Anda di halaman 1dari 3

1.

Matakuliah TM3101 Teknik Pemboran I

a. Silabus

Kode Beban Semester: V KK/Unit Penanggung Sifat: Wajib


Matakuliah: SKS: 3 Jawab: TPPMM
TM3101

Nama Teknik Pemboran I


Matakuliah Drilling Engineering I
System of Units; Persiapan Tempat & Lokasi Pemboran; Peralatan Pemboran; Rotary Drilling Bit;
Mekanika Batuan; Lumpur Pemboran; Swelling Problem; Pressure Losses; Cutting Transport; Analisa
Surge, Swab dan Slip; Hidrolika Fluida Pemboran; Teori Semen & Penyemenan; Pengumpulan Data;
Silabus Vertical Well Drillstring Design; Drillstring Inspection Method; Well Completion
Ringkas System of Units; Preparation of Drilling Location; Drilling Equipment; Rotary Drilling Bit; Rock
Mechanics; Drilling Fluids; Swelling Problem; Pressure Losses; Cutting Ttransport; Surge, Swab and
Slip Analysis; Drilling Fluids Hydraulics; Cement and Cementing Theory; Data Tabulation; Vertical
Well Drillstring Design; Drillstring Inspection Method; Well Completion
Pengenalan terhadap satuan-satuan dalam operasi pemboran, persiapan tempat pemboran dan cara
mengirim peralatan pemboran ke lokasi tersebut, alat-alat yang digunakan dalam proses pengeboran,
pengertian Rotary drilling bit, mekanika batuan dan kekuatan batuan formasi, fungsi lumpur
pemboran dan cara mendesain lumpur pemboran tersebut, masalah swelling dalam lubang pemboran,
kehilangan tekanan pada lubang pemboran, cara memindahkan cutting ke permukaan, analisa
kecepatanan minimum untuk memindahkan cutting ke permukaan, desain operasi penyemenan pada
Silabus casing, proses pengumpulan data pemboran, desain drillstring configuration, komplesi sumur.
Lengkap Introduction to units in drilling operation, preparation in drilling location and prepare a way o
deliver drilling equipment, drilling equipment in drilling operation proses, introduction to rotary
drilling bit, rock mechanics and formation compressive strength, drilling fluids function and design,
swelling problems in wellbore, pressure losses in wellbore area, cutting transport, analysis minimum
velocity required to delivered cutting to surface, cementing program design, data tabulation in
drilling operation, design drillstring configuration.
Mahasiswa mempunyai pengetahuan yang menyeluruh dari seluruh aspek dasar operasi pemboran,
Luaran dan mampu menangani beberapa masalah ketika pengangkatan cutting ke permukaan, mampu
(Outcomes) mendesain program penyemenan di suatu sumur dan mampu mendesain konfigurasi drillstring untuk
sumur vertical.
TK3082 Pengantar Peristiwa
Prerequisite
Perpindahan
Matakuliah MS2111 Mekanika Kekuatan Material Prerequisite
Terkait GL3xxx Geologi Dasar Prerequisite
KU1183 Pengantar Teknologi
Prerequisite
Sumberdaya Bumi
Kegiatan
Penunjang
(1) Rubiandini R.R.S, "Teknik Opreasi Pemboran", TM-ITB, 2008 (Pustaka utama)
Pustaka (2) Burgoyne, "Applied Drilling Engineering", SPE, 1986 (Pustaka penunjang)
(3) Mian M.A., "Petroleum Engineering Handbook", Penn Well, 1992 (Pustaka penunjang)
Panduan Berdasarkan UAS, UTS, PR dan Quis
Penilaian
Waktu dan tempat::
Catatan Setiap Selasa jam 07:00-09:00 di Ruang Aula Gedung Energi Lantai 1
Tambahan Setiap Jumat jam 07:00-08:00 di 9232
b. Satuan Ajar Perkuliahan (SAP)

