Anda di halaman 1dari 2

1.

TM3101 Teknik Pemboran I


Kode MK: TM3101

Bobot SKS: 3

Semester: V

KK / Unit Penanggung Jawab: TPPMM

Sifat: Wajib Prodi

Teknik Pemboran I

Nama Matakuliah

Drilling Engineering I
System of Units; Persiapan Tempat & Lokasi Pemboran; Peralatan Pemboran; Rotary Drilling Bit; Rig Sizing and Selection; Drilling Cost;
Asal Mula Tekanan Formasi dan Gradien Rekah; Tekanan Abnormal; Sifat Fisik Fluida Pemboran; Masalah yang Timbul Akibat Swelling;
Kehilangan Tekanan; Cutting Transport; Analisa Surge, Swab dan Slip; Pemilihan Komposisi Drillpipe pada Lubang Vertikal; Drillstring
Inspection Method.
System of Units; Preparation of Drilling Location; Drilling Equipment; Rotary Drilling Bit; Rig Sizing and Selection; Drilling Cost;
Formation Pressure and Fracture Gradient; Source of Abnormal Pressure; Physical Properties of Drilling Fluids; Swelling Problem;
Pressure Losses; Cutting Transport; Surge, Swab and Slip Analysis; Vertical Well Drillstring Design; Drillstring Inspection Method

Silabus Ringkas

Pengenalan terhadap satuan-satuan dalam operasi pemboran; persiapan tempat pemboran dan cara mengirim peralatan pemboran ke
lokasi tersebut; alat-alat yang digunakan dalam proses pengeboran; pengertian rotary drilling bit; cara memilih rig dan menghitung
kapasitas yang dibutuhkan; menghitung perkiraan biaya pemboran; teknik deteksi tekanan formasi dan tekanan rekah, baik sebelum,
selama, dan sesudah melakukan pemboran; asal mula tekanan abnormal; fungsi lumpur pemboran dan cara mendesain lumpur pemboran
tersebut; masalah swelling dalam lubang pemboran; kehilangan tekanan pada lubang pemboran; cara memindahkan cutting ke
permukaan; analisa kecepatan minimum untuk memindahkan cutting ke permukaan; desain konfigurasi drillstring, cara memeriksa
klasifikasi
pipa.
Introduction
to units in drilling operation; preparation in drilling location and prepare a way to deliver drilling equipment; drilling

Silabus Lengkap

equipment in drilling operation process; introduction to rotary drilling bit; rig selection and calculation of required rig capacity; predicting
the cost for drilling operation; detection of formation pressure and fracture gradient before, during, and after drilling operation; source of
abnormal pressure; drilling fluids function and design; swelling problems in wellbore; pressure losses in wellbore area; cutting transport;
analysis minimum velocity required to delivered cutting to surface; design of drillstring configuration; inspecting the tubular classification.
Mahasiswa mempunyai pengetahuan yang menyeluruh dari seluruh aspek dasar operasi pemboran, dan mampu menangani beberapa
masalah ketika pengangkatan cutting ke permukaan, dan mampu mendesain konfigurasi drillstring untuk sumur vertikal.

Luaran (Outcomes)

Matakuliah Terkait

TK3082 Pengantar Peristiwa Perpindahan

Prasyarat

MS2111 Mekanika Kekuatan Material

Prasyarat

GL3xxx Geologi Dasar

Prasyarat

KU1183 Pengantar Teknologi Sumberdaya Bumi

Prasyarat

Kegiatan Penunjang
1. Bourgoyne, "Applied Drilling Engineering", Society of Petroleum Engineers, 1986.
2. Neal J. Adams, "Drilling Engineering", PennWell Publishing Company, 1985.

Pustaka

3. Heriot-Watt University, "Drilling Engineering".


4. Hussain Rabia, Well Engineering & Construction.
A 80
75 AB < 80
70 B < 75
65 BC < 70
60 C < 65
50 D < 60
E < 50

Panduan Penilaian

Catatan Tambahan

Mg#
1

Topik
Pendahuluan

Waktu kuliah: Senin (09.00 11.00) dan Jumat (07.00 08.00)

Pada hari Jumat, diadakan diskusi dan presentasi tugas

Sub Topik
Pendahuluan

Kelas (67%)

Praktikum (33%)

Rincian: UAS (25%)


UTS (25%)
PR (25%)
Quiz (25%)

Rincian: Laporan (100%)

Capaian Belajar Mahasiswa


Sumber Materi
Memahami operasi pemboran secara
Bourgoyne, Applied Drilling Engineering,
menyeluruh, sejak dari persiapan,
Chapter 1
pelaksanaan, dan teknologi baru dan Neal Adams, Drilling Engineering, Chapter 1
masa yang akan datang
Heriot-Watt University, Drilling Engineering,
Chapter 1

Memahami sistem satuan, serta persiapan Bourgoyne, Applied Drilling Engineering,


tempat, dan lokasi pemboran
Chapter 1
Neal Adams, Drilling Engineering, Chapter 1
Heriot-Watt University, Drilling Engineering,
Chapter 1
Memahami peralatan Pemboran dan jenis Bourgoyne, Applied Drilling Engineering,

