BAB II
KLASIFIKASI MASSA BATUAN
Kelompok IV II-1
1610813210016
PRAKTIKUM TAMBANG BAWAH TANAH
LABORATORIUM TEKNOLOGI PERTAMBANGAN
PROGRAM STUDI TEKNIK PERTAMBANGAN
FAKULTAS TEKNIK
UNIVERSITAS LAMBUNG MANGKURAT
Kelompok IV II-2
1610813210016
PRAKTIKUM TAMBANG BAWAH TANAH
LABORATORIUM TEKNOLOGI PERTAMBANGAN
PROGRAM STUDI TEKNIK PERTAMBANGAN
FAKULTAS TEKNIK
UNIVERSITAS LAMBUNG MANGKURAT
Kelompok IV II-3
1610813210016
PRAKTIKUM TAMBANG BAWAH TANAH
LABORATORIUM TEKNOLOGI PERTAMBANGAN
PROGRAM STUDI TEKNIK PERTAMBANGAN
FAKULTAS TEKNIK
UNIVERSITAS LAMBUNG MANGKURAT
Kelompok IV II-4
1610813210016
PRAKTIKUM TAMBANG BAWAH TANAH
LABORATORIUM TEKNOLOGI PERTAMBANGAN
PROGRAM STUDI TEKNIK PERTAMBANGAN
FAKULTAS TEKNIK
UNIVERSITAS LAMBUNG MANGKURAT
Kelompok IV II-5
1610813210016
PRAKTIKUM TAMBANG BAWAH TANAH
LABORATORIUM TEKNOLOGI PERTAMBANGAN
PROGRAM STUDI TEKNIK PERTAMBANGAN
FAKULTAS TEKNIK
UNIVERSITAS LAMBUNG MANGKURAT
Kelompok IV II-6
1610813210016
PRAKTIKUM TAMBANG BAWAH TANAH
LABORATORIUM TEKNOLOGI PERTAMBANGAN
PROGRAM STUDI TEKNIK PERTAMBANGAN
FAKULTAS TEKNIK
UNIVERSITAS LAMBUNG MANGKURAT
5. Clipboard digunakan sebagai tempat untuk menulis dan juga membantu dalam
pengukuran orientasi kekar.
Kelompok IV II-7
1610813210016
PRAKTIKUM TAMBANG BAWAH TANAH
LABORATORIUM TEKNOLOGI PERTAMBANGAN
PROGRAM STUDI TEKNIK PERTAMBANGAN
FAKULTAS TEKNIK
UNIVERSITAS LAMBUNG MANGKURAT
Gambar 2.7
Sampel Batu
8. APD (alat pelindung diri) digunakan sebagai pelindung diri dalam melaksanakan
kegiatan praktikum
Kelompok IV II-8
1610813210016
PRAKTIKUM TAMBANG BAWAH TANAH
LABORATORIUM TEKNOLOGI PERTAMBANGAN
PROGRAM STUDI TEKNIK PERTAMBANGAN
FAKULTAS TEKNIK
UNIVERSITAS LAMBUNG MANGKURAT
c. Menahan tekanan pada alat dan menekan tombol pada sisi alat untuk mengunci
hulu palu pada posisinya, secara otomatis akan membaca skala angka yang
dihasilkan dari rata-rata pengujian.
d. Menghindari permukaan batuan yang pecah karena sudah terdapat rongga udara
yang mengisi.
e. Melakukan pengujian sebanyak 10 kali pada titik yang berbeda.
2.4.2. Parameter Klasifikasi Kekar
Adapun prosedur kerja pada pengamatan perimeter kekar adalah sebagai
berikut:
a. Membentangkan meteran pada simulator struktur kekar.
b. Menghitung dip dan dip direction structure, yang memotong bentang meteran
dengan kompas geologi, dengan cara menaruh clipboard pada kekar, lalu
menempelkan sisi west pada clipboard untuk pengukuran dip. Selanjutnya
menempelkan sisi south pada bidang struktur batuan yang akan diukur,
kemudian memasukkan gelembung yang ada apa bull eyes, agar berada disisi
tengah, dengan cara menggeser-geserkan kompas dan menjaga agar sisi south
tetap menempel pada bidang yang diukur. Setelah gelembung berada ditengah
maka baca angka yang ditunjukkan oleh jarum utara. Angka tersebut dapat
menunjukkan nilai dari dip direction.
c. Mengukur jarak antar kekar yang memotong garis scanline menggunakan
meteran.
d. Menentukan tingkat kekasaran kekar, jarak antar permukaan kekar (aperture),
kemenerusan kekar (persintence), jumlah kekar (λ).