Capaian Belajar
Mg# Topik Sub Topik Sumber Materi
Mahasiswa
 Bourgoyne, Applied Drilling
1 Memahamioperasipemborans
ecaramenyeluruh, Engineering, Chapter 1
Selasa,  Neal Adams, Drilling Engineering,
sejakdaripersiapan,
20 Agustus 2019 Pendahuluan Pendahuluan
pelaksanaan, Chapter 1
Jumat, danteknologibarudanmasa  Heriot-Watt University, Drilling
23 Agustus 2019 yang akandatang Engineering, Chapter 1
 Bourgoyne, Applied Drilling
2
Engineering, Chapter 1
Selasa, Pelaksanaan  System of Units Memahamisistemsatuan,  Neal Adams, Drilling Engineering,
27 Agustus 2019 Operasi PersiapantempatdanLo sertapersiapantempat,
Chapter 1
Jumat, Pemboran kasiPemboran danlokasipemboran
 Heriot-Watt University, Drilling
30 Agustus 2019 Engineering, Chapter 1
 Bourgoyne, Applied Drilling
Engineering, Chapter 1
3
 Rabia, Well Engineering and
Selasa,  PeralatanPembora
Peralatanutama MemahamiperalatanPembora Construction, Chapter 14
3 September 2019 Pemboran
n
ndanjenis Bit  Neal Adams, Drilling
Jumat, Rotary Drilling Bits
Engineering,Chapter 16
6 September 2019  Heriot-Watt University, Drilling
Engineering, Chapter 1 dan 2
 Bourgoyne, Applied Drilling
Engineering, Chapter 1
4
 Neal Adams, Drilling Engineering,
Selasa, Mengerticaramemilih Rig Chapter 16
Rig Sizing &
10 September 2019 Selection
Rig Sizing & Selection danmenghitungkemampuan
 Heriot-Watt University, Drilling
Jumat, yang dibutuhkan
Engineering, Chapter 2
13 September 2019  Rabia, Well Engineering and
Construction, Chapter 14
 Bourgoyne, Applied Drilling
Engineering, Chapter 1
5
 Neal Adams, Drilling Engineering,
Selasa, Chapter 19
MampumenghitungPerkiraan
17 September 2019 Drilling Cost Drilling Cost
pembiyaanpemboran  Heriot-Watt University, Drilling
Jumat, Engineering, Chapter 1
20 September 2019  Rabia, Well Engineering and
Construction, Chapter 15
 Bourgoyne, Applied Drilling
Engineering, Chapter 3 dan 4
6 Memahamiteknikdeteksitekan  Rabia, Well Engineering and
Selasa, TekananFormas anformasi, dantekananrekah, Construction, Chapter 1 dan 2
TekananFormasidanGr
24 September 2019 idanGradienRek
adienRekah
baiksebelum, selama,
 Neal Adams, Drilling
Jumat, ah dansesudahmelakukanpembor
an Engineering,Chapter 3 dan 4
27 September 2019  Heriot-Watt University, Drilling
Engineering, Chapter 5
 Rabia, Well Engineering and
Construction, Chapter 14
7
 Neal Adams, Drilling Engineering,
Selasa, Chapter 3
Tekanan AsalMulaTekanan Memahamiasalmulanyatekan
1 Oktober 2019 Abnormal Abnormal an abnormal  Heriot-Watt University, Drilling
Jumat, Engineering, Chapter 5
4 Oktober 2019  Rabia, Well Engineering and
Construction, Chapter 1
8 UTS
Selasa,
Capaian Belajar
Mg# Topik Sub Topik Sumber Materi
Mahasiswa
8 Oktober 2019
Jumat,
11 Oktober 2019
 Bourgoyne, Applied Drilling
Engineering, Chapter 1
9
 Rabia, Well Engineering and
Selasa, Memahamisifatfisiklumpur Construction, Chapter 7
Lumpur Sifatfisiklumpurpembor
15 Oktober 2019 Pemboran an
(densitas, viskositas, gel
 Neal Adams, Drilling
Jumat, strength, dan filtration loss)
Engineering,Chapter 8
18 Oktober 2019  Heriot-Watt University, Drilling
Engineering, Chapter 9
10 Rabia, Well Engineering and
Selasa, Construction, Chapter 12
MasalahPembor Masalah yang Memahamiakibat swelling
22 Oktober 2019 an Timbulakibat Swelling danpenanggulangannya
Jumat,
25 Oktober 2019
 Bourgoyne, Applied Drilling
Engineering, Chapter 4
11
 Rabia, Well Engineering and
Selasa, Mengerticaramenghitungkehil Construction, Chapter 8
29 Oktober 2019 Pressure Losses KehilanganTekanan angantekananpadapipadan
 Neal Adams, Drilling
Jumat, annulus
Engineering,Chapter 18
1 November 2019  Heriot-Watt University, Drilling
Engineering, Chapter 10
 Neal Adams, Drilling Engineering,
12  Mampumenghitungkecep Chapter 18
Selasa,  Cutting Transport atanmiminumnaiknya  Rabia, Well Engineering &
Analisa Surge,
5 November 2019 Swab & Slip Analisa Surge, Swab & cutting Construction, Chapter 8
Jumat, Slip Mampumenganalisaefektarikd  Bourgoyne, Applied Drilling
8 November 2019 antekanpadapenarikanpipa
Engineering, Chapter 4
 Heriot-Watt, Drilling Engineering,
13
Chapter 3
Selasa, Vertical Well PemilihanKomposisiDri Memahamiperhitunganmende  Neal Adams, Drilling Engineering,
12 November 2019 Drillstring llpipepadaLubangVertik sainrangkaian drill string
Chapter 15
Jumat, Design al. unsuksumurVertikal
 Rabia, Well Engineering &
15 November 2019 Construction, Chapter 10
14  Heriot-Watt, Drilling Engineering,
Selasa, Chapter 3
Drillstring Drillstring Inspection Memahamicara-
19 November 2019 Inspection Methods caramemeriksaklasifikasipipa
Jumat,
22 November 2019
15
Selasa,
PresentasidanDiskusikelompo
26 November 2019 Presentasi PresentasidanDiskusi
kProyekPemboran
Jumat,
29 November 2019
16
Selasa, UAS -
3 Desember 2019

Anda mungkin juga menyukai