA TANGAN :
- Besi beton (polos atau ulir) kg 157.500
- Kawat beton kg 2.250
- Portland cement (PC) kg 336.000
- Pasir beton m3 0.540
- Split Pecah Mesin 2/3 m3 0.810
- Kayu Kelas II balok m3 0.120
- Plywood 9 mm lembar 2.800
- Kayu Dolken batang 32.000
- Upah
- Pekerja orang/hari 5.300
- Tukang batu orang/hari 0.275
- Tukang kayu orang/hari 1.300
- Tukang besi orang/hari 1.050
NAMA KONTRAKTOR :
analisa harga Page 356 of 503
BOQ GARDU INDUK 70 KV TELUK DALAM
TANDA TANGAN :
- Kepala Tukang orang/hari 0.265
- Mandor orang/hari 0.265
ROK
TOTAL
- Material
- Kayu Kelas III m3 0.002
- Paku 5 cm -12 cm kg 0.010
- Besi beton (polos atau ulir) kg 3.000
- Kawat beton kg 0.045
- Portland cement (PC) kg 4.000
- Pasir beton m3 0.006
- Split Pecah Mesin 2/3 m3 0.009
- Upah
- Pekerja orang/hari 0.180
- Tukang batu orang/hari 0.020
- Tukang kayu orang/hari 0.020
- Tukang besi orang/hari 0.020
- Kepala Tukang orang/hari 0.006
- Mandor orang/hari 0.009
ROK
TOTAL
- Material
- Kayu Kelas III m3 0.003
- Paku 5 cm -12 cm kg 0.020
- Besi beton (polos atau ulir) kg 3.600
- Kawat beton kg 0.050
- Portland cement (PC) kg 5.500
- Pasir beton m3 0.009
- Split Pecah Mesin 2/3 m3 0.015
- Upah
- Pekerja orang/hari 0.297
- Tukang batu orang/hari 0.033
- Tukang kayu orang/hari 0.033
- Tukang besi orang/hari 0.033
- Kepala Tukang orang/hari 0.010
- Mandor orang/hari 0.015
ROK
TOTAL
- Material
- Kayu kelas III m3 0.040
- Paku kg 0.300
NAMA KONTRAKTOR :
analisa harga Page 357 of 503
BOQ GARDU INDUK 70 KV TELUK DALAM
TANDA TANGAN :
- Minyak bekisting liter 0.100
- Upah
- Pekerja orang/hari 0.520
- Tukang kayu orang/hari 0.260
- Kepala Tukang orang/hari 0.026
- Mandor orang/hari 0.026
ROK
TOTAL
NAMA KONTRAKTOR :
analisa harga Page 358 of 503
BOQ GARDU INDUK 70 KV TELUK DALAM
TANDA TANGAN :
- Material
- Kayu kelas III m3 0.045
- Paku kg 0.300
- Minyak bekisting liter 0.100
- Upah
- Pekerja orang/hari 0.520
- Tukang kayu orang/hari 0.260
- Kepala Tukang orang/hari 0.026
- Mandor orang/hari 0.026
ROK
TOTAL
- Material
- Kayu kelas III m3 0.040
- Paku kg 0.400
- Minyak bekisting liter 0.200
- Kayu Kelas II balok m3 0.015
- Plywood 9 mm lembar 0.350
- Kayu Dolken batang 2.000
- Upah
- Pekerja orang/hari 0.660
- Tukang kayu orang/hari 0.330
- Kepala Tukang orang/hari 0.033
- Mandor orang/hari 0.033
ROK
TOTAL
- Material
- Kayu kelas III m3 0.040
- Paku kg 0.400
- Minyak bekisting liter 0.200
- Kayu Kelas II balok m3 0.018
- Plywood 9 mm lembar 0.350
- Kayu Dolken batang 2.000
- Upah
- Pekerja orang/hari 0.660
- Tukang kayu orang/hari 0.330
- Kepala Tukang orang/hari 0.033
- Mandor orang/hari 0.033
ROK
TOTAL
NAMA KONTRAKTOR :
analisa harga Page 359 of 503
BOQ GARDU INDUK 70 KV TELUK DALAM
TANDA TANGAN :
- Material
- Kayu kelas III m3 0.040
- Paku kg 0.400
- Minyak bekisting liter 0.200
- Kayu Kelas II balok m3 0.015
- Plywood 9 mm lembar 0.350
- Kayu Dolken batang 6.000
- Upah
- Pekerja orang/hari 0.660
- Tukang kayu orang/hari 0.330
- Kepala Tukang orang/hari 0.033
NAMA KONTRAKTOR :
analisa harga Page 360 of 503
BOQ GARDU INDUK 70 KV TELUK DALAM
TANDA TANGAN :
- Mandor orang/hari 0.033
ROK
TOTAL
- Material
- Tiang bor Ø 60 cm
- Beton mutu K 175 m3 0.283
- Besi U 32 kg 42.390
- Casing ls 1.000
- Peralatan
- Mesin Bor jam 0.300
- Pipa Tremie jam 0.300
- Mesin Mollen jam 0.300
- Theodolite jam 0.300
- Peralatan Penunjang jam 0.150
- Mobilisasi
- Mobilisasi Peralatan ls 1.000
- Upah
- Pekerja orang/hari 0.100
- Mandor orang/hari 0.010
- Operator orang/hari 0.050
ROK
TOTAL
- Material
- Tiang pancang Ø 30 cm
- Beton mutu K 350 m3 0.080
- Besil U 32 kg 28.260
- Bekisting m2 0.400
- BBM lt 0.500
NAMA KONTRAKTOR :
analisa harga Page 361 of 503
BOQ GARDU INDUK 70 KV TELUK DALAM
TANDA TANGAN :
- Peralatan
- Mesin Pancang jam 0.150
- Theodolit jam 0.150
- Peralatan Penunjang jam 0.150
- Mobilisasi
- Mobilisasi Peralatan ls 1.000
- Upah
- Pekerja orang/hari 0.150
- Mandor orang/hari 0.015
- Operator orang/hari 0.150
- Mekanik orang/hari 0.015
- Juru Ukur orang/hari 0.015
- Material
- Kayu kelas II balok m3 0.015
- Paku kg 0.200
- Upah
- Pekerja orang/hari 0.150
- Tukang kayu orang/hari 0.300
NAMA KONTRAKTOR :
analisa harga Page 362 of 503
BOQ GARDU INDUK 70 KV TELUK DALAM
TANDA TANGAN :
- Kepala Tukang orang/hari 0.030
- Mandor orang/hari 0.030
ROK
TOTAL
- Material
- gypsum board lembar 0.364
- Paku kg 0.110
- Upah
- Pekerja orang/hari 0.100
- Tukang kayu orang/hari 0.050
- Kepala Tukang orang/hari 0.005
- Mandor orang/hari 0.005
ROK
TOTAL
- Material
- Calsiboard lembar 0.400
- Paku kg 0.010
- Upah
- Pekerja orang/hari 0.030
- Tukang kayu orang/hari 0.070
- Kepala Tukang orang/hari 0.007
- Mandor orang/hari 0.004
ROK
TOTAL
- Material
- List gypsum profil m' 1.050
- Tepung gypsum kg 0.150
- Upah
- Pekerja orang/hari 0.060
- Tukang kayu orang/hari 0.060
- Kepala Tukang orang/hari 0.006
- Mandor orang/hari 0.003
NAMA KONTRAKTOR :
analisa harga Page 363 of 503
BOQ GARDU INDUK 70 KV TELUK DALAM
TANDA TANGAN :
ROK
TOTAL
- Material
- Ubin Keramik 40x40 buah 9.000
- Portland Cement (PC) kg 9.800
- Pasir pasang m3 0.045
- Semen warna kg 1.500
- Upah
- Pekerja orang/hari 0.125
- Tukang batu orang/hari 0.250
- Kepala Tukang orang/hari 0.013
- Mandor orang/hari 0.013
ROK
TOTAL
- Material
NAMA KONTRAKTOR :
analisa harga Page 364 of 503
BOQ GARDU INDUK 70 KV TELUK DALAM
TANDA TANGAN :
- Ubin Keramik 20x20 buah 26.500
- Portland Cement (PC) kg 10.400
- Pasir pasang m3 0.045
- Semen warna kg 1.620
- Upah
- Pekerja orang/hari 0.135
- Tukang batu orang/hari 0.270
- Kepala Tukang orang/hari 0.014
- Mandor orang/hari 0.014
ROK
TOTAL
- Material
- Ubin Keramik 20x20 buah 26.500
- Portland Cement (PC) kg 9.300
- Pasir pasang m3 0.018
- Semen warna kg 1.940
- Upah
- Pekerja orang/hari 0.900
- Tukang batu orang/hari 0.450
- Kepala Tukang orang/hari 0.045
- Mandor orang/hari 0.045
ROK
TOTAL
- Material
- Batu paras / Batu tempel hitam m2 1.100
- Portland Cement (PC) kg 11.750
- Pasir pasang m3 0.035
- Upah
- Pekerja orang/hari 0.700
- Tukang batu orang/hari 0.350
- Kepala Tukang orang/hari 0.035
- Mandor orang/hari 0.035
ROK
TOTAL
TANDA TANGAN :
- Material
- Ubin Keramik 10x40 buah 2.650
- Portland Cement (PC) kg 1.240
- Pasir pasang m3 0.003
- Upah
- Pekerja orang/hari 0.090
- Tukang batu orang/hari 0.090
- Kepala Tukang orang/hari 0.009
- Mandor orang/hari 0.005
ROK
TOTAL
52 1 m2 Floorhardener
- Material
- Floorhardener kg 5.000
- Upah
- Pekerja orang/hari 0.120
- Tukang batu orang/hari 0.120
- Kepala Tukang orang/hari 0.012
- Mandor orang/hari 0.006
ROK
TOTAL
- Material
- Keramik Tahan Asam m2 1.050
- Semen kg 14.140
- Pasir pasang m3 0.040
- Upah
