PENYEDIAAN AIR MINUM DAN SANITASI BERBASIS MASYARAKAT ( PAMSIMAS III TA 2019)
SUMBER DANA
NO. URAIAN KEGIATAN VOL. SAT.
APBN ( Rp. ) APBDes ( Rp. ) IN CASH ( Rp. )
C KEGIATAN PEMBERDAYAAN
I Operasional KKM 1.00 Paket - - 10,016,500
II Pelatihan Administrasi dan Keuangan (KKM, Satlak) 1.00 Paket - - 928,500
III Pelatihan Teknik (KKM, Satlak) 1.00 Paket - - 763,500
IV Pelatihan Kesehatan (KKM, Satlak) 1.00 Paket - - 928,500
V Pelatihan Operasional dan Pemeliharaan Sarana (KPSPAMS) 1.00 Paket - - 856,500
VI Promosi Kesehatan / PHBS 1.00 Paket 1,459,250 - 506,500
JUMLAH ( C ) 1,459,250 - 14,000,000
A
IN KIND TOTAL ( Rp. )
termin 1 termin 2
( Rp. )
apbn apbdes incash inkind apbn apbdes
56,000,000 326,252,000 122,018,000 35,573,000 6,345,000 97,958,000
56,000,000 326,252,000 122,018,000
- - 15,701,000 11,888,000
- 8,289,000 11,059,000
- 8,289,000
-
R MASYARAKAT
MOH. SYAHID
CD
SUM SUMNO DEWI
termin 2 termin 3
- (11,888,000) - -
- - - 8,289,000
- 856,500 - 856,500
2,416,000 - 506,500 (4,100,000) 1,965,750
4,027,500 39,000,000 (99,205,000) 1,183,500 44,202,000 303,726,750
SYAIFUL ARIF AGUSTIEN BRAHMANTINA
Koordinator
WAKTU RENCANA KERJA /TIME SCHEDULE
PROGRAM PENYEDIAAN AIR MINUM DAN SANITASI BERBASIS MASYARAKAT ( PAMSI
Desa : KALIPUCANG
Kecamatan : TUTUR
Kabupaten : PASURUAN
Propinsi : JAWA TIMUR
I. Pekerjaan Reservoir 1.00 unit #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
II. Pekerjaan Jaringan Perpipaan 1.00 unit #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
III. Pekerjaan Bak Pengumpul 1.00 unit #REF! #REF! #REF! #REF! #REF! #REF!
II Pek. Tempat Cuci Tangan SD III - 3 Unit 1.00 paket #REF! #REF!
C. OPERASIONAL KKM
I. Administrasi dan Operasional KKM 1.00 paket #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
II. Pemicuan Kesehatan dan PHBS Di Masyarakat 1.00 paket #REF! #REF! #REF! #REF! #REF! #REF!
ICHWAN ADI, S.ST REDISTON SIMATUPANG AKHMAD MUNIRRUZAMAN SUM SUMNO DEWI SYAIFUL ARIF
NIP. 19660712 198703 1 010
A KERJA /TIME SCHEDULE
ITASI BERBASIS MASYARAKAT ( PAMSIMAS III TA 2017 )
SEPTEMBER OKTOBER
SKALA ( % )
1 2 3 4 1 2 3 4
100
#REF! #REF! #REF! #REF!
#REF! #REF!
40
0
#REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
Pagar
Bambu 4m 12.00 btg 13,700 164,400
Batu pecah mesin 1/2 3.00 m3 235,700 707,100
Besi beton 10 mm 9.00 Ljr 70,500 634,500
Besi beton 6 mm 7.00 Ljr 24,500 171,500
Kawat Beton ( bendrat ) 2.00 kg 15,000 30,000
Kayu 5/7 Lokal 1.00 m3 1,500,000 1,500,000
Kayu Papan bekesting lokal 68.00 Lbr 8,500 578,000
Minyak pelumas begisting 2.00 ltr 5,000 10,000
Paku 4.00 kg 15,000 60,000
Pasir Cor 2.00 m3 358,400 716,800
Pasir Pasang 5.46 m3 141,700 773,682
Portland Cement (PC) 40 Kg 37.00 zak 57,000 2,109,000
Pagar BRC Uk.2400 x 1500 galvanize 10.00 lbr 477,000 4,770,000
Tiang penghubung Uk. Ø 1.5" x 1500 10.00 btg 178,000 1,780,000
jamban
Bambu 4m 10.75 btg 13,700 147,302
Bak Mandi Fiberglas 55 x 55 x 60 cm (s 1.00 bh 520,000 520,000
Bata Merah 1,257.20 bj 625 785,750
Batu Belah 3.23 m3 170,000 549,780
Batu pecah mesin 1/2 0.28 m3 235,700 65,714