Kelompok IV II-9
1610813210016
PRAKTIKUM TAMBANG BAWAH TANAH
LABORATORIUM TEKNOLOGI PERTAMBANGAN
PROGRAM STUDI TEKNIK PERTAMBANGAN
FAKULTAS TEKNIK
UNIVERSITAS LAMBUNG MANGKURAT
berbeda dengan pos B tetap, dan untuk mengetahui besarnya kekuatan batuan
tersebut dilakukan konversi dengan pembacaan terhadap grafik hammer test. Hasil
data pembacaan schmidt hammer test pada tabel di bawah ini:
*Sumber : Modul Praktikum Tambang Bawah Tanah ULM, 2019
Gambar 2.9
Grafik Hammer Test
Kelompok IV II-10
1610813210016
PRAKTIKUM TAMBANG BAWAH TANAH
LABORATORIUM TEKNOLOGI PERTAMBANGAN
PROGRAM STUDI TEKNIK PERTAMBANGAN
FAKULTAS TEKNIK
UNIVERSITAS LAMBUNG MANGKURAT
Tabel 2.1.
Form Schmidt Hammer Test
Schmidt Hammer Test
Wall Heading
2
N/mm =
NO Pos B NO Pos B N/mm2 = MPa
MPa
1 46 41 1 51 64
2 30 31 2 51 64
3 44 39 3 52 67
4 32 32 4 52 67
5 41 36 5 26 22
6 50 43 6 46 55
7 36 36 7 42 48
8 22 26 8 50 64
9 48 42 9 54 70
10 41 38 10 32 31
Rata-rata 38,7 36,6 Rata-rata 45,6 55,2
Kelompok IV II-11
1610813210016
PRAKTIKUM TAMBANG BAWAH TANAH
LABORATORIUM TEKNOLOGI PERTAMBANGAN
PROGRAM STUDI TEKNIK PERTAMBANGAN
FAKULTAS TEKNIK
UNIVERSITAS LAMBUNG MANGKURAT
Kelompok IV II-12
1610813210016
PRAKTIKUM TAMBANG BAWAH TANAH
LABORATORIUM TEKNOLOGI PERTAMBANGAN
PROGRAM STUDI TEKNIK PERTAMBANGAN
FAKULTAS TEKNIK
UNIVERSITAS LAMBUNG MANGKURAT
Tabel 2.3
Pengukuran Kedudukan Kekar Wall
Jarak
Jarak Panjang
Dip antar
No. Dip Strike bukaan kekar
direction kekar
kekar (cm) (cm)
(cm)
1 290 N 840 E N 3540 E 18 1 2
2 330 0
N 91 E N 10 E 6 2,6 95
3 470 N 930 E N 30 E 16 2,7 115
4 240 0
N 91 E N 10 E 29 1,9 250
5 350 0
N 88 E 0
N 358 E 11 1,6 96
a 490 N 2500 E N 1600 E 3 2 54
b 500 N 2750 E N 1850 E 54 1,7 80
c 590 N 2610 E N 1710 E 19 2,6 68
d 940 N 2640 E N 1740 E 42 2 73
e 560 N 2630 E N 1730 E 39 2 67
Rata-rata - - 23,7 2,01 90
Arah Umum - N 10 E - - -
Kelompok IV II-13
1610813210016
PRAKTIKUM TAMBANG BAWAH TANAH
LABORATORIUM TEKNOLOGI PERTAMBANGAN
PROGRAM STUDI TEKNIK PERTAMBANGAN
FAKULTAS TEKNIK
UNIVERSITAS LAMBUNG MANGKURAT
Gambar 2.12
Sketsa Kekar Wall
Kelompok IV II-14
1610813210016
PRAKTIKUM TAMBANG BAWAH TANAH
LABORATORIUM TEKNOLOGI PERTAMBANGAN
PROGRAM STUDI TEKNIK PERTAMBANGAN
FAKULTAS TEKNIK
UNIVERSITAS LAMBUNG MANGKURAT
Tabel 2.4.