- Pekerja orang/hari 0.270
- Tukang batu orang/hari 0.150
- Kepala Tukang orang/hari 0.015
NAMA KONTRAKTOR :
analisa harga Page 366 of 503
BOQ GARDU INDUK 70 KV TELUK DALAM
TANDA TANGAN :
- Mandor orang/hari 0.014
ROK
TOTAL
- Material
- Atap Klip-lock Hi-Ten m2 1.100
- Paku sekrup buah 8.000
- Upah
- Pekerja orang/hari 0.140
- Tukang kayu orang/hari 0.070
- Kepala Tukang orang/hari 0.007
- Mandor orang/hari 0.007
ROK
TOTAL
- Material
- Atap Spandek colorbond m2 1.050
- Paku kg 0.120
- Upah
- Pekerja orang/hari 0.140
- Tukang kayu orang/hari 0.070
- Kepala Tukang orang/hari 0.007
- Mandor orang/hari 0.007
ROK
TOTAL
- Material
- Nok Standard Hi-Ten m' 1.050
- Paku sekrup buah 6.000
- Upah
- Pekerja orang/hari 0.150
- Tukang kayu orang/hari 0.070
- Kepala Tukang orang/hari 0.008
- Mandor orang/hari 0.008
ROK
TOTAL
- Material
- Nok Spandek Colorbond m' 1.050
- Paku kg 0.040
NAMA KONTRAKTOR :
analisa harga Page 367 of 503
BOQ GARDU INDUK 70 KV TELUK DALAM
TANDA TANGAN :
- Upah
- Pekerja orang/hari 0.150
- Tukang kayu orang/hari 0.070
- Kepala Tukang orang/hari 0.008
- Mandor orang/hari 0.008
ROK
TOTAL
57 1 m2 Pasang Isolasi panas glasswool t=10 cm, aluminium foil dua lapis & kawat ram (roof mesh)
NAMA KONTRAKTOR :
analisa harga Page 368 of 503
BOQ GARDU INDUK 70 KV TELUK DALAM
TANDA TANGAN :
- Material
- Isolasi panas glasswool t=10 cm, aluminium foil dua lapis m2 1.050
- Kawat ram (roof mesh) kg 3.000
- Upah
- Pekerja orang/hari 0.150
- Tukang kayu orang/hari 0.050
- Kepala Tukang orang/hari 0.005
- Mandor orang/hari 0.005
ROK
TOTAL
- Material
- Meni kg 0.167
- Cat Besi / kayu kg 0.200
- Amplas lembar 0.400
- Kuas bh 0.050
- Minyak Cat ltr 0.150
- Upah
- Pekerja orang/hari 0.200
- Tukang cat orang/hari 0.300
- Kepala Tukang orang/hari 0.030
- Mandor orang/hari 0.010
ROK
TOTAL
- Material
- Plamur kg 0.160
- Cat tembok kg 0.175
- Amplas lembar 0.500
- Kuas bh 0.010
- Perancah kayu ls 1.000
- Upah
- Pekerja orang/hari 0.160
- Tukang cat orang/hari 0.280
- Kepala Tukang orang/hari 0.030
- Mandor orang/hari 0.010
ROK
TOTAL
- Material
- Plamur kg 0.160
- Cat tembok kg 0.175
- Amplas lembar 0.500
NAMA KONTRAKTOR :
analisa harga Page 369 of 503
BOQ GARDU INDUK 70 KV TELUK DALAM
TANDA TANGAN :
- Kuas bh 0.010
- Perancah kayu ls 1.000
- Upah
- Pekerja orang/hari 0.160
- Tukang cat orang/hari 0.280
- Kepala Tukang orang/hari 0.030
- Mandor orang/hari 0.010
ROK
TOTAL
NAMA KONTRAKTOR :
analisa harga Page 370 of 503
BOQ GARDU INDUK 70 KV TELUK DALAM
TANDA TANGAN :
61 1 m2 Jalan Lingkungan
1 m2 Base Structure
- Pekerjaan Tanah
- Galian tanah m3 1.000
- Urugan tanah m 3
1.000
- Sub Base Coarse
- Sirtu tebal 350 mm m3 0.360
- Base Coarse
- Batu Pecah 3 - 5, tebal 150 mm m3 0.150
- Upah
- Pekerja orang/hari 0.675
- Mandor orang/hari 0.063
- Operator Stomwalls jam 0.024
ROK
TOTAL
- Upah
- Pekerja orang/hari 0.360
- Pekerja aspal orang/hari 0.060
- Mandor orang/hari 0.018
- Operator Stomwalls jam 0.006
ROK
TOTAL
- Upah
- Pekerja orang/hari 0.360
- Pekerja aspal orang/hari 0.060
- Mandor orang/hari 0.018
- Operator Stomwalls jam 0.006
ROK
TOTAL
- Upah
NAMA KONTRAKTOR :
analisa harga Page 371 of 503
BOQ GARDU INDUK 70 KV TELUK DALAM
TANDA TANGAN :
- Pekerja orang/hari 0.055
- Mandor orang/hari 0.002
- Sewa Stomwalls /stamper hari 0.001
ROK
TOTAL
NAMA KONTRAKTOR :
analisa harga Page 372 of 503
BOQ GARDU INDUK 70 KV TELUK DALAM
TANDA TANGAN :
- Besi Siku L50x50x5 Galvanis kg 15.000
ROK
TOTAL
ROK
TOTAL
ROK
TOTAL
ROK
TOTAL
NAMA KONTRAKTOR :
analisa harga Page 373 of 503
BOQ GARDU INDUK 70 KV TELUK DALAM
TANDA TANGAN :
ROK
TOTAL
70 1 m' Tipe II
NAMA KONTRAKTOR :
analisa harga Page 374 of 503
BOQ GARDU INDUK 70 KV TELUK DALAM
TANDA TANGAN :
- Plat Bordes tebal 6 mm kg 45.000
ROK
TOTAL
ROK
TOTAL
72 1 m' Tipe IV
ROK
TOTAL
ROK
TOTAL
NAMA KONTRAKTOR :
analisa harga Page 375 of 503
BOQ GARDU INDUK 70 KV TELUK DALAM
TANDA TANGAN :
ROK
TOTAL
NAMA KONTRAKTOR :
analisa harga Page 376 of 503
BOQ GARDU INDUK 70 KV TELUK DALAM
TANDA TANGAN :
- Plesteran 1 : 4 m3 2.440
ROK
TOTAL
ROK
TOTAL
ROK
TOTAL
Material
- Pasangan Batu bata 1 : 4 m3 0.371
- Semen kg 114.000
- Pasir Pasang m3 0.184
- Batu pecah 2/3 m 3
0.033
- Pembesian BJTP-24 kg 4.850
- Pasir Beton m3 0.120
Upah kerja
- Pekerja orang/hari 2.160
- Tukang batu orang/hari 0.720
- Kepala Tukang orang/hari 0.072
- Mandor orang/hari 0.108
ROK
NAMA KONTRAKTOR :
analisa harga Page 377 of 503
BOQ GARDU INDUK 70 KV TELUK DALAM
TANDA TANGAN :
TOTAL
Material
- Pasangan Batu bata 1 : 4 m3 0.250
- Semen kg 77.000
- Pasir Pasang m3 0.130
- Batu pecah 2/3 m 3
0.020
- Pembesian BJTP-24 kg 2.600
- Pasir Beton m3 0.090
Upah kerja
- Pekerja orang/hari 1.420
- Tukang batu orang/hari 0.473
- Kepala Tukang orang/hari 0.047
- Mandor orang/hari 0.071
ROK
TOTAL
NAMA KONTRAKTOR :
analisa harga Page 378 of 503
BOQ GARDU INDUK 70 KV TELUK DALAM
TANDA TANGAN :
78 1 m3 Pemasangan Bronjong :
Material
- Batu Belah m3 1.200
- Kawat Mash dia 4 mm Kg 25.000
Upah kerja
- Tukang batu orang/hari 1.500
- Pekerja orang/hari 4.000
- Mandor orang/hari 0.200
ROK
TOTAL
Upah kerja
- Galian tanah m3 2.250
- Urugan tanah kembali m3 1.500
- Pemasangan pagar ls 1.000
ROK
TOTAL
Upah kerja
- Galian tanah m3 2.250
- Urugan tanah kembali m3 1.500
- Pemasangan pagar ls 1.000
ROK
TOTAL
NAMA KONTRAKTOR :
analisa harga Page 379 of 503
BOQ GARDU INDUK 70 KV TELUK DALAM
TANDA TANGAN :
- Kawat Harmonika Galvanis m2 1.100
- Besi Siku Galvanized L 40.40.5 kg 10.692
- Besi Strip plat 20.3 kg 1.685
- Pondasi 0,80x0,80 m2 Beton bertulang mutu K 175; m3 0.120
Besi : 100 kg/m3
- Sloof 20/30 beton bertulang mutu K 175; m3 0.030
besi : 100 kg/m3
Upah kerja
- Galian tanah m3 0.420
- Urugan tanah kembali m3 0.180
- Pemasangan pagar ls 1.000
ROK
TOTAL
NAMA KONTRAKTOR :
analisa harga Page 380 of 503
BOQ GARDU INDUK 70 KV TELUK DALAM
TANDA TANGAN :
- Pondasi 0,3 x 0,3 m2 beton bertulang mutu K 175; m3 0.090
Besi : 100 kg/m3
- Kolom 30/30 Beton bertulang mutu K 175; m3 0.522
Besi : 100 kg/m3
Upah kerja
- Galian tanah m3 2.880
- Urugan tanah kembali m3 0.980
- Pemasangan pintu pagar (termasuk engsel & grendel) ls 1.000
ROK
TOTAL
Upah kerja
- Galian tanah m3 2.000
- Urugan tanah kembali m3 0.720
- Pemasangan pintu pagar (termasuk roda, rel, tiang pengaku/pengarah pintu
ls & grendel) 1.000
ROK
TOTAL
Upah kerja
- Galian tanah m3 3.380
- Urugan tanah kembali m3 1.690
ROK
TOTAL
NAMA KONTRAKTOR :
analisa harga Page 381 of 503
BOQ GARDU INDUK 70 KV TELUK DALAM
TANDA TANGAN :
Material
- Batu Koral m3 1.000
Upah kerja
- Pekerja orang/hari 0.300
- Mandor orang/hari 0.010
Material
- Kanstin beton cetak 10 x 20 x 40 cm bh 2.500
- Plasteran 1 pc : 2 ps m2 0.045