Peralatan Pemboran
Bit
Chapter 1
Rotary Drilling Bits
Rabia, Well Engineering and Construction,
Chapter 14
Neal Adams, Drilling Engineering, Chapter 16
Heriot-Watt University, Drilling Engineering,
Chapter 1 dan 2
Rig Sizing & Selection
Mengerti cara memilih Rig dan
Bourgoyne, Applied Drilling Engineering,
menghitung kemampuan yang
Chapter 1
dibutuhkan
Neal Adams, Drilling Engineering, Chapter 16
Heriot-Watt University, Drilling Engineering,
Chapter 2
Rabia, Well Engineering and Construction,
Chapter 14
Drilling Cost
Mampu menghitung Perkiraan
Bourgoyne, Applied Drilling Engineering,
pembiyaan pemboran
Chapter 1
Neal Adams, Drilling Engineering, Chapter 19
Heriot-Watt University, Drilling Engineering,

Tanggal
Senin
24 Agustus 2015
Jumat
28 Agustus 2015

Pelaksanaan Operasi

System of Units
Pemboran
Persiapan tempat dan
Lokasi Pemboran

Senin
31 Agustus 2015

Peralatan utama
Pemboran

Senin
7 September 2015

Rig Sizing &


Selection

Drilling Cost

Jumat
4 September 2015

Jumat
11 September 2015

Senin
14 September 2015
Jumat
18 September 2015

Senin
21 September 2015
Jumat
25 September 2015

Mg#

Topik

Sub Topik

Capaian Belajar Mahasiswa

Tekanan Formasi Tekanan Formasi dan


dan Gradien Rekah
Gradien Rekah

Memahami teknik deteksi tekanan


formasi, dan tekanan rekah, baik
sebelum, selama, dan sesudah
melakukan pemboran

Tekanan Abnormal Asal Mula Tekanan


Abnormal

Memahami asal mulanya tekanan


abnormal

Lumpur Pemboran Sifat fisik lumpur


pemboran

Memahami sifat fisik lumpur (densitas,


viskositas, gel strength, dan filtration
loss)

9
10

11

12

Ujian Tengah Semester


Masalah Pemboran Masalah yang Timbul
akibat Swelling

Pressure Losses

Kehilangan Tekanan

Analisa Surge, Swab Cutting Transport


& Slip
Analisa Surge, Swab &
Slip

13

Vertical Well
Pemilihan Komposisi
Drillstring Design
Drillpipe pada
Lubang Vertikal.

14

Drillstring
Inspection

15

16

Sumber Materi
Chapter 1
Rabia, Well Engineering and Construction,
Chapter 15
Bourgoyne, Applied Drilling Engineering,
Chapter 3 dan 4
Rabia, Well Engineering and Construction,
Chapter 1 dan 2
Neal Adams, Drilling Engineering, Chapter 3
dan 4
Heriot-Watt University, Drilling Engineering,
Chapter 5
Rabia, Well Engineering and Construction,
Chapter 14
Neal Adams, Drilling Engineering, Chapter 3
Heriot-Watt University, Drilling Engineering,
Chapter 5
Rabia, Well Engineering and Construction,
Chapter 1
Bourgoyne, Applied Drilling Engineering,
Chapter 1
Rabia, Well Engineering and Construction,
Chapter 7
Neal Adams, Drilling Engineering, Chapter 8
Heriot-Watt University, Drilling Engineering,
Chapter 9

Presentasi

Drillstring Inspection
Methods

Presentasi dan Diskusi

Memahami akibat swelling dan


penanggulangannya

Rabia, Well Engineering and Construction,


Chapter 12

Mengerti cara menghitung kehilangan


tekanan pada pipa dan annulus

Bourgoyne, Applied Drilling Engineering,


Chapter 4
Rabia, Well Engineering and Construction,
Chapter 8
Neal Adams, Drilling Engineering,Chapter 18
Heriot-Watt University, Drilling Engineering,
Chapter 10
Mampu menghitung kecepatan miminum Neal Adams, Drilling Engineering, Chapter 18
naiknya cutting
Rabia, Well Engineering & Construction,
Mampu menganalisa efek tarik dan tekan
Chapter 8
pada penarikan pipa
Bourgoyne, Applied Drilling Engineering,
Chapter 4
Memahami perhitungan mendesain
Heriot-Watt, Drilling Engineering, Chapter 3
rangkaian drill string unsuk sumur Neal Adams, Drilling Engineering, Chapter 15
Vertikal
Rabia, Well Engineering & Construction,
Chapter 10
Memahami cara-cara memeriksa
klasifikasi pipa

Presentasi dan Diskusi kelompok Proyek


Pemboran

Ujian Akhir Semester

Heriot-Watt, Drilling Engineering, Chapter 3

Tanggal

Senin
28 September 2015
Jumat
2 Oktober 2015

Senin
5 Oktober 2015
Jumat
9 Oktober 2015

Senin
12 Oktober 2015
Jumat
16 Oktober 2015

Senin
19 Oktober 2015
Senin
26 Oktober 2015
Jumat
30 Oktober 2015
Senin
2 November 2015
Jumat
6 November 2015

Senin
9 November 2015
Jumat
13 November 2015
Senin
16 November 2015
Jumat
20 November 2015
Senin
23 November 2015
Jumat
27 November 2015
Senin
30 November 2015
Jumat
4 Desember 2015
Senin
7 Desember 2015

Anda mungkin juga menyukai