Form Scanline
Lokasi Pengukuran
Parameter
Wall Heading
O
Arah garis pengukuran N 181 E N 190O E
Panjang Scanline 2,5 m 2,5 m
Jenis Batuan Serpentinit Serpentinit
Schmidt Hammer Test 36,6 MPa 55,2 MPa
Jumlah kekar 10 10
Jumlah pasangan kekar 3 4
Jarak antar kekar 23,7 cm 29,12 cm
Lebar bukaan kekar 2,01 cm 0,99 cm
Kekasaran bidang kekar Rough Rough
Panjang kekar 0,9 m 0,849 m
Kondis Material pengisi kekar None None
i Kekar Tingkat pelapukan kekar Unweathered Unweathered
Rock Quality Designation (RQD) 91,2 % 93,2 %
Keadaan Air Tanah Damp Completely Dry
N 183O E/30O
N 1O E/24O
Arah Orientasi Kekar (Fair)
(Fair)
Kelompok IV II-15
1610813210016
PRAKTIKUM TAMBANG BAWAH TANAH
LABORATORIUM TEKNOLOGI PERTAMBANGAN
PROGRAM STUDI TEKNIK PERTAMBANGAN
FAKULTAS TEKNIK
UNIVERSITAS LAMBUNG MANGKURAT
RQD 93,2 % 20
Kelompok IV II-16
1610813210016
PRAKTIKUM TAMBANG BAWAH TANAH
LABORATORIUM TEKNOLOGI PERTAMBANGAN
PROGRAM STUDI TEKNIK PERTAMBANGAN
FAKULTAS TEKNIK
UNIVERSITAS LAMBUNG MANGKURAT
Kelompok IV II-17
1610813210016
PRAKTIKUM TAMBANG BAWAH TANAH
LABORATORIUM TEKNOLOGI PERTAMBANGAN
PROGRAM STUDI TEKNIK PERTAMBANGAN
FAKULTAS TEKNIK
UNIVERSITAS LAMBUNG MANGKURAT
Kelompok IV II-18
1610813210016
PRAKTIKUM TAMBANG BAWAH TANAH
LABORATORIUM TEKNOLOGI PERTAMBANGAN
PROGRAM STUDI TEKNIK PERTAMBANGAN
FAKULTAS TEKNIK
UNIVERSITAS LAMBUNG MANGKURAT
Tabel 2.6.
Excavation And Rock Support Recommendation Heading
Rock Support
Ground Excavation
Class (Drill & Blast)
Rock Bolt Shotcrete Steelsets
Very good
Full face:
rock No support
3m advance
81-100
Locally
bolts in
Full face: crown, 3 m 50 mm in
Good rock 1.0-1.5 m advance; long, crown
None
61-80 Complete support 20 m spaced 2.5 where
from face m with required
occasional
wire mesh
Systematic
Top heading and
bolts 4 m
bench:
long, 50 – 100
1.5 – 3 m advance in
spaced 1.5 mm in
Fair rock top heading;
– 2 m in crown, and None
41-60 Commence support
crown and 30 mm in
after each blast;
walls with sides
Commence support 10
wire mesh
m from face
in crown
Systematic
Top heading and
bolts 4 – 5
bench: 100 – 150
m long, Light ribs
1.0 - 1.5 m advance in mm in
Poor rock spaced 1 - spaced 1.5
top heading; Install crown and
21-40 1.5 m in m where
support concurrently 100 mm in
crown and required
with excavation, 10 m sides
walls with
from face
wire mesh
Systematic
Medium to
Multiple drifts: bolts 5 – 6 150 – 200
heavy ribs
0.5 - 1.5 m advance in m long, mm in
spaced 0.75
Very poor top heading; Install spaced 1 - crown, 150
m with steel
rock support concurrently 1.5 m in mm in
lagging and
< 21 with excavation; crown and sides, and
forepoling if
shotcrete as soon as walls with 50 mm on
required.