- Urugan pasir dipadatkan t = 15 cm m3 0.400
- Galian tanah m3 0.012
NAMA KONTRAKTOR :
analisa harga Page 382 of 503
BOQ GARDU INDUK 70 KV TELUK DALAM
TANDA TANGAN :
Upah kerja pasang kansteen ls 1.000
ROK
TOTAL
ROK
TOTAL
Material
- Closet Duduk / Monoblok bh 1.000
- Kelengkapan 6% dari harga Closet 0.060
Upah
- Pekerja orang/hari 3.300
- Tukang batu orang/hari 1.100
- Kepala Tukang orang/hari 0.001
- Mandor orang/hari 0.160
ROK
TOTAL
Material
- Closet Jongkok bh 1.000
- Semen kg 6.000
- Pasir Pasang m3 0.010
Upah
- Pekerja orang/hari 1.000
- Tukang batu orang/hari 1.500
- Kepala Tukang orang/hari 0.001
- Mandor orang/hari 0.160
ROK
TOTAL
Material
- Urinoir bh 1.000
- Kelengkapan 30% dari harga Urinoir 0.300
Upah
- Pekerja orang/hari 1.000
NAMA KONTRAKTOR :
analisa harga Page 383 of 503
BOQ GARDU INDUK 70 KV TELUK DALAM
TANDA TANGAN :
- Tukang batu orang/hari 1.000
- Kepala Tukang orang/hari 0.100
- Mandor orang/hari 0.100
ROK
TOTAL
Material
- Wastafel bh 1.000
- Kelengkapan 30% dari harga Wastafel 0.300
- Semen kg 6.000
- Pasir Pasang m3 0.010
Upah
- Pekerja orang/hari 1.200
- Tukang batu orang/hari 0.145
- Kepala Tukang orang/hari 0.150
NAMA KONTRAKTOR :
analisa harga Page 384 of 503
BOQ GARDU INDUK 70 KV TELUK DALAM
TANDA TANGAN :
- Mandor orang/hari 0.100
ROK
TOTAL
Material :
- Listplank Superplank m' 1.100
- Paku kg 0.050
Upah kerja
- Pekerja orang/hari 0.110
- Tukang batu orang/hari 0.220
- Kepala Tukang orang/hari 0.022
- Mandor orang/hari 0.005
ROK
TOTAL
Material :
- Besi Profil WF kg 1.100
- Cat Meni Besi kg 0.080
Upah kerja
- Pekerja orang/hari 0.006
- Tukang besi orang/hari 0.060
- Kepala Tukang orang/hari 0.006
- Mandor orang/hari 0.000
ROK
TOTAL
90 1 m2 Waterproofing
Material
- Waterproofing kg 0.350
- Serat Fiber m 2
1.000
Upah kerja
- Pekerja orang/hari 0.050
- Mandor orang/hari 0.003
- Tukang kayu orang/hari 0.075
ROK
TOTAL
Note:
1. Daftar isian 2 (untuk referensi)
Tenaga Kerja
NAMA KONTRAKTOR :
analisa harga Page 385 of 503
BOQ GARDU INDUK 70 KV TELUK DALAM
TANDA TANGAN :
- Pekerja 0.060
- Tukang 0.060
- Kepala Tukang 0.030
Bahan/Material
- Besi Baja /kg 1.050
- Galvanis Besi /kg 1.050
- Washer etc 1.050
- Fabrikasi /kg 1.050
ROK
Tiap 1kg Besi Angkur
Rent of Equipment
- Bamboo stick
- Pully unit / day
- Cord meter
- BV (winch/windla unit / day
- Angkur unit / day
A. TENAGA
NAMA KONTRAKTOR :
analisa harga Page 386 of 503
BOQ GARDU INDUK 70 KV TELUK DALAM
TANDA TANGAN :
1 Pekerja oh 0.050
2 Tukang Kayu oh 0.050
3 Kepala Tukang oh 0.005
4 Mandor oh 0.003
B. BAHAN
1 List kayu profil m 1.050
2 Paku Kg 0.010
C. PERALATAN
1 Alat Bantu Ls 0.100
NAMA KONTRAKTOR :
analisa harga Page 387 of 503
BOQ GARDU INDUK 70 KV TELUK DALAM
TANDA TANGAN :
- Minimum Charge / mesin 500 Meter 500 Meter
2. Drop Hammer
http://pancangbetonminipile.blogspot.co.id/2015/11/jual-tiang-pancang-mini-pile-20-cm-x-20.html
A. TENAGA
1 Pekerja oh 0.040
2 Tukang oh 0.040
3 Mandor oh 0.002
B. BAHAN
1 Sikagrout kg 1,920.000
2 Air ltr 400.000
C. PERALATAN
2 Injeksi Ls 1.000
3 Alat Bantu Ls 0.150
NAMA KONTRAKTOR :
analisa harga Page 388 of 503
BOQ GARDU INDUK 70 KV TELUK DALAM
TANDA TANGAN :
Jenis Pekerjaan : Pemasangan langit-langit tripleks ukuran (120 x 240) cm, tebal 3 mm, 4 mm & 6 mm
PERKIRAN
NO KOMPONEN SATUAN
KUANTITAS
A. TENAGA
1 Pekerja oh 0.100
2 Tukang Kayu oh 0.100
3 Kepala Tukang oh 0.010
4 Mandor oh 0.005
B. BAHAN
1 Akustik Lmbr 0.375
2 Paku tripleks Kg 0.030
C. PERALATAN
1 Alat Bantu Ls 0.100
A. TENAGA
1 Pekerja oh 4.000
2 Mandor oh 0.500
B. BAHAN
1 m -
C. PERALATAN
1 Chainsaw Jam 2.800
2 Alat Bantu Ls 0.100
NAMA KONTRAKTOR :
analisa harga Page 389 of 503
BOQ GARDU INDUK 70 KV TELUK DALAM
TANDA TANGAN :
JUMLAH HARGA PERALATAN
D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )
E. OVERHEAD & PROFIT -
F. HARGA SATUAN PEKERJAAN
Asumsi tajuk
A. TENAGA
1 Pekerja oh 1.200
2 Tukang Las oh 1.200
3 Kepala Tukang Las oh 0.120
4 Mandor oh 0.006
B. BAHAN
1 Pintu gulung besi m2 1.000
C. PERALATAN
1 Alat Bantu Ls 0.200
A. TENAGA
1 Pekerja oh 0.360
2 Tukang Kayu oh 0.180
3 Kepala Tukang oh 0.024
4 Mandor oh 0.006
B. BAHAN
1 Balok kayu m1 5.250
2 Papan kayu 3 X 20 m2 1.050
3 Paku kg 0.350
NAMA KONTRAKTOR :
analisa harga Page 390 of 503
BOQ GARDU INDUK 70 KV TELUK DALAM
TANDA TANGAN :
JUMLAH HARGA BAHAN
C. PERALATAN
1 Alat Bantu Ls -
- Material
- Kayu kelas III m3 0.040
- Paku kg 0.300
- Minyak bekisting liter 0.100
- Upah
- Pekerja orang/hari 1
- Tukang kayu orang/hari 0
- Kepala Tukang orang/hari 0
- Mandor orang/hari 0
ROK
TOTAL
NAMA KONTRAKTOR :
analisa harga Page 391 of 503
BOQ GARDU INDUK 70 KV TELUK DALAM
TANDA TANGAN :
50-A1/SA1A-26/7)
ROK
HARGA TOTAL 0%
SATUAN HARGA
(RUPIAH) (RUPIAH)
5 6=4x5
162,053 162,053
54,000 162,000
60,886 121,772
25,400 12,700
-
120,000 120,000
120,000 240,000
150,000 15,000
833,525
0% -
833,525
2,291,100 16,038
2,291,100 27,493
25,400 508
NAMA KONTRAKTOR :
analisa harga Page 392 of 503
BOQ GARDU INDUK 70 KV TELUK DALAM
TANDA TANGAN :
120,000 12,000
120,000 12,000
130,000 1,300
150,000 750
70,089
0% -
70,089
15,434 19,293
2,291,100 412,398
25,400 21,590
27,400 30,140
25,000 875,000
183,400 27,510
183,400 18,340
262,500 39,375
800 24,000
NAMA KONTRAKTOR :
analisa harga Page 393 of 503
BOQ GARDU INDUK 70 KV TELUK DALAM
TANDA TANGAN :
52,152 13,038
204,600 409,200
202,000 16,160
83,800 12,570
40,000 12,000
62,947 3,777
120,000 240,000
120,000 120,000
120,000 240,000
130,000 39,000
150,000 7,500
2,580,890
0% -
2,580,890
15,434 26,238
2,291,100 481,131
25,400 7,620
25,000 262,500
183,400 5,502
262,500 13,125
89,300 133,950
120,000 240,000
120,000 120,000
130,000 26,000
150,000 7,500
1,323,566
0% -
1,323,566
120,000 6,000
150,000 750
6,750
0% -
6,750
6.1
SNI 2835: 2008
120,000 108,000
150,000 6,750
114,750
0% -
114,750
TANDA TANGAN :
120,000 120,000
150,000 4,800
124,800
0% -
124,800
120,000 180,000
150,000 9,000
189,000
0% -
189,000
NAMA KONTRAKTOR :
analisa harga Page 395 of 503
BOQ GARDU INDUK 70 KV TELUK DALAM
TANDA TANGAN :
SNI 2835: 2008
120,000 36,000
150,000 2,250
38,250
0% -
38,250
120,000 39,600
150,000 1,500
41,100
0% -
41,100
11,000 13,200
120,000 30,000
150,000 3,750
46,950
0% -
46,950
114,750 68,850
124,800 74,880
6,750 33,750
46,950 56,340
233,820
0% -
233,820
183,400 220,080
NAMA KONTRAKTOR :
analisa harga Page 396 of 503
BOQ GARDU INDUK 70 KV TELUK DALAM
TANDA TANGAN :
120,000 36,000
150,000 1,500
257,580
0% -
257,580
25,758.00
SNI 03-2835-2008
165,360 198,432
120,000 30,000
150,000 3,750
232,182
0% -
232,182
800 56,000
25,000 287,500
183,400 7,886
NAMA KONTRAKTOR :
analisa harga Page 397 of 503
BOQ GARDU INDUK 70 KV TELUK DALAM
TANDA TANGAN :
120,000 3,600
120,000 12,000