Besi beton 10 mm 6.76 Ljr 70,500 476,904
Besi beton 6 mm 5.20 Ljr 24,500 127,305
Besi strip 0.68 kg 15,000 10,125
Buis Beton diameter 1 m+tutup 6.00 Bh 150,000 900,000
Cat Dinding Interior grade A 9.34 kg 46,250 431,938
Daun pintu PVC & kusen KM/WC (70 x 1.00 unit 275,000 275,000
Eternit 1 x 1 8.50 bh 17,000 144,500
Genteng Kodok 250.00 bh 2,500 625,000
Bubungan lokal 8.75 bj 5,500 48,125
Kayu Papan bekesting lokal 9.35 Lbr 8,500 79,433
Kawat Beton ( bendrat ) 0.86 kg 15,000 12,884
Kayu 4/6 Meranti 0.10 m3 4,100,000 418,200
Kayu 5/7 Lokal 0.15 m3 1,500,000 225,792
Kayu 6/10 Meranti 0.05 m3 4,100,000 202,950
Keramik Lantai 20 x 20 3.00 m2 60,000 180,000
Keramik 30x30 (Polos) 2.00 m2 50,000 100,000
Keramik Dinding ( 20x25 Cm ) 10.38 m2 55,000 570,900
Kloset Jongkok Porselen 1.00 unit 135,000 135,000
Minyak pelumas begisting 1.29 ltr 5,000 6,426
Paku 4.93 kg 15,000 73,881
Pasir Cor 0.20 m3 358,400 71,166
Pasir Pasang 4.02 m3 141,700 569,392
Plamir Dinding 3.59 kg 25,000 89,800
Portland Cement (PC) 40 Kg 20.31 zak 57,000 1,157,854
SCT
Bambu 4m 8.64 btg 13,700 118,368
Bata Merah 302.40 bj 625 189,000
Batu pecah mesin 1/2 0.16 m3 235,700 38,806
Besi beton 10 mm 5.13 Ljr 70,500 361,609
Besi beton 6 mm 4.27 Ljr 24,500 104,630
Kawat Beton ( bendrat ) 0.66 kg 15,000 9,947
Kayu 5/7 Lokal 0.19 m3 1,500,000 278,640
Keni PVC 1/2 " 12.00 Bh 3,200 38,400
Keni PVC 3/4 " 12.00 Bh 3,300 39,600
Keramik Dinding ( 20x25 Cm ) 14.40 m2 55,000 792,000
Kran wastafel 6.00 bh 49,500 297,000
Paku 2.16 kg 15,000 32,400
Pasir Cor 0.12 m3 358,400 42,025
Pasir Pasang 0.60 m3 141,700 85,530
Pipa PVC SNI S.10 Ø 3/4" 24.00 Ljr 33,400 801,600
Pipa PVC SNI S.10 Ø 1/2" 24.00 Ljr 20,380 489,120
Portland Cement (PC) 40 Kg 7.05 zak 57,000 402,069
Wastafel + Acesoris 6.00 bh 500,000 3,000,000
236,373,057
Pipa PVC MOF SNI S.12,5 Ø 1" 57.00 Ljr 37,600 2,143,200
Pipa PVC MOF SNI S.12,5 Ø 1,5" 154.00 Ljr 75,900 11,688,600
Pipa PVC MOF SNI S.12,5 Ø 2" 95.00 Ljr 111,180 10,562,100
Pipa PVC MOF SNI S.12,5 Ø 3" 190.00 Ljr 230,520 43,798,800
Reducer PVC dia 50 x 40 1.00 bh 7,500 7,500
Reducer PVC dia 63 x 50 1.00 bh 15,400 15,400
Reducer PVC dia 75 x 63 1.00 bh 56,900 56,900
Reducer PVC dia 90 x 75 1.00 bh 80,000 80,000
Tee PVC dia. 40 x 32 5.00 bh 6,700 33,500
Tee PVC dia. 50 x 40 1.00 bh 15,400 15,400
Tee PVC dia. 63 x 40 1.00 bh 38,700 38,700
Tee PVC dia. 90 x 40 3.00 bh 78,500 235,500
Dop PVC dia. 32 5.00 bh 4,600 23,000
Dop PVC dia. 50 1.00 bh 9,000 9,000
Flange Spigot PVC 3" 3.00 Bh 300,000 900,000
Flange Spigot PVC 2" 1.00 Bh 200,000 200,000
76,357,212
1,710,000
13,538,920
69,807,600
1,290,720
60,000,000
236,373,057
BAB V. RENCANA PENGADAAN BARANG DAN JASA TINGKAT MA
Rencanakan pengadaan Barang dan Jasa terkait dengan pelaksanaan kegiatan dalam RKM, dimana prosesnya harus
Barang dan Jasa Pamsimas di Tingkat Masyarakat, Edisi 2016 (dalam Bentuk Tabel)
Paket
No. Uraian : Material/Barang/Jasa Volume Satuan Harga Satuan (Rp)
Pengadaan
(1) (2) (3) (4) (5) (6)
Bambu 4m 390.39 btg Rp 13,700
Batu Belah 3.23 m3 Rp 170,000