possible after blasting wire mesh. face
Close invert
Bolt invert
Kelompok IV II-19
1610813210016
PRAKTIKUM TAMBANG BAWAH TANAH
LABORATORIUM TEKNOLOGI PERTAMBANGAN
PROGRAM STUDI TEKNIK PERTAMBANGAN
FAKULTAS TEKNIK
UNIVERSITAS LAMBUNG MANGKURAT
RQD 92,1 % 20
Kelompok IV II-20
1610813210016
PRAKTIKUM TAMBANG BAWAH TANAH
LABORATORIUM TEKNOLOGI PERTAMBANGAN
PROGRAM STUDI TEKNIK PERTAMBANGAN
FAKULTAS TEKNIK
UNIVERSITAS LAMBUNG MANGKURAT
Kelompok IV II-21
1610813210016
PRAKTIKUM TAMBANG BAWAH TANAH
LABORATORIUM TEKNOLOGI PERTAMBANGAN
PROGRAM STUDI TEKNIK PERTAMBANGAN
FAKULTAS TEKNIK
UNIVERSITAS LAMBUNG MANGKURAT
Kelompok IV II-22
1610813210016
PRAKTIKUM TAMBANG BAWAH TANAH
LABORATORIUM TEKNOLOGI PERTAMBANGAN
PROGRAM STUDI TEKNIK PERTAMBANGAN
FAKULTAS TEKNIK
UNIVERSITAS LAMBUNG MANGKURAT
Tabel 2.8.
Excavation And Rock Support Recommendation Wall
Rock Support
Ground Excavation
Class (Drill & Blast)
Rock Bolt Shotcrete Steelsets
Very good
Full face:
rock No support
3m advance
81-100
Locally
bolts in
Full face: crown, 3 m 50 mm in
Good rock 1.0-1.5 m advance; long, crown
None
61-80 Complete support 20 m spaced 2.5 where
from face m with required
occasional
wire mesh
Systematic
Top heading and
bolts 4 m
bench:
long, 50 – 100
1.5 – 3 m advance in
spaced 1.5 mm in
Fair rock top heading;
– 2 m in crown, and None
41-60 Commence support
crown and 30 mm in
after each blast;
walls with sides
Commence support 10
wire mesh
m from face
in crown
Systematic
Top heading and
bolts 4 – 5
bench: 100 – 150
m long, Light ribs
1.0 - 1.5 m advance in mm in
Poor rock spaced 1 - spaced 1.5
top heading; Install crown and
21-40 1.5 m in m where
support concurrently 100 mm in
crown and required
with excavation, 10 m sides
walls with
from face
wire mesh
Systematic
Medium to
Multiple drifts: bolts 5 – 6 150 – 200
heavy ribs
0.5 - 1.5 m advance in m long, mm in
spaced 0.75
Very poor top heading; Install spaced 1 - crown, 150
m with steel
rock support concurrently 1.5 m in mm in
lagging and
< 21 with excavation; crown and sides, and
forepoling if
shotcrete as soon as walls with 50 mm on
required.
possible after blasting wire mesh. face
Close invert
Bolt invert
Kelompok IV II-23
1610813210016
PRAKTIKUM TAMBANG BAWAH TANAH
LABORATORIUM TEKNOLOGI PERTAMBANGAN
PROGRAM STUDI TEKNIK PERTAMBANGAN
FAKULTAS TEKNIK
UNIVERSITAS LAMBUNG MANGKURAT
2.6.2. Q-System
Q-System atau disebut juga sebagai tunneling quality index pertama kali
diusulkan oleh Barton, Lien dan Lunde pada tahun 1947 di Norwegian Geotechnical
Institude (NGI) sehingga disebut juga NGI classification system. Q-System sebgai
salah satu dari klasifikasi massa batuan dibuat berdasarkan studi kasus dilebih dari
200 kasus tunneling dan caverns.
a. Nilai Q-System heading
Dari hasil pengukuran kedudukan kekar dilapangan kemudian akan
dilakukan perhitungan untuk menentukan kelas massa batuan heading yang
terdapat pada batuan yang diuji.
Tabel 2.9.