130,000 1,300
150,000 2,250
370,536
0% -
370,536
800 56,000
25,000 473,750
183,400 6,969
120,000 3,600
120,000 12,000
130,000 1,300
150,000 2,250
555,869
0% -
555,869
25,000 156,000
183,400 4,402
120,000 36,000
120,000 18,000
130,000 1,950
150,000 2,250
218,602
0% -
109,301 satu sisi tebal 7.5 cm
25,000 255,600
183,400 3,668
120,000 36,000
120,000 18,000
130,000 1,950
150,000 2,250
317,468
0% -
158,734 satu sisi tebal 7.5 cm
NAMA KONTRAKTOR :
analisa harga Page 398 of 503
BOQ GARDU INDUK 70 KV TELUK DALAM
TANDA TANGAN :
SNI 2837: 2008
25,000 129,600
183,400 4,768
120,000 18,000
120,000 9,000
130,000 1,040
150,000 1,200
163,608
0% -
163,608
NAMA KONTRAKTOR :
analisa harga Page 399 of 503
BOQ GARDU INDUK 70 KV TELUK DALAM
TANDA TANGAN :
SNI 2837: 2008
25,000 81,250
120,000 24,000
120,000 12,000
130,000 1,300
150,000 1,500
120,050
0% -
120,050
25,000 5,450,000
183,400 95,368
262,500 228,375
120,000 198,000
120,000 30,000
130,000 3,250
150,000 12,000
161,200 161,200
6,178,193
0% -
6,178,193
120,000 144,000
120,000 24,000
130,000 2,600
150,000 9,000
377,550 377,550
6,707,731
0% -
6,707,731
25,000 8,150,000 BJ
127 96,660 0.2451612903 3100 kg/m3 0.105
NAMA KONTRAKTOR :
analisa harga Page 400 of 503
BOQ GARDU INDUK 70 KV TELUK DALAM
TANDA TANGAN :
271 278,547 0.713592233 1442 kg/m3 0.527
45 9,675 1522 kg/m3 0.676
1000 kg/m3
120,000 198,000
120,000 33,000
130,000 3,640
150,000 12,450
377,550 377,550
9,159,522
0% -
9,159,522
NAMA KONTRAKTOR :
analisa harga Page 401 of 503
BOQ GARDU INDUK 70 KV TELUK DALAM
TANDA TANGAN :
127 88,775 3100 kg/m3 0.120
271 283,419 1442 kg/m3 0.484
45 9,675 1522 kg/m3 0.688
1000 kg/m3
120,000 198,000
120,000 33,000
130,000 3,640
150,000 12,450
-
9,903,959
0% -
9,903,959
120,000 252,000
120,000 42,000
130,000 4,550
150,000 15,750
377,550 377,550
12,257,053
0% -
12,257,053
210,000 252,000
25,000 4,075,000
183,400 95,368
120,000 180,000
120,000 90,000
130,000 9,750
150,000 11,250
4,713,368
0% -
4,713,368
210,000 252,000
25,000 5,050,000
183,400 88,949
NAMA KONTRAKTOR :
analisa harga Page 402 of 503
BOQ GARDU INDUK 70 KV TELUK DALAM
TANDA TANGAN :
120,000 180,000
120,000 90,000
130,000 9,750
150,000 11,250
5,681,949
0% -
5,681,949
210,000 252,000
88,200 38,102
120,000 93,600
120,000 46,800
130,000 5,070
150,000 5,850
441,422
0% -
441,422
NAMA KONTRAKTOR :
analisa harga Page 403 of 503
BOQ GARDU INDUK 70 KV TELUK DALAM
TANDA TANGAN :
SNI 7394: 2008
15,500 162,750
16,700 2,505
120,000 8,400
120,000 8,400
130,000 910
150,000 600
183,565
0% -
183,565
18,356.50
2,291,100 458,220
25,400 38,100
53,700 21,480
15,500 2,441,250
16,700 37,575
25,000 8,400,000
183,400 99,036
412,000 333,720
120,000 636,000
120,000 33,000
120,000 156,000
120,000 126,000
130,000 34,060
150,000 39,750
12,854,191
0% -
12,854,191
2,291,100 618,597
25,400 50,800
53,700 32,220
15,500 3,255,000
16,700 50,100
25,000 8,400,000
183,400 99,036
412,000 333,720
120,000 678,000
120,000 33,000
120,000 187,200
NAMA KONTRAKTOR :
analisa harga Page 404 of 503
BOQ GARDU INDUK 70 KV TELUK DALAM
TANDA TANGAN :
120,000 168,000
130,000 41,990
150,000 42,450
13,990,113
0% -
13,990,113
2,291,100 916,440
25,400 101,600
NAMA KONTRAKTOR :
analisa harga Page 405 of 503
BOQ GARDU INDUK 70 KV TELUK DALAM
TANDA TANGAN :
53,700 107,400
15,500 4,882,500
16,700 75,150
25,000 8,400,000
183,400 99,036
412,000 333,720
3,969,000 595,350
141,107 493,875
15,434 308,680
120,000 678,000
120,000 33,000
120,000 187,200
120,000 168,000
130,000 41,990
150,000 42,450
17,464,391
0% -
17,464,391
2,291,100 733,152
25,400 81,280
53,700 85,920
15,500 3,255,000
16,700 50,100
25,000 8,400,000
183,400 99,036
412,000 333,720
3,969,000 555,660
141,107 395,100
15,434 246,944
120,000 762,000
120,000 33,000
120,000 198,000
120,000 168,000
130,000 42,900
150,000 47,700
15,487,512
0% -
15,487,512
2,291,100 733,152
25,400 81,280
53,700 85,920
NAMA KONTRAKTOR :
analisa harga Page 406 of 503
BOQ GARDU INDUK 70 KV TELUK DALAM
TANDA TANGAN :
15,500 2,441,250
16,700 37,575
25,000 8,400,000
183,400 99,036
412,000 333,720
3,969,000 476,280
141,107 395,100
15,434 493,888
120,000 636,000
120,000 33,000
120,000 156,000
120,000 126,000 Pre-cast block ukuran 20 x 20 x
NAMA KONTRAKTOR :
analisa harga Page 407 of 503
BOQ GARDU INDUK 70 KV TELUK DALAM
TANDA TANGAN :
130,000 34,450 Transpor
150,000 39,750 Upah instalasi + alat bantu
14,602,401
0% -
14,602,401
2,291,100 4,582
25,400 254
15,500 46,500
16,700 752
25,000 100,000
183,400 1,100
412,000 3,708
120,000 21,600
120,000 2,400
120,000 2,400
120,000 2,400
130,000 780
150,000 1,350
187,826
0% -
187,826
2,291,100 6,873
25,400 508
15,500 55,800
16,700 835
25,000 137,500
183,400 1,651
412,000 6,180
120,000 35,640
120,000 3,960
120,000 3,960
120,000 3,960
130,000 1,300
150,000 2,250
260,417
0% -
260,417
2,291,100 91,644
25,400 7,620
NAMA KONTRAKTOR :
analisa harga Page 408 of 503
BOQ GARDU INDUK 70 KV TELUK DALAM
TANDA TANGAN :
53,700 5,370
120,000 62,400
120,000 31,200
130,000 3,380
150,000 3,900
205,514
0% -
205,514
NAMA KONTRAKTOR :
analisa harga Page 409 of 503
BOQ GARDU INDUK 70 KV TELUK DALAM
TANDA TANGAN :
SNI 7394: 2008
2,291,100 103,100
25,400 7,620
53,700 5,370
120,000 62,400
120,000 31,200
130,000 3,380
150,000 3,900
216,970
0% -
216,970
2,291,100 91,644
25,400 10,160
53,700 10,740
3,969,000 59,535
141,107 49,387
15,434 30,868
120,000 79,200
120,000 39,600
130,000 4,290
150,000 4,950
380,374
0% -
380,374
2,291,100 91,644
25,400 10,160
53,700 10,740
3,969,000 71,442
141,107 49,387
15,434 30,868
120,000 79,200
120,000 39,600
130,000 4,290
150,000 4,950
392,281
0% -
392,281
TANDA TANGAN :
2,291,100 91,644
25,400 10,160
53,700 10,740
3,969,000 59,535
141,107 49,387
15,434 92,604
120,000 79,200
120,000 39,600
130,000 4,290
NAMA KONTRAKTOR :
analisa harga Page 411 of 503
BOQ GARDU INDUK 70 KV TELUK DALAM
TANDA TANGAN :
150,000 4,950
442,110
0% -
442,110
- Tiang bor Ø 40 cm
- 0.1257 -
18,356.50 778,132 18.850 346,012
- 75,000
182,500
960,632 603,512
0% - - -
NAMA KONTRAKTOR :
analisa harga Page 412 of 503
BOQ GARDU INDUK 70 KV TELUK DALAM
TANDA TANGAN :
SNI 3434-2008
3,969,000 61,123
25,400 5,080
120,000 18,000
120,000 36,000
NAMA KONTRAKTOR :
analisa harga Page 413 of 503
BOQ GARDU INDUK 70 KV TELUK DALAM
TANDA TANGAN :
130,000 3,900
150,000 4,500
128,603
0% -
128,603
SNI 2839:2008
67,000 24,388
25,400 2,794
120,000 12,000
120,000 6,000
130,000 650
150,000 750
46,582
0% -
46,582
SNI 2839:2008
120,000 3,600
120,000 8,400
130,000 910
150,000 600
63,814
0% -
63,814
SNI 2839:2008
25,500 26,775
6,250 938
120,000 7,200
120,000 7,200
130,000 780
150,000 450
43,343
NAMA KONTRAKTOR :
analisa harga Page 414 of 503