Paket 1 Batu pecah mesin 1/2 15.49 m3 Rp 235,700
Bahan Alam
1 Pasir Cor 10.32 m3 Rp 358,400
Pasir Pasang 12.08 m3 Rp 141,700
Sub Total Paket 1 Bahan Alam
Paket
No. Uraian : Material/Barang/Jasa Volume Satuan Harga Satuan (Rp)
Pengadaan
(1) (2) (3) (4) (5) (6)
Lem Pipa 20.00 kg Rp 90,000
Manhole 60 x 60 cm lengkap 1.00 Bh Rp 360,000
dengan gembok
Minyak pelumas begistng 28.29 ltr Rp 5,000
Pagar BRC Uk.2400 x 1500 galvanize 10.00 lbr Rp 477,000
Paku 61.09 kg Rp 15,000
Plamir Dinding 8.75 kg Rp 25,000
Plywood 9 mm (122x244) 44.00 lbr Rp 230,000
Portland Cement (PC) 40 Kg 214.37 zak Rp 57,000
Tiang penghubung Uk. Ø 1.5" x 150 10.00 btg Rp 178,000
Wastafel + Acesoris 6.00 bh Rp 500,000
Waterproofing 5.00 Ltr Rp 50,000
Sub Total Paket 2 Bahan Toko
Paket
No. Uraian : Material/Barang/Jasa Volume Satuan Harga Satuan (Rp)
Pengadaan
(1) (2) (3) (4) (5) (6)
Paket 6 Lain Pengadaan Pompa dan Solar Cell 1.00 unit Rp 60,000,000
6 Lain
-
Paket
No. Uraian : Material/Barang/Jasa Volume Satuan Harga Satuan (Rp)
Pengadaan
(1) (2) (3) (4) (5) (6)
-
-
G DAN JASA TINGKAT MASYARAKAT
Waktu
Metoda
Jumlah Biaya (RP) Pelaksanaan
Pengadaan Pengadaan
(7) (8) (9)
Rp 5,348,370
Rp 549,780
Survey
Rp 3,651,980 Perbandingan
Harga
Rp 3,697,191
Rp 1,712,005
Rp 14,959,326 Rp 14,959,326
Rp 520,000
Rp 1,048,500
Rp 5,703,013
Rp 9,050,000
Rp 5,250,000
Rp 3,120,000
Rp 403,435
Rp 10,125
Rp 48,125
Rp 900,000
Rp 431,938
Rp 1,596,000
Rp 275,000
Rp 144,500
Rp 625,000
Rp 517,832
Rp 418,200
Rp 7,784,832 Survey
Perbandingan
Rp 202,950 Harga
Rp 657,433
Rp 180,000
Rp 100,000
Rp 1,362,900
Rp 135,000
Rp 297,000
Harga
Waktu
Metoda
Jumlah Biaya (RP) Pelaksanaan
Pengadaan Pengadaan
(7) (8) (9)
Rp 1,800,000
Rp 360,000
Rp 141,426
Rp 4,770,000
Rp 916,281
Rp 218,800
Rp 10,120,000
Rp 12,218,922
Rp 1,780,000
Rp 3,000,000
Rp 250,000
Rp 76,357,212 Rp 76,357,212
Waktu
Metoda
Jumlah Biaya (RP) Pelaksanaan
Pengadaan Pengadaan
(7) (8) (9)
Rp 550,000
Rp 900,000
Rp 2,000,000
Rp 188,400
Rp 541,200 4,179,600
Survey
Rp 456,000 Perbandingan 69,807,600
Harga
Rp 1,344,600 73,987,200
Rp 140,000
Rp 800,000
Rp 38,400
Rp 39,600
Rp 1,500,000
Rp 3,750,000
Rp 801,600
Rp 489,120
Rp 13,538,920 Rp 13,538,920
Rp 2,143,200 36,000
Rp 11,688,600 75,000
Rp 10,562,100 111,000
Rp 43,798,800 230,000
Rp 7,500 7,500
Rp 15,400 15,400
Rp 56,900 56,000
Rp 80,000 Survey 80,000
Perbandingan
Rp 33,500 Harga 6,500
Rp 15,400 15,000
Rp 38,700 38,000
Rp 235,500 77,000
Rp 23,000 4,000
Rp 9,000 8,000
Rp 900,000 275,000
Rp 200,000 200,000
Rp 69,807,600 Rp 69,807,600
Rp 140,000
Rp 150,000
Waktu
Metoda
Jumlah Biaya (RP) Pelaksanaan
Pengadaan Pengadaan
(7) (8) (9)
Rp 550,000
Rp 150,000
Rp 25,000
Survey
Rp 30,000 Perbandingan
Harga
Rp 20,000
Rp 15,000
Rp 110,000
Rp 360,000
Rp 160,000
Rp 1,710,000 Rp 1,710,000
Survey
Rp 60,000,000 Perbandingan
Harga
Rp 60,000,000 Rp 60,000,000
236,373,057
Waktu
Metoda
Jumlah Biaya (RP) Pelaksanaan
Pengadaan Pengadaan
(7) (8) (9)
-
-
2,052,000
11,550,000
10,545,000
43,700,000
7,500
15,400
56,000
80,000
32,500
15,000
38,000
231,000
20,000 Rp 27,600.00
8,000
825,000
200,000
69,375,400
432,200