Nilai Q System untuk Heading
HEADING
Parameter Q- System
Value Rating
3
RQD Good (8-13 joint per m ) 85
0,374
Q=
Kelompok IV II-24
1610813210016
PRAKTIKUM TAMBANG BAWAH TANAH
LABORATORIUM TEKNOLOGI PERTAMBANGAN
PROGRAM STUDI TEKNIK PERTAMBANGAN
FAKULTAS TEKNIK
UNIVERSITAS LAMBUNG MANGKURAT
Kelompok IV II-25
1610813210016
PRAKTIKUM TAMBANG BAWAH TANAH
LABORATORIUM TEKNOLOGI PERTAMBANGAN
PROGRAM STUDI TEKNIK PERTAMBANGAN
FAKULTAS TEKNIK
UNIVERSITAS LAMBUNG MANGKURAT
Gambar 2.16
Stand-UP TIME Heading (A Realistic Approach TO Estimate Stand-UP TIME,
Rammammurthy T, 2007)
Setelah melakukan plotting data maxUS dan nilai Q. Jadi, menurut grafik di
atas terowongan tersebut mampu bertahan selama kurang lebih dari 1 jam dengan
maksimal lubang bukaan (span) yang mampu bertahan tanpa adanya sistem
penyanggaan adalah sebesar 2,159 m.
Kelompok IV II-26
1610813210016
PRAKTIKUM TAMBANG BAWAH TANAH
LABORATORIUM TEKNOLOGI PERTAMBANGAN
PROGRAM STUDI TEKNIK PERTAMBANGAN
FAKULTAS TEKNIK
UNIVERSITAS LAMBUNG MANGKURAT
Dequipvalent heading =
= 2,159 / 1,6 = 1,35
Gambar 2.17
Rock Classes Heading (Engineering Rock Mass Clasification, ZT Bieniawski, 1989)
Dari hasil grafik tersebut didapat bahwa dengan Q untuk heading = 0,374
dan Dequivalent = 1,35 lokasi tersebut termasuk kedalam kelas batuan E (very
poor). Pada area bukan bolt spacing in shotcreted area 0-1 meter dan spasi pada
bolt spacing in shotcreted areas yaitu 1,3–1,5 meter.
Kelompok IV II-27
1610813210016
PRAKTIKUM TAMBANG BAWAH TANAH
LABORATORIUM TEKNOLOGI PERTAMBANGAN
PROGRAM STUDI TEKNIK PERTAMBANGAN
FAKULTAS TEKNIK
UNIVERSITAS LAMBUNG MANGKURAT
6,306
Q=
Kelompok IV II-28
1610813210016
PRAKTIKUM TAMBANG BAWAH TANAH
LABORATORIUM TEKNOLOGI PERTAMBANGAN
PROGRAM STUDI TEKNIK PERTAMBANGAN
FAKULTAS TEKNIK
UNIVERSITAS LAMBUNG MANGKURAT
Gambar 2.18
Stand-Up Time Wall (A Realistic Approach To Estimate Stand-Up Time,
Rammammurthy T, 2007)
Setelah melakukan plotting data maxUS dan nilai Q. Jadi, menurut grafik di
atas terowongan tersebut mampu bertahan kurang lebih dari 100 jam dengan
maksimal lubang bukaan (span) yang mampu bertahan tanpa adanya sistem
penyanggaan buatan adalah sebesar 6,68 m.
Kelompok IV II-29
1610813210016
PRAKTIKUM TAMBANG BAWAH TANAH
LABORATORIUM TEKNOLOGI PERTAMBANGAN
PROGRAM STUDI TEKNIK PERTAMBANGAN
FAKULTAS TEKNIK
UNIVERSITAS LAMBUNG MANGKURAT
Dequipvalent wall =
= 6,68 / 1,6 = 4,18
Gambar 2.19
Rock Classes Wall (Engineering Rock Mass Clasification, Zt Bieniawski, 1989)
Dari hasil grafik tersebut didapat bahwa dengan Q untuk wall = 6,306 dan
Dequivalent = 4,18 lokasi tersebut termasuk kedalam kelas batuan C (Fair)
systematic bolting.
Kelompok IV II-30
1610813210016
PRAKTIKUM TAMBANG BAWAH TANAH
LABORATORIUM TEKNOLOGI PERTAMBANGAN
PROGRAM STUDI TEKNIK PERTAMBANGAN
FAKULTAS TEKNIK
UNIVERSITAS LAMBUNG MANGKURAT
2.7. Pembahasan
Pembahasan BEDA-BEDA
Kelompok IV II-31
1610813210016