BOQ GARDU INDUK 70 KV TELUK DALAM
TANDA TANGAN :
0% -
43,343
SNI 7395:2008
65,000 585,000
25,000 245,000
183,400 8,253
1,700 2,550
120,000 15,000
120,000 30,000
130,000 1,690
150,000 1,950
889,443
0% -
889,443
SNI 7395:2008
NAMA KONTRAKTOR :
analisa harga Page 415 of 503
BOQ GARDU INDUK 70 KV TELUK DALAM
TANDA TANGAN :
50,200 1,330,300
25,000 260,000
183,400 8,253
1,700 2,754
120,000 16,200
120,000 32,400
130,000 1,820
150,000 2,100
1,653,827
0% -
1,653,827
SNI 7395:2008
50,200 1,330,300
25,000 232,500
183,400 3,301
1,700 3,298
120,000 108,000
120,000 54,000
130,000 5,850
150,000 6,750
1,743,999
0% -
1,743,999
SNI 7395:2008
150,000 165,000
25,000 293,750
183,400 6,419
120,000 84,000
120,000 42,000
130,000 4,550
150,000 5,250
600,969
0% -
600,969
NAMA KONTRAKTOR :
analisa harga Page 416 of 503
BOQ GARDU INDUK 70 KV TELUK DALAM
TANDA TANGAN :
SNI 7395:2008
3,268 8,660
25,000 31,000
183,400 550
120,000 10,800
120,000 10,800
130,000 1,170
150,000 750
63,730
0% -
63,730
SNI 7395:2008
9,800 49,000
120,000 14,400
120,000 14,400
130,000 1,560
150,000 900
80,260
0% -
80,260
SNI 7395:2008
270,000 283,500
25,000 353,500
183,400 7,336
120,000 32,400
120,000 18,000
130,000 1,950
NAMA KONTRAKTOR :
analisa harga Page 417 of 503
BOQ GARDU INDUK 70 KV TELUK DALAM
TANDA TANGAN :
150,000 2,025
698,711
0% -
698,711
SNI 3436:2002
214,200 235,620
300 2,400 http://www.rumahmaterial.com/2016/01/daftar-harg
http://www.mediabangunan.com/2013/06/daftar-ha
120,000 16,800
120,000 8,400
130,000 910
150,000 1,050
265,180
0% -
265,180
SNI 3436:2002
197,200 207,060
300 36
120,000 16,800
120,000 8,400
130,000 910
150,000 1,050
234,256
0% -
234,256
SNI 3436:2002
61,500 64,575
300 1,800
120,000 18,000
120,000 8,400
130,000 1,040
150,000 1,200
95,015
0% -
95,015
SNI 3436:2002
82,500 86,625
210,000 8,400
NAMA KONTRAKTOR :
analisa harga Page 418 of 503
BOQ GARDU INDUK 70 KV TELUK DALAM
TANDA TANGAN :
120,000 18,000
120,000 8,400
130,000 1,040
150,000 1,200
123,665
0% -
123,665
NAMA KONTRAKTOR :
analisa harga Page 419 of 503
BOQ GARDU INDUK 70 KV TELUK DALAM
TANDA TANGAN :
SNI 3436:2002
40,000 42,000
10,925 32,775
120,000 18,000
120,000 6,000
130,000 650
150,000 750
100,175
0% -
100,175
37,736 6,302
60,886 12,177
6,500 2,600
23,600 1,180
- -
120,000 24,000
120,000 36,000
130,000 3,900
150,000 1,500
87,659
0% -
87,659
49,500 7,920
25,440 4,452
6,500 3,250
23,600 236
-
120,000 19,200
120,000 33,600
130,000 3,900
150,000 1,500
74,058
0% -
74,058
49,500 7,920
20,352 3,562
6,500 3,250
NAMA KONTRAKTOR :
analisa harga Page 420 of 503
BOQ GARDU INDUK 70 KV TELUK DALAM
TANDA TANGAN :
23,600 236
-
120,000 19,200
120,000 33,600
130,000 3,900
150,000 1,500
73,168
0% -
73,168
NAMA KONTRAKTOR :
analisa harga Page 421 of 503
BOQ GARDU INDUK 70 KV TELUK DALAM
TANDA TANGAN :
114,750 114,750
38,250 38,250
165,360 59,530
400,000 60,000
120,000 81,000
150,000 9,420
152,000 3,648
366,598
0% -
366,598
13,900 97,300
412,000 82,400
310,000 3,100
433,540 43,354
52,300 471
120,000 43,200
120,000 7,200
150,000 2,700
152,000 912
280,637
0% -
280,637 http://www.pengaspalanhotmix.com/2017/01/biaya-pengaspalan-jalan-
Hotmix 7.5 cm
NAMA KONTRAKTOR :
analisa harga Page 422 of 503
BOQ GARDU INDUK 70 KV TELUK DALAM
TANDA TANGAN :
120,000 6,600
150,000 300
322,000 322
40,234
0% -
40,234
114,750 240,975
38,250 51,638
257,580 38,637
-
-
NAMA KONTRAKTOR :
analisa harga Page 423 of 503
BOQ GARDU INDUK 70 KV TELUK DALAM
TANDA TANGAN :
17,638 264,570
595,820
0% -
595,820
114,750 137,700
38,250 22,950
257,580 30,910
-
-
17,638 194,018
385,578
0% -
385,578
114,750 68,850
38,250 10,328
257,580 15,455
-
-
17,638 88,190
182,822
0% -
182,822
114,750 240,975
38,250 51,638
257,580 38,637
- 9,159,521.84
- 18,356.50
17,638 264,570 442,110.45
595,820
0% -
595,820
114,750 424,977
38,250 82,620
257,580 65,683
-
-
17,638 398,972
17,638 1,587,420
2,559,671
NAMA KONTRAKTOR :
analisa harga Page 424 of 503
BOQ GARDU INDUK 70 KV TELUK DALAM
TANDA TANGAN :
0% -
2,559,671
114,750 168,683
38,250 38,633
257,580 30,910
-
-
17,638 194,018
NAMA KONTRAKTOR :
analisa harga Page 425 of 503
BOQ GARDU INDUK 70 KV TELUK DALAM
TANDA TANGAN :
17,638 793,710
1,225,953
0% -
1,225,953
114,750 97,538
38,250 20,273
257,580 20,606
-
-
17,638 194,018
17,638 476,226
808,660
0% -
808,660
114,750 107,291
38,250 22,568
257,580 23,182
-
-
17,638 194,018
17,638 555,597
902,656
0% -
902,656
114,750 149,175
38,250 21,420
257,580 10,303
4,713,368 2,121,016
218,602 533,388 0.45
2,835,302 2.3
0% -
2,835,302
114,750 149,175
38,250 21,420
257,580 10,303
4,713,368 2,121,016
36,000 87,840 100 cm
-
NAMA KONTRAKTOR :
analisa harga Page 426 of 503
BOQ GARDU INDUK 70 KV TELUK DALAM
TANDA TANGAN :
2,389,754 0.135 -
0% - tebal tutup 15 cm
2,389,754
114,750 68,850
38,250 14,153
257,580 15,455
555,869 778,217
NAMA KONTRAKTOR :
analisa harga Page 427 of 503
BOQ GARDU INDUK 70 KV TELUK DALAM
TANDA TANGAN :
36,000 87,840
964,514
0% -
964,514
114,750 68,850
38,250 14,153
257,580 15,455
555,869 778,217
36,000 39,600
-
916,274
0% -
916,274
114,750 80,325
38,250 7,650
257,580 51,516
335,100 335,100
21,600 108,000
262,500 105,000
687,591
0% -
687,591
370,536 137,469
25,000 2,850,000
183,400 33,746
412,000 13,596
-
183,400 22,008
120,000 259,200
120,000 86,400
130,000 9,360
150,000 16,200
3,427,979
0% -
NAMA KONTRAKTOR :
analisa harga Page 428 of 503
BOQ GARDU INDUK 70 KV TELUK DALAM
TANDA TANGAN :
3,427,979
370,536 92,634
25,000 1,925,000
183,400 23,842
412,000 8,240
-
183,400 16,506
120,000 170,400
120,000 56,760
130,000 6,110
150,000 10,650
2,310,142
0% -
2,310,142
NAMA KONTRAKTOR :
analisa harga Page 429 of 503
BOQ GARDU INDUK 70 KV TELUK DALAM
TANDA TANGAN :
210,000 252,000
10,925 273,125
130,000 195,000
120,000 480,000
150,000 30,000
3,540,267
0% -
3,540,267
285,417 285,417
44,917 59,739
12,854,191.00 1,028,335
13,990,113.00 419,703
114,750 258,188
38,250 57,375
85,000 85,000
2,193,757
0% -
2,193,757
175,000 175,000
44,917 52,553
12,854,191.00 1,028,335
13,990,113.00 419,703
114,750 258,188
38,250 57,375
75,000 75,000
2,066,154
0% -
2,066,154
NAMA KONTRAKTOR :
analisa harga Page 430 of 503
BOQ GARDU INDUK 70 KV TELUK DALAM
TANDA TANGAN :
29,755 32,731
17,638 188,585
27,400 46,164
-
114,750 48,195
38,250 6,885
75,000 75,000
397,560
0% -
397,560
NAMA KONTRAKTOR :
analisa harga Page 431 of 503
BOQ GARDU INDUK 70 KV TELUK DALAM
TANDA TANGAN :
- 10.80 485,100
0.18 -
-
0.34 -
114,750 330,480
38,250 37,485 2.88 330,480
- 0.98 37,485
1,130,475 1.00 -
0% - 1,885,752
1,130,475 -
1,885,752
137,500 825,000
110,367 353,173
44,917 913,605
-
114,750 229,500
38,250 27,540
-
2,348,818
0% -
2,348,818
370,536 889,287
218,602 1,049,288 tidak di cat ?
-
0.12 -
-
0.0135 -
-
0.03 -
17,638 94,293
29,755 226,971
114,750 387,855
38,250 64,643
2,712,336
0% -
2,712,336
NAMA KONTRAKTOR :
analisa harga Page 432 of 503
BOQ GARDU INDUK 70 KV TELUK DALAM
TANDA TANGAN :
262,500 262,500
120,000 36,000
150,000 1,500
300,000
0% -
300,000
26,000 65,000
317,468 14,286
257,580 103,032
114,750 1,377
NAMA KONTRAKTOR :
analisa harga Page 433 of 503
BOQ GARDU INDUK 70 KV TELUK DALAM
TANDA TANGAN :
36,000 36,000
219,695
0% -
219,695
26,000 43,420
317,468 14,286
257,580 103,032
114,750 1,377
103,032 103,032
265,147
0% -
265,147
3,395,700 3,395,700
3,395,700 203,742
120,000 396,000
120,000 132,000
130,000 130
150,000 24,000
4,151,572
0% -
4,151,572
831,600 831,600
25,000 150,000
183,400 1,834
120,000 120,000
120,000 180,000
130,000 130
150,000 24,000
1,307,564
0% -
1,307,564
1,023,000 1,023,000
1,023,000 306,900
120,000 120,000
NAMA KONTRAKTOR :
analisa harga Page 434 of 503
BOQ GARDU INDUK 70 KV TELUK DALAM
TANDA TANGAN :
120,000 120,000
130,000 13,000
150,000 15,000
1,597,900
0% -
1,597,900
693,500 693,500
693,500 208,050
25,000 150,000
183,400 1,834
120,000 144,000
120,000 17,400
130,000 19,500
NAMA KONTRAKTOR :
analisa harga Page 435 of 503
BOQ GARDU INDUK 70 KV TELUK DALAM
TANDA TANGAN :
150,000 15,000
1,249,284
0% -
1,249,284
38,397 42,236
25,400 1,270
120,000 13,200
120,000 26,400
130,000 2,860
150,000 750
86,716
0% -
86,716
15,500 17,050
37,736 3,019
120,000 720
120,000 7,200
130,000 780
150,000 45
28,814
0% -
28,814
TANDA TANGAN :
120,000 7,200 18,300 Angkur baut Ø16 34,575
120,000 7,200 Angkur baut Ø19 34,575
130,000 3,900 Angkur baut Ø22 34,575
Angkur baut Ø25 34,575
15,500 16,275 Angkur baut Ø29 34,575
- Angkur baut Ø32 34,575
- Angkur baut Ø36 34,575
- Angkur baut Ø40 34,575
34,575
0% -
Jumlah 34,575
6.00 0
3.00 0
150.00 0
1.00 0
1.00 0
1,764,000
ROK 0% -
Jumlah 1,764,000
1 Kg Erection 1,764
@ Rp. = Rp. -
@ Rp. = Rp. -
@ Rp. 114,750 = Rp. 15,491
@ Rp. 38,250 = Rp. 5,116
Jumlah = Rp. 62,157
ROK 0% -
Jumlah 62,157
Dibulatkan = Rp. 62,157
Satuan : 1m'
HARGA JUMLAH
SATUAN HARGA
(Rp) (Rp)
NAMA KONTRAKTOR :
analisa harga Page 437 of 503
BOQ GARDU INDUK 70 KV TELUK DALAM
TANDA TANGAN :
120,000.00 6,000.00
120,000.00 6,000.00
130,000.00 650.00
150,000.00 450.00
13,100.00
0.00
25,400.00 254.00
254.00
0.00
0.00
C) 13,354.00
0.00
13,300.00
(Bandung) (buah)
169,500
30 (trailer)
180,500
138,000
50 (trailer)
145,700
127,000
50 (trailer)
134,700
Harga (Khusus)
(Bandung)
60,000
55,000.00
25,000,000
NAMA KONTRAKTOR :
analisa harga Page 438 of 503
BOQ GARDU INDUK 70 KV TELUK DALAM
TANDA TANGAN :
500 Meter
35,000
30,000 http://pancangbetonminipile.blogspot.co.id/2015_
8,000,000
400 Meter
sa.html
-20.html
Satuan : 1 m3
HARGA JUMLAH
SATUAN HARGA
(Rp) (Rp)
120,000.00 4,800.00
120,000.00 4,800.00 0.28 16.8
150,000.00 300.00
9,900.00
0.00
0.00
0.00
C) 9,900.00
0.00
9,900.00 0.0707 700
NAMA KONTRAKTOR :
analisa harga Page 439 of 503
BOQ GARDU INDUK 70 KV TELUK DALAM
TANDA TANGAN :
Satuan : 1m2
HARGA JUMLAH
SATUAN HARGA
(Rp) (Rp)
120,000.00 12,000.00
120,000.00 12,000.00
130,000.00 1,300.00
150,000.00 750.00
26,050.00
62,947.00 23,605.13
25,400.00 762.00
24,367.13
0.00
0.00
C) 50,417.13
0.00
50,400.00
Satuan : 1 btg
HARGA JUMLAH
SATUAN HARGA
(Rp) (Rp)
120,000.00 480,000.00
150,000.00 75,000.00
555,000.00
0.00 0.00
0.00
0.00
0.00
NAMA KONTRAKTOR :
analisa harga Page 440 of 503
BOQ GARDU INDUK 70 KV TELUK DALAM
TANDA TANGAN :
0.00
C) 555,000.00
0.00
555,000.00
Asumsi tajuk 5 X 5 m 22,200
Satuan : 1m2
HARGA JUMLAH
SATUAN HARGA
(Rp) (Rp)
120,000.00 144,000.00
120,000.00 144,000.00
130,000.00 15,600.00
150,000.00 900.00
304,500.00
885,000.00 885,000.00
885,000.00
0.00
0.00
C) 1,189,500.00
0.00
1,189,500.00
Satuan : 1m2
HARGA JUMLAH
SATUAN HARGA
(Rp) (Rp)
120,000.00 43,200.00
120,000.00 21,600.00
130,000.00 3,120.00
150,000.00 900.00
68,820.00
8,018.85 42,098.96
68,733.00 72,169.65
25,400.00 8,890.00
NAMA KONTRAKTOR :
analisa harga Page 441 of 503
BOQ GARDU INDUK 70 KV TELUK DALAM
TANDA TANGAN :
123,158.61
0.00
0.00
C) 191,978.61
0.00
191,900.00
-
-
-
-
-
-
-
-
-
-
- -
-
NAMA KONTRAKTOR :
analisa harga Page 442 of 503
BOQ GARDU INDUK 70 KV TELUK DALAM
TANDA TANGAN :
Menggali 1 m3 tanah biasa sedalam 1 meter
NAMA KONTRAKTOR :
analisa harga Page 443 of 503
BOQ GARDU INDUK 70 KV TELUK DALAM
TANDA TANGAN :
- Patok TIP (15x15x70) cm + (40x40x10) cm
K225 Patok TIP (15x15x70) cm 0.01575 m3 9,903,959 155,987.35
Bekisting 0.36 m2 216,970 78,109.02
234,096.37
NAMA KONTRAKTOR :
analisa harga Page 444 of 503
BOQ GARDU INDUK 70 KV TELUK DALAM
TANDA TANGAN :
- Patok TP 10x10x60) cm + (20x20x10) cm
Patok TP 10x10x60) cm 0.006 m3 9,903,959 59,423.75
0.2 m2 216,970 43,393.90
102,817.65
NAMA KONTRAKTOR :
analisa harga Page 445 of 503
BOQ GARDU INDUK 70 KV TELUK DALAM
TANDA TANGAN :
/09/macam-macam-berat-jenis-material.html
m3
m3
m3
A. TENAGA
1 Pekerja oh 0.8000 120,000 96,000.00
2 Tukang batu oh 0.4000 120,000 48,000.00
3 Kepala Tukang b oh 0.0400 130,000 5,200.00
4 Mandor oh 0.0800 150,000 12,000.00
m3
NAMA KONTRAKTOR :
analisa harga Page 446 of 503
BOQ GARDU INDUK 70 KV TELUK DALAM
TANDA TANGAN :
m3 JUMLAH HARGA TENAGA 161,200.00
m3
B. BAHAN
1 0.00
C. PERALATAN
1 Vibrator Ls 0.3000 73,421 22,026.21
2 Kereta Dorong Ls 0.2000 450,000 90,000.00
3 Alat Bantu Ls 0.1500 20,000 3,000.00
NAMA KONTRAKTOR :
analisa harga Page 447 of 503
BOQ GARDU INDUK 70 KV TELUK DALAM
TANDA TANGAN :
m3
m3
m3
1.650 120,000
0.275 120,000
0.028 130,000
0.083 150,000
1.000 377,550
ROK 0%
TOTAL
NAMA KONTRAKTOR :
analisa harga Page 448 of 503
BOQ GARDU INDUK 70 KV TELUK DALAM
TANDA TANGAN :
Pembuatan dan Pemasangan Patok Beton Batas Tanah
NAMA KONTRAKTOR :
analisa harga Page 449 of 503
BOQ GARDU INDUK 70 KV TELUK DALAM
TANDA TANGAN :
Harga 139,715.12 Ongkos ang 19,200
TANDA TANGAN :
Ongkos pasan 10,000
NAMA KONTRAKTOR :
analisa harga Page 451 of 503
BOQ GARDU INDUK 70 KV TELUK DALAM
TANDA TANGAN :
2,400
alasi + alat bantu 6,000
66,809.60
Pembulatan 66,810.00
NAMA KONTRAKTOR :
analisa harga Page 452 of 503
BOQ GARDU INDUK 70 KV TELUK DALAM
TANDA TANGAN :
- Tiang bor Ø 50 cm
0.1963 -
29.452 540,644
75,000
-
-
-
-
-
772,394
-
772,394
NAMA KONTRAKTOR :
analisa harga Page 453 of 503
BOQ GARDU INDUK 70 KV TELUK DALAM
TANDA TANGAN :
6.19 Memasang 1 m2 rangka langit-langit (50 x 100) cm, kayu kelas II atau III
NAMA KONTRAKTOR :
analisa harga Page 454 of 503
BOQ GARDU INDUK 70 KV TELUK DALAM
TANDA TANGAN :
Mandor OH 0,075
NAMA KONTRAKTOR :
analisa harga Page 455 of 503
BOQ GARDU INDUK 70 KV TELUK DALAM
TANDA TANGAN :
Memasang 1 m2 lantai ubin warna ukuran (40 x 40) cm M2 Lantai Keramik polos 30 x 30 cm
Keramik polos 30 x 30 cm
Semen portland
Pasir pasang
Semen warna
Pekerja
Tukang batu
Kepala tukang
Mandor
http://www.softwarerab.com
NAMA KONTRAKTOR :
analisa harga Page 456 of 503
BOQ GARDU INDUK 70 KV TELUK DALAM
TANDA TANGAN :
Perlengkapan 35 % harga pipa
Pekerja
Tukang batu
Kepala tukang
Mandor
Peralatan
NAMA KONTRAKTOR :
analisa harga Page 457 of 503
BOQ GARDU INDUK 70 KV TELUK DALAM
TANDA TANGAN :
NAMA KONTRAKTOR :
analisa harga Page 458 of 503
BOQ GARDU INDUK 70 KV TELUK DALAM
TANDA TANGAN :
m/2016/01/daftar-harga-atap-metal-bluescope-lysaght.html
om/2013/06/daftar-harga-atap-metal-bluescope.html
NAMA KONTRAKTOR :
analisa harga Page 459 of 503
BOQ GARDU INDUK 70 KV TELUK DALAM
TANDA TANGAN :
aya-pengaspalan-jalan-hotmix-per.html
151,375
NAMA KONTRAKTOR :
analisa harga Page 460 of 503
BOQ GARDU INDUK 70 KV TELUK DALAM
TANDA TANGAN :
NAMA KONTRAKTOR :
analisa harga Page 461 of 503
BOQ GARDU INDUK 70 KV TELUK DALAM
TANDA TANGAN :
galian tanah 1.30 m3 vol. saluran 0.990
180 cm timbunan 0.310
NAMA KONTRAKTOR :
analisa harga Page 462 of 503
BOQ GARDU INDUK 70 KV TELUK DALAM
TANDA TANGAN :
40 cm 0.55 luas penampang saluran tebal 25 cm
0.44 luas penampang saluran tebal 20 cm
80 cm
1 M' Saluran U 30 :
pas. batu bata 1:5 0.400 m2 370,536
plesteran 0.240 m2 158,734 38,096
NAMA KONTRAKTOR :
analisa harga Page 463 of 503
BOQ GARDU INDUK 70 KV TELUK DALAM
TANDA TANGAN :
pasir urug 0.010 m3 257,580 2,576
galian tanah 0.040 m3 114,750 4,590
buis beton 0 30 1.000 m1 90,000 90,000
135,262
ROK 0% -
TOTAL 135,262
1 M' Saluran O 30 :
pas. batu bata 1:5 0.400 m2 370,536
pasir urug 0.010 m3 257,580 2,576
galian tanah 0.040 m3 114,750 4,590
buis beton 0 30 1.000 m1 135,000 135,000
142,166
ROK 0% -
TOTAL 142,166
NAMA KONTRAKTOR :
analisa harga Page 464 of 503
BOQ GARDU INDUK 70 KV TELUK DALAM
TANDA TANGAN :
swing 1.1 m
1.10 192,500
2.30 253,843
NAMA KONTRAKTOR :
analisa harga Page 465 of 503
BOQ GARDU INDUK 70 KV TELUK DALAM
TANDA TANGAN :
4.60 206,617
0.18 -
0.34 -
1.44 165,240
0.48 18,360
1 125,000
961,560
-
961,560
NAMA KONTRAKTOR :
analisa harga Page 466 of 503
BOQ GARDU INDUK 70 KV TELUK DALAM
TANDA TANGAN :
bar 150 mm
1.050 - -
1.62 m 21,332.78 /m
0.96 m 35,959.44 /m 1.0400416
NAMA KONTRAKTOR :
analisa harga Page 467 of 503
BOQ GARDU INDUK 70 KV TELUK DALAM
TANDA TANGAN :
0.63 m 54,629.48 /m
0.44 m 78,579.55 /m
0.34 m 103,055.14 /m
0.26 m 133,134.39 /m
0.19 m 179,145.08 /m
0.16 m 218,169.08 /m
0.13 m 276,254.35 /m
0.10 m 341,255.66 /m
NAMA KONTRAKTOR :
analisa harga Page 468 of 503
BOQ GARDU INDUK 70 KV TELUK DALAM
TANDA TANGAN :
NAMA KONTRAKTOR :
analisa harga Page 469 of 503
BOQ GARDU INDUK 70 KV TELUK DALAM
TANDA TANGAN :
.blogspot.co.id/2015_11_01_archive.html
menit
xy Grout)
NAMA KONTRAKTOR :
analisa harga Page 470 of 503
BOQ GARDU INDUK 70 KV TELUK DALAM
TANDA TANGAN :
pembersihan 6,750
gali/bor Ø40 7,841
cor (d=50cm) 230,204
angkut material & alat 50,000
pengukuran 70,089
364,884
1,094,652.62 - Pemasangan Patok Beton
NAMA KONTRAKTOR :
analisa harga Page 471 of 503
BOQ GARDU INDUK 70 KV TELUK DALAM
TANDA TANGAN :
pembersihan 6,750
gali/bor Ø40 7,841
cor (d=50cm) 230,204
angkut material & alat 50,000
pengukuran 280,355.60
575,151
575,150.91 - Pemasangan Patok Beton
NAMA KONTRAKTOR :
analisa harga Page 472 of 503
BOQ GARDU INDUK 70 KV TELUK DALAM
TANDA TANGAN :
Upah Pengecoran Satuan
- Biaya Penegecoaran Ls
- Perawatan Ls
- Tes Kubus Beton & Slump Ls
NAMA KONTRAKTOR :
analisa harga Page 473 of 503
BOQ GARDU INDUK 70 KV TELUK DALAM
TANDA TANGAN :
161,200.00
0.00
161,200.00
NAMA KONTRAKTOR :
analisa harga Page 474 of 503
BOQ GARDU INDUK 70 KV TELUK DALAM
TANDA TANGAN :
mutu f’c = 26,4 MPa (K 300), slump (12 ± 2) cm, w/c = 0,52
10,325,000
86,613
276,381
9,675
198,000
33,000
3,640
12,450
377,550
11,322,309
-
11,322,309
NAMA KONTRAKTOR :
analisa harga Page 475 of 503
BOQ GARDU INDUK 70 KV TELUK DALAM
TANDA TANGAN :
HARGA JASA BORE PILE MANUAL
DIAMETER HARGA/M KETERRANGAN
20 Rp 40.000 Kedalaman rata-rata 6 meter
25 Rp 45.000 Kedalaman rata-rata 6 meter
30 Rp 65.000 Kedalaman rata-rata 6 meter
35 Rp 60.000 Kedalaman rata-rata 6 meter
40 Rp 110.000 Kedalaman rata-rata 6 meter
50 Rp 160.000 Kedalaman rata-rata 6 meter
60 Rp 220.000 Kedalaman rata-rata 6 meter
Keterangan : rata maxima manual
- harga di atas sudah termasuk Pengecoran, Pembesian, Pengeboran hanya jasa Tenaga saja tidak termasuk bahan material
- Biaya ongkos Pulang Pergi Tenaga di tanggung pihak penguna jasa
- Biaya Mob de Mob / pengadaan peralatan bor ke lokasi Proyekcbelum termasuk, biayanya berbeda sesuai lokasi proyek
NAMA KONTRAKTOR :
analisa harga Page 476 of 503
BOQ GARDU INDUK 70 KV TELUK DALAM
TANDA TANGAN :
http://borepile-solo.blogspot.co.id/2015/12/biaya-upah-harga-bore-pile-diameter.html
tau III
NAMA KONTRAKTOR :
analisa harga Page 477 of 503
BOQ GARDU INDUK 70 KV TELUK DALAM
TANDA TANGAN :
4 mm, 5 mm, dan 6 mm
NAMA KONTRAKTOR :
analisa harga Page 478 of 503
BOQ GARDU INDUK 70 KV TELUK DALAM
TANDA TANGAN :
Keramik polos 30 x 30 cm setara Mulia
os 30 x 30 cm m2 1.000 65,000 65,000
and Kg 8.000 25,000 200,000
g M3 0.022 183,400 3,943
na Kg 0.013 1,700 22
Oh 0.250 120,000 30,000
u Oh 0.120 120,000 14,400
ng Oh 0.012 130,000 1,560
Oh 0.013 150,000 1,875
316,800
ROK 0% -
TOTAL 316,800.2
ww.softwarerab.com/analisa-harga-satuan-pekerjaan-pondasi.htm
VC Ø 1/2" (AW)
1/2" m1 1.200 - -
NAMA KONTRAKTOR :
analisa harga Page 479 of 503
BOQ GARDU INDUK 70 KV TELUK DALAM
TANDA TANGAN :
n 35 % harga pipa lot 1.000 - -
Oh 0.036 120,000 4,320
u Oh 0.060 120,000 7,200
ng Oh 0.006 130,000 780
Oh 0.002 150,000 270
12,570
ROK 0% -
TOTAL 12,570.0
VC Ø 3/4" (AW)
3/4" m1 1.200 6,614 7,937
n 35 % harga pipa lot 1.000 2,778 2,778
Oh 0.036 120,000 4,320
u Oh 0.060 120,000 7,200
ng Oh 0.006 130,000 780
Oh 0.002 150,000 270
23,285
ROK 0% -
TOTAL 23,284.7
VC Ø 2" (AW)
2" m1 1.200 45,100 54,120
n 35 % harga pipa lot 1.000 18,942 18,942
Oh 0.036 120,000 4,320
u Oh 0.060 120,000 7,200
ng Oh 0.006 130,000 780
Oh 0.002 150,000 270
85,632
ROK 0% -
TOTAL 85,632.0
NAMA KONTRAKTOR :
analisa harga Page 480 of 503
BOQ GARDU INDUK 70 KV TELUK DALAM
TANDA TANGAN :
47,240
ROK 0% -
TOTAL 47,240.0
NAMA KONTRAKTOR :
analisa harga Page 481 of 503
BOQ GARDU INDUK 70 KV TELUK DALAM
TANDA TANGAN :
NAMA KONTRAKTOR :
analisa harga Page 482 of 503
BOQ GARDU INDUK 70 KV TELUK DALAM
TANDA TANGAN :
NAMA KONTRAKTOR :
analisa harga Page 483 of 503
BOQ GARDU INDUK 70 KV TELUK DALAM
TANDA TANGAN :
Jenis Produk Spesifikasi Harga (Rp) /Pcs
Buis Beton 20 x100 cm Rp. 60.000
Buis Beton 30 x 100 cm Rp. 90.000
NAMA KONTRAKTOR :
analisa harga Page 484 of 503
BOQ GARDU INDUK 70 KV TELUK DALAM
TANDA TANGAN :
Buis Beton 40 x 100 cm Rp. 110.000
Buis Beton 50 x 100 cm Rp. 175.000
Buis Beton 60 x 100 cm Rp. 225.000
Buis Beton 80 x 50 cm Rp. 225.000
Buis Beton 100 x 50 cm Rp. 275.000
Buis Beton 150 x 50 cm Rp. 600.000
Tutup Buis Beton 80 cm Rp. 225.000
Tutup Buis Beton 100 cm Rp. 275.000
http://www.conblocknusantara.com/?pi=9&idd=2&i=BUIS%20BETON
NAMA KONTRAKTOR :
analisa harga Page 485 of 503
BOQ GARDU INDUK 70 KV TELUK DALAM
TANDA TANGAN :
NAMA KONTRAKTOR :
analisa harga Page 486 of 503
BOQ GARDU INDUK 70 KV TELUK DALAM
TANDA TANGAN :
NAMA KONTRAKTOR :
analisa harga Page 487 of 503
BOQ GARDU INDUK 70 KV TELUK DALAM
TANDA TANGAN :
0.0251 55.29 13,823.01
NAMA KONTRAKTOR :
analisa harga Page 488 of 503
BOQ GARDU INDUK 70 KV TELUK DALAM
TANDA TANGAN :
gan Patok Beton BM
NAMA KONTRAKTOR :
analisa harga Page 489 of 503
BOQ GARDU INDUK 70 KV TELUK DALAM
TANDA TANGAN :
Qty Harga Satuan Jumlah Harga
1.0 276,200 276,200
1.0 101,350 101,350
0.0 55,000 0+
377,550
NAMA KONTRAKTOR :
analisa harga Page 490 of 503
BOQ GARDU INDUK 70 KV TELUK DALAM
TANDA TANGAN :
STANDART HARGA KHUSUS DKI JAKARTA
http://sumurartesis.blogspot.co.id/p/tarif-harga.html
NAMA KONTRAKTOR :
analisa harga Page 491 of 503
BOQ GARDU INDUK 70 KV TELUK DALAM
TANDA TANGAN :
1 M' Pipa PVC Ø 3" (AW)
Pipa pvc Ø 3" m1 1.200 - -
NAMA KONTRAKTOR :
analisa harga Page 492 of 503
BOQ GARDU INDUK 70 KV TELUK DALAM
TANDA TANGAN :
Perlengkapan 35 % harga pipa lot 1.000 - -
Pekerja Oh 0.036 120,000 4,320
Tukang batu Oh 0.060 120,000 7,200
Kepala tukang Oh 0.006 130,000 780
Mandor Oh 0.002 150,000 270
12,570
ROK 0% -
TOTAL 12,570.0
NAMA KONTRAKTOR :
analisa harga Page 493 of 503
BOQ GARDU INDUK 70 KV TELUK DALAM
TANDA TANGAN :
Uraian pekeraan gorong2 buis beton d=0.30 m (k-175)
I BAHAN
1 buis beton 1 bh
II TENAGA
1 mandor 0.029 org/hr
NAMA KONTRAKTOR :
analisa harga Page 494 of 503
BOQ GARDU INDUK 70 KV TELUK DALAM
TANDA TANGAN :
2 kepala tukang 0.012 org/hr
3 tukang 0.116 org/hr
4 pekerja 0.581 org/hr
III ALAT
1 linggis 0.05 bh
2 kayu pemiku dan tampar 0.05 unit
p) /Pcs Nilai HSPK :
No. JP VI.7
NAMA KONTRAKTOR :
analisa harga Page 495 of 503
BOQ GARDU INDUK 70 KV TELUK DALAM
TANDA TANGAN :
Uraian pekeraan gorong2 buis beton d=0.40 m (k-175)
I BAHAN
1 buis beton 1 bh
II TENAGA
1 mandor 0.037 org/hr
p) /Pcs 2 kepala tukang 0.015 org/hr
3 tukang 0.149 org/hr
4 pekerja 0.744 org/hr
III ALAT
1 linggis 0.053 bh
2 kayu pemiku dan tampar 0.053 unit
Nilai HSPK :
No. JP VI.8
Uraian pekeraan gorong2 buis beton d=0.50 m (k-175)
I BAHAN
1 buis beton 2 bh
II TENAGA
1 mandor 0.046 org/hr
2 kepala tukang 0.026 org/hr
3 tukang 0.0263 org/hr
4 pekerja 1.315 org/hr
III ALAT
1 linggis 0.059 bh
2 kayu pemiku dan tampar 0.059 unit
Nilai HSPK :
No. JP VI.9
Uraian pekeraan gorong2 buis beton d=0.60 m (k-175)
NAMA KONTRAKTOR :
analisa harga Page 496 of 503
BOQ GARDU INDUK 70 KV TELUK DALAM
TANDA TANGAN :
m
I BAHAN
1 buis beton 2 bh
II TENAGA
1 mandor 0.066 org/hr
2 kepala tukang 0.0262 org/hr
3 tukang 0.0263 org/hr
4 pekerja 1.35 org/hr
III ALAT
1 linggis 0.059 bh
2 kayu pemiku dan tampar 0.059 unit
Nilai HSPK :
No. JP VI.10
Uraian pekeraan gorong2 buis beton d=0.80 m (k-175)
NAMA KONTRAKTOR :
analisa harga Page 497 of 503
BOQ GARDU INDUK 70 KV TELUK DALAM
TANDA TANGAN :
m
I BAHAN
1 buis beton 2 bh
II TENAGA
1 mandor 0.119 org/hr
2 kepala tukang 0.048 org/hr
3 tukang 0.477 org/hr
4 pekerja 2.386 org/hr
III ALAT
1 linggis 0.063 bh
2 kayu pemiku dan tampar 0.063 unit
Nilai HSPK :
No. JP VI.11
Uraian pekeraan gorong2 buis beton d=1.00 m (k-175)
I BAHAN
1 buis beton 2 bh
II TENAGA
1 mandor 0.186 org/hr
2 kepala tukang 0.075 org/hr
3 tukang 0.746 org/hr
4 pekerja 3.73 org/hr
III ALAT
1 linggis 0.067 bh
2 kayu pemiku dan tampar 0.067 unit
Nilai HSPK :
NAMA KONTRAKTOR :
analisa harga Page 498 of 503
BOQ GARDU INDUK 70 KV TELUK DALAM
TANDA TANGAN :
gorong2 buis beton d=0.30 m (k-175) tbl 5cm
HARGA HARGA
SATUAN
90,000 90,000
150,000 4,350
NAMA KONTRAKTOR :
analisa harga Page 499 of 503
BOQ GARDU INDUK 70 KV TELUK DALAM
TANDA TANGAN :
130,000 1,560
120,000 13,920
120,000 69,720
44,000 2,200
10,000 500
Nilai HSPK : 182,250
NAMA KONTRAKTOR :
analisa harga Page 500 of 503
BOQ GARDU INDUK 70 KV TELUK DALAM
TANDA TANGAN :
gorong2 buis beton d=0.40 m (k-175) tbl 5cm
HARGA HARGA
SATUAN
110,000 110,000
150,000 5,550
130,000 1,950
120,000 17,880
120,000 89,280
44,000 2,332
10,000 530
Nilai HSPK : 227,522
HARGA HARGA
SATUAN
-
-
-
-
-
-
Nilai HSPK : -
HARGA HARGA
SATUAN
NAMA KONTRAKTOR :
analisa harga Page 501 of 503
BOQ GARDU INDUK 70 KV TELUK DALAM
TANDA TANGAN :
-
-
-
-
-
-
-
Nilai HSPK : -
HARGA HARGA
SATUAN
NAMA KONTRAKTOR :
analisa harga Page 502 of 503
BOQ GARDU INDUK 70 KV TELUK DALAM
TANDA TANGAN :
-
-
-
-
-
-
-
Nilai HSPK : -
HARGA HARGA
SATUAN
-
-
-
-
-
-
Nilai HSPK : -
NAMA KONTRAKTOR :
analisa harga Page 503 of 503
BOQ GARDU INDUK 70 KV TELUK DALAM
TANDA TANGAN :